Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
TNPA Lower Ground Canteen Port Administration - Building Green Street - Port of Port Elizabeth -
Organization Type
GOVERNMENT
Published
16 Oct 2026
OCDS Reference
ocds-9t57fa-174509
Marine structural refurbishment of the dom pedro quay at the port of port elizabeth under a seven-month contract. The work covers demolition and recasting of damaged concrete deck sections, new welded steel connections fixed with hilti hit-re chemical anchors, stanchion and base plate repairs, replacement of fenders and rubber blocks, stainless steel 316l access ladders and handgrips, and 400 mm thick rock scour protection using stone of at least 60 kg. All materials and workmanship must meet the stated SANS specifications, with shop drawings approved before fabrication and every dimension verified on site. Bidders must be registered on the csd with a valid tax compliance status and must be able to demonstrate marine structural capability; bids close on 16 november 2026 at 16:00.
Closing: bids close on 16 November 2026 at 16:00.
Scope: marine structural refurbishment of the Dom Pedro Quay β concrete deck demolition and recasting, welded steel connections using HILTI HIT-RE chemical anchors, stanchion and base plate repairs, fender and rubber block replacement, stainless steel 316L ladders and handgrips, and 400 mm thick rock scour protection with minimum 60 kg stone.
Materials: concrete to SANS 0100 and SANS 1200 with cube tests at 7 and 28 days; steelwork to SANS 1431:2007, hot-dip galvanised to SANS 121:2000; reinforcement to SANS 920 at 450 MPa characteristic yield; stainless steel grade 316L, passivated; welding by qualified welders.
Shop drawings: four copies must be submitted for approval before fabrication starts, and all dimensions must be verified on site with discrepancies reported to the engineer.
Curing and striking: concrete cured continuously for seven days; props remain until the specified striking times (for example 14 days for beams, 10 days for slabs); cambers Span/400 or Span/150 as specified.
Spacing: fender carrier tyres at 26 m centres for straddle carriers; bollards and ladders at 18 m centres.
Eligibility: CSD registration and a valid tax compliance status (SARS TCS or tax pin) are required, with B-BBEE points claimed on SBD 6.1; no minimum B-BBEE level or CIDB grade is set, but bidders must show capacity for marine concrete, steel and fender work. SBD 4, 6.1, 8 and 9 must be completed and signed.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 16 November 2026 - 16:00
Venue
TNPA Lower Ground Canteen Port Administration Building Green Street Port of Port Elizabeth
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
TNPA Lower Ground Canteen Port Administration - Building Green Street - Port of Port Elizabeth -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Annexure D -Health and Safety Specification.pdf (unknown)16 Oct
2026
Tender Published
Tender was published
16 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure K - Civil Engineering Drawings.pdf
Transnet National Ports Authority requires the refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, including civil works such as heavy-duty manholes, stormwater and electrical ducting, concrete slabs, and associated reinstatement, over a seven-month period.
Annexure A - Bill of Quantities.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, including demolition of existing deck structures, new deck construction, stormwater and drainage works, fender installation, underwater excavation and levelling, and electrical installation, over a seven-month period for Transnet National Ports Authority.
Annexure L- Electrical drawings.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth (Gqeberha) for Transnet National Ports Authority over a period of seven months. The work covers LV electrical cabling installed in UPVC sleeves, new electrical kiosks and shore-power pedestals, quay lighting and earthing, all to SANS 10142-1 and Transnet's electrical specification.
Annexure H - TNPA IMS Policy Commitment Statement Rev 01.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth over a seven-month contract period, for Transnet National Ports Authority. The works sit within TNPA's Integrated Management System, so the appointed contractor is expected to deliver to TNPA's quality, safety, environmental, energy and emergency-preparedness commitments.
Annexure B_ How to submit bids electronically guide for Bidders (1).pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth for Transnet National Ports Authority, over a contract period of seven (7) months. Bids close on 16 November 2026 at 16:00 and are submitted electronically through the Transnet eTender portal.
Annexure I - Contractor Environmental and Sustainability.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth for Transnet National Ports Authority, over a contract period of seven (7) months. Contractors working on site must comply with Transnet's Contractor Environmental and Sustainability Specification, which sets the minimum environmental management requirements for construction.
RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, covering marine and civil infrastructure works such as fenders, scour protection, quay wall, storm water management, slipway and caisson, for Transnet National Ports Authority. The contract runs for seven (7) months under the NEC3 Engineering and Construction Contract, with pricing against a Bill of Quantities.
Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth for Transnet National Ports Authority over a period of seven months. The annexure sets out the contractor documentation submittal requirements, covering preparation, submission, review, as-built and manual documentation.
Annexure G - TIMS Policy Commitment Statement.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, Eastern Cape, for Transnet National Ports Authority over a contract period of seven (7) months. Bidders must submit Annexure G, the TIMS Policy Commitment Statement, with their bid.
Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth for Transnet National Ports Authority in the Eastern Cape, executed over a contract period of seven (7) months.
Annexure J - Standard Operating Procedure for Construction EM.pdf
The refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth over a seven-month construction period must be executed under Transnet's Construction Environmental Management standard operating procedure, which governs environmental appointments, method-statement approval, monitoring, incident handling and site closure. The procedure places overall environmental accountability on the contractor and applies to any construction project managed by Transnet SOC Ltd or its construction agent.
Annexure D -Health and Safety Specification.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, including marine, civil, electrical, and controls and instrumentation works, over a seven-month period. The project involves demolishing and reconstructing concrete surfaces, removing manganese material, installing scour protection and new fendering systems, upgrading electrical kiosks and lighting, and installing stormwater drainage and a conservancy tank.
Annexure M - Marine Structural Drawings.pdf
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, including concrete deck repairs, steel stanchion and fender replacement, scour protection, and installation of stainless steel access ladders and handrails. The works are for Transnet National Ports Authority over a seven-month period.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 1Β 488Β 650
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, covering marine, civil, electrical and controls and instrumentation engineering.
Background
Reason for the work
Technical Specifications
Source: Annexure D -Health and Safety Specification.pdf (unknown)Scope of work β Refurbishment of the Dom Pedro Quay, Port of Port Elizabeth, covering Marine, Civil, Electrical, Controls and Instrumentation (C&I) engineering.
Marine engineering
Civil engineering
Electrical
Outstanding scope from the December 2023 refurbishment start
Condition of the structures
Experience & Qualifications
Source: Annexure D -Health and Safety Specification.pdf (unknown)Construction Health and Safety Officer
Construction Manager
Construction Supervisors
Permit to Work and isolation roles
Quality Management
Source: Annexure D -Health and Safety Specification.pdf (unknown)Health and Safety Management Plan content
Plan review and acceptance
Performance monitoring
Electrical installation quality
Compliance Requirements
Source: Annexure D -Health and Safety Specification.pdf (unknown)Health and safety compliance
Appointments and competence
Health and Safety Management Plan
Health and Safety Policy
Health & Safety
Source: Annexure D -Health and Safety Specification.pdf (unknown)Construction Manager
Environmental
Source: Annexure D -Health and Safety Specification.pdf (unknown)Environmental requirements
Description
Source: Annexure L- Electrical drawings.pdf (unknown)The annexure provides electrical drawings for the refurbishment of the Dom Pedro Quay at the Port of Gqeberha. It covers LV power distribution, shore power pedestals, electrical kiosks, lighting, and cable routing. Drawings reference Transnet Port of Gqeberha and include compliance notes with SANS 10142-1, earthing, lightning protection, and contractor requirements.
Technical Specifications
Source: Annexure L- Electrical drawings.pdf (unknown)The annexure covers electrical drawings for the Dom Pedro Quay refurbishment at the Port of Gqeberha (Port Elizabeth).
Compliance Requirements
Source: Annexure L- Electrical drawings.pdf (unknown)Electrical work must comply with SANS 10142-1 (as amended).
Health & Safety
Source: Annexure L- Electrical drawings.pdf (unknown)The drawings include earthing and lightning protection requirements, including earth resistance below 5 ohms and soil resistivity survey before installation. Contractor must comply with SANS 10142-1 and obtain approval from the consultant. No specific OHS plan or HSE compliance details are provided in this annexure.
Submission Guidelines
Source: Annexure B_ How to submit bids electronically guide for Bidders (1).pdf (TENDER)Submission is electronic only via the Transnet eTender portal.
Evaluation Criteria
Source: Annexure B_ How to submit bids electronically guide for Bidders (1).pdf (TENDER)Registration on the Transnet eTender portal is required to access and bid for this tender.
Compliance Requirements
Source: Annexure B_ How to submit bids electronically guide for Bidders (1).pdf (TENDER)Portal registration requires a Central Supplier Database (CSD) number; bidders without one enter their company registration number in that field.
Description
Source: Annexure H - TNPA IMS Policy Commitment Statement Rev 01.pdf (unknown)TNPA provides port infrastructure, real estate and marine services at South Africa's eight commercial seaports. Its core functions include planning, provision, maintenance and improvement of port infrastructure; marine-related services, port services and navigation aids; and property management and real estate functions. Under the National Ports Act, TNPA acts as landlord, controller of port services and facilities, change agent, controller of navigation, coordinator with other state agencies, marketer and administrator.
Quality Management
Source: Annexure H - TNPA IMS Policy Commitment Statement Rev 01.pdf (unknown)TNPA operates an Integrated Management System (IMS) covering quality, safety, environment and other management disciplines. The IMS Policy Commitment Statement is reviewed every three years or as circumstances require. Progress against the policy commitments is reported to the relevant governance structures. TNPA holds itself accountable for the IMS, and all employees, contractors and stakeholders share responsibility for delivering on the commitments.
Environmental
Source: Annexure H - TNPA IMS Policy Commitment Statement Rev 01.pdf (unknown)TNPA's IMS commitments include: complying with applicable legislation, regulations, codes, standards and best practices; setting objectives and targets to address significant risks and opportunities; implementing waste and pollution prevention to protect the environment; promoting prudent and sustainable use of energy and natural resources; providing a safe and secure environment for employees and stakeholders; preventing injuries and ill health; promoting safe operational principles to minimise safety incidents; ensuring emergency preparedness and recovery; and promoting food safety in food preparation and handling environments.
Important Dates
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Compulsory clarification meeting: 26 October 2026 at 10:00, TNPA Lower Ground Canteen, Port Administration Building, Green Street, Port of Port Elizabeth. Duration approximately 6 hours. Attendance is mandatory; late arrivals will not be accommodated. Site walk follows; PPE required (safety shoes, goggles, long-sleeved shirts, high-visibility vests, hard hats). Bring T2.2-01 for signature.
Closing date: 16 November 2026 at 16:00.
Tender validity: 12 weeks from closing date.
Contact Information
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Enquiries:
Employer's Agent address:
Transnet National Port Authority
Admin Building (eMendi)
N2 Neptune Road
Off Klub Road
Port of Ngqura
Port Elizabeth, 6212
Submission portal: https://transnetetenders.azurewebsites.net
Submission Guidelines
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Submission method: electronic only, via the Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net).
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Evaluation stages:
Award: highest total score, unless objective criteria justify otherwise. Transnet may conduct due diligence and risk analysis on the preferred tenderer.
Technical Specifications
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Scope: Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth.
Financial Requirements
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Pricing: Bill of Quantities (Annexure A) must be fully completed and submitted.
Compliance Requirements
Source: RFP - Refurbishment of Dom Pedro Quay at Port of Port Elizabeth (6) (1).pdf (RFP)Mandatory compliance:
Description
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)This document is the Contractor Environmental and Sustainability Specification Guidelines (TRN-IMS-GRP-GDL-014.4). It sets out the minimum environmental requirements for contractors working on Transnet SOC Ltd sites, covering environmental management during construction, including policy, EMP, EO appointment, sub-contractor management, pre-site access governance, safety data sheets, environmental induction, method statements, incident handling, inspections, site planning, waste management, and various environmental controls.
Evaluation Criteria
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)Precondition to working on site: a duly appointed Contractor's Environmental Officer with relevant environmental qualifications and experience matched to the complexity of the scope and the sensitivity of the site, as determined by Transnet during tender. No construction may take place without one.
Approvals required before site access: the environmental file must be accepted by the Transnet PER, and the Contractor must obtain a Site Access Certificate from the Transnet Project Manager.
Approval required before activity start: Environmental Method Statements must be approved by the Transnet Construction Manager, Transnet PER and, where relevant, the Environmental Control Officer and local authorities.
Sub-contractors must comply with the specification to the extent it relates to their scope of work or services.
Non-conformance with the environmental specification or with any permit or licence is treated as non-conformance with the Works Information and is a Defect the Contractor must rectify. Site Closure Certificates will not be recommended while non-conformances remain open, and the Transnet Project Manager may use contractual means such as retention moneys to rectify them.
Technical Specifications
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)This document sets out the minimum environmental management requirements for contractors working on Transnet SOC Ltd sites. It must be read together with the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP).
Key obligations:
Methodology
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)Environmental Method Statements must describe the proposed activity, plant, equipment, materials, labour, method, environmental management of site conditions, transportation, storage, spill containment, timing, location, potential impacts, and monitoring. They must be signed by the Contractor, Transnet CM and PER, and ECO where applicable. Activities may only commence after approval.
Experience & Qualifications
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)The Contractor's Environmental Officer must have relevant environmental qualifications and experience appropriate to the project complexity and site sensitivity. The level of competency is determined by Transnet during tender. If the EO is replaced, the Contractor must submit a CV of an alternative EO with similar or better qualifications for approval. No construction may take place without a duly appointed EO.
Quality Management
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)Environmental inspections and audits are conducted using interviews, document review, observations, monitoring, and measurement/verification. The Contractor's EO conducts daily or weekly inspections. Transnet PER conducts monthly inspections. The standard/minimum requirement for all environmental inspections is 90%.
Compliance Requirements
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)No specific compliance requirements are stated in this document beyond the environmental obligations described in the technical specifications.
Health & Safety
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)The Contractor must provide a safe working environment, including:
Environmental
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)The Contractor must comply with all environmental requirements in this specification, including:
Contractual Terms
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)Transnet accepts no liability for the Contractor's failure to achieve required performance levels, even if Transnet approves method statements or provides other communication. The Contractor remains fully responsible for compliance with the specification.
Environmental non-conformances are treated as defects under the contract. The Contractor must rectify them promptly. The Transnet Project Manager may use contractual remedies, including retention moneys, to correct unresolved non-conformances.
Section
Source: Annexure I - Contractor Environmental and Sustainability.pdf (TENDER)SHEQ (Safety, Health, Environment and Quality) is referenced as a relevant consideration.
Description
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)This document is a standard (DOC-STD-0001) that defines the Contractor's responsibilities for the preparation, submission, receipt, review, and collection of Technical and/or Deliverable Documentation, as detailed in the Contractor Documentation Register (CDR). The scope covers all Contractor Deliverables required for each contract. The standard applies to all contractors, sub-contractors, vendors, suppliers, and consultants providing services to Transnet National Ports Authority (the Employer).
Important Dates
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)Closing date: 16 November 2026 at 16:00 (from tender record).
Document approval dates (for the standard itself, not the tender):
Contact Information
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)No contact information is provided in this document.
Submission Guidelines
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)All documentation must be submitted under cover of a Contractor's Transmittal Note (Annexure A), which must list all contract references, document numbers, revision numbers, titles, and a chronological listing of the transmitted documents. The Transmittal Note must state the purpose of the submission; documentation for different purposes must be sent on separate Transmittal Notes, otherwise it will be rejected.
Electronic transmission is via email or a shared link. Emails must not exceed 6 MB and must include the Transmittal Note. The email subject line must contain the contract number, contract description, and description of the documentation transmitted.
Hard copy transmission is required where specified in the Contractor Documentation Register (CDR).
The Contractor Documentation Register (CDR) must be submitted within 2 weeks of the contract kick-off meeting, in Excel format, and updated as a 'live' document. Document Control assigns document numbers; the Contractor must use the exact numbers and titles from the CDR on all documentation.
Returnable forms:
Evaluation Criteria
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)No evaluation criteria are stated in this document. The document is a standard for contractor documentation submittal requirements, not a bid evaluation document.
Technical Specifications
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)This document is a standard (DOC-STD-0001) that defines the Contractor's responsibilities for preparing, submitting, and managing technical and deliverable documentation for the contract.
Key requirements:
Quality Management
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)The standard references ISO 9001:2015 (Quality Management Systems Requirements), SANS 10111 (Code of Practice for Engineering Drawings), and SANS 10143 (Building Drawing Practice).
Documentation must be of high quality and submitted within the time required as defined in the Works Information, Contractor Documentation Register (CDR), and Contract.
Review codes are used to denote documentation status: C1 (Accepted), C2 (Accepted with Comments β revise and resubmit), C3 (Rejected β revise and resubmit), C4 (Information only).
As-built documentation must reflect the same degree of detail as the original documents and include all deviations or changes from approved AFC documents.
Compliance Requirements
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)No specific compliance requirements are stated in this document. The document references ISO 9001:2015 (Quality Management Systems), SANS 10111 (Code of Practice for Engineering Drawings), and SANS 10143 (Building Drawing Practice) as applicable standards.
Contractual Terms
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)Acceptance of documentation by the Project does not relieve the Contractor of responsibility for correctness or conformance with requirements; that responsibility rests solely with the Contractor.
The review process does not entitle the Contractor to submit any claims due to time loss.
The Contractor shall not proceed with any activities controlled by the Contractor's documentation until it has been re-submitted and acceptance indicated.
The Contractor is responsible for providing sub-contractors with all relevant information and ensuring they apply the standard; the Contractor remains responsible for the works as if not sub-contracted.
Special Conditions
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)The Contractor Documentation Register (CDR) is a list of documentation deliverables to be submitted as per agreed dates. The CDR must be submitted within 2 weeks of the contract kick-off meeting. Documentation numbering is allocated by Document Control, and the Contractor must use exact document numbers and titles. As-built documentation must be prepared with red mark-ups, and final documentation forms part of the final Contractor Manuals or Data Packs.
Section
Source: Annexure F - DOC-STD-0001_Contractor Submittal Requirements Rev 00.pdf (unknown)No evaluation criteria are stated in this document.
Important Dates
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Clarification meeting: details (date, time, venue) are stated in the tender data; attendance may be required.
Briefing Session
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)A clarification meeting may be required; details are stated in the tender data.
Contact Information
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)All communications must be directed to the employer's agent, in English, in a form that can be read, copied and recorded.
Submission Guidelines
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Submission method: sealed tender, original plus copies, packages marked "ORIGINAL" and "COPY", outer package marked with employer's address and identification details.
Evaluation Criteria
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Evaluation process:
Technical Specifications
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Scope: refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth.
Quality Management
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)No specific quality management requirements are stated in this document; quality is addressed through the general requirement that the bidder demonstrate professional and technical competence and that the tender be responsive to specifications.
Pricing Schedule
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Pricing must include all duties, taxes (except VAT) and levies; VAT shown separately.
Financial Requirements
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Pricing:
Compliance Requirements
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Eligibility:
Health & Safety
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)No specific health and safety requirements are stated in this document; general obligations include complying with all legal obligations and behaving equitably, honestly and transparently.
Contractual Terms
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)The contract will be concluded with the highest-ranked tenderer, subject to acceptance criteria.
Special Conditions
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Competitive negotiation procedure may be used, allowing clarification and fine-tuning of tenders without altering fundamental aspects.
Requirements
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Bidders must satisfy the eligibility criteria in the tender data, not be under restriction from doing business with the employer, and notify of material changes.
Section
Source: Annexure C - Standard-for-Uniformity-August-2019-21-31.pdf (TENDER)Evaluation includes checking completeness, responsiveness, and compliance.
Evaluation Criteria
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)The contractor must, at tender stage, submit a signed commitment to conform to SOP 009-TCC-CLO-SUS-11386, recommend a suitably qualified and competent person to serve as the Contractor's Environmental Officer (EO), and provide an Environmental Policy and an Environmental Management Plan (EMP).
The recommended EO must be appointed when the contract is awarded and must serve for the duration of construction; if replaced, a person of similar qualification and competency must be appointed before the previous incumbent leaves.
The contractor must obtain any environmental approvals required by its own activities that Transnet has not already obtained (e.g. permits for destroying protected plant species, grave relocation permits).
The contractor is accountable for environmental compliance on site and will be held liable for any non-compliance with environmental statutes or non-conformances with the SOP due to its negligence.
Technical Specifications
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)This annexure is a Standard Operating Procedure (SOP) for Construction Environmental Management (document 009-TCC-CLO-SUS-11386, version 1.0, effective 01 October 2023, review date 30 September 2028).
It applies to any construction project under Transnet SOC Ltd or its Construction Agent.
It defines how environmental management will be practised on Transnet construction projects to avoid or minimise negative impacts and optimise positive impacts throughout the asset lifecycle.
It must be read with the Contractor Environmental and Sustainability Specification Guidelines (CESSG) and the Project Environmental Specification (PES) for the project.
It sets out responsibilities for Transnet Procurement, Project Manager, Project Environmental Resource, Construction Manager, Environmental Control Officer, Contractor's Environmental Officer, and the Contractor.
It establishes procedures for the tender stage, construction stage (before and after site access), and post-construction, including environmental file requirements, method statements, inspections, reporting, and site closure.
It references relevant legislation including NEMA, the National Water Act, the National Environmental Management: Waste Act, the Environment Conservation Act, the Occupational Health and Safety Act (including Asbestos Regulations), and EIA Regulations.
Methodology
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)The contractor must prepare a rehabilitation and site closure method statement for approval by the Transnet PER and CM.
Once approved, the contractor must implement the rehabilitation method statement.
The contractor must submit a site close-out report for acceptance by the Transnet PER and CM.
After rehabilitation is accepted, the contractor must hand over the entire environmental file to Transnet.
The Transnet PM issues a Site Closure Certificate once the environmental file is received and the PER recommends closure.
Quality Management
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)The contractor must maintain an environmental file on site, always available and up to date, containing all environmental documents provided by Transnet, the contractor's commitments, the EMP, the EO's CV, an organogram, contact information, plant and equipment list, hazardous substances list with MSDS, site layout plan, and site establishment method statement.
The contractor must conduct an activity-based environmental risk assessment and prepare activity-based method statements for activities that may pose environmental risk; these must be approved by the Transnet PER and CM before the activity is executed.
The contractor must agree an inspection schedule with the Transnet PER (daily or weekly) and conduct inspections accordingly.
The contractor must report, investigate and record environmental incidents, and close out non-conformances within specified timeframes.
The contractor must monitor waste, water and energy management, and maintain related records.
The contractor must submit reports to the Transnet PER on a daily or weekly basis.
Compliance Requirements
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)The contractor must comply with the SOP and any other environmental documents provided by Transnet during tender.
The contractor must confirm conformance to the SOP in its bid.
The contractor must recommend a suitably qualified and competent person as Contractor's Environmental Officer, for acceptance by Transnet.
The contractor must obtain any environmental approvals required by its own activities that Transnet has not already obtained.
The contractor must maintain an environmental file on site containing, among others: the contractor's EMP, the EO's CV, an organogram of contractor staff, contact information, a list of plant and equipment (with fuel capacity, hazardous components, service cycles, noise levels), a list of hazardous substances (with MSDS), a site layout plan, and a site establishment method statement.
The contractor must conduct an activity-based environmental risk assessment and prepare activity-based method statements for activities posing environmental risk; these must be approved by the Transnet PER and CM before the activity is executed.
The contractor must ensure all staff, sub-contractors and visitors attend environmental induction.
The contractor must monitor waste, water and energy management, and maintain related records.
The contractor must report, investigate and record environmental incidents, and close out non-conformances within specified timeframes.
The contractor must submit reports to the Transnet PER on a daily or weekly basis.
Health & Safety
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)The contractor must comply with the Occupational Health and Safety Act, including the Asbestos Regulations (Government Notice R155 in Government Gazette 23108 of February 2002) and General Safety Regulations (Reg. 2(2) PPE).
The contractor must ensure all staff, sub-contractors and visitors attend environmental induction.
The contractor must maintain a list of hazardous substances used during construction, with MSDS on site.
The contractor must maintain a list of plant and equipment indicating fuel capacity, hazardous components, service/maintenance cycles and noise levels.
The contractor must ensure environmental signage and barriers are correctly placed.
Environmental
Source: Annexure J - Standard Operating Procedure for Construction EM.pdf (unknown)The SOP applies to any construction project under Transnet SOC Ltd or its Construction Agent.
The contractor must comply with the SOP and associated environmental specifications.
The contractor must obtain any environmental approvals required by its own activities that Transnet has not already obtained.
The contractor must conduct an activity-based environmental risk assessment and prepare method statements for activities posing environmental risk.
The contractor must monitor waste, water and energy management, and maintain related records.
The contractor must report, investigate and record environmental incidents, and close out non-conformances.
The contractor must submit reports to the Transnet PER on a daily or weekly basis.
The contractor must maintain an environmental file on site containing all required documents.
The contractor must ensure all staff, sub-contractors and visitors attend environmental induction.
The contractor must comply with relevant legislation including NEMA, the National Water Act, the National Environmental Management: Waste Act, the Environment Conservation Act, and the Occupational Health and Safety Act.
Description
Source: Annexure K - Civil Engineering Drawings.pdf (unknown)Civil engineering drawings for the refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, issued for construction by Transnet National Ports Authority (Civil & Perway Infrastructure Operating Divisions).
Drawing set covers:
Drawing register references: 2138436-1-001-C-LA-0001-01-00 (setting out plan), 2138436-1-001-C-LA-0002-01-00 (stormwater plan), X.PE.E0023-1-100-C-LA-0003-01 (electrical setting out plan layout), X.PE.E0023-1-100-C-DE-0002-00 (electrical typical manhole detail). Project number 20150383; Transnet registration number 1990/000900/30.
Drawings are the confidential intellectual property of Transnet and may be used only for their intended purpose.
Contact Information
Source: Annexure K - Civil Engineering Drawings.pdf (unknown)Transnet National Ports Authority
N2 Neptune Road, off Klub Road
Coega
6100
Telephone: 011 351 9001
Fax: 011 351 9023
Technical Specifications
Source: Annexure K - Civil Engineering Drawings.pdf (unknown)Scope: refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, executed over a seven-month contract period.
Concrete
Reinforcement
Founding and inspection
Manholes and covers
Stormwater and pipework
Road reserve and concrete surface trenches
Electrical
Site obligations
Quality Management
Source: Annexure K - Civil Engineering Drawings.pdf (unknown)Inspection and hold points
Concrete quality
Reinforcement quality
Workmanship standards
Contractual Terms
Source: Annexure K - Civil Engineering Drawings.pdf (unknown)Drawings are issued for construction and remain the confidential intellectual property of Transnet; copyright and all other rights are reserved and the documents may be used only for their intended purpose.
Contractor obligations carried by the drawings:
Section
Source: Annexure K - Civil Engineering Drawings.pdf (unknown)Civil engineering drawings covering heavy duty manholes, stormwater plan, electrical manhole details, pipe encasement details, trench details, cable routes and setting out plans.
Concrete
Reinforcement
Manholes and covers
Stormwater and pipework
Trench layerworks
Electrical
Site obligations
Description
Source: Annexure M - Marine Structural Drawings.pdf (unknown)Refurbishment of the Dom Pedro Quay at the Port of Port Elizabeth, involving marine structural works. Scope includes concrete deck repairs, installation of new fenders, bollards, access ladders, and scour protection. Drawings cover concrete details, isolation joints, fender systems, ladder details, and quay cross-sections.
Technical Specifications
Source: Annexure M - Marine Structural Drawings.pdf (unknown)Scope of work
Standards and materials
Methodology
Source: Annexure M - Marine Structural Drawings.pdf (unknown)Work includes demolition of damaged concrete, recasting, installation of new steel connections using chemical anchors (HILTI HIT-RE), welding of steel plates, and repair of stanchions. Fender replacement involves inspecting existing units, reusing serviceable ones, and fabricating/installing new D-fenders and rubber blocks. Scour protection requires placing 400mm thick rock (minimum 60kg) with levelling.
Quality Management
Source: Annexure M - Marine Structural Drawings.pdf (unknown)Concrete works must comply with SANS 0100 and SANS 1200. Concrete cubes to be taken and tested at 7 and 28 days. Steelwork to comply with SANS 1431:2007. Welding to SANS standards. All steel to be hot-dip galvanised to SANS 121:2000. Stainless steel grade 316L, passivated, free from defects. Shop drawings to be submitted for approval before fabrication. Contractor to verify dimensions on site and report discrepancies to the engineer.
Compliance Requirements
Source: Annexure M - Marine Structural Drawings.pdf (unknown)Bidder eligibility
Returnable forms
Technical compliance
Health & Safety
Source: Annexure M - Marine Structural Drawings.pdf (unknown)All welders must be qualified. Welding must be done safely, with prevention of sparks and proper ventilation. General safety practices implied.
Contractual Terms
Source: Annexure M - Marine Structural Drawings.pdf (unknown)Contractor must supply shop drawings for approval before fabrication. All work to be carried out in accordance with the engineer's instructions. Discrepancies must be reported to the engineer. Contractor responsible for verifying dimensions on site.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
17 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
011-584-0635[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.