ESKOM requires a professional service provider to deliver integrated supplier development, localisation and industrialisation (sdl&i) monitoring, verification, reporting, assurance, analytical support and structured intervention services across its national footprint for two years (24 months) under an nec3 professional services contract (psc3) term contract. The work covers evidence-based verification of localisation, supplier development, enterprise and skills development, employment creation and designated-group commitments, audit-ready evidence management, risk and escalation tracking, corrective intervention plans, and technology-enabled dashboards and reporting. Pricing is fixed and firm from the contract date until completion with NO inflation adjustment, and the consultant must carry professional indemnity cover to the total of the prices until the defects date. The most consequential consideration for a bidder is that the offer is priced on the c2.1 Schedule of staff rates and expenses, with delay damages of 10% per task order and liability capped at the total of the prices.
Key Requirements
Closing — bids close on 27 November 2026 at 08:00; the offer must be made on the C1.1 Form of Offer & Acceptance stating the total price excluding VAT, VAT at 15% and the total including VAT.
Returnable documents — the Schedule of Deviations (the only permitted deviations from the tender documents), C1.2b Contract Data provided by the Consultant, and the C2.1 Pricing Schedule of staff rates and expenses.
Contract term and coverage — 24 months from the starting date in the Contract Data, delivered nationally across Eskom project sites and supplier locations under an NEC3 Professional Services Contract (PSC3) term contract (main Option G).
Pricing — fixed and firm from the contract date until completion with no inflation adjustment, priced in South African Rand on the C2.1 schedule of staff rates and expenses.
Insurance — professional indemnity cover to the total of the Prices (or the cumulative total of task orders), maintained until the defects date of 26 weeks; insurer or broker certificates confirming cover must be produced on request.
Delivery deadlines — SDL&I Performance Plan within 60 days of contract start, bi-annual reporting every 6 months, first programme for acceptance within 2 weeks of the contract date, revised programmes at intervals no longer than 4 weeks, and quality policy statement and plan within 30 days.
Risk and compliance exposure — delay damages of 10% of each task order, liability capped at the total of the Prices with indirect and consequential loss at R0.00 and liability ending 24 months after completion; notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days; report any security breach to [email protected] within 24 hours.
Appointment of a suitably qualified professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two (2) years.
Tender context
Return to this tender’s issuing organisation, province, or category.
Appointment of a suitably qualified professional service provider to deliver integrated supplier development, localisation and industrialisation (sdl&i) monitoring, verification, reporting, assurance, analytical support and structured intervention services across ESKOM for a period of two (2) years.
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Document240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfReview complete
Description
Important Dates
03 Nov
2026
PUBLICATION
Tender Published
Tender was published
27 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Standard Bidding Document (SBD 4) Bidders Disclosure.pdf
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Annexure A and B - Techncial Evaluation Criteria.pdf
Eskom is appointing a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract value is estimated between R50 million and R300 million. The evaluation is a two-stage process: a desktop evaluation (minimum 80% threshold) followed by a site evaluation (minimum 100% threshold) for the top bidder.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The service provider will be appointed through a competitive tender process and must adhere to Eskom's integrity and ethical standards.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract is a NEC3 Professional Services Contract (PSC3) with a term contract option, including task orders and a range of standard and additional conditions.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract includes quality management system requirements, a contract quality plan, and specific returnable documents.
Eskom is appointing a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract will be governed by the NEC3 Professional Services Contract (PSC3).
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Eskom seeks to appoint a professional service provider for a two-year contract to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom. The scope covers national operations and requires a suitably qualified provider.
Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The service covers post-contract monitoring of SDL&I obligations, verification of reported outcomes, evidence management, audit support, and coordination of corrective interventions.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom is appointing a professional service provider for a two-year contract to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom nationally. The tender is open and will be evaluated in accordance with Eskom's procurement policies and the Preferential Procurement Policy Framework Act.
Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services for a two-year period. The scope covers professional resources, managed services, field verification activities, technology enablement, reporting and governance, and travel and disbursements, with pricing submitted via a detailed costing schedule.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The service provider will be responsible for ensuring that Eskom's suppliers and sub-suppliers comply with the quality management system requirements set out in the specification, including ISO 9001 certification and the submission of quality plans and inspection and test plans.
Eskom requires appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Eskom requires appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf
Eskom is appointing a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract requires compliance with local production and content requirements as per the Preferential Procurement Regulations, 2011.
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a two-year period, based at Megawatt Park. The contract includes specific goals for B-BBEE status, local procurement content, subcontracting to black-owned entities, job creation and skills development, with a 90/10 preference point system.
20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract will be awarded following a tender process that includes pre- and post-contract quality requirements aligned with ISO 9001.
240-109253698 Contract Quality Plan (CQP) Template.docx
Eskom requires a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract includes a mandatory Contract Quality Plan (CQP) that the successful bidder must develop and maintain, covering quality management, communication, sub-supplier control, documentation, and post-delivery activities.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Eskom requires appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
MS Teams meeting Link for Clarification Meeting.docx
Eskom is appointing a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years. The contract will be awarded following a non-compulsory virtual clarification meeting scheduled for 13 November 2026.
Eskom requires appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two years.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
BIDDERS LIST - CALIBRATION, SERVICE AND AD HOC MAINTENANCE OF CHEMICAL SERVICES LABORATORY EQUIPMENT FOR A PERIOD OF FIVE (5) YEARS AT LETHABO POWER STATION
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
This is the Eskom Supplier Quality Management Specification (240-105658000, QM 58, Revision 4). It defines the minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers, and sets out the criteria for evaluation, selection, registration, assessment, performance monitoring, and auditing of suppliers. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts. The focus is on establishing and continually improving a quality management system conforming to ISO 9001.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Closing date: 27 November 2026 (from tender record).
Closing time: 08:00 (from tender record).
Effective date of specification: 01 July 2026 (date of authorisation).
Next review date: May 2030.
No briefing or site visit dates are stated in the document.
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
No specific contact details (name, email, telephone) are stated in the document.
Department: Procurement and Supply Chain Management, Eskom Holdings SOC Ltd.
Submission address: not stated in the document.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Returnable documents (all must be completed, signed and submitted with the bid):
Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001): acknowledges and commits to Eskom's supplier quality requirements.
Valid ISO 9001 certificate (or applicable QMS certificate) from an accredited certification body, unless excluded by the applicable category.
Latest internal and external audit reports, including nonconformities and corrective actions.
Draft contract quality plan (CQP) specific to the scope of work, addressing ISO 10005 requirements.
Example of an inspection and test plan (ITP) or quality control plan (QCP) from similar work.
Documented information for control of externally provided processes, products and services.
Records of management review meetings (agenda, minutes, attendance registers).
Documented information for roles, responsibilities and authorities in relation to the QMS (e.g., organisation charts, job descriptions).
Submission method and address: not stated in the document.
Closing time: not stated in the document.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Evaluation is based on the quality requirements set out in this specification and the associated tender evaluation scorecard (240-168873697).
Bidders must submit all required quality documentation as per the applicable category (1, 2, 3 or 4) indicated in Form A. Only one category applies per procurement process.
Minimum qualifying score: not stated in the document.
Preference point system (80/20 or 90/10): not stated in the document.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
This specification (240-105658000, QM 58, Revision 4) sets out the minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers.
Scope: applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for products and services.
Key requirements:
Suppliers must develop, implement, maintain and continually improve a quality management system (QMS) conforming to ISO 9001 (latest revision).
A valid ISO 9001 certificate from an accredited certification body is required unless excluded by the applicable category.
Suppliers must ensure sub-suppliers also comply with the same QMS requirements.
Suppliers must manage sub-supplier quality through performance management programmes, including audits, surveillance, and assessment of CQPs and QCPs.
Contract Quality Plans (CQPs) must be developed in accordance with ISO 10005 and submitted before the initial kick-off or pre-fabrication meeting, whichever is earlier.
Quality Control Plans (QCPs) / Inspection and Test Plans (ITPs) must cover all stages from materials verification through to commissioning and hand-over.
QCPs/ITPs must be reviewed and accepted by Eskom before work commences; changes require Eskom's agreement.
Hold points and witness points apply; work must not proceed beyond a hold point without Eskom's written authorisation.
Quality kick-off meetings are held at contract start and at the start of each phase; 14 days' notice of coordination meetings is required.
Mandatory pre-inspection meetings are convened by Eskom or its inspection agency.
Eskom may appoint resident quality inspectors at the supplier's or sub-supplier's premises; workspace must be provided at no cost.
Suppliers must manage preservation of materials and equipment, including storage, transit and special precautions for sensitive items.
Special processes (e.g., welding, NDT) require qualified personnel, with records maintained (WQR, WPS, PQR).
Suppliers must inform Eskom of any proposed changes to the QMS or staff that affect the quality system.
Suppliers must provide free and uninhibited access to Eskom for inspections and audits.
Nonconformities must be managed and corrective actions implemented.
Quality categories (1 to 4):
Category 1: Full ISO 9001 certificate, audit reports, CQP, ITP/QCP example, documented information for externally provided processes, management review records.
Category 2: Objective evidence of a developed, implemented and maintained QMS (manual, policy, objectives, documented information, internal audit procedure, nonconformity and corrective action procedure), audit reports, CQP, ITP/QCP example, documented information for externally provided processes, management review records.
Categories 3 and 4: not detailed in the extracted text.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Preservation programme methodology:
Develop a preservation work plan and evaluate execution performance of all parties involved in transportation, handling, or storage.
Oversee material quality preservation plan preparation and execution at all work locations.
Establish a records management process for preservation programme records, compliant with Eskom information management requirements.
Identify all physical assets requiring pre-operation preservation, including bulk materials, consumables, equipment systems, and components.
Clearly communicate pre-operation preservation requirements to sub-suppliers.
Document processes for monitoring compliance with preservation programme requirements.
Compliance monitoring starts with engineering instructions and continues until equipment is incorporated into an operating system.
Compliance evaluation frequency must anticipate transfer of responsibility between project functions (procurement, logistics, fabrication, construction).
Preservation requirements must be documented and communicated to procurement, logistics, construction, quality, security, and other functions.
The preservation programme must address temporary, long-term, and in-transit preservation, including protection from atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, and corrosive atmospheres.
Detailed procedures for application, use, monitoring, and maintenance of coatings, coverings, fasteners, lines, and other components must be provided.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Quality management system requirements:
Suppliers and sub-suppliers must develop, implement, maintain and improve a QMS conforming to ISO 9001 (latest revision).
The QMS must include documented information such as a quality manual, quality plans, work procedures, work instructions, method statements, and workflow documentation.
A valid ISO 9001 certificate from an accredited certification body is required unless excluded by the applicable category.
The QMS must be maintained and reviewed; changes must be communicated to Eskom.
Sub-suppliers must also comply with QMS requirements where their scope includes design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning, or project management.
The main supplier is responsible for managing sub-supplier quality programmes.
Quality plans (CQP, QCP/ITP) must be developed in accordance with ISO 10005 and submitted for Eskom review.
QCPs/ITPs must include intervention points (hold, witness, surveillance, review, verification) and be accepted by Eskom before work starts.
Quality kick-off meetings and pre-inspection meetings are mandatory.
Eskom may appoint inspection agencies or resident inspectors; suppliers must provide workspace at no cost.
Nonconformities must be managed and corrective actions implemented.
Special processes (welding, NDT, etc.) require qualified personnel and documented records.
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
No pricing schedule or financial details are provided in the extracted text.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
No specific financial requirements (pricing format, bid security, bonds, guarantees, retention, payment terms, turnover) are stated in the document.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
B-BBEE: The document references the Preferential Procurement Policy Framework Act (PPPFA) but does not specify a minimum B-BBEE level or preference point system in the extracted text.
CIDB: Not applicable (this is a services tender, not construction).
CSD registration: Not stated in the document.
Tax compliance: Not stated in the document.
ISO 9001 certification: Required unless excluded by the applicable category (see technical specifications).
Other standards referenced: ISO 10005, ISO 9000, ISO 10006, ISO 9004, SANS 10845-1, IAEA GS-R-3.1, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034).
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
The document references the Eskom Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific health and safety requirements are detailed in the extracted text.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Preservation management programme requirements:
The supplier must manage preservation from transfer of ownership through storage and transit to final installation.
Storage and control of materials must follow manufacturer recommendations and project-specific requirements.
Special precautions are required for valves, electrical motors, mechanical and rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation, and other materials.
Preservation requirements must be clearly documented in purchase orders and communications with sub-suppliers.
Sub-supplier input into preservation protocols must be documented.
Preservation requirements must be communicated to logistics, construction, quality, security and other project functions.
Sub-supplier responsibilities for preservation execution must be clearly designated.
Project team responsibilities for preservation oversight must be defined at every stage.
Eskom must have free and unrestricted access to all preservation records for inspection and audit.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Evaluation is based on the quality requirements in this specification and the associated tender evaluation scorecard (240-168873697). Bidders must submit all required quality documentation as per the applicable category (1, 2, 3 or 4) indicated in Form A. Only one category applies per procurement process. Minimum qualifying score and preference point system are not stated in the extracted text.
Source: Standard Bidding Document (SBD 4) Bidders Disclosure.pdf (TENDER)
Returnable form
SBD 4 (Bidder's Disclosure): must be completed, signed and submitted with the bid. It records whether the bidder or any of its directors, trustees, shareholders, members, partners or controlling-interest holders is employed by the state, has a relationship with an employee of the procuring institution, or holds an interest in another related enterprise.
Disqualification risk
A bidder appearing on the Register for Tender Defaulters or the List of Restricted Suppliers is automatically excluded from the bid process.
A disclosure that is found to be untrue or incomplete disqualifies the bid.
Compliance Requirements
Source: Standard Bidding Document (SBD 4) Bidders Disclosure.pdf (TENDER)
Returnable form
SBD 4 (Bidder's Disclosure): declares state employment, relationships with employees of the procuring institution and interests in related enterprises; signing it also certifies that the bid was prepared independently and that no pricing or bid information was shared with competitors.
Automatic exclusion
Listing on the Register for Tender Defaulters or the List of Restricted Suppliers.
A false or incomplete disclosure, which also exposes the bidder to rejection or action under the PFMA SCM Instruction on preventing abuse in the supply chain management system.
DocumentScope of Work.pdfReview complete
Description
Source: Scope of Work.pdf
Eskom requires a service provider to deliver integrated post-contract monitoring, verification, reporting, assurance and structured intervention support for its Supplier Development, Localisation and Industrialisation (SDL&I) contractual obligations and outcomes. The service must support Eskom in monitoring and assuring the implementation of SDL&I obligations already embedded in awarded contracts, balance suitably skilled people, structured verification processes, reporting capability, intervention management and appropriate technological tools, and have national reach to conduct verification and assurance reviews across relevant Eskom sites, supplier locations and project locations. The service must be outcome-focused and geared towards the attainment of SDL&I objectives, including B-BBEE, localisation and industrialisation, enterprise and supplier development, sustainable and inclusive economic growth, job creation and preservation, skills development and transfer, NIPP assessment and industrialisation objectives, and preferential procurement and participation by designated groups.
Important Dates
Source: Scope of Work.pdf (RFP)
Closing date: 27 November 2026 at 08:00 (from tender record).
No briefing session or site visit is stated in the provided document.
Contact Information
Source: Scope of Work.pdf (RFP)
No contact information is stated in the provided document.
Submission Guidelines
Source: Scope of Work.pdf (RFP)
Proposal submission requirements:
Detailed technical proposal covering the post-contract SDL&I monitoring, verification, reporting, assurance and intervention support approach.
Monitoring and reporting methodology.
Structured corrective intervention model for delayed, underperforming or non-achieved SDL&I contractual obligations.
Reporting framework, performance tracking tools and management insight capability.
Description of proposed technological tools, including data management, workflow tracking, reporting, dashboards, security and integration capability.
Company profile, relevant experience, comparable projects, client references and case studies where available.
Proposed team structure, key personnel, roles, responsibilities and relevant qualifications or experience.
Pricing model, cost breakdown, assumptions, mobilisation plan, support model and continuous improvement approach.
Submission method and address are not stated in the provided document.
Evaluation Criteria
Source: Scope of Work.pdf (RFP)
Evaluation areas and indicative weightings:
Understanding of SDL&I contractual obligations, post-contract monitoring requirements and contracted outcomes: 10%
Monitoring, verification, assurance and reporting methodology: 10%
Evidence management, audit support, data quality and reporting capability: 10%
Structured intervention, escalation, corrective action and recovery tracking approach: 10%
Technology-enabled tools, workflow tracking, evidence management, reporting dashboards, collaboration functionality, comparative reporting, integration capability and proof that a similar system is already in operation: 40%
Team capability, national reach, mobilisation plan, stakeholder engagement model, understanding of the B-BBEE Act and reporting requirements, and experience in managing enterprise and supplier development initiatives: 20%
Mandatory requirements (bidders must demonstrate compliance; Eskom may require supporting documentation, references, demonstrations, certifications or other evidence):
Proven experience in SDL&I, supplier development, localisation, industrialisation, transformation, enterprise development or comparable economic development support assignments.
Capability to conduct SDL&I monitoring and reporting reviews across the business.
Capability to review awarded contracts, SDL&I schedules, commitments, milestones, reporting obligations and evidence requirements to establish post-contract monitoring baselines.
Proven ability to support corrective interventions, escalations, recovery plans and resolution tracking where contracted SDL&I obligations are delayed, underperforming or not achieved.
Ability to provide credible reporting, audit-ready records and management insights.
Access to, or ability to deploy, suitable technological tools to support data management, workflow tracking, reporting, dashboards and evidence management.
Ability to mobilise within agreed timelines and sustain support for the full 24-month contract period.
Technical Specifications
Source: Scope of Work.pdf (RFP)
Scope of work:
Review awarded contracts, SDL&I schedules, commitments, milestones, reporting obligations and evidence requirements to establish a post-contract monitoring baseline.
Monitor supplier performance against SDL&I contractual obligations, milestones, evidence requirements and agreed outcomes.
Conduct verification and assurance reviews of reported SDL&I outcomes across relevant locations.
Design, coordinate and track structured corrective interventions to address underperformance, delays, evidence gaps, non-compliance risks and non-attainment of contracted SDL&I outcomes.
Provide early warnings, escalation reports, exception reporting, risk tracking and intervention progress reports.
Maintain supporting documentation, evidence packs and audit-ready reporting records.
Provide management dashboards, reports, analytics and recommendations to support decision-making and accountability.
Deploy appropriate technological tools to support data management, reporting, evidence management, workflow tracking and post-contract SDL&I visibility.
Detailed service requirements:
Support model, methodology and tools: propose an integrated post-contract support model combining skilled resources, clear methodologies, national verification capability, reporting discipline, governance routines and fit-for-purpose technological tools. Demonstrate experience in SDL&I or comparable assignments; provide tools for data capture, workflow tracking, evidence management, reporting and dashboards; provide suitably skilled resources; demonstrate ability to work across multiple contracts, suppliers, regions and stakeholder groups.
Monitoring, verification, assurance and reporting: monitor supplier delivery against SDL&I commitments, targets and milestones; verify reported outcomes through document reviews, data checks, site visits or other assurance methods; track local content, industrialisation, SMME participation, designated group participation, job creation, job preservation, skills development, skills transfer and supplier development outcomes; provide exception reports, early warnings, escalation reports and recommendations; maintain audit-ready evidence packs and assurance records.
Evidence management, audit support and compliance: maintain supporting evidence such as contracts, purchase orders, invoices, proof of delivery, payment confirmations, training records, employment records, local content evidence and supplier development records; provide audit trails, evidence registers and document completeness checks; support internal and external audits; identify reporting gaps, data quality issues and evidence deficiencies; support compliance with applicable procurement, B-BBEE, localisation, industrialisation and governance requirements.
Governance, risk, escalation and intervention tracking: maintain risk registers, action trackers, issue logs, escalation reports and intervention trackers; provide early warning indicators; support escalation to Eskom contract management teams and governance forums; track corrective actions, interventions, resolutions and outstanding matters; support implementation of contractual remedies or penalties where applicable and instructed by Eskom.
Post-contract structured intervention support: identify barriers to delivery and recommend corrective actions; support engagement between Eskom contract management teams, suppliers, subcontractors and stakeholders; track agreed interventions, recovery actions, responsible parties, timelines and closure evidence; report on intervention effectiveness and unresolved risks.
Technology-enabled reporting and tools: support secure data capture, storage and reporting; enable workflow tracking; support dashboards, analytics, exception reporting and management insights; enable evidence management and audit-ready reporting; protect Eskom information, supplier information, personal information and commercially sensitive information. The proposed solution must already exist and have proven capability to track similar projects; Eskom will not procure a standalone software solution.
Management insights and performance reporting: provide executive dashboards, operational reports and exception reports; measure progress against contracted local content, SMME participation, job creation, skills development, industrialisation and supplier development obligations; provide recommendations for corrective action, escalation, evidence improvement and continuous improvement.
Non-functional requirements:
Secure and controlled access to data and reports.
Reliable reporting and evidence management capability.
Scalable support across multiple suppliers, contracts, regions and interventions.
Appropriate data protection and confidentiality controls.
Audit-ready records, traceability and version control.
Responsive support and clear escalation mechanisms.
Implementation requirements:
Provide a structured implementation approach covering mobilisation, onboarding, contract portfolio review, SDL&I obligation baseline development, stakeholder engagement, reporting framework development, tool configuration where applicable, governance arrangements, assurance approach, escalation protocols and continuous improvement.
Support and service management:
Provide ongoing post-contract support for the full contract duration, including monitoring, verification, assurance, reporting, structured intervention coordination, stakeholder engagement, issue and risk tracking, evidence management, audit support, governance meeting support, management insight generation and continuous improvement recommendations.
Deliverables:
Mobilisation and implementation plan.
Contract portfolio review and SDL&I obligation baseline report.
Structured corrective intervention plans for underperforming, delayed or at-risk SDL&I contractual obligations.
Technology-enabled reporting tools or configured mechanisms to support data management, workflow tracking and reporting visibility.
Knowledge transfer, close-out reports and sustainability recommendations.
Methodology
Source: Scope of Work.pdf
The bidder must propose a practical and integrated post-contract support model that combines suitably skilled resources, clear methodologies, national verification capability, reporting discipline, governance routines and fit-for-purpose technological tools. The methodology must cover monitoring, verification, reporting, assurance and structured intervention support. The bidder must demonstrate experience in SDL&I, supplier development, localisation, industrialisation, transformation, economic development or comparable assignments, and provide tools for data capture, workflow tracking, evidence management, reporting and dashboards. The bidder must also demonstrate the ability to work across multiple contracts, suppliers, regions and stakeholder groups.
Experience & Qualifications
Source: Scope of Work.pdf
The bidder must be suitably qualified, experienced and capable. Mandatory requirements include proven experience in SDL&I, supplier development, localisation, industrialisation, transformation, enterprise development or comparable economic development support assignments; capability to conduct SDL&I monitoring and reporting reviews across the business; capability to review awarded contracts, SDL&I schedules, commitments, milestones, reporting obligations and evidence requirements to establish post-contract monitoring baselines; proven ability to support corrective interventions, escalations, recovery plans and resolution tracking; ability to provide credible reporting, audit-ready records and management insights; access to or ability to deploy suitable technological tools; and ability to mobilise within agreed timelines and sustain support for the full 24-month contract period. The proposed solution must already exist and have proven capability to track similar projects that monitor SDL&I deliverables and/or ESD beneficiaries. The bidder must provide a company profile, relevant experience, comparable projects, client references and case studies where available, and a proposed team structure with key personnel, roles, responsibilities and relevant qualifications or experience.
Quality Management
Source: Scope of Work.pdf
The service provider must maintain accurate, complete and auditable records to support reported SDL&I outcomes. This includes maintaining supporting evidence such as contracts, purchase orders, invoices, proof of delivery, payment confirmations, training records, employment records, local content evidence and supplier development records. The provider must provide audit trails, evidence registers and document completeness checks, support internal and external audits by providing timely and accurate information, identify reporting gaps, data quality issues and evidence deficiencies, and support compliance with applicable procurement, B-BBEE, localisation, industrialisation and governance requirements.
Financial Requirements
Source: Scope of Work.pdf (RFP)
No financial requirements (pricing format, bid security, bonds, guarantees, retention, payment terms, turnover) are stated in the provided document.
Compliance Requirements
Source: Scope of Work.pdf (RFP)
No specific compliance requirements (CSD registration, tax status, B-BBEE level, CIDB grade, CIPC registration, local content) are stated in the provided document. The document references support for B-BBEE, localisation and industrialisation as objectives of the service, but does not specify thresholds or evidence requirements for bidders.
Contractual Terms
Source: Scope of Work.pdf
The service and any supporting technological tools must be practical, secure, scalable, auditable, user-friendly and fit for purpose. The bidder must demonstrate the ability to protect confidential, personal and commercially sensitive information and to comply with applicable governance, procurement, audit, data protection and information security requirements. Requirements include secure and controlled access to data and reports, reliable reporting and evidence management capability, scalable support across multiple suppliers, contracts, regions and interventions, appropriate data protection and confidentiality controls, audit-ready records, traceability and version control, and responsive support with clear escalation mechanisms.
DocumentSDL&I Strategy.pdfReview complete
Description
Source: SDL&I Strategy.pdf
Provision of professional services for integrated monitoring, verification, reporting, assurance and structured intervention support for a period of two years at Eskom Megawatt Park.
Important Dates
Source: SDL&I Strategy.pdf (unknown)
Closing date: 27 November 2026 at 08:00 (from tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: SDL&I Strategy.pdf (unknown)
No contact details are stated in the document.
Submission Guidelines
Source: SDL&I Strategy.pdf (unknown)
Returnable documents:
SDL&I Strategy Setting Template: completed and submitted with the bid.
Valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPS affidavit.
Proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown.
Certified ID copies of shareholders.
Proof of disability where applicable.
Submission method: not stated in the document.
Closing time: not stated in the document.
Evaluation Criteria
Source: SDL&I Strategy.pdf (unknown)
Evaluation uses the 90/10 preference point system.
Price: maximum 90 points.
Specific goal (B-BBEE status level): maximum 10 points.
B-BBEE points (90/10 system):
Level 1: 10 points
Level 2: 9 points
Level 3: 6 points
Level 4: 5 points
Level 5: 4 points
Level 6: 3 points
Level 7: 2 points
Level 8: 1 point
Non-compliant: 0 points
Total points (price + specific goal) are rounded to two decimal places. Contract awarded to the tenderer scoring the highest total points.
If a tenderer fails to provide documentation for preference points, they are not disqualified but:
May only score 1 point out of 90 for price.
Scores 0 points out of 10 for specific goals.
Objective criteria (NIPP, Designated Sectors, CIDB) are not applicable.
Technical Specifications
Source: SDL&I Strategy.pdf (unknown)
Scope of work:
Provision of professional services for integrated monitoring, verification, reporting, assurance and structured intervention support.
Services to be delivered at Eskom Megawatt Park.
Contract duration: 2 years.
SDL&I obligations (contractual commitments, not scoring criteria):
Local procurement content: 100% of total spending must be local content (value added in South Africa).
Subcontracting: 15% of scope must be subcontracted to EME/QSE entities with at least 51% black ownership. The sub-contractor must not be a subsidiary or have shares in the main contractor.
Jobs: tenderers must propose the type and number of jobs to be created and retained in South Africa.
Skills development: one candidate must be skilled for every R5 million cumulative spend. Candidates must be unemployed graduates from recognised South African universities or TVET colleges. Proof of appointment (letter of competence, proof of attendance, service contract, or certificate of compliance) must be submitted. Implementation begins one month after the threshold is reached. Candidates must represent all provinces and reflect population demographics. Tenderers bear the full cost of skills development; Eskom makes no financial contribution.
Methodology
Source: SDL&I Strategy.pdf
Skills development approach: tenderers participate directly and through their supply network; SETA-accredited training providers may be approached for critical and scarce skills. Tenderers bear the full cost of skills development; Eskom makes no financial contribution. Tenderers are advised to approach SETAs for grants, subsidies, and incentives, and SARS for tax rebates.
Experience & Qualifications
Source: SDL&I Strategy.pdf
Skills development candidates must be currently unemployed graduates from recognised South African universities or TVET colleges. The successful tenderer must skill one candidate for every R5 million cumulative spend. Proof of appointment (letter of competence, proof of attendance, service contract, or certificate of compliance) must be submitted. Candidates must be from all provinces and reflect population demographics.
Financial Requirements
Source: SDL&I Strategy.pdf (unknown)
Pricing format:
Tender response must be separated into components as per the Price Schedule included with the tender documents.
Local procurement content is total spending minus the imported component.
Retention and performance security:
Eskom will retain 2.5% of every invoice amount (excluding VAT) for failure to submit SDL&I performance reports or failure to meet SDL&I obligations.
Retained amounts are released if compliance results are positive.
No bid security, bonds, guarantees, or payment terms are stated.
Compliance Requirements
Source: SDL&I Strategy.pdf (unknown)
B-bbee:
A valid B-BBEE certificate or sworn affidavit is a condition for contract award.
Revenue up to R10 million (EME): sworn affidavit may be submitted.
Revenue up to R50 million (QSE): must comply with all elements of the QSE scorecard relevant to the sector, unless at least 51% black-owned, in which case a sworn affidavit is required.
Must be submitted within 30 days of contract signing.
Bidders at Level 4 at award must achieve Level 3 by the end of the first year and maintain it.
Bidders at Level 5-8 or non-compliant must achieve Level 4 by the end of the first year, then improve to Level 3 and maintain it.
Sworn affidavit validity requirements:
Deponent's name and ID number as per identity document.
Designation (director, owner, or member) must be indicated.
Enterprise name as per CIPC registration and business address.
Percentage of black ownership, black female ownership, and designated group (no blank spaces).
Total revenue for the year under review and whether based on audited financial statements or management accounts.
Financial year end (day/month/year).
B-BBEE status level (only one).
Empowering supplier status (for QSEs, basis must be selected).
Deponent and Commissioner of Oaths must sign on the same date; Commissioner must sign and stamp.
Commissioner of Oaths cannot be an employee or ex officio of the enterprise.
No CIDB grading, CSD registration, tax clearance, or CIPC registration requirements are stated.
Contractual Terms
Source: SDL&I Strategy.pdf
Contractual obligations include:
B-BBEE improvement or retention plan within 30 days of contract signing.
B-BBEE level migration milestones: Level 4 to Level 3 by end of year 1; Level 5-8 or non-compliant to Level 4 by end of year 1, then Level 3.
Local procurement content of 100%.
Subcontract 15% of scope to black-owned EME/QSEs.
Skills development: one candidate per R5 million spend.
Biannual SDL&I performance reports.
Retention of 2.5% of invoice amount (excluding VAT) for failure to meet SDL&I obligations or submit reports; released if compliance is positive.
Eskom reviews reports within 60 days of receipt; corrective measures required before the next report, failing which retention clauses are invoked.
Section
Source: SDL&I Strategy.pdf
Evaluation uses the 90/10 preference point system. Price scores up to 90 points; specific goal (B-BBEE status level) scores up to 10 points. Points are added and rounded to two decimal places. Contract awarded to the highest total scorer. B-BBEE points: Level 1 = 10, Level 2 = 9, Level 3 = 6, Level 4 = 5, Level 5 = 4, Level 6 = 3, Level 7 = 2, Level 8 = 1, Non-compliant = 0. Failure to provide preference point documentation means the tenderer may only score 1 point out of 90 for price and 0 out of 10 for specific goals.
DocumentEskom General Conditions of Purchase.pdfReview complete
Contact Information
Source: Eskom General Conditions of Purchase.pdf (unknown)
Fraud and corruption reporting: [email protected], telephone 0800 11 2722
Evaluation Criteria
Source: Eskom General Conditions of Purchase.pdf (unknown)
The supplier must accept Eskom's General Conditions of Purchase; non-acceptance must be indicated in writing. The supplier must be able to provide services in accordance with the agreement. The supplier must comply with all statutory requirements. The supplier must not be bankrupt or in financial circumstances that prejudice proper performance. The supplier must complete Eskom's CPA (IG) form. The supplier must include delivery costs in the price unless otherwise stated.
Technical Specifications
Source: Eskom General Conditions of Purchase.pdf (unknown)
Supply of goods or execution of works/services as described in the agreement.
Quality Management
Source: Eskom General Conditions of Purchase.pdf
Acceptance: Goods/works/services subject to Eskom's approval; Eskom may inspect/test at any stage. If Eskom does not notify acceptance, it is deemed accepted. Rejection: If supplier fails to comply, Eskom may reject goods by written notice specifying reason and whether replacement or re-work is required. For goods, rejected items returned at supplier's risk and expense; supplier must refund payments and cover costs of obtaining replacements. For services, supplier must correct non-conformances/defects; if delayed, Eskom may have them corrected by a third party at supplier's cost.
Financial Requirements
Source: Eskom General Conditions of Purchase.pdf (unknown)
Prices or rates may include a price adjustment calculated per the formula in the agreement. Payment may be in any currency, with one exchange rate to ZAR. Payment within 30 days after receipt of a correct tax invoice. Eskom's VAT registration number (4740101508) must appear on the tax invoice. Delivery costs must be stated in the tender; if not stated, they are deemed included. No payment for containers or packing materials unless otherwise stated.
Compliance Requirements
Source: Eskom General Conditions of Purchase.pdf (unknown)
Supplier must adhere to all statutory requirements. Agreement governed by South African law, subject to SA courts. Supplier must complete Eskom's CPA (IG) form.
Contractual Terms
Source: Eskom General Conditions of Purchase.pdf
Indemnity: Supplier indemnifies Eskom against claims arising from negligence, IP infringement, breach of statutory duty, defective design, materials or workmanship. Warranty: Goods/works/services fit for purpose and free from defects for one year from acceptance (unless otherwise stated); defects rectified free of cost within agreed time. Assignment/subcontracting: Neither party may cede or delegate rights/obligations without written consent; Eskom may cede to subsidiaries or restructured entities on written notice. Statutory requirements: Supplier must comply with all relevant laws; agreement governed by RSA law, SA courts have jurisdiction. Breach: Non-defaulting party may terminate after written notice if default not remedied. Termination: Eskom may terminate at any time if supplier defaults, becomes bankrupt, or is in financial circumstances prejudicing performance. Ethics: Eskom expects high ethical standards from suppliers.
Quality requirements are evaluated under Category 2. Bidders must satisfy either Option 1 or Option 2 for Section A, plus Sections B, C, and E.
Section A – Quality Management System (ISO 9001):
Option 1: Valid ISO 9001 certification by an accredited body, with the certificate scope relevant to the services, issued by an authorised certification authority with recognised international accreditation, and valid (not expired). Score: 4.
Option 2: Documented QMS that complies with ISO 9001 but is not certified. Must include: QMS manual defining scope, quality policy approved by top management, quality objectives approved by top management, documented information for control of documented information (Clause 7.5), control of nonconforming outputs (Clause 8.7), nonconformity and corrective action (Clause 10.2), and internal audit (Clause 9.2). Score: 7.
Section B – Evidence of QMS in operation (score: 4):
Documented roles, responsibilities and authorities (organisation chart and responsibility matrix, including quality management function).
Documented control of externally provided processes, products and services, including criteria for evaluation, selection, monitoring and re-evaluation of external providers.
Latest internal management system audit report, including objective, scope, criteria and outcomes.
Records of management review meetings (minutes, attendance registers).
Section C – Contract Quality Plan (score: 1):
Draft Contract/Project Quality Plan specific to the scope of work, referencing ISO 10005.
Section E – Additional requirements (score: 1):
Form A completed and signed.
Total possible score: 4 (Option 1) or 7 (Option 2) + 4 + 1 + 1 = 10 (Option 1) or 13 (Option 2).
Provision of integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a period of two (2) years.
The tender is for the appointment of a professional service provider to deliver integrated SDL&I monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for two years.
Scope: Appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support, and structured intervention services across Eskom.
Contract period: Two (2) years.
Key deliverables (implied by scope):
Monitoring and verification of SDL&I activities.
Reporting and assurance services.
Analytical support.
Structured interventions.
Detailed technical requirements are in Appendix A (attached separately) and the Scope of Work annexure.
ISO 9001:2015 certificate OR QMS manual with required documented information (quality policy, objectives, control of documents, internal audit, management review, etc.).
Contract Quality Plan per Eskom references.
Safety:
OHS acknowledgement form, baseline risk assessment, valid letter of good standing.
B-bbee:
Proof of B-BBEE status level (certificate or sworn affidavit as per B-BBEE Codes).
Specific Goals claimed under SBD 6.1.
Local content:
SBD 6.2 declaration and supporting schedules (G2, G3, G4).
CIDB: Not applicable.
Contractual conditions: NEC3 Professional Services Contract (PSC3).
Functionality threshold: 80%. Price scored out of 90 points. Specific Goals scored out of 10 points. 90/10 preference point system. Detailed technical criteria in Appendix A.
Document240-109253698 Contract Quality Plan (CQP) Template.docxReview complete
Description
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx
The document is a Contract Quality Plan (CQP) template that the supplier must complete to plan for meeting Eskom's quality management requirements. It is not a full tender specification.
Submission Guidelines
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx (unknown)
Returnable documents: the completed Contract Quality Plan (CQP) template, compiled by the tenderer and approved by the organisation owner. Eskom reviews and accepts the CQP after award. No other submission requirements are stated.
Evaluation Criteria
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx (unknown)
No specific evaluation criteria are stated. The bidder must be a suitably qualified professional service provider. The CQP must be compiled by the tenderer and approved by the organisation owner, with Eskom review and acceptance after award.
Technical Specifications
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx (unknown)
The Contract Quality Plan (CQP) template is provided to help the supplier identify and plan for meeting Eskom's quality management expectations. The CQP must cover: scope of work, communication channels, organogram, interfacing documents, suppliers and sub-suppliers, monitoring, items to be manufactured/refurbished/purchased, QCP/ITP requirements, special controls, documented information to be submitted, records control, concession and non-conformance management, databook management, tools and equipment, customer property, product preservation, identification and traceability, and commissioning/post-delivery activities.
Compliance Requirements
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx (unknown)
No specific compliance requirements are stated. The CQP must be compiled by the tenderer and approved by the organisation owner.
Returnable documents, organised into four folders:
Commercial Folder: completed Invitation to Tender (ITT); CIPC registration; B-BBEE certificate or sworn affidavit; COIDA letter of good standing; SARS tax pin; CSD report downloaded within seven days of submission; SDL&I returnables; E-Tenderers' E-Tendering Training Acknowledgement Form; Supplier Evaluation Pack Template.
Financial Folder: signed NEC3 contract (with pricing); supplier quotation on company letterhead; BOQ in both Excel and PDF format; financial statements (if applicable).
SHEQ Folder: OHS documentation (if applicable), including Acknowledgement Form for Eskom SHE Rules and other Requirements, Life Saving Rules Acknowledgement Form, and COIDA letter of good standing; environmental (if applicable); quality (if applicable).
Technical Folder: technical evaluation returnables as per the technical evaluation criteria.
Evaluation Criteria
Source: E-Tender Folders Guideline.pdf (TENDER)
Evaluation is based on the returnables listed in the Commercial, Financial, SHEQ, and Technical folders. Bidders must submit all required documents, including the Supplier Evaluation Pack Template and technical evaluation returnables. No specific scoring split or minimum qualifying score is stated in the provided document.
Pricing Schedule
Source: E-Tender Folders Guideline.pdf
Pricing must be provided in a signed NEC3 contract (with pricing), a supplier quotation on company letterhead, and a BOQ in both Excel and PDF format. Financial statements are required if applicable.
Financial Requirements
Source: E-Tender Folders Guideline.pdf (TENDER)
Financial folder must include:
Signed NEC3 contract (with pricing)
Supplier quotation on company letterhead
BOQ in both Excel and PDF format
Financial statements (if applicable)
Compliance Requirements
Source: E-Tender Folders Guideline.pdf (TENDER)
Mandatory compliance documents:
CSD report downloaded within seven days of submission
Valid SARS tax pin
Valid B-BBEE certificate or sworn affidavit
COIDA letter of good standing
CIPC registration
Completed E-Tenderers' E-Tendering Training Acknowledgement Form
Completed Invitation to Tender (ITT)
Health & Safety
Source: E-Tender Folders Guideline.pdf
SHEQ folder requirements (if applicable):
Occupational Health and Safety (OHS) documentation
Acknowledgement Form for Eskom SHE Rules and other Requirements
Life Saving Rules Acknowledgement Form
COIDA letter of good standing
Environmental documentation (if applicable)
Quality documentation (if applicable)
Section
Source: E-Tender Folders Guideline.pdf
Technical evaluation returnables must be submitted as per the technical evaluation criteria. A Supplier Evaluation Pack Template is required. Quality documentation is required if applicable.
DocumentEskom - Standard Conditions of Tender - 30 January 2025.pdfReview complete
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Closing date: 27 November 2026 at 08:00 (SAST).
Closing time is strictly adhered to, based on the Telkom time signal.
Site visit and/or clarification meeting: if stipulated as compulsory in the Tender Data, attendance is mandatory; failure to attend results in disqualification. Details are stated in the Tender Data (not provided in the source).
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Enquiries must be directed in writing to the Eskom Representative identified in the Invitation to Tender. No other Eskom official may be contacted.
Contact details (name, email, telephone) are not stated in the source document.
Submission address: not stated in the source document; for e-tendering, submission is via the Eskom Tender Bulletin site.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Submission method: E-tendering via the Eskom Tender Bulletin site on the Eskom E-tendering page. Paper submissions are not permitted for e-tendering.
Tenders must be submitted in English, completed in ink (not pencil), and signed by an authorised signatory.
Upload and finalise the tender before the closing date and time; the system will not accept changes or submissions after that point.
The tenderer is responsible for ensuring all uploaded documents are complete, readable, and not corrupt.
Returnable forms and documents must be completed and submitted by the closing date and time; mandatory returnables required for contract award must be submitted before award.
Required returnables include: Acknowledgement Form (stating whether the tender is for the whole or part of the scope), SDL&I Undertaking (annexure), proof of authority if an agent submits, and any other mandatory documents stated in the Tender Data.
Tenders that do not contain mandatory documents or information by the closing date and time will be disqualified.
No late tenders will be accepted; proof of posting or courier delivery does not count as proof of delivery.
Eskom will not accept responsibility for misplacement or premature opening if the outer package is not sealed or the address/reference is marked incorrectly.
Tenderers must not sub-contract 100% of the scope of work; such tenders are ineligible and disqualified.
All communication with Eskom must be in writing to the Eskom Representative only, in English.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Evaluation stages:
Basic compliance: tender must meet all basic compliance requirements stated in the Invitation to Tender; failure renders the tender non-responsive.
Mandatory tender returnables: missing mandatory documents by closing date and time leads to disqualification.
Pre-qualification criteria: if stipulated, must be met; Eskom will not measure a criterion twice in different phases (no double dipping).
Functionality (if applicable): scored against functionality criteria; must meet the minimum threshold stated in the Tender Data to proceed.
Financial analysis: Eskom assesses the financial risk of the tenderer; if risk is too high and no suitable mitigating factors exist, the tenderer will not be considered for award.
Price evaluation: evaluated per Tender Data criteria, considering factors such as CPA, FOREX, commodity exposure, discounts, technical adjustment, PV, and forecasted invoicing rates.
B-BBEE scoring: scored as per CSD report or certificate/affidavit provided; if no valid B-BBEE proof is provided at closing, the tenderer scores zero under PPPFA point allocation (but is not disqualified if otherwise responsive).
Specific Goals: scored with reference to supporting documentation; failure to meet or provide proof results in zero points for Specific Goals within the 90/10 or 80/20 allocation.
Ranking: Price and Specific Goals scores are added and tenders ranked highest to lowest.
The preference point system (80/20 or 90/10) applies as per PPPFA.
Objective criteria may be used only if stipulated in the Invitation to Tender; functionality and B-BBEE scorecard elements cannot be used as objective criteria.
Reverse e-auction may be used if indicated; in such cases, tenders must not include prices.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Scope: Appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom.
Contract period: two (2) years.
The tenderer must not sub-contract 100% of the scope of work.
The successful tenderer must achieve Contract Skills Development Goals (CSDG) as per CIDB Standard for Developing Skills through Infrastructure Contracts, applicable to contracts of R5 million or more (professional/service contracts) or CIDB grade 7 or higher (engineering/construction).
The successful tenderer must achieve Contract Participation Goals (CPG) for engaging targeted enterprises as per CIDB standard, applicable to construction works contracts in GB and CE classes, with minimum project duration of 6 months, and where at least 25% of the main contract could be subcontracted.
The successful tenderer may be required to provide cataloguing information per item after award and label materials per Eskom specifications; cataloguing costs are paid by Eskom.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Quality requirements:
Tenderers must provide proof of safety, health, environmental and quality (SHEQ) systems, policies, and capabilities at closing date and time; all SHEQ costs and personnel must be reflected in the tender.
The successful tenderer must comply with Eskom's SHEQ requirements and relevant legislation (OHS Act, etc.).
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Pricing schedule:
Rates and prices must be in South African Rand, fixed for the contract duration, and include all duties, taxes (including VAT), and levies applicable 14 days prior to closing.
Prices must be submitted in accordance with the exchange rate and base date stipulated in the Invitation to Tender.
No alterations to tender documents except to correct errors; corrections must be initialled by all signatories and may not use correction fluid or tape.
Alternative tenders only if permitted and submitted with a main tender.
Arithmetical errors: words prevail over figures; Eskom will correct errors and the corrected total is binding unless the tenderer rejects, leading to rejection.
Financial analysis: Eskom assesses financial risk; if risk is too high and no mitigating factors, the tenderer will not be considered for award.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Pricing:
Rates and prices must be in South African Rand, fixed for the contract duration, and not subject to price adjustment except as provided in the Invitation to Tender.
Include all duties, taxes (including VAT), and levies applicable 14 days prior to closing date and time.
If alternative tenders are permitted, they must be based only on criteria in the Tender Data and submitted with a main tender.
Arithmetical errors: if figures and words disagree, words prevail; Eskom may correct errors and the corrected total is binding unless the tenderer rejects, in which case the tender is rejected.
Financial analysis: Eskom will assess the financial risk of the tenderer; if risk is too high and no mitigating factors, the tenderer will not be considered for award.
Security for performance: if required, the tenderer must indicate at least two financial institutions it is likely to approach; Eskom may reject unsuitable institutions.
Insurance: Eskom's insurance may not cover all risks; tenderers should seek qualified advice.
No compensation is paid for tender preparation costs.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Eligibility:
Must comply with eligibility criteria in the Tender Data; must not be under any restriction to do business with Eskom or State-Owned Companies.
Must be registered on the Central Supplier Database (CSD) and have a valid tax compliance status.
Must not sub-contract 100% of the scope of work.
Must complete and submit the SDL&I Undertaking by contract award; failure means the tender will not be considered for award.
Must provide proof of authority if an agent submits the tender.
Must comply with relevant legislation: National Treasury Instruction Notes, CIDB regulations (if applicable), PPPFA regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements.
Must provide proof of SHEQ systems, policies, and capabilities at closing date and time; all SHEQ costs and personnel must be reflected in the tender.
CIDB registration: if stipulated in Tender Data, must be registered at closing date and time, or be capable of being registered within 21 working days; proof of registration is mandatory at closing, or proof of application must be submitted by closing and actual proof by contract award.
B-BBEE: proof of B-BBEE level (certificate/CSD number/report) must be provided at closing if it is a pre-qualification criterion; otherwise, for PPPFA points, if not provided or fraudulent/expired, the tenderer scores zero but is not disqualified.
Designated materials and thresholds: information must be submitted no later than contract award; failure means the tender will not be considered for award.
Fraud or misrepresentation: Eskom may disqualify and report to B-BBEE Commission; suspension from business with State-Owned Companies for up to 10 years and possible jail time.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Health and safety:
Proof of SHEQ systems, policies, and capabilities must be provided to Eskom's satisfaction at closing date and time for tender submission and/or contract award.
All costs and personnel associated with SHEQ must be included in the tender.
Compliance with OHS Act and Eskom's SHEQ requirements is mandatory.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Contract terms:
Eskom may accept or reject any variation, deviation, or alternative tender, and may cancel the tender at any time before contract conclusion, with written reasons on request.
Eskom may enter into mandated negotiations with selected tenderers.
Tender validity: tender must remain valid for acceptance within the validity period; if Eskom requests an extension, the tenderer may agree (without modifying the tender) or be excluded from further consideration.
Confidentiality: all matters arising from the procurement are confidential; documents provided by Eskom may only be used for preparing and submitting the tender.
Site visit/clarification meeting: if compulsory, attendance is mandatory; failure results in disqualification.
Eskom may reject a tender if there is proof of influence, collusion, bid rigging, or fraudulent/illegal activity.
Eskom will not disclose evaluation information until after award.
The successful tenderer must sign the Form of Agreement.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Additional evaluation criteria:
Functionality (if applicable): scored against criteria; must meet minimum threshold in Tender Data to proceed.
Financial analysis: Eskom determines financial risk; if risk is too high and no mitigating factors, tenderer not considered for award.
Price evaluation: per Tender Data, considering CPA, FOREX, commodity exposure, discounts, technical adjustment, PV, and forecasted invoicing rates.
B-BBEE scoring: as per CSD report or certificate/affidavit; if not provided or invalid, scores zero under PPPFA but not disqualified.
Specific Goals: scored with supporting documentation; failure results in zero points within 90/10 or 80/20 allocation.
Ranking: Price + Specific Goals scores added, ranked highest to lowest.
Objective criteria: may be used only if stipulated; functionality and B-BBEE scorecard elements cannot be used.
Reverse e-auction: if used, tenders must not include prices.
DocumentEskom Standard Conditions of Tender.pdfReview complete
Description
Source: Eskom Standard Conditions of Tender.pdf
The tender is for the appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) services across Eskom, including monitoring, verification, reporting, assurance, analytical support and structured interventions. The contract runs for two years.
Important Dates
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
Closing date: 27 November 2026 at 08:00 (SAST).
Compulsory site visit or clarification meeting: if cited as compulsory in the Tender Data, attendance is mandatory; failure to attend disqualifies the bid. Date, time and venue are stated in the Tender Data.
Clarification queries: must be submitted before the closing time for clarification, as stated in the Tender Data.
Contact Information
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
No specific contact names, emails, or telephone numbers are provided in the source document.
Submission address: as stated in the Tender Data (tender box at the Eskom tender office).
Enquiries: direct all written communication to the Eskom Representative only.
Submission Guidelines
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
Submission method: sealed hard copy only, delivered to the tender box at the address stated in the Tender Data. No telephonic or email submissions unless the Tender Data says otherwise.
Submit one complete original tender plus one complete hard copy of the original. Missing the copy disqualifies the bid.
A soft copy may also be required if stated in the Tender Data.
Mark the inner packages "ORIGINAL" and "COPY". Each inner package must show the Eskom address, the Invitation to Tender number, and the tenderer's name and contact address.
Seal the original and copies together in an outer package marked "CONFIDENTIAL", showing only the Eskom address and the Invitation to Tender number.
Complete the Acknowledgement Form and submit it with the tender, stating whether the bid covers the whole or part of the scope.
Sign the original tender; the signatory must be duly authorised.
Write in ink, not pencil. Do not use correction fluid or tape.
Do not alter tender documents except to correct errors; initial all corrections.
Returnable forms: complete and submit all mandatory returnables by the tender deadline. These include the Acknowledgement Form, SBD forms (e.g., SBD 4 Declaration of Interest, SBD 9 Certificate of Independent Bid Determination), proof of authority to act as agent (if applicable), and any other forms listed in the Tender Data.
Late tenders are returned unopened. Proof of posting or courier delivery is not accepted as proof of delivery.
Eskom employees may not deposit tenders on behalf of bidders.
Tenders must be in English.
Evaluation Criteria
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
Evaluation stages:
Basic compliance check – failure to meet stated basic compliance renders the bid non-responsive.
Mandatory returnables check – missing mandatory documents by the deadline makes the bid non-responsive.
Functionality (if applicable) – scored against technical criteria; must meet the minimum threshold stated in the Tender Data to proceed.
Financial risk analysis – Eskom assesses the bidder's financial statements; may disqualify if risk is too high and no mitigating factors exist.
Price evaluation – according to criteria in the Tender Data, considering factors such as CPA, FOREX, commodity increases, discounts, NPV, and forecasted invoicing rates.
Specific Goals (B-BBEE) – scored based on supporting documentation. If a bidder fails to meet Specific Goals or submit proof by the closing deadline, they are not disqualified but receive 80/90 points for Price and zero for Specific Goals.
Ranking – Price and Specific Goals scores are added; highest total wins, unless objective criteria under PPPFA Section 2(1)(f) apply.
Arithmetical errors: amounts in words govern. Eskom may correct errors; if the bidder does not accept corrections, the bid may be rejected.
Designated materials: failure to meet dtic local content requirements for designated materials renders the bid non-responsive.
Reverse e-auction may be used if stated in the enquiry; if so, prices submitted in the tender are disregarded.
Technical Specifications
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
The scope is the appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom.
Contract period: two (2) years.
The tenderer must not sub-contract 100% of the scope of work; such bids are ineligible.
The tenderer must provide reasonable proof of SHEQ systems, policies and capabilities at contract award.
Quality Management
Source: Eskom Standard Conditions of Tender.pdf
The tenderer must provide reasonable proof of quality management systems, policies and capabilities at contract award. All costs and personnel associated with SHEQ must be reflected in the tender. The Acknowledgement Form must be completed and submitted, stating whether the bid covers the whole or part of the scope.
Pricing Schedule
Source: Eskom Standard Conditions of Tender.pdf
Prices must include all duties, taxes (including VAT) and levies, based on rates applicable 14 days before the tender deadline. Rates and prices are fixed for the contract duration unless otherwise stated. Prices are in South African Rand unless instructed otherwise. Arithmetical errors are corrected; amounts in words govern. If a bill of quantities or pricing schedule applies, line item totals govern over unit rates, except for gross decimal misplacement where the line item total governs. The tenderer must accept corrections or the bid may be rejected.
Financial Requirements
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
Pricing:
Include all duties, taxes (including VAT) and levies in rates and prices, based on rates applicable 14 days before the tender deadline.
Rates and prices must be fixed for the contract duration, with no price adjustment unless stated in the enquiry.
State prices in South African Rand unless otherwise instructed.
Prices may be subject to correction of arithmetical errors; the corrected total is binding.
Insurance:
Eskom's insurance may not cover all risks; bidders should seek qualified advice.
Security for performance:
If required, the tenderer must name at least two financial institutions it would approach for the security; Eskom may reject unsuitable institutions.
No bid security amount or guarantee percentage is stated in the source document.
Compliance Requirements
Source: Eskom Standard Conditions of Tender.pdf (TENDER)
Eligibility:
Must comply with eligibility criteria in the Tender Data and not be under any restriction to do business with Eskom or State Owned Companies.
Must not sub-contract 100% of the scope.
Registrations and compliance:
CSD registration (per National Treasury instructions).
CIDB registration: mandatory at tender closing if applicable; proof of application may be accepted at closing, but actual registration printout must be provided by contract award.
B-BBEE: comply with Amended B-BBEE Codes; provide valid certificate or affidavit as required. Fraudulent certificates or fronting will be reported to the B-BBEE Commissioner.
COIDA and OHS Act compliance.
SHEQ systems and policies in place at contract award.
For construction works, comply with CIDB regulations and dtic designated materials local content requirements.
Proof of authority to act as agent if submitting on behalf of a principal.
Contract Skills Development Goal (CSDG) and Contract Participation Goals (CPG) may apply if thresholds are met (e.g., works over R60 million, professional services over R5 million, or certain CIDB grades).
Health & Safety
Source: Eskom Standard Conditions of Tender.pdf
Tenderers must comply with the OHS Act, COIDA, and Eskom's SHEQ requirements. Provide reasonable proof that safety, health, environmental and quality systems are in place at contract award. Include all SHEQ costs and personnel in the tender. For construction works, CIDB registration is mandatory at closing. Contract Skills Development Goal (CSDG) applies to works over R60 million or professional services over R5 million with contract duration of 12 months or more. Contract Participation Goals (CPG) apply to certain CIDB Grade 7-9 contracts with duration of 6 months or more, requiring engagement of targeted enterprises to at least 5% of contract value.
Contractual Terms
Source: Eskom Standard Conditions of Tender.pdf
Communication with Eskom must be in writing, in English, and directed to the Eskom Representative only. Eskom may accept or reject any variation, deviation or alternative tender, and may cancel the tender process at any time before contract formation. Eskom may negotiate with selected tenderers. Eskom disclaims liability for inaccuracies in tender documents. Tender validity: the bid must remain valid for acceptance within the validity period stated in the Tender Data; if validity lapses without extension, the process is invalidated. Tender documents are confidential and may only be used for preparing the bid. The successful bidder must sign the Form of Agreement.
Section
Source: Eskom Standard Conditions of Tender.pdf
Evaluation follows the standard Eskom process: basic compliance, mandatory returnables, functionality (if applicable), financial risk analysis, price evaluation, and Specific Goals (B-BBEE) scoring. Bidders who fail to submit Specific Goals proof by closing are not disqualified but score zero for Specific Goals. Price and Specific Goals scores are added for ranking. Designated materials local content requirements must be met or the bid is non-responsive. Reverse e-auction may be used if stated in the enquiry.
DocumentE-Tenderers E-Tendering Training Acknowledgement Form.pdfReview complete
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)
Closing date: 27 January 2025
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)
Returnable documents:
E-Tendering Training Acknowledgement Form: mandatory returnable prior to e-tendering. Must be fully completed and submitted to Eskom within the prescribed period. Failure to do so renders the tenderer non-responsive and disqualified.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)
Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory and a precondition for responsiveness. Failure to submit within the prescribed period will result in disqualification.
DocumentPricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsxReview complete
Description
Source: Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx
The tender is for the appointment of a professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for two years.
Submission Guidelines
Source: Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx (unknown)
Returnable documents: the completed pricing schedule (all pink cells filled) and any forms specified in the full tender pack. Bids must be submitted before the closing time; late bids are disqualified.
Evaluation Criteria
Source: Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx (unknown)
Evaluation is based on the completed pricing schedule. Prices must be in ZAR excluding VAT and escalation. Local suppliers must not link pricing to foreign exchange rates. If foreign currency is used, bidders must provide SARB exchange rate proof and complete the currency table. No other evaluation criteria are stated in this document.
Technical Specifications
Source: Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx (unknown)
Scope: Integrated monitoring, verification, reporting and assurance support services for Eskom's Supplier Development, Localisation and Industrialisation (SDL&I) programme, over a two-year period. The pricing schedule covers six categories: professional resources, managed services, verification activities, technology enablement, reporting and governance, and travel and disbursements. Quantities are specified per line item (e.g., 1,440 hours for Programme Director, 24 months for managed services, 96 desktop verification reviews).
Financial Requirements
Source: Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx (unknown)
Pricing must be in ZAR, excluding VAT and escalation. Local suppliers cannot link pricing to foreign exchange rates. If foreign currency is used, bidders must use the SARB exchange rate at 12:00 on the day of advertisement and submit proof. Exchange rate variations may not be claimed for local mark-up. All pink cells in the pricing schedule must be completed.
Compliance Requirements
Source: Pricing Schedule - SDLI Verification Reporting and Assurance Support Services.xlsx (unknown)
No specific compliance requirements (e.g., CSD, B-BBEE, tax) are stated in this document.
DocumentAcknowledgement Form - Life Saving Rules.pdfReview complete
Evaluation Criteria
Source: Acknowledgement Form - Life Saving Rules.pdf (unknown)
Bidders must sign the Acknowledgement Form for Eskom's Life-saving Rules, pledging to familiarise themselves with and abide by the rules as set out in the Life-saving Rules Standard (240-62196227).
Compliance Requirements
Source: Acknowledgement Form - Life Saving Rules.pdf (unknown)
Eskom's Life-saving Rules apply to all Eskom employees, subsidiaries, agents, consultants, contractors, and any person entering Eskom sites. Violation of these rules is subject to zero tolerance. The rules cover: open, isolate, test, earth, and create an equipotential zone before touch; hook up at height; buckle up; be sober; ensure that you have a permit to work; and ensure safe live working. Adherence to these rules is a condition of employment.
Health & Safety
Source: Acknowledgement Form - Life Saving Rules.pdf
Eskom's Life-saving Rules are non-negotiable safety rules with zero tolerance for violations. They apply to all Eskom employees, subsidiaries, agents, consultants, contractors, and any person entering Eskom sites. The rules require: open, isolate, test, earth, and create an equipotential zone before touch; hook up at height; buckle up; be sober; ensure a permit to work; and ensure safe live working. Adherence is a condition of employment.
DocumentMS Teams meeting Link for Clarification Meeting.docxReview complete
Description
Source: MS Teams meeting Link for Clarification Meeting.docx
Eskom requires a suitably qualified professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) services, including monitoring, verification, reporting, assurance, analytical support and structured intervention services, across Eskom for a period of two (2) years.
Important Dates
Source: MS Teams meeting Link for Clarification Meeting.docx (unknown)
Clarification meeting (non-compulsory): 13 November 2026 at 10:00–11:00 (SAST), held virtually via Microsoft Teams.
Evaluation Criteria
Source: MS Teams meeting Link for Clarification Meeting.docx (unknown)
No eligibility criteria, pre-qualification requirements, or mandatory forms are stated in the available document. The clarification meeting is non-compulsory, so attendance is not a prerequisite to bid.
Technical Specifications
Source: MS Teams meeting Link for Clarification Meeting.docx (unknown)
Eskom requires a suitably qualified professional service provider to deliver integrated Supplier Development, Localisation and Industrialisation (SDL&I) services, including monitoring, verification, reporting, assurance, analytical support and structured intervention services, across Eskom for a period of two (2) years.
Eskom enforces a zero-tolerance policy on violation of its Life-saving Rules. These rules apply to all Eskom employees, subsidiaries, agents, consultants, contractors, and any person entering Eskom sites. Bidders must ensure their personnel understand and comply with these rules at all times.
Eskom enforces a zero-tolerance policy on violation of its Life-saving Rules. These rules apply to all Eskom employees, subsidiaries, agents, consultants, contractors, and any person entering Eskom sites. Bidders must ensure their personnel understand and comply with these rules at all times.
DocumentAnnexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfReview complete
Description
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
The bidder must provide notification to Eskom prior to the appointment of contractors or suppliers for the commencement of work.
Evaluation Criteria
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
The bidder must acknowledge and understand the Eskom OHS legal and other requirements listed in Annexure B, and must ensure compliance with all applicable Eskom and statutory OHS requirements. The bidder must also ensure that all employees (contractors/suppliers) undergo the relevant Eskom induction.
Technical Specifications
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
The bidder must comply with the following Eskom OHS documents when working at or rendering a service to Eskom:
Eskom Contractor Health and Safety Requirements Standard 32-136
OHS specification/requirements provided
Eskom Occupational Health and Safety Incident Assessment Procedure 32-95
Eskom Occupational Health and Safety Risk Management Procedure 32-520
Eskom Working at Height Standard 32-418
Safety, Health, Environment and Quality Policy 32-727
Nonconformity and Corrective Action Procedure 240-53464409
After contract award, the bidder is responsible for fully aligning its processes to Eskom's OHS requirements (policies, procedures, standards).
Compliance Requirements
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
The bidder must acknowledge and understand the Eskom OHS legal and other requirements listed in Annexure B. The bidder must ensure that all employees (contractors/suppliers) undergo the relevant Eskom induction. Penalties will be enforced on the main supplier for non-conformance with Eskom and/or statutory OHS requirements.
Health & Safety
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
The bidder must ensure that it understands the OHS requirements listed in Annexure B. The bidder must comply with all applicable Eskom and statutory OHS requirements.
Contractual Terms
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
The main supplier must:
Demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers.
Provide notification to Eskom prior to the appointment of contractors or suppliers for the commencement of work.
Ensure that contractors/suppliers have adequate resources and competencies.
Be accountable for the management of its contractors/suppliers to ensure compliance with applicable legal and Eskom requirements.
Monitor contractors/suppliers through audits and assessments regarding OHS compliance during execution of the work.
Provide grounds for termination of work done by contractors/suppliers.
Deal with all non-conformances/non-compliance by contractors/suppliers (all tiers) directly with the main contractor/supplier in terms of performance and penalty processes.
Eskom reserves the right to verify this when deemed necessary; the contractor may be instructed to provide copies of testimonials/references and contact details of clients (including Eskom) for whom previous work of a similar nature was done.
Section
Source: Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
The bidder must comply with the Safety, Health, Environment and Quality Policy 32-727.
DocumentE-tendering Help Manual for supplier.pdfReview complete
Description
Source: E-tendering Help Manual for supplier.pdf
The document is the Eskom eTendering System Suppliers Help Manual (revision 3.0, dated 28 August 2023). It explains how suppliers register on the eTendering portal, verify their email, log in with an OTP, and submit tender documents online. It also covers editing registration details, logging off, and resetting passwords. The system is compatible with most web browsers, with Microsoft Edge recommended.
Important Dates
Source: E-tendering Help Manual for supplier.pdf (TENDER)
Closing date: 27 November 2026 at 08:00 (from tender record). No other dates are stated in the document.
Contact Information
Source: E-tendering Help Manual for supplier.pdf (TENDER)
No specific contact details are provided in the document. For system problems, contact the buyer responsible for the published tender.
Submission Guidelines
Source: E-tendering Help Manual for supplier.pdf (TENDER)
Submission method: online via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and have a CSD number to gain access. Upload documents under the correct category (technical, commercial, finance). Each file must not exceed 50MB; total uploads must not exceed 900MB. Finalise the submission before the closing time; the system records the submission timestamp. After finalising, an email confirmation with a submission ID is sent — keep it for reference. Returnable forms: none specified in the provided document.
Evaluation Criteria
Source: E-tendering Help Manual for supplier.pdf (TENDER)
No evaluation criteria are stated in the provided document. The document only notes that closed tenders are sent directly to suppliers who meet selection and evaluation criteria.
Technical Specifications
Source: E-tendering Help Manual for supplier.pdf (TENDER)
The document is a user manual for the Eskom eTendering system, not the tender specification. It describes how suppliers register, log in, and submit tender documents online. No scope, deliverables, quantities, or locations are stated.
Quality Management
Source: E-tendering Help Manual for supplier.pdf
No quality management requirements are stated in the provided document.
Compliance Requirements
Source: E-tendering Help Manual for supplier.pdf (TENDER)
CSD registration: a valid CSD number is required to access the eTendering system. No other compliance requirements are stated.
Health & Safety
Source: E-tendering Help Manual for supplier.pdf
No health and safety requirements are stated in the provided document.
DocumentE-tendering Help Manual acknowledgement form.pdfReview complete
Evaluation Criteria
Source: E-tendering Help Manual acknowledgement form.pdf (unknown)
Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period will render the tenderer non-responsive and disqualified from the procurement process.
DocumentStandard Bidding Document (SBD 6.2) Declaration of Local Content.pdfReview complete
Description
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf
The document does not specify the services, works or goods to be delivered, nor the stipulated minimum local content threshold(s). Bidders must indicate whether any portion of the offered services, works or goods has imported content.
Submission Guidelines
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf (TENDER)
Returnable documents — all must be completed, signed and submitted with the bid:
SBD 6.2 (Declaration Certificate for Local Production and Content): declares the local content percentage of the bid, calculated per SATS 1286:2011, and must be signed by the Chief Financial Officer or another legally responsible person nominated in writing by the Chief Executive or senior management.
Annex C (Local Content Declaration – Summary Schedule): summarises the local content calculation and must be submitted with the bid documentation at closing.
Annexes D and E (supporting schedules): must be completed and kept by the bidder for verification for at least 5 years; the successful bidder must update them with actual values for the contract duration.
Disqualification risks:
Failure to submit SBD 6.2 and Annex C as part of the bid documentation.
Failure to declare that Annexes C, D and E have been audited and certified as correct.
Submission of incorrect or unverifiable local content data may lead to remedies under Regulation 13 of the Preferential Procurement Regulations, 2011.
Evaluation Criteria
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf (TENDER)
Evaluation may follow a two-stage process:
Stage 1: minimum threshold for local production and content.
Stage 2: price and B-BBEE.
The stipulated minimum local content threshold for this bid is not specified in the document.
Technical Specifications
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf (TENDER)
The document does not specify the services, works or goods to be delivered, nor the stipulated minimum local content threshold(s) for this bid. Bidders must determine whether any portion of the offered services, works or goods has imported content.
Quality Management
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf
The local content declaration templates (Annexes C, D and E) must be audited and certified as correct. The bidder must declare that the templates have been audited and certified. The bidder must keep Annexes D and E for verification for at least 5 years.
Pricing Schedule
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf
The bid price (excluding VAT) and the imported content value must be declared. The local content percentage is calculated using the formula in SATS 1286:2011, using the SARB exchange rates at 12:00 on the advertisement date. Annex C must be submitted with the bid; Annexes D and E must be kept for verification for at least 5 years and updated by the successful bidder for the contract duration.
Financial Requirements
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf (TENDER)
Local content calculation:
Local content (LC) = [1 - (imported content in Rand / bid price in Rand excluding VAT)] × 100, per SATS 1286:2011.
Imported content includes costs of imported components, parts, materials, labour, intellectual property, freight, landing costs, duties and similar taxes.
Exchange rates used must be the SARB rates published at 12:00 on the date of advertisement of the bid; proof of the rates must be submitted.
The bidder must declare the bid price (excluding VAT) and the imported content value in the declaration.
The successful bidder must continuously update Annexes C, D and E with actual values for the duration of the contract.
Compliance Requirements
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf (TENDER)
Local content compliance:
This is a designated sector bid; only locally produced goods, services or works, or locally manufactured goods meeting the stipulated minimum threshold for local production and content, will be considered.
The awarded bidder may not subcontract in a way that reduces the overall local content below the stipulated minimum threshold.
The local content declaration must be signed by the Chief Financial Officer or another legally responsible person nominated in writing by the Chief Executive or senior management; this obligation cannot be transferred to an external representative, auditor or third party.
The bidder must declare that Annexes C, D and E have been audited and certified as correct.
The stipulated minimum threshold is not specified in the document.
Contractual Terms
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf
The awarded bidder may not subcontract in a manner that reduces the overall local content below the stipulated minimum threshold. The successful bidder must continuously update Annexes C, D and E with actual values for the duration of the contract. The bidder must accept that the procurement authority may request verification of local content per SATS 1286:2011.
Section
Source: Standard Bidding Document (SBD 6.2) Declaration of Local Content.pdf
A two-stage bidding process may be followed: the first stage involves a minimum threshold for local production and content, and the second stage evaluates price and B-BBEE.
DocumentAnnexure A and B - Techncial Evaluation Criteria.pdfReview complete
Description
Source: Annexure A and B - Techncial Evaluation Criteria.pdf
The service covers integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom for a two-year period.
Important Dates
Source: Annexure A and B - Techncial Evaluation Criteria.pdf (RFP)
Closing date: 27 November 2026 at 08:00 (from tender record).
No briefing or site visit date is stated in the document.
Evaluation Criteria
Source: Annexure A and B - Techncial Evaluation Criteria.pdf (RFP)
Stage 1 – Desktop Evaluation (weighted 100%):
Understanding of SDL&I (10%): written methodology/approach statement covering all contractual obligations, compliance categories (subcontracting, enterprise/supplier development, localisation, post-contract monitoring, industrialisation, job creation/preservation, skills development/transfer, preferential procurement from designated groups). Must include at least 2 signed reference letters from past clients confirming successful monitoring and reporting of enterprise and supplier development execution.
Monitoring, verification, assurance and reporting methodology (10%): end-to-end, repeatable M&E framework/matrix linked to contractual obligations, plus evidence of prior application on comparable projects.
Evidence management, audit, data quality and reporting capability (20%): process control manual, business systems, evidence capture, classification, version control, audit trail logs, and controls for security, processing integrity and privacy.
Structured intervention, escalation, corrective action and recovery tracking (10%): Process Control Manuals (PCMs) with SOPs for delays, underperformance, evidence gaps and risk recovery; escalation matrix and workflow diagrams.
Technology-enabled tools/software (40%): demonstrate (via screenshots, video, prototype or live system) supplier profile/contract management, data collection, unlimited evidence upload, data verification/analysis, performance dashboards, non-performance flagging, Eskom role-based access, POPIA compliance, and system architecture/data-flow diagrams. Minimum 2 signed reference letters showing prior implementation and active use of the proposed system or comparable solution.
Team capability, national reach, mobilisation plan, stakeholder engagement and reporting (20%): organogram, tailored CVs of named key personnel, mobilisation plan, stakeholder engagement strategy, and B-BBEE Compliance Advisory Framework/sample reports.
Minimum threshold for Stage 1: 80%. Bidders scoring below 80% are disqualified.
Stage 2 – Site Evaluation:
Only the bidder that achieved the minimum 80% in Stage 1 receives a site visit.
The site visit verifies that the functionality shown in screenshots is live, operational and fully functional.
The bidder must achieve 100% in the site evaluation; scoring below 100% results in disqualification.
Technical Specifications
Source: Annexure A and B - Techncial Evaluation Criteria.pdf (RFP)
Scope: integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom.
Contract period: two (2) years.
The service must cover:
Subcontracting and enterprise/supplier development.
Localisation post-contract monitoring and industrialisation.
Job creation and preservation.
Skills development and skills transfer.
Preferential procurement from designated groups.
Monitoring, audit, verification, assurance and reporting.
Structured interventions, escalation, corrective action and recovery tracking.
Technology-enabled tools for workflow tracking, evidence management and reporting dashboards.
Cross-collaboration, comparison and integration capabilities.
Methodology
Source: Annexure A and B - Techncial Evaluation Criteria.pdf
Bidders must submit an end-to-end, repeatable monitoring and evaluation methodology framework/matrix covering monitoring, audit, verification, assurance and reporting, linked to the contractual obligations. The methodology must demonstrate prior application on comparable projects, not just description.
Experience & Qualifications
Source: Annexure A and B - Techncial Evaluation Criteria.pdf
Bidders must provide an organogram and tailored CVs of named key personnel detailing relevant qualifications and experience. A project mobilisation plan and stakeholder engagement strategy are required. The team must demonstrate national reach and a working understanding of the B-BBEE Act and its reporting requirements.
Quality Management
Source: Annexure A and B - Techncial Evaluation Criteria.pdf
The proposed system must have controls around security, processing integrity and privacy. Evidence of a live system with full documentation is required. Process Control Manuals (PCMs) must detail standard operating procedures for delays, underperformance, evidence gaps and risk recovery tracking.
Compliance Requirements
Source: Annexure A and B - Techncial Evaluation Criteria.pdf (RFP)
B-BBEE: Bidders must demonstrate understanding of the B-BBEE Act and its reporting requirements (via B-BBEE Compliance Advisory Framework/sample reports). No specific B-BBEE level or threshold is stated.
POPIA: The proposed system must demonstrate compliance with the Protection of Personal Information Act (POPIA), including security, access control and protection of personal information.
No CSD registration, tax clearance, CIDB grading, or other eligibility criteria are stated in the document.
Section
Source: Annexure A and B - Techncial Evaluation Criteria.pdf
Monitoring, verification, assurance and reporting methodology (10%)
Evidence management, audit, data quality and reporting capability (20%)
Structured intervention, escalation, corrective action and recovery tracking (10%)
Technology-enabled tools/software (40%)
Team capability, national reach, mobilisation plan and stakeholder engagement (20%)
Stage 2 Site Evaluation: only the bidder that achieved 80% in Stage 1 is visited; must achieve 100% to proceed.
Document20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdfReview complete
Contact Information
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf (unknown)
Eskom quality representative:
Name: Bongi Tshabalala
Designation: Senior Advisor: Quality
Date: 2026/10/27
Submission Guidelines
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf (unknown)
Returnable documents:
Form A (Tender & Contract Quality Requirements): must be completed and signed by the tenderer to acknowledge and accept Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001. The form includes a section for the tenderer's quality representative to sign.
Evaluation Criteria
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf (unknown)
The tenderer must complete and sign Form A to confirm acceptance of Eskom's quality requirements. No other evaluation criteria are stated in this document.
Methodology
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf
The tenderer must align its approach with ISO 9001 clauses and quality principles as listed in the quality management section.
Quality Management
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf
The tenderer must comply with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001. The applicable ISO 9001 clauses are: Context of the Organisation, Leadership, Planning, Support, Operation, Performance evaluations, and Improvement. The applicable quality principles are: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship management.
Compliance Requirements
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf (unknown)
The tenderer must accept and comply with Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001, as confirmed by signing Form A.
Section
Source: 20261027_ Form A Cat2_SDL&I monitoring, verification + reporting.pdf
No additional evaluation criteria are stated beyond the requirement to complete and sign Form A.
The Eskom Supplier Integrity Pact applies to all existing and potential suppliers of Eskom Holdings SOC Ltd and its wholly owned subsidiaries. It requires suppliers to act ethically and with integrity, and to complete, sign and submit the Integrity Declaration Form when participating in any Eskom procurement process. The pact supplements all other relevant commercial and ethics policies and codes.
Eskom Supplier Integrity Pact: read, complete, sign and submit the Integrity Declaration Form with every bid.
Integrity Declaration Form: discloses any interest or relationship with an Eskom employee or director, and includes a Declaration of Fair Tendering Practices.
Non-Disclosure Agreement (NDA): required to protect confidential information.
Disqualification risks:
Failure to submit the signed Integrity Declaration Form.
Misrepresentation, false certifications, or forged documents.
Collusive, dishonest, or illegal agreements with other tenderers.
Offering or accepting gifts or inducements above the R1,500 limit to Eskom employees or directors.
This document is the Eskom Supplier Integrity Pact, applicable to all existing and potential suppliers of Eskom Holdings SOC Ltd and its wholly owned subsidiaries.
Supplier obligations:
Maintain an impeachable standard of integrity in all business and personal dealings.
Prevent all dishonest, unfair, fraudulent, corrupt, and illegal practices during procurement and contract execution.
Be familiar with all publicly available Eskom policies and procedures affecting supply chain processes.
Reject all improper business practices.
Not abuse trust placed by Eskom employees or misuse opportunities for personal gain.
Maintain and enhance professional competence.
Adopt policies and practices aligned with Eskom's labour practices, employment equity initiatives, and human relations policies.
Do not disclose confidential information without express consent from an authorised Eskom representative.
Do not misrepresent information or submit false certifications or forged documents.
Avoid relationships with Eskom employees or directors that could be perceived as contrary to fairness, equitability, transparency, competitiveness, or cost-effectiveness.
Disclose any interest or relationship with an Eskom employee or director, whether financial, personal, or private.
Do not offer or accept business courtesies, gifts, bribes, fees, commissions, or inducements to or from Eskom employees or directors involved in evaluation, adjudication, or negotiation.
Do not enter into dishonest or illegal agreements or understandings with other tenderers.
Report any dishonest, fraudulent, or inappropriate behaviour of Eskom employees or directors to the Eskom Ethics office, Forensic office, or toll-free hotline.
Gifts and business courtesies to Eskom employees or directors must not exceed R1,500 in value.
Contractual Terms
Source: Eskom Supplier Integrity Pack.pdf
Suppliers may be subject to Eskom's Supplier Discipline Process and sanctions if found guilty of misconduct. Eskom may suspend a supplier from the Eskom Vendor Database and forward the supplier's name and directors to National Treasury for inclusion on the List of Restricted Suppliers. Eskom employees and directors are prohibited from having any direct or indirect personal or beneficial interest in any contract with Eskom. The pact is governed by South African law and remains valid until replaced.
Section
Source: Eskom Supplier Integrity Pack.pdf
Bidders must not engage in unethical or fraudulent dealings with Eskom employees or directors involved in evaluation, adjudication, or negotiation. No business courtesy, bribe, gift, fee, commission, or inducement may be offered to or requested by such employees or directors.
Eskom builds Supplier Development, Localisation and Industrialisation (SDL&I) obligations into supplier contracts to drive transformation, localisation, enterprise and skills development, job creation and sustainable growth. It requires an experienced consultant to run a people-led, evidence-based post-contract monitoring and assurance service supported by fit-for-purpose technology.
Duration
24 months from the starting date in the Contract Data.
Objectives
Monitor supplier delivery against contractual obligations and milestones.
Verify reported outcomes against credible evidence.
Produce management reports, dashboards and performance analytics.
Coordinate structured corrective interventions and recovery actions.
Identify implementation risks and issue early warning reports.
Support workflow tracking and evidence management through technology tools.
Core activities
Review awarded contracts, schedules, commitments, milestones, reporting obligations and evidence requirements to set a post-contract monitoring baseline.
Monitor supplier performance against obligations, milestones, evidence requirements and expected outcomes.
Conduct monitoring, verification and assurance reviews nationally across project sites and supplier locations.
Design, coordinate and monitor corrective interventions for underperformance, delays, evidence gaps, compliance risks and non-achievement of obligations.
Prepare early warning, escalation, exception and intervention progress reports.
Maintain evidence repositories, evidence registers, audit trails and audit-ready records.
Produce executive dashboards, operational and analytical reports and recommendations for governance and decision-making.
Deploy secure technology for data capture, workflow and action tracking, evidence management, dashboards, analytics and reporting; the technology enables the service and is not a standalone software product.
Detailed service requirements
Monitoring, verification, assurance and reporting: monitor localisation, industrialisation, supplier development, enterprise development, skills development, employment creation and designated-group participation; verify achievements through document reviews, data analysis, interviews and site visits; maintain audit-ready evidence files; prepare exception reports, early warnings and management recommendations.
Evidence management, audit support and compliance: maintain contracts, purchase orders, invoices, delivery confirmations, payment records, training records, employment records and supplier development documentation; identify reporting gaps, data-quality issues and documentation deficiencies; support internal and external audits and applicable procurement, transformation, localisation and governance requirements.
Governance, risk, escalation and intervention: maintain risk registers, action trackers, issue logs and escalation registers; provide early warning indicators for delayed or underperforming obligations; support escalation to Eskom contract-management teams and governance structures; monitor corrective actions and intervention plans to completion; support contractual remedies when instructed by Eskom.
Technology and information security: secure controlled access to information, reports and supporting documentation; reliable document and evidence management, version control and complete audit trails; protection of confidential, personal and commercially sensitive information in line with data-protection and information-security requirements; scalable, user-friendly dashboards and reporting with availability and business-continuity arrangements.
Implementation and service management
Project mobilisation and onboarding; contract portfolio and obligations review; baseline monitoring and verification plans; stakeholder engagement and communication strategy; reporting framework and governance structure; configuration of reporting tools; risk-management and escalation procedures; quality-assurance methodology; continuous improvement and performance monitoring; knowledge transfer and transition planning.
Deliverables
Project mobilisation and implementation plan.
Contract portfolio review and contractual-obligations baseline report.
Structured corrective intervention plans for underperforming, delayed or at-risk obligations.
Monitoring, verification and assurance review reports.
Executive dashboards, operational, exception, management and impact-assessment reports.
Evidence packs, evidence registers, audit-support documentation and document-completeness reports.
C1.1 Form of Offer & Acceptance — signed offer stating the total price exclusive of VAT, VAT at 15% and the total inclusive of VAT.
Schedule of Deviations — the only permitted deviations from the tender documents; no other amendment is valid.
C1.2b Contract Data provided by the Consultant.
C2.1 Pricing Schedule — staff rates and expenses.
Post-award obligation
Within two weeks of receiving the completed agreement, the consultant must contact Eskom's agent to arrange delivery of securities, bonds, guarantees, proof of insurance and other required documentation; failure to do so is a repudiation of the agreement.
Integrated Supplier Development, Localisation and Industrialisation (SDL&I) monitoring, verification, reporting, assurance, analytical support and structured intervention services across Eskom.
People-led, evidence-based post-contract monitoring and assurance service, supported by fit-for-purpose technology.
Duration: 24 months from the starting date in the Contract Data.
Objectives
Monitor supplier delivery against contractual obligations and milestones.
Verify reported outcomes against credible evidence.
Produce management reports, dashboards and performance analytics.
Coordinate structured corrective interventions and recovery actions.
Identify implementation risks and issue early warning reports.
Support workflow tracking and evidence management through technology tools.
Service requirements
Monitoring, verification, assurance and reporting: monitor localisation, industrialisation, supplier development, enterprise development, skills development, employment creation and designated-group participation commitments; verify achievements through document review, data analysis, interviews and site visits; maintain audit-ready evidence files; prepare exception reports and early warnings.
Evidence management and audit support: maintain contracts, purchase orders, invoices, delivery confirmations, payment records, training records, employment records and supplier development documentation; identify reporting gaps and data-quality issues; support internal and external audits.
Governance, risk, escalation and intervention: maintain risk registers, action trackers, issue logs and escalation registers; provide early warning indicators; support escalation to Eskom contract-management teams; monitor corrective actions to completion; support contractual remedies when instructed by Eskom.
Technology and information security: secure controlled access to information and reports; document and evidence management with version control and audit trails; protection of confidential, personal and commercially sensitive information; scalable dashboards and reporting with business-continuity arrangements.
Coverage: monitoring, verification and assurance reviews conducted nationally across relevant project sites and supplier locations.
Implementation and service management
Project mobilisation and onboarding; contract portfolio review; baseline monitoring and verification plans; stakeholder engagement and communication strategy; reporting framework and governance structure; configuration of reporting tools; risk-management and escalation procedures; quality-assurance methodology; continuous improvement; knowledge transfer and transition planning.
Deliverables
Project mobilisation and implementation plan.
Contract portfolio review and contractual-obligations baseline report.
Structured corrective intervention plans for underperforming, delayed or at-risk obligations.
Monitoring, verification and assurance review reports.
Executive dashboards, operational, exception, management and impact-assessment reports.
Evidence packs, evidence registers, audit-support documentation and document-completeness reports.
Pricing Schedule C2.1 (Part C2 Pricing Data) — staff rates by name/designation and expenses; the task schedule is in C2.1.
Prices are fixed and firm from the contract date until completion (no inflation adjustment).
Form of Offer & Acceptance states the offered total of the Prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT.
Currency: South African Rand.
Payment
Assessment interval: monthly per task.
Payment within 30 days after receipt of a tax invoice by Eskom Finance.
Interest rate: publicly quoted prime rate charged by Standard Bank of South Africa at the time payment was due.
The consultant must include Eskom's VAT number 4640101507 on each invoice.
Delay damages
Delay damages: 10% of each task order (Option X7).
If delay damages reach the stated limit, Eskom may terminate the consultant's obligation to provide the services.
Liability
Consultant's total liability: limited to the total of the Prices.
Consultant's liability for indirect or consequential loss: R0.00.
Employer's liability for the consultant's indirect or consequential loss: R0.00.
Liability for defects found after the defects date: limited to the total contract value or actual loss.
End of liability: 24 months after completion of the whole of the services/task order.
Insurance (Insurance Table A — provided by the consultant)
Professional indemnity: total of the Prices (or cumulative total of task orders), cover until the defects date.
Loss of or damage to property: replacement cost where not covered by the employer's insurance.
Death or bodily injury to a person (not the consultant's employee) or property damage: employer's policy deductible as at contract date.
Death or bodily injury to the consultant's employees: amount required by applicable law, cover until the defects date.
Certificates from the insurer or broker confirming cover must be provided on request.
Termination
Either party may terminate on 30 days' notice for a reason not stated in the contract.
On employer termination for an unstated reason, an additional amount is due equal to 5% of the difference between the forecast final total of the Prices absent termination and the other amounts due on termination.
The consultant must notify Eskom within 7 days of any change in legal status, ownership or business composition that changes its B-BBEE status.
An updated verification certificate and supporting documentation must be submitted within 30 days of that notification.
If the B-BBEE status decreases, Eskom may renegotiate or terminate the services.
Failure to notify may constitute grounds for termination.
Tax and registration
The consultant (if registered in South Africa under the Companies Act) must comply with the VAT Act and include Eskom's VAT number 4640101507 on invoices.
Data protection and security
POPIA: each party is an independent responsible party for shared personal information; consent and fair-processing notices are required; personal information may not be transferred to a foreign third party without written consent and compliance with section 62 of POPIA.
Security breach: notify Eskom in writing at [email protected] immediately and no later than 24 hours of becoming aware of unauthorised or unlawful activity; mitigate at own cost; report progress at least once per business day.
Security Standards: comply with Eskom's Security Standards and policies; identify risks at least once every 12 months and implement safeguards with Eskom's written approval; written reports within 30 days of each investigation or verification; Eskom may audit at any time with reasonable notice.
ISO certifications must remain valid for the contract duration and renewed certificates furnished to Eskom.
Cloud services storing financial or personal identifiable information: the Cloud Service Provider must hold valid SOC 1 and SOC 2 Type II reports; a bridge letter is required where reports are older than 6 months.
Joint ventures
Members of a joint venture, consortium or unincorporated grouping are jointly and severally liable.
The key person authorised to bind the grouping must be notified within 2 weeks of the contract date.
The composition of the grouping may not change without Eskom's written consent.
Ethics
No coercive, collusive, corrupt, fraudulent or obstructive action during procurement or execution; Eskom may terminate without a court finding of guilt.
The employer must ensure ambient air in the work area meets the South African asbestos standard under the Occupational Health and Safety Act, 1993 (Asbestos Regulations, GNR February 2002).
Occupational exposure limit: 0.2 regulated asbestos fibres per millilitre of air as a 4-hour time-weighted average.
Short-term exposure limit: 0.6 regulated asbestos fibres per millilitre of air as a 10-minute time-weighted average.
Action level: 50% of the OEL (0.1 fibres per millilitre over 4 hours).
Monitoring and reporting are done by an independent, SANAS-accredited and Department of Employment and Labour approved asbestos inspection authority.
The consultant may run parallel measurements at its own cost; results are assessed only against South African statutory limits.
If asbestos is identified, a risk assessment is done and, where exposure above the action level is possible, immediate control measures and air monitoring follow to declare the area safe.
The consultant's personnel may stop work and leave a contaminated area until it is declared safe.
Removal and disposal of asbestos is done by a registered asbestos contractor instructed by the employer at the employer's expense.
Security vetting and screening
Vetting applies to National Key Points, critical infrastructure, intelligence-related access, and where the scope or risk rating requires it.
The consultant and its subcontractors must implement risk and security management measures and support the Vetting Fieldwork Unit's screening requirements.
Identifying documents, certificates and records must be provided for the consultant's owners, directors, executives, members, subcontractors and employees.
Criminal record verification certificates must be issued by a SAPS-accredited screening company, be no older than four weeks at submission and remain valid for the duration of access.
Fraudulent, cancelled, withdrawn, invalidated or expired certificates, or a criminal conviction, may lead to immediate removal and blocking of the person from Eskom premises, installations, sites, systems and information; this is not a compensation event.
Costs of obtaining and submitting vetting documents are borne by the consultant.
NEC3 Professional Services Contract (PSC3, April 2013), main Option G (term contract) with dispute resolution Option W1.
Secondary options: X1 price adjustment for inflation, X2 changes in law, X7 delay damages, X9 transfer of rights, X10 Employer's Agent, X11 termination by the Employer, X18 limitation of liability, X19 task order, and Z1 to Z19 additional conditions.
Employer: Eskom Holdings SOC Ltd (reg no 2002/015527/30), a state-owned company.
Governing law: Republic of South Africa. Language: English. Period for reply: 2 weeks.
Prices are fixed and firm from the contract date until completion.
Termination
Either party may terminate on 30 days' notice for a reason not stated in the contract.
On employer termination for an unstated reason, an additional amount is due equal to 5% of the difference between the forecast final total of the Prices absent termination and the other amounts due on termination.
Termination is also available where delay damages reach the stated limit, where B-BBEE status decreases, or where a prohibited action occurs.
A business rescue order against the consultant is added as a termination ground.
Liability
Consultant's total liability: limited to the total of the Prices.
Consultant's liability for indirect or consequential loss: R0.00; employer's liability for the consultant's indirect or consequential loss: R0.00.
Liability for defects found after the defects date: limited to the total contract value or actual loss.
End of liability: 24 months after completion of the whole of the services/task order.
Rights, confidentiality and assignment
The employer owns the consultant's rights over material prepared for the contract; the consultant must obtain equivalent rights from subconsultants and provide the transfer documents.
The consultant may not cede, delegate or assign rights or obligations without the employer's written consent; the employer may cede to its subsidiaries or divisions on written notice.
Confidential information may not be disclosed to others; images of the employer's works require prior written consent and all rights vest in the employer.
Dispute resolution
Adjudicator selected from the ICE-SA panel; if the parties cannot agree, appointed by AFSA.
Arbitration under the Association of Arbitrators (Southern Africa) rules, held in Johannesburg, South Africa.
Other conditions
Joint ventures are jointly and severally liable; the authorised key person must be notified within 2 weeks of the contract date.
Nuclear liability: the employer, as operator of Koeberg Nuclear Power Station, indemnifies the consultant for nuclear damage, subject to stated exceptions.
Asbestos: the employer manages asbestos and ACM under its Asbestos Standard; the consultant's personnel may stop work and leave a contaminated area until it is declared safe.
POPIA and security clauses govern personal information, breach notification and vetting.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.