Quantity surveying professional services for the rehabilitation of airside pavements at o.R. Tambo international airport under a 30-month nec3 professional services contract. Bidders must be registered with cipc, hold valid csd and SARS tax compliance, and the lead quantity surveyor must be registered as prqs with sacqsp. A performance bond of 10% of total fees and professional indemnity insurance of at least r10 million are required.
Bidders must be registered with CIPC and hold valid CSD registration and SARS tax compliance status.
The lead quantity surveyor must be registered as a Professional Quantity Surveyor (PrQS) with SACQSP.
Professional Indemnity insurance of at least R10 million and Public Liability insurance of at least R20 million are required.
A performance bond of 10% of the total prices must be provided from an employer-accepted bank or insurer in the form per Annexure B.
An Occupational Health and Safety Agreement under Section 37(2) of the OHS Act must be concluded before work starts, with COID good-standing evidence and safety documentation submitted 7 days before work.
Joint ventures and consortia are jointly and severally liable and must notify the employer of the authorised key person within one week of the contract date.
Cession, delegation or assignment of rights or obligations without the employer's written consent is prohibited.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 23 September 2026 - 11:00
Venue
ORTIA Media Room (Next to the Post Office) O.R. Tambo International Airport, 1 Jones Road, Kempton P
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Note that the briefing is compulsory and ensure that you sign the attendance register that will be circulating NO late submission will be accepted please deposit your tender at the correct box and sign the correct register when submitting your tender.
Request for Proposal
1 Jones Road - Kempton Park - Gauteng - 1632
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
26 Aug
2026
Tender Published
Tender was published
23 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf
Airports Company South Africa (ACSA) seeks a professional quantity surveying firm to provide services for the rehabilitation of airside pavements at O.R. Tambo International Airport over a 30-month period. The contract is based on the NEC3 Professional Services Contract (Main Option A: Priced contract with activity schedule) and includes project stages from initiation through close-out.
Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf
Airports Company South Africa (ACSA) seeks a Construction Health and Safety Agent for the rehabilitation of airside pavements at O.R. Tambo International Airport over a 30-month period. The contract is based on the NEC3 Professional Services Contract (Main Option A: Priced contract with activity schedule) and requires the appointed consultant to provide professional health and safety agent services in compliance with the Occupational Health and Safety Act and Construction Regulations.
ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf
Airports Company South Africa (ACSA) invites proposals for professional services — civil and electrical engineering, project management, quantity surveying, and construction health and safety agent — for the rehabilitation of airside pavements at O.R. Tambo International Airport over a 30-month period. The scope covers design and construction supervision for multiple taxiways, taxilanes, runway thresholds, service roads, and two new paved access roads (approximately 1.4 km and 1 km) adjacent to runway 03R–21L. Bidders may submit for one or more disciplines and will be evaluated separately per discipline.
Project Management for Refurbishment of Pavements at ORTIA.pdf
Airports Company South Africa (ACSA) seeks a professional services provider for project management, civil and electrical engineering, quantity surveying, and health & safety agent services for the rehabilitation of airside pavements at O.R. Tambo International Airport over a 30-month period. The contract is based on the NEC3 Professional Services Contract (Main Option A: Priced contract with activity schedule) and includes six project stages from initiation to close-out.
Engineering Services for the Refurbishment of Pavements at ORTIA.pdf
Airports Company South Africa (ACSA) seeks a professional services provider for the rehabilitation of airside pavements at O.R. Tambo International Airport over a 30-month period. The contract covers civil and electrical engineering, project management, quantity surveying, and health & safety agent services under an NEC3 Professional Services Contract (Main Option A).
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Project name: Rehabilitation of Airside Pavements at ORTIA, 6650. Title: Provision of Project Management Professional Services for the Rehabilitation of Airside Pavements at OR Tambo International Airport for a period of 30 months. NEC3 Professional Services Contract (PSC). Services: project management professional services for rehabilitation of airside pavements. Scope in Part C3: Scope of Work.
Important Dates
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Closing date: 23 September 2026 at 11:00. No briefing or site visit is mentioned.
Contact Information
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Employer: Airports Company South Africa SOC Limited, OR Tambo International Airport, Private Bag X1, Kempton Park 1627. Telephone: +27 11 390 1012. Fax: +27 11 921 6911. Employer's Agent: OR Tambo International Airport, Private Bag X1, Kempton Park 1627.
Submission Guidelines
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Bidders must submit a completed Form of Offer and Acceptance, Pricing Data (Part C2), and all returnable schedules. Submission method and address are not specified in the provided document.
Evaluation Criteria
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Bidder must be a legally registered entity (CIPC) with valid professional registrations for key personnel (ECSA for engineers, SACQSP for quantity surveyors, SACPCMP for project managers/health & safety agents). Must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance (TCS/pin). Must demonstrate capacity to provide 10% performance bond and required insurance covers (Professional Indemnity, Public Liability, COIDA). Joint ventures/consortia must declare joint and several liability and notify the key authorised person within 1 week of Contract Date. No specific B-BBEE level, CIDB grade, or local content percentage stated in the provided document.
Technical Specifications
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Services: Provision of project management professional services for rehabilitation of airside pavements at OR Tambo International Airport. Duration: 30 months. Contract: NEC3 Professional Services Contract (PSC) with Main Option A (priced contract with activity schedule). Project stages: Stage 1 Project Initiation and Briefing (5%), Stage 2 Concept and Feasibility (20%), Stage 3 Detail Development (20%), Stage 4 Tender Documentation and Procurement (10%), Stage 5 Construction and Contract Administration (40%), Stage 6 Close-out Services (5%). Risk register includes: availability of as-built information, access to site, site constraints, statutory approvals, programme deviations, cost estimate accuracy.
Methodology
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Risk Register includes: availability of as-built information, access to site and working hours, site constraints and constructability, statutory requirements and approvals, deviations from programme and cashflow, accuracy of cost estimates. Consultant's Risk Register additions: availability of As-Built Information, Access to Site, Progress vs Programme, Cash Flow Management. Employer provides access to: as-built information and service layouts (upon contract award), all relevant airport areas (upon contract award), traffic forecast data (upon contract award). Consultant access to: all available As-built Information and existing services (upon award), relevant Engineering, Operational and Maintenance Personnel of ACSA (upon award). Design document acceptance procedure: Consultant submits Design Documents per Scope; Employer returns marked A, B, or C with reasons; Consultant amends and resubmits; disagreements notified within 1 week; work cannot proceed without acceptance. Early warning: subcontractors attend risk reduction meetings if attendance assists. Compensation events: Employer instruction changing Scope (excludes Consultant-requested changes or risk reduction meeting decisions from Consultant's fault); notification within 4 weeks of awareness; entitlement only if affects critical path; time periods amendable by agreement.
Experience & Qualifications
Source: Project Management for Refurbishment of Pavements at ORTIA.pdfConsultant must provide key person: Project Manager with name, responsibilities, qualifications, experience. Consultant must be fully experienced, properly qualified, registered, licensed, equipped, organized, and financed. Consultant warrants satisfaction with completeness, sufficiency, and accuracy of information provided at Contract Date.
Quality Management
Source: Project Management for Refurbishment of Pavements at ORTIA.pdfQuality policy statement and quality plan must be provided within 4 weeks of contract date. Defects date: 52 weeks after Completion. Defects correction period: 2 weeks. Extended defects date if Employer cannot use work due to defect after Completion (max twice original period). Design document acceptance procedure: Consultant submits, Employer marks A (accepted), B (accepted with comments), or C (rejected) with reasons; Consultant amends and resubmits; work cannot proceed without acceptance. Consultant must exercise skill, care, diligence of a professional providing similar services.
Pricing Schedule
Source: Project Management for Refurbishment of Pavements at ORTIA.pdfActivity schedule included in Part C2. Tendered total of Prices in Form of Offer and Acceptance. Percentage points per stage: Stage 1 Project Initiation and Briefing 5%, Stage 2 Concept and Feasibility 20%, Stage 3 Detail Development 20%, Stage 4 Tender Documentation and Procurement 10%, Stage 5 Construction and Contract Administration 40%, Stage 6 Close-out Services 5%. Staff rates as stated in Pricing Data.
Financial Requirements
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Pricing format: Priced contract with activity schedule (Option A). Tendered total of Prices in Form of Offer and Acceptance. Staff rates as per Pricing Data. Payment: assessed every 4 weeks on the 25th day, paid within 4-6 weeks of tax invoice. Interest: 1% above prime rate. Performance bond: 10% of total Prices, unconditional on-demand from accepted bank/insurer. Delay damages: 1% per week up to 10% of professional fees. Insurance required: Professional Indemnity, Public Liability (limit R100 million per occurrence), Aviation Liability, COIDA. Contract Works insurance with limits: public liability R100 million, lateral support R50 million. No financial capacity threshold stated.
Compliance Requirements
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance (TCS/pin). Must be registered with CIPC. Key personnel must hold professional registrations: ECSA for engineers, SACQSP for quantity surveyors, SACPCMP for project managers and health & safety agents. Joint ventures/consortia must declare joint and several liability and notify the key authorised person within 1 week of contract date. Must sign the Occupational Health and Safety Agreement per Section 37(2) of OHSA. Must provide proof of COID good standing. No specific B-BBEE level, CIDB grade, or local content percentage stated.
Health & Safety
Source: Project Management for Refurbishment of Pavements at ORTIA.pdfOccupational Health and Safety Agreement per Section 37(2) of OHSA and Construction Regulation 5.1(k). Mandatary must have COID coverage for all employees with letter of good standing prior to work. Public Liability Insurance and other adequate insurance. Compliance with OHSA and regulations. All work under close supervision of competent persons. Baseline risk assessment required before work. Safe work practices and procedures documented and enforced. PPE provided and worn at all times. Incidents reported to Department of Labour and Client. No use of Client's equipment without written approval. Work permits required for hazardous activities. No alcohol/intoxicating substances on premises. Mandatary warrants authority to sign. All documentation including Construction Manager appointment (Construction Regulation 8) must be submitted 7 days before work commences.
Contractual Terms
Source: Project Management for Refurbishment of Pavements at ORTIA.pdfConditions: NEC3 Professional Services Contract, April 2013. Main Option A: Priced contract with activity schedule. Dispute resolution Option W1. Secondary Options: X7 Delay damages, X10 Employer's Agent, X11 Termination by Employer, X13 Performance bond, X18 Limitation of liability, Z Additional conditions. Law: Republic of South Africa. Language: English. Period of reply: 7 days. Retention: 5 years after Completion. Starting date: upon signing of contract by ACSA. Completion date: 3 years upon signing. First programme within 2 weeks. Revised programmes every 4 weeks. Defects date: 52 weeks after Completion. Defects correction: 2 weeks. Assessment interval: every 4 weeks on 25th day. Payment: 4-6 weeks after tax invoice. Currency: ZAR. Interest: 1% above prime. Adjudicator from Panel in Annexure C. Adjudicator nominating body: Chairman of Johannesburg Society of Advocates. Tribunal: Arbitration per Association of Arbitrators (Southern Africa) rules. Place: Johannesburg. Delay damages: 1% per week up to 10% of professional fees. Performance bond: 10% of total Prices, unconditional on-demand. Limitation of liability: Consultant's liability limited to incurred loss/damages to property. End of liability: 52 weeks after Completion. Additional conditions Z1-Z29 include interpretation, time of essence, early warning, consultant obligations, sub-consulting payment proof, design document acceptance, extended defects date, invoice requirements, payment terms, compensation event amendments, project stages with percentage points, changes in law, performance bond extension, cession/delegation restrictions, joint and several liability for JVs, ethics, confidentiality, employer step-in rights, liens waiver, intellectual property, dispute resolution amendments (adjudication excludes termination, written submissions only, termination disputes direct to arbitration). Panel of Adjudicators: Adv. Ghandi Badela, Mr. Errol Tate, Adv. Saleem Ebrahim, Mr. Sebe Msutwana, Mr. Sam Amod, Adv. Sias Ryneke, Mr. Emeka Ogbugo.
Requirements
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Consultant's key persons: Project Manager. Consultant must be fully experienced, properly qualified, registered, licensed, equipped, organized, and financed. Consultant warrants satisfaction with information. Must provide proof of payment to sub-consultants within 5 days of Employer request. Must submit quality policy and plan within 4 weeks of contract date. Must provide insurance as per Insurance Clauses. Performance bond unconditional on-demand. Must notify Employer of key person with binding authority within 1 week of contract date. Must not materially alter JV/consortium composition without written consent. Safety documentation including Construction Manager appointment must be submitted 7 days before work commences.
Section
Source: Project Management for Refurbishment of Pavements at ORTIA.pdf (unknown)Employer: Airports Company South Africa SOC Limited, OR Tambo International Airport, Private Bag X1, Kempton Park 1627. Tel: +27 11 390 1012. Fax: +27 11 921 6911. Employer's Agent: OR Tambo International Airport, Private Bag X1, Kempton Park 1627. Adjudicator panel: Adv. Ghandi Badela (+27 11 282 3700, [email protected]), Mr. Errol Tate (+27 11 262 4001, [email protected]), Adv. Saleem Ebrahim (+27 11 535 1800, [email protected]), Mr. Sebe Msutwana (+27 11 442 8555, [email protected]), Mr. Sam Amod ([email protected]), Adv. Sias Ryneke (083 653 2281, [email protected]), Mr. Emeka Ogbugo (+27 12 349 2027, [email protected]).
Description
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdfProfessional civil and electrical engineering, project management, quantity surveying, and health & safety agent services for the rehabilitation of airside pavements at O.R. Tambo International Airport over 30 months. Scope includes ECSA stages 1–6 design for pavement rehabilitation (service roads, runways, taxiways, taxi lanes, runway thresholds 03L/21R/21L) and design of two new 4m-wide paved access roads (ILS 03R ~1.4 km, ILS 21L ~1 km) to replace unpaved service roads. Suspected groundwater issue at thresholds requires investigation. Electrical engineering addresses existing airfield ground lighting. Construction may be required at night. Bidders may select one or more disciplines; each discipline evaluated separately.
Important Dates
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Issue Date: 26 August 2026. Compulsory Briefing Session: 3 September 2026 at 10:00, venue ORTIA Media Room (next to Post Office), O.R. Tambo International Airport, 1 Jones Road, Kempton Park – attendance register signed by bidder's representative confirms attendance. Query Closing Date: 7 September 2026 at 16:00 (clarifications only via email to [email protected]). Bid Closing Date and Time: 23 September 2026 at 11:00. Bid validity period: 120 business/working days from closing date.
Contact Information
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)SCM Enquiries: Davis Mthethwa, SCM Senior Buyer, email [email protected], telephone +27 11 723 1400. Technical Enquiries: not specified (N/A). Submission address: ACSA North Wings Offices, International Terminal Building 3rd Floor, O.R. Tambo International Airport, Tender Box A. Postal address: P O Box 75480, Gardenview, Gauteng, 2047. Physical address: Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, 1632.
Submission Guidelines
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Submission method: Hand delivery only to Tender Box A, 3rd Floor ACSA North Wing Offices, O.R. Tambo International Airport. Bid documents must be submitted in printed format (original and one copy) plus an electronic copy on USB flash drive or accessible link; the original is legally binding. Each page of the bid must be signed or stamped by the authorised signatory. A Tender Deposit Register must be completed and signed by the person depositing the bid. Late bids will not be accepted. Alternative bids are accepted only if accompanied by a fully compliant original bid response. All mandatory returnable documents listed in Section 4.1 must be completed, signed and submitted at closing; failure to submit any mandatory document disqualifies the bid. Mandatory forms include: Priced offer (NEC3 PSC Part C2), Declaration of Interest and Politically Exposed Persons (Section 5), Certificate of Attendance of Compulsory Briefing (Section 6), Declaration of Forbidden Practices (Section 7), Terms and Conditions of RFP (Section 8), Acceptance of ACSA Terms and Conditions (Section 9), Confidentiality and Non-Disclosure Agreement (Section 10), Certificate of Authority to Sign Tender (Appendix A), Certificate of Authority of Joint Ventures where applicable (Appendix B), Record of Addenda (Appendix C), Proposed Amendments and Qualifications (Appendix D), Schedule of Tenderer's Experience (Appendix E), CV and Experience of Key Personnel (Appendix F), Proof of Professional Registration (Appendix G), Transformation Framework and Specification forms (Appendix K), Proposed Subcontractor (Appendix L), Letter of Good Standing with Workers Compensation Commissioner (Appendix M), SBD 4 Bidder's Disclosure (Appendix Q), SBD 6.1 Preference Points Claim (Appendix R), SBD 6.2 Declaration for Local Content and Production (Appendix P). Other returnable documents (not mandatory at closing but required before award): Tax PIN (Appendix N), Names and ID numbers of directors/trustees/members/shareholders and senior management (Appendix O), Certificate of Incorporation showing ownership split (Appendix O), Central Supplier Database Report (Appendix S). All submitted information must remain valid for the contract duration; updated documents must be provided if any expire.
Returnable Documents
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Mandatory Returnable Documents: Priced offer NEC3 PSC Part C2; Declaration of Interest and Politically Exposed Persons (Section 5); Certificate of Attendance of Compulsory Briefing (Section 6); Declaration of Forbidden Practices (Section 7); Terms and Conditions of RFP (Section 8); Bidders must accept ACSA Terms and Conditions (Section 9); Confidentiality and Non-Disclosure Agreement (Section 10); Certificate of Authority to Sign Tender (Appendix A); Certificate of Authority of Joint Ventures (Appendix B); Record of Addenda to Tender Documents (Appendix C); Proposed Amendments and Qualifications (Appendix D); Schedule of Tenderer's Experience (Appendix E); CV and Experience of Key Personnel (Appendix F); Proof of Professional Registration (Appendix G); Transformation Framework and Specification forms (Appendix K); Proposed Subcontractor (Appendix L); Letter of Good Standing with Workers Compensation Commissioner (Appendix M); SBD 4 Form Bidder's Disclosure (Appendix Q); SBD 6.1 Form Preference Points Claim (Appendix R); SBD 6.2 Form Declaration for Local Content and Production (Appendix P). Other Returnable Documents: Tax Pin number (Appendix N); Names and identity numbers of Directors/Trustees/Members/Shareholders and Senior management (Appendix O); Certificate of Incorporation showing ownership split (Appendix O); Central Supplier Database Report (Appendix S). All submitted information must remain valid for contract duration; updated documents must be provided if validity expires.
Evaluation Criteria
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Five-stage evaluation: Stage 1 – mandatory administrative compliance (attendance at compulsory briefing, signed Form of Offer C1.1, all mandatory returnable documents submitted); Stage 2 – functionality/technical evaluation per discipline; Stage 3 – price and preference (PPPFA 80/20 for bids ≤ R50 million); Stage 4 – post-tender negotiations if applicable; Stage 5 – award. Functionality minimum threshold: 70 out of 100 points for each discipline bid package (engineering services, project management, quantity surveying, health & safety agent services). Bidders scoring below 70 on any selected discipline are disqualified from further evaluation. Functionality scoring per discipline:
Engineering Services (100 pts): Organisation Experience 40 pts (relevant completed projects: airport runway design 20, taxiway design 20, taxi lane design 20, new national/provincial highway design 10, major road rehabilitation design 10; cumulative construction cost ≥ R120M incl. VAT across max 4 projects). Pavement Engineer/Technologist Experience 60 pts (Pr Eng/Pr Tech ECSA registered; relevant design projects: airport runway 30, taxiway 30, taxi lane 30, new highway 15, major road rehabilitation 15; cumulative construction cost ≥ R120M incl. VAT across max 4 projects).
Project Management Services (100 pts): Organisation Experience 60 pts (built environment projects with construction duration ≥ 12 months, 10 pts each). Project Manager 40 pts (Pr CPM SACPCMP registered; built environment projects ≥ 12 months, 10 pts each).
Quantity Surveying Services (100 pts): Organisation Experience 60 pts (built environment projects ≥ 12 months, 10 pts each). Quantity Surveyor 40 pts (Pr QS SACQSP registered; built environment projects ≥ 12 months, 10 pts each).
Health & Safety Agent Services (100 pts): Organisation Experience 60 pts (built environment projects ≥ 12 months, 10 pts each). Health & Safety Agent 40 pts (Pr CHSA SACPCMP registered; projects ≥ 12 months, 10 pts each).
Project reference form (Appendix E) must be completed fully with contactable references; completion certificates, reference letters and appointment letters are not accepted. CVs must follow Appendix F with proof of registration on Appendix G. All referenced projects must be completed.
Price evaluation formula: Ps = 80[1 – (Pt – Pmin)/Pmin]. Preference points (20) awarded per PPPFA 2022/2023 specific goals: B-BBEE Status Level 1=5, Level 2=4.5, Level 3=4, Level 4=3, Level 5=2, Level 6=0.5, Level 7=0.3, Level 8=0.1; Black youth majority-owned entities=5; Black women majority-owned entities=5; Company majority owned by people with disabilities=5; Non-compliant contributor=0. Failure to meet specific goals scores zero but does not disqualify. SBD 6.1 (Appendix R) and SBD 6.2 (Appendix P) are mandatory for preference claims.
Technical Specifications
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Scope: Professional services for rehabilitation of airside pavements at O.R. Tambo International Airport over 30 months, covering ECSA design stages 1–6. Disciplines: Civil and Electrical Engineering, Project Management, Quantity Surveying, Construction Health & Safety Agent. Bidders may bid for one or more disciplines and will be evaluated per selected discipline.
Pavement rehabilitation areas (Table 1): Taxilane Lima 820m×60m (49,200 m²), Taxiway Quebec 250m×60m (15,000 m²), Taxiway Charlie 1,355m×60m (81,300 m²), Taxiway Echo (Denel Gate) 300m×60m (18,000 m²), Taxiway Echo (Behind Alpha 1&2) 200m×60m (12,000 m²), Taxiway Alpha 1,520m×60m (91,200 m²), 21L Threshold 280m×60m (16,800 m²), Taxiway Hotel 185m×60m (11,100 m²), Taxiway & Taxilane India 800m×60m (48,000 m²), Alpha Service Road 460m×15m (6,900 m²), 03L Threshold 250m×60m (15,000 m²), 21R Threshold 750m×60m (45,000 m²), Charlie Service Road strengthening 350m×15m (5,250 m²). Runway thresholds 03L, 21R, 21L require rehabilitation; suspected groundwater issue to be investigated.
Electrical engineering: address existing airfield ground lighting (AGL) in designs and construction.
New access roads: design and construct two 4m-wide paved service roads over existing unpaved ILS service roads – ILS 03R approx 1.4 km, ILS 21L approx 1 km. Construction may be required at night when runway is not active due to proximity.
Key personnel registration requirements: Engineering – Pavement Engineer/Technologist (Pr Eng/Pr Tech ECSA); Project Management – Project Manager (Pr CPM SACPCMP); Quantity Surveying – Quantity Surveyor (Pr QS SACQSP); Health & Safety – Construction Health & Safety Agent (Pr CHSA SACPCMP). Organisation experience: Engineering – relevant completed projects with cumulative construction cost ≥ R120M incl. VAT (max 4 projects); other disciplines – built environment projects with construction duration ≥ 12 months. Project references (Appendix E) must be completed with contactable references; CVs per Appendix F with proof of registration on Appendix G.
Methodology
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdfDesign methodology: engineering design services from ECSA stages 1–6 for pavement rehabilitation and new access roads. Pavement rehabilitation covers service roads, runways, taxiways, taxi lanes and runway thresholds (03L, 21R, 21L) with identified defects (longitudinal/transverse cracks, block cracking, surface depressions, shear failures). Groundwater investigation required at runway thresholds. Electrical engineering to accommodate existing airfield ground lighting (AGL) in designs and construction. Two new 4m-wide paved access roads to replace unpaved ILS service roads (ILS 03R ~1.4 km, ILS 21L ~1 km); construction may be required at night when runway is inactive. After design finalisation, a contractor will be procured separately for construction.
Experience & Qualifications
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdfEngineering Services: Organisation – relevant completed projects (airport runway/taxiway/taxi lane design, new national/provincial highway design, major road rehabilitation design) with cumulative construction cost ≥ R120M incl. VAT across max 4 projects. Pavement Engineer/Technologist – Pr Eng/Pr Tech ECSA registered; relevant design projects with cumulative construction cost ≥ R120M incl. VAT across max 4 projects. Project Management Services: Organisation – built environment projects with construction duration ≥ 12 months. Project Manager – Pr CPM SACPCMP registered; built environment projects ≥ 12 months. Quantity Surveying Services: Organisation – built environment projects ≥ 12 months. Quantity Surveyor – Pr QS SACQSP registered; built environment projects ≥ 12 months. Health & Safety Agent Services: Organisation – built environment projects ≥ 12 months. Health & Safety Agent – Pr CHSA SACPCMP registered; projects ≥ 12 months. All projects for references and key resources must be completed. Project reference form (Appendix E) must be fully completed with contactable references; completion certificates, reference letters and appointment letters not accepted. CVs per Appendix F with proof of registration on Appendix G.
Financial Requirements
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Pricing format: Priced offer using NEC3 PSC Part C2 (mandatory returnable). Price must remain firm and valid for 120 business/working days from closing date. Evaluation uses PPPFA 80/20 preference point system for bids with rand value ≤ R50 million. Price formula: Ps = 80[1 – (Pt – Pmin)/Pmin]. No explicit bond, guarantee or insurance amounts stated in the document. No minimum turnover or financial capacity thresholds specified. Each JV/consortium party must submit separate tax compliance status (TCS PIN or CSD number).
Compliance Requirements
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Mandatory compliance: Attendance at compulsory briefing session (signed register). Signed Form of Offer (C1.1). Valid professional registration for key personnel: ECSA (Pr Eng/Pr Tech) for engineering; SACPCMP (Pr CPM) for project management; SACQSP (Pr QS) for quantity surveying; SACPCMP (Pr CHSA) for health & safety. Tax compliance: SARS Tax Compliance Status PIN or CSD number (each JV/consortium party separately). Central Supplier Database (CSD) registration (Appendix S). No mandatory minimum B-BBEE level, but specific goals points awarded per PPPFA 2022/2023 (SBD 6.1 Appendix R mandatory). SBD 4 Bidder's Disclosure (Appendix Q) mandatory. SBD 6.2 Declaration for Local Content and Production (Appendix P) mandatory. Declaration of Interest and Politically Exposed Persons (Section 5) mandatory. Declaration of Forbidden Practices (Section 7) mandatory. Certificate of Authority to Sign Tender (Appendix A) mandatory. Letter of Good Standing with Workers Compensation Commissioner (Appendix M) mandatory. Foreign suppliers must declare tax residency, branch, permanent establishment and source of income in RSA. Bidders must not be blacklisted or found guilty of corruption, fraud, B-BBEE fronting or anti-competitive practices. CIDB grading not specified (professional services).
B-BBEE Requirements
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)B-BBEE specific goals scored out of 20 per PPPFA 2022/2023 (80/20 system): Level 1=5, Level 2=4.5, Level 3=4, Level 4=3, Level 5=2, Level 6=0.5, Level 7=0.3, Level 8=0.1. Additional goals: Black youth majority-owned entities=5; Black women majority-owned entities=5; Company majority owned by people with disabilities=5; Non-compliant contributor=0. Proof must be submitted to claim points; failure to meet specific goals scores zero but does not disqualify. SBD 6.1 (Appendix R) and SBD 6.2 (Appendix P) are mandatory returnable documents.
Health & Safety
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdfConstruction Health & Safety Agent services are a distinct discipline within this tender. Key personnel must be registered as Professional Construction Health & Safety Agent (Pr CHSA) with SACPCMP. Organisation and key personnel experience must be demonstrated on built environment projects with construction duration ≥ 12 months. No additional project-specific OHS requirements, safety plans or HSE compliance details are specified beyond the professional registration and experience criteria.
Contractual Terms
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdfBid validity: 120 business/working days; prices must remain firm. ACSA reserves the right to: award whole or part of the bid; split the award; negotiate with shortlisted bidders; award to a bidder other than the highest scoring where objective criteria allow; reject the lowest acceptable bid; cancel the bid. Confidentiality: ACSA will not disclose bidder information to third parties without written approval; bidder names not disclosed until process finalised; bidders may not disclose bid information without ACSA written approval; third parties consulted by bidders must complete confidentiality agreements returned with the bid. Successful bidder must conclude a fully completed and signed written contract post award. Bid subject to Preferential Procurement Policy Framework Act 2000, Preferential Procurement Regulations, General Conditions of Contract (GCC) and any special conditions. Dispute resolution: binding arbitration by a single arbitrator (agreed or nominated by AFSA), held in Johannesburg in English, to be commenced and concluded within 30 days of dispute notification; award final and binding, may be made an order of court. ACSA may reject incomplete, late or conditional bids; may withdraw RFP at any time without liability. If ACSA and successful bidder fail to execute formal contract within 30 days of award (or later date set by ACSA), award deemed null and void. ACSA may amend RFP terms before contract finalisation without liability. Hotline for fraud/corruption reporting: 0800 00 80 80 or 086 726 1681, email [email protected].
Requirements
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdf (RFP)Mandatory: attendance at compulsory briefing session; signed Form of Offer (C1.1); all mandatory returnable documents per Section 4.1. Professional registration: ECSA (Pr Eng/Pr Tech) for engineering; SACPCMP (Pr CPM) for project management; SACQSP (Pr QS) for quantity surveying; SACPCMP (Pr CHSA) for health & safety. Tax compliance: SARS TCS PIN or CSD number per party. CSD registration. SBD 4, SBD 6.1, SBD 6.2 mandatory. Declaration of Interest and PEP/DPIP, Declaration of Forbidden Practices, Certificate of Authority to Sign, Letter of Good Standing with Workers Compensation Commissioner mandatory. Foreign suppliers must declare RSA tax status. No CIDB grading required. Bidders not blacklisted or guilty of corruption/fraud/B-BBEE fronting/anti-competitive practices.
Section
Source: ORTIA8313.2026.RFP PS FOR CIVIL AND ELECTRICAL ENG, PM, QS AND SAFETY AGENT.pdfFive-stage evaluation: Stage 1 – mandatory administrative compliance (compulsory briefing attendance, signed Form of Offer C1.1, all mandatory returnables); Stage 2 – functionality per discipline (minimum 70/100 per discipline); Stage 3 – price and preference (PPPFA 80/20 for ≤ R50M); Stage 4 – post-tender negotiations if applicable; Stage 5 – award. Functionality scoring detailed per discipline in evaluationCriteria. Project references (Appendix E) must be complete with contactable references; CVs per Appendix F with registration proof on Appendix G. All referenced projects must be completed. Price formula: Ps = 80[1 – (Pt – Pmin)/Pmin]. Preference points per specific goals table. SBD 6.1 and SBD 6.2 mandatory for preference claims.
Description
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfProvision of construction health and safety agent services for the rehabilitation of airside pavements at O.R. Tambo International Airport for a period of 30 months. Project number 6650. Contract based on NEC3 Professional Services Contract (April 2013) Main Option A with activity schedule.
Important Dates
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Closing date: 2026-09-23 at 11:00 (from tender record). Starting date: upon signing of contract by ACSA. Completion date for the whole of the services: 3 years upon signing of contract. First programme submission: within 2 weeks of contract commencement. Revised programmes at intervals no longer than 4 weeks. Defects date: 52 weeks after Completion. Defects correction period: 2 weeks. Assessment interval: every 4 weeks on the 25th day of each successive month. Payment period: 4-6 weeks after receipt of tax invoice. Period of reply: 7 days. Retention period: 5 years following Completion or earlier termination. No compulsory briefing or site visit date is stated.
Contact Information
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Employer: Airports Company South Africa SOC Limited, O.R. Tambo International Airport, Private Bag X1, Kempton Park 1627. Telephone: +27 11 921 6911. Fax: +27 11 390 1012. Employer's Agent: O.R. Tambo International Airport, Private Bag X1, Kempton Park 1627. Adjudicator nominating body: Chairman of the Johannesburg Society of Advocates. Arbitration: Association of Arbitrators (Southern Africa), Johannesburg. No named SCM or technical contact persons are provided.
Submission Guidelines
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Submission method and address are not stated in the provided document. The Form of Offer and Acceptance (C1.1) must be completed, signed and returned as the offer cover page. Returnable schedules referenced in the tender data must be completed and submitted with the offer. The tenderer must deliver any securities, bonds, guarantees, proof of insurance and other documentation required by the conditions of contract within two weeks of receiving a completed copy of the agreement. Failure to fulfil these obligations constitutes repudiation. No compulsory briefing or site visit is mentioned.
Evaluation Criteria
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Contract uses NEC3 Professional Services Contract (April 2013) Main Option A: Priced contract with activity schedule. Evaluation follows project stages with percentage weighting: Stage 1 Project Initiation and Briefing 5%, Stage 2 Concept and Feasibility 20%, Stage 3 Detail Development 20%, Stage 4 Tender Documentation and Procurement 10%, Stage 5 Construction and Contract Administration 40%, Stage 6 Close-out Services 5%. Price for Services Provided to Date is the total of prices for completed stages plus a proportion of the price for each stage in progress. Before the end of Stage 2 the consultant assesses total prices for remaining stages for employer acceptance. Minimum qualifying thresholds, preference point system (80/20 or 90/10) and functionality scoring are not specified in the provided text.
Technical Specifications
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Scope: Provision of construction health and safety agent services for the rehabilitation of airside pavements at O.R. Tambo International Airport for a period of 30 months. Services governed by NEC3 Professional Services Contract. Key deliverables per project stage: Stage 1 Strategic brief, Stage 2 Concept report, Stage 3 Design development report, Stage 4 Completed production information, Stage 5 Construction works capable of being used by Employer as intended, Stage 6 Completed project contracts. Risk register includes: availability of as-built information, access to site and working hours, site constraints and constructability, statutory requirements and approvals, deviations from programme and cashflow, accuracy of cost estimates. Employer provides access upon contract award to: as-built information and service layouts, all relevant airport areas, traffic forecast data, and relevant engineering, operational and maintenance personnel. Quality policy statement and quality plan required within 4 weeks of Contract Date. Consultant must be fully experienced, properly qualified, registered, licensed, equipped, organised and financed. Consultant warrants completeness, sufficiency and accuracy of all information provided at Contract Date. Sub-consultant payment obligations must be proven within 5 days of employer request. Design documents submitted for acceptance marked A (accepted), B (accepted with comments) or C (rejected). Occupational Health and Safety Agreement (Section 37(2) OHS Act, Construction Regulation 5.1(k)) must be concluded before work commences. Mandatary must submit safety documentation including Construction Manager appointment (Construction Regulation 8) 7 days before work commences. Baseline risk assessment by competent person required before commencement. Competent persons must be appointed and trained. All incidents/accidents reported to Provincial Director: Department of Labour and Client. No alcohol or intoxicating substances on premises. Permit required for permit-required work. Public Liability Insurance as required by Subcontract Agreement. Professional Indemnity and Aviation Liability insurance required per ACSA Insurance Clauses.
Experience & Qualifications
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfConsultant's key person: Construction Health and Safety Agent (name, responsibilities, qualifications, experience to be provided by consultant). Consultant must be fully experienced, properly qualified, registered, licensed, equipped, organised and financed. Consultant warrants completeness, sufficiency and accuracy of all information provided at Contract Date. Sub-consultant payment obligations must be proven within 5 days of employer request. Joint ventures/consortia: joint and several liability; must notify Employer of authorised key person within 1 week of Contract Date; must not materially alter composition without prior written consent. Experience in construction health and safety agent services on airside or major infrastructure projects implied but not explicitly detailed in provided text.
Quality Management
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfQuality policy statement and quality plan must be provided within 4 weeks of Contract Date. Consultant must use skill, care and diligence required of a professional providing similar services. Consultant represents it is fully experienced, properly qualified, registered, licensed, equipped, organised and financed. Consultant warrants completeness, sufficiency and accuracy of all information provided at Contract Date. Design documents submitted for acceptance marked A (accepted), B (accepted with comments) or C (rejected) with employer response not unreasonably delayed. Defects correction period: 2 weeks. Defects date: 52 weeks after Completion, extendable if Employer cannot use work due to defect (max twice original period).
Pricing Schedule
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfActivity schedule in Part C2 Pricing Data. Tendered total of prices in Form of Offer and Acceptance. Prices inclusive of VAT. Project stage percentage weighting: Stage 1 5%, Stage 2 20%, Stage 3 20%, Stage 4 10%, Stage 5 40%, Stage 6 5%. Price for Services Provided to Date = total of prices for completed stages + proportion of price for each stage in progress. Before end of Stage 2, consultant assesses total prices for remaining stages for employer acceptance. Assessment interval: every 4 weeks on 25th day. Payment: 4-6 weeks after receipt of tax invoice (Z9.1 amends to 3 weeks). Currency: South African Rand. Interest: 1% above prime rate. Performance bond: 10% of total Prices. Delay damages: 1% per week up to 10% of professional fees.
Financial Requirements
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Pricing: Activity schedule in Part C2 Pricing Data. Tendered total of prices in Form of Offer and Acceptance. Prices inclusive of VAT. Performance bond: 10% of total of Prices, unconditional on-demand from bank or insurer accepted by Employer, in form set out in Annexure B. Bond must remain valid and enforceable until end of contract period; if expiry date does not coincide, consultant must extend validity 4 weeks prior to expiry, else Employer may claim full amount as cash security. Payment: assessment interval every 4 weeks on 25th day; payment within 4-6 weeks after receipt of tax invoice (Z9.1 amends to 3 weeks). Currency: South African Rand. Interest: 1% above publicly quoted prime rate (365-day year). Delay damages: 1% per week up to maximum 10% of total professional fees. If delay damages reach limit, Employer may terminate consultant's obligation. Consultant's liability for indirect/consequential loss limited to incurred loss/damages to property. Employer's liability for indirect/consequential loss limited to R0.00. End of liability date: 52 weeks after Completion. Insurance: COID Act coverage with letter of good standing required before work. Public Liability, Aviation Liability, Professional Indemnity per ACSA Insurance Clauses. Principle Controlled Insurance effected by Employer for contracts not exceeding R150 million, construction period 36 months, defects liability 24 months.
Compliance Requirements
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdf (unknown)Consultant must be a legally registered entity (CIPC registration implied). Must be compliant with tax obligations (valid SARS tax clearance/pin). Must be registered with relevant professional bodies (SACPCMP for Construction Health and Safety Agent). Must have valid COID Act registration (letter of good standing from Compensation Fund or Licensed Insurer). Must not be restricted from doing business with the state. Joint ventures/consortia: joint and several liability; must notify Employer of authorised key person within 1 week of Contract Date; must not materially alter composition without prior written consent. Ethics: compliance with Prevention and Combating of Corrupt Activities Act; breach constitutes grounds for termination. Confidentiality: all information obtained treated as confidential; prior written consent required for disclosure. Intellectual Property: IP rights remain vested in originator; Consultant grants irrevocable, transferable, non-exclusive royalty-free licence to Employer for constructing, repairing, demolishing, operating and maintaining works. Cession, delegation, assignment: Consultant requires Employer's written consent (not unreasonably withheld). Employer may cede and delegate on written notice. Liens and encumbrances: Consultant keeps equipment free of liens; waives all liens vis-a-vis Employer. Dispute resolution: Adjudication (written submissions only, no oral hearings) per Option W1; Arbitration per Association of Arbitrators (Southern Africa) Rules in Johannesburg; termination disputes excluded from adjudication. Returnable forms: Form of Offer and Acceptance (C1.1), Contract Data (C1.2), Occupational Health and Safety Agreement (C1.3), ACSA Insurance Clauses (C1.4), Pricing Data (Part C2), Scope of Works (Part C3), Site Information (Part C4). Standard SBD/MBD forms not explicitly listed but typically required: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Past SCM Practices), SBD 9 (Independent Bid Determination), Authority to Sign/Board Resolution.
Health & Safety
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfDuplicate health_safety section from extendedSections input. Content already covered in primary health_safety section above.
Contractual Terms
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfDuplicate contractual_terms section from extendedSections input. Content already covered in primary contractual_terms section above.
Section
Source: Health and Safety Agent for Refurbishment of Pavements at ORTIA.pdfEvaluation based on project stage completion percentages: Stage 1 Project Initiation and Briefing 5%, Stage 2 Concept and Feasibility 20%, Stage 3 Detail Development 20%, Stage 4 Tender Documentation and Procurement 10%, Stage 5 Construction and Contract Administration 40%, Stage 6 Close-out Services 5%. Price for Services Provided to Date calculated as total of prices for completed stages plus proportion of price for stages in progress. Before end of Stage 2, consultant assesses total prices for remaining stages for employer acceptance. Consultant does not start Stage 3 services until receiving employer's instruction. No functionality scoring, minimum thresholds or preference point system detailed in provided text.
Description
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdfProvision of engineering professional services for the rehabilitation of airside pavements at OR Tambo International Airport for a period of 30 months. Project number 6650. Contract is NEC3 Professional Services Contract (PSC).
Important Dates
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)Closing date: 23 September 2026 at 11:00.
No mandatory briefing or site visit is mentioned.
Contract starting date: upon signing by ACSA.
Completion date: 3 years after signing.
Defects date: 52 weeks after Completion.
Defects correction period: 2 weeks.
Assessment interval: every 4 weeks on the 25th day of each month.
Payment: within 4 to 6 weeks after receipt of a valid tax invoice.
Submission Guidelines
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)Bids must be submitted in a sealed envelope to the Employer at: Airports Company South Africa SOC Limited, OR Tambo International Airport, Private Bag X1, Kempton Park 1627. The closing date is 23 September 2026 at 11:00. The bid must include the completed Form of Offer and Acceptance, Pricing Data (Part C2), Scope of Work (Part C3), Site Information (Part C4), and any Schedule of Deviations. All documents must be signed by a duly authorised representative. Late bids will be disqualified.
Evaluation Criteria
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)The contract is awarded under NEC3 Professional Services Contract, Main Option A (Priced contract with activity schedule). No specific scoring split, functionary thresholds, or preference points are stated in the document. Price appears to be the primary evaluation factor as the bid is based on a priced activity schedule.
Technical Specifications
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)Provision of engineering professional services for the rehabilitation of airside pavements at OR Tambo International Airport. Services include civil engineering, electrical engineering, project management, quantity surveying, and health & safety agent services. The contract period is 30 months. The detailed scope is in Part C3 of the contract document.
Methodology
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)Consultant submits first programme within 2 weeks of contract commencement. Revised programmes at intervals no longer than 4 weeks. Risk Register includes: Availability of as-built information, Access to site, Site constraints, Statutory approvals, Programme deviations, Cost estimate accuracy. Quality policy and plan within 4 weeks. Design documents submitted to Employer for acceptance (A, B, C). Consultant attends risk reduction meetings. Employer provides access to as-built information, airport areas, and traffic forecast data upon award.
Experience & Qualifications
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdfKey personnel required: Pavement Engineer, Resident Engineer, Electrical Engineer, Geometric Design Engineer. Their responsibilities, qualifications, and experience must be provided in the bid.
Pricing Schedule
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdfPricing schedule in Part C2. Tendered total of Prices in Form of Offer and Acceptance. Activity schedule includes project stage percentage points: Stage 1 Project Initiation and Briefing 5%, Stage 2 Concept and Feasibility 30%, Stage 3 Detail Development 25%, Stage 4 Tender Documentation and Procurement 15%, Stage 5 Construction and Contract Administration 20%, Stage 6 Close-out Services 5%. Price for Services Provided to Date is total of Prices for completed stages plus proportion of current stage.
Financial Requirements
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)Pricing is based on an activity schedule (Part C2). The tendered total of prices is stated in the Form of Offer and Acceptance. Payment is assessed every 4 weeks on the 25th day of each month. Invoices are paid within 4 to 6 weeks after receipt of a valid tax invoice. Interest on late payment is 1% above prime rate. A performance bond of 10% of the total prices is required. The successful bidder must provide insurance: Public Liability, Aviation Liability, and Professional Indemnity per ACSA Insurance Clauses. Delay damages are 1% per week up to a maximum of 10% of professional fees.
Compliance Requirements
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdf (unknown)The Consultant must be a legally registered entity. Key personnel must be professionally registered and experienced (Pavement Engineer, Resident Engineer, Electrical Engineer, Geometric Design Engineer). The Consultant must be in good standing with the Compensation Fund (COID Act) and provide a letter confirming same. Public Liability Insurance and Professional Indemnity Insurance are required. An Occupational Health and Safety Agreement under Section 37(2) of the OHS Act must be signed before work commences. The document does not specify CSD registration, tax clearance, B-BBEE level, or CIDB grading, but these are standard requirements for ACSA.
Health & Safety
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdfOccupational Health and Safety Agreement under Section 37(2) of OHS Act and Construction Regulation 5.1(k) required. Mandatary must comply with OHS Act and COID Act. Insurance: COID coverage, Public Liability, and other adequate insurance. Safety documentation including Construction Manager appointment (Regulation 8) must be submitted 7 days before work commences. Baseline risk assessment required. No alcohol or intoxicants on premises. PPE required. All incidents reported to Department of Labour and Client. Agreement binding for all work.
Contractual Terms
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdfContract is NEC3 PSC April 2013, Main Option A (Priced contract with activity schedule). Secondary options: X7 (Delay damages), X10 (Employer's Agent), X11 (Termination by Employer), X13 (Performance bond), X18 (Limitation of liability), Z (Additional conditions). Law of the contract: South Africa. Language: English. Period of reply: 7 days. Retention period: 5 years. Starting date: upon signing by ACSA. Completion date: 3 years after signing. First programme: within 2 weeks. Revised programmes: every 4 weeks. Defects date: 52 weeks after Completion. Defects correction: 2 weeks. Assessment interval: every 4 weeks on 25th day. Payment: 4-6 weeks after tax invoice. Currency: ZAR. Interest: 1% above prime. Performance bond: 10% of total Prices. Delay damages: 1% per week up to 10% of professional fees. Limitation of liability: indirect/consequential loss limited to incurred loss/damages; liability for property damage limited to incurred loss/damages; total liability for all matters limited to incurred loss/damages. End of liability: 52 weeks after Completion. Adjudicator from panel; nominating body: Chairman of Johannesburg Society of Advocates. Tribunal: Arbitration per Association of Arbitrators (Southern Africa) rules, place Johannesburg. Additional conditions Z1-Z29 cover interpretation, time of essence, early warning, consultant obligations, sub-consulting, design document acceptance, defects date extension, payment, compensation events, project stages, cession, joint and several liability, ethics, confidentiality, step-in rights, liens, intellectual property, dispute resolution.
Section
Source: Engineering Services for the Refurbishment of Pavements at ORTIA.pdfThe contract is awarded based on the priced activity schedule (Option A). No specific evaluation criteria or scoring is stated in the document.
Description
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)PROJECT NAME AND NUMBER: REHABILITATION OF AIRSIDE PAVEMENTS AT ORTIA, 6650. TITLE OF PROJECT: PROVISION OF QUANTITY SURVEYING PROFESSIONAL SERVICES FOR THE REHABILITATION OF AIRSIDE PAVEMENTS AT OR TAMBO INTERNATIONAL AIRPORT FOR A PERIOD OF 30 MONTHS. NEC 3: PROFESSIONAL SERVICES CONTRACT (PSC). The services are the provision of quantity surveying professional services for the rehabilitation of airside pavements at OR Tambo International Airport for a period of 30 months. The Scope is in the document called Part C3: Scope of Work.
Important Dates
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion and Procurement 10%","is_compulsory":false}"}
Submission Guidelines
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)The bid is an NEC3 Professional Services Contract offer. It must include the Form of Offer and Acceptance with the total offered price stated in words and figures inclusive of VAT, Part C2 Pricing Data, and a Schedule of Deviations recording any amendments to the tender documents. Deviations not recorded in the Schedule of Deviations are not part of the contract. The bid/contract is structured as Part C1 Agreements and Contract Data, Part C2 Pricing Data, Part C3 Scope of Work and Part C4 Site Information.
Evaluation Criteria
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)The available text sets pre-qualification requirements rather than a scoring split. Bidders must be registered with CIPC and hold valid CSD registration and SARS tax compliance status. Required insurance: Professional Indemnity of at least R10 million and Public Liability of at least R20 million. A performance bond of 10% of total fees is required from an employer-accepted bank or insurer in the form per Annexure B. The Lead Quantity Surveyor must be registered as PrQS with SACQSP and the Transformation Agent must have relevant experience. Joint ventures and consortia are jointly and severally liable and must notify the employer of the authorised key person within one week of the contract date. No subcontracting is permitted without the employer's written consent. Bidders must comply with the Prevention and Combating of Corrupt Activities Act.
Technical Specifications
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)Provision of quantity surveying professional services for the rehabilitation of airside pavements at OR Tambo International Airport (project number 6650). The contract period is 30 months. The detailed scope is defined in Part C3: Scope of Work. Employer-provided access on contract award includes as-built information and service layouts, all relevant airport areas, and traffic forecast data if available. Risk register matters include availability of as-built information, site access and working hours, site constraints and constructability, statutory requirements and approvals, deviations from programme and cashflow, and accuracy of cost estimates.
Methodology
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)Risk Register matters: Availability of as-built information, Access to site and working hours, Site constraints and constructability, Statutory requirements and approvals, Deviations from programme and cashflow, Accuracy of cost estimates. Consultant's Risk Register matters: Availability of As-Built Information, Access to Site, Progress vs Programme, Cash Flow Management. Employer provides access to: As-built information and service layouts (upon contract award), All relevant airport areas (upon contract award), Traffic forecast data (upon contract award). Consultant access to: All available As-built Information & existing services (upon award), Relevant Engineering, Operational and Maintenance Personnel of ACSA (upon award). Procedure for acceptance of Consultant's Design Documents: submission per Scope, Employer returns marked A (accepted), B (accepted with comments), C (rejected) with reasons. Consultant amends and resubmits for B/C. Disagreement with comments: notify within 1 week. Non-notification within 1 week means compliance does not change Scope. Time periods for compensation events may be amended by agreement.
Experience & Qualifications
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdfJob: Transformation Agent
Responsibilities:
11.2(3) The completion date for the whole of the services is as required by the Employer
Confidential
ConfidentialConfidentialConfidential
11.2(10) The following matters (if any) will be included in the Risk Register
11.2(13) The staff rates are as stated in the Pricing Data
25.2 The Employer provides access to the following persons, places and things
access to access date
1 All available As-built Information & existing Upon award of the project(s)
services
2 Relevant Engineering, Operational and Upon award of the project(s)
Maintenance Personnel of ACSA
A Priced contract with activity schedule
11.2(14) The activity schedule is in the Pricing Data
11.2(18) The tendered total of the Prices is in the Form of Offer and Acceptance
The percentage points for each stage are as follows:
Project stage Percentage points
for each stage
Description %
Stage 1: Project Initiation and Briefing 5%
Stage 2: Concept and Feasibility 20%
Stage 3: Detail Development 20%
Stage 4: Tender Documentation and Procurement 10%
Stage 5: Construction and Contract Administration 40%
Stage 6: Close-out Services 5%
Confidential
ConfidentialConfidentialConfidential
Part c1: agreements and contract data
C1.3: Occupational health and safety agreement
Occupational health and safety agreement
AGREEMENT IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH & SAFETY ACT (ACT ) & CONSTRUCTION REGULATION 5.1(k)
Objectives
To assist Airport Company South Africa (ACSA) in order to comply with the requirements of:
Act).
To this end an Agreement must be concluded before any consultant/ subcontracted work may commence
The parties to this Agreement are:
Name of Organisation:
Airports company south africa
O.R. Tambo international airport
Physical Address:
Airport Company South Africa
O.R. Tambo International Airport
Private Bag X1, Kempton Park
1627
Hereinafter referred to as “Client”
Name of organisation:
Physical Address:
Hereinafter referred to as “the Mandatary/ Principal Contractor”
Confidential
ConfidentialConfidentialConfidential
Mandatory’s main scope of work
General information forming part of this agreement
REGULATIONS promulgated in terms of the former Machinery and Occupational Safety Act No. as amended as well as other REGULATIONS which may be promulgated in terms of the Act
and other relevant Acts pertaining to the job in hand.
WITHOUT DEROGATING FROM HIS/HER STATUS IN HIS/HER RIGHT AS AN EMPLOYER or user
of the plant
CONTRACTOR) for unlawful acts or omissions of Mandataries (CONTRACTORS) save where a
Written Agreement between the parties has been concluded containing arrangements and
procedures to ensure compliance with the said Act BY THE MANDATARY.
provisions of the Occupational Health & Safety Act (OHS Act) and applicable Regulations.
Written Agreement with them.
event of inability to perform as per this Agreement.
Manager appointment in terms of construction regulation 8, must be submitted 7 days before work
commences.
The undertaking
The Mandatary undertakes to comply with:
Insurance
covered in terms of the COID Act, which shall remain in force whilst any such employees are present
on the Client’s premises. A letter is required prior commencing any work on site confirming that the
Principal contractor or contractor is in good standing with the Compensation Fund or Licensed
Insurer.
shall remain in force whilst they and /or their employees are present on the Client’s premises, or which
shall remain in force for that duration of their contractual relationship with the Client, whichever period
is the longest.
a. Public Liability Insurance Cover as required by the Subcontract Agreement.
b. Any other Insurance cover that will adequately makes provision for any possible losses and/or
claims arising from their and /or their Subcontractors and/or their respective employee’s acts
and/or omissions on the Client’s premises.
Compliance with the occupational health & safety act
The Mandatary undertakes to ensure that they and/or their subcontractors if any and/or their
respective employees will at all times comply with the following conditions:
Confidential
ConfidentialConfidentialConfidential
supervision of the Mandatary’s employees who are to be trained to understand the hazards
associated with any work that the Mandatary performs on the Client’s premises.
assignment shall immediately be forwarded to the Client.
OHSAct and that s/he and his/her employees and any of his subcontractors comply
with the requirements.
before commencement of any work in the Client’s premises. A baseline risk assessment
document will include identification of hazards and risk, analysis and evaluation of the risks and
hazards identified, a documented plan and safe work procedures to mitigate, reduce or control
the risks identified, and a monitoring and review plan of the risks and hazards.
& Safety aspect pertaining to them or to the work that is to be performed.
strictly enforced.
employees and shall be worn at all times.
and enforced and all employees shall be made conversant with the contents of these practises.
the Client’s premises.
Director: Department of Labour as well as to the Client.
any of the Client’s machinery/article/substance/plant/personal protective equipment without prior
written approval.
performed prior to the obtaining of a duty completed approved permit.
on the Client’s premises. Anyone suspected to be under the influence of alcohol or any other
intoxicating substance shall not be allowed on the premises. Anyone found on the premises
suspected to be under the influence of alcohol or any other intoxicating substance shall be
escorted off the said premises immediately.
inquire into Occupational Health & Safety.
Further undertaking
sign this agreement on behalf of the Mandatary. The signing power of this representative must be
designated in writing by the Chief Executive Officer of the Mandatary. A copy of this letter must be
made available to the Client.
in writing anything he/she deems to be unhealthy and /or unsafe. He has versed his employees in
this regard.
and other persons in any way whilst performing work on the Client’s premises.
procedure is duly completed, signed and received by the Client.
Confidential
ConfidentialConfidentialConfidential
Acceptance by mandatary
In terms of section 37(2) of the Occupational Health & Safety Act and section 5.1(k) of the Construction
Regulations 2014,
I .......................................a duly authorised 16.2 Appointee acting for and on behalf of
.......................................................(company name) undertake to ensure that the requirements and the
provision of the OHSAct and its regulations are complied with.
Mandatary – WCA/ Federated Employers Mutual No...........................................
Expiry date .................................................................................................
Signature on behalf of mandatary date
(Warrant his authority to sign)
Signature on behalf of the client date
Airport company south africa
Confidential
ConfidentialConfidentialConfidential
Part c1: agreements and contract data
C1.4: Acsa insurance clauses
Insurance clauses for capex projects
The insurance clauses in this document should be extracted and attached to tender documents and to contracts.
Please note that the successful bidder must source insurance covers listed under paragraph 1.6
a) Section 2 – Public Liability
c) Aviation Liability
d) Professional Indemnity
Section a: definitions
Landside refers to:
terminals and cargo buildings.
Airside refers to:
perimeter gatehouses and cargo buildings.
Section b: insurance clauses
Insurance clauses for airside construction contracts where the awarded
Contract value does not exceed r150 million, and the construction period does not
Exceed 36 months, and the defects liability period does not exceed 24 months.
Each Party shall be responsible for effecting and maintaining the relevant insurances as specified below and to
the extent relevant to the Contract.
1.1 Notwithstanding anything elsewhere contained in this Contract and without limiting the obligations,
liabilities or responsibilities of the Contractor in anyway whatsoever (including but not limited to any
requirement for the provision by the Contractor of any other insurances) the Employer shall effect
and maintain for the duration of the construction and maintenance periods of the Contract - as
appropriate in the joint names of the Employer, the Contractor and where relevant Sub-Contractors
the following insurances which are subject to the terms, limits, exceptions and conditions of the
Policy:
Confidential
ConfidentialConfidentialConfidential
a) Contract Works/Contractors Public Liability/ Removal Of Lateral Support Liability
Section 1 Of The Policy – Contract Works
Contract Works Insurance for the full value of the Works to provide cover against accidental
physical loss of or damage to the Works, Temporary Works and materials intended for
incorporation in the Works all being the subject matter of this Contract including to the extent
provided for in the policy whilst in transit or temporarily stored at any premises en route to or
from the Site (other than where this is a continuation of Marine Transit) within the territorial
limits of the policy.
This insurance may specifically exclude any cost necessary to replace or rectify any of the
property insured, which is in a defective condition due to defect in design, plan specification,
material or workmanship.
This insurance contains the following limitations and warrantees;
Open Trench Limitation
In respect of loss or damage to open trenches and pipes, conduits or cables laid therein, caused directly or
indirectly
by rain, inundation or flood, Insurers liability shall be limited in respect of the aggregate length of open trenches
at
any one time to 2,500 meters.
Exposed Layer Works (applicable to works involving paving, roadways, bulk earthworks and runways
and
2 taxiways)
In respect of loss or damage to Exposed Layer Works relating to paving, roadways and runways (including
taxiways)
caused directly or indirectly by rain, inundation or flood, Insurers liability shall be limited in respect of the
aggregate
length of Exposed Layer Works at any one time to 2,500 meters.
Section II of the Policy – Contractors Public Liability
Public Liability Insurance which provides indemnity against legal liability in the event of
accidental death of or injury to persons and/or loss of or damage to property(other than the
Works the subject matter of this Contract) arising from the execution of the Contract with a limit
of indemnity of R100,000,000 in respect of any one occurrence or series of occurrences
consequent on or attributable to one source or original cause.
Section III of the Policy – Removal Of Lateral Support Liability
Removal Of Lateral Support Liability which provides indemnity against legal liability in the event
of accidental death of or injury to persons and/or loss of or damage to property (other than the
Works the subject matter of this Contract) arising out of or in connection with shock or vibration
or the removal or weakening of or interference with support to property in the vicinity of the
Contract Site and arising out of or in connection with the Insured Contract (but not in respect of
tunneling works) and occurring during the Period of Insurance.
The Limit of Indemnity being limited to R50,000,000 attributable to one source or original
Cause
b. Contract Works SASRIA – Providing physical loss of or damage to the Works, Temporary Works
Confidential
ConfidentialConfidentialConfidential
and materials intended for incorporation in the Works as covered by the underlying Contract
Works policy as noted in (a) above due to perils as covered in terms of the SASRIA Contract
Works wording as issued by SASRIA SOC.
The Contract Works SASRIA cover excludes consequential or indirect loss or damage of any kind
or description whatsoever.
The SASRIA Contract Works policy is limited to R500,000,000 (Incl VAT) in the aggregate during
the policy period of insurance.
The Contract Works SASRIA policy wording can be obtained from the SASRIA website
http://www.sasria.co.za/ which notes the covers and policy exclusions.
c) Aviation Liability Insurance which provides indemnity against legal liability in the event of
accidental death of or injury to persons and/or loss of or damage to property (other than the
Works the subject matter of this Contract) arising from the execution of the Contract with a
limit of indemnity of R2,000,000,000 in respect of any one occurrence or series of occurrences
consequent on or to one source or original cause.
This insurance is in respect of liability relating to aircrafts.
d) Design & Construct Professional Indemnity Insurance which provides indemnity against legal
liability to pay compensation as a result of any actual or alleged negligent act, error or omission
in the performance of the Professional Duties of the insured and arising from the execution of
this project. The limit of indemnity under this insurance shall be *R25,000,000 in the aggregate
during the annual policy period of insurance that ACSA effect such cover during the policy
period from 1 April to 31 March during each policy period of insurance.
*The limits of indemnity applies to all ACSA contracts as a whole and does not apply specifically to this
contract. The aggregate limit could be exhausted by claims under other ACSA contracts and there is no
guarantee that this insurance cover will provide sufficient cover to this specific contract should the
aggregate limit be exhausted.
The Policy only covers the rectification of the works and excludes all consequential losses.
Professional Duties do not include:
a) Labour and construction work which would normally be the responsibility of the building
or engineering contractor.
b) Supervision of the construction works usually undertaken by a building or engineering
contractor.
Employer. The Contractor shall comply to all the terms and conditions of the Employer arranged
policies and the Contractor shall be deemed to be fully aware of all the conditions, limits,
limitations, exclusions/exceptions and deductibles that are contained in the Employer arranged
policies. Copies of the Employer arranged policies are obtainable on request from the Employer and
if the Contractor is of the opinion that additional insurance is required, such shall be for the
Contractors account.
1.3 The Employer shall pay the premium in connection with the insurances effected by the Employer.
The Employer is entitled to all return premiums, dividends, discounts, or adjustments in connection
with the insurances effected by the Employer.
1.4 The Contractor shall not include any premium charges for this insurance except to the extent, which
Confidential
Qualifications:
Experience:
Job: Transformation Agent
Qualifications:
Experience:
11.2(3) The completion date for the whole of the services is as required by the Employer
Quality Management
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)Quality policy statement and quality plan provided within 4 weeks of Contract Date. Defects date: 52 weeks after Completion. Defects correction period: 2 weeks. Extending defects date: if Employer cannot use work due to Defect after Completion, defects date delayed by equal period. Employer notifies Consultant of change. Extended defects date period does not exceed twice original period. Invoices include details stated in Scope showing amount due assessment and details for valid tax invoice. Payment within 3 weeks of receiving invoice with required details. Late tax invoice submission extends payment time by equal period. Compensation events: Employer instruction to change Scope except Consultant-requested changes or risk reduction meeting decisions from Consultant's fault. Consultant must notify compensation event within 4 weeks of awareness or entitlement lost. Consultant entitled to changes only if compensation event affects critical path.
Pricing Schedule
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf(Registration Number: 1993/004149/30)
and ............................................................
(Registration Number: ___________________)
for The provision of quantity surveying professional services for the
rehabilitation of airside pavements at OR Tambo International
Airport for a period of 30 months.
Contents: No of pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Works [●]
Part C4 Site Information [●]
contained in this agreement and in the contract that is the subject of this agreement.
The terms of the contract, are contained in: Z
Part C1 Agreements and Contract Data, (which includes this Form of Offer and
Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
contract, may remedy the default either himself or procure a third party (including
any subConsultant or supplier of the Consultant) to do so on his behalf. The
reasonable costs of such remedial works shall be borne by the Consultant.
Z26.2 The Consultant co-operates with the Employer and facilitates and permits the use
of all required information, materials and other matter (including but not limited to
documents and all other drawings, CAD materials, data, software, models, plans
designs, programs, diagrams, evaluations, materials, specifications, schedules
reports, calculations, manuals or other documents or recorded information
(electronic or otherwise) which have been or are at any time prepared by or on
behalf of the Consultant under the contract or otherwise for and/or in connection
with the works) and generally does all things required by the Project Manager to
achieve this end.
Z27 Liens and Encumbrances
11.2(10) The following matters (if any) will be included in the Risk Register
11.2(13) The staff rates are as stated in the Pricing Data
25.2 The Employer provides access to the following persons, places and things
access to access date
1 All available As-built Information & existing Upon award of the project(s)
services
2 Relevant Engineering, Operational and Upon award of the project(s)
11.2(14) The activity schedule is in the Pricing Data
11.2(18) The tendered total of the Prices is in the Form of Offer and Acceptance
Financial Requirements
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)Pricing is under NEC3 Main Option A (priced contract with activity schedule); the activity schedule is in Part C2 and the tendered total of prices is in the Form of Offer and Acceptance. Prices are inclusive of VAT. Stage percentage weights: Stage 1 Project Initiation and Briefing 5%, Stage 2 Concept and Feasibility 20%, Stage 3 Detail Development 20%, Stage 4 Tender Documentation and Procurement 10%, Stage 5 Construction and Contract Administration 40%, Stage 6 Close-out Services 5%. Price for services provided to date is the total of completed stage prices plus a proportionate share of the stage in progress. Before the end of Stage 2, the consultant must submit an assessment of the total prices for the remaining stages for employer acceptance; Stage 3 services start only on employer instruction. The contract data also allows stages 1 and 2 to be time-based under Option E, with remaining stages priced under Option A or C. Payment is assessed every four weeks on the 25th and paid 4-6 weeks after receipt of a valid tax invoice. Currency is South African Rand; interest is 1% above prime. Performance bond: 10% of total prices. Delay damages: 1% per week up to a maximum of 10% of professional fees. The employer's liability for the consultant's indirect or consequential loss is limited to R0.00.
Compliance Requirements
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf (unknown)Bidders must be registered with CIPC and hold valid CSD registration and SARS tax compliance status. Professional Indemnity insurance of at least R10 million and Public Liability insurance of at least R20 million are required. The Lead Quantity Surveyor must be registered as PrQS with SACQSP. The successful bidder must provide a performance bond of 10% of total prices from an employer-accepted bank or insurer in the form per Annexure B. An Occupational Health and Safety Agreement under Section 37(2) of the OHS Act and Construction Regulation 5.1(k) must be concluded before work starts, along with COID good-standing evidence and safety checklist documentation including the Construction Manager appointment, submitted 7 days before work. Cession, delegation or assignment of rights or obligations without the employer's written consent is prohibited. Joint ventures and consortia are jointly and severally liable and must notify the employer of the authorised key person within one week of the contract date. Bidders must comply with the Prevention and Combating of Corrupt Activities Act.
Health & Safety
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdf50.1 The assessment interval is Every four (4) weeks, on the 25th day of each
successive month
51.1 The period within which payment is Four to six (4-6) weeks after the receipt of the tax
made is invoice
51.2 The currency of this contract is the South African Rand
51.5 The interest rate is One (1) % above
the publicly quoted prime rate of
interest (calculated on a 365-day year)
charged from time to time by Bank
for amounts due in Rands; and the
exchange rate published by the South
W1.4(2) The tribunal is Arbitration
W1.4(5) If the tribunal is arbitration, the The arbitration procedure is as set out in the latest
arbitration procedure is: edition of Rules for the Conduct of Arbitrations
published by The Association of Arbitrators
(Southern Africa) or its successor body.
W1.4 The place where arbitration is to be Johannesburg, South Africa.
held is:
Z1 Interpretation of the law
Z1.1 Add the following at the end of core clause 12.3: Any extension, concession, waiver or
relaxation of any action stated in this contract by the Parties or the Adjudicator does not constitute
a waiver of rights, and does not give rise to an estoppel unless the Parties agree otherwise and
confirm such agreement in writing.
Z2 Add the following at the end of core clause 12:
Z2.1 In this contract:
Z2.1.1 references to any Party to the Contract include its successors or permitted assigns;
Z2.1.2 references to the Consultant include the obligations of its personnel;
Z2.1.3 the references to the provisions of any law shall include such provisions as amended, re-enacted
or consolidated from time to time in so far as such amendment, re-enactment or consolidation
applies or is capable of applying to any works under this Contract;
Z2.1.4 references to this Contract and any deed, Contract or instrument are deemed to include
references to this Contract or such other deed, agreement or instrument as amended, novated,
supplemented, varied or replaced from time to time;
Z2.1.5 references to a "person" include a natural person, company or any other artificial person or other
corporate entity, a charity, trust, partnership, joint venture, syndicate, or any other association of
persons;
Z2.1.6 references to “month” shall be to a calendar month;
Z2.1.7 headings are for convenience only and will not be taken into consideration in the interpretation of
the Contract;
would assist in deciding the actions to be taken.
Z4 The Consultant’s obligations: Delete core clause 21 and replace with the following:
Z4.1 The Consultant Provides the Services in accordance with the Scope and with due expedition and
without delay.
Z4.2 The Consultant’s obligation is to use the skill, care and diligence that is required of a professional
providing similar services. The Consultants observes and/or exercise the degree of skill, care,
diligence, prudence and foresight which would reasonably and ordinarily be exercised by a skilled
and experienced Consultant in relation to his practices, methods, techniques, specifications
and/or standards (whether in respect of design, engineering, construction, performance, safety,
workmanship, equipment, components or otherwise) engaged in the same type of undertaking
under the same or similar circumstances and conditions to the Services.
Z4.3 The Consultant represents that he is, and ensures that he is at all times fully experienced,
properly qualified, registered, licensed, equipped, organized and financed to perform the Services
in terms of this contract.
Z4.4 The Consultant warrants that he has satisfied himself, prior to the Contract Date, as to the
completeness, sufficiency and accuracy of all information provided to him as at the Contract Date.
amendment, reinterpretation, change in application or other modification
after the Contract Date of any law, excluding (i) the enactment of any bill
inside the country, but only if such bill is enacted without any material
changes being made to the contents of such bill from the form published
in the Gazette (as defined in the Interpretation Act, 1957) as at the
Contract Date, and (ii) any such modification in law relating to any taxes,
charges, imposts, duties, levies or deductions that are assessed in
relation to a person’s income; or
other than (i) in accordance with the terms upon which it was originally
granted, (ii) as a result of the failure by the Contractor to comply with any
condition set out therein, or (iii) as a result of any act or omission of the
Part c1: agreements and contract data
C1.3: Occupational health and safety agreement
AGREEMENT IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH & SAFETY ACT (ACT ) & CONSTRUCTION REGULATION 5.1(k)
To assist Airport Company South Africa (ACSA) in order to comply with the requirements of:
Act).
of the plant
CONTRACTOR) for unlawful acts or omissions of Mandataries (CONTRACTORS) save where a
provisions of the Occupational Health & Safety Act (OHS Act) and applicable Regulations.
Mandatories who utilise the services of their own Mandatories (contractors) must conclude a similar
All work performed by the Mandatary on the Client’s premises must be performed under the close
supervision of the Mandatary’s employees who are to be trained to understand the hazards
associated with any work that the Mandatary performs on the Client’s premises.
assignment shall immediately be forwarded to the Client.
before commencement of any work in the Client’s premises. A baseline risk assessment
document will include identification of hazards and risk, analysis and evaluation of the risks and
hazards identified, a documented plan and safe work procedures to mitigate, reduce or control
the risks identified, and a monitoring and review plan of the risks and hazards.
& Safety aspect pertaining to them or to the work that is to be performed.
inquire into Occupational Health & Safety.
sign this agreement on behalf of the Mandatary. The signing power of this representative must be
designated in writing by the Chief Executive Officer of the Mandatary. A copy of this letter must be
made available to the Client.
in writing anything he/she deems to be unhealthy and /or unsafe. He has versed his employees in
this regard.
and other persons in any way whilst performing work on the Client’s premises.
procedure is duly completed, signed and received by the Client.
In terms of section 37(2) of the Occupational Health & Safety Act and section 5.1(k) of the Construction
Regulations 2014,
I .......................................a duly authorised 16.2 Appointee acting for and on behalf of
.......................................................(company name) undertake to ensure that the requirements and the
provision of the OHSAct and its regulations are complied with.
Mandatary – WCA/ Federated Employers Mutual No...........................................
Contractual Terms
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdfSchedule of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract
Data) to arrange the delivery of any securities, bonds, guarantees, proof of insurance and any other
documentation to be provided in terms of the conditions of contract identified in the Contract Data. Failure
to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of this
agreement.
Main Option A: Priced contract with activity schedule
Dispute resolution Option W1: Dispute resolution procedure
Secondary Options (incorporating X7: Delay damages
amendments)
X10: Employer’s Agent
X11: Termination by the Employer
X13: Performance bond
X18: Limitation of liability
Z: Additional conditions of contract
of the NEC3 Professional Service Contract, April
12.2 The law of the contract is the law of the Republic of South Africa
13.1 The language of this contract is English
13.3 The period of reply is Seven (7) days
13.6 The period of retention is 5 years following Completion or earlier
termination of a contract
2 The Parties’ main responsibilities
81.1 The Consultant provides the The Insurance Clauses which is attached at the end
insurance stated in of the Contract Data. The insurances are in the joint
names of the Parties and provide cover for events
which are at the Consultant risk from the starting
date until the Defects Certificate or a termination
certificate has been issued.
insurance in respect of death of or Occupational Injuries and Diseases Act No. 130 of
bodily injury to employees of the 1993
Option W1
W1.1 The Adjudicator is The Adjudicator is the person selected by the Party
intending to refer the dispute, from the Panel of
1627
The authority of the Employer’s Agent is to act on
behalf of the Employer with the authority set out in
the Contract Data
X11 Termination by Employer
X11.1 The Employer may Terminate the Consultant’s obligation to Provide the
services for a reason not stated in this contract by
notifying the Consultant
X13 Performance Bond
X13.1 The performance bond percentage 10% of the total of the Prices.
is:
X18 Limitation of Liability
X18.1 The Consultant’s liability to the The Total of the Incurred loss and/or damages
X18.2 For any one event, the Consultant’s The Total of the Incurred loss and/or damages
liability to the Employer for loss of caused to the property.
or damage to the Employer’s
property is limited to:
X18.3 The Consultant’s total liability to the The Total of the Incurred loss and/or damages
X18.4 The Consultant’s total liability to the The Total of the Incurred loss and/or damages
under or in connection with this or delict and otherwise to the extent allowed under
contract, other than excluded the law of the contract.
matters, is limited to
X18.5 The end of liability date is 52 weeks after Completion of the whole of the
services.
entitled to a change in the Prices, the Completion Date or a Key Date and the Employer is
absolved from all liability in connection with the event.
Z12 Assessing compensation events: add the following at the end of core clause 63.4:
Z20.2 Add the following as new secondary option clause X13.2: The Contractor
ensures that the performance bond is valid and enforceable until the end of the
contract period. If the terms of the performance bond specify its expiry date and
the end of the contract period does not coincide with such expiry date, four weeks
prior to the said expiry date, the Contractor extends the validity of the
performance bond until the end of the contract period. If the Contractor fails to so
extend the validity of the performance bond, the Employer may claim the full
amount of the performance bond and retain the proceeds as cash security.
Z21 Limitation of liability: Insert the following new clause as Option X18.4:
Z21.1 The Employer's liability to the Consultant for the Consultant's indirect or
consequential loss is limited to R0.00.
Z21.2 Notwithstanding any other clause in this contract, any proceeds received from the
security bonds and guarantees provided by the Consultant in terms of this
from any insurances but for the conduct of the Consultant shall be excluded from
the calculation of the limitations of liability listed in the contract.
Z22.2 The Employer may, on written notice to the Consultant, cede and delegate its
rights and obligations under this contract to any person or entity.
Z23 Joint and several liability
Z23.1 If the Consultant constitutes a joint venture, consortium or other unincorporated
grouping of two or more persons, these persons are deemed to be jointly and
severally liable to the Employer for the performance of the Contract.
Z23.2 The Consultant shall, within 1 week of the Contract Date, notify the Employer of
the key person who has the authority to bind the Consultant on their behalf.
Z23.3 The Consultant does not materially alter the composition of the joint venture,
consortium or other unincorporated grouping of two or more persons without prior
written consent of the Employer.
Z24 Ethics
Z24.1 The Consultant undertakes:
Z24.2 The Consultant’s breach of this clause constitutes grounds for terminating the
Consultant’s obligation to Provide the Services or taking any other action as
appropriate against the Consultant (including civil or criminal action). However,
lawful inducements and rewards shall not constitute grounds for termination.
Z24.3 If the Consultant is found guilty by a competent court, administrative or regulatory
body of participating in illegal or corrupt practices, including but not limited to the
making of offers (directly or indirectly), payments, gifts, gratuity, commission or
benefits of any kind, which are in any way whatsoever in connection with the
contract with the Employer, the Employer shall be entitled to terminate the
contract in accordance with the procedures stated in core clause 92.2. the
amount due on termination is A1.
Z25 Confidentiality
Z25.1 All information obtained in terms of this contract or arising from the
implementation of this contract shall be treated as confidential by the Consultant
and shall not be used or divulged or published to any person not being a party to
this contract, without the prior written consent of the Project Manager or the
become entitled to over such Equipment from time to time
Z28 Intellectual Property
Z28.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design,
copyright, trade mark, trade name, trade secret or other intellectual or industrial
property right relating to the Works.
Z28.2 IP rights remain vested in the originator and shall not be used for any reason
whatsoever other than carrying out the works.
Z28.3 The Consultant gives the Employer an irrevocable, transferrable, non-exclusive
royalty free licence to use and copy all IP related to the works for the purposes o
constructing, repairing, demolishing, operating and maintaining the works.
on terms no less onerous than the terms the Employer would use to protect its IP
Z28.5 The Consultant shall indemnify and hold the Employer harmless against and from
any claim alleging an infringement of IP rights (“the claim”), which arises out of
or in relation to:
Z28.5.1 the Consultant’s design, manufacture, construction or execution of the Works;
Z28.5.2 the use of the Consultant’s Equipment, or
Z28.5.3 the proper use of the Works.
Z28.6 The Employer shall, at the request and cost of the Consultant, assist in contesting
the claim and the Consultant may (at its cost) conduct negotiations for the
settlement of the claim, and any litigation or arbitration which may arise from it.
Z29 Dispute resolution: The following amendments are made to Option W1:
Under clause W1.3, in the fourth row of the first column of the adjudicationZ29.1
table, the following words are added after the words “any other matter”:
“excluding disputes relating to termination of the contract”.
The following clauses are added at the end of clause W1.3:Z29.2
“The Adjudicator shall decide the dispute solely on the written submissions of theZ29.2.1
parties. No oral submissions shall be heard during adjudication.”
shall remain in force whilst they and /or their employees are present on the Client’s premises, or which
shall remain in force for that duration of their contractual relationship with the Client, whichever period
is the longest.
a. Public Liability Insurance Cover as required by the Subcontract Agreement.
b. Any other Insurance cover that will adequately makes provision for any possible losses and/or
claims arising from their and /or their Subcontractors and/or their respective employee’s acts
and/or omissions on the Client’s premises.
Part c1: agreements and contract data
C1.4: Acsa insurance clauses
Please note that the successful bidder must source insurance covers listed under paragraph 1.6
a) Section 2 – Public Liability
c) Aviation Liability
d) Professional Indemnity
Section a: definitions
perimeter gatehouses and cargo buildings.
Section b: insurance clauses
Contract value does not exceed r150 million, and the construction period does not
Exceed 36 months, and the defects liability period does not exceed 24 months.
the extent relevant to the Contract.
1.1 Notwithstanding anything elsewhere contained in this Contract and without limiting the obligations,
liabilities or responsibilities of the Contractor in anyway whatsoever (including but not limited to any
requirement for the provision by the Contractor of any other insurances) the Employer shall effect
and maintain for the duration of the construction and maintenance periods of the Contract - as
appropriate in the joint names of the Employer, the Contractor and where relevant Sub-Contractors
the following insurances which are subject to the terms, limits, exceptions and conditions of the
a) Contract Works/Contractors Public Liability/ Removal Of Lateral Support Liability
Section 1 Of The Policy – Contract Works
property insured, which is in a defective condition due to defect in design, plan specification,
material or workmanship.
This insurance contains the following limitations and warrantees;
indirectly
by rain, inundation or flood, Insurers liability shall be limited in respect of the aggregate length of open trenches
at
any one time to 2,500 meters.
Exposed Layer Works (applicable to works involving paving, roadways, bulk earthworks and runways
and
2 taxiways)
In respect of loss or damage to Exposed Layer Works relating to paving, roadways and runways (including
taxiways)
caused directly or indirectly by rain, inundation or flood, Insurers liability shall be limited in respect of the
aggregate
length of Exposed Layer Works at any one time to 2,500 meters.
Section II of the Policy – Contractors Public Liability
accidental death of or injury to persons and/or loss of or damage to property(other than the
Works the subject matter of this Contract) arising from the execution of the Contract with a limit
of indemnity of R100,000,000 in respect of any one occurrence or series of occurrences
consequent on or attributable to one source or original cause.
Section III of the Policy – Removal Of Lateral Support Liability
of accidental death of or injury to persons and/or loss of or damage to property (other than the
Works the subject matter of this Contract) arising out of or in connection with shock or vibration
or the removal or weakening of or interference with support to property in the vicinity of the
Contract Site and arising out of or in connection with the Insured Contract (but not in respect of
tunneling works) and occurring during the Period of Insurance.
The Limit of Indemnity being limited to R50,000,000 attributable to one source or original
or description whatsoever.
The SASRIA Contract Works policy is limited to R500,000,000 (Incl VAT) in the aggregate during
the policy period of insurance.
http://www.sasria.co.za/ which notes the covers and policy exclusions.
c) Aviation Liability Insurance which provides indemnity against legal liability in the event of
accidental death of or injury to persons and/or loss of or damage to property (other than the
Works the subject matter of this Contract) arising from the execution of the Contract with a
limit of indemnity of R2,000,000,000 in respect of any one occurrence or series of occurrences
consequent on or to one source or original cause.
d) Design & Construct Professional Indemnity Insurance which provides indemnity against legal
liability to pay compensation as a result of any actual or alleged negligent act, error or omission
in the performance of the Professional Duties of the insured and arising from the execution of
this project. The limit of indemnity under this insurance shall be *R25,000,000 in the aggregate
during the annual policy period of insurance that ACSA effect such cover during the policy
period from 1 April to 31 March during each policy period of insurance.
*The limits of indemnity applies to all ACSA contracts as a whole and does not apply specifically to this
contract. The aggregate limit could be exhausted by claims under other ACSA contracts and there is no
guarantee that this insurance cover will provide sufficient cover to this specific contract should the
aggregate limit be exhausted.
a) Labour and construction work which would normally be the responsibility of the building
or engineering contractor.
b) Supervision of the construction works usually undertaken by a building or engineering
contractor.
policies and the Contractor shall be deemed to be fully aware of all the conditions, limits,
limitations, exclusions/exceptions and deductibles that are contained in the Employer arranged
policies. Copies of the Employer arranged policies are obtainable on request from the Employer and
if the Contractor is of the opinion that additional insurance is required, such shall be for the
1.3 The Employer shall pay the premium in connection with the insurances effected by the Employer.
with the insurances effected by the Employer.
1.4 The Contractor shall not include any premium charges for this insurance except to the extent, which
Section
Source: Quantity Surveyor for Refurbishment of Pavements at ORTIA.pdfdesigns, programs, diagrams, evaluations, materials, specifications, schedules
40.2 The quality policy statement and quality plan are provided within 4 weeks of the Contract
The percentage points for each stage are as follows
Project stage Percentage points
for each stage
Stage 1: Project Initiation and Briefing 5%
Stage 2: Concept and Feasibility 20%
Stage 3: Detail Development 20%
Stage 4: Tender Documentation and Procurement 10%
Stage 5: Construction and Contract Administration 40%
Stage 6: Close-out Services 5%
of services completed in that project stage.
concept stage of the project
Before the end of project stage 2, the Consultant in conjunction with the Employer
stages and submits the assessment to the Employer for acceptance. If the
The Consultant does not start any services included in project stage 3 until he
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Jones Road - Kempton Park - Gauteng - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
26 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 818 438
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Other professional, scientific and technical activities. Unlock full pricing strategies, bid frequency, and historical win rates.