Tender Type
Request for Bid(Open-Tender)
Delivery Location
As per the Invitation to Tender - Various Sites - Various Sites -
Organization Type
GOVERNMENT
Published
31 Aug 2026
OCDS Reference
ocds-9t57fa-167640
ESKOM requires the manufacture, testing and supply of estimated quantities of wire strands and electrical wire for its central east cluster (kwazulu-natal and free state operating units) on an as-and-when-required basis for 36 months. The single most consequential requirement is the submission of a complete OHS compliance package — including a ceo-signed annexure b acknowledgement form, OHS plan, baseline OHS risk assessment, valid coida letter of good standing, and OHS policy — all addressing the specific scope of work and signed by the CEO, without which the bid will be disqualified.
Closing date and time: 30 September 2026 at 10:00 (submission method and address not stated in provided sections).
Mandatory returnable documents (all must be submitted with the bid):
Eligibility and compliance thresholds: Compliance with Occupational Health and Safety Act 1993 and Regulations; Compensation for Occupational Injuries and Diseases Act 1993; Basic Conditions of Employment Act; and listed Eskom OHS procedures (Incident Management 32-95, SHEQ Policy 32-727, Emergency Planning 32-123, Life Saving Rules 240-62196227, PPE 240-120054284, Substance Abuse 32-37, OHS Risk Assessment 32-520).
Contractor management obligations: Main supplier must have a documented contractor/supplier selection process with OHS competency criteria; notify Eskom before appointing any contractor/supplier and before work commencement; ensure contractors/suppliers have necessary resources and competencies; implement audit programme for OHS compliance; manage non-conformances through agreed penalty mechanisms aligned to Eskom processes.
All employees and contractors must undergo Eskom induction and company induction before work commencement.
Contractual penalties apply for non-compliance with statutory or Eskom OHS requirements by the main supplier, its contractors or suppliers.
No CIDB grading, B-BBEE level, local content percentage, minimum turnover, or professional registration requirements are stated in the provided sections.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 30 September 2026 - 10:00
Venue
Join: https://teams.microsoft.com/meet/371611155029073?p=2sWUofmgUMxiB0sVYy Meeting ID: 371 611 155
Categories
Request for Bid(Open-Tender)
As per the Invitation to Tender - Various Sites - Various Sites -
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: SECTION 4 - Quality.zip31 Aug
2026
Tender Published
Tender was published
30 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SECTION 6 - Environmental.zip
Eskom is procuring the manufacture, testing, and supply of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a 36-month period.
SECTION 5 - Safety.zip
Eskom is procuring the manufacture, testing and supply of estimated quantities of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a 36-month period.
E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf
Eskom Holdings SOC Ltd invites tenders for the manufacture, test, and supply of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a 36-month period. The contract may be awarded to one or two suppliers per line item based on price variance, with mandatory local content thresholds of 90% for electrical and telecom cables and 100% for steel value-added wire products.
SECTION 4 - Quality.zip
Eskom requires the manufacture, testing, and supply of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a 36-month period. The tender is governed by Eskom's Supplier Quality Management Specification (240-105658000, Revision 4), which mandates ISO 9001-aligned quality management systems, contract quality plans, and inspection/test plans with defined hold and witness points.
SECTION 2 - Technical.zip
Eskom is procuring the manufacture, test, and supply of zinc-coated stranded steel wire conductors and stays for distribution lines in the Central East Cluster (KwaZulu-Natal and Free State) on an as-and-when-required basis for 36 months. The tender covers 10 specific conductor types (SAP numbers) with detailed technical specifications governed by SANS 182-5 and Eskom standard 240-75883116.
SECTION 1 - Commercial and Finance.zip
Eskom Holdings SOC Ltd invites tenders for the manufacture, test and supply of estimated quantities of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when required basis for a period of 36 months. The contract will be awarded under NEC3 Supply Contract terms.
SECTION 3 - SDL&I.zip
Eskom invites tenders for the manufacture, testing, and supply of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a 36-month period. The tender includes mandatory local content requirements, B-BBEE specific goals scoring, and Supplier Development, Localisation and Industrialisation (SDL&I) obligations with financial penalties for non-compliance.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Procurement and Supply
Chain Management
Revision: 4
Total Pages: 30
Next Review Date: May 2030
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by and Authorized by
Functional
Responsibility
Sipho A Sambo Bathusi Montwedi Gerhard Van Der Walt
Middle Manager Senior Manager General Manager
(Acting) (Acting)
Procurement and
Supplier Quality Procurement and Supply Chain
Management Supply Chain Management
ManagementProcurement and Corporate Services
Supply Chain Corporate Services
Management
Corporate Services
Date: 2026/05/26 Date: Date: 01 July 2026
EDC TN Formatted 15.10.2021/TR Formatted 22.10.2025
Template ID: 32-4 (Rev 13) Document template (for procedures, manuals, standards, instructions, etc.)
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Content
. Introduction .................................................................................................................................................. 3
2.1 Scope ................................................................................................................................................. 3
2.1.1 Purpose .................................................................................................................................. 3
2.1.2 Applicability ............................................................................................................................ 3
2.1.3 Effective date ......................................................................................................................... 3
2.2 Normative/Informative References ..................................................................................................... 3
2.2.1 Normative ............................................................................................................................... 3
2.2.2 Informative ............................................................................................................................. 4
2.3 Definitions ........................................................................................................................................... 4
2.4 Abbreviations ...................................................................................................................................... 6
2.5 Roles and Responsibilities ................................................................................................................. 6
2.6 Process for Monitoring ....................................................................................................................... 7
2.7 Related/Supporting Documents ......................................................................................................... 7
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................................... 8
3.2 Quality Plan ........................................................................................................................................ 9
3.3 Contract Quality Plan ......................................................................................................................... 9
3.4 Quality Control Plan ......................................................................................................................... 11
4.1 Main Supplier and Sub-supplier Categories .................................................................................... 15
4.2 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................................... 18
5.1. Contract Execution ............................................................................................................... 19
5.2. Supplier Quality Performance Monitoring Phase ................................................................. 20
5.3. Supplier Quality Audit .......................................................................................................... 21
6.1. Rights of Access ............................................................................................................... 21
6.2. Eskom Rights to Information ............................................................................................................ 22
6.3. Preservation ..................................................................................................................................... 23
6.4. Quality Audits Related Conditions .................................................................................................... 27
6.5. Management of Nonconformities and Nonconforming Outputs Identified by Eskom ...................... 27
6.6. Special Processes ............................................................................................................................ 28
Acceptance ................................................................................................................................................ 29
Revisions ................................................................................................................................................... 29
Development Team ................................................................................................................................... 30
Acknowledgements ................................................................................................................................... 30
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the evaluation, selection,
supplier/ vendor registration, assessment, performance monitoring, and auditing of suppliers.
Eskom’s position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The focus is to ensure suppliers establish and continually
improve their QMS and enhance service delivery, and customer satisfaction by implementing and
conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements for various externally provided products, services and processes and
continual adherence throughout the duration of a contract.
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnable
[12] 240-168873697 Supplier Quality Management: Tender Evaluation Scorecard
[13] 240-125473040 Supplier Quality Management: Guideline for QM 58 Selection Criteria
[14] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[15] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components.
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
NOTE: An Inspection and Test Plan (ITP) is a structured document that outlines the
necessary inspections and tests to ensure that a product or process meets specified quality
requirements and standards.
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use. This may include
welding processes or non-destructive techniques
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CFT Cross Functional Team
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT / NDE Non-Destructive Testing / Non-Destructive Examination
PMI Positive Material Identification
QCP Quality Control Plan
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
WPS Welding Procedure Specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
The assigned Eskom Quality representative/ professional when part of a Cross Functional Team
(CFT) appointed to transact on externally provided products, services and processes shall select
applicable requirements for existing and potential Eskom suppliers using, 240-125473040 Supplier
Quality Management – Guideline for QM 58 Selection Criteria and Form A (Tender and Contract
Quality Requirements for Supplier Quality Management: Specification 240-105658000/ QM 58 and
Quality Requirements for ISO 9001 Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnables as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule to review performance and effectiveness of this specification.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
2.7.1 Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
[5] 240-144723833 Quality Requirements Exemption Certificate
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001, and may include a quality manual, quality plans, work procedures, work
instructions, method statements, workflow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnables, as per the categories
of quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier’s
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Where a new product/ service introduced in Eskom, the requirements for such shall be in line
with available industry recommended practises (RP) or applicable codes (for example for
BESS, the RP UL 9540 or IEEE 1790) in the absence of SANS equivalent
3.1.6 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.7 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
3.1.8 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.9 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables, as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained
contract/project quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract/project quality plan (CQP) and/ or quality control plan (QCP)/ inspection
and test plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract/ Project Quality Plan should address the quality assurance elements related to
the scope of work and/ or technical specification for the specified duration.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans and the
sub-contracted scope of work. In addition to the elements specified in ISO 10005, the supplier’s
and/ or sub-suppliers’ CQPs shall include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture.
3.3.6 The personnel carrying out special processes (for example, NDE, welding, coating, heat
treatment, etc.) where the results cannot be fully verified by subsequent inspection and test
shall be suitably qualified and, where applicable, registered with statutory bodies as legally
required, that is, as radiographic workers to conduct radiography. The requirements for the
qualification shall be specified, and personnel records shall be maintained in accordance with
the Project Quality Personnel Qualification Specification and, where applicable, legal
requirements.
3.3.7 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s training and development policies
or in line with applicable regulatory and statutory bodies requirements.
3.3.8 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training and development policies. All the training certificates shall meet the
applicable regulatory or statutory requirements in terms of having the unit standard /National
Qualification Framework (NQF) completed and the accreditation number of the service
providers.
3.3.9 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.10 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.11 The CQP information shall include, but not limited to:
methods to be utilised to ensure quality.
generated.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Cqp.
project.
3.3.12 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.13 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.3.14 Competence and Qualification of Personnel managing quality shall be in line with applicable
qualification, certificates as deemed by the respectable company criteria.
3.3.15 Where personnel involved in the management of quality shall be noted to be lacking relevant
competences, Eskom shall request the removal of such personnel from the contract site
operations in respect to all activities and process that leads to conformity of product /services.
3.4 Quality Control Plan
The supplier shall develop, implement and maintain processes and procedures that efficiently and
effectively allows monitoring and verification of the scope of work activities, to outline specific
procedures; standards; and responsibilities for maintaining product or service quality.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services. The
intervention points and the inspection and tests methods to be applied are to be indicated
as per ISO 10005, Guidelines for Quality Plans.
3.4.2 QCP/ ITP shall be reviewed and accepted by an Eskom employer representative, its
inspection authority or agency, and they shall allow for the insertion of Eskom specific
requirements, including hold and witness points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
QCP/ ITP and be based on the sub-contracted scope of work.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
with reference to the relevant criticality risk rating
international standard, with the relevant clause number for each operation
agency
intervention in the plan
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
will take place, including facility location(s)
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
inspectors
applicable), and Eskom prior to commencement of work
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
inspected
distribution, and report retention requirements
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
equipment and sub-systems (if applicable)
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
The selected quality assessment criteria and Form A of this specification will be compiled and
completed by the assigned Eskom Quality representative/ professional who using the guideline 240125473040, shall select the suitable supplier quality requirements to be met.
Form A (Section A & Section E) of this specification must also be completed and signed by the
supplier responding to an Eskom invitation to tender, in order to acknowledge, accept and further
commit to comply with the Eskom Supplier Quality requirements as per this specification and ISO
9001 Standard or any additional quality requirements specific to the scope of work.
4.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
The following are the minimum returnable documentation for Categories 1 to 4:
4.1.1 Category 1: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
Automobile; ICT) of a QMS (the latest applicable revision). The QMS should drive the
supplier’s business management processes to ensure that all of Eskom’s requirements are
fully met on a consistent basis.
audit reports. The audit reports must include, if applicable, nonconformities identified, and
the resulting remedial actions (correction and/ or corrective action reports).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals,
procedures.
described in the tender documents. The plan must address the minimum requirements as
per ISO 10005.
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
Processes, Products and Services.
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.1.2 Category 2: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
QMS that complies with ISO 9001 or any applicable standard of quality management system
(the latest applicable revision). The following documents (approved/ signed copies) shall be
submitted:
o Quality Management System manual or a documented information that have defines
and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information)
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The audit reports must include, if applicable, nonconformity identified, and the resulting
remedial actions (correction and/ or corrective action reports).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
described in the tender documents. The plan must address the minimum requirements as
per ISO 10005.
quality control plan (QCP) on similar or previous work done.
Processes, Products and Services.
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals,
procedures.
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.1.3 Category 3: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
9001 (or the latest applicable revision). The following documented information (approved/
signed copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information)
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
described in the tender documents. The plan must address the minimum requirements as
per ISO 10005.
quality control plan (QCP).
Processes, Products and Services.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals,
procedures.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.1.4 Category 4: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
scope of work.
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
strategic direction). (documented information)
Processes, Products and Services.
authorities, specific to the project/ scope of work/ technical requirements. Examples of
relevant documented information are; organization charts, job descriptions, work instructions,
duty statements, manuals, procedures.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.2 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Critical plant includes the following:
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted during the requirements setting phase of the
transaction.
5.1. Contract Execution
The supplier shall submit the following documents within 30 days (depending on the contract
duration) or as per stated timeline after the contract date, prior to the commencement of work, for
acceptance by Eskom:
Method statement before contract award. This shall be reviewed and signed off by Eskom
appointed employer agent within 30 days or as per stated timeline after contract award.
(Inspection and Test Plan) ITP(s) for review and acceptance by Eskom prior to the
commencement of any work, inclusive of subcontracted work, within 30 days or as per
stated timeline after contract award.
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
considered when compiling CQPs and QCPs.
minimum of 7 working days prior to the activity being executed.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
meetings shall be convened by Eskom with the supplier.
manager or his/her representative for the contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
5.2. Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom assigned employer agent at predetermined
intervals during the execution of a contract using agreed key performance indicators. The monitored
key performance areas include the following:
Subsequent key performance indicators associated with these areas will include the following:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
5.3. Supplier Quality Audit
5.3.1. Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification
such as contract document.
5.3.2. Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, verification of compliance reviews, surveillance,
inspections, or other interim or final assessments of scope of work deliverables provided by
the supplier or sub-suppliers.
5.3.3. Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
5.3.4. Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, verification of compliance reviews, surveillance,
inspections, or other interim or final assessments of scope of work deliverables provided by
the supplier or sub-suppliers.
5.3.5. Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with established documented
information for managing audits.
5.3.6. The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
5.3.7. The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
6.1. Rights of Access
Eskom:
6.1.1. shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
6.1.2. reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
6.1.3. reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
The supplier:
6.1.4. shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
6.1.5. shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
6.1.6. shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
6.1.7. shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
6.1.8. shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
6.1.9. shall ensure that the above requirements flow down to sub-suppliers.
6.2. Eskom Rights to Information
6.2.1. To expect that the works will be conducted in accordance with the contract between the
parties.
6.2.2. To have access to the supplier’s information as determined by applicable legislation.
6.2.3. Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages. Eskom
will coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
6.2.4. To obtain access to any audit reports of audits performed by the supplier reflected in the audit
programme.
6.2.5. To conduct independent quality audits during all phases of the contract, and the supplier shall
provide all resources to support these activities.
6.2.6. Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
6.2.7. To participate in, and/or lead, investigations related to incidents involving its products.
6.2.8. To require from suppliers to be responsible for the cost of re-inspections.
6.2.9. To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.2.10. Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
6.2.11. Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location.
6.2.12. Shall carry out assessments and audits on all new suppliers and sub-suppliers.
6.2.13. Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
6.2.14. Reserves the right to select intervention points within all developed supplier QCPs/ ITPs for
Eskom oversight of selected functions and to perform surveillance or audits of the work.
6.2.15. Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
6.2.16. Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
6.3. Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
6.3.1. Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
6.3.2. Development and implementation of preservation programme training appropriate to work
need.
6.3.3. Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not limited
to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
6.3.4. Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
6.3.5. Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
6.3.6. Review and tracking of compliance with sub-supplier provided preservation requirements and
recommendations.
6.3.7. Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.3.8. Preservation work plan development and plan execution performance evaluation of all parties
engaged for provision of material transportation, handling, or storage services.
6.3.9. Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
6.3.10. Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
6.3.11. The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
6.3.12. Where the project responsibility for equipment and materials management has been formally
delegated, the supplier’s preservation programme shall ensure clear and unambiguous
communication of pre-operation preservation of goods quality requirements to sub-suppliers.
6.3.13. The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
6.3.14. Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
6.3.15. Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
6.3.16. Supplier engineering shall ensure that preservation requirements for scope of work systems,
system components, equipment, materials, and other procured goods are clearly and
unambiguously documented and that preservation requirements are efficiently and effectively
communicated to project procurement, logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements. This shall take the form of a preservation programme applicable
to all systems, system components, equipment, materials, customer-supplied materials, and
other goods procured or managed under the scope of work.
6.3.17. The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions.
coverings, fasteners, lines, and other components for internal and external weather
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
proofing;
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
cyclical motion in transit, for example, wave-generated movement during sea
transport;
bracing, padding, framing, chocking, etc.;
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
by hard and soft barriers, as required, to maintain a protective perimeter;
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
6.3.18. detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain preservation
status.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.3.19. The supplier’s preservation management programme scope shall encompass management
of preservation requirements, from initial transfer of ownership or management responsibility
to project scope of responsibility, through any period of temporary or longer-term storage and
through any period of transit, including transit for final delivery at point of active use or
installation.
6.3.20. The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
6.3.21. The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components, mechanical
and rotating equipment, piping and fittings, instrumentation, flange faces, gaskets, coatings,
insulation, and other materials. Special precautions include, but are not limited to, supplier-
specified maintenance procedures related to engines, electric motors, pumps, compressors,
etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
6.3.22. The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
6.3.23. Where sub-supplier expertise is utilised in determination of the preservation protocol, supplier
procurement processes shall ensure clear and unambiguous documentation of sub-supplier
input into preservation management programme requirements.
6.3.24. Supplier procurement shall ensure that preservation requirements for scope of work systems,
system components, equipment, materials, and other procured goods are clearly and
unambiguously documented and that preservation requirements are efficiently and effectively
communicated to project logistics, construction management, quality, security, and other
project functional areas, as required, for efficient and effective implementation of preservation
requirements.
6.3.25. The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
6.3.26. The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation management
programme execution.
6.3.27. The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
6.3.28. The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.4. Quality Audits Related Conditions
6.4.1. The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
6.4.2. The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
6.4.3. Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s audit
schedule.
6.4.4. Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
6.4.5. Eskom reserves the right to conduct independent quality audits, scheduled and unscheduled,
during all phases of the contract. The supplier shall provide all resources to support these
activities.
6.4.6. Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
6.4.7. The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
6.4.8. The assessments and audits shall be carried out on all new suppliers and their sub-suppliers.
6.4.9. Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
6.4.10. Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
6.5. Management of Nonconformities and Nonconforming Outputs Identified by Eskom
6.5.1. Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
6.5.2. A formal response shall be prepared in respect of the defined criteria and submitted to Eskom
for its review, evaluation, and acceptance, within a maximum of 14 calendar days from the
date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
6.5.3. Eskom may, at its discretion, request a response sooner and, in any case, before the supplier
proceeding with any pending/further intervention or corrective action, as may be required by
Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.5.4. Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
6.5.5. The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
6.5.6. Nonconforming outputs identified by Eskom shall be documented via a NC Report and issued
to the suppliers via the contract communication protocol. The suppliers shall investigate the
matter and respond in writing to Eskom of disposition within the stated contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
6.5.7. Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
6.5.8. Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
6.5.9. Repeated Nonconformities, if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
6.6. Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
6.6.1. The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
6.6.2. This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
6.6.3. All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
Where applicable, a relevant Management System for the special process shall be certified or
approved by an accredited body and proof of certification shall be submitted to Eskom for review.
An example for this will be the Welding Management System based on ISO 3834.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.6.4. The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
6.6.5. This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
6.6.6. All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
6.6.7. Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
6.6.8. Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
6.6.9. The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
6.6.10. The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Portia Mngomezulu Group Executive: Corporate Services
Mpho Dire Chief Procurement Officer (Acting): Corporate Services
Bathusi Montwedi Senior Manager (Acting): Procurement and Supply Chain Management
Sanjiv Kalicharran Senior Manager (Acting): Risk and Sustainability - Quality Management
Rolland Ngugama Middle Manager: Risk and Sustainability - Quality Assurance
Pamela Dondashe Middle Manager: Risk and Sustainability - Quality Assurance
Date Rev. Compiler Remarks
Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
October 2025 4 SA Sambo
processes and systems. Including updates on
numbering of the document.
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Date Rev. Compiler Remarks
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) X
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
Important Dates
Source: SECTION 4 - Quality.zip (unknown)Closing date: 30 September 2026 at 10:00 (as per tender record).
Specification effective date: date of authorisation (signed 1 July 2026).
Next review date of specification: May 2030.
No compulsory briefing or site visit dates are stated in this document.
Contact Information
Source: SECTION 4 - Quality.zip (unknown)Eskom Holdings SOC Ltd — Procurement and Supply Chain Management.
Quality specification compiled by Sipho A Sambo (Acting Middle Manager, Procurement and Supplier Quality Management).
Supported by Bathusi Montwedi (Acting Senior Manager, Procurement and Supply Chain Management).
Authorised by Gerhard Van Der Walt (General Manager, Procurement and Supply Chain Management, Corporate Services).
No direct enquiry email, phone or submission address provided in this section; refer to the main tender invitation for SCM contact details.
Submission Guidelines
Source: SECTION 4 - Quality.zip (unknown)Returnable documents required with the tender:
All returnables must be submitted with the tender response. Incomplete or unsigned forms will lead to disqualification.
Evaluation Criteria
Source: SECTION 4 - Quality.zip (unknown)Evaluation follows Eskom's Supplier Quality Management Specification (240-105658000, QM 58) and the Tender Evaluation Scorecard (240-168873697).
Technical Specifications
Source: SECTION 4 - Quality.zip (unknown)Scope: Manufacture, test and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months.
Quality requirements governed by Eskom Supplier Quality Management Specification 240-105658000 (QM 58, Revision 4).
Applicable standards (normative): ISO 9001 (QMS requirements), ISO 10005 (Quality Plans guidelines).
Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034), PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1.
Key definitions: Hold Point (work cannot proceed without Eskom written authorisation), Witness Point (work may proceed after formal notification and waiver), Intervention Points (inspection, hold, witness, surveillance, review, verification), Special Processes (welding, NDE, coating, heat treatment — results not fully verifiable by subsequent inspection).
Supplier and sub-supplier QMS must conform to ISO 9001 latest revision.
Contract Quality Plan (CQP) required per ISO 10005, including: record management (material tests, PMI, certifications), free access for inspection, final documentation submission prior to shipment, welding management (WQR, WPS, PQR), special installation/fabrication procedures, personnel qualification for special processes (statutory registration where required), training records with NQF/accreditation, storage/preservation/maintenance instructions, sub-supplier monitoring, communication channels, management authority, document lists.
Quality Control Plan / Inspection and Test Plan (QCP/ITP) required for all manufacturing stages: material certification, fabrication, in-process inspections, final acceptance tests, packaging, preservation, site acceptance, construction/erection, pre-commissioning and commissioning. Must include hold/witness points, acceptance criteria referenced to specifications/standards, intervention points for Eskom/AIA, inspector qualifications, test procedures, sign-off by all parties.
Sub-supplier QCPs/ITPs must be developed and controlled by main supplier; separate QCP/ITP per sub-supplier scope.
Mandatory quality kick-off meeting and pre-inspection meetings (14 days' notice).
Eskom may appoint resident quality inspectors at supplier/sub-supplier premises (supplier provides workspace at no cost).
Eskom may appoint any AIA/inspection agency; supplier may not object or hinder.
Preservation requirements: identification, handling, packaging, storage, transportation per specifications.
Nonconformity management: Eskom identifies nonconformities; supplier must implement correction and corrective action.
Special processes: welding (WPS, WQR, PQR), NDE, coating, heat treatment — personnel certified and registered where legally required.
Rights of access: Eskom and its agents have free, uninhibited access to supplier and sub-supplier facilities and records.
Eskom rights to information: supplier must provide all quality-related documentation on request.
Compliance Requirements
Source: SECTION 4 - Quality.zip (unknown)Mandatory compliance requirements:
Section
Source: SECTION 4 - Quality.zipEvaluation criteria are defined in the Supplier Quality Management Specification (240-105658000) and the Tender Evaluation Scorecard (240-168873697). Bidders are assessed against one of four quality categories (Category 1–4) as indicated in Form A for the specific procurement. Category 1 requires a valid ISO 9001 certificate from an accredited certification body plus full QMS documentation (audit reports, roles/responsibilities, draft CQP, example ITP/QCP, control of externally provided processes, management review records). Category 2 requires objective evidence of a developed, implemented and maintained QMS compliant with ISO 9001 (manual, policy, objectives, procedures for document control, internal audit, nonconformity and corrective action) plus similar documentation to Category 1 except the ISO certificate. Categories 3 and 4 have reduced requirements per the List of Tender Returnables (240-12248652). Pre-contract award capability and capacity assessment of main supplier and sub-suppliers is conducted. Post-award evaluation includes contract execution monitoring, supplier quality performance monitoring, and supplier quality audits. Preference points are awarded under the PPPFA 80/20 or 90/10 system via SBD 6.1. Minimum qualifying scores for functionality/quality are set in the tender-specific evaluation criteria and Form A.
Description
Source: SECTION 3 - SDL&I.zipThis document contains the SDL&I (Supplier Development, Localisation & Industrialisation) requirements for the Eskom tender for wire strands and electrical wire. It includes:
Important Dates
Source: SECTION 3 - SDL&I.zip (unknown)Closing date: 30 September 2026 at 10:00 (from tender record).
No compulsory briefing or site visit dates stated in the provided document sections.
Contract duration: 36 months.
B-BBEE sworn affidavits valid for 12 months from date signed by Commissioner of Oaths.
B-BBEE Improvement/Retention Plan must be submitted within 30 days of contract signing.
SDL&I Implementation Schedule must be completed and returned to SDL&I representative within 28 days after contract award.
Yearly SDL&I compliance reports required. Eskom reviews reports within 30 days of receipt.
Contact Information
Source: SECTION 3 - SDL&I.zip (unknown)Eskom Holdings SOC Ltd
Business Unit: KZN Operating Unit
Scope: Wire Strands and Electrical Wire
No specific SCM or technical contact names, emails, or phone numbers provided in the extracted sections.
dti Campus contact (from guidance document):
Private Bag X84, Pretoria, 0001
77 Meintjies Street, Sunnyside, 0002
Tel: (012) 394 0000
Customer Contact Centre: 0861 843 384 (local) / +27 12 394 9500 (international)
Website: www.thedti.gov.za
Submission Guidelines
Source: SECTION 3 - SDL&I.zip (unknown)Returnable documents required with the bid:
Annexure C is a condition for contract award and must be submitted by the closing date. The Tender Authority may request Annexures D and E. Successful tenderers must continuously update Declarations C, D and E with actual values for the contract duration.
Evaluation Criteria
Source: SECTION 3 - SDL&I.zip (unknown)Preference point system: 90/10 or 80/20 (specific goals up to 10/20 points). B-BBEE status level points:
Tenderers failing to provide B-BBEE documentation are not disqualified but score 0 points for specific goals (only price points out of 80/90).
Objective criteria (not scored but condition for contract award):
SDL&I objectives (Transformation, Local Procurement, Jobs, Skills Development) are not scored but commitments become contractual obligations. Penalty of 2.5% of contract value for failure to meet SDL&I obligations.
Technical Specifications
Source: SECTION 3 - SDL&I.zip (unknown)Scope: Manufacture, test and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months.
Local content requirements: Designated sector minimum local production and content thresholds must be achieved in full (specific percentages not stated in extracted text). SBD 6.2 and Annexure C are conditions for contract award.
SDL&I contractual obligations:
Penalty: 2.5% of contract value for failure to meet SDL&I obligations.
Retention: 2.5% of every invoice (excl. VAT) retained as security until SDL&I obligations fulfilled, progress reports received, and compliance report approved.
Financial Requirements
Source: SECTION 3 - SDL&I.zip (unknown)Pricing: As-and-when-required basis over 36 months (estimated quantities).
Local content calculation: Must follow SATS 1286:2011 methodology using Annexures C, D, E. Tender exchange rate per SBD/MBD 6.2.
Security/Retention: 2.5% of every invoice (excluding VAT) retained by Eskom as security for SDL&I obligation fulfilment. Released only upon receipt of SDL&I progress reports, fulfilment of all SDL&I obligations, and submission of approved compliance report.
Penalty: 2.5% of contract value for failure to meet SDL&I obligations.
Skills development costs: Contractor bears total cost; Eskom makes no financial contribution.
No explicit bonds, guarantees, or payment terms stated in extracted sections.
Compliance Requirements
Source: SECTION 3 - SDL&I.zip (unknown)Mandatory compliance documents:
Sworn affidavit validity requirements:
No CIDB grading required. No professional body registrations specified.
Description
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdfAnnexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form Annexure D Y
1.1.5 *CPA Requirements for Local Goods Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.10 *SBD 4 – Bidders Disclosure Annexure J Y
1.1.14 E-tendering Help Manual acknowledgement form Attached Y
1.1.15 E-tendering Help Manual for supplier Attached Y
1.1.18 Scope of Work Attached Y
1.1.19 NEC3 Supply Contract - must be completed, Attached
including pricing, and signed to accept
Important Dates
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Issue date: 31 August 2026.
Closing date and time: 30 September 2026 at 10:00 AM (South Africa Standard Time).
Non-compulsory clarification meeting: 9 September 2026 at 13:30 PM via Microsoft Teams (Meeting ID: 371 611 155 029 073, Passcode: fR6Pf7qT, Link: https://teams.microsoft.com/meet/371611155029073?p=2sWUofmgUMxiB0sVYy). Attendance encouraged but not mandatory.
Clarification query deadline: 5 working days before tender closing date (queries to [email protected]).
Tender validity period: 180 days from closing date and time.
Contact Information
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Eskom Representative: Malungi Sibiya.
Telephone: +27 33 395 7002.
Email: [email protected].
All queries and clarifications must be submitted in writing to this email address.
Submission address: Eskom E-tendering portal (https://etendering.eskom.co.za).
Fraud/corruption reporting: 0800 11 2722 or [email protected].
Submission Guidelines
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Submission method: Electronic upload only via the Eskom E-tendering portal (https://etendering.eskom.co.za). No hard copies, ZIP files, or condensed files accepted. Maximum upload size 500 MB per document; total submission limited to 4 GB. All documents must be in PDF format. The signed NEC3 Supply Contract with pricing must be uploaded. Resubmissions replace all previous submissions; only the latest version is considered. Submission status must show as complete before the deadline.
Disqualifiable returnables (must be submitted by closing date and time):
Non-disqualifiable returnables (must be submitted by closing; if missing, Procurement will request in writing and allow 5 working days to submit, failing which the tender is disqualified):
Contract award returnables (required before award):
Evaluation Criteria
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Eligibility: Tenderer must not be restricted by National Treasury, on the Tender Defaulters list, or restricted by Eskom; must not have nationality of a sanctioned country; must not submit more than one tender; JV/consortium agreement must stipulate joint and several liability; no conflict of interest (common controlling partner/shareholder or information access); tender must be signed by authorised person; must not subcontract 100% of scope.
Two-stage evaluation:
Specific Goals scored out of 20 or 10 points per PPPFA 2022 B-BBEE status level table (Level 1 = 20/10 points, Level 2 = 18/9, Level 3 = 14/6, Level 4 = 12/5, Level 5 = 8/4, Level 6 = 6/3, Level 7 = 4/2, Level 8 = 2/1, Non-compliant = 0). Valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPC certificate (EME) required to claim points; failure to provide documentation results in 0 points for specific goals but does not disqualify.
Ranking: Combined price and specific goals score; highest total wins. Tie-break: highest specific goals score, then drawing of lots.
Objective criteria: Applicable as a condition for contract award; failure may lead to second-ranked tenderer being recommended.
Award split: If more than one commercially and financially acceptable supplier per line item, award split by price variance: 0% variance = 50/50; 1-5% = 60/40; 6-10% = 70/30; >10% variance negotiated down.
Technical Specifications
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Scope: Manufacture, test, and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months.
Applicable standards and documents (provided in Technical folder):
Technical evaluation criteria vary per line item and are detailed in the Technical Evaluation Criteria (TEC) documents in the Technical folder. Tenderers must familiarise themselves with all applicable requirements.
Local content thresholds (designated sectors):
SBD 6.2 Declaration and Annexure C (Local Content Declaration Summary Schedule) are mandatory returnables and a condition for contract award.
Methodology
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdfand management of OHS work
risks related to the scope of
be included. used for the risk
by tenderers directly and through their supply network. In certain
cases, the SETA’s accredited training providers can be approached
to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates
categorically exclude Eskom employees and registered learners. The
tenderers are required to take full responsibility for the total cost of
developing the requisite skills, and Eskom shall not make any
financial contribution towards the fulfilment of this
obligation. Tenderers also are advised to approach their relevant
Pricing Schedule
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.10 *SBD 4 – Bidders Disclosure Annexure J Y
1.1.14 E-tendering Help Manual acknowledgement form Attached Y
1.1.15 E-tendering Help Manual for supplier Attached Y
1.1.18 Scope of Work Attached Y
1.1.19 NEC3 Supply Contract - must be completed, Attached
including pricing, and signed to accept the terms and
conditions of the contract.
Note:
necessary information at tender closing will result
in disqualification.
acceptance of the terms and conditions of the contract.
For E-Tendering, a tenderer’s failure to have submitted/uploaded
tender documents will render the tender non-responsive.
3.10 Mandatory tender returnables A tenderer that does not submit mandatory documents by or the
complete information required in mandatory documents by the
deadlines as stipulated in the Tender Returnable section of the
respective Invitation to Tender will be deemed non-responsive.
Commercial Mandatory Returnable (Disqualifiable)
acceptance of the terms and conditions of the contract.
Commercial Mandatory Returnable (Non - Disqualifiable)
amounts subject to interest and the terms and condition of
interest.
current liabilities that are subject to interest.
specifying the terms of the loan, whether secured or
unsecured, terms of repayment and interest rates.
company.
completion is a requirement and signed if signature is a requirement.
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Basic Compliance
pricing and acceptance of the terms and
conditions of the contract.
Financial Requirements
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Pricing format: Prices submitted on the NEC3 Supply Contract (inclusive of VAT). Price list must be in PDF on the NEC Supply Contract.
Payment terms:
Price evaluation: Inclusive of VAT; corrected for arithmetic errors; excluding contingencies; adjusted for acceptable variations; compared on Net Present Value basis considering price adjustment factors and exchange rate fluctuations where applicable. Unconditional discounts considered for evaluation; conditional discounts not considered for evaluation but applied at payment.
SDL&I financial security: Eskom retains 2.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released upon receipt of SDL&I progress reports, fulfilment of all SDL&I obligations, and submission of approved compliance report by SDL&I Department. Penalty of 2.5% of Contract Value for failure to meet SDL&I obligations.
Financial stability assessment: Analysis of financial statements (not scored) to determine if tenderer is financially stable enough to execute the contract. Required documents: approved annual financial statements (statement of financial position, comprehensive income, changes in equity, cash flows, notes), ITA34C Income Tax Assessment for non-audited companies (current and previous financial years).
Compliance Requirements
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdf (TENDER)Mandatory registrations and certifications:
Health & Safety
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdfSECTION 2 - Technical ✓
Section 3 - sdl & i ✓
SECTION 4 - Quality ✓
SECTION 5 - Safety ✓
SECTION 6 - Environmental ✓
process must be submitted in writing to the Eskom Representative
via the following email address: [email protected]
All Clarification queries and responses will be published on Eskom’s
the following key pointers to ensure their validity:
number.
order to know that person is duly authorised to depose of an affidavit. (Mark the
applicable option).
where applicable, and enterprise business address.
the case of specialised enterprises as per Statement 004, the percentage of black
beneficiaries must be reflected. (No blank spaces to be left).
financial statements or management account. (Mark the applicable option).
used to determine the total revenue. (Financial year end to be stipulated by
day/month/year).
level)
the basis for the empowering supplier status.
sworn affidavit must be signed in the presence of the Commissioner of Oath.
Furthermore the Commissioner must also sign and stamp)
because, a person cannot by law, commission a sworn affidavit in which they have
an interest.
requirements form (Annexure B) signed and submitted by
the tenderer?
2 All: Environmental (or SHE/SHEQ) policy signed by
must still be submitted.
o Statement of financial position ( Balance Sheet )
o Statement of comprehensive income ( income statement )
o Statement of changes in Equity
o Statement of cash flows
o Notes to the financial statements
o ITA 34C Income Tax Assessment for companies that have
NOT been AUDITED. The ITA-34C assessments must be
provided for the current and previous financial years. The
turnover amount shown in the income statement must
correspond to the amount shown in the ITA-34C. Should
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
Environmental
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdfLow Categories
Ref. KPIs
1 Annexure B
Is the acknowledgement of Eskom's SHE rules and
requirements form (Annexure B) signed and submitted by
the tenderer?
2 All: Environmental (or SHE/SHEQ) policy signed by
Company Owner/CEO/MD:
Commitment to: (1) compliance to environmental
compliance obligations; and (2) environmental duty of care.
Total
Score:
0 = Document not submitted OR submitted but does not satisfy
the minimum requirements
1 = Document submitted and the content satisfy the minimum
documents within the stipulated time will result in the tender being
deemed unacceptable in terms of their contractual requirements and
will not be evaluated further.
Environmental Requirements
Commitment to: (1) compliance to environmental
compliance obligations; and (2) environmental duty of care.
requirements form (Annexure B) signed and submitted
by the tenderer?
2 ISO 14001 Environmental Management Standard
certificate.
E3460DXKZNOU Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Environmental Documents required as per the Environmental √
Contractual Terms
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
The analysis of the tenderers’ financial statements is not a criterion
for the purposes of the scoring and awarding of points or the
determination of competitive ranking, but to determine if the tenderers
are financially stable enough to execute the contract / order of the
magnitude to be awarded.
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Section
Source: E3460DXKZNOU - Invitation to Tender for Wire Strands and Electrical Wire.pdfensure availability of supply, should the tender evaluation result in
6% - 10% Variance – 70/30 split
Technical Evaluation
be found on the applicable technical evaluation standards namely;
3.13 Functionality/Technical Functionality/Technical requirements are applicable.
There are various technical evaluation criteria as there are numerous
evaluation criteria (TEC) in the Technical folder.
make use of the following Technical Evaluation documents to ensure
171000554, and 240-75883116 and drawings DDT7036 and
Tenderers who do not meet the threshold for functionality scoring will
3.15 Evaluation of Price Either the 80/20 or 90/10 principle will be applied to rank tenderers.
preference system.
A maximum of 80 or 90 points will be allocated for price on the
80/20 or 90/10
Ps = Points scored for price of tender under consideration
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 or 90 points.
3.18 Evaluation of Specific Goals
3.18 Evaluation of Specific Goals Specific
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 or 10 points in accordance with
the PPPFA.
A maximum of 10/20 points may be awarded to a tenderer for the
specific goal specified for the tender. The points scored for the specific
Description
Source: SECTION 1 - Commercial and Finance.zipTender E3460DXKZNOU: Manufacture, test, and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months. Open invitation to tender. Contract type: NEC3 Supply Contract. Tender documents comprise Section 1 (Commercial and Financial), Section 2 (Technical), Section 3 (SDL&I), Section 4 (Quality), Section 5 (Safety), Section 6 (Environmental). All documents downloadable from Eskom Tender Bulletin and National Treasury e-Tender Portal. Annexures A–J and SBD forms as listed in submission guidelines are attached and must be completed. E-tendering Help Manual and acknowledgement form provided. Scope of Work attached. NEC3 Supply Contract must be completed, priced, signed, and submitted at closing.
Important Dates
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Issue date: 31 August 2026.
Closing date and time: 30 September 2026 at 10:00 AM (10h00).
Tender validity period: 180 days from closing date and time.
Clarification meeting (non-compulsory): 9 September 2026 at 13:30 (13h30) via Microsoft Teams. Meeting ID: 371 611 155 029 073; Passcode: fR6Pf7qT; Join link: https://teams.microsoft.com/meet/371611155029073?p=2sWUofmgUMxiB0sVYy. Attendance encouraged but not mandatory.
Clarification queries deadline: 5 working days before tender closing date (i.e., by 23 September 2026). All queries must be submitted in writing to the Eskom Representative via email. Responses published on Eskom Tender Bulletin and National Treasury e-Tender Portal.
Contact Information
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Eskom Representative: Malungi Sibiya.
Telephone: +27 33 395 7002.
Email: [email protected] (for all clarifications and queries).
Fraud/corruption reporting: 0800 11 2722 or [email protected].
Submission address: Eskom E-tendering portal (https://etendering.eskom.co.za).
Tender documents published on: Eskom Tender Bulletin and National Treasury e-Tender Portal.
Submission Guidelines
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Submission method: electronic upload only via the Eskom E-tendering portal (https://etendering.eskom.co.za). No hard copies, ZIP files, or condensed files accepted. Maximum file size 500 MB per document; total submission limited to 4 GB. All documents must be in PDF format. The price list must be submitted in PDF on the NEC3 Supply Contract. Resubmissions replace all previous submissions; only the latest version is considered. Submission status must show as complete.
Mandatory returnables at closing (disqualifiable if missing):
Mandatory returnables at closing (non-disqualifiable; 5 working days to cure if missing):
Required at contract award:
Evaluation Criteria
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Eligibility: Tenderer must not be restricted by National Treasury, on the Tender Defaulters list, or restricted by Eskom. No conflict of interest (common controlling partner, shared information access, or influence). JV/consortium agreements must stipulate joint and several liability. Tenderer cannot subcontract 100% of the scope. Must meet technical mandatory requirements per line item per Eskom Standards 240-171000554 and 240-75883116 and drawings DDT7036 and DDT3124.
Functionality/Technical: Applicable; various criteria per line item detailed in Technical Evaluation Criteria (TEC) documents in the Technical folder. Tenderers who do not meet the functionality scoring threshold will be disqualified. Specific threshold score not stated in the provided text.
Price evaluation: Either 80/20 or 90/10 preference point system applied; the lowest acceptable tender determines which system is used. Price points calculated using the standard formula Ps = 80(1 - (Pt-Pmin)/Pmin) or Ps = 90(1 - (Pt-Pmin)/Pmin). Prices evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for acceptable variations/deviations, and compared on Net Present Value basis considering tendered programme, price adjustment factors, exchange fluctuations, and risk parameters. Unconditional discounts considered; conditional discounts excluded from evaluation but applied at payment.
Specific Goals (B-BBEE): Scored out of 20 (80/20) or 10 (90/10) points per PPPFA 2022. Points per B-BBEE status level: Level 1 = 20/10, Level 2 = 18/9, Level 3 = 14/6, Level 4 = 12/5, Level 5 = 8/4, Level 6 = 6/3, Level 7 = 4/2, Level 8 = 2/1, Non-compliant = 0. Valid B-BBEE certificate (SANAS), sworn affidavit (EME/QSE), or CIPC certificate (EME) required to claim points; absence yields 0 specific-goal points but does not disqualify. Supporting ownership/shareholding documents may be requested.
Ranking: Combined price and specific-goal points; highest total wins. Deadlock: highest specific-goal points wins; if still tied, drawing of lots.
Objective criteria: Applicable as a condition for contract award; failure may lead to second-ranked tenderer being recommended.
Award split: If more than one commercially and financially acceptable supplier per line item, award split by price variance: 0% variance = 50/50; 1-5% = 60/40; 6-10% = 70/30; >10% variance negotiated down.
Technical Specifications
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Scope: Manufacture, test, and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months.
Applicable standards and documents (provided in Technical folder):
Tenderers must meet all mandatory technical requirements per line item as defined in the above standards and drawings. Technical evaluation will assess compliance with these requirements. Failure to meet the functionality scoring threshold results in disqualification.
Financial Requirements
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Pricing format: Prices submitted on the NEC3 Supply Contract (completed, signed, and priced) in PDF. Evaluation inclusive of VAT. Arithmetic errors corrected. Contingencies excluded. Net Present Value comparison used, considering tendered programme, price adjustment factors, exchange rate fluctuations, and risk parameters. Unconditional discounts included in evaluation; conditional discounts excluded from evaluation but honoured at payment.
Payment terms: For contracts valued below R50 million (incl. VAT), Eskom commits to payment within 30 days of receipt of undisputed invoices. For contracts above R50 million, payment terms as stipulated in the contract (full text truncated in source).
Local content thresholds (designated sectors):
SBD 6.2 and Annexure C (Local Content Declaration Summary Schedule) are returnables and a condition for contract award.
No explicit performance bond, guarantee, or insurance amounts stated in the provided text. Declaration of Insurances form requires confirmation that required policies are in place; copies to be provided if requested.
Compliance Requirements
Source: SECTION 1 - Commercial and Finance.zip (TENDER)Mandatory compliance documents:
Eligibility restrictions: Not restricted by National Treasury, not on Tender Defaulters list, not restricted by Eskom, no conflict of interest, JV/consortium must have joint and several liability, no 100% subcontracting.
Environmental: Acknowledgement of Eskom SHE rules (Annexure B) signed; Environmental/SHE/SHEQ policy signed by CEO/MD committing to compliance and duty of care. ISO 14001 certificate required for higher categories.
Safety (OHS): Annexure B acknowledgement signed by CEO and witness; OHS plan including Incident Management Plan, Emergency Preparedness Plan, SHE Communication, PPE, Substance Abuse Management, signed by CEO; Baseline OHS Risk Assessment (BRA) covering all scope risks, methodology included, next review date, signed by CEO; Valid Letter of Good Standing (COIDA or equivalent) with nature of business relevant to scope; OHS policy signed by CEO with next review date, complying with OHS Act Section 7.
Quality: Requirements referenced but detailed criteria not provided in the extracted text.
SDL&I (contractual obligations, not scored):
Section
Source: SECTION 1 - Commercial and Finance.zipEvaluation follows a multi-stage process:
Award split rules for multiple acceptable suppliers per line item based on price variance bands.
Description
Source: SECTION 6 - Environmental.zipThe tender covers the manufacture, test and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a period of 36 months. The main supplier is responsible for the appointment and management of contractors or suppliers for the commencement of work, including demonstrating selection criteria, notifying Eskom prior to appointment, ensuring adequate resources and competencies, and monitoring OHS compliance through audits and assessments.
Submission Guidelines
Source: SECTION 6 - Environmental.zip (unknown)Returnable documents required with the bid:
Evaluation Criteria
Source: SECTION 6 - Environmental.zip (unknown)Environmental/OHS compliance evaluation uses a pass/fail scoring system:
Low risk work: Requires signed Annexure B and signed Environmental/SHE/SHEQ policy by Company Owner/CEO/MD.
Alternative pathway: Requires signed Annexure B and valid ISO 14001 Environmental Management Standard certificate.
Technical Specifications
Source: SECTION 6 - Environmental.zip (unknown)Scope covers the manufacture, test and supply of estimated quantities of wire strands and electrical wire for Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months.
OHS and environmental management requirements:
Compliance Requirements
Source: SECTION 6 - Environmental.zip (unknown)Mandatory compliance requirements:
Description
Source: SECTION 2 - Technical.zipThis document (240-171000554 Rev 1) defines the technical evaluation criteria for zinc-coated stranded steel wire conductors and stays for Eskom Distribution lines. It governs the evaluation of tender submissions from manufacturers/suppliers for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months. The document covers the desktop evaluation (Level 1 mandatory gatekeepers and Level 2 functional scoring) and factory assessment (Level 3) processes. It references the product standard 240-75883116 (Rev 2) for detailed technical requirements. Annexures include test matrix (A), technical schedules A/B (B), factory assessment checklist (C), and hybrid drum details (D). The evaluation is per SAP number/item. Document applies across Eskom Distribution division, subsidiaries and controlled entities. Reviewed every five years; next review February 2031.
Important Dates
Source: SECTION 2 - Technical.zip (unknown)Closing date: 30 September 2026 at 10:00 (from tender record). No briefing, site visit, or clarification deadlines stated in the provided technical evaluation document.
Contact Information
Source: SECTION 2 - Technical.zip (unknown)No SCM or technical contacts, emails, phones, or submission address stated in the provided technical evaluation document. Authorisation signatories listed: AI' Louise Van Deventer (General Manager: Technology and Engineering), Thomas Jacobs (Senior Manager: Technology and Engineering Acting), Lucy Sangweni (High Voltage Overhead Lines Study Committee Chairperson), Pravind Orrie (Asset Creation Senior Manager - Limlanga Cluster), Brenda Cebekhulu (Asset Creation Senior Manager - Central East Cluster), Thandiwe Nkambule (Asset Creation Senior Manager - Gauteng Cluster), Cynthia Ngomane (Asset Creation Senior Manager - Gemma Cluster), Paul Matiwani (Asset Creation Senior Manager - Cape Coastal Cluster).
Submission Guidelines
Source: SECTION 2 - Technical.zip (unknown)Submission channel and format are not stated in the provided technical evaluation document. The document describes the evaluation process and required returnable evidence but does not specify how or where to submit the tender. Bidders must refer to the main tender enquiry package for submission instructions.
Returnable documents required per SAP number/item (Level 1 mandatory gatekeepers):
Additional submission notes:
Evaluation Criteria
Source: SECTION 2 - Technical.zip (unknown)Three-stage technical evaluation:
Level 1: Mandatory (Gatekeeper) Criteria — pass/fail per SAP number/item. All six criteria must be met (100% compliance) to proceed. Criteria: completed Technical Schedules A&B; submitted test report matrix; proof of accredited type testing (or witnessed); approved manufacturer drawings; product compliance with Eskom specification (minor/correctable deviations only); confirmation of hybrid drum supply for >100m lengths. Failure on any criterion disqualifies the submission.
Level 2: Functional (Scoring) Criteria — assessed only for submissions passing Level 1. Scored out of 100 points with 80% minimum threshold to proceed. Weighted criteria:
Level 3: Factory Assessment — conducted only if Level 2 score ≥80%. Uses checklists (Annexure C as guide) to verify factory capability to supply required products and comply with specifications and tender submissions. Minimum 80% score required to meet technical requirements threshold. Assessment covers business, technical and quality perspectives. All information treated as highly confidential.
Technical Specifications
Source: SECTION 2 - Technical.zip (unknown)Scope: Manufacture, test and supply of zinc-coated stranded steel wire conductors and stays for Eskom Distribution overhead powerlines (Central East Cluster: KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months. Various conductor sizes per SAP numbers: 3x3.35mm, 7x4.00mm, 3x3.35mm, 7x4.00mm, 19x2.65mm, 7x3.35mm, 19x2.65mm, 7x3.51mm, 19x2.7mm, 3/4.00mm, 19/2.65mm, 7/3.35mm, 7/3.51mm, 19/2.7mm, 3/3.35mm, 7/4.00mm.
Applicable standards (normative): SANS 182-5:2001, IEC 60888:1987, SANS 61089:1991, IEC 61394:1997, SANS 935:2007, SANS 10005:2006, SANS 1288:2007, ISPM 15, ISO 9001, Eskom Procurement Procedure 32-1034, Eskom Standard 240-75883116.
Key technical requirements per conductor type (from Annex A/B schedules):
Financial Requirements
Source: SECTION 2 - Technical.zip (unknown)No pricing format, bond, guarantee, insurance, payment terms, or financial capacity thresholds stated in the provided technical evaluation document. The document mentions 'performance guarantees' in a fragmented context but does not specify amounts or conditions. Bidders must refer to the commercial tender documents for financial requirements.
Compliance Requirements
Source: SECTION 2 - Technical.zip (unknown)Mandatory compliance requirements per SAP number/item:
Returnable forms/documents (compressed):
Section
Source: SECTION 2 - Technical.zipSee main evaluationCriteria section for complete three-stage evaluation breakdown. This extended section fragment only repeats the document title and ISO 9001 reference; no additional evaluation criteria beyond those already captured.
Description
Source: SECTION 5 - Safety.zipTender for the manufacture, test and supply of estimated quantities of wire strands and electrical wire for Eskom's Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for a 36-month period. The OHS tender returnable requirements include: Annexure B Acknowledgement Form (CEO and witness), OHS Plan with specific components (Incident Management, Emergency Preparedness, SHE Communication, PPE, Substance Abuse Management), Baseline OHS Risk Assessment with methodology and review date, valid COIDA Letter of Good Standing relevant to scope, and OHS Policy signed by CEO with review date. All OHS documents must be signed by the CEO where indicated.
Contact Information
Source: SECTION 5 - Safety.zip (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"clude the following"}
Submission Guidelines
Source: SECTION 5 - Safety.zip (unknown)Returnable documents required with the tender submission:
All forms must be completed, signed and submitted; omission or incomplete signing may lead to disqualification.
Evaluation Criteria
Source: SECTION 5 - Safety.zip (unknown)The document does not specify the price/preference split (80/20 or 90/10), minimum functionality scores, or financial capacity thresholds. Evaluation will include verification of mandatory OHS returnable documents (Annexure B, OHS Plan, BRA, COIDA Letter of Good Standing, OHS Policy) and compliance with statutory and Eskom OHS requirements. Contractual penalties apply for non-compliance with OHS requirements by the main supplier, its contractors or suppliers. No CIDB grading, B-BBEE level, local content percentage or minimum turnover requirements are stated in the provided sections.
Technical Specifications
Source: SECTION 5 - Safety.zip (unknown)Scope: Manufacture, test and supply of estimated quantities of wire strands and electrical wire for the Central East Cluster (KwaZulu-Natal and Free State Operating Units) on an as-and-when-required basis for 36 months.
OHS obligations:
Compliance Requirements
Source: SECTION 5 - Safety.zip (unknown)Mandatory compliance items:
No CIDB grading, B-BBEE level, local content percentage or professional registration requirements are stated in the provided sections.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
As per the Invitation to Tender - Various Sites - Various Sites -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
31 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 298 425
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog