Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Research, Testing and Development, Lower Germiston Road - Cleveland - Johannesburg - 2000
Organization Type
GOVERNMENT
Published
27 Oct 2026
OCDS Reference
ocds-9t57fa-175898
The design, supply, delivery, installation and commissioning of a hybrid wind and solar pv microgrid research facility at eskom's research, testing and development (rt&d) site in gauteng, under a three-year contract. The plant and its cabling must meet ESKOM standard 240-56063805 for lv power and control cable rated 600/1000 v (SANS 1507-1 and SANS 1507-3) and ESKOM standard 240-129686484 for power plant controls and instrumentation, and only cable bearing the sabs mark is accepted. Bidders must submit completed technical schedules a and b with the test and deviation schedules, english test reports and a full cable catalogue at tender stage. The highest risk is the schedule rule: a blank schedule b entry against a requirement listed in schedule a is read as confirmation that the bidder does not comply, so an incomplete schedule can sink an otherwise compliant bid.
Scope and term: design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D), Gauteng, over three years.
Closing: 27 November 2026 at 08:00.
Mandatory standards: compliance with Eskom 240-56063805 (LV power and control cable, 600/1000 V, per SANS 1507-1 and SANS 1507-3) and Eskom 240-129686484 (power plant controls and instrumentation) is compulsory; any deviation is a non-conformance. Cable must carry the SABS mark and be tested in accordance with SANS 1507.
Technical Schedules A and B, including the test schedules and deviation schedules, must be completed in full and submitted with the bid; a blank Schedule B entry against a Schedule A requirement is treated as confirmation of non-compliance, and any deviation must be recorded in the deviation schedule.
Tender-stage evidence: type, routine and sample test reports in English covering all materials used in the cable construction, plus a catalogue giving dimensional data and ratings for the full range of cables offered.
Quality and guarantee: a documented and implemented quality management system meeting at least ISO 9001 (ISO 9002 is referenced), open to Eskom audit and pre-delivery verification of goods; a minimum 15-year product and workmanship guarantee for the applied coating system, provided at tender stage by the supplier on behalf of both the manufacturer and the installer.
Registration: Central Supplier Database (CSD) registration and a valid SARS tax clearance / tax compliance status PIN.
Conductor and cable identification systems must be submitted for Eskom approval, be unique and traceable, visible to the naked eye, repeated at intervals of no more than 500 mm where not continuous, and withstand 90 Β°C continuous and at least 250 Β°C short-circuit conductor temperatures.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 27 November 2026 - 10:00
Venue
Eskom Research, Testing and Development, Lower Germiston Road, Johannesburg
Categories
Request for Bid(Open-Tender)
Eskom Research, Testing and Development, Lower Germiston Road - Cleveland - Johannesburg - 2000
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx (unknown)27 Oct
2026
Tender Published
Tender was published
27 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Rosherville Geotech Report.pdf
SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docx
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site, with a contract duration of three years. The procurement follows the 90/10 preferential procurement system, with specific goals worth up to 10 points, and includes mandatory subcontracting (30% of contract value) and local content requirements.
Technical Standards.zip
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Gauteng, with a contract period of three years. The facility will support research into hybrid renewable microgrid systems.
E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Johannesburg, with a three-year contract period. The contract will be governed by the NEC3 Engineering Construction Contract, and bidders must meet strict technical, financial and compliance requirements.
ANNEX E - Supporting Schedul to Annex C.pdf
ANNEX C - Designated Material.pdf
ANNEX D - Local Content Declaration.pdf
C1 1 ECC3_ Hybrid Facility_01102025.pdf
Design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom's Research, Testing and Development (RT&D) site in Rosherville, under an NEC3 Engineering and Construction Contract (Option A: Priced contract with activity schedule). The contract includes a 15-month design and construction period, followed by technical support for 21 months after construction completion, with sectional completion dates for design, procurement, construction, and commissioning.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Gauteng, with a contract period of three years.
Research Facility USL V1 2024 - FINAL.pdf
Eskom requires the design, supply, delivery, installation, and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Gauteng, with a contract period of three years. The facility will include substation, underground services, and associated electrical and civil infrastructure as shown in the layout plans.
Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdf
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its RT&D site in Rosherville, Johannesburg. The facility will integrate a 30kWac solar PV array with single-axis tracking, a 30kWac wind turbine system, a 60kWh usable BESS, a 30kW power conversion system, a 30kW programmable load, and a control room, all to be operated for research purposes over a three-year period.
Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf
Supply and delivery of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D), including design, installation and commissioning, with a three-year contract period. Eskom requires tenders to be submitted by 27 November 2026 at 12:00, and bidders must comply with the Eskom Supplier Integrity Pact.
Technical Evaluation Criteria.zip
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Rosherville, Gauteng, for a period of three years. The facility will integrate solar PV (30 kWac), wind turbines (30 kWac), battery storage (60 kWh usable), a power conversion system, a programmable load, a control room, and monitoring and control systems, to be used for research and training. The contract includes a three-year service period and requires compliance with a comprehensive set of SANS, IEC, and EN standards.
Activity Schedule_Hybid Wind - October 2026.xlsx
Eskom requires the design, engineering, supply, construction, installation, testing, commissioning, operation and maintenance of a Hybrid Wind and Solar PV Microgrid Research Facility at its Research, Testing & Development (RT&D) site in Gauteng, with an output of 60 kWh, for a period of three years. The contract is an EPC lump-sum arrangement covering all works, including O&M for the first two years, with pricing in multiple currencies and a CPA formula for inflation.
Quality.zip
Design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom's Research, Testing and Development (RT&D) site, with a contract period of three years. The tender is issued by Eskom and falls under Supplier Quality Management Category 3, requiring bidders to demonstrate a quality management system compliant with ISO 9001 and submit specific quality documentation.
E-tendering Help Manual for supplier - 27 January 2025 (2).docx
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site, with a contract period of three years.
Enivronmental.zip
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing & Development (RT&D) site in Gauteng, with a contract period of three years. The project is subject to a comprehensive Environmental Management Plan (EMP) that bidders must comply with during construction.
Supplier Declaration of Interest Template (5).docx
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Gauteng, with a contract period of three years. The facility is intended for research purposes and must be delivered as a complete, operational system.
Safety.zip
Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its Research, Testing and Development (RT&D) site in Gauteng, with a contract period of three years. The tender includes mandatory occupational health and safety (OHS) compliance documents and agreements.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 3Β 155Β 171
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Returnable form
Submission channel
Disqualification
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx (unknown)Responsiveness gate
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx (unknown)Mandatory returnable
Description
Source: Activity Schedule_Hybid Wind - October 2026.xlsxDesign, engineering, supply, construction, installation, testing, commissioning, operation and maintenance of a Hybrid Wind and Solar PV Microgrid Research Facility at Eskom Research, Testing & Development (RT&D), with an output of 60 kWh, under a three-year contract.
Submission Guidelines
Source: Activity Schedule_Hybid Wind - October 2026.xlsx (unknown)Bids must be submitted by the closing time on 27 November 2026 at 10:00. Submission method and address are to be confirmed in the full tender document.
Returnable documents, all completed and signed:
Bid packaging and channel must follow the instructions in the full tender document; bids received after the closing time may be disqualified.
Evaluation Criteria
Source: Activity Schedule_Hybid Wind - October 2026.xlsx (unknown)Evaluation follows the 90/10 preference point system (or as stated in the full tender document).
Technical Specifications
Source: Activity Schedule_Hybid Wind - October 2026.xlsx (unknown)Scope: Design, engineering, supply, construction, installation, testing, commissioning, operation and maintenance (O&M) of a Hybrid Wind and Solar PV Microgrid Research Facility at Eskom Research, Testing & Development (RT&D).
Output: 60 kWh (as indicated in the title and activity schedule).
The work is executed as an EPC (Engineering, Procurement and Construction) contract on a lump-sum basis, covering all studies, permitting, design, procurement, manufacturing, delivery to site, erection, commissioning, testing, completion, and O&M until the end of the Defects Liability Period.
Deliverables include the microgrid itself, access road, site facilities, and any additional infrastructure as per the Employer's Requirements.
The Activity Schedule is a general guide; bidders may propose their own breakdown as long as it covers the full scope.
O&M must be priced for Years 1β2; the contract is for a period of three (3) years overall.
Financial Requirements
Source: Activity Schedule_Hybid Wind - October 2026.xlsx (unknown)Pricing format: Lump-sum EPC price, with a detailed Activity Schedule (optional additional breakdown).
Prices must be comprehensive, including all direct and indirect costs, overheads, profit, risks, liabilities, taxes (except VAT, which is added separately) and customs duties on imported plant.
The total price excludes VAT; VAT at the current rate (15%) is added on the cover page.
Bids may be quoted in up to three currencies, one of which must be ZAR. All rates must use the SARB exchange rate at 12:00 on the day of advertisement.
Contract Price Adjustment (CPA): Prices are fixed and firm for the first 12 months after contract signing, then escalated annually using the agreed CPA formula. The fixed portion of each formula must be at least 15%.
CPA base date is one month before the tender closing date; escalation is calculated using the latest available index versus the base index.
Insurance: Bidders must quote the price on Carriage and Insurance Paid (CIP) basis with Insurance (PWI). Failure to provide a PWI price makes the bid non-responsive.
Insurances required: cargo during transport, installation all risks, third-party liability, and any other specified.
Payment terms: As per the NEC ECC contract; the Activity Schedule forms the basis for valuation and progress monitoring.
No claims for errors, omissions or misunderstandings will be accepted after the closing date.
Compliance Requirements
Source: Activity Schedule_Hybid Wind - October 2026.xlsx (unknown)CSD registration: mandatory.
Valid SARS tax compliance status (TCS or tax pin).
B-BBEE: status level required for preference points (level certificate or qualifying affidavit depending on revenue).
SARB exchange rate proof: must be submitted.
CPA formula: must be completed unless prices are fixed and firm.
No alternative offers are accepted.
Bidders must be able to deliver the full EPC scope, including design, engineering, construction, and O&M.
Insurances as per NEC ECC contract.
Technical Specifications
Source: Research Facility USL V1 2024 - FINAL.pdf (unknown)Scope
Description
Source: SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docxDesign, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D), with a contract duration of three years.
Submission Guidelines
Source: SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docx (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
If preference point documentation is not provided, the bidder is not disqualified but scores 0 points for specific goals and may only score out of 90/80 for price.
Evaluation Criteria
Source: SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docx (unknown)Preference points system: PPPFA 90/10 (contract value above R50 million) or 80/20 (contract value equal or below R50 million).
B-BBEE status level points (specific goals):
Contract awarded to the tenderer scoring the highest total points, subject to section 2(1)(f) of the PPPFA.
Objective criteria (if applied): failing to meet them may lead to the second-ranked tenderer being recommended for award.
Technical Specifications
Source: SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docx (unknown)Scope: Design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D).
Duration of the project: 3 years.
Business unit: RT&D Gas and Renewables.
Financial Requirements
Source: SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docx (unknown)Subcontracting: mandatory for contracts above R30 million β successful tenderer must subcontract a minimum of 30% of the contract value to an EME or QSE (which may be at least 51% owned by black people, youth, women, persons with disabilities, people in rural/underdeveloped areas or townships, military veterans, or a cooperative at least 51% black-owned).
A supplier may not subcontract more than 25% of the contract value to any entity that does not have an equal or higher B-BBEE status level than the supplier, unless the subcontract is to a capable EME.
SDL&I retention: Eskom will retain 1.5% of every invoice amount (excluding VAT) as security for SDL&I obligations.
Skills development: the successful tenderer must skill one candidate for every R5 million received cumulatively; obligation applies for the contract duration and positive progress must be demonstrated monthly. Candidates must be currently unemployed graduates from school, universities, or TVET campuses. Costs of development are the tenderer's responsibility.
Compliance Requirements
Source: SDLI stragety Design supply delivery installation and commissioning of wind and solar PV microgrid research facility at RTD.docx (unknown)CSD registration and a valid tax clearance (SARS TCS or tax pin) are required.
A valid B-BBEE certificate or sworn affidavit (as per revenue thresholds) is a condition for contract award:
Local content: SBD 6.2 and Annexure C are mandatory; local procurement content is value added in South Africa (total spending minus imported component), and responses must separate local and imported components per the price schedule.
B-BBEE improvement or retention plan (an essential document) must be submitted within 30 days of contract signature:
CIDB skills development: noted as not a construction contract, but if applicable, CSDG target is 2.5%.
Description
Source: Technical Evaluation Criteria.zipEskom's RT&D division is establishing a hybrid wind and solar PV microgrid research facility at its Rosherville site. The facility is a supply-and-install project intended for research into microgrids. The major components are solar PV, wind turbines, batteries, power conversion, programmable load, control room, monitoring and control, and auxiliaries. The design builds on Eskom's existing deployed microgrid concept.
Contact Information
Source: Technical Evaluation Criteria.zip (unknown)Technical Evaluation Team (document authors):
No email addresses or telephone numbers were given in the provided text.
Submission Guidelines
Source: Technical Evaluation Criteria.zip (unknown)Returnable documents: the completed Technical Returnable Document (the Excel scoring spreadsheet), the Preliminary Design Report addressing every criterion in it, and the evidence sheets referenced by it (component datasheets, Single Line Diagrams, compliance certificates). Bidders must also submit the standard tender returnables required by Eskom for this RFB.
Evaluation Criteria
Source: Technical Evaluation Criteria.zip (unknown)Two-stage evaluation.
Stage 1 β Mandatory technical criteria (pass/fail; failure of any one disqualifies the bid):
Stage 2 β Qualitative technical evaluation (weighted, minimum 80% to qualify):
Technical Specifications
Source: Technical Evaluation Criteria.zip (unknown)Eskom requires the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at its RT&D Rosherville site. The system integrates the following major components operating as one unit: solar PV panels, wind turbine generators, batteries, power conversion system (PCS), programmable load, control room, monitoring and control system, and all auxiliaries.
Key performance and capacity requirements:
Related small wind turbine scope (contractor responsibilities): geotechnical study, foundation type based on soil conditions, wind resource assessment, wind direction/turbulence analysis, turbine sizing, environmental impact assessment, structural analysis, permits and legal compliance, noise assessment, and maintenance/service accessibility.
Standards to comply with (latest editions): SANS 10142, IEC 61215, SANS 1067, IEC 61730, IEC 62619 (lithium), EN 62619:2017, EN 62368-1:2014+A11:2017, EN IEC 63000:2018, IEC 61400, SANS 10142-1/-2, EN 50618, SANS 1501-1, IEC 60332-1-2, IEC 61000β6β5, EN 62109-1:2010, EN 62109-2:2011, EN IEC 62040-1:2019+A11:2021, EN 62477-1:2012, IEEE 1613, IEC 61850β3, IEC 62368, UL 60950-1, IEC 61000-6-2, IEC 62056-46, EN 55032:2015 (+A11:2020), EN 55024:2010 (+A1:2015), EN 55035:2017 (+A11:2020), EN 61000-3-11 (2000/2019), IEC 61000-3-11 (2000/2017), EN 61000-3-12:2011, EN 61000-6-2:2005, EN 61000-6-4:2007+A1:2011.
Compliance Requirements
Source: Technical Evaluation Criteria.zip (unknown)Mandatory technical gatekeepers (from the evaluation criteria): references, company experience, business operating period in South Africa, ECSA registration of lead design engineer. No B-BBEE, CIDB, CSD or tax compliance requirements were stated in the provided text.
Section
Source: Technical Evaluation Criteria.zipThe technical evaluation uses a weighted scorecard against the Employer's requirements. Stage 1 is a mandatory pass/fail gatekeeper set (references, experience, ECSA registration). Stage 2 scores the qualitative criteria listed in the Technical Returnable spreadsheet. The minimum weighted technical score to be considered is 80%.
Description
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfThis is the Eskom Supplier Integrity Pact, a binding ethical conduct agreement between Eskom and its suppliers. It requires suppliers to maintain high integrity, avoid dishonest, fraudulent, or corrupt practices, and to complete and submit the Integrity Declaration Form when participating in any Eskom procurement process. Eskom commits to fair, transparent, and competitive procurement aligned with South African law.
Important Dates
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)No closing date, briefing, or site visit is stated in this document.
Contact Information
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Ethics reporting:
Submission Guidelines
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)No scoring split or preference point system is stated in this document. Bidders must comply with the Integrity Pact's obligations; contravention may lead to supplier discipline, suspension from the Eskom Vendor Database, and listing on the National Treasury's List of Restricted Suppliers.
Technical Specifications
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Not applicable β this document is the Eskom Supplier Integrity Pact, which applies to all existing and potential suppliers of Eskom Holdings SOC Ltd and its wholly owned subsidiaries. It supplements all other commercial and ethics policies and codes.
Financial Requirements
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Business courtesies and gifts offered to Eskom employees/directors must not exceed R1,500.00 in value and must not place the recipient under obligation or improperly influence them.
Compliance Requirements
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Supplier must:
Contractual Terms
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfSuppliers are subject to Eskom's supplier discipline process for misconduct, with sanctions including suspension from the Eskom Vendor Database and referral to National Treasury for listing on the Restricted Suppliers list. Eskom employees involved in evaluation must be excluded from any tender where a conflict of interest exists. The pact is governed by South African law and remains valid until replaced.
Description
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfThe scope document describes a research microgrid facility to be built at Eskom's RT&D Rosherville site. The facility integrates solar PV, wind turbines, battery storage, power conversion, programmable load, and monitoring/control systems, and will be used to advance Eskom's microgrid offering. The project is a supply-and-install source project.
Contact Information
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdf (unknown)No contact details are stated in the supplied scope document. Refer to the full tender pack.
Submission Guidelines
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdf (unknown)Submission method and closing details are not stated in the supplied scope document; consult the full tender pack for the submission address, format, and closing time.
Returnable documents: the scope document lists none. Complete the standard Eskom bid forms (SBD/MBD, declarations, pricing schedules) as required by the invitation.
Evaluation Criteria
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdf (unknown)Bidders must be ISO 9001 certified.
Compliance with the Occupational Health and Safety Act of 1993 and all relevant environmental legislation is required.
The contractor must comply with Eskom's Supplier Quality Management Specification (240-105658000).
No scoring split, minimum qualifying score, or preference point system is stated in the provided document.
Technical Specifications
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdf (unknown)Eskom requires the design, supply, delivery, installation, and commissioning of a complete hybrid wind and solar PV microgrid research facility at its RT&D site in Rosherville, Johannesburg.
Key components and capacities:
Functionality required: manual control, voltage (volt-var) control, frequency control, P-control (curtailment), load management, switching, metering and revenue collection, short-term forecasting, programmable load, economic dispatch.
Operational requirements:
Control room must be equipped with viewing screen (>80cm), interactive smart whiteboard, video conferencing, manual input controls, data storage and cloud upload.
Furniture for the control room is specified: operator workstations (4 chairs, desks, monitors, phones), conference area (table for 10), kitchenette, and miscellaneous items.
Training obligations (part of the works):
Project deliverables and deadlines (Table 1):
Site location: Lower Germiston Rd, Rosherville, Johannesburg, 2095. GPS: 28Β° 6'47.69"E 26Β°13'58.08"S.
Methodology
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfThe contractor must present the design for technical review along with all relevant drawings, and the installation and commissioning methodology is reviewed as part of the design review. The design must be approved by the Project Manager.
Quality Management
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfMandatory ISO 9001 certification; the contractor must use its QMS for all project phases and provide evidence of a fully implemented QMS. A quality control plan and inspection test plan are required. The employer may audit the contractor's or subcontractors' QMS. Compliance with Eskom's Supplier Quality Management Specification 240-105658000 is required.
Compliance Requirements
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdf (unknown)Mandatory:
No CSD, tax clearance, B-BBEE, or CIDB grading thresholds are stated in the provided document.
Health & Safety
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfCompliance with the Occupational Health and Safety Act of 1993 and Eskom SHE policies is mandatory. Environmental protections must be implemented before work; poor implementation may lead to suspension of works.
Environmental
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfThe contractor must comply with all applicable environmental legislation, Eskom's SHE specification, and Eskom's waste management procedure 32-245. Environmental impact assessments are required as part of the wind turbine scope. Work areas must be kept clean; hazardous waste handled under DWAF regulations. The employer provides colour-coded bins and empties them.
Contractual Terms
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfThe contractor must comply with the Conditions of Contract, including suspension of works if environmental protection measures are inadequate. Design review meetings are required, with the design approved by the Project Manager. The contractor must provide technical support on an as-and-when basis and participate in knowledge transfer workshops when requested. Work may be ordered by task order (management of work done by task order).
Section
Source: Hybrid Wind and Solar PV Microgrids Research Facility Scope Document.pdfISO 9001 certification is mandatory. No scoring split, minimum score, or preference point system is stated in the supplied document.
Description
Source: Quality.zipThe tender is for the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D), specifically the RT&D Renewable Hydrogen Facility, for a period of three (3) years.
The work is governed by Eskomβs Supplier Quality Management specification 240-105658000, which sets out minimum quality requirements for suppliers and sub-suppliers, and requires conforming to ISO 9001.
The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of RFIs, RFQs, RFPs and contracts for procurement of products and services.
Important Dates
Source: Quality.zip (unknown)Closing date: The document indicates the closing date as 17 October 2021 (the date on the Eskom quality specification). This appears to be the date of the specification, not the tender closing date. The tender record closing date is 27 November 2026 at 10:00.
Contact Information
Source: Quality.zip (unknown)Eskom quality representative: Thokozani Mngomezulu
Designation: Senior Advisor Quality Assurance
Date issued: 17 April 2025
Submission Guidelines
Source: Quality.zip (unknown)Completed and signed Form A (Tender and Contract Quality Requirements for Supplier Quality Management, specification 240-105658000 / QM 58 and ISO 9001) must be returned with the bid to acknowledge and accept Eskomβs supplier quality requirements.
Returnable quality documentation for Category 3:
The tenderer must complete and sign this form (Form A) and the response must be submitted with the other listed tender returnables.
Evaluation Criteria
Source: Quality.zip (unknown)Bidders are evaluated on the quality deliverables listed in the List of Tender Returnables (240-12248652) under Category 3, with each listed item scored (indicator = 1 where applicable).
Sections and scoring:
The bidder must acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001.
Technical Specifications
Source: Quality.zip (unknown)Scope of work: design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D) β the RT&D Renewable Hydrogen Facility.
Contract duration: three (3) years.
Quality requirements are per Eskom Supplier Quality Management Specification 240-105658000 (revision 3) and ISO 9001.
The quality classification applicable is Category 3 (pre-contract award quality requirements).
The bidder must develop, implement, maintain and continually improve a QMS based on ISO 9001 and conform to Eskom quality requirements throughout the contract.
The bidder must submit a draft Contract Quality Plan specific to the scope of work, and an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) covering chemical analysis for 3 chemicals.
The bidder must ensure sub-supplier compliance with the same quality requirements, including QMS certification and quality plans.
Compliance Requirements
Source: Quality.zip (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB) are detailed in the available document.
The bidder must comply with Eskom Supplier Quality Management specification 240-105658000 and ISO 9001 (as described in technical specifications).
ISO 9001 certification or documented QMS compliance is required as per the applicable category (Category 3).
Section
Source: Quality.zipQuality evaluation is per the List of Tender Returnables (240-12248652) with the applicable category (Category 3) determining the required documentation.
For Category 3, the bidder must submit objective evidence of a QMS complying with ISO 9001, including documented information for the QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure.
The bidder must also submit a draft Contract Quality Plan, an example ITP or QCP, documented information for control of externally provided processes, roles and responsibilities, and management review records.
These quality deliverables are assessed as part of the tender evaluation (indicators = 1 for each applicable item).
Description
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdfProcurement is for design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D).
Contract period: 3 years.
Tender documents supplied free of charge.
Submitted tenders deemed acceptance of Eskom Standard Conditions of Tender (available at www.eskom.co.za).
Important Dates
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)Closing date/time: 27 November 2026 at 10h00 SAST
Tender validity: 12 weeks from closing
Clarification meeting (non-compulsory): 11 November 2026 at 10h00 SAST
Venue: Eskom Research, Testing and Development, Lower Germiston Road, Johannesburg
Attendees to meet at Main Reception at 09:45
RSVP to confirmation of attendance: confirm to [email protected] with attendee details, two working days before meeting.
Contact Information
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)Eskom Representative
Procurement Manager
Submission and clarification attendance email: [email protected]
Fraud and corruption reporting: 0800 11 2722, [email protected]
Submission Guidelines
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)Submission method: electronic via Eskom E-Tendering at https://etendering.eskom.co.za. Upload documents under folders Technical, Commercial, Financial, SHEQ, and other. All documents in PDF format; pricing schedule in PDF and Excel. No zip files, no hard copies. If resubmitting, the latest version is accepted; previous versions become null and void. Ensure submission status is marked complete. Tender validity: 12 weeks from closing.
Mandatory returnables (disqualifiable if not submitted by closing):
Non-disqualifiable returnables (may be requested within 5 working days after closing):
Clarification queries: must be submitted before 20 November 2026 (5 working days before closing).
No queries to any Eskom official other than the Eskom Representative.
Evaluation Criteria
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)Evaluation stages:
Total score = price points + specific goals points, ranked highest to lowest.
Technical Specifications
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)Scope: design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D).
Contract period: three (3) years.
The contract will be NEC3 Engineering Construction Contract (ECC).
A complete Scope of Work is provided as Annexure (NEC ECC).
Successful tenderer must meet Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) as per CIDB standards.
CIDB grading required: Grade 6 EP, 6 EB, or 6 ME or higher (or potentially emerging enterprise).
Joint ventures must have all members CIDB-registered, lead member with required grade or one level below with recognition status, combined grade per CIDB regulations.
Alternative tenders not allowed.
Cataloguing: may be required post-award; pricing schedule must include a line item for cataloguing if required.
Quality Management
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdfQuality requirements:
Pricing Schedule
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdfPricing schedule/BOQ: must be submitted in PDF and Excel format. If not contained in contract, complete the pricing schedule. Upload size per document 500 MB, total submission 4 GB. Cataloguing line item may be required.
Prices evaluated inclusive of VAT, corrected for errors, excluding contingencies, NPV comparison.
Unconditional discounts considered; conditional discounts apply at payment only.
Financial Requirements
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)Security: Performance Bond β Demand Guarantee, and Parent Company Guarantee.
For performance bond/demand guarantee, bidder must select at least two financial institutions from Eskom-approved list: Standard Bank, First National Bank, ABSA.
Payment terms: For contracts below R50,000,000 (incl. VAT), payment within 30 days of undisputed invoice. For contracts above R50,000,000, payment within 60 days.
Prices evaluated inclusive of VAT.
Financial statements required as a contractual requirement for CIDB-related transactions (compulsory from R30,000 excluding VAT).
Eskom reserves right to negotiate prices with preferred bidders if not market-related.
Compliance Requirements
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdf (TENDER)CSD registration mandatory (CSD number/CSD report).
Tax clearance: provide SARS e-filing PIN or certified copy of tax clearance certificate (for local tenderers not on CSD). Foreign suppliers with no SA footprint only need SBD 1.
Employment Equity Act: designated employers must provide proof of compliance (SA tenderers).
CIDB: valid proof of required grading (Grade 6 EP/EB/ME or higher) at closing or within 21 working days if agreed.
B-BBEE: to claim preference points, submit valid B-BBEE certificate, sworn affidavit (no electronic signatures) or CIPC affidavit, proof of ownership/shareholding, certified ID copies, proof of disability if applicable. Failure to submit evidence results in 0 points for specific goals but not disqualification.
COIDA: original certificate of good standing or proof of application (SA tenderers).
Quality: submit QMS manual, quality policy and objectives (top management), control of documented information, internal audit, organisation chart/responsibility matrix, control of external providers, draft quality plan, example ITP/QCP, Form A.
Safety: OHS plan, baseline risk assessment, letter of good standing (COIDA), OHS policy signed by CEO, 37(2) Eskom agreement, acknowledgement of Eskom Lifesaving rules, H&S costing, SACPCMP proof for full-time safety professional.
Environmental: environmental policy signed by CEO, aspect and impact register, construction environmental management plan.
Financial: latest approved annual financial statements of the tendering company (not parent or holding), including background, director's report, auditor's/reviewer's report, statements, notes, public interest score (if not audited), ITA34C for current and previous years (if not audited).
Joint ventures: letter of intent or valid JV agreement, confirmation of single business entity, single designated bank account.
Prohibited: subcontracting 100% of scope, submitting more than one tender (except due to upload size limits), conflict of interest, tenders signed by non-authorised persons, restricted by National Treasury, Tender Defaulters list, international sanctions list.
Health & Safety
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdfSafety and health requirements:
COIDA certificate of good standing or proof of application required (South African tenderers).
Contractual Terms
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdfContract form: NEC3 Engineering Construction Contract (ECC).
Security: performance bond (demand guarantee) and parent company guarantee. Bidder to nominate at least two financial institutions from Eskom approved list (Standard Bank, FNB, ABSA).
Payment: 30 days for contracts below R50m (incl. VAT); 60 days for contracts above R50m.
Contract Skills Development Goals (CSDG) apply; contractor must achieve goals as per CIDB standard.
Contract Participation Goals (CPG): at least 5% of contract value to be subcontracted to targeted enterprises, applicable to GB and CE classes, minimum 6 months duration, at least 25% of main contract subcontracted in CE, EB, GB, or ME.
Post-award returnables: Form A2 Baseline Training Plan, A3 Project Interim Report, A4 Supervisor Agreement, A5 Project Completion Report; and Annexure A-Targeted Enterprise Declaration Affidavit, Project Interim Report, Completion Report.
Section
Source: E3730CXMWP_Invitation to Tender_Hybrid Wind_27 October 2026.pdfRefer to standard evaluation criteria section. Functionality (Technical) weight 100%, threshold 80%. Price 80 points, specific goals 20 points.
Tenders ranked by total (price + specific goals) under 80/20 system.
Description
Source: Safety.zipThe tender concerns a hybrid wind and solar PV microgrid research facility at Eskom RT&D, to be designed, supplied, delivered, installed and commissioned over a three-year period.
The documentation included is a Section 37(2) agreement and related OHS acknowledgement forms, setting out health, safety and environmental obligations for the contractor.
Eskom's Life-saving Rules are mandatory and must not be violated under any circumstances. They are: open/isolate/test/earth/create an equipotential zone before touch; hook up at height; buckle up; be sober; have a permit to work; ensure safe live working.
Submission Guidelines
Source: Safety.zip (unknown)Returnable documents (each must be signed and submitted):
Submission method: via the Eskom tender box or as indicated elsewhere. The closing time is 10:00 on the closing date.
Disqualification risks:
Evaluation Criteria
Source: Safety.zip (unknown)Evaluation will consider the completeness and correctness of the OHS returnables and compliance with statutory requirements.
Technical Specifications
Source: Safety.zip (unknown)The tender is for the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D), for a period of three years.
The document provided focuses on health and safety requirements for the contract, including:
Compliance Requirements
Source: Safety.zip (unknown)Mandatory OHS compliance documents (returnables):
Additional compliance notes:
Evaluation Criteria
Source: Enivronmental.zip (unknown)Bidders must comply with the EMP and all applicable legislation, including NEMA, the National Water Act, the Hazardous Chemical Substances Act, the Occupational Health and Safety Act, and Eskom's SHEQ Policy 32-727. The EMP will form part of the contract documentation and is binding on all contractors on site. No specific scoring or preference point system is stated in this document.
Technical Specifications
Source: Enivronmental.zip (unknown)The EMP applies to the construction of the RT&D Hybrid Wind and Solar Facility and associated infrastructure. Key environmental obligations for the contractor include:
Compliance Requirements
Source: Enivronmental.zip (unknown)The EMP is a mandatory compliance document for all contractors. Applicable legislation includes:
Contractors must keep a copy of the EMP on site at all times, maintain an environmental incident register, and comply with the 'polluter pays' principle under NEMA Section 28.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docxThe document is a user manual for the Eskom eTendering system, which replaces the physical submission of tender documents at Eskom offices. Suppliers must register on the system before they can upload tender documents; registration requires a CSD number and email/OTP verification.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docx (unknown)Submission method: electronic upload via the Eskom eTendering system only.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docx (unknown)No tender-specific evaluation criteria are stated in the supplied document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docx (unknown)The supplied document is the Eskom eTendering System Suppliers Help Manual, not the technical specifications for the hybrid microgrid research facility. No technical scope, quantities, locations, or service levels are provided.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docx (unknown)Bidders must have a CSD (Central Supplier Database) number to access the eTendering system.
Submission Guidelines
Source: Supplier Declaration of Interest Template (5).docx (unknown)Returnable documents:
Evaluation Criteria
Source: Supplier Declaration of Interest Template (5).docx (unknown)No evaluation criteria are stated in the extracted document. The only requirement is submission of the Supplier Declaration of Interest as a returnable.
Compliance Requirements
Source: Supplier Declaration of Interest Template (5).docx (unknown)No compliance requirements are stated beyond the Supplier Declaration of Interest. The document does not mention CSD registration, tax clearance, B-BBEE levels, or CIDB grading.
Important Dates
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)Closing date: 27 November 2026 at 10:00
Starting date (contract): 20 May 2026
Access to site (whole working area): 20 April 2026
Programme submission (first): within two weeks of contract start
Sectional completions:
Completion of the whole of the works: 15 months from contract start (includes design, construction, commissioning and handover)
Defects date: 52 weeks after Completion
Technical support completion: 21 months after Construction Completion Date
No briefing or site visit is stated.
Contact Information
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)Project Manager: not stated
Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30)
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Adjudicator nominating body: ICE-SA (South African Institution of Civil Engineering) β www.ice-sa.org.za
Arbitration body: Association of Arbitrators (Southern Africa)
No enquiry contact names or email addresses are stated in the provided text.
Submission Guidelines
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)Returnable documents β all must be completed, signed and submitted with the bid:
Submission method: not stated in the provided text. Closing time is governed by the tender record (10:00). Bids must be submitted before the closing time; late bids are disqualified.
Evaluation Criteria
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)Contract award follows a competitive tendering process. The offered price is evaluated in accordance with the conditions of tender. No specific scoring split, minimum qualifying score or preference point system (80/20 or 90/10) is stated in the provided text.
Technical Specifications
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)Design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility.
Location: Eskom Research, Testing and Development (RT&D), Rosherville, Gauteng.
Contract type: NEC3 Engineering and Construction Contract (April 2013), main Option A (Priced contract with activity schedule), with specified secondary options (X1, X2, X3, X5, X7, X13, X16, X18) and additional Z-clauses Z1βZ15.
Bidder must design the facility; Works Information is in Part 3 (Scope of Work) and Site Information in Part 4.
The Employer is not willing to take over the works before the Completion Date.
Risk Register includes interface with other contractors on site.
Bidder must comply with Construction Regulations 2014 (under OHSA), all applicable health, safety and environmental laws, and Eskom's Asbestos Standard 32-303.
Bidder may be appointed as Principal Contractor for the site.
No quantities, capacity or technical performance parameters are stated in the provided text.
Experience & Qualifications
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfContractor must provide details of key persons in Contract Data Part Two, including name, job, responsibilities, qualifications and experience, with CVs attached to the relevant tender schedule.
No minimum experience or qualification requirements are stated.
Quality Management
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfDefects correction: defects date 52 weeks after Completion; defect correction period is one week (or longer if agreed).
Liability for defects due to design is limited to the total of the Prices at contract date (plus other factors).
No other quality management or QA/QC requirements are stated in the provided text.
Pricing Schedule
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfPricing under Option A: priced contract with activity schedule.
The bidder completes the activity schedule and states a total price (excluding VAT) in Contract Data Part Two.
Fee percentages (direct and subcontracted) must be inserted.
Hourly rates for design staff may be required for defined cost calculations.
Payment: monthly assessments, payments within four weeks, interest at prime/LIBOR.
No schedule of rates or bill of quantities is stated.
Financial Requirements
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)Pricing format: Option A β priced contract with activity schedule; the bidder completes the activity schedule and states a total price (excluding VAT, VAT at 15%, and total including VAT).
Performance bond: 10% of the contract price (Option X13).
Retention: 10% of the contract price; retention free amount is nil (Option X16).
Delay damages: 0.03% per day per section, capped at 10% of the contract price total.
Payment: monthly assessments between the 25th of each month; payment period is four weeks; interest at prime rate (Standard Bank) for Rand amounts, LIBOR for other currencies.
Payment requires a tax invoice within one week of payment certificate; invoice must show Eskom's VAT number 4740101508; late invoice delays payment.
Employer's liability for indirect/consequential loss: R0.00.
Contractor's liability for indirect/consequential loss: R0.00; liability for defects and other matters is limited to the total of the Prices (with specified exclusions).
End of liability date: 3 years after defects date for latent defects; otherwise per Prescription Act.
Insurance: Contractor provides Insurance Table A cover (replacement cost of works, plant, materials, equipment, and public liability); Employer provides Insurance Table B (assets all risk, contract works, environmental, general/public liability, transportation, motor fleet, terrorism, cyber, nuclear liability).
Price adjustment: Option X1 applies; 85% adjustable, 15% non-adjustable; base date one month prior to tender closing.
Multiple currencies: Option X3 applies; payment in other currency to a foreign bank account, SARB-approved CFC account, or agreed alternative.
ASGI-SA Guarantee may be required (if applicable).
No financial capacity or turnover thresholds stated.
Compliance Requirements
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdf (unknown)B-BBEE: Contractor must maintain B-BBEE status; any change in status must be notified to the Employer within 7 days, with updated verification certificate within 30 days; a decrease may lead to renegotiation or termination.
Joint ventures: if bidding as a JV, consortium, or grouping, all parties are jointly and severally liable; the group must notify the Project Manager within two weeks of contract date of the key person authorised to bind the group; group composition cannot change without written consent.
No cession, delegation or assignment without written consent.
Confidentiality: all contract information is confidential; images of the works require prior written consent; subcontractors must also comply.
Health, safety and environment: comply with Construction Regulations 2014, OHSA, environmental laws, and Eskom's asbestos standard; asbestos removal/ disposal by a registered asbestos contractor at Employer's expense.
Ethics: no corrupt, fraudulent, collusive, coercive or obstructive actions; such actions may lead to termination.
Tax invoice: must include Eskom's VAT number 4740101508.
No CIDB grading, CSD registration, tax clearance, or specific B-BBEE level thresholds stated.
Health & Safety
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfContractor must take reasonable precautions to maintain health and safety of persons on site.
Employer may appoint the Contractor as Principal Contractor under Construction Regulations 2014.
Prices must include sufficient amount for compliance with health and safety laws.
Contractor must comply with the Construction Regulations, OHSA, and all health and safety rules in the contract; subcontractors must also comply.
Asbestos: Employer ensures ambient air meets OELs; Contractor may stop work and leave contaminated area until declared safe; asbestos removal/disposal by registered asbestos contractor at Employer's expense.
Environmental
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfContractor must comply with all applicable environmental laws and regulations and any rules/guidelines in the contract, and ensure subcontractors and employees do the same.
Contractual Terms
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfContract: NEC3 ECC, Option A (priced contract with activity schedule), with secondary options X1 (price adjustment), X2 (change in law), X3 (multiple currencies), X5 (sectional completion), X7 (delay damages), X13 (performance bond), X16 (retention), X18 (limitation of liability), and Z-clauses Z1βZ15.
Law: Republic of South Africa; language: English; period for reply: two weeks.
Dispute resolution: Adjudicator from ICE-SA panel, or appointed by AFSA if no agreement; arbitration under Association of Arbitrators rules in Johannesburg.
Employer may terminate if contractor has business rescue order granted against it.
Termination for delay damages reaching the cap may also terminate the works.
Contractor must not disclose confidential information without consent; images of the works require prior written consent.
B-BBEE status changes must be reported within 7 days; termination possible for non-reporting.
No assignment or delegation without written consent.
Joint ventures jointly and severally liable.
Insurance requirements as per Tables A and B.
Asbestos management per Eskom standard and regulations; contractor may stop work if unsafe.
Tax invoice must include Eskom VAT number 4740101508.
Employer indemnifies contractor for nuclear damage (except unlawful intent or unauthorised presence at Koeberg).
Section
Source: C1 1 ECC3_ Hybrid Facility_01102025.pdfThe bid is evaluated via a competitive tendering process; the Schedule of Deviations records any agreed deviations from the tender documents. No specific evaluation criteria or scoring split are stated in the provided text.
Description
Source: Technical Standards.zipScope of the attached technical standards
Submission Guidelines
Source: Technical Standards.zip (unknown)Returnable documents
Evaluation Criteria
Source: Technical Standards.zip (unknown)Technical evaluation
Technical Specifications
Source: Technical Standards.zip (unknown)The contract covers the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid research facility at Eskom Research, Testing and Development (RT&D), over a three-year period.
Applicable Eskom standards
LV power and control cable (240-56063805)
Controls and instrumentation (240-129686484)
Financial Requirements
Source: Technical Standards.zip (unknown)Performance guarantees
Compliance Requirements
Source: Technical Standards.zip (unknown)Registration and statutory
Quality and certification
Section
Source: Technical Standards.zipAcceptance of LV power and control cables is based on the technical evaluation criteria applicable at the time of tender and on factory acceptance testing as required by the cable standard.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Eskom Research, Testing and Development, Lower Germiston Road - Cleveland - Johannesburg - 2000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
08 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.