Tender Type
Request for Bid(Open-Tender)
Delivery Location
90 Hans van Rensberg, Polokwane - Polokwane central - Polokwane - 0699
Organization Type
GOVERNMENT
Published
28 Oct 2026
OCDS Reference
ocds-9t57fa-176162
ESKOM requires the supply and delivery of various types of medium-voltage distribution transformers within the limlanga cluster on an 'as and when' required basis over a 24-month period. Bidders must provide a valid iso 9001 certificate and submit a range of quality management documents, including a draft contract quality plan and an inspection and test plan. The evaluation is based solely on quality deliverables, with a maximum of 12 points, and NO minimum qualifying score is specified.
Closing date: 19 November 2026 at 08:00 (submission method and address not stated in the document).
Mandatory returnable: Form A must be completed and signed.
ISO 9001 certification: Must be valid, issued by an accredited certification body, and scope must be relevant to the products/services.
Quality management evidence: Submit organisation chart, responsibility matrix, documented control of externally provided processes, latest internal audit report, latest certification audit report (not older than 12 months), and management review meeting records.
Draft Contract Quality Plan: Must be specific to the scope of work, per ISO 10005.
Draft Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar work must be submitted.
Evaluation: Quality deliverables scored 1 or 0 across five sections (max 12 points); no minimum qualifying score or price/functionality split is stated.
Date & Time
Thursday, 19 November 2026 - 10:00
Venue
MS Teams - Refer to ITT for link.
Categories
Request for Bid(Open-Tender)
90 Hans van Rensberg, Polokwane - Polokwane central - Polokwane - 0699
28 Oct
2026
Tender Published
Tender was published
19 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. The tender is governed by Eskom's Supplier Quality Management specification (QM 58), which mandates that suppliers develop, implement, and maintain a quality management system conforming to ISO 9001, and comply with category-specific quality requirements.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Median Estimate
R 208 868
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Closing date: 19 November 2026 at 08:00 (per tender listing)
Document effective date: 01 July 2026
Specification next review date: May 2030
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Enquiries:
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)The bid is evaluated using the quality selection criteria and the Tender Evaluation Scorecard (240-168873697), with the specific quality category (1, 2, 3 or 4) indicated in Form A.
Minimum quality requirements per category:
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Scope: Supply of various types of transformers on an as-and-when required basis for the LimLanga Cluster, over 24 months.
Quality requirements apply to the supply of the transformers, including:
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfMethodology requirements (from preservation and quality control sections):
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo pricing schedule or payment terms are specified in this document. The specification focuses on quality management requirements only.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific financial requirements are stated in the document.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Quality registration:
Quality system certification:
Standard forms:
B-BBEE requirements are not specified in the quality specification.
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe health and safety requirements are minimal in this specification. Reference is made to the Safety, Health, Environment and Quality (SHEQ) Policy (32-727) as an informative document. There are no specific OHS requirements stated for bidders beyond general compliance with this policy.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfStandard conditions include:
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfAdditional evaluation details:
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
G3 - RT284 Annex D Imported Content Declaration.pdf
G2- RT284 Annex C Local Content Declaration - Summary Schedule.pdf
240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdf
Eskom seeks the supply and delivery of various types of medium-voltage distribution transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four months. The tender includes strict supplier quality management requirements, including ISO 9001 certification, a contract quality plan, and inspection and test plans.
G4 - RT284 Annex E Local Content Declaration - Supporting Schedule to Annex C.pdf
NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc
Eskom Holdings SOC Ltd requires the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. The contract is governed by the NEC3 Supply Contract (April 2013) and includes specific conditions on delivery, defects, payment, and liability.
240-68099512 (Rev 9) Form A- Transformers.pdf
Supply and delivery of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months, for Eskom in Limpopo Province.
ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf
Supply and delivery of various types of pole and ground mounted transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months, with only ester oil-filled units accepted.
Eskom - Standard Conditions of Tender - Rev 12.pdf
Eskom requires the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. The tender is open to eligible suppliers and will be evaluated in accordance with Eskom's procurement policies and the Preferential Procurement Policy Framework Act.
E-tendering Help Manual for supplier - 27 January 2025 (1).docx
Supply and delivery of various types of transformers within the LimLanga Cluster on an as-and-when required basis over a period of twenty-four (24) months for Eskom.
SCOPE OF WORK.pdf
Eskom requires a contract for the supply and delivery of medium-voltage (MV) pole-mounted distribution transformers, ranging from 16 kVA to 500 kVA, for the LimLanga Cluster over a twenty-four-month period. The transformers are needed for construction, maintenance, refurbishment, strengthening, and emergency restoration of distribution networks, with primary voltages of 11 kV and 22 kV and secondary voltages of 242 V, 420 V, or +242/-242 V.
SDLI Strategy Setting for Bidders - Supply of Transformers.pdf
Supply and delivery of various types of medium-voltage distribution transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. The contract is issued by Eskom and includes specific goals for B-BBEE, local production and content, and other SDL&I obligations.
Clarification meeting link.docx
Supply and delivery of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months, for Eskom.
Deviation Schedule - Ester Oil Options - 240-45395762 Rev 4.xlsx
Eskom requires the supply of various pole-mounted distribution transformers on an 'as and when' required basis over a 24-month period within the LimLanga Cluster in Limpopo. The scope covers single-phase, dual-phase, and three-phase units from 16 kVA to 500 kVA at 11 kV, 22 kV, and 33 kV primary voltages, all with ester oil insulation and coastal-grade corrosion protection.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Supply and delivery of various types of transformers within the LimLanga Cluster on an as-and-when required basis over a period of twenty-four (24) months, issued by Eskom.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx
Eskom requires the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. The tender is open to suppliers who can meet the delivery and quality requirements for transformers as specified by Eskom.
Copy of BOQ_ Supply of various types of Transormes 20.10.2026.xlsx
Supply and delivery of various distribution transformers on an as-and-when required basis for the LimLanga Cluster over a 24-month period. The contract covers 22 line items of pole-mounted and coastal transformers, with quantities from 30 to 1250 units each. The contract is interim and will cease once the Distribution Division National Contract is in place.
LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf
Eskom requires the supply of various types of transformers within the LimLanga Cluster on an as-and-when required basis over a period of twenty-four (24) months. The tender is open to bidders who can provide an acceptable guarantee from a pre-vetted guarantor or one that passes Eskom Treasury vetting.
Contract Quality Plan (CQP) Template.docx
Supply and delivery of various types of transformers within the LimLanga Cluster on an as-and-when required basis over a 24-month period, for Eskom.
Technical evaluation criteria 240-128700801 Revision 3.pdf
Eskom requires the supply of various types of distribution transformers within the LimLanga Cluster on an as-and-when required basis over 24 months. The procurement covers pole-mounted (16 kVA to 500 kVA), ground-mounted (100 kVA to 1 MVA), and SWER transformers, evaluated strictly against the technical criteria in standard 240-45395762.
Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx
Supply of various types of transformers within the LimLanga Cluster on an as-and-when required basis over a 24-month period, issued by Eskom.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Constance Sekhuto
Phone
021-941-5762
[email protected]
Address
90 Hans van Rensberg, Polokwane - Polokwane central - Polokwane - 0699
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
21
Last checked
28 Oct 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Description
Source: Copy of BOQ_ Supply of various types of Transormes 20.10.2026.xlsxSupply of various types of distribution transformers within the LimLanga Cluster on an as-and-when required basis over a period of 24 months.
Technical Specifications
Source: Copy of BOQ_ Supply of various types of Transormes 20.10.2026.xlsx (unknown)Supply of various types of distribution transformers within the LimLanga Cluster on an as-and-when required basis over 24 months. The contract is interim and will cease once the Distribution Division National Contract is in place.
Pricing schedule items (SAP No. / description / unit / quantity):
Description
Source: Clarification meeting link.docxThe scope is the supply of various types of transformers within the LimLanga Cluster, on an "as and when" required basis, over a 24-month contract period.
Important Dates
Source: Clarification meeting link.docx (unknown)Clarification meeting (non-compulsory, online): 03 November 2026 at 14:00.
Technical Specifications
Source: Clarification meeting link.docx (unknown)Supply of various types of transformers within the LimLanga Cluster on an "as and when" required basis for a period of 24 months.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx (unknown)Eskom Holdings SOC Ltd
Megawatt Park
Maxwell Drive
Sunninghill ext. 3
Sandton
Postal address: PO Box 1091, Johannesburg, 2000
Submission Guidelines
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx (unknown)Submission requires the completed, signed Non-Disclosure Agreement (NDA) template. This is the only returnable document identified in the provided material.
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx (unknown)The tender evaluation process is not detailed in the provided document. The only stated requirement is that bidders must sign and return the NDA. Bidders must be legally capable of entering into a binding agreement under South African law.
Submission Guidelines
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx (unknown)Returnable Documents: The QCP or ITP template must be completed and submitted as part of the bid.
Technical Specifications
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx (unknown)Supply of various types of transformers within the LimLanga Cluster on an "as and when" required basis over a 24-month period. The QCP or ITP must be completed for the supply, covering inspection and test methods, acceptance criteria, and intervention points (hold, witness, document review, surveillance, verification).
Description
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.docThe procurement is for the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. Eskom is the purchasing entity.
Important Dates
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)Contract starting date: to be advised.
Delivery date: specified in each purchase order.
Defects date: 12 months from date of delivery per purchase order.
Defect correction period: 3 weeks including testing.
Defects access period: 5 working days.
Period for reply: one week.
Revised programmes due every 2 weeks.
B-BBEE status change notification: within 7 days of change; updated verification within 30 days.
No briefing or site visit dates are stated in the available text.
Contact Information
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)Contact: Constance Sekhuto (Supply Manager)
Address: Eskom Megawatt Park, 1 Maxwell Drive, Sunninghill, Johannesburg
Telephone: 016 457 5925
Email: [email protected]
Purchaser: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30)
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199
Telephone: 011 800 8000
No submission address stated.
Submission Guidelines
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)Returnable forms and documents - name each and the obligation it commits the bidder to:
Submission method and address: Not stated in the available text. Closing time: Not stated in the available text.
Evaluation Criteria
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)Evaluation stages and scoring split are not stated in the available text.
Contract award is subject to acceptance of the Offer by Eskom.
Bidders must be able to provide securities, bonds, guarantees, proof of insurance, and other documentation within two weeks of receiving the signed agreement.
Delay damages of R5,000 per day, capped at 15% of the purchase order value, will apply for late delivery.
The performance bond amount will be advised at contract award.
Financial analysis may require a parent company guarantee or performance bond.
Bidders must accept all NEC3 Supply Contract (April 2013) core clauses, options X1, X2, X3, X7, X13, X17, and Z-clauses.
Technical Specifications
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)The scope is the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over 24 months.
Goods information is in Part C3: Scope of Work and referenced drawings.
Supply requirements are in Annexure A to the Contract Data.
Manufacturing must be in accordance with Eskom designs/specifications.
Financial Requirements
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)Pricing: The offered total of the Prices exclusive of VAT, plus VAT at 15%, and the total inclusive of VAT must be stated in the Form of Offer and Acceptance.
Payment: Eskom pays within 30 days of submission of a tax-compliant invoice with a GR number for contracts valued below R50 million (including VAT); within 60 days for contracts valued above R50 million.
Interest on late payments: Standard Bank prime rate (for ZAR) or LIBOR (for foreign currencies).
Delay damages: R5,000 per day, capped at 15% of the purchase order value.
Performance bond: amount to be advised at contract award.
Parent company guarantee: required if financial analysis recommends it.
Supplier's total liability: limited to the total of the Prices.
End of liability date: 12 months after delivery of all goods and services.
Purchaser's liability for indirect or consequential loss: limited to R0.00.
Foreign currency payment methods: Payment Method 1A, 1B, 2, or Fixed ZAR contract; requirements include being the direct importer and providing documentary evidence.
Compliance Requirements
Source: NEC Supply Contract_The supply of various types of Transformers 20.10.2026.doc (unknown)VAT: The bidder must be registered for VAT and include Eskom's VAT number 4740101508 on all invoices.
B-BBEE: The bidder must notify Eskom of any change in B-BBEE status within 7 days and submit updated verification within 30 days. A decrease in status may lead to renegotiation or termination.
Health and safety: The bidder must comply with all applicable health and safety laws and regulations; the total of the Prices includes an amount for this compliance.
Environmental: The bidder and subcontractors must comply with all applicable environmental laws and regulations.
Law of contract: South African law. Language: English.
Adjudicator: selected from ICE-SA panel or appointed by AFSA. Tribunal: arbitration in South Africa under the Association of Arbitrators (Southern Africa) rules.
Ethics: The bidder must not engage in corrupt, coercive, or collusive actions.
Description
Source: Deviation Schedule - Ester Oil Options - 240-45395762 Rev 4.xlsxBidders must enter the enquiry number on the Source Data worksheet so it carries through to all AB Schedule sheets.
Submission Guidelines
Source: Deviation Schedule - Ester Oil Options - 240-45395762 Rev 4.xlsx (unknown)Bidders must complete and submit the AB Schedule pricing sheets and the Source Data worksheet. The AB Schedule is for Ester Oil options only; if the scope includes Ester options, the Ester Oil or Ester/Ester Schedule must also be submitted to the Buyer.
Evaluation Criteria
Source: Deviation Schedule - Ester Oil Options - 240-45395762 Rev 4.xlsx (unknown)No explicit evaluation criteria are stated in the provided document.
Technical Specifications
Source: Deviation Schedule - Ester Oil Options - 240-45395762 Rev 4.xlsx (unknown)Transformers to be supplied include various types (single-phase, three-phase, dual-phase) with power ratings from 16 kVA to 500 kVA, primary voltages 11 kV, 22 kV, or 33 kV, and secondary voltages 242V/420V. All units are for coastal use with Ester Oil insulation. Each transformer must comply with SANS 780 standards, including type and routine tests, with guaranteed no-load and load losses as specified. SABS certification mark and permit number must be stated. Coastal transformers must have corrosion protection coating system (e.g., DS-14 + DS-15) and final coat in Azure Blue. Inland transformers (if offered) require DS numbers per DSP 240-75655504.
Compliance Requirements
Source: Deviation Schedule - Ester Oil Options - 240-45395762 Rev 4.xlsx (unknown)No specific compliance requirements are stated in the provided document.
Description
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdfThis addendum amends the technical evaluation criteria for pole and ground mounted transformers (Unique Identifier: 240-128700801). It applies to the supply of transformers within the Limlanga Cluster on an 'as and when' required basis over 24 months.
Important Dates
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf (unknown)Addendum issued: 19 August 2026.
Contact Information
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf (unknown)Enquiries:
Procurement and Supply Chain Management, Sourcing Wires:
Technical contacts (as per addendum):
Submission Guidelines
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf (unknown)Technical evaluation (Unique Identifier: 240-128700801) uses a scoring methodology with the following scores:
Technical Specifications
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf (unknown)Procurement: supply of pole and ground mounted transformers within the Limlanga Cluster on an 'as and when' required basis over 24 months.
Technical requirements (as amended):
Methodology
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdfScoring methodology for technical evaluation (TEC 240-128700801):
Compliance Requirements
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdf (unknown)Eskom factory accreditation is mandatory before contract award for units from previously unaccredited factories. Design review by an Eskom qualified/trained team is required where no Eskom approved design review exists.
Section
Source: ADDENDUM TO TECHNICAL EVALUATION CRITERIA.pdfThe addendum revises the technical evaluation criteria for the transformer tender. Key changes include: electronic submissions must be searchable PDFs; only Ester Oil filled transformers are accepted; a Bidder Cover Letter is required; OEMs must be Eskom accredited before award if offering units from unaccredited factories; design reviews must be conducted by an Eskom qualified team where no approved design review exists.
Important Dates
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Closing date: 19 November 2026 at 08:00 (SAST).
Compulsory briefing/site visit: A site visit and/or clarification meeting may be stipulated as compulsory in the Tender Data; failure to attend will result in disqualification. Details are only in the Tender Data; the document does not specify a date, time, or venue.
Contact Information
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Eskom Representative: Only the Eskom Representative identified in the Invitation to Tender may be contacted. No other Eskom official should be approached.
Submission address: As stated in the Tender Data (for e-tendering, use the Eskom e-Tendering page).
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Submission method: The tender must be submitted via the Eskom e-Tendering platform at the Eskom Tender Bulletin site (Eskom E-tendering page). Physical tender boxes are not used for e-tendering.
Submission requirements:
Returnable forms (complete, sign, and submit):
Disqualification risks:
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)The tender is for the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis.
Duration: 24 months.
The scope includes supply of transformers as specified in the Invitation to Tender (the extracted document does not contain the detailed specification/quantity list; these are provided in the Tender Data).
Quality Management
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfTenderers must provide proof of safety, health, environment, and quality (SHEQ) systems and capabilities at closing or by contract award. All costs and personnel associated with SHEQ must be included in the tender. The successful bidder may also be required to provide cataloguing information after award and label materials per Eskom's labelling specifications.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfThe pricing schedule must be completed with rates and prices in South African Rand, including all duties, taxes, and levies applicable 14 days before closing. Rates must be fixed for the contract duration. Arithmetical errors will be corrected per Eskom's rules (e.g., amount in words prevails over figures; line-item total prevails if unit rate multiplication is wrong). Bidders must not use correction fluid or tape. If a reverse e-auction is used, the tender must not contain prices.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Pricing:
Contract security:
Insurance:
Financial capacity:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)CSD registration: Mandatory - tenderers must be registered on the Central Supplier Database.
Tax clearance: A valid tax clearance (SARS TCS or tax pin) is required.
B-bbee:
CIDB: If stipulated in the Tender Data, CIDB registration or application (within 21 working days of closing) is required; proof must be submitted at closing.
SHEQ: Proof of safety, health, environment, and quality systems must be provided; costs must be included in the tender.
Local content: Information on designated materials and thresholds must be submitted by contract award.
Legislation: Compliance with National Treasury Instructions, PPPFA Regulations, B-BBEE Codes, COIDA, OHS Act, and other applicable laws is required.
SDL&I Undertaking: Must be completed and submitted by contract award.
Fraud/misrepresentation: Any misrepresentation or falsification of documents (including B-BBEE certificates) will lead to disqualification and possible suspension from doing business with State-Owned Companies for up to 10 years.
Health & Safety
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfCompliance with the OHS Act and Eskom's SHEQ requirements is mandatory. Proof of SHEQ systems, policies, and capabilities must be provided by the closing date or contract award. Bidders must ensure all SHEQ costs are included in the tender. Construction-related contracts may trigger CIDB Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) if the contract meets specified thresholds (e.g., R5 million or more, or CIDB grade 7 or higher).
Contractual Terms
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfTender validity: Tenders must remain valid for acceptance until a contract is concluded; Eskom may request a specific additional period. Bidders may be asked to extend validity; those who decline are excluded from further consideration.
Confidentiality: All matters relating to the procurement must be treated as confidential; documents may only be used for preparing the tender.
Eskom's rights: Eskom may accept or reject any variation, deviation, or alternative tender, accept only part of a tender, cancel the tender at any time (with written reasons on request), and negotiate with one or more selected tenderers.
Liability: Eskom and its representatives are not liable for losses or damages incurred by tenderers during the process.
Contract formation: The successful bidder must sign the Form of Agreement; negotiations may amend the contract documents. Addenda issued during the tender period become part of the Invitation to Tender.
Termination/penalties: Not detailed in the extracted document; likely in the contract conditions listed in the Tender Data.
Section
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfIn addition to the standard evaluation stages (basic compliance, mandatory returnables, pre-qualification, functionality, financial analysis, price, B-BBEE, and Specific Goals), Eskom may consider objective criteria under section 2(1)(f) of the PPPFA, provided they are stipulated in the Invitation to Tender. Reverse e-auction may be used, in which case the tender must not include prices; if prices are included, they will not be considered. Bidders must not be restricted from doing business with Eskom or State-Owned Companies.
Description
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdfSupply and delivery of various types of medium-voltage distribution transformers within the LimLanga Cluster, on an 'as and when required' basis over a period of twenty-four months.
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdf (TENDER)Specific Goals: Up to 10 points are awarded for the specific goal (B-BBEE status level) under the 90/10 preference point system. Points for price and specific goal are added and rounded to two decimals. Contract awarded to highest total.
Scoring table (B-BBEE Status Level of Contributor):
Documents required to claim preference points:
Failure to submit preference points documentation does not disqualify, but bidder may score only out of 90 for price and 0 out of 10 for specific goals.
Objective Criteria: Not mandatory to include, but a condition for contract award. If not met, second-ranked bidder may be recommended for award.
Designated Sector: Transformers is a designated sector. Local Content threshold: 90% for Class 0. SBD 6.2 Declaration Form and Annex C (Local Content Declaration - Summary Schedule) are mandatory returnables.
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdf (TENDER)Scope of work: Supply of medium-voltage distribution transformers (various types) within the LimLanga Cluster on an "as and when" required basis.
Duration: 24 months (2 years).
Designated sector: Transformers, Class 0, with a minimum Local Content threshold of 90%.
Methodology
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdfSkills Development Proposals:
Financial Requirements
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdf (TENDER)SDL&I Penalty and Performance Security:
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdf (TENDER)B-bbee:
Sworn affidavit validity requirements:
SDL&I Transformation - B-BBEE Improvement or Retention Plan:
Procurement from Designated Groups:
Skills Development:
Jobs:
Section
Source: SDLI Strategy Setting for Bidders - Supply of Transformers.pdfSpecific Goals: Maximum 10 points for the specific goal (B-BBEE status level) under the 90/10 system. Points added to price points; total rounded to two decimal places. Contract awarded to highest total.
Scoring table (B-BBEE Status Level of Contributor):
Preference points documentation required: valid B-BBEE certificate / sworn affidavit / CIPS affidavit, proof of ownership (CIPC docs), certified ID copies of shareholders, proof of disability where applicable.
Failure to provide documentation for preference points:
Description
Source: 240-68099512 (Rev 9) Form A- Transformers.pdfPre-contract award quality requirements apply under Category 1 only. No more than one category may be selected. The bidder must indicate whether site assessment is applicable. Main Supplier and Sub-supplier Capability and Capacity Assessment is not required.
Submission Guidelines
Source: 240-68099512 (Rev 9) Form A- Transformers.pdf (unknown)Returnable documents: complete and sign Form A (Tender & Contract Quality Requirements). The form confirms the tenderer's quality representative details and acceptance of the applicable quality clauses.
Evaluation Criteria
Source: 240-68099512 (Rev 9) Form A- Transformers.pdf (unknown)Pre-contract award quality requirements apply under Category 1 of the quality specification. Bidders must indicate which quality categories apply and confirm whether a site assessment is required. Supplier capability and capacity assessment applies.
Technical Specifications
Source: 240-68099512 (Rev 9) Form A- Transformers.pdf (unknown)Supply of various types of transformers within the LimLanga Cluster on an as-and-when required basis over 24 months. Bidders must comply with the quality requirements set out in Form A (Document 240-68099512 Rev 9).
Methodology
Source: 240-68099512 (Rev 9) Form A- Transformers.pdfThe tender requires the bidder's quality system to address ISO 9001 clauses on context of the organisation, leadership, planning, support, operation, performance evaluation and improvement. The bidder must demonstrate alignment with the seven quality management principles.
Quality Management
Source: 240-68099512 (Rev 9) Form A- Transformers.pdfEskom reserves rights of access to bidder premises, rights to information, preservation of records, and rights to conduct quality audits. Nonconformities and nonconforming outputs identified by Eskom must be managed. Special processes apply. Bidders must comply with ISO 9001 clauses covering context, leadership, planning, support, operation, performance evaluation and improvement, and the associated quality principles (customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, relationship management).
Compliance Requirements
Source: 240-68099512 (Rev 9) Form A- Transformers.pdf (unknown)Mandatory compliance with the quality requirements in Form A, including selection of Category 1 for pre-contract award quality requirements. No other eligibility criteria such as CSD registration, tax clearance, B-BBEE level or CIDB grading are stated in the provided document.
Section
Source: 240-68099512 (Rev 9) Form A- Transformers.pdfBidders must comply with the quality requirements in Form A, including pre-contract award quality requirements (Category 1). Supplier quality performance monitoring, quality audits related conditions, and management of nonconformities apply.
Description
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdfThe document attached is a list of pre-vetted guarantors that Eskom accepts guarantees from without further vetting. The tender itself is for the supply of transformers on an as-and-when basis over 24 months.
Important Dates
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)Closing date: 30 September 2024 at 08:00 (per the source listing; note tender record lists 2026-11-19).
No other dates are provided.
Submission Guidelines
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)Returnable documents: none are specified in the available source material.
Submission method: not stated in the source. The closing date and time are recorded in the tender listing (8:00 am on 19 November 2026).
Evaluation Criteria
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)The bid is evaluated on the acceptability of the provided guarantee.
Technical Specifications
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)The tender covers the supply of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over 24 months.
Quantity and detailed technical specifications are not provided in the source.
Financial Requirements
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)A guarantee (bid bond or performance guarantee) must be provided by an acceptable guarantor.
Acceptable guarantors include the pre-vetted list. If not pre-vetted, the entity must meet the credit rating thresholds and be approved by Eskom Treasury.
The following pre-vetted insurance guarantors have specified available limits (as at 31 July 2024):
If the chosen guarantor has no available credit limit, the guarantee will not be accepted and the bid may be marked non-responsive.
Compliance Requirements
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)No specific compliance requirements (e.g. CSD, B-BBEE, tax) are stated in the source document.
Contractual Terms
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdfThe guarantee must be from an acceptable guarantor; otherwise the bid may be marked non-responsive. Guarantees from entities not on the pre-vetted list are subject to a evaluation by Eskom Treasury that can take up to 12 weeks. If the guarantee is ultimately not accepted, the bid is disqualified from further evaluation.
Section
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdfThe primary evaluation criterion is the acceptability of the guarantee. Bidders using a guarantor not pre-vetted must ensure the guarantor meets the minimum credit rating and be prepared for the possibility that Treasury vetting may reject the guarantor.
Description
Source: Contract Quality Plan (CQP) Template.docxThe supplied document is a Contract Quality Plan (CQP) template to be completed by the successful bidder, assisting them to plan how they will meet the client's quality management expectations for the contract. The template references SANS 466:2005 / ISO 10005:2005 for guidance.
Evaluation Criteria
Source: Contract Quality Plan (CQP) Template.docx (unknown)Bidders must complete and submit the Contract Quality Plan (CQP) template with their bid. The CQP must be compiled by a representative of the tenderer and approved by the owner of the organisation. No other evaluation criteria are stated in the provided document.
Technical Specifications
Source: Contract Quality Plan (CQP) Template.docx (unknown)The CQP is a mandatory template that must be completed to address quality management for the supply of various types of transformers within the LimLanga Cluster. The CQP must cover:
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docxThe document is the Eskom eTendering System Suppliers Help Manual (revision 3.0, dated 28 August 2023, prepared by Group IT Application Operations). It explains how to register, log in, upload and finalise tender submissions electronically through the eTendering portal (https://eTendering.eskom.co.za), which replaces physical delivery to Eskom tender offices. It does not describe the scope, quantities, location, duration, or other particulars of the transformer supply tender referenced in the tender record.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)Submission is electronic via the Eskom eTendering system, not by physical delivery to tender offices.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)No evaluation criteria are stated in the source document. The document is a user manual for the eTendering system, not the tender-specific evaluation framework.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)The purpose of the eTendering system is to allow suppliers to upload tender documents electronically for tenders advertised on the Eskom Tender Bulletin.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)CSD registration is mandatory to gain access to the eTendering system and to submit a bid electronically.
Description
Source: Technical evaluation criteria 240-128700801 Revision 3.pdfThis document defines the technical evaluation criteria and methodology for MV distribution pole-mounted and ground-mounted transformers, aligned with Eskom standard 240-45395762. It covers scope, definitions, evaluation stages (mandatory, functional, factory assessment, design review), and requirements for test reports and deviations. It applies across all Eskom divisions.
Submission Guidelines
Source: Technical evaluation criteria 240-128700801 Revision 3.pdf (unknown)Returnable documents (each item per SAP number offered):
Submission format:
Disqualification risks:
Evaluation Criteria
Source: Technical evaluation criteria 240-128700801 Revision 3.pdf (unknown)Evaluation stages:
Scoring: 100% functional (technical) criteria, per SAP number.
Factory assessment:
Continuous compliance: successful bidders are assessed over the contract term for design changes, exceedances of guaranteed losses, and trended failures, via documentary evidence, design reviews, and factory assessments.
Technical Specifications
Source: Technical evaluation criteria 240-128700801 Revision 3.pdf (unknown)Scope: MV Distribution pole-mounted and ground-mounted transformers.
Pole-mounted transformers: primary voltages 3.3 kV, 6.6 kV, 11 kV, 22 kV or 33 kV; low voltage secondary; power ratings 16 kVA to 500 kVA.
Ground-mounted transformers: primary voltages 3.3 kV, 6.6 kV, 11 kV or 22 kV; low voltage secondary; power ratings 100 kVA to 1 MVA.
SWER isolation transformers: primary 11 kV, 22 kV, 33 kV; secondary 19 kV phase-to-ground; up to 400 kVA.
SWER distribution transformers: primary 19 kV; secondary low voltage; ratings 16, 32, 64 kVA.
Design requirements:
Test requirements:
Range acceptance for similar designs:
Ester oil transformers:
Deviations:
Methodology
Source: Technical evaluation criteria 240-128700801 Revision 3.pdfEvaluation is performed in two parts: a desktop evaluation of the tender returnables (mandatory and functional criteria) and a factory assessment of each manufacturing facility. Only bidders meeting the mandatory requirements and achieving a functional score of at least 80% proceed to the factory assessment.
Quality Management
Source: Technical evaluation criteria 240-128700801 Revision 3.pdfQuality management system: ISO 9001 is a normative reference. The supplier must comply with Eskom standard 240-45395762 for specific transformer requirements. Test reports must originate from a registered SABS facility, accredited test facility, or the factory test facility.
Compliance Requirements
Source: Technical evaluation criteria 240-128700801 Revision 3.pdf (unknown)Mandatory qualification: ISO 9001 (Quality Management Systems) compliance implied by normative reference.
Evidence requirements:
Contractual Terms
Source: Technical evaluation criteria 240-128700801 Revision 3.pdfDuring the contract term, the supplier is continuously assessed for: changes to designs, exceedances of contractually guaranteed losses, and trended failures. Assessments may include review of documentary evidence such as type tests, design reviews, and factory assessments.
Section
Source: Technical evaluation criteria 240-128700801 Revision 3.pdfAdditional details from the evaluation criteria:
Description
Source: SCOPE OF WORK.pdfThe LimLanga Cluster requires a contract for the supply and delivery of medium-voltage distribution transformers. These transformers support construction, maintenance, refurbishment, strengthening, and emergency restoration of electrical distribution networks. The material list comprises MV pole-mounted distribution transformers from 16 kVA to 500 kVA, with primary voltages of 11 kV and 22 kV, and secondary voltages of 242 V, 420 V, or +242/-242 V as applicable. Transformers must conform to applicable Eskom specifications, approved drawings, quality requirements, and relevant South African National Standards.
Important Dates
Source: SCOPE OF WORK.pdf (unknown)Closing date: 19 November 2026 at 08:00
Document effective date: 21 October 2025
Review date: October 2028
No briefing or site visit is stated.
Evaluation Criteria
Source: SCOPE OF WORK.pdf (unknown)Evaluation is based on compliance with Eskom technical specifications, approved drawings, inspection and routine test requirements, and approved quality documentation. No specific scoring split, minimum qualifying score, or preference point system (80/20 or 90/10) is stated in the provided document.
Technical Specifications
Source: SCOPE OF WORK.pdf (unknown)Scope: Supply and delivery of medium-voltage (MV) distribution transformers for the LimLanga Cluster, used for construction, maintenance, refurbishment, strengthening, and emergency restoration of electrical distribution networks.
Contract period: The document states a one-year contract period in the scope and business justification sections, but the tender record indicates a 24-month period. Prefer the tender record: 24 months.
Transformer types: MV pole-mounted distribution transformers, ranging from 16 kVA to 500 kVA, for 11 kV and 22 kV networks.
Secondary voltage configurations: 242 V, 420 V, or +242/-242 V as specified per item.
Coastal unit: One specified coastal 500 kVA, 22 kV/420 V transformer item.
Quality and compliance: Transformers must conform to applicable Eskom specifications, approved drawings, quality requirements, and relevant South African National Standards.
Testing and documentation: Supplier must provide manufacturer documentation, test certificates, compliance certificates, and other technical information for receiving, inspection, and acceptance.
Packaging and delivery: Transformers must be suitably packaged, labelled, handled, and transported to prevent damage during transit and offloading.
SAP material list:
Quality Management
Source: SCOPE OF WORK.pdfTransformers must meet specified kVA ratings, primary and secondary voltage ratings, mounting configuration, coastal or standard application requirements, technical descriptions, markings, quality assurance, and testing or certification requirements. The supplier must comply with applicable Eskom technical specifications, approved drawings, inspection requirements, routine test requirements, and approved quality documentation.
Compliance Requirements
Source: SCOPE OF WORK.pdf (unknown)Bidders must comply with Eskom's technical specifications, approved drawings, inspection requirements, routine test requirements, and approved quality documentation. No specific pre-qualification thresholds such as CSD registration, tax clearance, B-BBEE level, or CIDB grading are stated in the provided document.
Health & Safety
Source: SCOPE OF WORK.pdfNo specific OHS requirements are stated beyond general compliance with applicable technical, quality, and safety requirements as part of the contract. Transformers must be suitable for their intended voltage, loading, and application requirements to ensure safety and performance of the distribution network.
Contractual Terms
Source: SCOPE OF WORK.pdfSupply and delivery of MV pole-mounted distribution transformers from 16 kVA to 500 kVA for 11 kV and 22 kV networks.
Provide transformers with secondary voltage configurations of 242 V, 420 V, or +242/-242 V per SAP item.
Supply both standard MV pole-mounted units and the specified coastal 500 kVA, 22 kV/420 V unit.
Comply with applicable Eskom technical specifications, drawings, inspection requirements, routine test requirements, and approved quality documentation.
Deliver transformers suitably packaged, labelled, handled, and transported to prevent damage during transit and offloading.
Provide manufacturer documentation, test certificates, compliance certificates, and other technical information required for receiving, inspection, and acceptance.
Support timely replenishment of transformer stock for maintenance, capital projects, service restoration, and network reliability improvement initiatives.
Section
Source: SCOPE OF WORK.pdfTransformers must conform to applicable Eskom specifications, approved drawings, quality requirements, application requirements, technical descriptions, markings, quality assurance, testing, and certification requirements. Routine test requirements and approved quality documentation apply.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form. Incomplete submission or failure to submit within the prescribed period disqualifies the bidder.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)No technical specifications were provided in the document.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)No specific compliance requirements were stated in the document.
Description
Source: 240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdfSupply and delivery of Medium-Voltage Distribution Transformers for a period of two years. The service is 'as and when' required within the LimLanga Cluster.
Submission Guidelines
Source: 240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdf (TENDER)Returnable documents must be completed and submitted with the bid:
Submission method and address are not stated in the provided document.
Evaluation Criteria
Source: 240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdf (TENDER)Evaluation is based on quality deliverables, each scored as 1 (applies) or 0. Sections and maximum points:
Total possible: 12 points. No minimum qualifying score or price/functionality split is stated.
Technical Specifications
Source: 240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdf (TENDER)Supply and delivery of various types of transformers within the LimLanga Cluster on an 'as and when' required basis over a period of twenty-four (24) months. The project title indicates Medium-Voltage Distribution Transformers. Detailed quantities and specifications are not provided in the extracted document.
Compliance Requirements
Source: 240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdf (TENDER)Bidders must hold a valid ISO 9001 certificate issued by a certification body with recognised international accreditation. The certificate's scope must be defined and relevant to the products/services. The certificate must be valid at the time of submission. No other compliance requirements (e.g., CSD, B-BBEE, CIDB) are stated.
Section
Source: 240-12248652 (Rev 7)_List of Tender Returnables-Supply Deliver of Transformers.pdfQuality deliverables are evaluated per the following sections (maximum points in brackets):
Total possible: 12 points.
Data conflicts
None detected