Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Near Ogies,on Jhb/Witbank Road - Kendal Power Station - Kendal Power Station - 1035
Organization Type
GOVERNMENT
Published
11 Sept 2026
OCDS Reference
ocds-9t57fa-170137
Date & Time
Thursday, 01 October 2026 - 10:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
ms team
Tenders are to be submitted electronically via ESKOM e-tendering site by the stipulated closing date and time. Https://etendering.eskom.co.za New e-tendering system training videos https://www.eskom.co.za/tenders
Categories
Request for Bid(Open-Tender)
Near Ogies,on Jhb/Witbank Road - Kendal Power Station - Kendal Power Station - 1035
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Contact Information
Source: NEC OFFER OF ACEPTANCE.pdf (unknown)11 Sept
2026
Tender Published
Tender was published
01 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdf
NEC SOW.pdf
E-tendering Help Manual for supplier - 27 January 2025 (1).docx
Final - Kendal Hydrogen Production Plant Project Technical Evaluation Strategy-signed (003) (004).pdf
NEC DATA BY EMPLOYER.pdf
NEC SITE INFORMATION.pdf
NEC FORM OF SECURITY.pdf
SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdf
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).pdf
NEC PRICING DATA.pdf
NEC OFFER OF ACEPTANCE.pdf
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (14).pdf
Eskom is procuring the supply, delivery, and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, with a contract period of 11 months. The document provided is a Non-Disclosure Agreement (NDA) template that bidders must sign before receiving confidential tender information.
BASELINE ASSESSMENT.pdf
ESKOM is procuring the supply, delivery, and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, with a contract period of 11 months. The tender includes an Occupational Health and Safety Baseline Risk Assessment that bidders must address, covering hazards such as ash exposure, noise, hydrogen leaks, and falling objects.
NEC DATA BY CONTRACTOR.pdf
ESKOM is procuring the supply, delivery, and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, with a contract period of 11 months. The tender uses an ECC3 (NEC3) Engineering and Construction Contract with a priced activity schedule, and bidders must complete Contract Data Part 2 with their details, key personnel, programme, and pricing.
SOW - H2 Production Plant - 2026 - signed.pdf
SHE.pdf
Eskom is procuring the supply, delivery, and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, with a contract period of 11 months. The tender includes a detailed Occupational Health and Safety (OHS) specification that bidders must comply with, covering legal, safety, and operational requirements.
Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf
Eskom is procuring the supply, delivery and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, with a contract period of 11 months. The tender is governed by Eskom's Standard Conditions of Tender and requires compliance with mandatory returnables, evaluation criteria, and applicable legislation.
Authorisation Form - 08 November 2024.pdf
Eskom is procuring the supply, delivery and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, with a contract period of 11 months. The tender requires bidders to complete an authorisation form appropriate to their legal entity type and to provide certified supporting documents.
NEC COVER PAGE.pdf
Supply, delivery and installation of a new hydrogen (H2) production plant at Kendal Power Station, for a contract period of 11 months, under an NEC3 Engineering & Construction Contract issued by Eskom Holdings SOC Ltd.
NEC.zip
Eskom Holdings SOC Ltd is procuring the supply, delivery, and installation of a new hydrogen (H2) production plant at Kendal Power Station in Mpumalanga, under an NEC3 Engineering and Construction Contract (Option A: Priced contract with activity schedule). The contract includes design, fabrication, installation, commissioning, and handover, with a total duration of 2 years (including an 11-month construction period) and a 52-week defect correction period.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 442 703
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"name":null,"email":null,"phone":null,"department":null,"address":"n the conditions of contract identified"}
Pricing Schedule
Source: NEC OFFER OF ACEPTANCE.pdfPart C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Compliance Requirements
Source: NEC OFFER OF ACEPTANCE.pdf (unknown)No specific requirements found
Health & Safety
Source: NEC OFFER OF ACEPTANCE.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Contractual Terms
Source: NEC OFFER OF ACEPTANCE.pdfof Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
Important Dates
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdf (TENDER){"closingDate":"01 September 2020"}
Contact Information
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdf (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":"submit proposals in a table below to develop the skills of unemployed"}
Evaluation Criteria
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdf (TENDER)Section 1: Specific Goals
A maximum of 10 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
Valves Valves 70%
Technical Specifications
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdf (TENDER)construction and Development
Programme (RDP) Goals
Tenderers who complete and submit the objectives as required, but who do not meet Eskom’s
targets, will not be disqualified. SDL&I objectives do not form part of scoring but commitments will
form part of contractual obligations
Transformation rema
Methodology
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdftheir supply network. In certain cases, the SETA’s accredited training providers can be approached
to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates categorically exclude Eskom employees
and registered learners. The tenderers are required to take full responsibility for the total cost of
developing the requisite skills, and Eskom shall not make any financial contribution towards the
fulfilment of this obligation. Tenderers also are advised to approach their relevant SETAs to access
grants, subsidies, and incentives as well as South African Revenue Services for tax rebates that are
earmarked for skills development initiatives
Section 4: SDL&I Penalty and Performance Security
Eskom will apply a penalty of 1% of the Contract Value for failure to meet SDL&I obligations.
For the duration of the contract, Eskom will retain 1% of every invoice (excluding VAT) as security for
the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the Contractor
upon fulfilment of all SDL&I obligations by the contractor.
Section 5: Reporting and Monitoring
Pricing Schedule
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdftender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
Compliance Requirements
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdf (TENDER)Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding
B-BBEE Minimum Level: 0
Points Allocation: 10 points
B-BBEE Details: nd Document Identifier 240-148918142 Rev 3
Industrialisation (SDL&I) Effective Date 01 September 2020
Strategy Setting Template Review Date September 2023
Description/ Scope of Work New Hydrogen H2 Protection Plant for a period of Twenty (20)
months at Kendal Power Station.
Duration of the Project 11 Months
Section 1: Specific Goals
A maximum of 10 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
total must be rounded off to the nearest two decimal places.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor 0 0
NB: The following documents are required to claim preference points,
CIPS affidavit
breakdown
ventures), a consolidated B-BBEE status level verification certificate.
Tenderer failing to provide documentation for the allocation of preference points will not be
disqualified, but’
Section 2: Objective criteria
Confidential
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system. No part o
Health & Safety
Source: SDLI targets setting template for bidder New Hydrogen H2 Protection Plant 20260513 (002).pdfensure their validity:
authorised to depose of an affidavit. (Mark the applicable option).
business address.
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
management account. (Mark the applicable option).
(Financial year end to be stipulated by day/month/year).
supplier status.
the presence of the Commissioner of Oath. Furthermore the Commissioner must also sign and stamp)
commission a sworn affidavit in which they have an interest.
Name of tenderer :.....................................................
Tenderer representative :............................................
Representative signature:..........................................
Date: ...............................................
Important Dates
Source: NEC SOW.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion document QM58 (Quality Management","is_compulsory":false}"}
Evaluation Criteria
Source: NEC SOW.pdf (unknown)Electronic submissions could be done using the SharePoint Transmittal Site functionality and route. This
2.5 Quality assurance requirements ...................................................................................................... 10
Technical Specifications
Source: NEC SOW.pdf (unknown)of the works ........................................................................................................................ 5
1.1 Executive overview ............................................................................................................................ 5
1.2 Employer’s objectives and purpose of the works .............................................................................. 5
1.3 Interpretation and terminology ........................................................................................................... 5
2 Management and start up. ..................................................................................................................... 8
2.1 Management meetings ...................................................................................................................... 8
2.2 Documentation control ....................................................................................................................... 8
2.3 Health and safety risk management .................................................................................................. 9
2.4 Environmental constraints and management ......
Methodology
Source: NEC SOW.pdff) The Contractor assesses the available data and knowledge explicitly. Any technical detail, policies,
imposed organisational conditions, contract conditions, specifications, overall programme
constraints, resource availability, long delivery items or any other factor of significance to Provide
the Works, are considered by the Contractor in his planning.
g) The Contractor provides work planning bar charts and resource schedules as agreed with the
Quality Management
Source: NEC SOW.pdf4.2 Subcontracting ................................................................................................................................. 23
4.2.1 Preferred subcontractors ........................................................................................................... 23
4.2.2 Subcontract documentation, and assessment of subcontract tenders ...................................... 23
4.2.3 Limitations on subcontracting ...................................................... Error! Bookmark not defined.
4.2.4 Attendance on subcontractors ................................................................................................... 23
4.3 Plant and Materials .......................................................................................................................... 23
4.3.1 Quality ........................................................................................................................................ 23
4.3.2 Plant & Materials provided “free issue” by the Employer ........................................................... 23
4.3.3 Contractor’s procurement of Plant and Materials ...................................................................... 24
4.3.4 Spares and consumables .......................................................................................................... 24
4.4 Tests and inspections before delivery ............................................................................................. 25
4.5 Marking Plant and Materials outside the Working Areas ................................................................. 25
4.6 Contractor’s Equipment (including temporary works). ..................................................................... 25
4.7 Cataloguing requirements ................................................................................................................ 26
5 Construction .......................................................................................................................................... 26
5.1 Temporary works, Site services & construction constraints ............................................................ 26
5.1.1 Employer’s Site entry and security control, permits, and Site regulations ................................. 26
5.1.2 Restrictions to access on Site, roads, walkways and barricades .............................................. 27
5.1.3 People restrictions on Site; hours of work, conduct and records ............................................... 28
5.1.4 Health and safety facilities on Site ............................................................................................. 28
5.1.5 Environmental controls, fauna & flora, dealing with objects of historical interest ...................... 29
5.1.6 Title to materials from demolition and excavation...................................................................... 29
5.1.7 Cooperating with and obtaining acceptance of Others .............................................................. 30
5.1.8 Publicity and progress photographs .......................................................................................... 30
5.1.9 Contractor’s Equipment ............................................................................................................. 30
5.1.10 Equipment provided by the Employer ........................................................................................ 31
5.1.11 Site services and facilities .......................................................................................................... 31
5.1.12 Facilities provided by the Contractor ......................................................................................... 31
5.1.13 Existing premises, inspection of adjoining properties and checking work of Others ................. 32
5.1.14 Survey control and setting out of the works ............................................................................... 32
5.1.15 Excavations and associated water control ................................................................................. 32
5.1.16 Underground services, other existing services, cable and pipe trenches and covers ............... 32
5.1.17 Control of noise, dust, water and waste ..................................................................................... 32
5.1.18 Sequences of construction or installation .................................................................................. 32
5.1.19 Giving notice of work to be covered up ...................................................................................... 33
5.1.20 Hook ups to existing works ........................................................................................................ 33
5.2 Completion, testing, commissioning and correction of Defects ......... Error! Bookmark not defined.
5.2.1 Work to be done by the Completion Date .................................... Error! Bookmark not defined.
5.2.2 Use of the works before Completion has been certified ............................................................ 33
5.2.3 Materials facilities and samples for tests and inspections ......................................................... 34
Part c3: scope of work c3.1 Ecc3 employer’s works information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
installation, integration, testing, commissioning, certification, and handover of the new hydrogen production
plant at Kendal Power Station. Upon completion the new hydrogen production plant should be able to
reliably produce, store and supply sufficient hydrogen to meet the demand of the station.
interval
Kick off meeting prior of the Once at 09h00 morning Kendal Project Manager, Contractor, Engineer,
execution of the project. Power Supervisor, Planner, Quality Controller,
Project Progress feedback Daily at 09h00 morning Kendal Project Manager, Contractor, Engineer,
meeting during execution. Power Supervisor, Planner, Quality Controller,
compensation events. 13h30 Power Supervisor, Planner, Quality Controller
Overall contract progress Monthly at 09h00 Kendal Project Manager, Contractor, Engineer,
and feedback morning Power Supervisor, Planner, Quality Controller,
f) Kendal Emergency Preparedness Plan (*1015702)
g) Kendal Non-conformance, Corrective and Preventive Actions Procedure (*1017357)
h) Kendal Waste Management procedure (*1024102)
i) Hazardous substance procedure (*1018300)
j) Eskom Flash report
k) SHEQ File Index (*1027127)
l) Site Inspection Checklist (*1027246)
2.5 Quality assurance requirements
a. The Contractor or Supplier complies with the Employer’s quality and technical requirements
including those listed in the Employer’s specification document QM58 (Quality Management
Specification 240- 105658000).
b. The Contractor submits a QMS as a returnable schedule and uses it for all phases of the Project.
The QMS complies with the requirements of ISO 9001 standard. The Contractor provides evidence
of a fully implemented QMS as and when requested by the Employer. The Employer may at his sole
discretion carry out an audit on the Contractor, the Contractor’s suppliers and Subcontractors.
acceptance and prior to the commencement of work
The Contractor will supply the Employer with a QCP which will detail the Contractor’s organisation, quality
assurance and quality control procedures specific to this project. The QCP must be aligned to, and
reference ISO 10005:2005 QMS, guidelines for quality plans and in compliance with the guideline in QM
58(Quality Management Specification 240- 105658000). The QCP will make reference to the Contractor’s
a. The Contractor’s QMS compliance with the requirements of ISO 9001
b. Contractor’s quality manual
c. Contractor’s quality procedures
d. Contractor’s quality forms and work instructions
e. Contractor’s quality system documents referenced in this Works Information
site.
Quality Management employee’s responsibilities include but are not limited to the following:
a. Administration of QA/QC functions
b. Verification of approval status of their or Subcontractor’s QCP and procedures
c. On-and -offsite inspections
d. Co-ordination, inspection and verification of the Employer’s intervention points
e. Review of Contractor testing and inspection documents (procedures, test results)
requirement does not constitute a compensation event, during the execution of the Works: -
a. Updated QCP register
b. Inspection notifications accompanied by their inspection report
c. Non-conformance and Defects registers and reports
d. Updated Site and off-site inspection schedules.
e. Inspections completed/outstanding.
f. Inspection and test reports
a. The Contractor is accountable for the quality of the output and liable for any failures.
b. The Contractor is responsible for defining the level of intervention of QA/QC or inspections. These
are in line with the Employers requirements.
c. The interventions points include all witness, hold, verification and review points required by the
Employer. The Contractor’s failure to allow the intervention points will constitute a non-conformance.
Part c3: scope of work c3.1 Ecc3 employer’s works information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
a. The Contractor is responsible for the inspection of all the Works that is performed, and the Employer
only verifies that the Works is conducted as per the Contract.
b. The Contractor conducts all inspections in accordance with the accepted QCP / ITP.
c. The Contractor drafts a QCP or ITP which shows each activity and submits to the Employer for
acceptance.
d. The Contractor provides suitably qualified personnel to conduct on-and-offsite inspections
e. The Contractor ensures that all Works are inspected and approved before the Employer is invited for
verification.
Where NCR’s and Defect notifications are issued, the Contractor acknowledges receipt as per reply
period and proposes corrective and preventive actions to the Employer as per the contract response
period. The corrective and preventive actions will include the implementation and completion dates.
Progress on all NCR’s and Defect notifications issued to the Contractor must be reported to the Employer
on weekly basis.
a. The Contractor’s keeps a register of all NCR’s and Defect notifications issued
b. Deviations from the Contract are treated as a non-conformance.
c. Records of NCRs and Defect notifications are kept and form part of the data book records.
includes but not limited to the following:
a) A register of NCRs and defects
b) Updated QCP / ITP register
c) Planned and completed local and foreign inspection dates
d) Completed and outstanding Inspections
2.6 Configuration management requirements
2.6.1 General Requirements
The contractor shall include the employer’s drawing number in the drawing title block. This requirement only
applies to design drawings developed by the contractor and their subcontractors. It shall not apply to
drawings developed by manufacturers for equipment and material such as valves, instruments, etc. Drawing
numbers shall be assigned by the Employer as drawings are developed.
The project name shall be listed on all drawings, including manufacturers’ drawings. A separate sheet may
be attached to the submittal if needed to adequately list all tag numbers associated with the drawings such
as valves or instruments which may have numerous tag numbers associated with it.
employer on the previous revision if applicable and the response/corrective action taken by the contractor.
commission containing the following as a minimum if applicable:
certificates
2.6.3 Document Identification
The Contractor is required to submit the Vendor Document Submission Schedule (VDSS) as per agreed
dates to the delegated Eskom Representative. Eskom will pre-allocate document numbers on the VDSS and
send back to the Contractor through the delegated Eskom Representative. The VDSS is revisable, and
changes must be discussed and agreed upon by all parties. Changes in the VDSS can be additional
documentation to be submitted, changes in submission dates or corrections in documentation descriptions,
document numbers, etc. The Contractor’s VDSS shall indicate the format of documents to be submitted.
2.6.4 Document Submission
2.8 Contractor’s management, supervision and key people
within two (2) weeks of the Contract Date.
duties and that a formal health and safety induction training programme is provided.
testing, delivery to Kendal Power Station site, off-loading, storage and preservation, installation, site testing,
cold and hot commissioning, project management, quality control, training, document configuration and
handover of the new hydrogen production plant for Kendal.
3.1 Employer’s design
At Kendal Power Station, the existing Hydrogen generating plant is supplied from the 11kV Station network
as follows:
Plant Board, circuit 1, via a single 11kV / 380V, 315 kVA, ONAN transformer.
0 1 BBA 11kV Station Board 1 0 2 BBA 11kV Station Board 2
1250 a
0 0 bht20
11kV / 380V
315 kVA
630 a
0 5 BHE 380V Hydrogen Gen Plant Board 01
Figure 3-1: Existing electrical supply to Hydrogen Generating Plant
integration into the Contractor’s detail design (See Figure 4-1 and Table 4-2).
loads, with interface to the existing point of supply.
The Contractor assesses the installed power cables to the existing plant for reuse.
The Contractor assesses the installed earthing and bonding to the existing plant for reuse.
ensure that the system shall meet the functional requirements and performance criteria required for
the plant as stipulated. The following functions in addition to the tests stipulated shall be performed:
deviations must be obtained in writing from the Project Manager.
4.1 People
4.1.1 Minimum requirements of people employed on the Site
duties.
The Contractor’s inspection personnel familiarise themselves with the content of the work and the
The Contractor ensures that co-ordinated and formally documented management system is in place
for the assurance of quality as specified in ISO 9001, Quality management Systems –
testing stages of the project. The Contractor issues preliminary notification of such hold and witness
points by fifteen working days' advance notice to the Project Manager and confirms such hold and
witness points at least seven days prior to the activity.
Part c3: scope of work c3.1 Ecc3 employer’s works information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
without impacting the project schedule.
control activities, including certificates of compliance, inspection reports, and test results.
105658000 (previously called QM58) and ISO: 9001 requirements as per the relevant category
from 240-10565800 and other Eskom Holdings SOC Limited’s Standards and specifications
4.3.2 Plant & Materials provided “free issue” by the Employer
of the Plant.
4.4 Tests and inspections before delivery
acceptance.
delivery and installation.
arrange for the Project Engineer to witness the equipment.
Approval of Delivery: No equipment, materials, or systems shall be delivered to the Working Areas until the
results of the tests and inspections have been reviewed and accepted by the Employer.
inspections before approval is granted for delivery.
4.5 Marking Plant and Materials outside the Working Areas
N/a
4.6 Contractor’s Equipment (including temporary works).
a) Design and Construction of Temporary Works:
If temporary works are required (e.g., scaffolding, temporary power supply), the Contractor must design,
procure, and construct these works in compliance with the relevant standards and regulations. The
temporary works must be fit for purpose and meet the specifications detailed in the Works Information.
b) Approval of Temporary Works:
Temporary works may be subject to the Employer’s approval before they are used on site. The
the Eskom Kendal safety induction.
successfully completing the safety induction.
d) Compliance and Monitoring
compliance. Non-compliance may result in penalties or work stoppages.
5.1.6 Title to materials from demolition and excavation
Pricing Schedule
Source: NEC SOW.pdfpressure rating or class, material, quantity etc.
well as provided in .pdf format.
Part c3: scope of work c3.1 Ecc3 employer’s works information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
a) The Contractor submits a single programme that incorporates the services and work (programmes)
of all his Subcontractors. All contractual dates are integrated into the Contractor’s programme. The
programme includes the activities performed by Subcontractor(s), the interface points between
different Subcontractor’s work, the Employer’s operations, the work of Others as well as the
interface points between the Contractor’s work and the individual Subcontractor’s work.
b) The following reports are required as supporting documentation to the Accepted Programme:
i. Time analysis print-out
ii. Critical activities report
iii. Key event report
iv. Resource schedules and histograms
c) All programmes and reports are computer generated (MS project).
d) The first Accepted Programme (at the Contract Date) serves as a baseline for the Provision of the
Financial Requirements
Source: NEC SOW.pdf (unknown)Payment Terms: payment certificate from the Project Manager in terms of core clause 51.1,
the Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that
stated in the Project Manager’s payment certificate.
The Contractor shall address the tax invoice to Eskom Holdings SOC Ltd and include on each invoice the
following information:
Compliance Requirements
Source: NEC SOW.pdf (unknown)All material certificates for pipes, fittings and all components used
Pressure test certificate and the calibration certificates of the gauges used
Pressure test procedures
The manufacturer’s/repairer’s certificate
All corrective actions
Operating Philosophy including all alarm and trip values
Parts catalogue
Maintenance manual
Storage, packing and transportation instructions 2.6.3 Document Identification The Contractor is required to submit the Vendor Document Submission Schedule (VDSS) as per agreed dates to the delegated Eskom Representative. Eskom will pre-allocate document numbers on the VDSS and send back to the Contractor through the delegated Eskom Representative. The VDSS is revisable, and changes must be discussed and agreed upon by all parties. Changes in the VDSS can be additional documentation to be submitted, changes in submission dates or corrections in documentation descriptions, document numbers, etc. The Contractor’s VDSS shall indicate the format of documents to be submitted. 2.6.4 Document Submission All project documents must be submitted to the delegated Eskom Representative with transmittal note according to Project / Plant Specific Technical Documents and Records Management Work Instruction (24076992014). In order to portray a consistent image, it is important that all documents used within the project follow the same standards of layout, style and formatting as described in the Work Instruction. The Contractor is required to submit documents as electronic and hard copies and both copies must be delivered to the Eskom Representative with a transmittal note. In addition, the Contractor shall be provided with the following standards which must be adhered to
Project Plant Specific Technical Documents - Handover Works Instruction 240-124341168
Project Documentation Deliverable Requirement Specification 240-65459834.
Technical Documentation Classification and Designation Standard 240-54179170.
Project/ Plant Specific Technical Documents and Records Management Work Instruction 240
PART C3: SCOPE OF WORK C3.1 ECC3 EMPLOYER’S WORKS INFORMATION ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________ NEW HYDROGEN PRODUCTION PLANT AT KENDAL POWER STATION 2.6.4.1 Electronic Submission (SharePoint Transmittal) Electronic submissions could be done using the SharePoint Transmittal Site functionality and route. This shall be done by executing the following steps: 2.6.4.1.1 Bulk Submission The contractor shall submit all documentation to the employer’s representative as well as the Project’s Documentation Centre in the following media
Electronic copies shall be submitted to Eskom Documentation Centre through SharePoint transmittal site that will be provided during contract award.
Hard copies shall be submitted to the employer’s representative accompanied by the Transmittal Note.
For bulk document submission, the following link can be used https://zendto.eskom.co.za/ 2.6.4.1.2 Emails and other submission methods Electronic copies shall be submitted to the Eskom Representative email subject; Project Name_Discipline_Subject. Electronic copies that are too large for email will be delivered on large file transfer protocol and/or hard drives to the Project Documentation Centre. A notification email, with the transmittal note attached, shall be sent to the Eskom Representative. 2.6.5 Engineering Change Management All design change management shall be performed in accordance with the latest revision of the Eskom Project Engineering Change Management Procedure (240-53114026) and the Employer shall ensure that Contractor is provided with latest revisions of this procedure. Any uncertainty regarding this procedure should be clarified with the Employer. All design reviews will be conducted according to the Design Review Procedure (240-53113685). 2.6.6 Drawings Requirements The creation and control of all Engineering Drawings shall be in accordance with the latest revision of 24086973501: Engineering Drawing Standards – Common Requirements. The Contractor shall provide detailed “As Required” arrangement/dimensional drawings for each part of work to be done. No work will commence without approval of these drawings approved by the Engineering representative of the Employer. After the works have been completed, detailed “As-built” drawings shall be provided by the Contractor. The “As-built” drawings are subject to the Employer’s Engineering representative comments and approval. All drawings shall indicate new installation/modified parts as well as adequate existing pipework to which the items are connected. This shall be done in sufficient detail to easily identify the location of the installation. All drawings shall contain the following as a minimum
Description of component with AKZ number.
Layout of the pipework with dimensions and angles.
Bill of materials for all components traceable to the layout. BOM should include size, schedule, pressure rating or class, material, quantity etc.
Design and operating pressures and temperatures.
Proof Pressure Test requirements and pressures.
Design Code.
All drawing revisions must be provided as paper copies in original (in all cases at least A3) size as well as provided in .pdf format. PART C3: SCOPE OF WORK C3.1 ECC3 EMPLOYER’S WORKS INFORMATION ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________ NEW HYDROGEN PRODUCTION PLANT AT KENDAL POWER STATION To aid in the production of the drawings, the Contractor may request copies of P&ID’s and the equipment’s original drawings from the Employer’s Library. The availability of current plant drawings cannot be guaranteed. All required drawings shall be prepared in accordance with the requirements as specified in 240-86973501: Engineering Drawing Office and Engineering Drawing Standard. A drawing register (Master Document List, with document titles, document revision, status, transmittal details and project phase) which records the drawing’s information shall be maintained by the Contractor. Drawings to be prepared will include and not be limited to
Equipment drawings
Equipment lists
Isometric drawings and P&ID’s
Original Equipment Manufacturer (OEM) manuals and part catalogues
Set point and parameter lists
Three dimensional drawings requirements; DGN model 2.6.6.1 Drawings Format and Layout The creation, issuing and control of all Engineering Drawings will be in accordance with the latest revision of engineering drawing Standard 240-86973501. Drawings issued to Eskom will be a minimum of one hardcopy and an electronic copy that is editable. All Contractors are required to submit electronic drawings in Micro Station (DGN) format, and scanned drawings in pdf format. No drawings in TIFF, AUTOCAD or any other electronic format will be accepted. Drawings issued to Eskom may not be “Right Protected” or encrypted. The Employer reserves the right to use these drawings to meet other contractual obligations. The Contractor shall include the Employer’s drawing number in the drawing title block. Drawing numbers will be assigned by the Employer as drawings are developed. 2.6.7 Plant Coding and Labelling 2.6.7.1 Plant Coding Coding of the design shall be based on the latest revision of 240-93576498 KKS Coding Standard and the Employer shall undertake the coding in line with its standards. The KKS coding shall be applied during the design review stage(s) and cross referenced to all arrangement drawings, schematics, instructions, and manuals and where practical to spare parts list/manuals. The Contractor shall be required to include allocated coding to the electronic design drawings. The Employers KKS Standard shall be used to allocate codes to the plant or system included in the works. Plant Coding shall be undertaken by the employer and as such the service provider shall make available the following documentation to code: 1 Mechanical
B-BBEE Details: aking.
of the works are fully conversant with respect to details of the methodology and communication
process existing, prior to accessing the Site.
labour laws and immigration regulations.
roles.
4.1.2 BBBEE and preferencing scheme
the contract, after contract award regarding any Broad Based Black Economic Empowerment (B-
BBEE) or preferencing scheme measures.
a) B-BBEE Level Compliance:
b) Skills Development and Enterprise Development:
training, mentorship programs, or sponsorship of accredited training for local labourers and
subcontractors.
c) Audit and Verification:
audit. All documentation related to B-BBEE compliance, including subcontracting agreements, invoices,
and training records, must be readily available for review upon request.
4.1.3 Accelerated Shared Growth Initiative – South Africa (ASGI-SA)
The Contractor complies with and fulfils the Contractor’s obligations in respect of the Accelerated and
Shared Growth Initiative - South Africa in accordance with and as provided for in the Contractor’s ASGI-SA
Compliance Schedule stated below
.
[Insert the agree
Health & Safety
Source: NEC SOW.pdfor replace the storage vessels’ pipework to be compatible with the new plant.
Ensure that the plant and surrounding areas are protected in case of emergencies.
Design, supply, install and commission new receiver inlet and outlet valve panels.
Supply new safety valves and arrangement in accordance with 240-56227413: Eskom Hydrogen
Provision of connections feeding into metering panel equipped with pressure transmitter and shut-
off valve for pressure below 500kPa and provide manual open from HMI when pressure is above
500kPa.
Make provision for bulk hydrogen delivery to be offloaded into the receivers.
Ensure that the new plant can meet the following design requirement:
the sender is included in the message as an attachment. This attachment includes
the Letter in PDF format.
3.2.2. In his reply the receiver includes the following text on the first line of the Message
Body: "Acknowledgement of receipt”. This acknowledgement of receipt is
contractually binding and serves as proof that the letter was delivered to the
receiver’s address (Core Clause 13.2).
3.2.3. When a reply to a letter is required, e.g. “Acceptance of documentation” the receiver
now becomes the sender and the procedure under for 3.1 and 3.2 is followed with
the receiver writing a new letter with a new reference number as described under
point 8
4.1. Sender - The sender prepares the letter with a space for the receiver to sign and date
acknowledgement of acceptance. The sender signs the letter and prepares two copies of
the letter for delivery.
4.2. Receiver - The receiver signs both copies of the letter upon receipt and returns a signed
and dated copy to the sender.
5.1. Sender – The sender prepares the letter with a space for the receiver to sign and date
acknowledgement of acceptance. The sender signs the letter and sends it to the receiver
by fax.
5.2. Receiver - Upon receipt, the receiver signs and dates the letter and returns it to the sender
by fax, acknowledging receipt.
6.1. Transmittals are numbered as described in point 8.
6.2. The same procedure as for letters described under point 4 is followed for transmittals
informal communication and not contractually binding. Only when a correspondence has been
acknowledged for receipt by the receiver by way of points 3.2, 4.2 or 5.2 will it be deemed
contractually binding.
8.1. Project Manager - The numbering of all formal correspondence from the Project
Manager starts with a prefix K0XXX-B-E followed by the correspondence number 0001,
0002 etc. Example: K0XXX-B-E0021.
8.2 Contractor - The numbering of all formal correspondence from the Contractor starts with
a prefix K0XXX-B-C followed by the correspondence number 0001, 0002 etc.
Example: K0XXX-B-C0021.
8.3 During the project kick-off meeting the Project Manager informs the Contractor of the
numbering to be used to substitute the XXX in the numbering K0XXX-B- mentioned in 8.
and 8.2.
2.3 Health and safety risk management
procedures that are specified on the she specification and annexure B form that is issued on tender
documents:
a) Adhere to the OHS Act .
b) All staff will undergo Safety Induction, presented by Employer’s Safety Risk Department.
c) National Disaster Management Act Covid-19
2.4 Environmental constraints and management
project are fully conversant with the details of the Contractor’s methodology and communication
process in use, prior to accessing the working areas.
and handling of other related lifting equipment to ensure personnel safety, productivity and
prevention of plant damage.
careful, competent and efficient in their several trades and callings.
The Contractor ensures that his co-ordinators and employees are fluent in the language of the
Employer working hours: Monday to Thursday 07h15 to 16h30 and Fridays 07h15 to 12h15.
Abnormal working hours are pre-arranged with the Project Manager.
Kendal emergency preparedness (e.g. evacuation, etc.) procedures are obtained from the Project
Once the final status of the controller user program and the documentation is established, all the
controller functions need to be executed step-by-step again.
over to the client.
3.3 Procedure for submission and acceptance of Contractor’s design
b) The Contractor prepares subcontracting document as according to the NEC Contract.
c) The Contractor must inform the Project Manager when intending to subcontract some of the works from
the contract scope.
d) The Contractor takes note that their Subcontractors Safety Files will be accepted by the Contractor
compliance before any work commence. Proof of acceptance by the Contractor Safety Manager needs to be
in the Safety file when handed over to Employer SHE Practitioners for verification.
e) The Contractor only employs qualified sub-contractors
4.2.3 Attendance on subcontractors
4.3 Plant and Materials
to Provide the Works, subject to the following constraints and requirements:
a) Transport to Site:
appropriate handling measures for fragile or hazardous materials.
b) Storage Before Installation:
requirements to preserve their integrity.
theft, damage, or degradation of materials.
c) Warranties:
expected lifespan or performance requirements of the materials.
d) Compliance Monitoring:
with the contract requirements.
schedules, and any anticipated issues.
e) Defective or Non-Compliant Materials:
impacting the project schedule or quality.
the project program.
5.1 Temporary works, Site services & construction constraints
5.1.1 Employer’s Site entry and security control, permits, and Site regulations
a) Site Access Permits and Entry Requirements
the Project Manager, before allowed to enter and work on the site of Kendal Power Station. It is
the responsibility of the Contractor to ensure that all required personnel have attended the safety
induction.
clearance.
approval.
c) Vehicle Access
upon entry and exit.
d) Personal and Equipment Inspections
or leaving the Site.
e) Compliance with Site Regulations
f) Induction and Training
g) Costs
with entry requirements shall be borne by the Contractor.
h) Breach of Security Protocols
5.1.2 Restrictions to access on Site, roads, walkways and barricades
a) Access Restrictions
restricted or hazardous zones is strictly prohibited without prior approval.
routes and restricted zones.
Escort Requirements: Visitors and unauthorized personnel must be escorted by authorized
Right of Way: Pedestrians, emergency vehicles, and operational machinery have right of way on
Vehicle Restrictions: Oversized or heavy vehicles require prior clearance and may only operate
during designated times.
c) Barricades
Provision of Barricades: The Contractor must provide and maintain temporary barricades around
hazardous areas, open trenches, excavations, or ongoing work zones.
and signage requirements.
hazard.
5.1.3 People restrictions on Site; hours of work, conduct and records
holidays, must be approved in advance by the Project Manager.
environmental, community, or operational constraints.
5.1.4 Health and safety facilities on Site
the Occupational Health and Safety Act (OHSA) and to address potential emergencies, disease outbreaks,
and other health risks:
Employer-Provided Facilities: First Aid stations equipped with basic medical supplies will be
available at the following locations on Site:
▪ Main Site Office
▪ Construction Area Safety Cabin
Trained Personnel: The Employer will ensure that trained first aiders are available during standard
working hours.
Emergency Contact Numbers: A list of emergency contact numbers (ambulance, fire department,
nearest hospital, etc.) will be prominently displayed at all work areas and First Aid stations.
On-Site Ambulance: Where applicable, an on-site ambulance will be available to handle critical
medical emergencies.
Hygiene Facilities: The Employer will provide handwashing stations, sanitizers, and hygiene posters
at key locations.
Vaccinations and Health Screening: Where required by local regulations or during epidemic
outbreaks, personnel must provide proof of vaccinations or undergo health screenings.
Isolation Facilities: A designated area will be set aside for isolating individuals showing symptoms of
contagious illnesses until medical assistance arrives.
Part c3: scope of work c3.1 Ecc3 employer’s works information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Evacuation Plan: An emergency evacuation plan will be displayed at prominent locations on the Site.
Fire Safety: Fire extinguishers and fire alarms will be installed at all major work areas. The
▪ Project name
▪ Employer’s name and logo
▪ Contractor’s name and logo
▪ Safety information and contact details
b) Progress Photographs
specified intervals or milestones.
of the Works.
c) Ownership and Use of Photographs
purposes.
5.1.9 Contractor’s Equipment
ensure operational safety and compliance.
Environmental
Source: NEC SOW.pdfcooling of all generators as it is an effective cooling agent and a cost-effective medium for the design of the
generators. The existing hydrogen production plant at Kendal is unavailable due to internal damages in the
electrolyser which will require asbestos gaskets to reseal the electrolyser if opened and fixed. Asbestos
gaskets can no longer be used at Kendal Power Station due to a once-off concession given by the
Department of Environmental Affairs back in 2010. The plant also has a significant number of aged and
obsolete critical equipment. It is recommended that the existing hydrogen production plant be replaced with a
newer technology High Pressure Hydrogen Production Plant.
a) Environmental Management System (ISO 14001, 2004)
b) National Environmental Management Act (Act )
c) Eskom SHEQ policy (32-727)
d) Kendal Environmental Aspect and Impact Identification, Rating and Management Procedure
(*1015586)
e) Kendal Environmental Communication Procedure (*1015692)
Part c3: scope of work c3.1 Ecc3 employer’s works information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
submission of any change communications is without prejudice to the Employer other rights
under this Contract.
i) Each party bears its own costs in relation to the preparation and agreement of each change
request and impact assessment
5.1.5 Environmental controls, fauna & flora, dealing with objects of historical interest
fauna and flora, and procedures for managing objects of historical or cultural significance on Site:
a) Environmental Controls
avoiding unnecessary clearing or grading of land.
b) Fauna & Flora
protected species must be reported to the Employer and dealt with under the guidance of
environmental authorities.
▪ Avoid clearing vegetation outside designated work areas.
▪ For any unavoidable vegetation removal, the Contractor must consult the Employer or
environmental officer.
▪ Replanting or restoration may be required in disturbed areas.
c) Dealing with Objects of Historical Interest
discovered during the works, the Contractor must immediately cease work in the affected area and
notify the Project Manager.
disturbance until guidance is provided by relevant authorities or the Employer.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docxeTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Compliance Requirements
Source: Final - Kendal Hydrogen Production Plant Project Technical Evaluation Strategy-signed (003) (004).pdf (unknown)Insufficient searchable text - AI extraction recommended
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).pdf (unknown){"closingDate":"27 January 2025"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Contact Information
Source: NEC DATA BY EMPLOYER.pdf (unknown){"name":null,"email":null,"phone":null,"department":"y Unrest","address":"C Ltd (reg no"}
Evaluation Criteria
Source: NEC DATA BY EMPLOYER.pdf (unknown)at Quality Assurance
Technical Specifications
Source: NEC DATA BY EMPLOYER.pdf (unknown)Construction
Contract, April 2013 (ECC3)
10.1 The Employer is (Name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state-owned company
incorporated in terms of the company laws of the
Republic of South Africa
Address Registered office at Megawatt Park, Maxwell
Drive, Sandton, Johannesburg
10.1 The Project
Quality Management
Source: NEC DATA BY EMPLOYER.pdf11.2(3) The completion date for the whole of the 2 Years after the contract date
works is
11.2(9) The key dates and the conditions to be Condition to be met key date
met are:
NEW HYDROGEN PRODUCTION PLANT AT 1 Completion of H2, include As per accepted
KENDAL POWER STATION the delivery, installation, programme (90
commission, testing, days duration).
training and handover of
New H2 Plant as per
accepted, also to be registered
at Quality Assurance
been discovered on reasonable inspection by the
date, without requiring any inspection not
ordinarily carried out by the Employer or the
any inspection over and above the reasonable
inspection, this does not place a greater
responsibility on the Employer or the Supervisor
to have discovered the Defect.
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
Financial Requirements
Source: NEC DATA BY EMPLOYER.pdf (unknown)Payment Terms: Payment terms may change, subject to
the contract value which will be discussed with a
potential supplier.
(Note: No advance payment will be made/
arranged. Payment certificate to be completed
after the assessment is done and both parties
agreed)
51.1 The currency of this contract is the South African Rand.
51.2 The period within which payments are
mad
Compliance Requirements
Source: NEC DATA BY EMPLOYER.pdf (unknown)No specific requirements found
B-BBEE Details: med to be jointly and
severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Project Manager
within two weeks of the Contract Date of the key person who has the authority to bind the
Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having been
given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Project Manager within thirty
days of the notification or as otherwise instructed by the Project Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Works.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may constitute a
Part c1: agreements and contract data c1.2A Ecc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
New hydrogen production plant at kendal power station
reason for termination. If the Employer terminates in terms of this clause, the procedures on
termination are P1, P2 and P3 as sta
Health & Safety
Source: NEC DATA BY EMPLOYER.pdfprogramme.
30.1 The access dates are no access will be Part of the Site Date
permitted if the following documents are
not met.
(subject to the approval of (90days).
Safety file).
submitted to the System
contractor will not be able to report on duty
within period mentioned above, he/she must
inform the Eskom Project Manager on time.
rights, and does not give rise to an estoppel unless the Parties agree otherwise and confirm such
agreement in writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety of
persons in and about the execution of the works. Without limitation the Contractor:
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Site;
proper compliance with the Construction Regulations, all applicable health & safety laws and
regulations and the health and safety rules, guidelines and procedures provided for in this
contract and generally for the proper maintenance of health & safety in and about the
execution of works; and
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z15.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail.
and related control measures at the Contractor’s expense. For the purposes of compliance
the results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z15.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z15.3 The Employer manages asbestos and ACM according to the Standard.
Z15.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z15.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z15.6 The Contractor continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
each person is required to access premises, installations or sites, systems or information. The
Employer may require updated certificates and identifying documents every 26 to 52 weeks,
subject to safety and security concerns and the risk rating of the works or services undertaken
and/or premises, installations or sites, systems or information.
Z16.4 If any such criminal verification record security clearance certificates is cancelled, withdrawn,
invalidated, amended, or expires, or a criminal conviction is noted against any person requiring
access, even if an appeal against the criminal conviction has been noted, the Project Manager
may instruct the Contractor to ensure that such person leaves the premises, installations or
site/s and is blocked from systems and information and the giving of this instruction is not a
compensation event.
Part c1: agreements and contract data c1.2A Ecc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
Non-Compliance with Safety and R2 500.00 per day until Capped at R25 000.00
Environmental Standards: The compliance is achieved
safety barriers and warning signage
around the New H2 Hydrogen
production plant within 48 hours of
site possession.
Non-Compliance with Quality R2 500.00 per day until Capped at R25 000.00
Standards: Failure to complete a compliance is achieved
quality control plan and ITP(s) for
review and acceptance by Eskom
prior to the commencement of any
work.
Late Submission of Completion R2 000.00 per day of delay Capped at R20 000.00
Documentation: Contractor fails to
provide final documentation within
agreed milestone period
Part c1: agreements and contract data c1.2A Ecc3 contract data part 1
Environmental
Source: NEC DATA BY EMPLOYER.pdfenvironmental laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Project Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
dates are extended by the notification periods required by regulations 3 and 21 of the
Asbestos Regulations, 2001.
Z15.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Z16 Security Clearance/ Criminal Checks
Important Dates
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdf (unknown){"closingDate":"31 May 2024"}
Contact Information
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdf (unknown){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"note specifying the means of transport, weight, number or volume as appropriate and"}
Technical Specifications
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdf (unknown)supply the goods or
execute the works
Quality Management
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdf240-59385009 Rev 3 Eskom General Conditions Identifier
of Purchase Effective Date 31 May 2024
Review Date May 2029
part of the goods by giving written notice to the Supplier specifying the reason for rejection and whether
replacement of goods or re-work is required.
In the case of goods delivered, Eskom may return the rejected goods to the Supplier at the Supplier's risk
and expense. Any money paid to the Supplier in respect of the goods not replaced within the time required,
together with the costs of returning rejected goods to the Supplier and obtaining replacement goods from a
third party, shall be paid by the Supplier to Eskom.
In the case of works/services, the Supplier shall correct non-conformances/defects as indicated by Eskom.
Pricing Schedule
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdffor price adjustment, which is calculated in accordance with the formula stated in the agreement. The
Health & Safety
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdfrate shall be used to convert from this currency to South African Rand (ZAR). Payment to the Supplier in
any currency other than ZAR shall not exceed the amounts stated in the agreement. Eskom’s CPA (IG)
form must be duly completed by the Supplier. Eskom will pay for the item within 30 days after receipt of a
correct Tax invoice. Eskom’s VAT registration number (4740101508) has to appear on the tax invoice,
before any payment will be made, as from 1 June 2004.
compliance with the terms and conditions of the agreement at the point of delivery/site specified in the
agreement on or before the date stated in the agreement. Late deliveries of the goods or late completion
of the works/services may be subject to a penalty as stated in the agreement. No payment shall be made
if the Supplier does not provide the goods/services/works as stated in agreement. Where goods are to be
delivered the Supplier shall:-
clearly mark the outside of each consignment or package with the Supplier's name and full details of
the destination in accordance with the order and include a packing note stating the contents thereof;
send an advice note specifying the means of transport, weight, number or volume as appropriate and
the point and date of dispatch, to Eskom at the address for delivery of the items;
send a detailed Tax invoice to Eskom after delivery of the goods or after completion of the
works/services;
state the agreement number on all communications in respect of the agreement; and
state in his tender whether delivery cost is included in the price. If not, it will be deemed to be included.
made for containers or packing materials or their return to the Supplier.
inspect and/or test the goods/works/services as well as the workmanship at any stage of the work. Should
Contractual Terms
Source: Eskom_General_Conditions_of_Purchase_-_31_May_2024.pdfcorrected by a third party at the Supplier’s costs.
and expenses arising from the negligence, infringement of intellectual or legal rights or breach of statutory
duty of the Supplier, his subcontractors, agents or servants or the rights of others, or from the Supplier's
defective design, materials or workmanship.
that the goods/works/services are fit for the purpose for which they are intended and that they will remain
free from defects for a period of one year (unless otherwise stated in the agreement) from acceptance. If
a defect/non-conformance is found with the goods/works/services within this period, the Supplier shall
rectify the defect/non-conformance within an agreed time period, free of cost to Eskom. The Supplier shall
use reasonable skill and care to provide the goods/ works/services as described in the contract.
obligations to any person without the written consent of the other or sub-contracting by the Supplier.
obligations under this agreement to any of its subsidiaries or any of its present divisions or operations
which may be converted into separate legal entities as a result of restructuring.
agreement which is governed by the law of the RSA and the parties hereby submit to the jurisdiction of
the SA courts.
and fail to rectify or remedy the default, and after receiving written notice from the non-defaulting party, the
latter shall be entitled to terminate the agreement.
has accrued or thereafter accrues to Eskom) if the Supplier defaults in due performance of the agreement,
or becomes bankrupt or otherwise is, in the opinion of Eskom, in such financial circumstances as to
prejudice the proper performance of the agreement.
our suppliers.
Contact Information
Source: NEC SITE INFORMATION.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s) of 686 MW each, the station capacity is 4116","address":null}
Evaluation Criteria
Source: NEC SITE INFORMATION.pdf (unknown)System, shall be trained and successful completion of Kendal’s authorization / evaluation process,
Technical Specifications
Source: NEC SITE INFORMATION.pdf (unknown)Eskom Kendal Power Station is situated approximately 40km Southwest of Witbank in the Mpumalanga
Quality Management
Source: NEC SITE INFORMATION.pdf3.1 General
this contract specification, are made available by the Project Manager at Kendal Power Station.
regulations and inspections. Contractor to work safe and have good hose keeping
3.2 Site Regulations
Part c4: site information c4 ecc3 site information
Employer’s name: contract number _____________
Compliance Requirements
Source: NEC SITE INFORMATION.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 1619
Health & Safety
Source: NEC SITE INFORMATION.pdf1.4 Supply of electricity
Electric power for construction, both 220V AC and 380V 3-phase supply, is supplied at Site free of
charge, but connection fees are for the Contractor's account. All installations comply with the details
set out in Kendal Maintenance Procedure- Contractor's Temporary Electrical Equipment Supply, and
Construction Power Supplies (Occupational Health and Safety Act - Act ) and the Kendal
safety standards and maintained in safe and proper working condition. The Employer has the right to
stop the Contractor's use of any electrical equipment or appliance which in the Employer's opinion
does not conform to the foregoing
2.3 Conditions of supply for erection
arranged with the Project Manager.
that it complies with the requirements of the Occupational Health and Safety Act, 1993 and the
code of Practice for wiring of premises, SABS 0142.
satisfied, it is connected and supplied from the construction power supply.
2.4 Warning
The Contractor complies with Employer’s site regulations as stipulated in Procedure, covering the
following:
3.4 Permits
Contractual Terms
Source: NEC SITE INFORMATION.pdfconnection points of water, electricity and toilet facilities cannot be guaranteed.
1.1.1 Is the contractor needed on site on a daily basis to carryout his/her contractual duties?
1.1.2 Does the nature of contract activities demand that the contractor be involved continuously,
with his/her contractual duties for the whole day for four (4) or more days in a week?
1.1.3 In a case of a break down, is the contractor required to respond to the call out within 15
minutes?
1.1.4 Is there any statutory regulation/s that warrants that the contractor must operate within the
premises of Kendal Power Station for the delivery of contractual obligations?
1.1.5 The Contractor is responsible for keeping the site in good state of maintenance and is
responsible to ensure that at the end of the Contract period, he informs the Site Manager to
inspect the site at least thirty days (30) before the Contract end date. The Contractor shall
vacate the site allocated to him at the end of the Contract or on termination of the Contract
Contact Information
Source: NEC FORM OF SECURITY.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ce to the above numbered contract made or to be made between"}
Technical Specifications
Source: NEC FORM OF SECURITY.pdf (unknown)Construction Contract
[Note to contract compiler:
Once it has been decided which securities are required for this contract delete from this file the ones
not required, revise the notes below accordingly and delete this note.]
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X4: Parent company gua
Contractual Terms
Source: NEC FORM OF SECURITY.pdfnot required, revise the notes below accordingly and delete this note.]
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X4: Parent company guarantee
Option X13: Performance Bond
Option X14: Advanced payment to the Contractor
Each of these secondary Options requires a bond or guarantee “in the form set out in the Works
Information”. Pro forma documents for these bonds and guarantees are provided here for convenience
but are to be treated as part of the Works Information.
Option X16: Retention (not used with Option F)
receives and accepts a Retention Money Guarantee exactly in the form stated he will instruct the Project
Manager not to assess any amount be retained in terms of secondary Option X16.
letterhead without any change to the text or format and completing the required details. The completed
document is then given to the Employer within the time stated in the contract.
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Pro forma Parent Company Guarantee (for use with Option X4)
(to be reproduced exactly as shown below on the letterhead of the Contractor’s Parent Company)
on behalf of the Contractor’s
parent company
of physical address
and duly authorised thereto do hereby unconditionally guarantee to the Employer that the Contractor shall
performance (whether or not the Agreement be formally determined). The Employer is to notify us and
we shall indemnify the Employer for any additional cost or expense it incurs.
of South Africa and we hereby submit to the non-exclusive jurisdiction of the High Court of South Africa.
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Signature of Witness(s)
Name(s) (printed)
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Pro forma Performance Bond – Demand Guarantee (for use
with Option X13)
(to be reproduced exactly as shown below on the letterhead of the Contractor’s Parent Company)
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Performance Bond – Demand Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] Contract Reference: ...... [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be
inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Project, entered into between
Eskom and the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No.
[.]as amended, varied, restated, novated or substituted from time to time; [Drafting Note:
Signature Date and Contract reference number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under
Registration Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Eskom” - means Eskom Holdings SOC Ltd, a company registered in accordance with the
laws of the Republic of South Africa under Registration Number 2002/015527/30].
1.6 “Expiry Date” - means the date on which the Defects Certificate is issued in terms of the
1.7 “Guaranteed Sum” - means the sum of R [●] ([●] Rand);
1.8 “Project” - means [insert if applicable.].
our respective capacities as _____________ and ___________ of the Bank, and duly authorized
thereto, confirm that we hold the Guaranteed Sum at the disposal of Eskom, as security for the
proper performance by the Contractor of all of its obligations in terms of and arising from the
the Expiry Date, any sum or sums not exceeding in total the Guaranteed Sum.
shall:
3.1 be signed on behalf of Eskom by a Group Executive, Divisional Executive, Senior General
Manager, General Manager or its delegate;
3.2 state the amount claimed (“the Demand Amount’);
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
principal and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances;
and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the
Guaranteed Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank
in terms hereof shall not be delayed, by the fact that a dispute may exist between Eskom
and the Contractor.
without advising us and without affecting our liability under this Guarantee. This includes, without
limitation, any extensions, indulgences, release or compromise granted to the Contractor or any
variation under or to the Contract.
under the Contract, then Eskom shall be entitled to cede to such third party the rights of Eskom
under this Guarantee on written notification to the Bank of such cession.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in 7 above, personal to Eskom and is neither negotiable nor
transferable;
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or
expiry hereof;
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South
Guarantee at the Bank’s Address.
Signed at _____________________ Date ____________________________
Bank Signatory: ___________________ Bank Signatory: ___________________
Witness: ________________________ Witness: _________________________
Bank’s seal or stamp
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
than 7 days following the submission to the Surety of a certificate signed by the Project Manager stating
the amount of the Employer's losses, damages and expenses incurred as a result of the non-
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
performance aforesaid. The signed certificate shall be deemed to be conclusive proof of the extent of
the Employer's loss, damage and expense.
to the advance payment.
Signature of Witness(s)
Name(s) (printed)
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Pro forma Retention Money Guarantee (may be used when
Option X16 applies)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Retention Money Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] : Contract Reference: [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be
inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Project, entered into between Eskom
and the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No. .......... as
amended, varied, restated, novated or substituted from time to time; [Drafting Note: Signature
Date and Contract reference number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under
Registration Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Eskom” - means Eskom Holdings SOC Limited, a company registered in accordance with the
laws of the Republic of South Africa under Registration Number 2002/015527/30
1.6 “Expiry Date” - means the date on which the Defects Certificate is issued in terms of the
1.7 “Guaranteed Sum” - means the sum of R [●] ([●] Rand); [Drafting Note: Insert amount of
Retention Money Guarantee.].
1.8 “Project” - means the.........................................
our respective capacities as _____________ and ___________ of the Bank, and duly authorized
thereto, confirm that we hold the Guaranteed Sum at the disposal of Eskom, as security for the
proper performance by the Contractor of all of its obligations in terms of and arising from the
the Expiry Date, any sum or sums not exceeding in total the Guaranteed Sum.
shall:
3.1 be signed on behalf of Eskom by a director of Eskom or his authorised delegate.
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
principal and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances;
and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the
Guaranteed Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank in
terms hereof shall not be delayed by the fact that a dispute may exist between Eskom and the
without advising us and without affecting our liability under this Guarantee. This includes, without
limitation, any extensions, indulgences, release or compromise granted to the Contractor or any
variation under or to the Contract.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in 7 above, personal to Eskom and is neither negotiable nor
transferable;
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry
hereof;
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South Africa
and shall be subject to the jurisdiction of the Courts of the Republic of South Africa.
8.6 Any claim which arises or demand for payment received after expiry date will be invalid and
unenforceable.
Guarantee at the Bank’s Address.
Signed at _____________________ Date ____________ Bank’s seal or stamp
Bank Signatory: ___________________ Bank Signatory: ___________________
Witness: ________________________ Witness: _________________________
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Pro-Forma ASGI-SA Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] Contract Reference: [●] [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be
inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Project, entered into between the
Employer and the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No. [●]
as amended, varied, restated, novated or substituted from time to time; [Drafting Note:
Signature Date and Contract reference number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under
Registration Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Contractor’s ASGI-SA Obligations” – means the Contractor’s ASGI-SA Obligations under and
as defined in the Contract.
1.6 “Employer” - means Eskom Holdings Limited, a company registered in accordance with the laws
of the Republic of South Africa under Registration Number 2002/015527/06.
1.7 “Expiry Date” - means the [●] day of [●] 200[●]; [Drafting Note: anticipated date of issue of
ASGI-SA Performance Certificate to be inserted.]
1.8 “Guaranteed Sum” - means the sum of R [●] ([●] Rand);
1.9 “Project” – means the ..............................
our respective capacities as _____________ and ___________ of the Bank, and duly authorized
thereto, confirm that we hold the Guaranteed Sum at the disposal of the Employer, as security for
the proper performance by the Contractor of the Contractor’s ASGI-SA Obligations and hereby
undertake to pay to the Employer, on written demand from the Employer received prior to the
shall:
3.1 state the amount claimed (“the Demand Amount’);
3.2 state that the Demand Amount is payable to the Employer in the circumstances contemplated in
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
principal and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances;
and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the
Guaranteed Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank in
terms hereof shall not be delayed, by the fact that a dispute may exist between the Employer
and the Contractor.
fit, without advising us and without affecting our liability under this Guarantee. This includes,
without limitation, any extensions, indulgences, release or compromise granted to the Contractor or
any variation under or to the Contract.
permitted under the Contract, then the Employer shall be entitled to cede to such third party the
rights of the Employer under this Guarantee on written notification to the Bank of such cession.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in 7 above, personal to the Employer and is neither negotiable nor
transferable;
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry
hereof;
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South Africa
and shall be subject to the jurisdiction of the courts of the Republic of South Africa.
8.6 Any claim which arises or demand for payment received after expiry date will be invalid and
unenforceable.
Guarantee at the Bank’s Address.
Signed at _____________________ Date ____________________________
Bank Signatory: ___________________ Bank Signatory: ___________________
Witness: ________________________ Witness: _________________________
Bank’s seal or stamp
Part c1: agreements and contract data c1.3 Ecc3 proforma guarantees
Contact Information
Source: NEC PRICING DATA.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Est. Rate Each Total Price","address":null}
Evaluation Criteria
Source: NEC PRICING DATA.pdf (unknown)15 Quality Officer
Technical Specifications
Source: NEC PRICING DATA.pdf (unknown)No: Unit Est. Rate Each Total Price
Qty
1.1 Fixed charge items
1 le 1
Methodology
Source: NEC PRICING DATA.pdfsubmit a complete activity schedule. The contractor is allowed to break activities in sub activities if
necessary. The activity schedule must be aligned to the programme and the method statement.
Quality Management
Source: NEC PRICING DATA.pdfTesting and commissioning of the works 47 LE 1
Preparation of Operation & Maintenance Manuals & Drawings 48 LE 1
Training of Eskom Staff personnel 49 LE 1
Labelling of plant as per approved Eskom Standards including safety 50 LE 1
signages
Pricing Schedule
Source: NEC PRICING DATA.pdfPart 2: pricing data
ECC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 9
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
C2.1 Pricing assumptions: Option A
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
and incidental to Providing the Works in accordance with the Works Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
activities in order to fulfil the obligation to complete the works for the tendered total of the Prices.
quantity, of work within that activity later turns out to be different to that which the Contractor
estimated at time of tender. The only basis for a change to the Prices is as a result of a
compensation event.
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Hydrogen Electrolysis plant producing at 15 Nm3/hour including 15 LE 2
auxiliaries, closed loop cooling, ventilation.
Metering station 16 LE 1
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
complete the item.
bonuses for employees, accommodation.
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Sunday: Responsible Person shall be required to work Nightshift. Working hours is seven to
seven:
6 Responsible Person – Sunday Nightshift Hrs
Public Holiday: Responsible Person shall be required to work Dayshift. Working hours is seven to
seven:
7 Responsible Person – Public Holiday Dayshift Hrs
Public Holiday: Responsible Person shall be required to work Nightshift. Working hours is seven
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Rates Schedule to apply on “as – and - when required” basis for any maintenance work, outside the scope of
this contract and for any compensation event calculations
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
C2.2 the activity schedule
Use this page as a cover page to the Contractor’s activity schedule.
Part c2: pricing data c2.2 ECC3/A activity schedule
Health & Safety
Source: NEC PRICING DATA.pdfItem Description Qty Price ea/ Total price
person
1 Medicals (only if annual medical certificate expired)
2 Health and Safety File
3 Safety Training
4 Health and Safety Officer (if >40 employees)
5 Hard hats with chin strips(Hooked on the hats itself not
inside)
6 Overalls
7 Gloves
8 Shoes (Safety boots)
9 Hearing protection
10 Safety goggles
11 Safety harnesses(with big hooks not small hooks)
12 Site Establishment
13 De-establishment
18 First Aid box for every 50 employees
19 Dust musk
20 Life save jacket
21 Welding gloves
22 Welding shield
23 Welding aprons
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
New hydrogen production plant at kendal power station
24 Covid-19 Requirements
25 Thermal Suit N/A
26 Special underwear – only cotton N/A
27 Flash Suit N/A N/A N/A
*28 Training: Appointed Operator - ORHVS (8 days) N/A Offer by Eskom N/A
*29 Training: Appointed Person - PSR (10 days) Offer by Eskom N/A
*30 Training: Responsible Person - ORHVS & PSR (18 days) N/A Offer by Eskom N/A
*31 Training: Authorised Supervisor - PSR (2.5 days) N/A Offer by Eskom N/A
Total value for health and safety for the total contract period
The above prices excludes VAT
It is compulsory for the Contractor to visit Kendal Safety Department after contract award and before any work may
commence to:
Suppliers are not, under any circumstances, to deviate from the required stipulated format for the provision of pricing.
Contractor:
Print name signature date
ESKOM
Kendal power station
Rates schedule for any compensation event calculations
Rates Schedule to apply on “as – and - when required” basis for any maintenance work, outside the scope of
this contract and for any compensation event calculations
Item Trade Base Rate per Rate per hour Normal Rate per hour Rate p
Hour time Overtime & Sund
Normal Time (Base rate Incl. Profit Saturday Holid
(Excl. Profit & & Overheads) (Base rate times 1.5) (Base
Overheads)
1 Rigger
2 Fitter
3 Boilermaker
4 Welder
5 Semi-skilled
6 Authorised
Supervisor (AS)
7 Responsible
Person (RP)
8 Project Manager
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
New hydrogen production plant at kendal power station
9 Site Manager
10 Projector Planner
11 Site Supervisor
12 Resource Manager
13 Stores Controller
14 Safety Officer
15 Quality Officer
16 Storeman
17 Driver
18 Safety
Representative
19 Artisan Assistance
Note:
other costs related to this works.
Contractor:
........................................................ .............................................................. ..................................................
Print name signature date
C2.2 the activity schedule
Use this page as a cover page to the Contractor’s activity schedule.
Part c2: pricing data c2.2 ECC3/A activity schedule
1.1 Fixed charge items
1 le 1
Establishment of Facilities on the Site (Offices, Storage Shed,
Ablution facilities, Tools & Equipment, etc.)
Safety File 2 LE 1
SAPS Clearance, Medicals, Inductions and Safety Equipment (SHEQ) 3 LE 1
Water supplies, electric power, communications, dealing with water, 4 LE 1
and access.
Removal of site establishment. 5 LE 1
1.2 Time related items
Offices and Storage sheds 6 LE 1
Ablution and latrine facilities. 7 LE 1
Living accommodation. 8 LE 1
Plant and Equipment hire 9 LE 1
Transport of staff to site 10 LE 1
Safety Officer 11 LE 1
Supervision for duration of construction (Project Management) 12 LE 1
Price list
Health and safety
4 Health and Safety Officer (if >40 employees)
5 Hard hats with chin strips(Hooked on the hats itself not
inside)
8 Shoes (Safety boots)
11 Safety harnesses(with big hooks not small hooks)
commence to:
Contractual Terms
Source: NEC PRICING DATA.pdfLocal Inspection Authority certification 25 LE 1
Issuing of Electrical plant reticulation - Certificate of Compliance 27 LE 1
Interconnecting piping design calculations 28 LE 1
Electrical design, review and sign off 29 LE 1
Supply, fabrication and installation of Interconnecting plant piping on 30 LE 1
site
Mechanical design, review and sign off 31 LE 1
Civil design, review and sign off 32 LE 1
Civil material (support and drainage pipes) 33 LE 1
Civil construction 34 LE 1
Control and instrumentation design, review and sign off. 35 LE 1
Electrical designs, review and sign off 36 LE 1
Cabling installation including cable racking and terminations 37 LE 1
Separate metering panel and bulk storage PLC 38 LE 1
Plant gas COC 39 LE 1
Supply and Installation of new door(s) as per Eskom requirements 40 LE 1
Supply all consumables required to execute the works 41 LE 1
Provision for interfacing to the system as per SOW 42 LE 1
Provision of fire detection system as part of hydrogen production plant 43 LE 1
integrated with power station fire detection system separate from
hydrogen production process.
Provision of Reverse Osmosis Plant to supply demin water 44 LE 2
Part c2: pricing data c2.2 ECC3/A activity schedule
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (14).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (14).pdf (unknown)The NDA requires bidders to be legally incorporated entities. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (14).pdf (unknown)Supply, delivery and installation of New
Hydrogen H2 Production Plant for a period Project
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (14).pdf (unknown)third parties. For purposes of this clause, the Receiving Party’s Representatives shall
be deemed to be acting, in the event of a breach, as the Receiving Party’s duly
authorised agents.
3.6 Accordingly, the Receiving Party agrees to indemnify, defend and hold the Disclosing
shall not apply to any Confidential Information that:
8.1 is known to, or in the possession of the Receiving Party prior to disclosure thereof by
the Disclosing Party;
8.2 is or becomes publicly known, otherwise than as a result of a breach of this Agreement
by the Receiving Party;
8.3 is developed independently of the Disclosing Party by the Receiving Party in
circumstances that do not amount to a breach of the provisions of this Agreement;
8.4 is disclosed by the Receiving Party to satisfy an order of a court of competent
jurisdiction or to comply with the provisions of any law or regulation in force from time
to time; provided that in these circumstances, the Receiving Party shall advise the
required to disclose and the Receiving Party will use its reasonable endeavours to
protect the confidentiality of such Confidential Information to the greatest extent
possible in the circumstances;
8.5 is disclosed to a third party pursuant to the prior written authorisation and Ltd to the
extent of such approval of the Disclosing Party;
8.6 is received from a third party in circumstances that do not result in a breach of the
provisions of this Agreement.
shall endure for a period of 3 (three) years after the date of termination of the
relationship between the parties or at a date specified in any subsequent agreement(s)
between the Parties in pursuance of the Project referred to herein.
Agreement and fail to remedy such breach within seven (7) business days from date
of a written notice to do so, then the Disclosing Party shall be entitled to invoke all
remedies available to it in law including, but not Ltd to, the institution of urgent
proceedings as well as any other way of relief appropriate under the circumstances, in
any court of competent jurisdiction, in the event of breach or threatened breach of the
14.2.1 will not result in a breach of any other Agreement to which it is a party; and
14.2.2 will not, to the best of its knowledge and belief, infringe the rights of any third party;
and the Disclosing Party hereby indemnifies and holds the Receiving Party harmless
against any liability for third party claims on such a basis.
Important Dates
Source: SHE.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: SHE.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"pril 2022 for Kendal Power Station"}
Evaluation Criteria
Source: SHE.pdf (unknown)Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing (COID). They must comply with the OHS Act and all applicable legislation (e.g., National Environmental Management Act, National Water Act, National Road Traffic Act). A Section 37(2) agreement must be signed with Eskom and with any appointed contractors. Bidders must not use child labour. Non-compliance with Eskom's Life-Saving Rules is considered serious misconduct and may lead to disciplinary action or contract termination.
Technical Specifications
Source: SHE.pdf (unknown)Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its Safety,
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
specification is Eskom Generation's minimum requirements which are required to be met for the
duration of the contract period by contractors/suppliers and, where required, the delivery
organisation. The contractor is expected to develop an OHS plan that meets these requirements as well
as all the relevant applicable legislation that they conform to. Eskom in no way assumes the contractor’s
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
execution of their health and safety programme for their employees and appointed contractor
employees. This OHS specification reflects minimum requirements and should not be construed as all-
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be taken
cognisance of and listed in the respective OHS plans. If there are any additional Eskom and/or
legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that must
be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to Eskom
Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
Definition Explanation
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic, and
cultural properties and conditions of the foregoing that influence
human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Occupational Health means comprehensive health and safety requirements for a contract, project,
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
National sourcing of services providers/contractors at the divisional level and not at BU
Enquiries/contracts level thorough tendering, request for price etc
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
Definition Explanation
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Main contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement services –
Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCA Hazardous Chemical Agents
LDV Light Delivery Vehicle
SDS Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file for
evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the project
manager/end user who will facilitate the signing of the document by Eskom and contractor
representatives.
3.1 Scope of work
Construction of a new hydrogen production plant
A copy of the detailed scope of work must be retained by the contractor.
Note: Contractor shall refer to NEC for detailed scope of works.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of
submitting the safety file. The main contractor must ensure that a section 37(2) agreement is compiled
between the main contractor and all their appointed contractors for the contract. The original copy of
the section 37(2) agreement must be retained by the contractor, and a copy must be retained by the
responsible project manager/end user. A copy of all the agreements must form part of the respective
contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children.".
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on Hazardous
Work by Children in South Africa" with emphasis on paragraph 2: Purpose and Interpretation. Eskom
does not condone the use of child labour and, therefore, all effort must be exercised, and child labour
should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to this
project being:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
Rights).
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are familiar
with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their strategic
objectives, and values of integrity, customer satisfaction, excellence, and innovation. The main
contractor and all appointed contractors, if not already in place, will be required to compile an
organisational SHEQ policy in line with their OHS responsibilities. The policy must be signed by the
organisation’s CE or the appointed assistant to the CE, OHS Act Section 16(2). The policy must be
displayed in a prominent place within the workplace. A copy of the policy must be filed in the contractor's
OHS files and attached as an annexure to the OHS Plan.
3.5 Covid -19 Requirements
Not applicable, however the appointed contractor must ensure that the Covid-19 is identified as a
hazard in the Contractor Baseline Risk Assessment with control measures are implemented and that
measures to manage Covid-19 are noted in the Contractor SHE Plan.
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing (LoG) from
such commissioner. The obligation lies with the contractors to ensure that the LoG remain valid
throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training, provision
of PPE, safety equipment purchases etc.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will comply
with the OHS Act for the duration of the contract. Before requiring appointees to accept an appointment,
the employer must ensure that they have received appropriate training and/or information about their
responsibilities. The relevant statutory appointments must be made in compliance with the OHS Act's
criteria, which include appointing a qualified individual to the appropriate roles. The following should be
included in the statutory appointments, but not limited to:
Substances Co-coordinator
3.8.1 Non statutory appointments
3.9 ESKOM life-saving rules
undertakes work for Eskom to do the same.
agents, consultants, and contractors. Any Eskom employee or employee of a Main Contractor
or appointed contractor who fails to follow these rules would be deemed a serious violation.
These rules are in place to protect any employee, labour broker, or contractor working from
significant injury or death.
premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required permit to
work.
Ensure safe live working
Rule 6
Ensure all live work basic principles are adhered to,
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home
to their families safely.
3.10 Substance abuse
workplace accidents and car driving. As a result, Eskom has the right to take reasonable
procedures to identify and prohibit drunk people from entering the company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom's procedure 32-37 ("Substance Abuse Procedure"), taking
into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and anyone
entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has self-alcohol
testing equipment.
on a regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge before
commencement of work.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the
supervisors responsible for the contract. List the relevant positions held, names of appointees,
legal appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement.
The Main contractor is responsible for keeping copies of all the organograms’ as well as
submitting them with the OHS plan. All organograms shall be updated timeously when
appointments are changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
the company’s letter head, listing the reporting structure from their CE down to their project
supervisors. The diagram must list the names, positions held, any appointments made and
must be signed off by the company's 16(1) or 16 (2).
and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors and
employees at all levels must demonstrate their commitment by being proactively involved in the day to
day operations, in particular the Occupational Health and Safety aspects of any project / contract.
Legislation requires that each employee must take reasonable care of themselves and their fellow
workers, from management level down to the lowest employee level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will be
listed and titled. The contractors shall:
of the OHS Act and Regulation 7 of the Construction Regulations.
appointed contractors within their working area, as contemplated by section 37(2) of the OHS
Act;
date of induction, relevant skills and licenses and be able to produce this list at the request of
the Eskom Project Manager.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
terms of their appointment and that they advise and assist these appointees in the execution of
their duties.
with on all work sites.
participation and cooperation.
records must be kept for each work site.
valid letter of good standing before the commencement of work and any future renewal letters
obtained during the contract for record-keeping purposes. The letter of good standing shall
reflect the name of the contractor’s company. Similarly, the Main contractor must provide the
Eskom project manager with all the valid letters of good standing from their appointed
contractors.
Commissioner’s valid letter of good standing before the commencement of work and any future
renewal letters obtained during the contract for record-keeping purposes. The letter of good
standing shall reflect the name of the contractor’s company.
in the health and safety aspects relating to such work and that the employees understand the
hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
the cost of safety and health measures throughout the project.
and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors who are
competent to do work, have satisfied the OHS compliance requirements and satisfied that the
contractor has the necessary competencies and resources to perform the work safely.
work throughout the contract period.
which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
employees have transgressed any of the requirements of the health and safety specification,
safety and health plans, site rules or any other requirements.
site or emerging risks. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
starting of any new task, irrespective of whether it is a repetitive task or not.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
approval prior to them commencing work.
3.12.2 Contractor site supervisor
The contractor site supervisor must be trained in the following:
liability
Must:
Eskom project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action is in
place.
first instance and thereafter the Eskom project manager in the second instance relating to
procedure requirements, non-conformances identified, corrective actions, audits and
inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
inspection reports.
statistics report etc
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full time
for this scope
The contractor health and Safety officer must be trained in the following:
understanding of ISO 45001, Minimum work experience 2yrs, OHS Diploma (applicable to 3-
5 years contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported.
A risk assessment is defined as an identification of the hazards present in the activity, work, site,
and an estimate of the extent of the risks involved, considering whatever precautions are already
being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as information
and record of the way jobs / tasks must be performed. Daily or issue based or task specific or on
the job risk assessments must be conducted at the place where work is to be performed/ conducted
to allow managers and employees to assess any inherent risks that could have been overlooked
during the initial risk assessment or any changes that might have occurred in a period of absence.
For example if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
procedures exist for ladders.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
rectify this shall be recorded, and safe working procedures drawn up.
and duly assigned.
must be nominated.
for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must be
aligned with the risk assessments. Method statements / written safe work procedure are control
measures used to prevent an incident from occurring during the execution of the project. A written
safe work procedure/ method statements provide guidance how to execute the task safely. A safe
working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
J. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
3.15 Fire equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.16 Flammable and combustible liquids
The volumes of fuel allowed to be stored will depend on site conditions and Statutory
Regulations e.g. by-laws.
work and the approval to be obtained from the local Municipality and to be complied with for
the duration the project.
stored in a flammable/combustible liquid store with adequate spillage retention and proper
labelling.
kg, shall be provided, installed and maintained.
a. Storage should be well clear of buildings.
b. Storage areas must be kept free from all combustible materials.
c. All Safety signs must be prominently displayed i.e.
d. Adequate firefighting equipment must be available.
of tank capacity.
material.
Bunded area shall have a drain valve.
No other material/equipment shall be stored in the bunded area.
For storage of hazardous and flammable liquids, the approval must be obtained from the Fire
department and/or the Municipality (if the services are rendered/available in the local
Municipality).
The storage of flammable or hazardous storage must be well ventilated.
The appropriate Jerry cans designed for petrol/diesel shall be used to store petrol on Eskom
sites and the appropriate colour coding should be complied with.
3.17 First aid and equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the legal requirements. Appointees must be
trained to level 2 and the training service provider must be registered in accordance with section
26(1) of the Skills Development Amendment Act, Act No. . It is good practice for all
employees to be trained to at least level 1.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
all employees.
are familiar with the emergency numbers.
or team of workers on site or part thereof, taking into account the type of work performed and
the distance between teams.
available and accessible for the immediate treatment of injured persons at the workplace.
contact details of the First Aider of such first aid box or boxes shall be erected.
made for incidents occurring after working hours.
3.17.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a regular basis,
kept clean and dust free.
3.18 OHS communication systems
outlining how they intend to communicate OHS issues to their staff, the mediums they will
employ and how they will measure the effectiveness of their OHS communication. Below is a
brief on how communication should take place. Where project meetings are conducted on
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
site, OHS shall be included as a standing agenda point and minutes of these meetings shall
be available on site at all times. Minutes of meeting must be compiled and filed in the relevant
OHS files. All employees shall have access to these minutes. Attendance register shall be
kept for all the health and safety meetings.
3.18.1 Statutory Health and Safety Committees
19 of the OHS Act. Similarly, appointed contractors shall establish their own statutory health
and safety committee.
All appointed contractors shall be members of the Main contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Listed below is a preferred agenda.
committees (Refer to Section 19 (2) (a) of the OHS Act).
Representatives on that specific statutory health and safety committee. (Refer to Section
19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
and the project manager and the Inspector at DEL.
incidents and other notified serious incidents.
shall keep record of all recommendations made by the committee.
current standards, procedures and practices.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.18.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
same as the statutory safety committee
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.18.2.1 Agenda
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation reports
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
3.18.2.2 Minutes and action items for all health and safety committee meetings
Minutes and record of action items shall be kept of all health and safety committee meetings.
Action column with target dates and responsible person shall be clearly visible on the minutes
and shall be completed during the meeting.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
kept for the duration of the project or a minimum period of three years.
the project or a minimum period of 12 months.
12 months.
chairperson.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.19 Tool box talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed. Each
employee who attends the briefing shall sign an attendance list of that pre-job brief form
undertaking that they have an understanding of the tasks, risks and control measures
required.
occur, then weekly tool box talks must be conducted. The toolbox talk topics will be based on
OHS issues pertaining to the project site. The topic and the contents shall be in writing.
Attendance registers with the topic listed shall be kept.
3.20 OHS training
OHS training requirements and the costing of such requirements. Similarly, appointed
contractor must provide the same requirements when bidding with the Main contractor.
relevant procedures. Additional to the requirements, will be that the Main contractor and
appointed contractors must have the appropriate qualifications, certificates and employees
should always be under competent supervision.
be given to those appointees prior to the acceptance of those appointments.
plan, all affected staff shall undergo the applicable refresher training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all contractor employees must be kept on the OHS
file.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.20.1 Main Contractor Induction training
The contractor is required to make arrangements with the Business Unit for its employees to attend
induction in order to be granted permission to access site.
employees have undergone the Eskom OHS induction training prior to commencing work on
site.
that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be kept in
the OHS file on site for the duration of the project.
All employees and visitors on site shall carry the proof of induction training.
It is the contractors responsibility to keep records of induction training.
3.20.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor employees
undergo site specific work induction with regard to the approved project OHS plan, hazards prevalent
on the work site, scope specific risk assessment, rules and regulations, and other related aspects. The
induction training should also include identification of sensitive features such as wetlands/vlei areas,
red data species, graves, etc.
3.20.3 Visitors to site induction
induction prior to being allowed access to site.
inducted. No visitors are permitted to undertake any work onsite, of any nature.
Induction training.
3.21 General training
The Main contractor will be required to ensure that before an employee commences work on the
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied himself
that the employee understands the hazards associated with the work to be performed by conducting
task/job observations.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.22 Contractor site establishment
where contractors are providing their own facilities, the following shall apply:
project manager, listing position of all buildings, amenities, storage, stacking areas and
temporary electrical installations. The appropriate colour coding and demarcation of storage
and stacking areas must be carried out.
ablution facilities and dining area in relation to one another and away from stacking and storage
areas.
Main contractor’s site facilities should be managed and kept hygienically clean.
Where the materials are stored at the work sites, proper stacking and storage shall be carried
out and maintained in good order at all times.
costs in the bill of quantities as per the OHS Act and its regulations and inline with the scope of
work.
Where Eskom is making provision of the facilities to the contractor, the following
shall apply:
together with the contractor management conduct inspections, draft and sign the service level
agreement.
times.
It is the responsibility of the contractor to maintain and keep the facility in a good condition.
It is the contractor’s responsibility to immediately report to the Eskom contract manager/project
manager the defects incurred.
3.23 Site roads
equipment’s as well as roadways for ease of manoeuvrability of these vehicles.
traversing the sites.
3.24 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
d. Ensure that vehicles are not overloaded.
No persons maybe transported at the back of the bakkie.
Drivers are required to conduct the route risk assessment prior to travelling/driving.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving.
All drivers shall have a valid medical fitness certificate.
The First aid box with valid contents and fire extinguishers must be included in the vehicle, be
services annually and inspected monthly. Drivers must be trained on how to use the First aid
box and fire extinguishers.
back of the vehicle.
vehicle access to site.
be valid at all times and this is applicable to yellow plant.
(thirty) meters must be left clear between such a vehicle and such a machine.
Vehicles which are not roadworthy will not be permitted to be used on site.
Precautions shall be taken to secure all loads properly. Loads projecting from vehicles shall
be securely loaded and in daytime a red flag and during darkness a red light or red reflective
material shall be attached to the extreme end of such projecting materials.
metres
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.25 Housekeeping and order
for the duration of the project/contract.
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the work area
immediately.
of all materials, scrap, temporary buildings and building bases to the satisfaction of the
client/agent.
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
appointed contractors to cease work until the area has been tidied up and made safe. Neither
additional costs nor extension of time to the contract shall be allowed as a result of such a
stoppage. Failure to comply with this requirement will result into site cleaning by another
cleaning contractor company at the cost of the Main contractor.
3.26 Lifting machines and lifting tackle
to
certified competent to perform the relevant tasks.
machine appears faulty, it shall be removed from service immediately.
accredited person/company at intervals not exceeding 12 months, as per regulation
18 or more frequently as desired
condition.
that the correct slinging equipment is used for the specific load
competent lifting tackle inspector, who shall record and sign of such examination,
such lifting tackle shall be stored or protected so as to prevent damage or
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
deterioration when not in use. And be subjected to inspections by a competent
person at intervals not exceeding three monthly.
3.27 Tools and equipment
maintained in a good condition.
regularly inspected at least monthly or as required by legislation and risk assessments. The
equipment should be numbered or tagged so that it can be properly monitored and inspected.
documentation prior to being brought onto the project and the records shall form part of the
OHS plan. Maintenance calibration shall be undertaken in terms of the manufacturer’s
requirements.
recommendations and legal requirements.
for use on this project.
unsuitable for the safe and satisfactory execution of the work for which it is intended, the
Eskom personnel shall advise the contractor in writing and the contractor shall forthwith
remove the item from site and replace it with a safe and adequate substitute.
Note: In such cases, the contractor shall not be entitled to extra payments or extensions of
time in respect of delay caused by Eskom’s instructions.
removed out of site immediately, locked away to prevent further use until such time as the tool
or piece of equipment has been repaired.
used on the project. Such tools and equipment’s shall be subjected to regular inspections.
3.27.1 Hand tools
inspected by the construction supervisor on a monthly basis as well as by users prior to use.
mushroom heads, to be removed at the end or beginning of shift prior to use.
Tools with sharp points in toolboxes must be protected with a cover.
All files and similar tools must be fitted with handles.
No make shift tools are permissible on the project.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Template
GENERATION COAL FIRED 32-726-03T Rev 1
Identifier
Stations OHS
Document SPECIFICATION FOR *1015696 Rev 3
Identifier
New Hydrogen Production Plant
Effective Date April 2022 for Kendal Power Station
3.28 Ladders
Ladders used shall conform to the requirements of GSR 13A and used in terms of GSR 6.
The appropriate head protection, with chin strap shall be worn by employees working from a
ladder or with climbing irons.
The ladder wheels, brakes and platform must be in good condition.
All metal parts to be in good condition, no cracks.
The appropriate head protection, with chin strap shall be worn by employees working from a
ladder or with climbing irons.
Non-slip devices must be in good condition and no paint to be on wooden ladders
Climbing irons are permitted to be used in place of ladders on condition that the requirements
of GSR 6 are not compromised and from an electrical point of view not damage any cabling.
The working at heights risk assessment must indicate the use of climbing irons.
such climbing irons.
When using climbing irons, the appropriate rope grab fall prevention system shall be used.
The correct fall protection equipment shall be worn and used whilst climbing up, working from
and climbing down ladders.
ladder (risk based) or with climbing irons.
every time prior to climbing by employees using such ladders. The inspection check lists must
be filed in the site OHS files
3.29 Auditing
3.29.1 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify compliance to
the requirements of the Eskom OHS specifications. Once there is compliance only then will the Main
contractors OHS plan be approved by the project manager or an appointed Eskom contract
custodian. The implementation of the OHS Plan shall be assessed / audited by Eskom personnel on a
regular basis. This will include physical conditions evaluation.
3.29.2 Eskom OHS audits
Eskom shall evaluate all contractors’ OHS performance on an ongoing basis against the legal, Eskom
requirements, OHS specification and the contractors OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
There will be monthly audits conducted by Eskom on the Main contractor/s and/or appointed
contractors. These audits shall be attended by the contractor’s site manager or his representative.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 37
Health & Safety
Source: SHE.pdf (unknown)Project Address: Kendal Power Station
Eskom’s Contract’s Manager Eskom’s Safety Officer
Name: Vumile Tshehla Name: Wesley Adam
Eskom’s Procurement Manager Eskom’s OHS Manager
Name: Mandla Mkhwanazi (Acting) Name: Nompilo Dlamini (Acting)
3.2 Legal compliance ........................................................................................................ 11
3.2.1 Section 37(2) (Legal) Agreement................................................................................ 11
3.2.2 Hazardous Work by Children (Child Labour) .............................................................. 11
3.2.3 OHS Act ...................................................................................................................... 11
3.2.4 Legislative Compliance ............................................................................................... 11
3.3 ESKOM requirements ................................................................................................. 12
3.4 Sheq policy .................................................................................................................... 12
3.5 Covid -19 Requirements ................................................................................................ 12
3.6 Coid ................................................................................................................................... 12
3.7 Costing for OHS within the project .................................................................. 12
3.8 Statutory appointments ......................................................................................... 13
3.8.1 Non statutory appointments ........................................................................................ 13
3.9 ESKOM life-saving rules........................................................................................... 13
3.10 Substance abuse ....................................................................................................... 14
3.11 Contractor organisational structure ........................................................ 15
3.11.1 Main Contractor Organogram ................................................................................... 15
3.11.2 Appointed Contractor/s Organogram ........................................................................ 15
3.12 Roles and responsibilities ................................................................................... 15
Commitment ....................................................................................................................... 15
3.12.1 Main contractors and appointed contractors ............................................................ 15
3.12.2 Contractor site supervisor ......................................................................................... 17
3.12.3 Contractor Health and Safety officer full time ........................................................... 18
3.13 Risk assessment (refer to 32-520) ...................................................................... 18
3.14 Safe work procedures / method statements .............................................. 19
3.15 Fire equipment and maintenance ....................................................................... 19
3.16 Flammable and combustible liquids ................................................................. 20
3.17 First aid and equipment.......................................................................................... 20
3.17.1 Boxes and equipment ............................................................................................... 21
3.18 OHS communication systems ................................................................................ 21
3.18.1 Statutory Health and Safety Committees ................................................................. 22
Effective Date April 2022 for Kendal Power Station
3.18.2 Non-statutory health and safety committees ............................................................ 22
3.19 Tool box talks / daily team talks / pre job meetings ................................ 24
3.20 OHS training ................................................................................................................ 24
3.20.1 Main Contractor Induction training ............................................................................ 25
3.20.2 Appointed Contractor induction training ................................................................... 25
3.20.3 Visitors to site induction ............................................................................................ 25
3.21 General training ....................................................................................................... 25
3.22 Contractor site establishment ........................................................................ 26
3.23 Site roads .................................................................................................................... 26
3.24 Vehicle management ................................................................................................ 26
3.25 Housekeeping and order....................................................................................... 28
3.26 Lifting machines and lifting tackle .................................................................. 28
3.27 Tools and equipment ............................................................................................... 29
3.27.1 Hand tools ................................................................................................................. 29
3.28 Ladders ......................................................................................................................... 30
3.29 Auditing ......................................................................................................................... 30
3.29.1 Approval and compliance of Main contractor OHS plan ........................................... 30
3.29.2 Eskom OHS audits ................................................................................................... 30
3.29.3 Contractor audits....................................................................................................... 31
3.30 Smoking ......................................................................................................................... 31
3.31 Cellular phones ....................................................................................................... 31
3.32 Occupational health, hygiene and rehabilitation ..................................... 31
3.32.1 Medical Assessments ............................................................................................... 31
3.33 Roles and responsibilities ................................................................................... 32
3.34 Personal protective equipment requirements .......................................... 32
3.35 Incident investigation ............................................................................................ 32
3.36 Emergency management ........................................................................................ 33
3.37 Non-conformance and compliance ................................................................... 33
3.38 OHS files ....................................................................................................................... 34
3.39 Work stoppage .......................................................................................................... 34
3.40 Hours of work ........................................................................................................... 34
3.40.1 Normal work .............................................................................................................. 34
3.40.2 Night work ................................................................................................................. 35
3.40.3 Overtime ................................................................................................................... 35
3.41 Omissions from safety and health requirements specification ........ 35
3.42 Contractor performance monitoring ........................................................... 35
3.43 Contract sign off .................................................................................................... 35
3.44 Eskom's right to terminate the contract .................................................... 36
Authorization ..................................................................................................................... 36
Revisions ................................................................................................................................ 36
Development team ............................................................................................................. 36
Effective Date April 2022 for Kendal Power Station
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its Safety,
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
specification is Eskom Generation's minimum requirements which are required to be met for the
duration of the contract period by contractors/suppliers and, where required, the delivery
organisation. The contractor is expected to develop an OHS plan that meets these requirements as well
as all the relevant applicable legislation that they conform to. Eskom in no way assumes the contractor’s
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
execution of their health and safety programme for their employees and appointed contractor
employees. This OHS specification reflects minimum requirements and should not be construed as all-
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
Effective Date April 2022 for Kendal Power Station
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Effective Date April 2022 for Kendal Power Station
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of
submitting the safety file. The main contractor must ensure that a section 37(2) agreement is compiled
between the main contractor and all their appointed contractors for the contract. The original copy of
the section 37(2) agreement must be retained by the contractor, and a copy must be retained by the
responsible project manager/end user. A copy of all the agreements must form part of the respective
contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children.".
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on Hazardous
Work by Children in South Africa" with emphasis on paragraph 2: Purpose and Interpretation. Eskom
does not condone the use of child labour and, therefore, all effort must be exercised, and child labour
should not be used.
3.2.3 OHS Act
Effective Date April 2022 for Kendal Power Station
Rights).
3.3 ESKOM requirements
with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their strategic
objectives, and values of integrity, customer satisfaction, excellence, and innovation. The main
contractor and all appointed contractors, if not already in place, will be required to compile an
organisational SHEQ policy in line with their OHS responsibilities. The policy must be signed by the
organisation’s CE or the appointed assistant to the CE, OHS Act Section 16(2). The policy must be
displayed in a prominent place within the workplace. A copy of the policy must be filed in the contractor's
3.5 Covid -19 Requirements
Not applicable, however the appointed contractor must ensure that the Covid-19 is identified as a
hazard in the Contractor Baseline Risk Assessment with control measures are implemented and that
measures to manage Covid-19 are noted in the Contractor SHE Plan.
3.6 Coid
employment compensation commissioner and have available a valid letter of good standing (LoG) from
such commissioner. The obligation lies with the contractors to ensure that the LoG remain valid
throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training, provision
of PPE, safety equipment purchases etc.
with the OHS Act for the duration of the contract. Before requiring appointees to accept an appointment,
the employer must ensure that they have received appropriate training and/or information about their
responsibilities. The relevant statutory appointments must be made in compliance with the OHS Act's
criteria, which include appointing a qualified individual to the appropriate roles. The following should be
included in the statutory appointments, but not limited to:
OHS Act General Administrative Regulation 9(2) – Incident Investigator
OHS Act Hazardous Chemical Substances Regulation 3(3) Hazardous Chemical
OHS Act General Safety Regulations 3(4) – First Aider/s
OHS act 8 (2) Person to Compile Risk Assessments
GAR 9(2) - Incident/accident investigator
CR 8(5) - Construction Health and Safety Officer (Full-time)
CR 8(7) - Construction Supervisor
CR 8(1) - Construction Manager
OHS Act Section 16(2) employer
3.8.1 Non statutory appointments
3.9 ESKOM life-saving rules
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
employees at all levels must demonstrate their commitment by being proactively involved in the day to
day operations, in particular the Occupational Health and Safety aspects of any project / contract.
participation and cooperation.
records must be kept for each work site.
valid letter of good standing before the commencement of work and any future renewal letters
obtained during the contract for record-keeping purposes. The letter of good standing shall
reflect the name of the contractor’s company. Similarly, the Main contractor must provide the
in the health and safety aspects relating to such work and that the employees understand the
hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
the cost of safety and health measures throughout the project.
and safety of persons or a risk of degradation to the environment.
which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
employees have transgressed any of the requirements of the health and safety specification,
safety and health plans, site rules or any other requirements.
site or emerging risks. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
procedures, work instructions and safety regulations issued by Eskom:
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full time
for this scope
understanding of ISO 45001, Minimum work experience 2yrs, OHS Diploma (applicable to 3-
5 years contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported.
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as information
and record of the way jobs / tasks must be performed. Daily or issue based or task specific or on
the job risk assessments must be conducted at the place where work is to be performed/ conducted
to allow managers and employees to assess any inherent risks that could have been overlooked
during the initial risk assessment or any changes that might have occurred in a period of absence.
procedures exist for ladders.
Effective Date April 2022 for Kendal Power Station
rectify this shall be recorded, and safe working procedures drawn up.
and duly assigned.
must be nominated.
for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Safe work procedures / method statements
aligned with the risk assessments. Method statements / written safe work procedure are control
measures used to prevent an incident from occurring during the execution of the project. A written
safe work procedure/ method statements provide guidance how to execute the task safely. A safe
working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
work and the approval to be obtained from the local Municipality and to be complied with for
the duration the project.
stored in a flammable/combustible liquid store with adequate spillage retention and proper
labelling.
kg, shall be provided, installed and maintained.
a. Storage should be well clear of buildings.
b. Storage areas must be kept free from all combustible materials.
c. All Safety signs must be prominently displayed i.e.
d. Adequate firefighting equipment must be available.
of tank capacity.
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
are familiar with the emergency numbers.
or team of workers on site or part thereof, taking into account the type of work performed and
the distance between teams.
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
kept for all the health and safety meetings.
3.18.1 Statutory Health and Safety Committees
19 of the OHS Act. Similarly, appointed contractors shall establish their own statutory health
and safety committee.
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Representatives on that specific statutory health and safety committee. (Refer to Section
19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
and the project manager and the Inspector at DEL.
incidents and other notified serious incidents.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.18.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
same as the statutory safety committee
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation reports
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
3.18.2.2 Minutes and action items for all health and safety committee meetings
kept for the duration of the project or a minimum period of three years.
the project or a minimum period of 12 months.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.19 Tool box talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed. Each
employee who attends the briefing shall sign an attendance list of that pre-job brief form
undertaking that they have an understanding of the tasks, risks and control measures
required.
plan, all affected staff shall undergo the applicable refresher training.
undergo site specific work induction with regard to the approved project OHS plan, hazards prevalent
on the work site, scope specific risk assessment, rules and regulations, and other related aspects. The
induction training should also include identification of sensitive features such as wetlands/vlei areas,
red data species, graves, etc.
3.20.3 Visitors to site induction
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied himself
that the employee understands the hazards associated with the work to be performed by conducting
task/job observations.
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
services annually and inspected monthly. Drivers must be trained on how to use the First aid
box and fire extinguishers.
metres
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
machine appears faulty, it shall be removed from service immediately.
regularly inspected at least monthly or as required by legislation and risk assessments. The
equipment should be numbered or tagged so that it can be properly monitored and inspected.
Environmental
Source: SHE.pdf (unknown)requirements pertaining to local authorities, municipal by-laws, or environmental legislation that must
be met by the contractor.
2.1.1 Purpose
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Section
Source: SHE.pdf (unknown)evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the project
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
Important Dates
Source: Authorisation Form - 08 November 2024.pdf (unknown){"closingDate":"08 November 2024"}
Contact Information
Source: Authorisation Form - 08 November 2024.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"nd to sign all documents in connection with the tender and any contract that may result from it on"}
Evaluation Criteria
Source: Authorisation Form - 08 November 2024.pdf (unknown)Bidders must complete the Authorisation Form and select the appropriate certificate for their entity type. For companies, a certified copy of the board resolution must be attached. For close corporations, a certified copy of the members' resolution. For partnerships, the certificate must be signed by all partners necessary to commit the partnership. For joint ventures, a certified copy of the Joint Venture Agreement and a power of attorney signed by all members are required. For sole proprietors, a declaration of sole proprietorship. For trusts, a certified copy of the trustees' resolution. All bidders must complete and sign the summary table at the end of the form.
Compliance Requirements
Source: Authorisation Form - 08 November 2024.pdf (unknown)Joint Venture Agreement which incorporates a statement
power of attorney in the case of
power of attorney signed by the legally authorised
Important Dates
Source: BASELINE ASSESSMENT.pdf (unknown){"closingDate":"19 May 2025"}
Evaluation Criteria
Source: BASELINE ASSESSMENT.pdf (unknown)Bidders must comply with the Occupational Health and Safety Baseline Risk Assessment template and the referenced legal and Eskom standards. No other eligibility criteria (such as CSD registration, B-BBEE level, or CIDB grading) are stated in the provided document.
Health & Safety
Source: BASELINE ASSESSMENT.pdf (unknown)Business/Operating unit: Kendal Power Station SOW: New H2 Plant Project Next Review Date: NA Template identifier: 240-70044602
Date: 17-May-25
Authorised by: Name: Glen Mphoreng Document identifier
Designation: H2 Plant System Engineer Revision number: 5
Date: 19 May 2025 Revision date: 30-Apr-27
Refer to Occupational Health and Safety Risk assessment procedure 32-520
List activity Hazard Identification Associated risk Risk type Whatconsequences?are the possible Existing Controls Control Owner Legal and Other Requirements
(controls implemented to eliminate hazards or reduce the
likelihood of the risk occurring), and Where applicable, add IRM system reference
(controls implemented to reduce the immediate impact of the List specific activities to be performed taking Person allocated the (applicable to risks that have an impact on
Anything with potential to cause of harm. A chance that injury , ill health or damage risk occurring) into consideration the equipment to be responsibility for implementing business objectives or require intervention from used, Note: A hazard can pose more than one risk. occur as a result of uncontrolled hazard. could Safety or health Considerwithoutthe worsecontrols?case scenario
the personnel involved in the task. the agreed controls Senior or Executive management such as
Personal protective equipment (PPE)
Ash Exposure to ash inhalation during windy season Health Respiratory andeye lungirritationinfections and/or providedWearing of dust masks is manadatory. Induction must be Contractor OHSAct secRegulations,13, HazardousAnnexure1,36Chemical Substance
Spark Fire Safety Loss of lives Use of spark-free tools within the H2 Plant area. Contractor OHSAct
Falling objects Injury Safety Loss of lives Steeringwhile it is clearhoistedof thein placearea whereby crane.the new H2 Plant will be placed Contractor OHSAct
Constructing new H2 Plant
Hydrogen leak Fire Safety Explosion and loss of lives Properlyequipmentisolateand spark-freethe H2 Receiverstools. . Only use EX Rated Contractor OHS Act. 240-56227413Systems StandardEskom Hydrogen
Contact Information
Source: NEC DATA BY CONTRACTOR.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"l, according to Options chosen, is essential to create a complete contract."}
Evaluation Criteria
Source: NEC DATA BY CONTRACTOR.pdf (unknown)No eligibility criteria, pre-qualification thresholds, or mandatory forms are stated in the provided document. Bidders must complete the Contract Data Part 2 as part of their tender submission.
Experience & Qualifications
Source: NEC DATA BY CONTRACTOR.pdf (unknown)2 Name:
Job
Responsibilities:
CV's (and further key persons data including
CVs) are appended to Tender Schedule entitled.
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Data is
Part c1: agreements and contract data c1.2B Ecc3 contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
New hydrogen production plant at kendal power station
A Priced contract with activity schedule
11.2(20) The activity schedule is in
11.2(30) The tendered total of the Prices is
(in figures)
(in words), excluding VAT
Part c1: agreements and contract data c1.2B Ecc3 contract data part 2
Qualifications:
Experience:
2 Name:
Qualifications:
Experience:
CV's (and further key persons data including
CVs) are appended to Tender Schedule entitled.
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Submission Guidelines
Source: NEC COVER PAGE.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance 3
Evaluation Criteria
Source: NEC COVER PAGE.pdf (unknown)No specific eligibility criteria are stated in the extracted content. The tender is issued by Eskom Holdings SOC Ltd, and bidders will be expected to complete the NEC3 Contract Data and provide pricing data. Standard South African procurement forms (e.g., SBD forms) are not mentioned in the extraction. No pre-qualification thresholds, B-BBEE requirements, or mandatory briefing are stated in the document.
Technical Specifications
Source: NEC COVER PAGE.pdf (unknown)Construction Contract
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________ )
for New Hydrogen Production Plant at Kendal Power
Station.
Contents: No of
pages
Part C1 Agreements & Contract Data 3
Part C2 Pricing Data 9
Part C3 Scope of Work
Pricing Schedule
Source: NEC COVER PAGE.pdf (unknown)Contents: No of
pages
Part C1 Agreements & Contract Data 3
Part C2 Pricing Data 9
Part C3 Scope of Work 32
Part C4 Site Information 6
Compliance Requirements
Source: NEC COVER PAGE.pdf (unknown)C1.1 Form of Offer and Acceptance 3
Contractual Terms
Source: NEC COVER PAGE.pdf (unknown)Part C1: Agreements & Contract Data
Contents: No of
pages
C1.1 Form of Offer and Acceptance 3
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer
C1.2b Contract Data provided by the Contractor
[to be inserted from Returnable Documents at award
stage]
C1.3 Proforma Guarantees
Contract 2 ecc3 cover pages
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)Tenderers must comply with eligibility criteria stated in the Tender Data. They must not be under any restriction to do business with Eskom or State-Owned Companies. Tenderers must not sub-contract 100% of the scope of work. Mandatory returnables must be submitted by the closing date and time; failure results in disqualification. If a compulsory site visit or clarification meeting is stipulated, attendance is mandatory. Tenderers must be registered on the CSD and provide tax clearance (SARS TCS or tax pin) as per Tender Data. B-BBEE level must be provided at closing if used as pre-qualification; otherwise, zero points under PPPFA. CIDB registration is required if stipulated in Tender Data; proof must be submitted at closing or within 21 working days. Proof of SHEQ systems, policies and capabilities must be provided. The SDL&I Undertaking must be completed and submitted by contract award. Tenderers must not have misrepresented or falsified any information; fraud or fronting leads to disqualification and reporting to the B-BBEE Commission. Tenderers must comply with all relevant legislation and regulatory instruments.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)of a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)reasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)tenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)including the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (2).pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Description
Source: NEC.zip (unknown)Construction Contract
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________ )
for New Hydrogen Production Plant at Kendal Power
Station.
Contents: No of
pages
Part C1 Agreements & Contract Data 3
Part C2 Pricing Data 9
Part C3 Scope of Work
Construction
Contract, April 2013 (ECC3)
10.1 The Employer is (Name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state-owned company
incorporated in terms of the company laws of the
Republic of South Africa
Address Registered office at Megawatt Park, Maxwell
Drive, Sandton, Johannesburg
10.1 The Project
Construction Contract
[Note to contract compiler:
Once it has been decided which securities are required for this contract delete from this file the ones
not required, revise the notes below accordingly and delete this note.]
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X4: Parent company gua
No: Unit Est. Rate Each Total Price
Qty
1.1 Fixed charge items
1 le 1
Eskom Kendal Power Station is situated approximately 40km Southwest of Witbank in the Mpumalanga
of the works ........................................................................................................................ 5
1.1 Executive overview ............................................................................................................................ 5
1.2 Employer’s objectives and purpose of the works .............................................................................. 5
1.3 Interpretation and terminology ........................................................................................................... 5
2 Management and start up. ..................................................................................................................... 8
2.1 Management meetings ...................................................................................................................... 8
2.2 Documentation control ....................................................................................................................... 8
2.3 Health and safety risk management .................................................................................................. 9
2.4 Environmental constraints and management ......
Evaluation Criteria
Source: NEC.zip (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance (TCS or tax pin). B-BBEE status is required for preference points. The contractor must be able to provide a performance bond and comply with Eskom's security clearance requirements (criminal verification record certificates for all personnel). The contract is subject to South African law and requires compliance with the Construction Regulations 2014 under the Occupational Health & Safety Act. No specific CIDB grading or local content percentage is stated in the document.
Section
Source: NEC.zip (unknown)Electronic submissions could be done using the SharePoint Transmittal Site functionality and route. This
2.5 Quality assurance requirements ...................................................................................................... 10
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Near Ogies,on Jhb/Witbank Road - Kendal Power Station - Kendal Power Station - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.