Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kusile Power Station Project - Balmoral - WITBANK - 1034
Organization Type
GOVERNMENT
Published
13 Jul 2026
OCDS Reference
ocds-9t57fa-162232
ESKOM seeks a competent contractor to perform electrical, c&i, and mechanical repairs on the balance of plant (bop) and bulk material handling (bmh) systems at kusile power station during the commissioning phase, prior to handover to the generation division. This tender is for experienced service providers with a proven track record in similar power station maintenance projects. The partnership aims to ensure all systems meet specified standards and quality requirements before operational handover.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 31 July 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Kusile Power Station Project - Balmoral - WITBANK - 1034
AI Document Analysis Stages
Description
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdf13 Jul
2026
Tender Published
Tender was published
31 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdf
Analysis completed but response format was invalid
NEC - BOP E3221GCDMPKUS.pdf
The tender is for the **Repair of Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during commissioning at Kusile Power Station**, issued by **Eskom Holdings SOC Ltd**. The contract is structured under the **NEC3 Term Service Contract (TSC3)** with a duration of **8 months**. The scope includes electrical, control & instrumentation (C&I), and mechanical repairs for BOP and BMH systems prior to handover to Eskom’s Generation Division. The contract is governed by South African law, with payments in **ZAR (South African Rand)** and a **15% VAT** applicable. The tender closes on **July 31, 2026**.
INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf
Eskom Holdings SOC Ltd invites tenders for the **Repair of BOP (Balance of Plant) and BMH (Boiler Mill Hydraulics) system during commissioning at Kusile Power Station Project**. The tender (E3221GCDMPKUS) is an open invitation, with submissions due electronically by **31 July 2026 at 10:00 UTC**. The contract involves technical repairs during the commissioning phase, with a validity period of 120 days post-closing. Evaluation is based on **functionality (70% threshold: Technical 75%, SHE 25%)**, **price (80 points)**, and **B-BBEE compliance (20 points)** under the 80/20 PPPFA system. Mandatory documents include authorization forms, SBD forms, tax clearance, and financial statements.
Works information BOP - E3221GCDMPKUS.pdf
This tender, issued by Eskom, invites bids for the repair of Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during the commissioning phase at Kusile Power Station. The scope includes electrical, control & instrumentation (C&I), and mechanical repairs, as well as procurement of spares, fault-finding, and ensuring compliance with Eskom's quality, safety, and documentation standards. The contract duration is 6 months (June 1, 2026 – November 30, 2026), with a closing date of July 31, 2026.
Repair of BOP - BOQ.xlsx
Eskom tender for repair of Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during commissioning at Kusile Power Station. The tender includes site establishment, management support, electrical/C&I/mechanical maintenance teams, and a significant provisional sum for spares. Total tender value is ZAR 5,000,000 excluding VAT.
SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf
This tender is for the repair of Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during commissioning at Kusile Power Station Project. The project duration is 8 months and falls under Eskom's Supplier Development, Localisation, and Industrialisation (SDL&I) strategy. The tender uses an 80/20 preference point scoring system with B-BBEE requirements, skills development goals, and local procurement obligations.
To download these documents and access AI-powered analysis, visit the main tender page.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 203 136
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Kusile Power Station Commissioning Department (Group Capital Division) seeks a competent contractor to perform repairs (electrical, C&I, and mechanical) on the Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during commissioning, prior to handover to the Generation Division (Gx). The scope includes detailed work for specific areas of the power plant, adhering to defined standards, quality requirements, specifications, and terms and conditions. The document applies to both common plant and unitised sections of BOP and BMH systems.
Submission Guidelines
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdf (unknown)Submit the following returnable documents as part of your bid: Organogram and CVs of the project team, including the proposed full-time lead for all service resources. The organogram must be accompanied by a letter confirming the availability of the project team for the duration of the project. Team members may only be replaced with individuals of equal or higher competence, after client approval.
Evaluation Criteria
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdf (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdf (unknown)Scope: Perform all repairs (electrical, C&I, and mechanical) on the Balance of Plant (BOP) and Bulk Material Handling (BMH) systems at Kusile Power Station during the commissioning phase, prior to handover to the Generation Division (Gx). Applicability: Applies to both common plant and unitised sections of BOP and BMH systems. Standards and quality requirements are detailed in the Works Information document (559-77412017). Normative references: Tender Technical Evaluation Procedure (240-48929482) and Works Information (559-77412017).
Methodology
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdfSubmit a method statement detailing how the proposed scope of work will be executed, including constraints and risks. Scoring: 5 (Far exceeds minimum requirements), 4 (Above minimum requirements), 3 (Fully meets requirements), 2 (Barely adequate), 1 (Non-compliant).
Experience & Qualifications
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdfSubmit CVs for all project team members in the organogram. Key requirements: Relevant experience of 8+ years scores highest (5), 5-7 years (4), 3-4 years (2), <1-3 years (1). At least one mechanical personnel must be laser alignment accredited with proof of certificate. Team replacements require client approval and must match or exceed the competence of the original member.
Compliance Requirements
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdf (unknown)At least one mechanical personnel must be laser alignment accredited, with proof of certificate submitted. Tenderers must provide a track record of five or more completed projects similar to the scope of work, including project descriptions, company names, values, dates, and client contact details.
Health & Safety
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdfSafety, Health, and Environment (SHE) is a mandatory evaluation component with a 25% weighting in the functionality score. Tenders must achieve ≥70% in SHE to qualify for further evaluation. Evaluators with SHE expertise will assess compliance against SHE criteria as part of the technical evaluation process.
Section
Source: Technical Evaluation Strategy BOP - E3221GCDMPKUS.pdfEvaluation follows a weighted score-card approach. Tenders must score ≥70% for functionality (Technical + SHE) to proceed. Technical evaluation is weighted at 75%, SHE at 25%. Mandatory criteria are pass/fail; failure disqualifies the tender. Qualitative criteria: Organogram and CVs (10%), Method Statement (40%), Personnel Qualifications (20%), Company Background (30%). Minimum qualitative score: 75%. Scoring: 5 (100% - Exceeds), 4 (80% - Meets), 3 (60% - Marginal), 2 (40% - Substantial gaps), 1 (20% - No achievement), 0 (0% - Non-responsive).
Description
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdfScope: Repair of BOP and BMH systems during commissioning at Kusile Power Station. Duration: 8 months.
Contact Information
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)Buyer: Martha Masemula
Department: Eskom Kusile Power Station – Group Capital Division
Compiled by: Davis Mposi, Senior Advisor: SDL&I, Group Capital Division (GCD).
Returnable Documents
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)Required for Preference Points:
Evaluation Criteria
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)Open to contractors capable of BOP and BMH system repairs. Must comply with B-BBEE requirements for preference points (non-compliant can still bid but score 0/20 for specific goals). No minimum subcontracting requirement specified. No CIDB compulsory training required. No designated sector requirements apply. Must be able to recruit locally from Nkangala District and Bronkhorstspruit areas.
Technical Specifications
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)Scope: Repair of BOP (Balance of Plant) and BMH (Boiler Make-up and Handling) systems during commissioning at Kusile Power Station.
Duration: 8 months.
Skills Development (if applicable as a contract condition):
Financial Requirements
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)SDL&I Performance Guarantee:
Compliance Requirements
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)B-BBEE Compliance:
Designated Sectors:
Job Creation & Local Hiring:
Subcontracting:
Ongoing Compliance:
B-BBEE Requirements
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdf (TENDER)Subcontracting & Local Procurement:
Contractual Terms
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdfReporting & Monitoring:
Section
Source: SD AND L STRATEGY BOP - E3221GCDMPKUS.pdfTenderers failing to submit B-BBEE documentation for preference points:
Description
Source: NEC - BOP E3221GCDMPKUS.pdfThe project involves repairing the Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during the commissioning phase at Kusile Power Station. The scope includes electrical, Control & Instrumentation (C&I), and mechanical repairs to ensure systems are operational before handover to the Generation Division (Gx). The document defines the detailed Scope of Work, applicable standards, quality requirements, and terms and conditions. Contractors must align their organisation fully with the specified scope activities and processes. The document is applicable to both common and unitised sections of BOP and BMH plants during commissioning.
Contact Information
Source: NEC - BOP E3221GCDMPKUS.pdf (unknown)For enquiries, contact Engineering Contract Strategies: Phone: 011 803 3008, Fax: 086 539 1902, Website: www.ecs.co.za. Service Manager: Sebongile Foku, Address: Kusile Power Station Project, R545 Balmoral/Kendal Road, Haartebeesfontein Farm, Witbank.
Submission Guidelines
Source: NEC - BOP E3221GCDMPKUS.pdf (unknown)Submit the following returnable documents as part of your tender: Form of Offer and Acceptance, Contract Data (Parts C1.2a and C1.2b), Pricing Data (Part C2), Scope of Work (Part C3), and Schedule of Deviations (if applicable). Ensure all documents are fully completed, signed, and returned to the Employer before the end of the validity period stated in the Tender Data. Failure to submit required securities, bonds, guarantees, proof of insurance, or other documentation within two weeks of contract award constitutes a repudiation of the agreement.
Evaluation Criteria
Source: NEC - BOP E3221GCDMPKUS.pdf (unknown)Mandatory
Preferred
Technical Specifications
Source: NEC - BOP E3221GCDMPKUS.pdf (unknown)Scope: Repair of Balance of Plant (BOP) and Bulk Material Handling (BMH) systems during commissioning at Kusile Power Station prior to handover to Generation Division (Gx). Work includes electrical, Control & Instrumentation (C&I), and mechanical repairs. Applicability: Applies to both common and unitised sections of BOP and BMH plants during the commissioning phase. Standards: Must comply with referenced normative documents, including SANS, ISO, BS, DIN, and Eskom-specific standards (e.g., SANS 10108, SANS 10142-1, ISO 9001:2015, 240-87435066 for Power Transformers). Quality Requirements: Adhere to Quality Management Systems (ISO 9001:2015), Quality Control Plans (QCP), and Eskom’s Supplier Quality Management Specification (QM 58). Safety: Comply with Occupational Health and Safety Act, Construction Regulations 2014, and Eskom’s SHE requirements (32-726).
Experience & Qualifications
Source: NEC - BOP E3221GCDMPKUS.pdfKey Personnel: Contractor must provide details of key personnel, including names, job titles, responsibilities, qualifications, and experience. CVs and supporting documentation must be submitted as part of the tender. Competency: Personnel must be trained and competent in plant optimisation, commissioning, and Bill of Material (BOM) compilation. Eskom Approval: Personnel performing quality-related special processes must be approved by Eskom (ESKASAAA3). Joint Ventures: If the Contractor is a joint venture, the key person with authority to bind the Contractor must be notified to the Service Manager within two weeks of the Contract Date.
Quality Management
Source: NEC - BOP E3221GCDMPKUS.pdfQuality Standards: Contractor must comply with ISO 9001:2015 (Quality Management Systems), ISO 10006:2003 (Quality Management in Projects), and ISO 10005 (Quality Plan Guidelines). Eskom-Specific Requirements: Adhere to Eskom’s Supplier Quality Management Specification (QM 58), Kusile Project RFI/PA001 Process, Defects Management Process, NC Process, and Audit Process Flow. Documentation: Maintain Quality Control Plans (QCP), records, and forecasts of expenses. Continuous Improvement: Implement processes for continuous improvement as outlined in the Scope of Work. Approvals: Personnel performing quality-related special processes must be approved by Eskom (ESKASAAA3).
Pricing Schedule
Source: NEC - BOP E3221GCDMPKUS.pdfPricing Format: Contractor must submit a Price List (Part C2.2) as part of the Pricing Data. The Price List is used for forecasting Defined Cost under Option A (Priced Contract with Price List). Entries in the Price List must include Unit, Expected Quantity, Rate, and Price columns. For items not adjusted by quantity, only the Price column is required. For time-based services, specify the unit of time and expected duration. Assessment: Payments are based on Defined Cost plus Fee. Contractor must prepare monthly forecasts of the total Defined Cost. Currency: South African Rand (ZAR). VAT: Include Eskom’s VAT number (4740101508) on all invoices.
Financial Requirements
Source: NEC - BOP E3221GCDMPKUS.pdf (unknown)Pricing Structure: Payments are made at Defined Cost plus Fee (Option A of NEC3 TSC3). Contractor must submit a Price List (Part C2.2) for forecasting purposes, even if not used for final pricing. Payment Terms: Contractor must provide a tax invoice within one week of receiving a payment certificate from the Service Manager. Invoice must include Eskom’s VAT number (4740101508). Payment period is 4 weeks from the assessment date (between the 21st of each month). Interest Rate: Publicly quoted prime rate (Standard Bank of South Africa) for Rand amounts; LIBOR for other currencies. Currency: South African Rand (ZAR). Contractor’s Fee: Direct and subcontracted fee percentages must be specified in Contract Data (Clause 11.2(8)).
Compliance Requirements
Source: NEC - BOP E3221GCDMPKUS.pdf (unknown)B-BBEE: Contractor must notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. Failure to notify may result in contract termination or renegotiation. If B-BBEE status decreases post-award, Eskom may terminate or renegotiate the contract. Joint Ventures: All members of a joint venture or consortium are jointly and severally liable. Key personnel with authority to bind the Contractor must be notified to the Service Manager within two weeks of contract award. CIDB Registration: Tenderer’s CIDB registration number must be provided in the Form of Offer. Insurance: Contractor must provide insurance cover for deductibles in Eskom’s policies (e.g., Assets All Risk, Project Insurance, Public Liability). Details available at: http://www.eskom.co.za/Tenders/InsurancePoliciesProcedures/Pages/EIMS_Policies_From_1_April_2014_To_31_March_2015.aspx. Ethics: Prohibited actions (e.g., coercive, collusive, corrupt, fraudulent, or obstructive actions) may result in termination. Contractor must cooperate fully with investigations into alleged Prohibited Actions.
Health & Safety
Source: NEC - BOP E3221GCDMPKUS.pdfContractor Responsibilities: Take all reasonable precautions to maintain health and safety. Comply with the Construction Regulations 2014 (under the Occupational Health and Safety Act) and all applicable health and safety laws. Eskom may appoint the Contractor as the Principal Contractor for the Affected Property. Contractor must ensure subcontractors, employees, and others under their control comply with all health and safety requirements. Costs: The total Prices must include sufficient amounts for compliance with health and safety regulations. Safety Standards: Adhere to Eskom’s Life Saving Rules, Incident Investigation Procedures, Smoking Policy, and zero-tolerance alcohol policy. Personal Protective Equipment (PPE) and Plant Safety Regulations (PSR) must be followed.
Environmental
Source: NEC - BOP E3221GCDMPKUS.pdfContractor must comply with all applicable environmental laws, regulations, and procedures outlined in the contract. Key references include the Environment Conservation Act (1989), National Environmental Laws Amendment Act (2009), National Water Act (1998), and Eskom’s environmental specifications (e.g., GVLIR 0007: Safety, Health and Environment Specifications for Contractors). Contractor must ensure subcontractors and employees also comply with environmental requirements. Specific attention must be given to waste management, emissions, and resource usage as per Eskom’s standards.
Contractual Terms
Source: NEC - BOP E3221GCDMPKUS.pdfContract Type: NEC3 Term Service Contract (TSC3) with Option A (Priced Contract with Price List) and secondary options including X1 (Price Adjustment for Inflation), X2 (Changes in Law), X18 (Limitation of Liability), X19 (Task Order), and X20 (Key Performance Indicators). Contract Duration: 8 months from the starting date. Liability: Contractor’s liability for indirect or consequential loss is limited to R0.00. For loss or damage to Eskom’s property, liability is limited to the deductibles in Eskom’s insurance policies (refer to Format TSC3). Contractor must provide insurance for deductibles not covered by Eskom. Termination: Eskom may terminate if the Contractor fails to notify of B-BBEE status changes, engages in Prohibited Actions (e.g., corruption, fraud), or fails to deliver required documentation. Dispute Resolution: Arbitration via the Association of Arbitrators (Southern Africa) or ICE-SA. Confidentiality: Contractor must not disclose confidential information without Eskom’s consent. Ethics: Prohibited Actions (e.g., coercive, collusive, corrupt) are grounds for termination.
Section
Source: NEC - BOP E3221GCDMPKUS.pdfTenders will be evaluated using the SHE Tender Evaluation and Scoring Card (Annexure D: 32-726). Compliance with quality and documentation control (Section 3.3 and 8) is critical. Eskom approval of personnel for quality-related special processes (ESKASAAA3) is mandatory. Evaluation focuses on technical capability, adherence to standards, and alignment with Eskom’s quality management and SHE requirements.
Description
Source: Repair of BOP - BOQ.xlsxSubmission Guidelines
Source: Repair of BOP - BOQ.xlsx (unknown)Evaluation Criteria
Source: Repair of BOP - BOQ.xlsx (unknown)No explicit eligibility criteria stated in provided document. However, tenderers must comply with Eskom's standard tender procedures, provide complete pricing schedules, and demonstrate capability to perform BOP/BMH repair work during power station commissioning.
Technical Specifications
Source: Repair of BOP - BOQ.xlsx (unknown)Financial Requirements
Source: Repair of BOP - BOQ.xlsx (unknown)Description
Source: Works information BOP - E3221GCDMPKUS.pdfImportant Dates
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)Contact Information
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)Submission Guidelines
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)Evaluation Criteria
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)General
Technical
Quality
Technical Specifications
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)Quality Management
Source: Works information BOP - E3221GCDMPKUS.pdfFinancial Requirements
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)Compliance Requirements
Source: Works information BOP - E3221GCDMPKUS.pdf (unknown)Health & Safety
Source: Works information BOP - E3221GCDMPKUS.pdfEnvironmental
Source: Works information BOP - E3221GCDMPKUS.pdfContractual Terms
Source: Works information BOP - E3221GCDMPKUS.pdfSection
Source: Works information BOP - E3221GCDMPKUS.pdfImportant Dates
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Briefing Session
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Contact Information
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Submission Guidelines
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Returnable Documents
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)1.1 Annexures to the Tender The following document listed hereunder are attached to this Invitation to Tender. Number Description Annexure Attached (Y / N / N/A) 1.1.1 *Authorisation Form Annexure A Y 1.1.2 *Acknowledgement form Annexure B Y 1.1.3 *Tenderer’s particulars Annexure C Y 1.1.4 *Integrity Declaration Form (Suppliers are required to download and read the Supplier Integrity Pact. It is accessible on the Eskom Tender Bulletin via Eskom Supplier Integrity Pact (eskom.co.za) link) Annexure D Y 1.1.5 *CPA Requirements for Local Goods/Services Annexure E N 1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N 1.1.7 SBD 6.2 Declaration Certificate for Local Production and Local Content (only applicable if designated materials are included and then Tenderers will be required to complete and submit Annexures G1 to G4 as evidence of compliance with this requirement). Annexure G1 Y Annexure C Local Content Declaration- Summary Annexure G2 Y Annexure D Imported Content Declaration – Supporting Annexure G3 Y Annexure E Local Content Declaration- Supporting Annexure G4 Y 1.1.8 *SBD 1 Invitation to Bid must be filled out by all tenderers and submitted with the tender at tender submission deadline Annexure H Y 1.1.9 *SBD 6.1 Preference Points Claim Form in terms of PPPFA 2022 regulations Annexure I Y 1.1.10 *SBD 4 – Bidders Disclosure Annexure J Y 1.1.11 Tax Evaluation questionnaire to determine whether a company, close corporation (CC) or Trust is a personal service provider for purposes of PAYE N/A 1.1.12 Reverse e-auction training acknowledgement form (if applicable) N/A 1.1.13 Reverse e-auction process (if applicable) N/A 1.1.14 E-tendering Help Manual acknowledgement form Annexure L Yes 1.1.15 E-tendering Help Manual for supplier Annexure M Yes 1.1.16 CIDB Contract Skills Development Goals (CSDG) (if applicable) N/A 1.1.17 Contract Participation Goals (CPG) (if applicable) N/A 1.1.18 Scope of Work Annexure N Yes 1.1.19 NEC or other Contract Annexure O Yes 1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Annexure P Yes PDF and excel format. The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes.
Evaluation Criteria
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)General
B-BBEE
Financial
Technical Specifications
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Methodology
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdfExperience & Qualifications
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdfPricing Schedule
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdfFinancial Requirements
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Compliance Requirements
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)B-BBEE Requirements
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Health & Safety
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdfContractual Terms
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdfRequirements
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdf (RFP)Section
Source: INVITATION TO TENDER BOP - E3221GCDMPKUS.pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kusile Power Station Project - Balmoral - WITBANK - 1034
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
6
Last checked
14 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Safety
Personnel
Legal