Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
KUSILE POWER STATION - WITBANK - EMALAHLENI/VICTOR KHANYE - 1035
Organization Type
GOVERNMENT
Published
19 Nov 2026
OCDS Reference
ocds-9t57fa-178821
ESKOM is procuring a comprehensive digitalisation and artificial intelligence solution for the kusile power station in mpumalanga, covering five pillars: network and infrastructure, intelligent inspection and digital integration, digital twin interface, paperless operations with sap integration, and digitisation of plant documents. The contract may be awarded to one or more suppliers, with preference for a single supplier delivering pillars 1, 2 and 4. Bidders must meet all mandatory requirements, achieve at least 75% in each pillar, and present an equivalent deployed solution; failure in any mandatory requirement disqualifies the bid.
Mandatory requirements: Bidders must demonstrate enterprise integration and digital transformation capability, including ERP integration experience and digital transformation consulting for power-generation enterprises within the preceding 10 years, and submit an integrated method statement and training/skills transfer approach.
IP and data rights: Bidders must provide a clear IP/Data Rights framework; Eskom retains ownership of its data and receives perpetual, irrevocable, transferable rights to operate, maintain, modify, integrate and further develop deliverables. Disclose all third-party/OEM restrictions and recurring licence costs.
Evaluation thresholds: Bidders must comply with all mandatory requirements, achieve at least 75% of the maximum score for each pillar, and present a successfully implemented and operational equivalent deployed solution. The scoring split is Schedule 5%, Pillar 1 35%, Pillar 2 20%, Pillar 3 10%, Pillar 4 15%, Pillar 5 15%.
On-premises deployment: The network management system must be deployed on-premises within Eskom's environment; public cloud hosting, deployment or operation is not accepted.
Technical specifications: Detailed hardware and software requirements are extensive, including industrial switches, outdoor APs, data centre switches, servers, storage, video management, AI cameras and analytics. Bidders must complete all sheets of the Technical Evaluation Excel (Annexure A) with justification and references for every requirement.
Closing date: 29 January 2027 at 08:00 (UTC). Submission method and address are not stated in the provided document.
Award structure: The Employer may award to one or more suppliers; preference is given to proposals where Pillars 1, 2 and 4 are delivered by a single supplier.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Venue
MICROSOFT TEAMS
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
KUSILE POWER STATION - WITBANK - EMALAHLENI/VICTOR KHANYE - 1035
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Description
Source: Smart Plant Digitilisation SHE Spec .pdf19 Nov
2026
Tender Published
Tender was published
29 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Kusile Contractor Baseline Risk Assessment_ Tender PDF.pdf
C4 ECC3 Site Information SPP_29.09.2026.docx
SBD 6.2 Local Content in terms of PPR 2017.pdf
Eskom requires procurement for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project in Mpumalanga. Bidders must complete a local content declaration (SBD 6.2) confirming compliance with minimum local production thresholds for designated sectors, using SATS 1286:2011 methodology and SARB exchange rates at the advertisement date.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom requires a supplier to deliver the Kusile Smart Plant Digitalisation and Artificial Intelligence project, with the supplier bound to Eskom's Supplier Quality Management specification (QM 58 / 240-105658000, Revision 3). The supplier must operate a formal ISO 9001-conforming quality management system and submit quality documentation at a category level selected by Eskom for the tender.
Kusile Plant Smart Digitilization-Pricing Schedule rev 1.xlsx
Design, procurement, implementation, integration, testing, training and handover of a smart plant digitalisation and artificial intelligence solution for Kusile Power Station. The scope covers five integrated technology pillars: network and infrastructure; intelligent inspection and digital integration; digital twin interface; paperless operations with SAP PM/MM integration; and digitisation of existing plant documents and data books.
Form CPA - General.docx
Procurement for Eskom's Kusile Smart Plant Digitalisation and Artificial Intelligence Project in Mpumalanga, covering supply and delivery and, where applicable, installation and commissioning of plant and equipment. Bidders must complete the applicable contract price adjustment schedule; failure to propose an adjustment method may result in the relevant tender price portion being treated as fixed.
Smart Plant Digitilisation SHE Spec .pdf
Procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project for Eskom Kusile Power Station, comprising the design, procurement, implementation, integration, testing, training and handover of five integrated technology pillars delivered in two sequential phases.
SBD 6.1.pdf
Eskom requires the supply of a smart plant digitalisation and artificial intelligence solution for the Kusile power station in Mpumalanga. The scope covers the digitalisation and AI project procurement for the plant.
240-77471499 Annexure B 2026.docx
Procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project for Eskom in Mpumalanga, closing on 29 January 2027 at 10:00.
240-68099512 Form A_Cat 2_ Rev 9.docx
Eskom requires the supply and delivery of a smart plant digitalisation and artificial intelligence solution for the Kusile power station in Mpumalanga. The successful bidder must comply with Eskom's Supplier Quality Requirements under specification 240-105658000 and the ISO 9001 standard.
240-109253698 CQP Template- Rev 3.docx
Eskom is procuring digitalisation and artificial intelligence services for the Kusile Smart Plant in Mpumalanga. Bidders must complete a Contract Quality Plan aligned to SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2, covering quality management, sub-supplier control, inspection and test plans, records, non-conformance, databook management, and commissioning support.
C2 ECC3 Pricing Data Option A_SPP_29.09.2026.docx
The department requires procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence project. The contract is a lump sum NEC3 ECC3 Option A for the digitalisation and AI works at the Kusile Power Station.
Meeting link .docx
Eskom requires the supply and implementation of a smart plant digitalisation and artificial intelligence solution for the Kusile power station in Mpumalanga. The scope covers the digitalisation and AI project procurement for the Kusile plant.
C1 3 ECC3 Proforma Guarantees_29.09.2026.docx
The department requires the procurement of digitalisation and artificial intelligence services for the Kusile Smart Plant project. The services will enable smart plant functionality and AI integration at the Kusile Power Station in Mpumalanga.
Form CPA (IG) Rev. 28 December 2006 - Annexure to Price Schedule.docx
Smart plant digitalisation and artificial intelligence services for Eskom's Kusile power station in Mpumalanga. The bid pack section governs contract price adjustment and payment of foreign commitments, requiring bidders to propose adjustment methods, nominate a foreign exchange payment method and complete the applicable rates and tariffs.
Standard Bidding Document (SDB) 4_Annexure A.doc
Eskom is procuring digitalisation and artificial intelligence solutions for the Kusile Smart Plant in Mpumalanga, with bids due by 29 January 2027 at 10:00 (SAST).
559-667439824 Generation Quality Control Plan Template 18Nov.docx
Procurement of the Kusile Smart Plant digitalisation and artificial intelligence project for Eskom. The tender seeks to procure digitalisation and AI services for the Kusile power plant.
Authorisation Form.pdf
Procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project for Eskom in Mpumalanga, with a closing date of 29 January 2027 at 10:00.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
Eskom requires the supply of a smart plant digitalisation and artificial intelligence project for the Kusile power station in Mpumalanga. The pack provided is the PAYE questionnaire used to classify service contractors for employees' tax withholding, not the technical scope of the digitalisation project.
KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdf
Design, procurement, implementation, integration, testing, training and handover of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project are required. The project covers a fully integrated digital ecosystem at Kusile Power Station using real-time data, AI analytics, predictive and prescriptive maintenance, immersive training, cybersecurity and data governance. Delivery is phased through network and infrastructure, intelligent inspection, digital twin, paperless operations and digitisation of existing plant documents and data books.
240-77433139 Annexure A supplier risk category.docx
Procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project for Eskom, Mpumalanga, closing 29 January 2027 at 10:00 (South Africa Standard Time). The available content covers occupational health and safety returnables, COID compliance and supplier risk categorisation rather than technical scope.
240-77471651 Annexure C 1 (3) High risk tender 2026.docx
Eskom requires the delivery of a smart plant digitalisation and artificial intelligence project at the Kusile power station in Mpumalanga. Bidders must submit a health and safety plan, baseline risk assessment, OHS costing and supporting OHS compliance documentation for evaluation before contract award.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
The department requires the procurement of digitalisation and artificial intelligence services for the Kusile Smart Plant. The services will enable smart plant operations through digitalisation and AI technologies.
C0 ECC3 Contract cover page_SPP_29.09.2026.docx
The department requires the design, execution, commissioning, handover and training for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project. The procurement is for ESKOM, Mpumalanga Province.
Integrity Pact Declaration Form_ANNEXURE A.pdf
Eskom requires the procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence project at Kusile Power Station in Mpumalanga. The scope covers digitalisation and AI solutions for the smart plant.
Eskom Standard Conditions of Tender.pdf
Digitalisation and artificial intelligence services for the Kusile Smart Plant are required by Eskom in Mpumalanga. Bidders must submit a complete original tender and one complete hard copy by 29 January 2027 at 10:00 SAST, with all mandatory returnables and in English.
C3 1 ECC3 Employers Works Information_SPP_29.09.2026.docx
The procurement covers implementation of a governed digital foundation for real-time and near-real-time data access, paperless field execution, AI-assisted inspection, controlled document retrieval, auditability and knowledge transfer at Kusile Power Station. The department requires the works to support operational efficiency, safety, data-driven decision-making, future-ready infrastructure, responsible AI and knowledge preservation for the Eskom facility in Mpumalanga.
SDL&I Strategy Setting.pdf
Eskom requires a 36-month programme to digitalise the Kusile smart plant and deploy artificial intelligence, with delivery in Mpumalanga. The contract is evaluated on a 90/10 basis, with up to 10 points for B-BBEE status and the balance for price.
Labour Taxation Questionnaire.pdf
Eskom requires the procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project.
KUS-20260973 Kusile Power Station Tender Technical Evaluation Strategy for Kusile Smart Plant Digitalisation and AI FINAL.pdf
Eskom requires a service provider to design, implement and integrate a Smart Plant digital ecosystem across five technology pillars at Kusile Power Station: industrial network and private cloud infrastructure, intelligent inspection and digital interaction, Digital Twin interface integration, paperless operations with SAP integration, and digitisation of plant documents into an EDMS. The solution must interoperate with the existing EPRI Program 224 Digital Twin and meet IEC 62443 cybersecurity standards.
C1 2b ECC3 Data by Contractor_SPP_29.09.2026.docx
The procurement concerns the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The project is to be delivered at Kusile Power Station in Mpumalanga for ESKOM. The closing date for the request is 29 January 2027 at 10:00.
Supplier Declaration of Interest Template (1).docx
Procurement of the Kusile Smart Plant digitalisation and artificial intelligence project for Eskom. The project involves providing digital and AI solutions to modernise the plant.
C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx
Eskom requires the design, execution, commissioning, handover and training for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project, delivered across five execution pillars plus technology transfer and training. The work is contracted under the NEC3 Engineering and Construction Contract (April 2013), main Option A (priced contract with activity schedule), with sectional completion.
SBD 1 - Converted.docx.pdf
Eskom invites bids for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project in Mpumalanga. The bid closes on 29 January 2027 at 10:00. The document provided is the standard invitation to bid (SBD1) form; detailed scope, evaluation criteria, and technical requirements are not included in this extract.
C1 1 ECC3 Offer Acceptance_SPP_29.09.2026.docx
The procurement covers the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project. The employer is Eskom Holdings SOC Ltd, and the contractor must perform the obligations and liabilities of the contract, including compliance with its terms and conditions, for an amount to be determined in accordance with the contract conditions.
Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls
Eskom requires the procurement of a smart plant digitalisation and artificial intelligence project for the Kusile Power Station in Mpumalanga. The scope covers the supply and implementation of digital and AI systems for the plant.
240-12248652_Catergory 2 List of Tender Returnables Rev 7.pdf
Digitalisation and artificial intelligence services for the Kusile Smart Plant over a three-year period. Eskom requires bidders to demonstrate quality management capability through ISO 9001 certification or documented QMS evidence, supported by quality plans and audit records.
Annexure A - Technical Evaluation Criteria_Rev6.xlsx
Eskom requires the supply, implementation and integration of a smart-plant digitalisation and artificial intelligence solution for the Kusile power station, delivered across five pillars: industrial network and private-cloud infrastructure; intelligent inspection and digital integration; digital twin interfacing; paperless operations integrated with SAP PM/MM; and digitisation of existing plant documents and data books.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 958 618
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This document is the OHS specification for the Kusile Smart Plant Digitalisation and Artificial Intelligence project. It sets out the minimum health and safety requirements that contractors must meet for the duration of the contract. The contractor is expected to develop an OHS plan that meets these requirements and all applicable legislation.
Important Dates
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)No specific dates (other than the closing date in the tender record) are stated in the provided document.
Contact Information
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)Eskom Contract's Manager: Dorothy Mbonane
Eskom Health and Safety Manager: Mapuleng Kobo
Eskom Safety Officer: Nkhetheni Ramukosi
Project Address: Kusile Power Station, R45 Kendal / Balmoral Road, Haartebeesfontein farm
Submission Guidelines
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)Returnable documents:
Submission method and address: Not stated in the provided document.
Evaluation Criteria
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)Evaluation is based on compliance with the OHS specification and tender requirements. No specific scoring split or minimum qualifying score is stated in the provided document.
Technical Specifications
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)Scope of work: Design, procurement, implementation, integration, testing, training, and handover of five integrated technology pillars, delivered in sequential phases.
Phase 1:
Phase 2:
Includes all necessary hardware, software, professional services, and training to achieve full operational capability. Costing and deliverables must be phased. Ongoing operational support beyond the initial three-month post-go-live period is not included and will be addressed through separate service level agreements. The scope of work is detailed on the NEC Contract.
Methodology
Source: Smart Plant Digitilisation SHE Spec .pdfThe contractor must develop safe work procedures and method statements based on risk assessments. Method statements must detail key activities to reduce hazards identified in risk assessments.
Experience & Qualifications
Source: Smart Plant Digitilisation SHE Spec .pdfThe contractor must appoint competent staff with appropriate qualifications, certificates, and training. Employees must be under competent supervision. Statutory appointees must receive training prior to accepting appointments. The contractor must keep records of employee inductions, skills, and licenses.
Quality Management
Source: Smart Plant Digitilisation SHE Spec .pdfThe main contractor must provide an organisational organogram on company letterhead, signed by the 16(1) or 16(2) appointee, showing responsibility from the chief executive down to supervisors. Appointed contractors must also provide their organograms. All organograms must be kept up to date and filed in the project OHS files.
Financial Requirements
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)OHS costing must be itemised based on the overall scope of the project, including training on safety, provision of PPE, safety equipment purchases, and medical surveillance. All costing must be included on the BOQ.
Compliance Requirements
Source: Smart Plant Digitilisation SHE Spec .pdf (unknown)Compliance with the OHS specification is mandatory. Key requirements include:
Health & Safety
Source: Smart Plant Digitilisation SHE Spec .pdfThe OHS specification applies to all contractors and suppliers for the duration of the contract. The contractor must develop an OHS plan that meets the requirements of the specification and applicable legislation. Eskom Kusile Power Station does not assume the contractor's legal responsibilities. The contractor remains accountable for the health and safety programme for their employees and appointed contractors. Key requirements include:
Environmental
Source: Smart Plant Digitilisation SHE Spec .pdfThe contractor must comply with environmental legislation, including the National Environmental Management Act and the Environment Conservation Act. Duty of care to the environment requires taking reasonable measures to prevent pollution or degradation.
Contractual Terms
Source: Smart Plant Digitilisation SHE Spec .pdfThe main contractor is responsible for the safety and health of their employees and appointed contractors. The main contractor must ensure appointed contractors comply with OHS requirements. Eskom Kusile Power Station has the right to terminate the contract for non-compliance with OHS requirements. Work stoppage may be ordered for unsafe conditions.
Section
Source: Smart Plant Digitilisation SHE Spec .pdfThe OHS specification must be evaluated as part of the tender. The main contractor must submit an OHS plan and safety file for evaluation prior to the start of work. The OHS department will issue section 37(2) agreements to the project manager/end user for signing.
Financial Requirements
Source: Form CPA - General.docx (unknown)Price adjustment (Form CPA — Contract Price Adjustment)
Description
Source: Meeting link .docxThe procurement covers the Kusile Smart Plant Digitalisation and Artificial Intelligence Project, issued by Eskom under tender E3839GXMPKUS.
No further description of the plant systems, deliverables or implementation phases is provided in the available tender information.
Important Dates
Source: Meeting link .docx (unknown)Closing date and time: 29 January 2027 at 10:00
Compulsory clarification meeting: 03 December 2025 at 13:00
Issue date: 17 November 2026
Bid validity period: 280 days from the closing date and time
Submission Guidelines
Source: Meeting link .docx (unknown)Submission method: electronic submission through the Eskom e-Tendering portal (https://eTendering.eskom.co.za).
Closing: 29 January 2027 at 10:00.
Responsibility: the bidder must ensure the bid is submitted on the portal before the closing time.
Returnable documents: none listed in the available tender information.
Technical Specifications
Source: Meeting link .docx (unknown)Scope: procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project for Eskom.
No further scope, deliverable, quantity or site detail is set out in the available tender information.
Submission Guidelines
Source: Standard Bidding Document (SDB) 4_Annexure A.doc (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Standard Bidding Document (SDB) 4_Annexure A.doc (unknown)The bidder must complete and sign SBD 4. The bidder must not be on the Register for Tender Defaulters or the List of Restricted Suppliers. The bidder must disclose any state employment, connections with Eskom staff, or interests in related enterprises. The bidder must certify no collusion, no price disclosure, and no improper communications with the procuring institution. False statements may lead to penalties under the Competition Act, NPA, and Prevention of Combating of Corrupt Activities Act.
Compliance Requirements
Source: Standard Bidding Document (SDB) 4_Annexure A.doc (unknown)The bidder must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. The bidder must complete and sign SBD 4 (Bidder's Disclosure), which requires disclosure of any state employment, relationships with Eskom staff, and interests in related enterprises.
Description
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfThe procurement is for the design, implementation, and integration of advanced digital technologies at Kusile Power Station, creating a fully integrated digital ecosystem across engineering, control, and business systems. The initiative aims to enable predictive and prescriptive maintenance, enhance operational efficiency, improve safety compliance, and develop a skilled workforce. Kusile is a 4,800 MW coal-fired power station in Mpumalanga, with six 800 MW units, the last commissioned in late September 2025. The station uses supercritical technology, wet flue gas desulphurisation, and fabric filter plants.
Submission Guidelines
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdf (unknown)Returnable documents: none specified in the available text. Submission method, address, and closing time are not stated in the provided document.
Evaluation Criteria
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdf (unknown)Evaluation criteria are not detailed in the available text. The document is a functional specification, not the bid invitation; scoring and preference point systems are not stated.
Technical Specifications
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdf (unknown)Scope: design, procurement, implementation, integration, testing, training, and handover of five integrated technology pillars at Kusile Power Station, delivered in two phases.
Pillar 1 – Network and Infrastructure:
Pillar 2 – Intelligent Inspection and Digital Interaction:
Pillar 3 – Digital Twin Interface and Integration:
Pillar 4 – Paperless Operations / Digitalised RWM and Outage Functions:
Pillar 5 – Digitization of Existing Plant Documents and Data Books:
Standards compliance:
Technology agnosticism and multi-language support required.
Ongoing operational support beyond the initial three-month post-go-live period is excluded and will be covered by separate SLAs.
Methodology
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfThe document outlines a Scope of Work and Execution Plan for the Smart Plant Digitalisation Initiative. The methodology involves delivering five integrated technology pillars in two sequential phases. The contractor is responsible for design, procurement, implementation, integration, testing, training, and handover. Specific method statements or execution plans are not detailed in the available text.
Quality Management
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfQuality management requirements are not explicitly detailed in the available text. The document references ISO 9001 (Quality Management Systems) as a normative standard. The specification includes requirements for quality control plans, acceptance testing, and documentation, but specific QA/QC procedures are not described in the extracted content.
Pricing Schedule
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfPricing schedule details are not provided in the available text. The document states that costing and deliverables should be phased, but no pricing format, rates, bill of quantities, or payment schedules are specified.
Financial Requirements
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdf (unknown)Pricing format, bid security, bonds, guarantees, retention, payment terms, and financial capacity thresholds are not stated in the available text. Costing and deliverables must be phased.
Compliance Requirements
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdf (unknown)The proposed solution must be supplied by a manufacturer recognised as a Leader in the latest applicable Gartner® Magic Quadrant™ reports for Enterprise Wired and Wireless LAN Infrastructure, Data Center Switching, and Enterprise Storage Platforms. Verifiable evidence of such recognition (report title, publication date, manufacturer name, supporting documentation) must be provided.
All AI-enabled functions must comply with Eskom's Responsible AI governance requirements, including inventory registration, validation evidence, human oversight, monitoring, and revalidation.
Data must be hosted on Eskom-approved infrastructure under Eskom control, governed by South African law. External access, support connections, or data transfers must be explicitly approved, logged, and governed by Eskom security and data governance requirements.
Compliance with normative standards: ISO 9001, IEC 62443, IEC 62351, IEC 62264, IEC 62541, IEC 61850, IEC 61511, IEC 60870-5-104, ISO 55001, ISO 27001, and Eskom PPE standard 240-44175132.
Health & Safety
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfHealth and safety requirements are implied through the reference to Eskom Personal Protective Equipment (PPE) standard 240-44175132 and the requirement that smart helmets must meet Eskom PPE requirements. The specification includes safety compliance as a strategic objective, with automated inspection systems and real-time monitoring to enhance safety protocols. Specific OHS plans or HSE compliance procedures are not detailed in the available text.
Environmental
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfEnvironmental requirements are not explicitly stated in the available text. The document mentions Kusile's technology (supercritical boilers, wet flue gas desulphurisation, fabric filter plants) which reduce environmental impact, but no specific environmental or sustainability requirements for the contractor are provided.
Contractual Terms
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfContract terms, duration, termination, and penalties are not detailed in the available text. The document specifies that ongoing operational support beyond the initial three-month post-go-live period is excluded and will be addressed through separate service level agreements. Intellectual property and AI Apprenticeship Programme (AIAP) integration are covered in the specification (sections 3.5), but specific contractual clauses are not provided.
Section
Source: KUS-20251198 Kusile Smart Plant Digitalisation- Functional Specification_FINAL.pdfAdditional evaluation criteria are not provided in the available text. The document is a functional specification and does not include scoring or evaluation methodology.
Description
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfThis document is Eskom's Supplier Quality Management specification (240-105658000/QM 58), which sets minimum quality requirements for all existing and potential Eskom suppliers. It defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for products and services. It requires suppliers to develop, implement, maintain and continually improve a QMS based on ISO 9001.
Important Dates
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Closing date: 29 January 2027 at 08:00 (from tender record).
Contact Information
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)No specific contact names, emails, or telephone numbers are provided in this document.
Submission Guidelines
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Returnable documents (per the List of Tender Returnables, 240-12248652):
Evaluation Criteria
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Quality assessment criteria are selected and completed by an Eskom Quality representative/professional using Form A.
Technical Specifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)This document is a generic Eskom Supplier Quality Management specification (240-105658000/QM 58), not the specific scope for the Kusile Smart Plant Digitalisation and AI project.
Methodology
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfMethod statements and execution plans:
Experience & Qualifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfPersonnel qualifications:
Quality Management
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfQuality management requirements:
Pricing Schedule
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfNo pricing schedule, rates, bill of quantities, or payment schedules are stated in this document.
Compliance Requirements
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)ISO 9001 certification: a valid certificate from an accredited certification body is required unless specifically excluded by the applicable quality category.
Health & Safety
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfThe specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific OHS requirements are detailed in this document.
Contractual Terms
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfPreservation requirements are contractual obligations:
Description
Source: 240-77433139 Annexure A supplier risk category.docxThis annexure is a guideline for categorising services by OHS risk (high, medium, low) and specifying corresponding OHS requirements. It is not a scope of work. The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project.
Contact Information
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)Development Team contact: Diane Maunatlala (role not specified). No other contacts or submission address provided.
Submission Guidelines
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)Returnable documents for OHS compliance (Annexure B):
Alternative to OHS plan/manual and related documents: OHSAS 18001 certificate plus valid letter of good standing or equivalent.
For supplier registration on Eskom vendor database: baseline OHS risk assessment and valid letter of good standing, or an OHS tender evaluation report.
Evaluation Criteria
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)OHS evaluation is a prerequisite for tender award and vendor registration. Bidders must be COID registered/compliant and submit a letter of good standing, or an accepted equivalent (insurance letter covering accidental death and disability to a minimum of R500,000 for companies without employees; proof of assessment and payment to the Compensation Commissioner; or international equivalent). Exemption from the Department of Labour is accepted. Risk category (high, medium, low) determines the specific OHS returnables required. No other evaluation criteria (price, functionality, B-BBEE, CIDB) are stated in this document.
Technical Specifications
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)This document is a guideline for categorising services by OHS risk (high, medium, low) and specifying corresponding OHS requirements. It is not a scope of work. The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project, but no technical specifications are provided in this annexure.
Financial Requirements
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms, or financial capacity thresholds are stated. OHS costing must be included in the bill of quantities.
Compliance Requirements
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)COID registration/compliance with letter of good standing, or accepted equivalent. OHS evaluation for vendor registration. For international suppliers: equivalent certificate from country of origin, or relevant legislation if no equivalent exists; if the supplier has South African offices employing citizens, a COID certificate is required. Joint ventures: all documents must reflect the JV name; COID letter must be in the JV name or each member must submit its own. No CSD, SARS tax, B-BBEE, CIDB, CIPC, or local content requirements are stated.
Description
Source: Eskom Standard Conditions of Tender.pdfThe tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The document provided is Eskom's Standard Conditions of Tender, which sets out the general rules for participating in Eskom tenders. Specific scope, quantities and deliverables are not detailed in this document; they are in the Enquiry documents.
Important Dates
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Closing date: 29 January 2027 at 08:00 (SAST).
Compulsory site visit / clarification meeting: attendance is compulsory if stipulated in the Tender Data. Details (date, time, venue) are stated in the Tender Data. Failure to attend results in disqualification.
Contact Information
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Contact: Eskom Representative (as identified in the enquiry document)
Role: Eskom Representative
All communication must be in writing to the Eskom Representative only.
Submission address: as stated in the Tender Data (tender box address).
Submission Guidelines
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Submission method: paper only, unless the Tender Data states otherwise.
Returnable forms (complete and sign all):
Disqualification risks:
Evaluation Criteria
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Evaluation stages:
Preference point system: 90/10 or 80/20 allocation as per the Enquiry.
Objective criteria: contract may be awarded to a tenderer that did not score the highest points only in accordance with Section 2(1)(f) of the PPPFA, if Objective Criteria are stipulated in the Enquiry. Functionality and B-BBEE scorecard elements may not be used as Objective Criteria.
Reverse e-auction: if indicated in the Enquiry, tenderers must submit a complete tender without prices; prices included will not be considered.
Arithmetical errors: if figures and words differ, the amount in words prevails. Eskom checks the highest-ranked tender for decimal point misplacement, omissions in pricing schedule/bill of quantities, multiplication or addition errors. Eskom notifies the tenderer and requests confirmation or acceptance of corrections. If the tenderer does not correct or accept corrections, the tender is rejected.
Technical Specifications
Source: Eskom Standard Conditions of Tender.pdf (TENDER)The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project.
Scope: digitalisation and artificial intelligence implementation at Kusile Power Station.
Specific technical specifications, quantities and deliverables are not detailed in this document; they are set out in the Enquiry documents (specification and works information).
Quality Management
Source: Eskom Standard Conditions of Tender.pdfTenderers must provide proof satisfactory to Eskom that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place by the deadline stipulated in the Enquiry. All SHEQ costs and personnel must be reflected in the tender. The tenderer must comply with relevant legislation and regulatory instruments, including Eskom's SHEQ requirements.
Pricing Schedule
Source: Eskom Standard Conditions of Tender.pdfPricing must include all duties, taxes (including VAT) and levies applicable 14 days prior to closing. Rates and prices are fixed for the contract duration unless the Enquiry provides for adjustment. Prices must be in South African Rand unless instructed otherwise. The Pricing Schedule must be fully completed; omissions or arithmetical errors may be corrected by Eskom with the tenderer's concurrence. If a bill of quantities or pricing schedule applies, line-item totals prevail over unit rates in case of multiplication errors; decimal point misplacement is corrected by adjusting the unit rate. The total of prices prevails over addition errors. If the tenderer does not accept corrections, the tender is rejected.
Financial Requirements
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Pricing:
Security:
Insurance:
Costs:
Financial analysis:
Compliance Requirements
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Eligibility:
Legislation and regulations:
Sheq:
CIDB:
Contract Skills Development Goals (CSDG):
Contract Participation Goals (CPG):
B-bbee:
Cataloguing:
Tender validity:
Health & Safety
Source: Eskom Standard Conditions of Tender.pdfCompliance with OHS Act, COIDA, and Eskom's Safety, Health, Environment and Quality (SHEQ) requirements is mandatory. Tenderers must provide proof of SHEQ systems, policies and capabilities by the deadline stipulated in the Enquiry. All SHEQ costs and personnel must be included in the tender. If CIDB grading is a criterion, registration with CIDB is required at closing or within 21 working days. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply as per CIDB standards for qualifying contracts.
Contractual Terms
Source: Eskom Standard Conditions of Tender.pdfEskom is not liable for any losses, claims or damages sustained by a tenderer as a result of participating in the tender or from any amendment, termination or suspension of the process.
Eskom reserves the right to enter into mandated negotiations with selected tenderers.
Eskom does not warrant the accuracy or completeness of tender information.
Tender validity: tender must remain valid for acceptance within the validity period; tenderers may be asked to extend validity. Refusal to extend results in exclusion.
Confidentiality: all matters arising in connection with the procurement are confidential; documents provided by Eskom may only be used for preparing and submitting the tender.
Standardised specifications: tenderers must obtain and familiarise themselves with the latest revisions of standardised specifications incorporated by reference.
Site visit/clarification meeting: attendance is compulsory if stipulated; failure results in disqualification.
Clarifications: all queries must be addressed in writing to the Eskom Representative; Eskom will publish responses on the platform where the tender was advertised.
Security: if a performance bond or demand guarantee is required, select a minimum of two (2) financial institutions from the Eskom-approved list.
Section
Source: Eskom Standard Conditions of Tender.pdfEvaluation follows the stages described in the main evaluationCriteria section: basic compliance, mandatory returnables, designated materials, functionality (if applicable), financial analysis, price evaluation, Specific Goals scoring, and ranking. The preference point system is 90/10 or 80/20 as per the Enquiry. Functionality and B-BBEE scorecard elements cannot be used as Objective Criteria. Reverse e-auction may be used if indicated in the Enquiry; in that case, tenders must be submitted without prices.
Description
Source: C3 1 ECC3 Employers Works Information_SPP_29.09.2026.docxThe project is the Smart Plant Digitalisation and Artificial Intelligence Project at Kusile Power Station, a coal-fired station in Mpumalanga with six units of about 800 MW each (total 4,800 MW). The initiative aims to create a governed digital foundation for real-time data access, paperless field execution, AI-assisted inspection, controlled document retrieval, auditability and technology transfer. Strategic objectives include improving operational efficiency and reliability, enhancing safety and compliance, enabling data-driven decision-making, building future-ready infrastructure, ensuring responsible AI governance, and preserving knowledge through technology transfer.
Evaluation Criteria
Source: C3 1 ECC3 Employers Works Information_SPP_29.09.2026.docx (unknown)Evaluation is based on the Invitation to Tender documentation. B-BBEE compliance is required, with the applicable preference point system (80/20 or 90/10) as stated in the tender. A minimum of 15% of the contract value must be subcontracted to enterprises from designated areas. Letters of Intent from proposed subcontractors must be submitted as part of the tender returnables; failure to do so may render the tender non-responsive. The Contractor is the Design Authority and must comply with the Employer's Design Review Procedure (240-53113685) and KKS coding and labelling requirements.
Technical Specifications
Source: C3 1 ECC3 Employers Works Information_SPP_29.09.2026.docx (unknown)The works comprise the implementation of the Smart Plant Digitalisation and Artificial Intelligence Project at Kusile Power Station, Mpumalanga. The station has six generating units of approximately 800 MW each (total 4,800 MW). The project aims to create a governed digital foundation for real-time and near-real-time data access, paperless field execution, AI-assisted inspection, controlled document retrieval, auditability and technology transfer. Key deliverables include:
Financial Requirements
Source: C3 1 ECC3 Employers Works Information_SPP_29.09.2026.docx (unknown)Invoicing: Within one week of receiving a payment certificate, the Contractor must provide a tax invoice to Eskom Holdings SOC Ltd, including the contract number, VAT registration numbers (Employer's VAT number 4740101508), and a description of services based on the Price List. Invoices are submitted to [email protected]. The contract uses Option A (priced contract with activity schedule) under NEC3 ECC. Bonds and guarantees are as per C1 3 ECC3 Proforma Guarantees. The Contractor must provide a priced schedule of recommended spare parts with unit rates and stock quantities.
Compliance Requirements
Source: C3 1 ECC3 Employers Works Information_SPP_29.09.2026.docx (unknown)B-BBEE: Refer to the Invitation to Tender documentation for applicable B-BBEE requirements; the Contractor must comply and submit required supporting documentation.
Designated subcontracting: Minimum 15% of contract value must be subcontracted to enterprises from designated areas; Letters of Intent from proposed subcontractors are required as part of tender returnables.
SHEQ: Compliance with the OHS Specification for Smart Plant Digitalisation (Document Identifier KUS-20260463) is mandatory. The Contractor must develop and implement a SHEQ Plan.
Site access: All personnel must comply with Eskom's Lifesaving Rules, attend mandatory site induction, obtain access permits, and be registered on the Worker Register. Work must comply with the Occupational Health and Safety Act, 85 of 1993.
Design: The Contractor is the Design Authority and must follow the Employer's Design Review Procedure (240-53113685).
Description
Source: SDL&I Strategy Setting.pdfThe project involves digitalisation and artificial intelligence at the Kusile power plant. SDL&I objectives align with RDP goals and include transformation (B-BBEE improvement), local procurement content, procurement from black-owned entities, job creation, and skills development. Tenderers who submit objectives but do not meet Eskom's targets are not disqualified; commitments become contractual obligations.
Important Dates
Source: SDL&I Strategy Setting.pdf (TENDER)Closing date: 29 January 2027 at 08:00 (from tender record).
Contact Information
Source: SDL&I Strategy Setting.pdf (TENDER)No specific contact details (names, emails, telephones) are provided in the document.
Submission Guidelines
Source: SDL&I Strategy Setting.pdf (TENDER)Returnable documents:
Evaluation Criteria
Source: SDL&I Strategy Setting.pdf (TENDER)Evaluation system: 90/10 preference point system.
Technical Specifications
Source: SDL&I Strategy Setting.pdf (TENDER)Scope: Procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project.
Methodology
Source: SDL&I Strategy Setting.pdfSkills development must be delivered directly by the tenderer and through its supply network. SETA-accredited training providers may be approached for critical and scarce skills. Tenderers must bear the full cost of skills development; Eskom makes no financial contribution. Tenderers are advised to approach SETAs for grants and SARS for tax rebates.
Financial Requirements
Source: SDL&I Strategy Setting.pdf (TENDER)SDL&I performance security:
Compliance Requirements
Source: SDL&I Strategy Setting.pdf (TENDER)B-BBEE requirements:
Health & Safety
Source: SDL&I Strategy Setting.pdfNo specific health and safety requirements are stated in the document.
Section
Source: SDL&I Strategy Setting.pdfSpecific goals (B-BBEE status) are scored out of 10 points under the 90/10 system. Objective criteria (local content, NIPP) are conditions for contract award; failure may lead to second-ranked tenderer being recommended. SDL&I objectives do not form part of scoring but become contractual obligations.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: E-Tenderers' E-Tendering Training Acknowledgement Form. Failure to submit it fully completed within the prescribed period disqualifies the bid.
Description
Source: Labour Taxation Questionnaire.pdfThe bidder must complete the Labour Taxation Questionnaire (Appendix H) as part of the bid. This questionnaire determines whether the bidder is a labour broker or personal services company for tax purposes.
Submission Guidelines
Source: Labour Taxation Questionnaire.pdf (unknown)Returnable documents: completed SBD 1, SBD 3.1/3.2/3.3, SBD 4, SBD 6.1, SBD 6.2, SBD 7.1/7.2, SBD 8, SBD 9, Authority to Sign / Board Resolution, and the Labour Taxation Questionnaire (Appendix H). All must be completed, signed and submitted with the bid.
Evaluation Criteria
Source: Labour Taxation Questionnaire.pdf (unknown)The bidder must submit the completed Labour Taxation Questionnaire (Appendix H) as part of the bid. No other evaluation criteria are specified in the available document.
Technical Specifications
Source: Labour Taxation Questionnaire.pdf (unknown)The Labour Taxation Questionnaire (Appendix H) must be completed by the bidder. It requires the bidder to answer questions about whether the entity provides labour to Eskom, whether it is a labour broker, and related tax classification matters. If the bidder is a labour broker, it must supply a valid, original or certified copy of an IRP30 for the current tax year within 30 days.
Compliance Requirements
Source: Labour Taxation Questionnaire.pdf (unknown)The bidder must complete the Labour Taxation Questionnaire (Appendix H) as part of the bid. No other compliance requirements are specified in the available document.
Section
Source: Labour Taxation Questionnaire.pdfThe Labour Taxation Questionnaire (Appendix H) must be completed and submitted as part of the bid. No other evaluation criteria are specified in the available document.
Submission Guidelines
Source: Supplier Declaration of Interest Template (1).docx (unknown)Returnable documents:
Description
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docxThe tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The provided text does not detail the scope of work; it focuses on OHS requirements.
Contact Information
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)OHS Representative (Eskom):
(No email, telephone or address provided in the document.)
Submission Guidelines
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)Returnable OHS documents, each to be completed, signed and submitted with the bid:
Each returnable is marked Y (Yes), N (No) or N/A (Not applicable) with comments. The bidder must be rated "Recommended" to proceed.
Evaluation Criteria
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)Evaluation is based on the OHS tender returnables listed. Each returnable is assessed for submission and adequacy. The bidder must be rated "Recommended" to proceed; a "Not Recommended" rating would disqualify the bid.
Technical Specifications
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The scope of work is not detailed in the provided text; the document focuses on OHS requirements for the work.
Compliance Requirements
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)OHS compliance requirements:
Important Dates
Source: C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx (unknown)Starting date: 01 April 2027
Contact Information
Source: C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx (unknown)Employer: Eskom Holdings SOC Ltd (reg no: 2002/015527/30)
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Project Manager and Supervisor: Kusile Power Station, R545 Balmoral/Kendal Road, Haartebeesfontein Farm, Witbank
Adjudicator: selected from ICE-SA Division of South African Institution of Civil Engineering Panel of Adjudicators; if parties do not agree, appointed by ICE-SA Division
Adjudicator nominating body: Chairman of ICE-SA (joint division of SAICE and London ICE)
Arbitration: Johannesburg, South Africa; procedure per latest Rules for the Conduct of Arbitrations by Association of Arbitrators (Southern Africa)
Evaluation Criteria
Source: C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx (unknown)The contract is a NEC3 Engineering and Construction Contract (April 2013) with main Option A (priced contract with activity schedule) and dispute resolution Option W1. Secondary options include X1 (price adjustment for inflation), X2 (changes in law), X3 (multiple currencies), X5 (sectional completion), X7 (delay damages), X13 (performance bond), X16 (retention), X18 (limitation of liability), and Z (additional conditions Z1 to Z17).
Technical Specifications
Source: C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx (unknown)Scope: Design, Execution, Commissioning, Handover and Training for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project.
Financial Requirements
Source: C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx (unknown)Pricing: Priced contract with activity schedule (Main Option A).
Compliance Requirements
Source: C1 2a ECC3 Data by Employer_SPP_29.09.2026.docx (unknown)B-BBEE: Contractor must notify employer within 7 days of any change in B-BBEE status and submit updated verification certificate within 30 days. A decrease in B-BBEE status may lead to renegotiation or termination. Failure to notify may constitute grounds for termination.
Health & Safety
Source: Kusile Contractor Baseline Risk Assessment_ Tender PDF.pdfThe document is an Eskom Occupational Health and Safety baseline risk assessment template (revision 5, dated 30 April 2025) for work at Kusile Power Station. It lists hazards and controls for activities such as cleaning conveyors and chutes, unblocking conditioners, conveying ash and gypsum, driving on ash dumps, constructing coal stockpiles, offloading coal, spotting, coal feeding, chemical offloading, water treatment, and general administrative work. Key hazards include fly ash exposure, entanglement in moving conveyors, slips and falls, hand-arm vibration, noise-induced hearing loss, heat stress, dust inhalation, vehicle collisions, and chemical exposure. Required controls include PPE (dust masks, hearing protection, safety boots, gloves, goggles, full body harnesses), pre-job briefs and inspections, warning signs, barricading, dust suppression, 5m following distance and 2m clearance from machines, 20km/hr speed limit, permits for confined space entry, medical surveillance, and toolbox talks. The template references Eskom procedure 32-285 and includes a risk rating matrix (consequence A-E, likelihood 1-5, effectiveness I-IV).
Description
Source: SBD 1 - Converted.docx.pdfThe successful bidder must complete and sign a written contract form (SBD 7). Bid responses must be deposited in the bid box at the stated street address. The invitation includes supplier information fields (name, postal and street address, telephone, cellphone, fax, email, VAT number, TCS PIN or CSD number, B-BBEE status level, and certificate or affidavit details). Bidders must indicate if they are an accredited representative in South Africa or a foreign-based supplier. The bid must be signed with proof of authority, and the total bid price and number of items offered must be stated. Bidding procedure and technical enquiries are directed to the contact person and telephone/fax/email provided in the invitation.
Submission Guidelines
Source: SBD 1 - Converted.docx.pdf (TENDER)Submission method: bids must be deposited in the bid box at the street address stated in the invitation, or submitted online. Bids must be on the official forms provided (not re-typed). Late bids will not be accepted.
Returnable forms:
Disqualification risks:
Evaluation Criteria
Source: SBD 1 - Converted.docx.pdf (TENDER)Evaluation is subject to the Preferential Procurement Policy Framework Act (PPPFA) 2000 and the Preferential Procurement Regulations, 2017. The document does not state the specific points split (80/20 or 90/10) or any minimum qualifying score.
Technical Specifications
Source: SBD 1 - Converted.docx.pdf (TENDER)The tender is for the procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. No further technical scope, quantities, or locations are stated in the available document.
Compliance Requirements
Source: SBD 1 - Converted.docx.pdf (TENDER)Mandatory compliance:
Description
Source: 240-12248652_Catergory 2 List of Tender Returnables Rev 7.pdfThe project is the Kusile Smart Plant Digitalisation and Artificial Intelligence Project, with a contract period of 3 years. The quality requirements are defined in specification 240-105658000 and related documents.
Evaluation Criteria
Source: 240-12248652_Catergory 2 List of Tender Returnables Rev 7.pdf (TENDER)Quality management system evaluation (Category 2 – Quality Requirements Deliverables, indicator = 1):
Technical Specifications
Source: 240-12248652_Catergory 2 List of Tender Returnables Rev 7.pdf (TENDER)The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project, for a period of 3 years. The scope includes digitalisation and AI implementation at Kusile power station. The quality requirements reference specifications 240-105658000, 240-109253698 and 240-109253302.
Compliance Requirements
Source: 240-12248652_Catergory 2 List of Tender Returnables Rev 7.pdf (TENDER)Quality management system compliance is mandatory:
Section
Source: 240-12248652_Catergory 2 List of Tender Returnables Rev 7.pdfQuality requirements are evaluated as Category 2 deliverables with indicator = 1. The evaluation covers:
Description
Source: 240-77471499 Annexure B 2026.docxThe tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The provided annexure is the Acknowledgement Form for Eskom OHS legal and other requirements.
Submission Guidelines
Source: 240-77471499 Annexure B 2026.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-77471499 Annexure B 2026.docx (unknown)The bidder must sign and return the Annexure B Acknowledgement Form.
The bidder must commit to complying with Eskom contractor Health and Safety requirements standard 32-136 and any provided OHS specifications.
The bidder must commit to aligning its processes with Eskom's OHS requirements after contract award.
The bidder must be able to provide testimonials, references, and client contact details for similar past work when requested.
The bidder must accept accountability for the OHS compliance of its contractors and suppliers across all tiers.
The bidder must accept that penalties will be enforced for non-conformance with Eskom or statutory OHS requirements.
Technical Specifications
Source: 240-77471499 Annexure B 2026.docx (unknown)The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project.
The bidder must comply with the following OHS documents when working at or rendering a service to Eskom:
After contract award, the bidder must fully align its processes to Eskom's OHS requirements (policies, procedures, standards).
All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's induction.
The main contractor/supplier must:
Eskom reserves the right to verify compliance and may instruct the contractor to provide copies of testimonials/references and contact details of clients (including Eskom) for similar past work.
Compliance Requirements
Source: 240-77471499 Annexure B 2026.docx (unknown)The bidder must comply with the Occupational Health and Safety Act 85 of 1993 and the Compensation for Occupational Diseases and Illnesses Act 130 of 1993.
The bidder must comply with Eskom contractor Health and Safety requirements standard 32-136 and any provided OHS specifications.
The bidder must sign the Annexure B Acknowledgement Form.
Description
Source: C1 3 ECC3 Proforma Guarantees_29.09.2026.docxThis document provides pro forma forms for bonds and guarantees required under the NEC3 Engineering & Construction Contract for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project. It includes a Performance Bond (demand guarantee) and a Retention Money Guarantee.
Technical Specifications
Source: C1 3 ECC3 Proforma Guarantees_29.09.2026.docx (unknown)The contract is based on the NEC3 Engineering & Construction Contract. The Works Information includes pro forma documents for bonds and guarantees, which are to be treated as part of the Works Information.
Financial Requirements
Source: C1 3 ECC3 Proforma Guarantees_29.09.2026.docx (unknown)The contract includes Secondary Option X13 (Performance Bond) and Option X16 (Retention). The Contractor may provide a Retention Money Guarantee in the form stated; if accepted, the Project Manager will not assess retention amounts. The Performance Bond is a demand guarantee, with the Guaranteed Sum to be inserted. The Retention Money Guarantee also has a Guaranteed Sum to be inserted. Both guarantees must be reproduced exactly on the bank's or parent company's letterhead and completed with the required details.
Compliance Requirements
Source: C1 3 ECC3 Proforma Guarantees_29.09.2026.docx (unknown)No specific compliance requirements stated in this document.
Description
Source: 559-667439824 Generation Quality Control Plan Template 18Nov.docxAfter the databook is completed, an authorised copy of this form must be sent to the site Documentation Control Centre for archiving and uploading to OpenText (Records Management).
Technical Specifications
Source: 559-667439824 Generation Quality Control Plan Template 18Nov.docx (unknown)After the databook is completed, an authorised copy of this form must be sent to the site Documentation Control Centre for archiving and uploading to OpenText (Records Management).
Description
Source: C2 ECC3 Pricing Data Option A_SPP_29.09.2026.docxPart C2 Pricing Data for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project, prepared under the NEC3 Engineering and Construction Contract (ECC3) Option A.
Submission Guidelines
Source: C2 ECC3 Pricing Data Option A_SPP_29.09.2026.docx (unknown)Tender submission
Financial Requirements
Source: C2 ECC3 Pricing Data Option A_SPP_29.09.2026.docx (unknown)Contract form
Pricing basis
Payment
Adjustments
Submission Guidelines
Source: SBD 6.1.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SBD 6.1.pdf (TENDER)Preference point system: 80/20 for bids up to R50 000 000 (all taxes included); 90/10 for bids above R50 000 000. The applicable system for this tender is not specified in the document.
Points allocation:
B-BBEE points table:
Price scoring formula: Ps = 80(1 - (Pt - Pmin)/Pmin) or Ps = 90(1 - (Pt - Pmin)/Pmin), where Pt is the price of the bid under consideration and Pmin is the price of the lowest acceptable bid.
Compliance Requirements
Source: SBD 6.1.pdf (TENDER)B-BBEE requirements:
Section
Source: SBD 6.1.pdfEvaluation is based on price and B-BBEE status level of contributor. The 80/20 or 90/10 preference point system applies depending on the bid value. Points for price are calculated using the formula provided. Points for B-BBEE status are awarded per the table. The total points for price and B-BBEE must not exceed 100.
Description
Source: Form CPA (IG) Rev. 28 December 2006 - Annexure to Price Schedule.docxThis annexure covers contract price adjustment and forex payments for importation. It applies to the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. Key rules: if no CPA method is proposed, the price is fixed; the price is fixed if the contract period is under six months; forex payment methods are limited to two options with Eskom's default being Payment Method 1; proof of importation is required at invoicing; and various adjustment methods for overseas and local costs are specified.
Technical Specifications
Source: Form CPA (IG) Rev. 28 December 2006 - Annexure to Price Schedule.docx (unknown)The tender is for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. This document is the Contract Price Adjustment and Forex Payments annexure for importation. Key points:
Financial Requirements
Source: Form CPA (IG) Rev. 28 December 2006 - Annexure to Price Schedule.docx (unknown)The document is the Contract Price Adjustment and Forex Payments annexure. It does not specify pricing format, bid security, bonds, guarantees, retention, or payment terms beyond the forex payment methods described. Key financial points:
Compliance Requirements
Source: Form CPA (IG) Rev. 28 December 2006 - Annexure to Price Schedule.docx (unknown)No specific compliance requirements are stated in this annexure. The document is solely about contract price adjustment and forex payments.
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.docxThe tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)Bidders must accept and sign the Eskom Supplier Quality Requirements acknowledgement form.
Compliance with specification 240-105658000 and ISO 9001 is required.
Only one pre-contract award quality category may be selected; Category 2 applies.
A named tenderer's quality representative must be provided.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)No specific compliance requirements are stated beyond the quality acknowledgement.
Description
Source: SBD 6.2 Local Content in terms of PPR 2017.pdfThis is a standard declaration form for local production and content in designated sectors. The specific goods, services or works and the minimum local content threshold are not stated in this document.
Submission Guidelines
Source: SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Evaluation may follow a two-stage process for designated sectors:
Local content is calculated as a percentage of the bid price (excluding VAT) using the formula in SATS 1286:2011. The stipulated minimum threshold for this bid is not stated in the document.
Technical Specifications
Source: SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)The document does not specify the goods, services or works to be procured, nor the applicable minimum local content threshold. The threshold table is left blank in the form.
Pricing Schedule
Source: SBD 6.2 Local Content in terms of PPR 2017.pdfThe bid price (excluding VAT) and the imported content (in Rand) must be declared. The local content percentage is calculated using the formula in SATS 1286:2011. Declarations C, D and E must be completed; Declaration C is submitted with the bid, while D and E are kept for verification for at least 5 years. The successful bidder must update these declarations with actual values for the contract duration.
Financial Requirements
Source: SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Local content calculation:
Bidders must submit proof of the SARB exchange rates used.
Record-keeping:
Compliance Requirements
Source: SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Local content compliance:
Standard eligibility criteria (CSD registration, tax clearance, B-BBEE) are not detailed in this document.
Contractual Terms
Source: SBD 6.2 Local Content in terms of PPR 2017.pdfThe contract may not be subcontracted in a manner that reduces the overall local content below the stipulated minimum threshold. If challenges arise in meeting the threshold after award, the dti must be informed for verification and directives.
Section
Source: SBD 6.2 Local Content in terms of PPR 2017.pdfA two-stage bidding process may be followed: first stage checks the minimum local content threshold; second stage evaluates price and B-BBEE.
Description
Source: Kusile Plant Smart Digitilization-Pricing Schedule rev 1.xlsxThe project is the smart plant digitalisation and artificial intelligence project at Kusile Power Station, covering design, procurement, implementation, integration, testing, training and handover of five integrated technology pillars: network and infrastructure, intelligent inspection and digital integration, digital twin interface, paperless operations with SAP integration, and digitisation of existing plant documents and data books.
Submission Guidelines
Source: Kusile Plant Smart Digitilization-Pricing Schedule rev 1.xlsx (unknown)Returnable documents: the completed NEC pricing schedule, including all applicable tabs, with rates entered in ZAR excluding VAT. All pricing cells must be completed; enter "N/A" for non-applicable items and provide a brief reason. Do not change item descriptions, units or quantities. Submission of the pricing schedule confirms all pricing has been checked and verified.
Technical Specifications
Source: Kusile Plant Smart Digitilization-Pricing Schedule rev 1.xlsx (unknown)Scope: design, procurement, implementation, integration, testing, training and handover of five integrated technology pillars at Kusile Power Station:
Key quantities from the pricing schedule:
Professional services include network architecture design, site survey, installation documentation, security configuration, and testing/validation.
Software licences: network management software (3-year), security software IDS/IPS (3-year), private cloud management software (3-year).
Financial Requirements
Source: Kusile Plant Smart Digitilization-Pricing Schedule rev 1.xlsx (unknown)Pricing schedule instructions:
Compliance Requirements
Source: Kusile Plant Smart Digitilization-Pricing Schedule rev 1.xlsx (unknown)No specific compliance requirements stated in the provided document.
Description
Source: 240-109253698 CQP Template- Rev 3.docxThe tender is for the procurement of the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The document provided is a Contract Quality Plan (CQP) template that the supplier must complete to plan for meeting Eskom's quality management requirements for the contract.
Submission Guidelines
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)Returnable documents: The completed Contract Quality Plan (CQP) template, Rev 0 during tender evaluation, to be revised to Rev 1 after contract signing. All sections of the CQP must be completed by the tenderer, including scope of work, organogram, interfacing documents, supplier lists, and quality records. The CQP must be signed by the tenderer's representative and approved by the owner of the organisation.
Technical Specifications
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)The tenderer must complete and submit a Contract Quality Plan (CQP) for the Kusile Smart Plant Digitalisation and Artificial Intelligence Project. The CQP must address:
Compliance Requirements
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)The CQP must reference SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2 for quality plan guidelines. The tenderer must comply with ISO 9001 requirements for customer property and quality management systems.
Submission Guidelines
Source: Authorisation Form.pdf (unknown)Returnable documents: the completed Authorisation Form (Eskom 240-15811258 Rev 1) must be submitted with the bid. The form must be signed by the authorised representative and, where applicable, accompanied by the relevant certificate and supporting resolution or power of attorney.
Compliance Requirements
Source: Authorisation Form.pdf (unknown)Authorisation Form requirements:
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Group Tax email: [email protected]
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Returnable documents: the completed PAYE Questionnaire (Evaluation Pack A for companies/close corporations/trusts, or Evaluation Pack B for individuals), the signed summary sheet, the signed particulars of the representative or individual, and the applicable appendices (1 to 9) indicated by the answers. The completed pack must be returned to Eskom, with a copy emailed to [email protected]. Failure to sign required affidavits or declarations results in PAYE being withheld from payments.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)The questionnaire determines the contractor's tax classification for PAYE purposes. Key tests:
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)The PAYE Questionnaire must be completed truthfully. The contractor must declare its tax status and provide the required affidavits and declarations. Non-residents must sign Appendix 9. Labour brokers must provide a valid IRP30 exemption certificate, or PAYE will be withheld.
Technical Specifications
Source: C0 ECC3 Contract cover page_SPP_29.09.2026.docx (unknown)The works comprise the design, execution, commissioning, handover and training for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project.
Description
Source: C1 2b ECC3 Data by Contractor_SPP_29.09.2026.docxThe project involves the digitalisation and artificial intelligence of the Kusile Power Station. The contract is based on the NEC3 Engineering and Construction Contract (April 2013), with the Contractor responsible for design and construction as per the Works Information.
Submission Guidelines
Source: C1 2b ECC3 Data by Contractor_SPP_29.09.2026.docx (unknown)Returnable documents: the completed C1.2b Contract Data Part 2 form, including all required data fields, key persons details and CVs, and the priced activity schedule. The form must be completed in full according to the selected contract options.
Technical Specifications
Source: C1 2b ECC3 Data by Contractor_SPP_29.09.2026.docx (unknown)The contract is for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project. The Contractor is responsible for design and works as defined in the Works Information. The contract is an NEC3 Engineering and Construction Contract (April 2013), option A (priced contract with activity schedule). The Contractor must provide key persons with specified qualifications and experience, and submit their CVs as part of the tender.
Financial Requirements
Source: C1 2b ECC3 Data by Contractor_SPP_29.09.2026.docx (unknown)The tenderer must provide the tendered total of the Prices (excluding VAT) in figures and words. The direct fee percentage and subcontracted fee percentage must be stated. For the Shorter Schedule of Cost Components, the percentage for people overheads, equipment rates, hourly rates for design work outside the working areas, design overheads percentage, and categories of design employees whose travel expenses are included in Defined Cost must be provided.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls (unknown)Bidders must complete the contractor information pack with all mandatory fields populated: contractor name, ID or passport number, income tax number, telephone number, physical address, postal address and banking details. The contractor type must be indicated.
Submission Guidelines
Source: Integrity Pact Declaration Form_ANNEXURE A.pdf (RFP)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Integrity Pact Declaration Form_ANNEXURE A.pdf (RFP)Eligibility and integrity checks:
Compliance Requirements
Source: Integrity Pact Declaration Form_ANNEXURE A.pdf (RFP)Integrity declaration:
Section
Source: Integrity Pact Declaration Form_ANNEXURE A.pdfThe evaluation will consider the bidder's integrity and compliance with fair tendering practices. Bidders must declare any interest or relationship with Eskom or state employees, and must not be restricted suppliers or tender defaulters.
Description
Source: C1 1 ECC3 Offer Acceptance_SPP_29.09.2026.docxThe contract is for the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project. The Employer (Eskom Holdings SOC Ltd) has solicited offers for this procurement.
Technical Specifications
Source: C1 1 ECC3 Offer Acceptance_SPP_29.09.2026.docx (unknown)Procurement of the Kusile Power Station Smart Plant Digitalisation and Artificial Intelligence Project. The contract is for digitalisation and AI implementation at Kusile Power Station.
Financial Requirements
Source: C1 1 ECC3 Offer Acceptance_SPP_29.09.2026.docx (unknown)The offered total of the Prices exclusive of VAT is to be stated, with VAT at 15% added to arrive at the total inclusive of VAT. The tenderer must provide securities, bonds, guarantees, proof of insurance and other documentation within two weeks of receiving the completed agreement.
Compliance Requirements
Source: C1 1 ECC3 Offer Acceptance_SPP_29.09.2026.docx (unknown)Tenderer's CIDB registration number must be provided if applicable.
Description
Source: Annexure A - Technical Evaluation Criteria_Rev6.xlsxThe project is the digitalisation and artificial intelligence initiative at Kusile Power Station. It covers network and infrastructure, intelligent inspection, digital twin interface, paperless operations with SAP integration, and digitisation of plant documents. The Employer prefers a single supplier for Pillars 1, 2 and 4 to ensure an integrated solution and clear accountability.
Submission Guidelines
Source: Annexure A - Technical Evaluation Criteria_Rev6.xlsx (unknown)Returnable documents:
Evaluation Criteria
Source: Annexure A - Technical Evaluation Criteria_Rev6.xlsx (unknown)Evaluation stages:
Scoring split (total 100%):
Qualitative scoring scale:
Mandatory technical criteria:
Technical Specifications
Source: Annexure A - Technical Evaluation Criteria_Rev6.xlsx (unknown)The project comprises five pillars:
Key technical requirements (Pillar 1):
Compliance Requirements
Source: Annexure A - Technical Evaluation Criteria_Rev6.xlsx (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB, local content) are stated in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
KUSILE POWER STATION - WITBANK - EMALAHLENI/VICTOR KHANYE - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
38
Last checked
19 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win government telecom contracts including fiber rollout, network infrastructure, mobile services, and broadband projects. ICASA licensing and compliance.
South Africa is bridging the digital divide. Explore the provincial and municipal broadband rollout projects and the technical requirements for bidding.
Avoid disqualification with our technical compliance checklist for IT bids. From OEM authorizations to POPIA and ISO standards.
Master the process of winning government IT tenders in South Africa. Learn about SITA registration, compliance requirements, and strategies for success.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Information and communication. Unlock full pricing strategies, bid frequency, and historical win rates.