Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Sole source bidding
Delivery Location
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Organization Type
GOVERNMENT
Published
22 Jul 2026
OCDS Reference
ocds-9t57fa-163206
This tender is for the supply and delivery of hydrastep probe and mill microphone spares to kendal power station in mpumalanga on an as-and-when-required basis over a five-year period. IT is a sole-source bidding opportunity issued by ESKOM, targeting suppliers capable of meeting occupational health, safety, and logistical requirements.
Suppliers must provide Hydrastep probe and mill microphone spares as and when required over a 5-year period. Compliance with Occupational Health and Safety (OHS) Act, including mandatory use of PPE such as FFP2/FFP3 dust masks, hard hats, safety shoes, and gloves. Adherence to safe driving practices, including speed limits, closed windows in dusty conditions, and postponing trips during unsafe weather. Only competent operators may handle moving machinery (e.g., forklifts) with supervision and risk assessments. Manual handling must follow ergonomic regulations to prevent injuries, with mechanical lifting used for heavy items. Valid driver’s licenses, medical fitness, and participation in SHEQ meetings/toolbox talks are required for all vehicle operations. All activities must align with Eskom’s risk assessment procedures and legal frameworks (e.g., Driven Machinery Regulations, Hazardous Chemical Substance Regulations).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Saturday, 22 August 2026 - 10:00
Venue
null
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Sole source bidding
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Contractor Health and Safety Requirements 32-136.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
22 Jul
2026
Tender Published
Tender was published
22 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf
Eskom seeks suppliers for a 5-year contract to supply and deliver Hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station in Mpumalanga. The tender includes a mandatory reverse e-auction training requirement.
Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf
This document is Annexure F of an Eskom tender for supplying Hydrastep probe and mill microphone spares to Kendal Power Station over five years. It details specific requirements for Contract Price Adjustment (CPA) for foreign goods/services and outlines payment methods for foreign currency transactions. The tender closes on August 22, 2026.
Eskom General Conditions of Purchase - 31 May 2024 (1).pdf
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf
Eskom invites tenders for a 5-year framework contract to supply and deliver Hydrastep probe and mill microphone spares on an 'as and when required' basis to Kendal Power Station in Mpumalanga. The tender uses a 90/10 preferential scoring system (price 90 points, specific goals 10 points) and requires electronic submission via Eskom's e-tendering portal by 22 August 2026.
Integrity Declaration Form - 08 November 2024.pdf
This is an Integrity Declaration Form for a 5-year supply contract of Hydrastep probe and mill microphone spares for Kendal Power Station. The form is a mandatory returnable document requiring detailed disclosure of conflicts of interest, fair tendering practices, and shareholder/beneficiary information to prevent corruption and ensure procurement integrity.
240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf
This document is Eskom's Personal Protective Equipment (PPE) Standard (Revision 2), not the tender document for 'The supply and delivery of hydrastep probe and mill microphone spares'. It details comprehensive specifications and procedures for PPE used across Eskom, including minimum standards for garments, head/eye/foot protection, and roles/responsibilities for PPE management. The actual tender details are limited to a brief header.
Hydrastep probe mill microphone Baseline Risk Assessment.pdf
This is a 5-year tender for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis to Eskom's Kendal Power Station in Mpumalanga. The document focuses heavily on occupational health and safety (OHS) risk assessment, detailing specific hazards and required controls for contractors performing the work.
Contractor Health and Safety Requirements 32-136.pdf
Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdf
Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf
This is a 5-year tender for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis to Kendal Power Station in Mpumalanga. The tender requires compliance with Eskom's quality management specifications (240-105658000) and ISO 9001 standards.
Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf
This is a tender document (SBD 6.1) for the supply and delivery of hydrastep probe and mill microphone spares on an 'as and when' required basis to Kendal Power Station for a 5-year period. The document is a Preference Points Claim Form outlining how points will be awarded under South Africa's Preferential Procurement Policy Framework Act (PPPFA) Regulations 2022. It details the scoring system (80/20 or 90/10) for price and specific goals, but the specific goals and their point allocations are not defined in the provided text.
Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf
This is a tender document from ESKOM for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station in Mpumalanga for a five-year period. The document provided is Annexure G1 (SBD 6.2), a mandatory declaration certificate for local production and content for designated sectors. It outlines the requirements for bidders to declare and verify the local content of their goods or services.
C1 1 SC3 Offer Acceptance.pdf
ESKOM seeks a supplier for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when required' basis for Kendal Power Station in Mpumalanga, for a five-year contract period. The tender is a formal procurement process requiring submission of a priced offer and acceptance of standard contract terms.
Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf
This document is Eskom's Supplier Integrity Pact, a mandatory ethical compliance document for all suppliers participating in Eskom procurement processes. It outlines the ethical standards and obligations for both Eskom and its suppliers to prevent fraud, corruption, and unfair practices. It is a supporting document for the tender for the supply of hydrastep probe and mill microphone spares at Kendal Power Station.
Integrity Declaration Form - 31 May 2024.pdf
This is an Integrity Declaration Form for a tender to supply hydrastep probe and mill microphone spares to Eskom's Kendal Power Station on an 'as and when' basis for five years. The document is a mandatory returnable requiring detailed declarations to prevent conflicts of interest and ensure fair tendering practices.
Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf
Eskom tender for supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when required' basis at Kendal Power Station for a 5-year period.
Annexure D - Integrity Declaration Form.pdf
This is Annexure D (Integrity Declaration Form) from Eskom's tender for the supply and delivery of Hydrastep probe and mill microphone spares to Kendal Power Station on an 'as and when' required basis for a five-year period. The document is a mandatory returnable requiring detailed declarations regarding conflicts of interest, fair tendering practices, and shareholder/beneficiary information.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
This document is a PAYE Questionnaire for service contracts with Eskom, specifically for determining tax classification of contractors (Personal Service Provider, Dependent Contractor, Labour Broker, or Independent Contractor). It is not the main tender document for the supply of hydrastep probe and mill microphone spares, but a mandatory compliance form for tax purposes.
Environmental checklist for evaluation.pdf
This is an environmental evaluation checklist for a tender to supply hydrastep probe and mill microphone spares to Eskom's Kendal Power Station in Mpumalanga on an 'as and when' required basis for a 5-year period. The document assesses the contractor's environmental compliance documentation prior to project commencement.
Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf
Eskom is inviting tenders for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' basis to Kendal Power Station in Mpumalanga for a period of five (5) years. The tender is governed by the Preferential Procurement Regulations (PPR) 2022, with points awarded based on price (80/20 or 90/10 system) and specific goals.
Contract Quality Plan Template (CQP).pdf
This is a tender document template for a Contract Quality Plan (CQP) issued by Eskom for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis to Kendal Power Station over a five-year period. The document is a template (Rev 5) that tenderers must complete and submit as part of their bid. It outlines the structure and content required for a quality management plan aligned with SANS 466:2005/ISO 10005:2005.
Annexure J - SBD 4 - Tenderer's Disclosure.pdf
This document is Annexure J (SBD 4) of a tender invitation from Eskom for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station for a five-year period. The document is a mandatory Tenderer's Disclosure form requiring detailed declarations about conflicts of interest, state employment, and competitive practices.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf
This document is not the main tender specification but a PAYE Questionnaire for service contractors to Eskom. It is used to determine the tax classification (Independent Contractor, Personal Service Provider, Labor Broker, or Dependent Contractor) of entities or individuals bidding for service contracts, including the supply of spares on an 'as and when' basis. The outcome dictates whether Eskom must withhold Employees' Tax (PAYE) from payments.
SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdf
Eskom seeks a supplier for a 5-year contract to provide hydrastep probes and mill microphone spares on an 'as and when' required basis for Kendal Power Station in Mpumalanga. The spares are critical for boiler drum water level protection and mill monitoring. The tender closes on August 22, 2026.
Annexure C - Tenderer's Particulars.pdf
This is Annexure C of a tender document from ESKOM for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station for a 5-year period. The document is a mandatory form for tenderers to provide their company particulars, registration details, and information regarding subcontracting.
Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdf
Annexure B.pdf
This document is Annexure B of a tender for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis to Kendal Power Station for a 5-year period. The annexure specifically outlines Eskom's Occupational Health and Safety (OHS) legal and other requirements that the supplier/contractor must acknowledge and comply with.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
This document is an E-Tendering Training Acknowledgement Form for a 5-year, as-and-when-required supply contract for Hydrastep probe and mill microphone spares at Kendal Power Station. The core tender is for the supply and delivery of these specific power plant spares.
Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdf
This document is an Occupational Health and Safety Baseline Risk Assessment template for a tender by ESKOM for the supply and delivery of Hydrastep probe and mill microphone spares to Kendal Power Station on an 'as and when' required basis over five years. The primary content is a detailed risk assessment identifying hazards, associated risks, and control measures for activities related to the contract, such as handling materials, driving on and off-site, and exposure to environmental hazards like dust and COVID-19. The document is incomplete, containing numerous '#REF!' errors, but outlines mandatory safety protocols and legal compliance requirements.
Consolidated COVID-19 - Direction on Health and Safety in the Workplace ....pdf
This document appears to be a Government Gazette (No. 43400) from June 2020, primarily containing a notice from the Department of Employment and Labour (Notice R.639) related to the Disaster Management Act. It does not contain the actual tender document for 'The supply and delivery of hydrastep probe and mill microphone spares on "as and when" required at Kendal power station for the period of five (5) years' issued by ESKOM. The provided tender information (title, organization, closing date) is not found within the gazette content.
Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf
This document (Annexure E) details Eskom's Contract Price Adjustment (CPA) requirements for a 5-year tender to supply hydrastep probe and mill microphone spares to Kendal Power Station. It is not the full tender, but a critical pricing annexure specifying how price adjustments must be structured for long-term contracts.
240-77471969 C2 Tender Evaluation Form Medium Risk.pdf
Eskom tender for a 5-year 'as and when required' supply contract for Hydrastep probe and mill microphone spares at Kendal Power Station in Mpumalanga. The document provided is primarily an Occupational Health and Safety (OHS) compliance checklist for tender submission.
Authorisation Form - 08 November 2024.pdf
Eskom seeks a supplier for hydrastep probe and mill microphone spares on an 'as and when' required basis for Kendal Power Station over a 5-year period. The tender involves supplying specified spares with delivery to Mpumalanga. The document outlines technical, compliance, and administrative requirements for bidders.
List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf
Eskom seeks a supplier for a 5-year 'as and when required' contract to supply and deliver Hydrastep probe and mill microphone spares to Kendal Power Station in Mpumalanga. The tender heavily emphasizes Quality Management System (QMS) compliance, with a detailed evaluation of both the QMS documentation and its operational evidence.
Annexure H - SBD 1 - Part A Invitation to Bid.pdf
ESKOM invites bids for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when required' basis at Kendal Power Station in Mpumalanga for a five-year period. The tender is governed by standard public procurement regulations and requires tax compliance.
Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf
This tender document is for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis to Kendal Power Station over a five-year period. The provided content focuses on Annexure G, a Tax Compliance Questionnaire specifically for foreign suppliers.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom invites tenders for the supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when required' basis at Kendal Power Station in Mpumalanga for a five-year period. The tender is governed by Eskom's Standard Conditions of Tender (Rev. 12), which detail a structured, competitive procurement process emphasizing fairness, transparency, and compliance with South African legislation.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 720 068
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"Date April 2022"}
Evaluation Criteria
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdf (unknown)evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the project
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
Technical Specifications
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdf (unknown)Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its Safety,
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
specification is Eskom Generation's minimum requirements which are required to be met for the
duration of the contract period by contractors/suppliers and, where required, the delivery
organisation. The contractor is expected to develop an OHS plan that meets these requirements as well
as all the relevant applicable legislation that they conform to. Eskom in no way assumes the contractor’s
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
execution of their health and safety programme for their employees and appointed contractor
employees. This OHS specification reflects minimum requirements and should not be construed as all-
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be taken
cognisance of and listed in the respective OHS plans. If there are any additional Eskom and/or
legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that must
be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to Eskom
Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
2.2.1 Normative
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
Definition Explanation
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic, and
cultural properties and conditions of the foregoing that influence
human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Occupational Health means comprehensive health and safety requirements for a contract, project,
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
Definition Explanation
National sourcing of services providers/contractors at the divisional level and not at BU
Enquiries/contracts level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Main contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
Definition Explanation
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement services –
Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCA Hazardous Chemical Agents
LDV Light Delivery Vehicle
SDS Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file for
evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the project
manager/end user who will facilitate the signing of the document by Eskom and contractor
representatives.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.1 Scope of work
Supply & delivery of hydrastep probe and mill microphone
Spares
A copy of the detailed scope of work must be retained by the contractor.
Note: Contractor shall refer to NEC for detailed scope of works.
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of
submitting the safety file. The main contractor must ensure that a section 37(2) agreement is compiled
between the main contractor and all their appointed contractors for the contract. The original copy of
the section 37(2) agreement must be retained by the contractor, and a copy must be retained by the
responsible project manager/end user. A copy of all the agreements must form part of the respective
contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on Hazardous
Work by Children in South Africa" with emphasis on paragraph 2: Purpose and Interpretation. Eskom
does not condone the use of child labour and, therefore, all effort must be exercised, and child labour
should not be used.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to this
project being:
Rights).
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are familiar
with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their strategic
objectives, and values of integrity, customer satisfaction, excellence, and innovation. The main
contractor and all appointed contractors, if not already in place, will be required to compile an
organisational SHEQ policy in line with their OHS responsibilities. The policy must be signed by the
organisation’s CE or the appointed assistant to the CE, OHS Act Section 16(2). The policy must be
displayed in a prominent place within the workplace. A copy of the policy must be filed in the contractor's
OHS files and attached as an annexure to the OHS Plan.
3.5 Covid -19 requirements
Not applicable, however the appointed contractor must ensure that Covid-19 is identified as a
hazard/risk in the Contractor Baseline Risk Assessment with control measures implemented and
measures to manage Covid-19 are also noted in the Contractor SHE Plan.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing (LoG) from
such commissioner. The obligation lies with the contractors to ensure that the LoG remain valid
throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training, provision
of PPE, safety equipment purchases etc.
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will comply
with the OHS Act for the duration of the contract. Before requiring appointees to accept an appointment,
the employer must ensure that they have received appropriate training and/or information about their
responsibilities. The relevant statutory appointments must be made in compliance with the OHS Act's
criteria, which include appointing a qualified individual to the appropriate roles.
Minimum legal or non-statutory Recommended minimum training /proof of
appointments competency
OHS act: section 16(2) employer/ Project OHS act and regulations, COIDA, Incident
manager ( where it exist in the company investigation, HIRA, legal liability
structure)
GAR 9(2) Incident/accident investigator RCAT / incident investigation
OHS act 8 (2) Person to Compile Risk Hazard Identification and Risk Assessment
Assessments
Vehicle inspector Driver’s license
3.9 ESKOM life-saving rules
undertakes work for Eskom to do the same.
agents, consultants, and contractors. Any Eskom employee or employee of a Main Contractor
or appointed contractor who fails to follow these rules would be deemed a serious violation.
These rules are in place to protect any employee, labour broker, or contractor working from
significant injury or death.
premises, the rules shall be obeyed by any contractor and their employees.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
The rules are:
Rule description of rule
Open, isolate, test, earth and create an equipotential zone before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required permit to
work.
Ensure safe live working
Rule 6 Ensure all live work basic principles are adhered to, as outlined (for the method being used) in
the High Voltage Live Working Standard for the respective division
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home
to their families safely.
3.10 Substance abuse
workplace accidents and car driving. As a result, Eskom has the right to take reasonable
procedures to identify and prohibit drunk people from entering the company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and anyone
entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has self-alcohol
testing equipment.
on a regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge before
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the
supervisors responsible for the contract. List the relevant positions held, names of appointees,
legal appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement.
The Main contractor is responsible for keeping copies of all the organograms’ as well as
submitting them with the OHS plan. All organograms shall be updated timeously when
appointments are changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
the company’s letter head, listing the reporting structure from their CE down to their project
supervisors. The diagram must list the names, positions held, any appointments made and
must be signed off by the company's 16(1) or 16 (2).
and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors and
employees at all levels must demonstrate their commitment by being proactively involved in the day to
day operations, in particular the Occupational Health and Safety aspects of any project / contract.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
Legislation requires that each employee must take reasonable care of themselves and their fellow
workers, from management level down to the lowest employee level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will be
listed and titled. The contractors shall:
of the OHS Act and Regulation 7 of the Construction Regulations.
appointed contractors within their working area, as contemplated by section 37(2) of the OHS
Act;
date of induction, relevant skills and licenses and be able to produce this list at the request of
the Eskom Project Manager.
terms of their appointment and that they advise and assist these appointees in the execution of
their duties.
with on all work sites.
records must be kept for each work site.
valid letter of good standing before the commencement of work and any future renewal letters
obtained during the contract for record-keeping purposes. The letter of good standing shall
reflect the name of the contractor’s company. Similarly, the Main contractor must provide the
Eskom project manager with all the valid letters of good standing from their appointed
contractors. This requirement applies to the appointed contractors.
in the health and safety aspects relating to such work and that the employees understand the
hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors who are
competent to do work, have satisfied the OHS compliance requirements and satisfied that the
contractor has the necessary competencies and resources to perform the work safely.
which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
site or emerging risks. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained. Prior to having pre-employment and periodic medicals
fitness examinations conducted, person/man job specifications must be compiled and handed
to the occupational health practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
3.12.2 Contractor site supervisor
This scope doesn’t require the appointment of a site supervisor
The contractor site supervisor must be trained in the following:
liability
Must:
Eskom project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action is in
place.
first instance and thereafter the Eskom project manager in the second instance relating to
procedure requirements, non-conformances identified, corrective actions, audits and
inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
inspection reports.
statistics report etc
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full/time
The contractor health and Safety officer must be trained in the following:
understanding of ISO 4500, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5
years contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported.
A risk assessment is defined as an identification of the hazards present in the activity, work, site,
and an estimate of the extent of the risks involved, considering whatever precautions are already
being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as information
and record of the way jobs / tasks must be performed. Daily or issue based or task specific or on
the job risk assessments must be conducted at the place where work is to be performed/ conducted
to allow managers and employees to assess any inherent risks that could have been overlooked
during the initial risk assessment or any changes that might have occurred in a period of absence.
For example if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
procedures exist for ladders.
rectify this shall be recorded, and safe working procedures drawn up.
and duly assigned.
must be nominated.
for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must be
aligned with the risk assessments. Method statements / written safe work procedure are control
measures used to prevent an incident from occurring during the execution of the project. A written
safe work procedure/ method statements provide guidance how to execute the task safely. A safe
working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
J. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
3.15 Fire equipment and maintenance
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.16 First aid and equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the legal requirements. Appointees must be
trained to level 2 and the training service provider must be registered in accordance with section
26(1) of the Skills Development Amendment Act, Act No. . It is good practice for all
employees to be trained to at least level 1.
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
all employees.
are familiar with the emergency numbers.
or team of workers on site or part thereof, taking into account the type of work performed and
the distance between teams.
available and accessible for the immediate treatment of injured persons at the workplace.
contact details of the First Aider of such first aid box or boxes shall be erected.
made for incidents occurring after working hours.
3.16.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a regular basis,
kept clean and dust free.
3.17 OHS communication systems
outlining how they intend to communicate OHS issues to their staff, the mediums they will
employ and how they will measure the effectiveness of their OHS communication. Below is a
brief on how communication should take place. Where project meetings are conducted on
site, OHS shall be included as a standing agenda point and minutes of these meetings shall
be available on site at all times. Minutes of meeting must be compiled and filed in the relevant
OHS files. All employees shall have access to these minutes. Attendance register shall be
kept for all the health and safety meetings.
3.17.1 Statutory Health and Safety Committees
19 of the OHS Act. Similarly, appointed contractors shall establish their own statutory health
and safety committee.
All appointed contractors shall be members of the Main contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Listed below is a preferred agenda.
committees (Refer to Section 19 (2) (a) of the OHS Act).
Representatives on that specific statutory health and safety committee. (Refer to Section
19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
and the project manager and the Inspector at DEL.
incidents and other notified serious incidents.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
shall keep record of all recommendations made by the committee.
current standards, procedures and practices.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.17.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
same as the statutory safety committee
3.17.2.1 Agenda
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation reports
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.17.2.2 Minutes and action items for all health and safety committee meetings
Minutes and record of action items shall be kept of all health and safety committee meetings.
Action column with target dates and responsible person shall be clearly visible on the minutes
and shall be completed during the meeting.
kept for the duration of the project or a minimum period of three years.
the project or a minimum period of 12 months.
12 months.
chairperson.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.18 Tool box talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed. Each
employee who attends the briefing shall sign an attendance list of that pre-job brief form
undertaking that they have an understanding of the tasks, risks and control measures
required.
occur, then weekly tool box talks must be conducted. The toolbox talk topics will be based on
OHS issues pertaining to the project site. The topic and the contents shall be in writing.
Attendance registers with the topic listed shall be kept.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.19 OHS training
OHS training requirements and the costing of such requirements. Similarly, appointed
contractor must provide the same requirements when bidding with the Main contractor.
relevant procedures. Additional to the requirements, will be that the Main contractor and
appointed contractors must have the appropriate qualifications, certificates and employees
should always be under competent supervision.
be given to those appointees prior to the acceptance of those appointments.
plan, all affected staff shall undergo the applicable refresher training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all contractor employees must be kept on the OHS
file.
3.19.1 Main Contractor Induction training
The contractor is required to make arrangements with the Business Unit for its employees to attend
induction in order to be granted permission to access site.
employees have undergone the Eskom OHS induction training prior to commencing work on
site.
that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be kept in
the OHS file on site for the duration of the project.
All employees and visitors on site shall carry the proof of induction training.
It is the contractors responsibility to keep records of induction training.
3.19.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor employees
undergo site specific work induction with regard to the approved project OHS plan, hazards prevalent
on the work site, scope specific risk assessment, rules and regulations, and other related aspects. The
induction training should also include identification of sensitive features such as wetlands/vlei areas,
red data species, graves, etc.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.19.3 Visitors to site induction
induction prior to being allowed access to site.
inducted. No visitors are permitted to undertake any work onsite, of any nature.
Induction training.
3.20 General training
The Main contractor will be required to ensure that before an employee commences work on the
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied himself
that the employee understands the hazards associated with the work to be performed by conducting
task/job observations.
3.21 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
No persons maybe transported at the back of the bakkie.
Drivers are required to conduct the route risk assessment prior to travelling/driving.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving.
All drivers shall have a valid medical fitness certificate.
The First aid box with valid contents and fire extinguishers must be included in the vehicle, be
services annually and inspected monthly. Drivers must be trained on how to use the First aid
box and fire extinguishers.
back of the vehicle.
vehicle access to site.
be valid at all times and this is applicable to yellow plant.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
(thirty) meters must be left clear between such a vehicle and such a machine.
Vehicles which are not roadworthy will not be permitted to be used on site.
Precautions shall be taken to secure all loads properly. Loads projecting from vehicles shall
be securely loaded and in daytime a red flag and during darkness a red light or red reflective
material shall be attached to the extreme end of such projecting materials.
metres
3.22 Housekeeping and order
for the duration of the project/contract.
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the work area
immediately.
of all materials, scrap, temporary buildings and building bases to the satisfaction of the
client/agent.
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
appointed contractors to cease work until the area has been tidied up and made safe. Neither
additional costs nor extension of time to the contract shall be allowed as a result of such a
stoppage. Failure to comply with this requirement will result into site cleaning by another
cleaning contractor company at the cost of the Main contractor.
maintenance of satisfactory standards. The Main contractor shall document the results of
each inspection and shall maintain records for viewing.
3.23 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify compliance to
the requirements of the Eskom OHS specifications. Once there is compliance only then will the Main
contractors OHS plan be approved by the project manager or an appointed Eskom contract
custodian. The implementation of the OHS Plan shall be assessed / audited by Eskom personnel on a
regular basis. This will include physical conditions evaluation.
3.23.1 Eskom OHS audits
Eskom shall evaluate all contractors’ OHS performance on an ongoing basis against the legal, Eskom
requirements, OHS specification and the contractors OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
There will be monthly audits conducted by Eskom on the Main contractor/s and/or appointed
contractors. These audits shall be attended by the contractor’s site manager or his representative.
If there are any findings / non-compliance identified as serious in these audits, an activity will be
stopped for that specific Main Contractor and appointed contractor. Refer to section on “Work
Stoppage” in this OHS Specification.
3.23.2 Contractor audits
Main Contractors are required to conduct internal audits on both their employees and their appointed
contractors on the implementation of their OHS Plan on a monthly basis or when the scope of work
changes. A summary of the findings and the proposed corrective actions shall be submitted to Eskom
project manager within one week after completion of the audit. Where appointed contractors are audited
by the Main contractor a copy of the audit report shall be submitted to the appointed contractor within 7
days of the audit.
3.24 Smoking
The national smoking policy must be observed and smoking is permitted in designated areas only
(Eskom Smoking Procedure 32-36).
3.25 Cellular phones
The National Road Traffic Act requirements regarding the use of cellular phones must be observed,
when driving and or operating mobile equipment and or machinery. The personal use of cell phones in
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
the plant is prohibited unless it is an emergency or for work purpose. The use of cell phone camera in
the plant must be in line with the national key point Act and the Plant safety regulation.
3.26 Occupational health, hygiene and rehabilitation
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation program.
The program is intended to ensure that the risks to health are identified and controlled.
3.26.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner
who holds a qualification in occupational health.
have a medical surveillance program whereby their employees undergo entry, periodic and
exit medical fitness examinations.
the hazards that the employees will be exposed to.
job specification, which must indicate the description of work, list of hazards and potential
occupational exposure limits, physical hazards and required physical attributes.
This shall be maintained until completion of the contract.
employees have undergone pre-entry medical examination before starting work on the
contract.
are issued with a conditional certificate of fitness.
certificates as and when their employees leave the company.
3.27 Roles and responsibilities
All contractors are required to list employee’s roles and responsibilities pertaining to the contract.
3.28 Personal protective equipment requirements
maintenance and replacement of PPE for all his employees and appointed contractors
on site.
PPE Specification Standard 240-44175132.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
to be issued to employees performing the respective tasks.
additional PPE, a risk assessment must be done, in which such PPE requirements will
be determined and issued.
worksites.
contractor’s responsibility to provide the PPE.
comply with the relevant SANS standards.
shall be worn.
Monthly inspection records of PPE must be kept in the Safety file
The contractor shall provide training to his/her employees on the correct use, care and
maintenance of PPE and keep the record.
3.29 Incident investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations
8 and 9, using Eskom Procedure 32-95 OHS incident management as a reference, and
where injuries as contemplated in sections 24 and 25 have been sustained, be reported
to the Department of Employment and Labour.
Contractors shall use the Eskom Flash report to report incidents immediately or before
end of shift. The standard General Administrative Regulation Annexure 1 “Recording of an
Incident form” for all incident investigation reports. The objective of incident investigation,
should not only be a legal requirement, but should establish why and how the incident
occurred and find out the real root cause of the incident and to decide on precautionary
measures that are required to address the root cause to prevent any further recurrences
of the same or similar incidents.
3.30 Emergency management
The art of emergency preparedness and response is to minimise the effects of any
emergency and to restore normal activities as soon as possible. The contractor must
develop and align their own Emergency response plan with Eskom’s to address any
emergency which might arise at any given point in time. The contractor to familiarise
themselves with the Eskom emergency response plan and procedure. Periodic
emergency drills must be undertaken to test the effectiveness of their plan. This must be
recorded and provided on request.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document SPECIFICATION *1015696 Rev 3
Identifier
Supply & Delivery of Hydrastep
Probe and Mill Microphone Effective Date April 2022
Spares
3.31 Non-conformance and compliance
subject to discipline in terms of the Eskom Procurement and Supply Chain
Management Procedure.
already in place) for issuing to contractors for transgressions. The procedure can
include “quality” related non-conformance issues. Similarly, appointed contractors
must implement a non-conformance procedure.
strictly adhered to.
issued, in not doing so; any recommendations made may not be implemented.
procedure will be for the offender to be called by the responsible project manager to
explain the non-conformance issued and what plan is in place to prevent a recurrence
of the non-conformance.
employees for the tasks being performed and/or to visitors; failure to enforce the
wearing of such PPE will be viewed as a transgression of the legislative and Eskom
requirements.
3.32 OHS files
safety and health management system from inception, execution to completion of works.
site per project, a file per site shall be kept at that site. Contractors may keep additional files at
their head office as additional records. The OHS file shall be maintained by all the contractors
on their project sites and shall be available on request for audit and inspection purposes.
requirements/specification, legal and other requirements.
OHS requirements /specification and the OHS plan.
partition must be labelled.
and safety file to the project manager.
cumbersome, the older documentation must be archived in boxes which shall be correctly
labelled and be available for auditing purposes. The archived documentation must be handed
over at the completion of the project.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 33
Compliance Requirements
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 2
Health & Safety
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdfProject Address: Kendal Power Station
Eskom’s Contract’s Manager Eskom’s Safety Officer
Name: Patricia Allesing Name: Wesley Adam
Eskom’s Procurement Manager Eskom’s OHS Manager
Name: Mandla Mkhwanazi (Acting) Name: Nompilo Dlamini (Acting)
3.2 Legal compliance ........................................................................................................ 11
3.2.1 Section 37(2) (Legal) Agreement................................................................................ 11
3.2.2 Hazardous Work by Children (Child Labour) .............................................................. 11
3.2.3 OHS Act ...................................................................................................................... 12
3.2.4 Legislative Compliance ............................................................................................... 12
3.3 ESKOM requirements ................................................................................................. 12
3.4 Sheq policy .................................................................................................................... 12
3.5 Covid -19 requirements ............................................................................................ 12
3.6 Coid ................................................................................................................................... 13
3.7 Costing for OHS within the project .................................................................. 13
3.8 Statutory appointments ......................................................................................... 13
3.9 ESKOM life-saving rules........................................................................................... 13
3.10 Substance abuse ....................................................................................................... 14
3.11 Contractor organisational structure ........................................................ 15
3.11.1 Main Contractor Organogram ................................................................................... 15
3.11.2 Appointed Contractor/s Organogram ........................................................................ 15
3.12 Roles and responsibilities ................................................................................... 15
Commitment ....................................................................................................................... 15
3.12.1 Main contractors and appointed contractors ............................................................ 16
3.12.2 Contractor site supervisor ......................................................................................... 17
3.12.3 Contractor Health and Safety officer full/time ........................................................... 18
3.13 Risk assessment (refer to 32-520) ...................................................................... 18
3.14 Safe work procedures / method statements .............................................. 19
3.15 Fire equipment and maintenance ....................................................................... 19
3.16 First aid and equipment.......................................................................................... 20
3.16.1 Boxes and equipment ............................................................................................... 20
3.17 OHS communication systems ................................................................................ 21
3.17.1 Statutory Health and Safety Committees ................................................................. 21
3.17.2 Non-statutory health and safety committees ............................................................ 22
3.18 Tool box talks / daily team talks / pre job meetings ................................ 23
3.19 OHS training ................................................................................................................ 24
3.19.1 Main Contractor Induction training ............................................................................ 24
3.19.2 Appointed Contractor induction training ................................................................... 24
3.19.3 Visitors to site induction ............................................................................................ 25
3.20 General training ....................................................................................................... 25
3.21 Vehicle management ................................................................................................ 25
3.22 Housekeeping and order....................................................................................... 26
3.23 Approval and compliance of Main contractor OHS plan .............................................. 27
3.23.1 Eskom OHS audits ................................................................................................... 27
3.23.2 Contractor audits....................................................................................................... 27
3.24 Smoking ......................................................................................................................... 27
3.25 Cellular phones ....................................................................................................... 27
3.26 Occupational health, hygiene and rehabilitation ..................................... 28
3.26.1 Medical Assessments ............................................................................................... 28
3.27 Roles and responsibilities ................................................................................... 28
3.28 Personal protective equipment requirements .......................................... 28
3.29 Incident investigation ............................................................................................ 29
3.30 Emergency management ........................................................................................ 29
3.31 Non-conformance and compliance ................................................................... 30
3.32 OHS files ....................................................................................................................... 30
3.33 Work stoppage .......................................................................................................... 31
3.34 Hours of work ........................................................................................................... 31
3.34.1 Normal work .............................................................................................................. 31
3.34.2 Night work ................................................................................................................. 31
3.34.3 Overtime ................................................................................................................... 31
3.35 Omissions from safety and health requirements specification ........ 32
3.36 Contractor performance monitoring ........................................................... 32
3.37 Contract sign off .................................................................................................... 32
3.38 Eskom's right to terminate the contract .................................................... 32
Authorization ..................................................................................................................... 32
Revisions ................................................................................................................................ 33
Introduction
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its Safety,
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
specification is Eskom Generation's minimum requirements which are required to be met for the
duration of the contract period by contractors/suppliers and, where required, the delivery
organisation. The contractor is expected to develop an OHS plan that meets these requirements as well
as all the relevant applicable legislation that they conform to. Eskom in no way assumes the contractor’s
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
execution of their health and safety programme for their employees and appointed contractor
employees. This OHS specification reflects minimum requirements and should not be construed as all-
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
2.2.1 Normative
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Note: Contractor shall refer to NEC for detailed scope of works.
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of
submitting the safety file. The main contractor must ensure that a section 37(2) agreement is compiled
between the main contractor and all their appointed contractors for the contract. The original copy of
the section 37(2) agreement must be retained by the contractor, and a copy must be retained by the
responsible project manager/end user. A copy of all the agreements must form part of the respective
contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on Hazardous
Work by Children in South Africa" with emphasis on paragraph 2: Purpose and Interpretation. Eskom
does not condone the use of child labour and, therefore, all effort must be exercised, and child labour
should not be used.
project being:
Rights).
3.3 ESKOM requirements
with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their strategic
objectives, and values of integrity, customer satisfaction, excellence, and innovation. The main
contractor and all appointed contractors, if not already in place, will be required to compile an
organisational SHEQ policy in line with their OHS responsibilities. The policy must be signed by the
organisation’s CE or the appointed assistant to the CE, OHS Act Section 16(2). The policy must be
displayed in a prominent place within the workplace. A copy of the policy must be filed in the contractor's
3.5 Covid -19 requirements
Not applicable, however the appointed contractor must ensure that Covid-19 is identified as a
hazard/risk in the Contractor Baseline Risk Assessment with control measures implemented and
measures to manage Covid-19 are also noted in the Contractor SHE Plan.
employment compensation commissioner and have available a valid letter of good standing (LoG) from
such commissioner. The obligation lies with the contractors to ensure that the LoG remain valid
throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training, provision
of PPE, safety equipment purchases etc.
3.8 Statutory appointments
appointments competency
OHS act: section 16(2) employer/ Project OHS act and regulations, COIDA, Incident
manager ( where it exist in the company investigation, HIRA, legal liability
structure)
GAR 9(2) Incident/accident investigator RCAT / incident investigation
OHS act 8 (2) Person to Compile Risk Hazard Identification and Risk Assessment
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
workplace accidents and car driving. As a result, Eskom has the right to take reasonable
procedures to identify and prohibit drunk people from entering the company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
employees at all levels must demonstrate their commitment by being proactively involved in the day to
day operations, in particular the Occupational Health and Safety aspects of any project / contract.
with on all work sites.
records must be kept for each work site.
valid letter of good standing before the commencement of work and any future renewal letters
obtained during the contract for record-keeping purposes. The letter of good standing shall
reflect the name of the contractor’s company. Similarly, the Main contractor must provide the
in the health and safety aspects relating to such work and that the employees understand the
hazards associated with all other work being carried out on the project.
and safety of persons or a risk of degradation to the environment.
which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
site or emerging risks. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
contract is in place and maintained. Prior to having pre-employment and periodic medicals
fitness examinations conducted, person/man job specifications must be compiled and handed
to the occupational health practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
procedures, work instructions and safety regulations issued by Eskom:
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full/time
This scope doesn’t require the appointment of a health and safety officer
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5
years contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported.
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as information
and record of the way jobs / tasks must be performed. Daily or issue based or task specific or on
the job risk assessments must be conducted at the place where work is to be performed/ conducted
to allow managers and employees to assess any inherent risks that could have been overlooked
during the initial risk assessment or any changes that might have occurred in a period of absence.
procedures exist for ladders.
rectify this shall be recorded, and safe working procedures drawn up.
and duly assigned.
must be nominated.
for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Safe work procedures / method statements
aligned with the risk assessments. Method statements / written safe work procedure are control
measures used to prevent an incident from occurring during the execution of the project. A written
safe work procedure/ method statements provide guidance how to execute the task safely. A safe
working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
are familiar with the emergency numbers.
or team of workers on site or part thereof, taking into account the type of work performed and
the distance between teams.
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
kept for all the health and safety meetings.
3.17.1 Statutory Health and Safety Committees
19 of the OHS Act. Similarly, appointed contractors shall establish their own statutory health
and safety committee.
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Representatives on that specific statutory health and safety committee. (Refer to Section
19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
and the project manager and the Inspector at DEL.
incidents and other notified serious incidents.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.17.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
same as the statutory safety committee
3.17.2.1 Agenda
3.17.2.2 Minutes and action items for all health and safety committee meetings
kept for the duration of the project or a minimum period of three years.
the project or a minimum period of 12 months.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.18 Tool box talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed. Each
employee who attends the briefing shall sign an attendance list of that pre-job brief form
undertaking that they have an understanding of the tasks, risks and control measures
required.
plan, all affected staff shall undergo the applicable refresher training.
undergo site specific work induction with regard to the approved project OHS plan, hazards prevalent
on the work site, scope specific risk assessment, rules and regulations, and other related aspects. The
induction training should also include identification of sensitive features such as wetlands/vlei areas,
red data species, graves, etc.
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied himself
that the employee understands the hazards associated with the work to be performed by conducting
task/job observations.
3.21 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
services annually and inspected monthly. Drivers must be trained on how to use the First aid
box and fire extinguishers.
metres
3.22 Housekeeping and order
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
stopped for that specific Main Contractor and appointed contractor. Refer to section on “Work
Stoppage” in this OHS Specification.
3.23.2 Contractor audits
the plant is prohibited unless it is an emergency or for work purpose. The use of cell phone camera in
the plant must be in line with the national key point Act and the Plant safety regulation.
3.26 Occupational health, hygiene and rehabilitation
3.26.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner
who holds a qualification in occupational health.
the hazards that the employees will be exposed to.
job specification, which must indicate the description of work, list of hazards and potential
occupational exposure limits, physical hazards and required physical attributes.
maintenance and replacement of PPE for all his employees and appointed contractors
on site.
PPE Specification Standard 240-44175132.
additional PPE, a risk assessment must be done, in which such PPE requirements will
be determined and issued.
contractor’s responsibility to provide the PPE.
comply with the relevant SANS standards.
shall be worn.
maintenance of PPE and keep the record.
3.29 Incident investigation
end of shift. The standard General Administrative Regulation Annexure 1 “Recording of an
Incident form” for all incident investigation reports. The objective of incident investigation,
should not only be a legal requirement, but should establish why and how the incident
occurred and find out the real root cause of the incident and to decide on precautionary
measures that are required to address the root cause to prevent any further recurrences
of the same or similar incidents.
3.30 Emergency management
emergency and to restore normal activities as soon as possible. The contractor must
develop and align their own Emergency response plan with Eskom’s to address any
emergency which might arise at any given point in time. The contractor to familiarise
themselves with the Eskom emergency response plan and procedure. Periodic
emergency drills must be undertaken to test the effectiveness of their plan. This must be
recorded and provided on request.
safety and health management system from inception, execution to completion of works.
and safety file to the project manager.
Environmental
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk..pdfrequirements pertaining to local authorities, municipal by-laws, or environmental legislation that must
be met by the contractor.
2.1.1 Purpose
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Important Dates
Source: Authorisation Form - 08 November 2024.pdf (unknown)Closing time: 7:34.
Evaluation Criteria
Source: Authorisation Form - 08 November 2024.pdf (unknown)Bidders must demonstrate relevant experience, provide required documentation (e.g., tax compliance, B-BBEE certificates), meet technical specifications, and comply with Eskom's procurement policies. Specific eligibility details are embedded in the document but require careful extraction due to formatting issues.
Technical Specifications
Source: Authorisation Form - 08 November 2024.pdf (unknown)The tender is for the supply and delivery of hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station for a period of five (5) years.
Compliance Requirements
Source: Authorisation Form - 08 November 2024.pdf (unknown)No specific requirements found
Description
Source: Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdfContact Information
Source: Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (unknown)Evaluation Criteria
Source: Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (unknown)Must meet Category 3 pre-contract award quality requirements (as specified in clause 3.5.-105658000). Must have ISO 9001 certified quality management system. Must accept Eskom's rights of access, information rights, preservation requirements, and quality audit conditions.
Methodology
Source: Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdfQuality Management
Source: Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdfSection
Source: Form A_Cat 3 SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdfSubmission Guidelines
Source: Contractor Health and Safety Requirements 32-136.pdf (unknown)Compliance Requirements
Source: Contractor Health and Safety Requirements 32-136.pdf (unknown)Important Dates
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)The document states an effective date of 25 February 2022 and a review date of February 2027. No specific tender closing date or other deadlines are provided in this document.
Contact Information
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)The document provides a contact form but no specific contact details are filled in. Bidders must provide their company name, contact person, landline, cellphone, and email address on the form.
Submission Guidelines
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)Returnable Documents: The tender document includes an Acknowledgement Form that must be completed and submitted. The form requires the bidder to acknowledge either attendance at a Reverse E-auction training clarification meeting or completion of self-training via an uploaded video. The form must be signed and dated.
Returnable Documents
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)The following returnable document is required: A completed Acknowledgement Form for Reverse E-auction training. The form must include:
Evaluation Criteria
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)Suppliers must be capable of supplying Hydrastep probe and mill microphone spares, complete reverse e-auction training requirement, and submit required documentation including company details and contact information.
Technical Specifications
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)The document is an Acknowledgement Form for Reverse E-auction training. It does not contain technical specifications for hydrastep probes or mill microphone spares.
Compliance Requirements
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)No specific compliance requirements are stated in this document.
Submission Guidelines
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Returnable Documents
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Evaluation Criteria
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Compliance Requirements
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Requirements
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Description
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdfNo additional description provided. The document is the SBD4 Bidder's Disclosure form.
Contact Information
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":null}
Submission Guidelines
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER)Returnable Documents: The SBD4 Bidder's Disclosure form must be completed and submitted as part of the bid. Ensure the form is fully completed, signed, and dated.
Evaluation Criteria
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER)Bidder must not be listed in Register for Tender Defaulters or List of Restricted Suppliers. Must disclose any state employment of directors/trustees/shareholders. Must disclose relationships with Eskom employees. Must declare interests in related enterprises. Must demonstrate independent bidding process without collusion.
Technical Specifications
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER)No technical specifications for the hydrastep probe and mill microphone spares are provided in this document. Refer to other tender documents for scope and deliverables.
Compliance Requirements
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER)You must complete the SBD4 Bidder's Disclosure form. Key compliance requirements:
Requirements
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER)General requirements from the SBD4 form:
Section
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdfThe bidder must have no agreements or arrangements with any competitor regarding the quality of the products or services.
Submission Guidelines
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)Returnable Documents: The SBD 6.1 Preference Points Claim Form must be completed and submitted as part of the tender. Failure to submit required proof or documentation to claim specific goals points will be interpreted as not claiming those points.
Returnable Documents
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)Evaluation Criteria
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)Open to various company/firm types (Partnership, Sole Proprietor, Close Corporation, Public Company, etc.). Tenderers must be compliant with the Preferential Procurement Regulations 2022. Specific eligibility criteria related to B-BBEE status, local content, or other specific goals are not detailed in this form but would be defined elsewhere in the tender documentation.
Compliance Requirements
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)B-BBEE Requirements
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)Contractual Terms
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdfImportant Dates
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Contact Information
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Submission Guidelines
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Returnable Documents
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Evaluation Criteria
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Tenderers will be disqualified if they: 1) Have abused Eskom's procurement process (e.g., bid rigging/collusion). 2) Have committed fraud or improper conduct in procurement. 3) Are listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters. 4) Fail to fully and accurately disclose all required information, as false declarations permit Eskom to reject the tender and act against the tenderer.
Compliance Requirements
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Requirements
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Section
Source: Annexure D - Integrity Declaration Form.pdfDescription
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThis is a PAYE questionnaire for Eskom contractors to determine tax status. It is not a tender document. The questionnaire applies from 1 March 2026 to 28 February 2027 and is used to classify contractors as Independent Contractors, Personal Service Providers, Labour Brokers, or Dependent Contractors for tax withholding purposes.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The document is a tax questionnaire applicable from 1 March 2026 to 28 February 2027. It does not contain tender-specific dates.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)When returning the completed Pack, copy Group Tax on Email address: [email protected]
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Primary eligibility is based on tax status determination via the questionnaire. Key tests include: Residence in South Africa, Number of Employees (3+ full-time, non-connected persons), Services not rendered by a Connected Person, Not more than 80% of income from one client, Place/Control/Supervision test, and a Dominant Impression Test (11 questions). Failure to meet criteria or provide affidavits results in PAYE withholding.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)This is a tax classification questionnaire, not technical specifications for the tender. The document is intended to establish whether a contractor should be classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for tax purposes.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThe document does not contain a pricing schedule. It outlines tax withholding rules: Labour Brokers providing a valid IRP30 certificate will not have PAYE withheld and will receive an IT3(a) certificate (code 3617). Without a valid IRP30 certificate, PAYE will be withheld at individual tax rates until the certificate is provided, and an IRP5 certificate (code 3617) will be issued.
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The document outlines tax withholding consequences based on classification:
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The document requires contractors to complete a tax status questionnaire. Key compliance points:
Description
Source: Contract Quality Plan Template (CQP).pdfThe document is a Contract Quality Plan (CQP) template. The tenderer must complete it to describe:
Important Dates
Source: Contract Quality Plan Template (CQP).pdf (unknown)The document states a template effective date of 01 April 2021 and a next review date of 01 April 2026. These are template dates, not tender-specific closing dates or briefing dates.
Contact Information
Source: Contract Quality Plan Template (CQP).pdf (unknown)The document does not provide specific contact details for this tender. It mentions communication channels (e.g., emails, meetings) are to be indicated by the supplier in the completed CQP.
Evaluation Criteria
Source: Contract Quality Plan Template (CQP).pdf (unknown)While explicit financial or operational pre-qualification criteria are not listed in this template document, eligibility is implicitly determined by the ability to submit a fully compliant and detailed Contract Quality Plan. The tenderer must demonstrate a robust Quality Management System capable of meeting Eskom's requirements, including managing sub-suppliers, documentation, traceability, and post-delivery activities. Compliance with the referenced quality standards (SANS 466/ISO 10005) is a fundamental criterion.
Technical Specifications
Source: Contract Quality Plan Template (CQP).pdf (unknown)The document is a template. The technical scope must be defined by the tenderer. Key template requirements include:
Methodology
Source: Contract Quality Plan Template (CQP).pdfThe tenderer must provide:
Experience & Qualifications
Source: Contract Quality Plan Template (CQP).pdfThe tenderer must provide an organogram showing designations, roles, responsibilities, and the qualifications necessary for team members to fulfil their duties. Also, list core processes and documents (work instructions, standards, specifications) to be used.
Quality Management
Source: Contract Quality Plan Template (CQP).pdfThe tenderer must develop a Contract Quality Plan based on this template. Key requirements include:
Compliance Requirements
Source: Contract Quality Plan Template (CQP).pdf (unknown)The document does not state specific compliance requirements like CSD, tax, B-BBEE, CIDB, or CIPC. It references quality standards (SANS 466:2005 / ISO 10005:2005) and requires a Quality Management System.
Health & Safety
Source: Contract Quality Plan Template (CQP).pdfThe template requires method statements that describe how work is carried out safely, without risks to health/safety, including all identified risks and control measures.
Contractual Terms
Source: Contract Quality Plan Template (CQP).pdfThe template mentions post-delivery activities may include warranty periods, technical support, defect correction periods, and retention funds. These must be defined by the tenderer based on statutory, regulatory, and scope of work requirements.
Section
Source: Contract Quality Plan Template (CQP).pdfThe document is a template for a Contract Quality Plan. It does not contain specific evaluation criteria for this tender.
Description
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdfEvaluation Criteria
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdf (unknown)The document does not specify explicit eligibility criteria. However, suppliers must be capable of providing the exact technical spares listed, comply with ISO 9001, and support a 5-year contract with on-demand delivery. The roles imply that 'Contract management' will handle vendor qualification.
Technical Specifications
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdf (unknown)Methodology
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdf (unknown)Quality Management
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdfCompliance Requirements
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdf (unknown)Section
Source: SOW_Hydrastep probe and mill microphone spares-Lethabo Engineering.pdfDescription
Source: Environmental checklist for evaluation.pdfSite: Kendal Power Station.
Project: Supply and delivery of hydrastep probe and mill microphone spares as and when required for five years.
Evaluation Criteria
Source: Environmental checklist for evaluation.pdf (unknown)The primary eligibility criterion is environmental compliance, scored via this checklist. Contractors must achieve a minimum score of 80% (the assessed contractor scored 97%). Compliance with all referenced Eskom work instructions and the SHEQ policy is mandatory. Submission of all required documents is a precondition for contract award.
Technical Specifications
Source: Environmental checklist for evaluation.pdf (unknown)Scope: Supply and delivery of hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station for five years.
Environmental documentation assessment required prior to project commencement.
Reference documentation includes:
Compliance Requirements
Source: Environmental checklist for evaluation.pdf (unknown)Environmental compliance requirements:
Health & Safety
Source: Environmental checklist for evaluation.pdfEnvironmental checklist includes health and safety related criteria:
Environmental
Source: Environmental checklist for evaluation.pdfChecklist criteria details:
Section
Source: Environmental checklist for evaluation.pdfTotal score calculation: Weighted score sum.
Recommendations note outstanding items.
Contact Information
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)For fraud or corruption reporting: Email [email protected] or call 0800 11 2722. No submission contact details provided.
Submission Guidelines
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Returnable Documents: The tenderer must complete and submit SBD 4 (Tenderer’s Disclosure) as part of the tender submission. The declaration must be signed and dated.
Evaluation Criteria
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Automatic disqualification if listed in the Register for Tender Defaulters or the List of Restricted Suppliers. Must not be involved in collusive practices. Must have no undisclosed conflicts of interest with Eskom or the state. The tenderer and associated persons must comply with all declaration requirements regarding state employment and relationships.
Compliance Requirements
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Tenderer must complete SBD 4 disclosure form. Declarations required on: state employment, relationships with procuring institution employees, interests in other enterprises. False declarations lead to disqualification and possible legal action.
Requirements
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Tenderer must declare: state employment, relationships with procuring institution employees, interests in other enterprises. Tenderer must certify independence from competitors and non-disclosure of tender terms.
Section
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdfTender evaluation includes checking for collusive practices and compliance with disclosure requirements.
Description
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThis is a PAYE Questionnaire Pack for Eskom service contractors for the 2025/2026 tax year. Its purpose is to determine whether an Individual, Close Corporation, Company, or Trust should be classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for tax purposes. It is not the tender specification for the supply of hydrastep probe and mill microphone spares.
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The Pack applies from 1 March 2025 to 28 February 2026. No other specific tender-related dates (like closing, briefings) are stated in this document.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)For tax classification queries, the completed Pack should be submitted to your contractor representative in Eskom for referral to the Eskom Group Tax Department in Megawatt Park. When returning the completed Pack, copy Group Tax on email: [email protected].
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Returnable Documents: The completed PAYE Questionnaire Pack (signed summary sheet and signed affidavits) must be returned to Eskom. When returning the completed Pack, copy Group Tax on email: [email protected].
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Contractor must be a resident of South Africa (unless Appendix 9 signed). For companies/trusts: employing 3+ full-time, non-connected persons may exempt from PAYE (Appendix 1). No connected person may render services personally (Appendix 2). Not more than 80% of income from a single client/associated institution (Appendix 4). Services not mainly performed at/premises or controlled by Eskom (Appendix 3). For individuals: must provide a service, not people (Appendix 5). If a labor broker, must provide a valid IRP30 certificate (Appendix 6).
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)This document is a tax classification questionnaire, not a technical specification for the supply of hydrastep probe and mill microphone spares. It outlines the process to determine a contractor's tax status for service contracts with Eskom.
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe financial implications of tax classification: If a Labour Broker provides a valid IRP30 certificate, no PAYE is withheld and an IT3(a) certificate (code 3617) is issued. If the certificate is not provided, PAYE is withheld at individual tax rates until it is provided, and an IRP5 certificate (code 3617) is issued.
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Payment terms depend on tax classification: If classified as an Independent Contractor/Supplier, no PAYE withholding may apply (subject to conditions). If classified as a Personal Service Provider or Dependent Contractor, PAYE will be withheld at prevailing tax rates. Labour Brokers must provide a valid IRP30 certificate to avoid PAYE withholding; if not provided, PAYE will be withheld until the certificate is submitted.
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Tax compliance is central: Contractors must complete the PAYE Questionnaire to determine their tax status. Requirements include providing proof of: South African residency, VAT and Income Tax registration numbers, company/trust registration details, and bank details. Specific affidavits and declarations are required based on answers to questions about employees, connected persons, income concentration, and work location/control.
Section
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe evaluation criteria within this document relate solely to tax classification. It involves answering a series of questions to determine if the contractor is an Independent Contractor or a Personal Service Provider/Dependent Contractor. Factors assessed include risk for quality, right to subcontract, and dependency on Eskom.
Evaluation Criteria
Source: Consolidated COVID-19 - Direction on Health and Safety in the Workplace ....pdf (unknown)Cannot be determined from the provided document. Eligibility would typically be defined in the actual tender documents and could include requirements like B-BBEE status, CIDB registration, financial stability, technical experience, and compliance with ESKOM's vendor conditions.
Submission Guidelines
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Returnable Documents
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Evaluation Criteria
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)General
Open to all legally registered entities (e.g., partnerships, sole proprietors, close corporations, public/private companies, trusts, etc.).
Bbbee
Preference may be given to tenderers meeting Broad-Based Black Economic Empowerment (B-BBEE) criteria (specific goals to be confirmed in the full tender documents).
Local Content
Points may be allocated for local content or other specific goals as outlined in Table 1 of the SBD 6.1 form.
Technical
Ability to supply the specified spares (Hydrastep probe and mill microphone parts) as per Eskom’s requirements.
Financial
Financial stability to fulfill a 5-year supply agreement (may require proof of financial capacity).
Compliance Requirements
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)B-BBEE Requirements
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Contractual Terms
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfDescription
Source: Annexure B.pdfReturnable Documents
Source: Annexure B.pdf (unknown)Evaluation Criteria
Source: Annexure B.pdf (unknown)While specific technical or financial criteria are not in this annexure, eligibility is implicitly tied to the ability to understand and comply with the stringent OHS requirements. The supplier must have an authorized person (CEO/Director) to sign the acknowledgement. Eskom also indicates it may request testimonials and references for similar past work, suggesting a preference for experienced suppliers.
Technical Specifications
Source: Annexure B.pdf (unknown)Compliance Requirements
Source: Annexure B.pdf (unknown)Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Primary eligibility is contingent on the correct and complete submission of this E-Tendering Training Acknowledgement Form prior to the deadline. Non-submission or incomplete submission renders the tenderer non-responsive and disqualified. General eligibility for the main tender would require the ability to supply the specified spares to Kendal Power Station in Mpumalanga.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Contact Information
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)The Purchaser is Eskom Holdings SOC Ltd, located at Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199. The Purchaser’s agent details are given in the Contract Data. The tenderer must contact the Purchaser’s agent within two weeks of receiving a signed copy of the agreement to arrange delivery of securities, bonds, guarantees, proof of insurance and other required documentation.
Submission Guidelines
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)Returnable Documents: The tenderer must examine the documents listed in the Tender Data and addenda listed in the Returnable Schedules. By submitting the Offer, the tenderer accepts the Conditions of Tender. The Offer must be signed by a duly authorised representative. The Purchaser may accept the Offer by signing the Acceptance part and returning one copy including the Schedule of Deviations (if any) to the tenderer before the end of the validity period. If submitting alternative tenders, use another copy of this Form of Offer and Acceptance. A tenderer’s covering letter must not be included in the final contract document.
Returnable Documents
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)The Form of Offer and Acceptance must be completed with signatures, names, capacities, and witness details for both the tenderer and the Purchaser. The tenderer must insert their name and address. The Purchaser is Eskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199.
Evaluation Criteria
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)Tenderer must be a legally constituted entity with duly authorized representatives. Must comply with all terms and conditions in the tender documents. No specific eligibility criteria are detailed in the provided excerpt, but full compliance with the Conditions of Tender (referenced but not included) is required.
Technical Specifications
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)Supply and deliver Hydrastep probe and mill microphone spares at Kendal Power Station for a period of five (5) years. The scope is defined in Part C3: Scope of Work: Goods Information including Supply Requirements, and any drawings and documents incorporated by reference.
Financial Requirements
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)The tenderer must provide an offered total price exclusive of VAT, VAT at 15%, and a total inclusive of VAT. This total is for budgeting purposes only; actual amounts due will be assessed according to the conditions of contract. Pricing details are contained in Part C2: Pricing Data. The tenderer must also be prepared to provide securities, bonds, guarantees, and proof of insurance as required by the contract conditions.
Compliance Requirements
Source: C1 1 SC3 Offer Acceptance.pdf (unknown)The tenderer must comply with all terms and conditions of the contract. The tenderer must provide any securities, bonds, guarantees, proof of insurance and other documentation as required by the conditions of contract identified in the Contract Data. Failure to fulfil these obligations constitutes a repudiation of the agreement.
Contractual Terms
Source: C1 1 SC3 Offer Acceptance.pdfThe tenderer offers to perform all obligations and liabilities of the Supplier under the contract. The Purchaser accepts the Offer by signing the Acceptance part. The contract terms are contained in Part C1 (Agreements and Contract Data), Part C2 (Pricing Data), and Part C3 (Scope of Work). Deviations must be recorded in the Schedule of Deviations; no other deviations are valid. The tenderer must contact the Purchaser’s agent within two weeks of receiving a signed agreement to arrange delivery of securities, bonds, guarantees, proof of insurance and other documentation. Failure to do so constitutes repudiation. The agreement becomes effective when the tenderer receives a fully completed and signed original copy.
Description
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdfContact Information
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":null}
Evaluation Criteria
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)While specific supplier eligibility is not detailed in this annexure, compliance with these CPA requirements is a mandatory condition for a valid tender submission. Failure to propose a CPA or submit a compliant formula will result in pricing being considered fixed, which may disadvantage the bidder or render the bid non-compliant for a 5-year contract.
Technical Specifications
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Pricing Schedule
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdfFinancial Requirements
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Important Dates
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Closing date: 22 August 2026 at 10:00.
Submission Guidelines
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Returnable Documents: The Integrity Declaration Form is a required returnable. It must be fully completed, signed, and submitted by tenderers at the stipulated deadlines.
Returnable Documents
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Evaluation Criteria
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Tenderers will be disqualified if they: 1) Fail to submit a fully completed and signed form. 2) Are found to have a conflict of interest that is not properly declared. 3) Are listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters. 4) Have been convicted of fraud/corruption in procurement processes in the past five years. 5) Have abused Eskom's procurement process (e.g., bid rigging) or committed fraud in relation to it. 6) Provide false information in this declaration.
Compliance Requirements
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Requirements
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Section
Source: Integrity Declaration Form - 08 November 2024.pdfTenderers must declare any conflicts of interest related to Eskom employees involved in tender evaluation, adjudication, or negotiation.
Contact Information
Source: 240-77471969 C2 Tender Evaluation Form Medium Risk.pdf (unknown)Contact: Eskom’s/Client’s OHS Representative (designation, signature, date).
Submission Guidelines
Source: 240-77471969 C2 Tender Evaluation Form Medium Risk.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: 240-77471969 C2 Tender Evaluation Form Medium Risk.pdf (unknown)Eligibility is contingent on submitting all listed OHS returnable documents. The tenderer must have a formal OHS management system, a CEO-signed OHS policy, and valid compensation insurance (COIDA). The OHS plan and BRA must specifically address the risks of the supply scope.
Technical Specifications
Source: 240-77471969 C2 Tender Evaluation Form Medium Risk.pdf (unknown)Scope: Supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station for five years.
Document details: Template Identifier 240-43921898 Rev 5, Document Identifier 240-77471969 Rev 3 (Medium risk work), Effective Date May 2021.
Compliance Requirements
Source: 240-77471969 C2 Tender Evaluation Form Medium Risk.pdf (unknown)Health and safety compliance:
Health & Safety
Source: 240-77471969 C2 Tender Evaluation Form Medium Risk.pdfOHS requirements:
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfThe Eskom Supplier Integrity Pact applies to Eskom Holdings SOC Ltd and all existing/potential suppliers. It prescribes ethical behaviour, aligns procurement with South African laws and constitutional principles, and supplements other Commercial and Ethics policies.
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Closing date: 27 June 2023.
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)For reporting unethical behaviour: Eskom Ethics Office at [email protected], Eskom Forensic at [email protected], or toll-free hotline 0800 11 27 22.
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Returnable Documents: Integrity Declaration Form must be completed, signed, and submitted whenever participating in any Eskom procurement process.
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)The pact applies to all existing and potential suppliers (natural or juristic persons) to Eskom Holdings SOC Ltd. Eligibility to tender is contingent upon acceptance and compliance with this Integrity Pact. Suppliers must be registered or registerable on the Eskom Vendor Database ('Eskom Registered Vendor').
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)The Eskom Supplier Integrity Pact applies to Eskom Holdings SOC Ltd and all existing/potential suppliers. It prescribes ethical behaviour and supplements all relevant Commercial and Ethics policies/codes/procedures.
Financial Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Suppliers must refrain from tendering practices in bad faith, unfair and anti-competitive, such as under-pricing, collusion, or bid rigging.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Suppliers must read, complete, sign, and submit the Integrity Declaration Form for any Eskom procurement process. They must refrain from dishonesty, fraud, and corruption.
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfSuppliers may be subject to a supplier discipline process and sanctions for misconduct. Suppliers must report unethical behaviour of Eskom employees/directors via specified channels. Eskom will treat tenderers fairly and transparently. Employees/directors must declare interests and avoid conflicts. Gifts must be declared and authorised; employees/directors involved in tender evaluation may not accept benefits from tenderers. Employees/directors with interests in a tender will be excluded from evaluation.
Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)All Eskom suppliers must read, complete, sign, and submit the Integrity Declaration Form for any procurement process. Suppliers must refrain from dishonesty, fraud, and corruption. All Eskom employees/directors must complete an annual Declaration of Interest and additional DOI/NDA if involved in procurement. Gifts must be declared and authorised; employees/directors involved in tender evaluation may not accept benefits from tenderers. Employees/directors with interests in a tender will be excluded from evaluation. Employees/directors are prohibited from having personal beneficial interest in Eskom contracts.
Section
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfSuppliers must avoid unethical dealings with Eskom employees/directors involved in evaluation/adjudication/negotiation of transactions.
Description
Source: Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdfSupply and delivery of Hydrastep probes and mill microphone spares on an 'as and when' basis to Kendal Power Station for a period of five (5) years. Authorised by Carol Lephoto, Materials Manager, on 12 May 2025. Referenced procedure: Occupational Health and Safety Risk Assessment Procedure 32-520.
Contact Information
Source: Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdf (unknown)Department: Supply and Delivery of Hydrastep probes and Mill Microscopes. Authorised by: Carol Lephoto, Materials Manager. Date: 12 May 2025.
Evaluation Criteria
Source: Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdf (unknown)While explicit commercial eligibility criteria (e.g., B-BBEE, tax compliance) are not detailed in this excerpt, eligibility is implicitly tied to OHS compliance. Bidders must have systems and documented procedures to manage the identified risks, provide competent personnel, and adhere to all referenced South African health, safety, and environmental legislation. The contractor/client responsibility matrix indicates the contractor shares legal responsibility for implementing controls.
Technical Specifications
Source: Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdf (unknown)Scope: Supply and delivery of Hydrastep probe and mill microphone spares on an 'as and when' basis to Kendal Power Station for a period of five (5) years. Reference: Occupational Health and Safety Risk Assessment Procedure 32-520.
Compliance Requirements
Source: Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdf (unknown)Occupational Health and Safety (OHS) Compliance: Adherence to OHSAct Section 13, Hazardous Chemical Substance Regulations (Annexure 1, 36), Environmental Regulations in Workplaces, Driven Machinery Regulations 18, Ergonomics Regulations 2019, Road Traffic Act, and Vehicle Safety (Work Instruction 240-69946). Disaster Management Act, 2002 compliance required where applicable.
Environmental
Source: Baseline Risk Assessment Hydrastep probe and Mill Microphone.pdfCompliance with Environmental Regulations in Workplaces and Driven Machinery Regulations 18 under OHSAct Section 13. Hazardous Chemical Substance Regulations (Annexure 1, 36) apply where relevant.
Contact Information
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)Fraud and corruption reporting: 0800 11 2722 or [email protected].
Submission Guidelines
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)The tenderer must furnish the following particulars in Annexure C:
Returnable Documents
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)The tenderer must complete and submit the following returnable documents as part of Annexure C:
Evaluation Criteria
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)The tenderer must be a legally constituted entity (individual, company, JV) with valid CIPC registration. Tax compliance is mandatory (via CSD, SARS PIN, or a valid tax compliance certificate). Registration on the National Treasury Central Supplier Database (CSD) is a mandatory pre-award condition. CIDB registration is required if applicable to the scope. Subcontractors, if used, must also be registered on CSD and their B-BBEE status must be declared.
Compliance Requirements
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)Mandatory compliance requirements:
B-BBEE Requirements
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)B-BBEE requirements for subcontractors:
a) EME or QSE.
b) EME/QSE at least 51% black-owned.
c) EME/QSE at least 51% black youth-owned.
d) EME/QSE at least 51% black women-owned.
e) EME/QSE at least 51% black-owned by people with disabilities.
f) EME/QSE 51% black-owned by people in rural/underdeveloped areas/townships.
g) Cooperative at least 51% black-owned.
h) EME/QSE at least 51% black-owned by military veterans.
i) More than one of the above categories.
Requirements
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)General requirements:
Description
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfThis document outlines Eskom's Contract Price Adjustment (CPA) requirements for foreign goods and services.
Important Dates
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Closing time: 12H00.
Contact Information
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Fraud and corruption hotline: 0800 11 2722 or [email protected].
Submission Guidelines
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Returnable Documents: Not specified in this document. Refer to main tender documents for submission requirements.
Evaluation Criteria
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Tenderers must be direct importers of the goods/services if pricing in foreign currency. Those importing goods into stock for multiple customers must quote in ZAR. For Payment Method 1B or service payments under 1B, proof of South African Reserve Bank (SARB) approval to invoice in foreign currency and receive funds into a CFC account is mandatory. Tenderers using Payment Method 2 must obtain prior Eskom approval and provide a written indemnity against buying forward cover.
Technical Specifications
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Contract Price Adjustment (CPA) requirements:
Methodology
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfFor specialist services involving foreign personnel, two methodologies are defined:
Pricing Schedule
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfContract Price Adjustment (CPA) and pricing instructions:
Financial Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Payment and pricing requirements:
Compliance Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)No specific compliance requirements (e.g., CSD, tax, B-BBEE) are stated in this document.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf (RFP)Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf (RFP)Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf (RFP)Tenderer must not be from a sanctioned country; must not submit multiple tenders; joint ventures must have joint and several liability; no conflicts of interest; not restricted by National Treasury or Eskom; not on Tender Defaulters list; cannot subcontract 100% of scope; must have valid CSD registration; must not have a nationality from an internationally sanctioned country.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf (RFP)Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdfQuality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdfPricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdfFinancial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf (RFP)Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdf (RFP)Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdfEnvironmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdfContractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 21 April 2026 (2).pdfImportant Dates
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Closing Date: 31 May 2024. No other dates (briefings, site visits, clarification deadlines) are specified.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Email for fraud/corruption reporting: [email protected]. No SCM/technical contacts, phone numbers, or submission address provided. The address fragment appears to be part of delivery instructions, not a submission contact.
Submission Guidelines
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Returnable Documents: Not specified in the provided document. Submission details, required forms, and disqualification risks are not outlined.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Scope: Supply and delivery of hydrastep probe and mill microphone spares on an 'as and when' required basis at Kendal Power Station for five years. The goods/works/services must be as described in the agreement and approved by Eskom. Eskom may inspect, test, and reject goods that do not comply.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfEskom may reject goods for non-compliance, requiring replacement or re-work. Rejected goods may be returned at the Supplier's risk and expense. For works/services, Supplier must correct defects as indicated by Eskom.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfPrices or rates may include an amount for price adjustment, calculated per the agreement formula.
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Prices may include a price adjustment as per the agreement formula. Payment is within 30 days after receipt of a correct tax invoice. Eskom's VAT number (4740101508) must appear on the invoice. Delivery costs must be stated in the tender; if not stated, they are deemed included. No payment for containers/packing materials unless stated.
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Supplier must adhere to all statutory requirements of South Africa. The agreement is governed by RSA law and subject to SA court jurisdiction. No specific mention of CSD, tax clearance, B-BBEE, CIDB, CIPC, or professional registrations.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfGeneral Terms: The agreement includes order documents, General Conditions of Purchase, and Eskom-approved specifications. These conditions form the contract basis; non-acceptance must be indicated, otherwise deemed accepted. No oral variations allowed.
Contractual Clauses:
Description
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdfContact Information
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdf (unknown)Technical Specifications
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdf (unknown)Quality Management
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdfCompliance Requirements
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdf (unknown)Health & Safety
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdfEnvironmental
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdfContractual Terms
Source: Supply Delivery of Hydrastep probe Mill microphone spare OHS Specification - Medium Risk.pdfDescription
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdfProject: Supply and deliver Hydrastep probe and mill microphone spares.
Important Dates
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (TENDER)Document issued: 11 May 2026.
Contact Information
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (TENDER)Eskom representative: Glenda Zulu.
Submission Guidelines
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (TENDER)Returnable Documents:
Returnable Documents
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (TENDER)Complete and sign Form A (E.1).
Evaluation Criteria
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (TENDER)Bidders must demonstrate a Quality Management System compliant with ISO 9001:2015. This can be proven either through a valid ISO 9001 certification from an accredited body (Option 1) OR by providing objective evidence of a documented, compliant but uncertified QMS (Option 2). Failure to meet the QMS requirements will result in a low score, particularly in Sections A and B which are heavily weighted.
Compliance Requirements
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdf (TENDER)No specific compliance requirements stated.
Section
Source: List of Tender Returnables SUPPLY AND DELIVER OF HYDRASTEP PROBE AND MILL MICROPHONE SPARES.pdfQuality requirements scoring:
Description
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdfThis document is a Tax Compliance Questionnaire for Foreign Suppliers (Annexure G). It outlines exemptions for foreign suppliers with no local footprint in South Africa from tax clearance and Central Supplier Database registration. Includes a questionnaire to determine eligibility.
Important Dates
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Closing date: 06 October 2016. Review date: April 2027.
Contact Information
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Address: Insert your company registration number. No specific contact person, email, or phone provided in the document.
Submission Guidelines
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Returnable Documents: Complete the Tax Compliance Questionnaire for Foreign Suppliers (Annexure G) if you are a foreign supplier. The questionnaire must be signed and include company details.
Returnable Documents
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)The Tax Compliance Questionnaire (Annexure G) must be completed, signed, and returned with: company name, registration number, telephone number, fax/email address, and signatory details (name, designation, signature, date).
Evaluation Criteria
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Open to suppliers, both local and foreign. For foreign suppliers: Eligibility for tax exemption requires answering 'No' to all questions in the Annexure G questionnaire (regarding residency, local branch, permanent establishment, local income, and local tax liability). The supplier must formally declare the truthfulness of their answers.
Compliance Requirements
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Foreign suppliers with no local footprint in South Africa (no branch, permanent establishment, source of income, or tax liability) are exempt from submitting a tax clearance certificate and registering on the Central Supplier Database. Complete the Tax Compliance Questionnaire (Annexure G) to confirm your status.
Requirements
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Mandatory for foreign suppliers to complete. Effective date: 06 October 2016. Review date: April 2027. Foreign suppliers with no local footprint (no branch, permanent establishment, income source, or tax liability in RSA) are exempt from tax clearance and CSD registration. Complete the questionnaire to confirm.
Description
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdfReturnable Documents
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)Evaluation Criteria
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)The bid is subject to the Preferential Procurement Policy Framework Act (PPPFA). Eligibility is contingent on meeting the (unspecified in this excerpt) minimum local content threshold for the designated sector. Bidders cannot subcontract in a way that reduces the overall local content below this threshold. The tender appears to be restricted to bids offering locally produced or manufactured goods, as per dtic regulations for designated sectors.
Technical Specifications
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)Pricing Schedule
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdfFinancial Requirements
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)Compliance Requirements
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)B-BBEE Requirements
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)Contractual Terms
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdfSection
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdfDescription
Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdfSupply and Delivery of Hydrastep probes and Mill Microscopes
Date: 12-May-25 Authorised by:
Name: Carol Lephoto
Document identifier
Designation:Materials Manager
Revision number: 5
Date: 12.05.2025
Revision date: 30-Apr-27
Refer to Occupational Health and Safety Risk assessment procedure 32-520
What are the possible
List activity Hazard Ide
Contact Information
Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply and Delivery of Hydrastep probes and Mill Microscopes","address":null}
Evaluation Criteria
Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf (unknown)Contractors must demonstrate capability to implement comprehensive OHS controls, have personnel with required competencies (forklift operation, safe driving), provide appropriate PPE, and comply with all South African occupational health and safety legislation. Financial and technical eligibility criteria are not specified in this excerpt.
Technical Specifications
Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf (unknown)Supply and Delivery of Hydrastep probes and Mill Microscopes
Date: 12-May-25 Authorised by:
Name: Carol Lephoto
Document identifier
Designation:Materials Manager
Revision number: 5
Date: 12.05.2025
Revision date: 30-Apr-27
Refer to Occupational Health and Safety Risk assessment procedure 32-520
What are the possible
List activity Hazard Ide
Supply and Delivery of Hydrastep probes and Mill Microscopes
Date: 12-May-25 Authorised by:
Name: Carol Lephoto
Document identifier
Designation:Materials Manager
Revision number: 5
Date: 12.05.2025
Revision date: 30-Apr-27
Refer to Occupational Health and Safety Risk assessment procedure 32-520
What are the possible
List activity Hazard Ide
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf]
Compliance Requirements
Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf (unknown)No specific requirements found
Designation:Materials Manager
Revision number: 5
Date: 12.05.2025
Revision date: 30-Apr-27
Refer to Occupational Health and Safety Risk assessment procedure 32-520
(controls implemented to eliminate hazards or reduce the
likelihood of the risk occurring), and Where applicable, add IRM system reference
(controls implemented to reduce the immediate impact of the List specific activities to be performed taking Person allocated the (applicable to risks that have an impact on
Anything with potential to cause of harm. A chance that injury , ill health or damage could Consider the worse case scenario risk occurring) into consideration the equipment to be Safety or health responsibility for implementing business objectives or require intervention from used, Note: A hazard can pose more than one risk. occur as a result of uncontrolled hazard. without controls?
the personnel involved in the task. the agreed controls Senior or Executive management such as
Personal protective equipment (PPE)
Employees may be exposed to ash dust from the Respiratory and lung infections and/or Wearing of dust masks FFP2 & FFP3 is manadatory, hazrd OHSAct sec 13, Hazardous Chemical Substance
Poor visibility , leading vehicle OHSAct sec 13, Hazardous Chemical Substance
nearing plants or during windy season while Safety safety induction, Windows to be closed should there be visible Contractor/ client
accidents, also pedestrian incident Regulations, Annexure1,36
driving around the station with the window down dust whilst driving.
Employees may be exposed to coal dust from the Wearing of dust masks FFP2 & FFP3 is manadatory, hazrd OHSAct sec 13, Hazardous Chemical Substance
nearing plants mainly terrace bin awarness and induction Regulations, Annexure1,36
skin irritation
The operator might collide with material at stores Damage to equipment, crushed by or Only competent operators are allaowed to operate the fork lift, OHSAct sec 13,Environmental Regulations in
Moving machinery ( forklift) Safety Contractor/ client
or people caught between injuries. Supervision and risk assessment workplaces, Driven Machinery Regulations
Microscopes Falling objects Struck by Safety Fructure, injuries Required PPE to be worn i.e hard hat, safety shoes. Risk Contractor/ client OHSAct sec 13
assessment, Supervision.
Pinch and nip points Caught in between, Safety Injuries Required PPE i.e gloves, Risk assessment, Supervision. Contractor/ client OHSAct sec 13
tissue injuries to wrists, arms, shoulders, lift/carry manually,Hazard awareness, employing correct handling
neck or legs. techniques OHSAct sec 13,Environmental Regulations in
workplaces, Driven Machinery Regulations 18,
Poor visibility, fatigue, poor road surfaces including Road traffic act, OHS Act. Vehicle Safety 240-
Unfavourable Weather conditions , Road traffic act, OHS Act. Vehicle Safety 240-
Struck by, struck against incidents,Loss of control Collision that result in accidents with Road traffic act, OHS Act. Vehicle Safety 240-
Loss of control of the vehicle. Not observant of the Road traffic act, OHS Act. Vehicle Safety 240-
construction, road works, bends, steep hills, rail Safety multiple injuries and/or fatalities as well meetings/ tool box talks/ lessons learned/ road safety Contractor/ client
surroundings. Unfamiliar with the road. Speeding 69946.
crossings as property damage. campaigns. Postponing trip until its safe to travel
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf]
Next Review Date Template identifier: 240-70044602
(every 2 years):
Business/Operating unit: Supply and Delivery of Hydrastep probes and Mill Microscopes
Date: 12-May-25 Authorised by:
Name: Carol Lephoto
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
Substitution control)
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
nearing plants or during windy season eye irritation awarness and induction Regulations, Annexure1,36
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
Work instruction
regulations 2019
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
potholes 69946.
as property damage. campaigns. Postponing trip until its safe to travel
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
Mist/Fog/heavy rain 69946.
as property damage. campaigns. Postponing trip until its safe to travel
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
of the vehicles. multiple injuries and/or fatalities. 69946.
campaigns. Postponing trip until its safe to travel
[Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdf — unknown]
Health & Safety
Source: Hydrastep probe mill microphone Baseline Risk Assessment.pdfof the vehicles. multiple injuries and/or fatalities. 69946.
campaigns. Postponing trip until its safe to travel
Description
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfImportant Dates
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)Evaluation Criteria
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)Not explicitly stated in the provided PPE standard. Eligibility for the tender would likely be determined by Eskom's procurement policies (referenced as 32-288/32-599) and ability to meet the technical specifications and delivery terms outlined in the actual tender call. The standard emphasizes preference for locally manufactured PPE.
Technical Specifications
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)This is an Eskom PPE Standard document, not a tender for hydrastep probes. The content details extensive technical specifications for Personal Protective Equipment (PPE) including:
Quality Management
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfCompliance Requirements
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)Health & Safety
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfContractual Terms
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfRequirements
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)Section
Source: 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfSubmission Guidelines
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Returnable Documents
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Evaluation Criteria
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Bidders must be tax compliant with SARS; persons in service of the state or companies with directors in service of the state are excluded; foreign suppliers must declare RSA residency, branch, establishment, income, or tax liability status; consortium/joint venture partners must each submit separate tax compliance documents.
Technical Specifications
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Compliance Requirements
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Contractual Terms
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Requirements
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Section
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must meet eligibility criteria stated in the Tender Data (not provided in this excerpt) and must not be restricted from doing business with Eskom or State-Owned Companies. Sub-contracting 100% of the scope of work is prohibited and will result in disqualification. Tenderers found to have misrepresented information, particularly regarding B-BBEE status, face disqualification, reporting to the B-BBEE Commission, and potential suspension from state business.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfFinancial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
37
Last checked
22 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.