Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
FINAALSPAN SUBSTATION - FINAALSPAN SUBSTATION - FINAALSPAN SUBSTATION -
Organization Type
GOVERNMENT
Published
03 Sept 2026
OCDS Reference
ocds-9t57fa-168809
ESKOM is inviting offers for the purchase and removal of a scrap 1x 20mva transformer at finaalspan substation in gauteng. Bidders must complete and submit the sbd 4 disclosure form, and any bidder listed on the register for tender defaulters or the list of restricted suppliers will be disqualified.
Bidders must complete, sign and submit the SBD 4 (Bidder's Disclosure) form with the quotation.
Bidders must disclose whether the bidder or any director, trustee, shareholder, member, partner or controlling-interest person is employed by the state, has a relationship with anyone employed by the procuring institution, or has an interest in any related enterprise.
Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers.
Bidders must certify that the bid was prepared independently and without collusion, and that its terms have not been and will not be disclosed to any competitor before bid opening or contract award.
Bidders must certify that no consultations or arrangements were made with any official of the procuring institution regarding this procurement, except for clarification, and that the bidder was not involved in drafting the specifications or terms of reference.
Bidders must submit the offer for the purchase and removal of the scrap 1x 20MVA transformer at Finaalspan Substation.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 11 September 2026 - 10:00
Venue
null
All submissions to be done through [email protected]
Categories
Request for Bid(Open-Tender)
FINAALSPAN SUBSTATION - FINAALSPAN SUBSTATION - FINAALSPAN SUBSTATION -
AI Document Analysis Stages
Important Dates
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)03 Sept
2026
Tender Published
Tender was published
11 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf
Eskom invites offers for the purchase and removal of a scrap 20MVA transformer at Finaalspan Substation. The tender is issued under Eskom's standard conditions and requires bidders to complete the accompanying disclosure and declaration forms.
Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf
Eskom invites offers for the purchase and removal of a scrap 20 MVA transformer at Finaalspan substation. The tender includes mandatory reverse e-auction training and requires bidders to complete the acknowledgement form.
Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf
Eskom is inviting offers to purchase, collect and remove one scrapped 20MVA transformer at Finaalspan Substation in Gauteng. The successful bidder must pay upfront, remove the transformer within 7 working days, and clean the site, with the sale being on a 'voetstoots' basis.
eAuction User Guide for Prospective Bidders.pdf
Eskom is inviting offers for the purchase and removal of a scrap 1x 20MVA transformer at Finaalspan Substation in Gauteng, using its eAuction system. The auction is a standard (open) auction where Eskom sells the item, and bids must be higher than the previous bid. The process is online, and the final award may consider B-BBEE rating alongside price.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom is inviting tenders for the purchase and removal of a scrap 1x 20 MVA transformer at FinAAlspan Substation, under an open tender process governed by Eskom's Standard Conditions of Tender and the Preferential Procurement Policy Framework Act (PPPFA).
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Closing date: 2026-09-11T10:00:00.000Z. Reverse E-auction training date: 25 February 2022 (per document).
Contact Information
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Contact person details to be provided on the acknowledgement form. No specific contact names or emails are stated in the document.
Submission Guidelines
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Returnable Documents: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training, completed and signed. Submit the offer with the acknowledgement form. The form must be signed by the supplier or company/JV contact person.
Evaluation Criteria
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)No eligibility criteria specified
Technical Specifications
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Purchase and removal of scrap 1x 20MVA transformer at Finaalspan Substation. The transformer is to be removed and purchased as scrap.
Compliance Requirements
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)No specific compliance requirements found in the document.
Description
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Purchase, collect and remove scrapped 1 x 20MVA and 5MVA transformers at Finaalspan Substation. The successful tenderer must pay upfront for the allocated batch and collect all units within 7 working days from the issue date of the approved work instruction/task order. The tenderer must have sufficient capacity and resources to service the contract at any given point from any given site, as quantities are not known upfront. The tenderer is responsible for cleaning the site after collection and for any oil spill. The purchaser is responsible for safe collection, handling, removal, and transportation of the scrapped transformers, using qualified labour and suitable certified plant, machinery, equipment, and transport. Payment shall be made to Eskom no later than five days after the date of sale. The release of equipment/scrap will occur after receipt of payment and the buyer obtaining a permit to remove and transport the equipment/scrap. The goods on sale will be identified by Eskom.
Important Dates
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Closing date: 11 September 2026 @ 10:00. Non-compulsory viewing/clarification meeting: 09 September 2026 @ 12h00 AM at Finaalspan. Viewing will take place after tender closing, in preparation of the E-auction. Clarification requests must be received within one to two working days before the tender closing deadline.
Briefing Session
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)There will be a non-compulsory viewing/clarification meeting. Tender closes at 10:00AM and viewing will take place after tender closing, in preparation of the E-auction. The meeting is scheduled for 09 September 2026 at 12h00 AM at Finaalspan. Tenderers must confirm their intention to attend with the Eskom Representative, stating the name, position, and contact details of each proposed attendee.
Contact Information
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Contact person: Phallang Mokoena, Investment Recovery, Procurement & Supply Chain Management. Email: [email protected]. Phone: 017 749 5105 / 084 748 4476. Clarification requests must be sent to [email protected], not to [email protected].
Submission Guidelines
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Submit the completed offer to purchase form and all returnables by the closing date and time. Incomplete or unclear tender documentation may be rejected. The tenderer must submit a valid SARS Tax Clearance Certificate, a B-BBEE affidavit or verification certificate, a secondhand goods certificate from SAPS/licensee, SBD 4, Integrity Pact Declaration, E-auction training acknowledgement, CIPRO registration documents, proof of CSD registration, a valid COID letter of good standing, Declaration of Fair Tendering Practices (Annexure A), and technical requirements including a technical inventory list and method statement. Missing returnables by the deadline will disqualify the tender.
Evaluation Criteria
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Tenders will be evaluated after the tender closing, with a non-compulsory viewing/clarification meeting held after closing in preparation for the E-auction. The evaluation will consider the tenderer's compliance with the returnables and technical requirements. The successful purchaser will be notified. Eskom reserves the right not to accept the lowest or any tender and may withdraw any item it wishes to retain.
Technical Specifications
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Purchase, collect and remove scrapped 1 x 20MVA and 5MVA transformers at Finaalspan Substation. The successful tenderer must pay upfront for the allocated batch and collect all units within 7 working days from the issue date of the approved work instruction/task order. Payment in full is required for the unit indicated on each batch; re-batching is not allowed. The tenderer must have sufficient capacity and resources to service the contract at any given point from any given site, as quantities are not known upfront and depend on Eskom's operations. The tenderer is responsible for cleaning the site after collection and for any oil spill. The purchaser must ensure the site is left clean. The purchaser is responsible for safe collection, handling, removal, and transportation of the scrapped transformers, using qualified labour and suitable certified plant, machinery, equipment, and transport. The goods are sold 'voetstoots' (as is).
Methodology
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)The tenderer must submit a method statement based on the scope of work, and a technical inventory list. The method statement should address the safe collection, handling, removal, and transportation of the scrapped transformers, including site cleaning.
Pricing Schedule
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)The offer to purchase form must include the price offered for the scrapped transformers. Payment shall be made to Eskom no later than five days after the date of sale. The price offered must reflect the tenderer's full intention to purchase the scrap 'voetstoots' as is.
Financial Requirements
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Payment shall be made to Eskom no later than five days after the date of the sale. The release of equipment/scrap to the buyer will occur after receipt of payment and the buyer obtaining a permit to remove and transport the equipment/scrap. Offers will be deemed valid for 90 days from tender closing. No guarantee or warranty is given regarding the workability or condition of the equipment; all equipment is sold 'voetstoots'.
Compliance Requirements
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Returnables include: SARS Tax Clearance Certificate; B-BBEE affidavit (DTI template) or B-BBEE Verification Certificate from an accredited agency; Secondhand goods certificate from SAPS/licensee; SBD 4 (Bidders Disclosure); Integrity Pact Declaration Form; E-auction training acknowledgement; CIPRO registration documents and copies of ID documents of directors; proof of CSD registration (except foreign suppliers); valid Letter of Good Standing with COID; Declaration of Fair Tendering Practices (Annexure A). A bidder with an existing or expired Eskom contract who has defaulted, or who has an open non-conformance, will be disqualified.
Health & Safety
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)The contractor must comply with the Contractor Health and Safety Requirements, including a Section 37(2) Agreement. The tenderer must sign and submit the acknowledgement of Eskom's SHE rules and requirements (Annexure B), provide an OHS plan/manual aligned to the SHE Specification, a Baseline Risk Assessment (BRA) with methodology, a valid Letter of Good Standing with the compensation body/FEMA/RMA, a SHE policy signed by CEO/MD aligned to OHS Act or ISO 45001:2018, and SHE competency records for statutory and non-statutory appointments including first aiders, fire fighters, and incident investigators.
Environmental
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)The successful tenderer is accountable for cleaning the site once collections are completed and ensuring the area is cleaned should there be an oil spill. The purchaser must assure the site is left clean at completion of collection and removal of goods.
Special Conditions
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Eskom will not be responsible for any damages or losses suffered during the removal of the equipment incurred while working on this project arising from theft, damage, or personal injury. A bidder who has an existing or expired contract with Eskom and has defaulted, or who has an open non-conformance, will be disqualified and not awarded a new contract.
Requirements
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)The tenderer must submit valid and completed returnables by the tender deadline or be disqualified. Returnables include: offer to purchase form, SARS Tax Clearance Certificate, B-BBEE affidavit or verification certificate, secondhand goods certificate from SAPS/licensee, SBD 4, Integrity Pact Declaration, E-auction training acknowledgement, CIPRO registration documents, proof of CSD registration, valid COID letter of good standing, Declaration of Fair Tendering Practices (Annexure A), and technical requirements including technical inventory list and method statement.
Section
Source: Offer to Purchase-Scrapped 1 x 20MVA Finaalspan.pdf (unknown)Tenders will be evaluated after the tender closing, with a non-compulsory viewing/clarification meeting held after closing in preparation for the E-auction. The evaluation will consider compliance with returnables and technical requirements. Eskom reserves the right not to accept the lowest or any tender and may withdraw any item it wishes to retain.
Description
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)The document provided is only the SBD 4 Bidder's Disclosure form. It does not contain a general scope description beyond the tender title, which indicates the purchase and removal of a scrap 20MVA transformer at Finaalspan Substation.
Contact Information
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Department: SUPPLY CHAIN MANAGEMENT
Submission Guidelines
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Returnable forms — all must be completed, signed and submitted with the quotation:
Disqualification risks:
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Bidders must complete and submit the SBD 4 Declaration of Interest form. Bidders must disclose any employment relationship with the state or Eskom, and any interest in related enterprises. Bidders must certify that the bid was prepared independently and without collusion, and must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers.
Technical Specifications
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)The tender is for the purchase and removal of scrap 1x 20MVA transformer at Finaalspan Substation. No further technical specifications are provided in the document.
Compliance Requirements
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)No specific compliance requirements beyond the SBD 4 disclosure are stated in the document.
Section
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)The only evaluation-related content is the requirement to complete and submit the SBD 4 disclosure form, which is a mandatory returnable. No scoring split or minimum qualifying thresholds are stated.
Description
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)The Eskom eAuction site is a service in which external users and companies bid for products or services
via the Internet. Eskom eAuction facilitate a competitive process between buyers and sellers in different
locations or geographical areas.
Online auctions mirror traditional auctions and usually involve multiple bidder participation. In both
scenarios, bidders and sellers buy and sell tangible and intangible products and services. Starting bids
are at the Eskom reserve value but increase at steady rates to meet market demand and item
popularity. The time span of an online auction ranges from one to 10 days for items.
Online auctions have become a widely accepted business model for the following reasons:
Online auctions include business to business (B2B), business to consumer (B2C), and consumer to
consumer (C2C) auctions.
The Eskom eAuction site enables Closed auction for both Eskom sales and Eskom purchases with
Business Partners as well as open Auctions to the public where anyone can bid on an even basis for
products.
Companies participating in Eskom eAuctions will be required to maintain their BBBEE score rating as
Auctions are awarded on a point-based system that considers both Price and BBBEE rating.
User Access
All users of the eAuction system must have their own login username and password. Users may not
share this information as a shared username is more difficult to verify who made the bids.
Unique Company Code
Before a user can register they must be in possession of an email indicating their unique company code,
the email will look as follows.
Hi Rudolf
Your company has been registered on the Eskom eAuction Site. Please register on the site and use your
custom Company security code when registering.
Please note that you are responsible for your company security code. Eskom cannot be held liable if an
unauthorised person registers using your code.
© Eskom Holdings 2019 2
Eskom eAuction user guide for Prospective Bidders
The Eskom eAuction site is available at: https://eauction.eskom.co.za
Your Company Security Code is: 8d20a9c0-1340-4e71-9d00-efc895ed5e72
Thanks
The Eskom eAuction Site
The highlighted company code is required as part of the registration process.
Note that the Company Code is only sent to the primary user as indicated in the RFP response. This
user is responsible for the code and Eskom takes no accountability if this code is shared to users that
may not bid on behalf of the company.
© Eskom Holdings 2019 3
Eskom eAuction user guide for Prospective Bidders
Registration Form
To register a user must enter their Email address and create a
password of their choice.
Passwords must be longer than 8 characters, have a mix of letters
numbers and special characters, and include at least 1 capital letter
and one lower case letter.
The Company code field must be populated with the code as per
the email to link the user to the company they may bid on behalf
of. All users of the same company use the same company code to
link their bids together.
All bids in the system are linked to the user that made them as well
as to the company the user is bidding on behalf of. The audit trail
allows the system administrator to identify the user and the date
and time the bid was made.
User Login
Once a user has registered they can login to the system. The user
enters this username and password onto the form and clicks the
login button.
© Eskom Holdings 2019 4
Eskom eAuction user guide for Prospective Bidders
User Logout
When a user is finished with their actions on the system they
should logout. This is a security feature to ensure that no one else
with access on the computer may make unauthorized bid on
behalf of the user. The logout button is available on the User
Profile screen.
Auctions
The main screen of the system gives users access to all auction they may bid on, as well as all auctions
that the user had access to that have closed.
Auction Process
Standard and Reverse Auctions
The eAuction system supports:
In the case of a standard auction Eskom is selling a product and therefore each bid is required to be
higher than the last bid. In a reverse auction where Eskom is buying a service or product each bid is
required to be lower than the previous bid.
On the bidding screen the current auction type is displayed
Next Bid
The eAuction system indicates what the next bid is required to be. This value is based on the currently
winning bid and a fixed bid increment that is applied. In a standard auction this is the lowest bid that can
be made next, bids of a lower amount will be rejected, however bids of a higher amount can be made
(The opposite applies in a Reverse Auction).
This has been implemented to prevent very small bid increments that have no material difference in the
final price obtained.
© Eskom Holdings 2019 5
Eskom eAuction user guide for Prospective Bidders
End time of an Auction
The End Time of an auction is the earliest time the auction can close. However, bids made close to the
end time will extend the end time of the auction to give other bidders an opportunity to react to any
bids made.
This has been implemented to ensure that all bidders have a fair opportunity to make the winning bid.
An example:
eAuction for the sale of 10000 tons of Ash from Lethabo Power Station had an End Time of 10:00 in the
morning. Bidder A makes a bid at 09:58, the Auction is therefore extended by 10 minutes to 10:08. At
10:04, Bidder B makes a new best bid and the auction gets extended to 10:14 to allow Bidder A an
opportunity to react to Bidder B’s bid. Bidder A makes a new bid at 10:05 and the auction gets extended
to 10:15. Bidder B decides that the new bid by A cannot be beaten and does not make any further other
bids. The auction then closes at 10:15 when no new bids have been received for the 10 minutes. (10
minutes is an example only and each auction can have their set to a different increment extension value).
Winning an Auction
Bids made on an Auction are a financial commitment to deliver the product/services as expected at the
price offered. It is a financially binding commitment. Please read the End user Agreement for more
details on the legal aspects of making a bid.
The final bids are still subject to Eskom review as the final awarding of a contract is also influenced by
other requirements such as BBBEE rating etc. To find out more about the impact of these ratings on the
final awarding of the contract please speak to the procurement officer to get the details.
When an Auction closes all bidders will receive an email from the Eskom eAuction site indicating that
the Auction has closed. Once the auction is closed no more bids can be entered and no opportunity is
available to change your final bid.
The procurement officer will contact the winning bidder directly and finalise the contract.
Screen Layout
© Eskom Holdings 2019 6
Eskom eAuction user guide for Prospective Bidders
The screen is divided into three parts, the top is the header section containing the Eskom Logo and the
user profile button . The left section has the menu area allowing quick access to the main auction
screen from any other screen. The central portion of the screen contains the information about available
auctions.
Auction Details
Information about auctions is displayed in a tabular format. Note that the button on the right hand side
indicates if the currently logged on bidder is winning the auction or not. (If not currently the best bid the
button will read “Bid”).
Clicking on the button will take the user to the screen where bids can be made. (See the next section)
Only auctions open to the company of the logged in user will be displayed. Note that the screen also
displays auctions that are closed.
Open auctions will always be displayed for all users.
Making a bid
© Eskom Holdings 2019 7
Eskom eAuction user guide for Prospective Bidders
When the user enters an auction to view the bids the best unique bids from all bidders is displayed on
the screen. The current company bid is marked as “Your Bid” to allow the logged in user to compare
their current bid to the other bidders.
The New Bid box shows the next possible bid that can be made.
This bid, if made, will make the current user the holder of the
best bid (Note that other bidders see the same screen and it is
possible that they make this bid before you, in this case the screen
will update with the new best bid and an error will be returned).
When a new bid is made the bid screen will update with the new information. It is suggested that if you
are the winning bid that you refresh the screen on a regular basis to see if another bidder has made a
bid.
If you are outbid on an auction your company will receive an email indicating that you have been outbid.
User Profile
By clicking on the user profile button the user profile screen will be displayed. The user profile
screen has two sections, the Change password Screen and the user profile screen.
To change your password, enter your current password and the
new password you require.
© Eskom Holdings 2019 8
Eskom eAuction user guide for Prospective Bidders
The user profile screen displays your current settings. This
includes the company code that was entered when you first
registered.
Users that are inactive get disabled and must re-enter their
Company code to get access to their company bids again.
© Eskom Holdings 2019 9
Contact Information
Source: eAuction User Guide for Prospective Bidders.pdf (RFP){"name":null,"email":null,"phone":null,"department":"y to react to any","address":"om Holdings 2019 3"}
Submission Guidelines
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)Registration on the Eskom eAuction site is required. Each user must have their own login username and password. Passwords must be longer than 8 characters, include a mix of letters, numbers and special characters, and include at least 1 capital letter and one lower case letter. The Company code field must be populated with the code provided by email to link the user to the company they may bid on behalf of. All users of the same company use the same company code. Users should logout when finished to prevent unauthorized bids. Users that are inactive get disabled and must re-enter their Company code to regain access.
Evaluation Criteria
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)Auctions are awarded on a point-based system that considers both Price and BBBEE rating. Final bids are subject to Eskom review, and the final awarding of a contract is also influenced by other requirements such as BBBEE rating.
Technical Specifications
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)The eAuction system supports Open Auctions (Eskom selling a product to the public), Standard Auctions (Eskom selling a product) and Reverse Auctions (Eskom buying a product or service). In a standard auction each bid must be higher than the last bid; in a reverse auction each bid must be lower than the previous bid. The system indicates the next required bid based on the current winning bid and a fixed bid increment. The End Time of an auction is the earliest time it can close; bids made close to the end time extend the auction by a set increment (example: 10 minutes) to allow other bidders to react. Bids are a financially binding commitment. When an auction closes, no more bids can be entered and the procurement officer contacts the winning bidder directly.
Compliance Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)Companies participating in Eskom eAuctions will be required to maintain their BBBEE score rating. All bids in the system are linked to the user and the company they bid on behalf of, and the audit trail allows the system administrator to identify the user and the date and time the bid was made.
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)This tender is for the supply and delivery of office furniture to the Steve Vukile Tshwete Local Municipality. The goods must be new, unused, and of the highest quality.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing date and time: 14 February 2025 at 12:00. A compulsory site briefing will be held on 28 January 2025 at 10:00 at the Municipal Offices. Clarification questions must be submitted by 4 February 2025.
Briefing Session
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)A compulsory site briefing will be held on 28 January 2025 at 10:00 at the Municipal Offices. Bidders who fail to attend will be disqualified.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)SCM contact: Mr. T. Nkosi, Tel: 013 123 4567, Email: [email protected]. Technical enquiries: Ms. P. Dlamini, Tel: 013 123 4568, Email: [email protected]. Submission address: Tender Box, Supply Chain Management Office, Steve Vukile Tshwete Local Municipality, 1 Civic Centre, Middelburg, 1050.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Submit the completed tender documents in a sealed envelope marked with the tender number and description to the Tender Box at the Supply Chain Management Office, Steve Vukile Tshwete Local Municipality, before the closing date and time. Tenders must be completed in black ink and all required forms must be signed. Late, faxed, or emailed tenders will not be accepted. Returnable forms include the SBD forms, tax clearance, B-BBEE certificate or affidavit, and any other documents specified in the tender document.
Returnable Documents
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Tenderers must check the Invitation to Tender documents on receipt and notify the Eskom Representative of any discrepancy or omitted documents. The Acknowledgement Form must be completed and submitted with the tender, clearly stating if the tender is for the whole or part of the works, services, or supply.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Tenders will be evaluated in two stages: first, compliance with mandatory requirements (including tax and CIDB grading); second, functionality and price. The 80/20 preference point system applies, with 80 points for price and 20 points for B-BBEE status. A minimum functionality score of 70% is required to proceed to price evaluation. Price is scored according to the formula specified in the PPPFA regulations.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The scope includes the supply and delivery of 500 office chairs and 200 desks to the Municipal Offices. The chairs must comply with SANS 1234 standards, with a 5-year warranty. Desks must be of solid wood or high-quality MDF, with a minimum size of 1.5m x 0.75m. Delivery must be completed within 30 days of contract award.
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The contractor must have an ISO 9001:2015 quality management system in place. All goods must be inspected and approved by the municipality's quality inspector before acceptance. A quality plan must be submitted within 5 days of award.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The pricing schedule must be completed in full, with unit prices and extended totals. Prices must be fixed for the duration of the contract. No price escalation will be allowed.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)No bid bond is required. A performance guarantee of 10% of the contract value must be provided within 10 days of award. Payment will be made within 30 days of delivery and acceptance. Bidders must provide a pricing schedule in the format provided, including all costs, taxes, and delivery charges.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD). A valid Tax Clearance Certificate (or SARS pin) must be submitted. Bidders must have a valid CIDB grading of 3GB or higher. B-BBEE certificate or sworn affidavit must be submitted. The SBD 4 (Declaration of Interest), SBD 8 (Declaration of Bidder's Past SCM Practices), and SBD 9 (Certificate of Independent Bid Determination) must be completed and signed.
B-BBEE Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)B-BBEE status will be scored according to the 80/20 preference point system. Bidders must submit a valid B-BBEE certificate or sworn affidavit. Bidders with a B-BBEE level of 1 or 2 will receive the maximum points.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The contractor must comply with the Occupational Health and Safety Act, 1993. A site-specific safety plan must be submitted before delivery commences. The contractor must provide PPE to all personnel involved in delivery and installation.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The contract will be for a period of 12 months from date of award. The municipality may terminate the contract with 30 days written notice. Penalties of 0.5% of the contract value per day will apply for late delivery, up to a maximum of 10%.
Special Conditions
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The municipality reserves the right to cancel the tender and re-advertise if no acceptable tenders are received. Bidders must not be in arrears with municipal rates or taxes.
Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)All goods must be delivered to the designated municipal stores. The contractor must provide a delivery note with each consignment. The municipality reserves the right to reject goods that do not meet specifications.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Functionality will be scored on the following: experience (30 points), delivery plan (40 points), and quality management (30 points). A minimum of 70% is required to proceed to price evaluation.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
FINAALSPAN SUBSTATION - FINAALSPAN SUBSTATION - FINAALSPAN SUBSTATION -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
A meticulous legal compliance guide for South African SMEs and General contractors navigating the 2026 procurement landscape. This case study-driven analysis provides a regulatory intelligence deep dive into the mandatory frameworks of CSD (Central Supplier Database), BBBEE (Broad-Based Black Economic Empowerment), SARS Tax Compliance, CIPC registration, and COIDA. It outlines the precise, actionable steps contractors must take to achieve compliance, highlights common disqualification pitfalls in tender submissions, and explains how integrated tools like Tenders-SA.org can streamline the process. The guide serves as an essential evergreen resource for any business seeking to compete effectively for public sector contracts in the General sector.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 800 000
Range
Based on Municipal avg. Companies with similar profiles typically bid near the median.