Summary
Sanpc requires one or more service providers to carry out due diligence audit work on an as-and-when-required basis over a 36-month period, with each assignment governed by a separate service order, purchase order or engagement order issued under sanpc's standard terms and conditions. Work is priced in south african rand at rates that are fixed and firm for the life of each order, with time-and-materials work paid only for hours actually recorded on sanpc's time and attendance system. The most consequential commercial exposure is that rates must be fully inclusive of staff costs, mobilisation, statutory contributions, insurance and overheads, and that sanpc will pay nothing beyond the amounts set out in each order.
Key Requirements
Closing and submission: bids close on 4 December 2026 at 09:00; submit through the channel and address stated in the bid document, as the closing time is enforced.
Contract structure: the appointment runs 36 months, but no work is guaranteed; each assignment is instructed through a separate service, purchase or engagement order, and work done without an executed order is at the supplier's own risk and cost.
Pricing basis: quote in South African Rand at rates that are fixed and firm for the duration of each order; rates must already cover staff costs, protective clothing, mobilisation and demobilisation, payroll taxes, levies, insurance and the cost of maintaining an office or supply base.
Payment terms: invoices monthly in arrear with original supporting documents signed by SANPC's authorised representative, settled by the 25th of the following month; late undisputed amounts carry interest at the ABSA prime rate plus 1%.
Pass-through costs: only third-party expenses named in an order and within the stated estimate are recoverable, with no mark-up or administration fee, and SANPC pays those third parties directly.
Insurance: maintain public liability cover, all-risk cover on own plant, material and equipment, and workmen's compensation cover under COIDA for the full contract period, and produce the policy on request.
Compliance exposure: hold every licence, certificate and authorisation needed to deliver the services, meet the B-BBEE obligations in Annexure B of the Acceptance Agreement, and comply with labour, occupational health and safety, and personal information law; breach or misrepresentation on B-BBEE allows SANPC to terminate and re-award.
151 Frans Conradie Drive, Parow (PetroSA building) - Parow - Cape Town - 7500
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentRFP Due Diligence.pdfReview complete
Description
Source: RFP Due Diligence.pdf
Important Dates
06 Nov
2026
PUBLICATION
Tender Published
Tender was published
04 Dec
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Due diligence audit services for South African National Petroleum Company (SANPC) are being procured for a 36-month contract, with the closing date set for 4 December 2026 at 11:00. Submissions may be made physically at the SANPC facility in Parow or online via www.etenders.gov.za.
Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf
Service providers are sought to conduct due diligence audits for SANPC's procurement processes, trading transactions, supplier registration, and corporate social investment projects, covering security clearance, legal status and BBBEE compliance, financial ability, counterparty risk assessment, and skills transfer, for a 36-month period.
SANPC requires service provider(s) to conduct due diligence audit services on an as-and-when-required basis over a 36-month period. The appointed provider will deliver audit services under SANPC's standard terms and conditions, governed by Service Orders issued during the contract term.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
For Leasing of the Transnet Rail Infrastructure Manager Sidings/Facilities Siding Number (Worcester) 140333 for a period of ten (10) yearsBT1TRIMRFPWR14 Worcester
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Appointment of service provider(s) to conduct due diligence audit services for SANPC as and when required over a 36-month period.
Important Dates
Source: RFP Due Diligence.pdf (RFP)
Issue date: 6 November 2026
Non-compulsory briefing
Date: Friday, 13 November 2026
Time: 11:00
Venue: Microsoft Teams
Attendance is strongly encouraged, not compulsory.
To receive the Teams link, email the company name to [email protected] by no later than 16:00 on Thursday, 12 November 2026.
Query deadline
Last day for submitting queries: 3 (three) days before the closing date.
Subject line must state the reference number SANPC/2026/016.
Queries must be in writing to the email address only; responses are published on the SANPC website and the National Treasury e-tender portal.
Briefing attendance
Email: [email protected] (send company name by 16:00 on 12 November 2026 to receive the Teams link).
Submission address (physical tender box)
SANPC Facility (PetroSA head office)
3rd Floor Reception
151 Frans Conradie Drive
Parow
Cape Town 7500
Online submission
www.etenders.gov.za
Submission Guidelines
Source: RFP Due Diligence.pdf (RFP)
Submission method
Online upload to the National Treasury eTender Portal (www.etenders.gov.za), or
Physical deposit in the SANPC tender box at SANPC Facility (PetroSA head office), 3rd Floor Reception, 151 Frans Conradie Drive, Parow, Cape Town 7500.
Tender box is accessible weekdays 08:00–16:00 only.
No email or faxed submissions will be accepted.
Upload or deposit well before the closing date; do not leave it to the closing day.
Copies
Submit one original plus one copy, unless the bid is submitted electronically.
Packaging
Envelopes must relate only to this RFP; do not include documents for any other tender.
Mandatory returnable documents (failure to submit disqualifies)
Completed Form of Offer (Part 4).
Separate pricing schedule with a detailed cost breakdown aligned to the scope and deliverables.
Proof of CSD registration number (foreign entities without a local registered entity exempt).
Written evidence of compliance with the scope of work and the Bid Elimination Criteria in Annexure A.
Returnable documents used for scoring (non-submission scores zero for that criterion)
B-BBEE certificate issued by an authorised body or person, or a B-BBEE sworn affidavit, to claim specific goal points.
Essential returnable documents (a further deadline may be granted; continued failure may disqualify)
Part 2: Background, Overview and Scope of Requirements.
Part 5: Proposal Form.
Part 6: Signing Power — Board of Directors resolution authorising the signatory.
Part 7: Certificate of Acquaintance with RFP Documents.
Part 8: Certificate of Acquaintance with General Tender Conditions — Services.
Part 9: RFP Declaration Form.
Part 10: Breach of Law Form.
Part 11: Certificate of Acquaintance with Non-Disclosure Agreement.
Annexure A: Preference Points Claim Form.
Annexure B: SBD 4 Declaration of Interest.
Annexure C: SBD 8 Declaration of Bidder's Past Supply Chain Management Practices.
Annexure D: SBD 9 Certificate of Independent Bid Determination.
Annexure E: SBD 1.
Appendix (II): General Tender Conditions.
Appendix (III): Safety Arrangements and Procedural Compliance with the Occupational Health and Safety Act.
Annexure A3: SANPC Standard Terms and Conditions.
Disqualification risks
Late submission or delivery to the wrong address.
Omission of any mandatory returnable document.
Failure to meet any Bid Elimination Criterion in Annexure A.
Canvassing any SANPC officer or employee between closing and award.
Collusion with another bidder.
Submission of a bid that does not conform to the instructions or scope of work.
Evaluation Criteria
Source: RFP Due Diligence.pdf (RFP)
Evaluation stages
Stage 1, Step 1 — Administrative responsiveness: bid received on time; all returnable documents completed and returned by the closing date and time; validity of all returnable documents verified. A bid must pass this step to proceed.
Stage 1, Step 2 — Substantive responsiveness: completed Form of Offer (Part 4); separate price schedule with cost breakdown aligned to the scope; CSD registration number (unless a foreign entity); compliance with the scope of work and the technical Bid Elimination Criteria in Annexure A, with written evidence. Failing any Bid Elimination Criterion results in immediate disqualification.
Stage 2 — Technical/functionality evaluation: not applicable.
Stage 3 — Weighted scoring: price plus specific goals.
Step 5 — Post-tender negotiations, if the price is not market-related, conducted sequentially with the highest-ranked bidder first, then the second and third ranked if required.
Step 6 — Selection of the preferred bidder; award to the highest scorer unless objective criteria stated in the bid documents justify another bidder.
Weighting
Price: 80 points under the 80/20 system, or 90 points under the 90/10 system.
Specific goals: 20 points under the 80/20 system, or 10 points under the 90/10 system.
Total: 100 points.
The 80/20 system applies to requirements up to R50,000,000 (all applicable taxes included); the 90/10 system applies above R50,000,000.
Price formula
Price score = 80 or 90 × (1 − (Pt − Pmin) / Pmin), where Pt is the bid price and Pmin is the lowest acceptable price.
Only unconditional discounts are considered in evaluation; conditional discounts are applied at payment stage only.
Specific goals (80/20 system)
51% or more black-owned: 10 points.
30% or more black women-owned: 10 points.
Maximum specific goal points: 20.
A B-BBEE certificate or sworn affidavit must be submitted to claim these points; without it the specific goal score is zero.
Minimum technical/functionality threshold
70% (stated in the summary of thresholds, although the technical evaluation stage is marked not applicable).
Post-tender negotiation
SANPC may not award if the price is not market-related and may negotiate or cancel the tender.
Bids and any best and final offers remain valid during negotiation and until award.
Technical Specifications
Source: RFP Due Diligence.pdf (RFP)
Scope
Appointment of one or more service providers to conduct due diligence audit services for SANPC as and when required, over a 36-month period.
Detailed scope of work and Bid Elimination Criteria are set out in Annexure A; bidders must submit written evidence of compliance with both.
Service levels
An experienced account representative must be assigned to work with the SANPC procurement department; no sales representatives for individual departments or locations.
A minimal number of fully informed and accountable people must be responsible for the agreement.
SANPC will hold ongoing reviews with the account representative and may require any team member to be replaced if not adding value.
The service provider must achieve a 95% service level on random compliance checks and on-time deliverables.
A telephone number must be provided for customer service calls.
Failure to meet the service levels entitles SANPC to cancel the contract in whole without penalty on 30 days' notice.
Risk management
Bidders must describe the control measures their entity has in place to mitigate SANPC's risk of non-performance, covering the quality of services delivered and continuity of service provision.
Exchange and remittance
If payment is to be made overseas to a principal or service provider that is not a registered South African company, the bidder must complete the beneficiary and exchange-rate details using the South African Reserve Bank rate published 7 calendar days before the closing date.
Offers must be fixed-price in South African Rand.
Methodology
Source: RFP Due Diligence.pdf
Evaluation methodology
Stage 1: responsiveness — administrative checks (timely receipt, complete returnable documents, validity) and substantive checks (Form of Offer, price schedule, CSD number, compliance with scope and Bid Elimination Criteria).
Stage 2: technical/functionality evaluation — not applicable.
Stage 3: weighted scoring of price and specific goals.
Post-tender negotiation if the price is not market-related, conducted sequentially with the highest-ranked bidder first.
Selection of the preferred bidder; award to the highest scorer unless objective criteria justify another bidder.
Experience & Qualifications
Source: RFP Due Diligence.pdf
Account representation
An experienced account representative must be assigned to work with the SANPC procurement department.
No sales representatives for individual departments or locations are required.
A minimal number of fully informed and accountable people must be responsible for the agreement.
SANPC may require any team member to be replaced if not adding value.
Experience and qualifications
No specific years of experience, qualifications or reference projects are stated in the document; compliance with the scope of work and Bid Elimination Criteria in Annexure A must be evidenced in writing.
Pricing Schedule
Source: RFP Due Diligence.pdf
Pricing requirements
A separate price schedule with a detailed breakdown of costs aligned to the scope and deliverables must be submitted.
Prices must be quoted in South African Rand, inclusive of VAT, and remain fixed.
The quoted fee remains fixed for one year; the bidder must propose the cost price adjustment and the relevant table.
Prices must be held valid for 120 days from the closing date.
Only unconditional discounts are considered in evaluation; conditional discounts are applied only at payment.
The Form of Offer (Part 4) must state the total offered price inclusive of VAT in words and figures.
Financial Requirements
Source: RFP Due Diligence.pdf (RFP)
Pricing format
A separate price schedule with a detailed breakdown of costs aligned to the scope and deliverables must be submitted.
Prices must be quoted in South African Rand, inclusive of VAT, and must remain fixed.
The quoted fee remains fixed for one year; the bidder must propose the cost price adjustment and the relevant table.
Prices must be held valid for 120 days from the closing date.
Only unconditional discounts are considered in evaluation; conditional discounts are applied only at payment.
Bid security, guarantees and retention
None stated in the document.
Payment and exchange
Fixed-price offers in ZAR are required.
For overseas remittance, the exchange rate is the SARB rate 7 calendar days before the closing date; beneficiary and bank details must be supplied.
Financial capacity
No turnover or financial capacity threshold is stated.
SANPC may request audited financial statements or other documentation for due diligence.
Compliance Requirements
Source: RFP Due Diligence.pdf (RFP)
CSD registration
Bidders must self-register on the National Treasury Central Supplier Database before submitting; business may not be awarded to an unregistered bidder.
Only foreign suppliers with no local registered entity are exempt.
SBD 1 (Annexure E) must be completed and submitted as a returnable document.
Tax compliance
Bidders must be tax compliant at submission and remain compliant for the entire contract term.
Tax matters must be in order or satisfactory arrangements made with SARS.
Foreign bidders are also subject to tax compliance status requirements.
In a consortium, joint venture or subcontracting arrangement, each party must be registered on the CSD and its tax status will be verified through the CSD.
B-bbee
A B-BBEE certificate issued by an authorised body or person, or a B-BBEE sworn affidavit, must be submitted to claim specific goal points; without it the specific goal score is zero.
Specific goals: 51% or more black-owned (10 points) and 30% or more black women-owned (10 points) under the 80/20 system.
The successful bidder must keep the tax clearance certificate and B-BBEE verification certificate valid for the contract duration; failure to renew entitles SANPC to terminate.
Joint ventures and consortiums
Intention to bid as a JV or consortium must be stated in the submission.
A signed JV or consortium agreement showing the percentage split of business and each party's responsibilities must be submitted; if unavailable, written confirmation of intention with the same details is required, and the service level agreement will only be concluded once the signed agreement is provided.
Other compliance
The successful bidder must comply with all applicable laws and regulations.
Personal information must be processed only for the purposes of the RFP and in compliance with POPIA, with appropriate technical and organisational safeguards; the bidder indemnifies SANPC for POPIA breaches.
Bidders must declare any serious breach of law in the preceding 5 years, including Competition Act breaches, in Part 10.
A Board resolution authorising the signatory must be submitted (Part 6).
Certificates of acquaintance with the RFP documents (Part 7), General Tender Conditions — Services (Part 8) and Non-Disclosure Agreement (Part 11) must be signed.
SBD 4 (Declaration of Interest), SBD 8 (Past SCM Practices) and SBD 9 (Independent Bid Determination) must be completed and signed.
Appendix (III) requires compliance with the Occupational Health and Safety Act and applicable regulations.
Health & Safety
Source: RFP Due Diligence.pdf
Occupational health and safety
Appendix (III) requires procedural compliance with the Occupational Health and Safety Act and applicable regulations.
The successful bidder must comply with all applicable laws and regulations.
Contractual Terms
Source: RFP Due Diligence.pdf
Contract duration
36 months.
Governing terms
SANPC Standard Terms and Conditions (Annexure A3), the General Tender Conditions — Services, and any special conditions in the RFP apply.
The proposal and SANPC's letter of appointment constitute a binding contract until a formal contract is signed.
South African law governs; the bidder must nominate a domicilium citandi et executandi in South Africa. Foreign bidders must name an authorised South African representative with power of attorney.
Penalties and breach
A penalty clause will be negotiated with SANPC for non-compliance with material terms, including delayed provision of services.
Non-compliance with material terms is a material breach and grounds for cancellation.
Failure to enter a formal contract or commence services within 4 weeks of notification entitles SANPC to recover costs of re-tendering or accepting a less favourable proposal.
Service levels
95% service level on random compliance checks and on-time deliverables.
Failure entitles SANPC to cancel in whole without penalty on 30 days' notice.
Validity of documents
Tax clearance and B-BBEE certificates must remain valid for the contract duration; failure to renew entitles SANPC to terminate without liability.
SANPC rights
SANPC may modify the scope and request re-tendering, reject non-conforming proposals, disqualify late proposals, not accept the lowest price, validate information, request audited financial statements, award at any time after closing, award only part of the services, split the award among more than one provider, cancel the process, exclude bidders guilty of a serious breach of law in the preceding 5 years, conduct post-tender negotiations, award to the highest scorer unless objective criteria justify otherwise, and award to the next ranked bidder if the preferred bidder fails to sign or commence.
SANPC will not reimburse preparatory costs.
Proposals are subject to legal review of proposed contractual terms before award.
Confidentiality
All RFP information is confidential; a signed Certificate of Acquaintance with the Non-Disclosure Agreement (Part 11) must be returned.
Divulging information related to SANPC's business requires written approval and must comply with POPIA.
Section
Source: RFP Due Diligence.pdf
Price scoring
Price carries 80 points under the 80/20 system or 90 points under the 90/10 system.
Formula: score = 80 or 90 × (1 − (Pt − Pmin) / Pmin), where Pt is the bid price and Pmin the lowest acceptable price.
Only unconditional discounts are evaluated; conditional discounts apply at payment only.
Specific goals
20 points under the 80/20 system or 10 points under the 90/10 system.
51% or more black-owned: 10 points.
30% or more black women-owned: 10 points.
A B-BBEE certificate or sworn affidavit is required to claim these points; without it the score is zero.
Award
Price and specific goal points are added; the highest total wins unless objective criteria stated in the bid documents justify another award.
The supplier must use adequate numbers of qualified staff with suitable training, education, experience and skill to perform the services.
The supplier must keep sufficient key staff with knowledge of SANPC's requirements and the relevant technical expertise for the duration of the contract.
The supplier must adopt the standards and processes required by the Transaction Documents.
Services and goods must be provided with promptness and diligence, in a workmanlike manner and to the standards of well-managed operations doing similar work.
For time-and-materials work, the supplier must use best efforts to perform cost-effectively at the required quality.
Staff replacement
SANPC may, on 2 business days' written notice with reasons, require the supplier to reconsider the deployment of any staff member performing unsatisfactorily.
The supplier must investigate and either correct the conduct within 2 business days or withdraw the staff member from the SANPC environment.
SANPC may shorten these periods where circumstances warrant an accelerated process.
SANPC may deny a staff member access and require immediate withdrawal where it believes the person breaches policies or poses a risk, and must give a written report with reasons within 7 days.
Services, workmanship, products, materials, documentation, tools and equipment must comply with relevant ISO quality assurance and certification requirements where applicable.
The supplier must use adequate numbers of qualified staff with suitable training, education, experience and skill, and adopt the standards and processes required by the Transaction Documents.
Work must be performed with promptness and diligence, in a workmanlike manner and to the standards of well-managed operations doing similar work.
Pre-acceptance testing
Before presenting goods or deliverables for acceptance testing, the supplier must submit a pre-acceptance testing plan for SANPC approval and test in accordance with the approved plan.
Where the supplier installs or implements goods or deliverables, it must do so and verify proper implementation.
The testing plan must be rigorous enough to identify reasonably discoverable deficiencies.
The supplier must promptly remedy deficiencies, retest and repeat until testing reveals no deficiencies.
Acceptance criteria and testing
The supplier must develop and submit acceptance criteria for SANPC approval well before presenting the items, allowing SANPC time to review and comment.
If SANPC rejects the criteria, it must give written reasons; the supplier must revise and resubmit or explain to SANPC's satisfaction.
Criteria must at minimum require no deficiencies, satisfaction of SANPC's stated business needs and functional and technical specifications, a successful SANPC security audit and stated acceptance-testing timeframes.
Every item of goods, deliverable or service requires formal acceptance; the supplier presents items for testing at the location SANPC designates.
SANPC starts acceptance testing as soon as practical after delivery and determines whether items meet specifications and acceptance criteria.
The supplier must assist with testing and answer queries within a reasonable time.
Deficiencies and rejection
The supplier must correct each deficiency at no charge within 24 hours of written notice, or a longer agreed period, unless caused by SANPC.
After correction the supplier must retest and resubmit the item.
On rejection, SANPC gives written reasons and a final 14-day correction period; if the supplier cannot correct within that period, SANPC may direct continued efforts, accept the item with an equitable charge reduction, or terminate the Transaction Document and require a refund of amounts paid within 14 days, after which the supplier may remove the items.
After the acceptance-testing period, the supplier may give written notice requiring SANPC to identify deficiencies with a documented example; if SANPC does not respond within 7 days, the item is deemed accepted.
Upgrades, enhancements and modifications to supported or maintained items are subject to acceptance testing.
Inspection
SANPC may inspect goods at the supplier's or its subcontractors' premises at all reasonable times and the supplier must arrange access.
Failure to inspect does not impair SANPC's rights or constitute acceptance.
Loan equipment
No lien arises over loan equipment in favour of the holder.
The holder must care for it diligently, mark SANPC-owned items uniquely, exclude any landlord's hypothec (including by written notice to the landlord) and insure it against all risks.
Both parties may reasonably inspect premises where loan equipment is held.
Rates and charges are set per Transaction Document (Service Order, Purchase Order or Engagement Order).
Charges include all taxes, duties and trade discounts, but exclude settlement discounts.
VAT is shown separately on each Transaction Document and paid by SANPC.
SANPC may require documentary proof of any price computation before paying.
Packing materials and containers are included in the price and become SANPC property on delivery; the supplier bears loss or damage from inadequate packing.
Time-and-materials work is paid only for actual hours at the agreed rates.
Rates are fully inclusive of staff costs (protective clothing, mobilisation/demobilisation, statutory contributions, insurance, payroll taxes, levies) and of establishing and maintaining a supply base or office.
Rates are fixed and firm for the duration of the Transaction Document unless the document states otherwise.
All prices are quoted in South African Rand.
Charges are intended to be full compensation; SANPC will not pay amounts beyond those in the Transaction Document.
Pass-through expenses
Only third-party expenses identified in the Transaction Document are pass-through, and only up to the stated estimate.
Unidentified or over-estimate third-party expenses are for the supplier's account unless SANPC approves them in writing.
No margin, mark-up or administration fee may be added to pass-through expenses.
SANPC pays the third party directly and may source, designate or approve such services or materials itself.
Materials bought on a pass-through basis are acquired in SANPC's name and belong to SANPC.
Invoicing and payment
Original invoices and monthly statements go to SANPC by the end of the calendar month in which the charges arose.
Invoices are monthly in arrear and are considered only with original supporting documents signed by SANPC's authorised representative and once approved for payment.
Payment is made by no later than the 25th day of the month following the month of invoice.
SANPC is not obliged to pay an invoice received more than 90 days after expiry, termination or completion of the Transaction Document, whichever is earlier.
SANPC may set invoicing standards on reasonable written notice.
The supplier must keep complete accounting records and supporting documentation and provide information SANPC reasonably requests to verify invoices.
SANPC may set off amounts the supplier owes it against amounts payable.
Undisputed amounts paid late bear interest at the ABSA Bank prime lending rate plus 1% from due date to actual payment.
Disputed amounts may be withheld in good faith and are automatically referred to dispute resolution.
Insurance
The supplier must maintain sufficient insurance for its obligations and liabilities for the duration of the contract and provide a copy of the policy on request.
Cover must include public liability, all-risk insurance on its own plant, material and equipment, and workmen's compensation as required by the Compensation for Occupational Injuries and Diseases Act.
Where insurers dispute liability, the supplier has recourse against the insurers only.
The supplier must hold all licences, certificates, authorisations and consents required under South African law (or any other applicable jurisdiction) to provide the goods or services, and must comply with their terms.
The supplier must materially comply with all regulatory obligations and corporate governance guidelines.
Goods must, on delivery, be lawful to possess and use in the territory where SANPC receives them and must not breach the law of the source territory.
The supplier must perform without infringing any third party's intellectual property or proprietary rights.
Labour and employment
The supplier must comply with the Labour Relations Act, Basic Conditions of Employment Act, Employment Equity Act, Skills Development Act, Skills Development Levies Act, Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Unemployment Insurance Act and Unemployment Insurance Contributions Act.
Where services are rendered at SANPC's selected areas, the supplier must give preference to local labour and first establish, to SANPC's satisfaction, that no similar category of labour is available locally, liaising with local interest groups.
The supplier must maintain sound labour relations, prevent industrial action, notify SANPC early of any anticipated industrial action and co-operate on contingency plans, press liaison and evacuation.
Industrial action by the supplier's staff does not relieve the supplier of its obligations.
Occupational health and safety
The supplier must comply with relevant occupational health and safety legislation, including the Occupational Health and Safety Act, the Mine Health and Safety Act and the Minerals and Petroleum Resources Development Act.
Staff must undergo the prescribed medical examination required by the Mine Health and Safety Act where applicable.
B-bbee
The supplier must meet the B-BBEE obligations set out in Annexure B of the Acceptance Agreement.
Failure to meet those obligations, misrepresentation in the tender, or dissolution of the B-BBEE arrangement entitles SANPC to terminate and to re-tender or award to the next highest-scoring bidder.
Personal information
The supplier may process personal information only to the extent necessary to perform the services, may not alter it, and may not disclose it to third parties except as the contract permits.
The supplier must comply with relevant occupational health and safety legislation, including the Occupational Health and Safety Act, the Mine Health and Safety Act and the Minerals and Petroleum Resources Development Act.
Staff must undergo the prescribed medical examination required by the Mine Health and Safety Act where applicable.
The supplier must maintain workmen's compensation insurance as required by the Compensation for Occupational Injuries and Diseases Act.
Labour and local content
The supplier must comply with the Labour Relations Act, Basic Conditions of Employment Act, Employment Equity Act, Skills Development Act, Skills Development Levies Act, Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Unemployment Insurance Act and Unemployment Insurance Contributions Act.
Where services are rendered at SANPC's selected areas, the supplier must give preference to local labour and first establish, to SANPC's satisfaction, that no similar category of labour is available locally, liaising with local interest groups.
The supplier must maintain sound labour relations, prevent industrial action, notify SANPC early of any anticipated industrial action and co-operate on contingency plans, press liaison and evacuation.
Industrial action by the supplier's staff does not relieve the supplier of its obligations.
Site conduct and access
The supplier and its staff must adhere to SANPC's security policies and conduct themselves appropriately and respectfully while on SANPC premises.
SANPC may deny a staff member access and require immediate withdrawal where it believes the person breaches policies or poses a risk, and must give a written report with reasons within 7 days.
The supplier must return access cards, security codes and other SANPC property immediately when staff no longer need access.
The standard terms bind the parties once an Acceptance Agreement is signed.
Work is contracted through Transaction Documents: Service Orders (services), Purchase Orders (goods) and Engagement Orders (assigned staff).
A Transaction Document takes effect only when both parties sign it; work done outside an executed Transaction Document is at the supplier's risk and cost.
Supplier terms on quotations, invoices or proposals have no effect unless the deviation is specifically recorded and signed by both parties.
A Transaction Document may amend the standard terms only for its own subject matter and only if it identifies the clause being amended and states that intent.
Duration and termination for breach
The contract runs from the Effective Date of the Acceptance Agreement for the period stated in it.
If the supplier breaches and does not remedy within 14 days of notice (or the period in the applicable conditions), SANPC may terminate the terms and any Transaction Documents and claim damages.
SANPC may also terminate on written notice if a Causal Event occurs (insolvency, compromise with creditors, liquidation, judicial management, cessation of business, an act of insolvency, disposal of a material part of the business, or a change in control or material shareholding) or if the supplier breaches a legal requirement or licence condition in a way SANPC considers detrimental.
Termination for B-BBEE failure, tender misrepresentation or dissolution of the B-BBEE arrangement allows SANPC to re-tender or appoint the next highest-scoring bidder.
All Transaction Documents terminate when the standard terms terminate.
Termination for convenience
SANPC may terminate the terms or any Transaction Document in whole or in part without cause on at least 30 days' written notice, with no liability to the supplier.
A termination for breach later found invalid is treated as a termination for convenience.
Termination/expiration assistance
On expiry or termination, the supplier must provide handover assistance at SANPC's request so SANPC or a third party can take over.
Assistance is free where the contract expires or is terminated other than for convenience; where SANPC terminates for convenience and requests assistance, the supplier may charge time-and-materials hourly rates agreed between the parties.
Liability
Each party is liable for direct damages only; indirect, incidental and consequential damages are excluded.
Disputes
Disputes go first to mediation by a single mediator, without legal representation; the mediator's written opinion binds the parties unless taken to arbitration.
Mediation costs are shared equally.
A dissatisfied party may, within one calendar month, refer the dispute to arbitration by a single agreed arbitrator or, failing agreement, two arbitrators (one appointed by each party).
Arbitration follows the Arbitration Act of 1965 and the Association of Arbitrators rules current at appointment; the award is final and binding.
Performance continues during mediation or arbitration unless SANPC suspends it, in which case SANPC bears the supplier's reasonable suspension costs.
Withheld disputed amounts are placed in escrow and paid out with proportionate interest according to the award.
Notices
Notices must be in writing and delivered by hand, registered mail or email to the addresses in the Acceptance Agreement.
Hand delivery counts when delivered during business hours against a receipt.
Registered mail counts 5 days after posting within South Africa and 10 days otherwise.
Email counts on the business day sent if received before midnight, otherwise on the next business day.
Force majeure
Neither party is liable for delay or default caused by events beyond its reasonable control (fire, flood, earthquake, natural events, riots, civil disorder, rebellion or revolution) where it was not at fault and could not reasonably have prevented or worked around the event.
If a force majeure event prevents performance of services SANPC identifies as critical for more than 3 consecutive days, SANPC may terminate the affected portion with an equitable charge adjustment, or terminate the whole agreement without liability.
The supplier receives no additional payment for costs caused by force majeure.
Supplier duties and SANPC duties
The supplier must cede to SANPC the benefit of third-party manufacturer, lessor or licensor warranties and indemnities where possible, and enforce them as SANPC directs.
The supplier must maintain a Relationship Manager throughout the contract and keep sufficient key staff with knowledge of SANPC's requirements and the relevant technical expertise.
SANPC may, on 2 business days' written notice with reasons, require the supplier to reconsider the deployment of any staff member performing unsatisfactorily; the supplier must investigate and either correct the conduct within 2 business days or withdraw the staff member.
SANPC may deny a staff member access to its premises and require immediate withdrawal where it believes the person breaches policies or poses a risk, and must give a written report with reasons within 7 days.
The supplier must return access cards, security codes and other SANPC property immediately when staff no longer need access.
The supplier must keep documentation on its services and goods up to date, in a form SANPC approves, attend required meetings and prepare required reports.
SANPC must give reasonable access to data, information, equipment and facilities, allow reasonable use of resources such as lay-down area, ablution, telephone and fax points, water, electricity and cranage, and provide reasonable staff assistance on adequate notice.
Inspection and acceptance
SANPC may inspect goods at the supplier's or its subcontractors' premises at all reasonable times; failure to inspect does not waive SANPC's rights or constitute acceptance.
Every item of goods, deliverable or service requires formal acceptance under the acceptance-testing clause.
The supplier must submit a pre-acceptance testing plan for SANPC approval, install or implement where responsible, and retest until no deficiencies remain.
The supplier must submit acceptance criteria for SANPC approval sufficiently in advance; criteria must at minimum require no deficiencies, satisfaction of SANPC's stated business needs and functional and technical specifications, a successful SANPC security audit and stated acceptance-testing timeframes.
SANPC may reject the criteria in writing with reasons; the supplier must revise and resubmit or explain to SANPC's satisfaction.
SANPC starts acceptance testing as soon as practical after delivery and the supplier must assist and answer queries.
The supplier must correct each deficiency at no charge within 24 hours of notice, or a longer agreed period, unless the deficiency arises from SANPC's acts, omissions or delays.
If an item is rejected, SANPC gives written reasons and a final 14-day correction period; if not corrected, SANPC may direct continued efforts, accept the item with an equitable charge reduction, or terminate the Transaction Document and require a refund of amounts paid within 14 days, after which the supplier may remove the items.
After the acceptance-testing period, the supplier may give written notice requiring SANPC to identify deficiencies with a documented example; if SANPC does not respond within 7 days, the item is deemed accepted.
Upgrades, enhancements and modifications to supported or maintained items are also subject to acceptance testing.
Warranties
The supplier warrants it will use adequate numbers of qualified, trained and experienced staff, adopt required standards and processes, and perform with promptness, diligence and workmanlike quality to the standards of well-managed operations.
For time-and-materials work, the supplier must use best efforts to perform cost-effectively at the required quality.
The supplier warrants it has the rights and licences to provide, distribute, licence, support and maintain the items, complies with all legal requirements and licence conditions, and that SANPC's possession or use of goods will not breach any law.
Goods must meet the Transaction Document or original equipment manufacturer specifications.
Spare parts must be available within 24 hours of request, with access to a supply for 5 years from the Effective Date of the Transaction Document.
Goods must be free of deficiencies and comply with the agreed technical and functional specifications.
The supplier indemnifies SANPC against losses from breach of these warranties.
For intellectual property infringement, the supplier must at its own cost secure SANPC's right to continue using the item or replace or modify it without degrading performance; if it cannot, it must remove the item with an equitable charge reduction, and SANPC may terminate without liability if the item is material to the services.
The supplier must pass through and enforce manufacturer, lessor or licensor warranties as SANPC directs.
Loan equipment
No lien arises over loan equipment in favour of the party holding it.
The holder may retain loan equipment for the agreed use, must care for it diligently, mark SANPC-owned items uniquely, exclude any landlord's hypothec (including by written notice to the landlord) and insure it against all risks.
Both parties may reasonably inspect premises where loan equipment is held.
DocumentAnnexure A Scope of Work and Bid Elimination Evaluation Criteria.pdfReview complete
Contact Information
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf (RFP)
Enquiries
Contact name: not stated in the available document.
Email: not stated in the available document.
Telephone: not stated in the available document.
Submission address: not stated in the available document.
Service delivery address: not stated in the available document.
Submission Guidelines
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf (RFP)
Returnable documents
Technical pre-qualification evidence: at least 3 previous similar engagements (last 5 years) with client details and contactable references; CVs of nominated personnel with proof of SA QC, CIA or RA certification; a full due diligence audit report completed within the last 5 years (confidential information may be redacted).
B-BBEE: a SANAS-approved certificate or affidavit applicable to the sector in which the bidder earns more than 50% of revenue.
SBD 4 (Declaration of Interest): discloses any director or shareholder employed by the state or connected to the department; a false declaration disqualifies the bid.
SBD 9 (Certificate of Independent Bid Determination): certifies the price was set independently with no collusion.
Tax compliance status on CSD.
Submission method and address: not stated in the available document.
Closing time: not stated in the available document.
Evaluation Criteria
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf (RFP)
Evaluation stages
Bid elimination (pass/fail): bidders must satisfy all three technical pre-qualification criteria below. Failure on any one disqualifies the bid.
At least 3 previous similar engagements in the last 5 years, with client details and contactable references, and a description of the services rendered.
A qualified Senior Auditor in the bidder's employ, evidenced by CVs of nominated personnel and proof of SA QC Certification and/or CIA Certification and/or RA Status.
A full due diligence audit report completed within the last 5 years (confidential information may be removed).
Further evaluation: the document does not state the scoring split, preference point system (80/20 or 90/10) or any minimum qualifying score.
Technical Specifications
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf (RFP)
Purpose
Conduct due diligence audits on companies recommended for award, identify risks of doing business with them, and give the approving authority assurance on whether to proceed.
SANPC intends to appoint more than one service provider.
The contract may be used by other CEF Group entities on an ad-hoc basis, subject to their approval: CEF, PetroSA, iGas, PASA, SFF and AEMFC.
Due diligence areas (not exhaustive)
Security clearance.
Legal status and B-BBEE compliance verification.
Financial ability, creditworthiness and credit risk.
Ability to deliver material, product or services under the scope of work.
Sanction screening, where applicable.
Regulatory violations, where applicable.
Reputational aspects.
Security clearance
Inspect National Treasury's Register for Tender Defaulters and Database of Restricted Suppliers.
Identify and disclose conflicts of interest as defined in SANPC's Procurement Policy and SBD 4 Annexure B.
Identify and disclose politically exposed persons.
Legal status and B-BBEE verification
Confirm the bidder's legal status and past supply chain practices.
Verify B-BBEE compliance against the five pillars: ownership, management control, skills development, enterprise and supplier development, socio-economic development.
Trace ownership to the ultimate natural person(s); where this is not possible, report to the highest level reasonably ascertainable and disclose the gaps.
Review organisational chart, shareholder list up to individual level, assumed names and registrations, and COID, ISO, ANSI, SABS or API certifications where applicable.
Review tax returns for the last three years, tax PIN and registrations, and CSD tax compliance status.
Obtain documentary proof of Registrar of Companies filings, payment by black members for their interest, equal working capital contribution, unconditional membership, MOI and articles of association, and that no white partner holds preference shares over ordinary voting shares or benefits from a one-sided shareholders' agreement.
Financial ability and credit risk
Assess solvency and credit bureau listings.
Assess ability to obtain credit or finance for the contract.
Confirm compliance with income tax and VAT legislation.
Confirm accounting in accordance with GAAP.
Review any joint venture or shareholders' agreement terms affecting finances.
Review audited financial statements for three years with auditor's reports.
For trading counterparties, additionally assess liquidity, working capital, cash flow, leverage, debt obligations, banking relationships, available credit facilities, payment history, historical defaults and ability to meet financial obligations.
Conduct physical verification of facilities where applicable, including photographs of personnel, facilities and equipment.
For materials, confirm stock holding, warehousing, official product agency or original manufacturer status in South Africa, reconditioning capability and certification to supply components to the required insurer standards.
Trading counterparty due diligence (enhanced)
Verify legal existence, ownership structure and ultimate beneficial ownership up to natural persons.
Verify directors, senior management and authorised representatives.
Verify parent companies, subsidiaries, related parties and material intermediaries.
Assess track record and experience in petroleum, energy or commodity trading.
Verify petroleum trading, import, export, storage, transportation and other regulatory licences.
Assess financial capacity: liquidity, working capital, cash flow, leverage, debt obligations, banking relationships and available credit facilities.
Assess payment performance, defaults, insolvency, business rescue, liquidation, material litigation and regulatory enforcement.
Assess ability to meet financial obligations under the proposed transaction.
Verify trade references and, where appropriate, banking or financial references.
Screen the counterparty, UBOs, directors, senior management, related entities, brokers and material intermediaries for direct and indirect sanctions, restricted-party status, PEP status, adverse media, fraud, corruption, bribery, money laundering, terrorist financing and other financial-crime risks.
Assess country, jurisdictional, political and regulatory risks for international counterparties.
Verify the proposed source and supply chain, including producers, refiners, suppliers, traders, brokers, agents and other material intermediaries.
Confirm legal title or contractual authority to sell or supply the product.
Verify product specifications, quality certification, provenance and ability to meet SANPC's specifications.
Assess operational and logistical capability to deliver the required product, volume and schedule.
Identify actual, potential or perceived conflicts of interest involving SANPC employees, directors, management or other transaction participants.
Independently verify banking details and confirm payment accounts are held in the legal name of the contracting counterparty.
Provide an overall counterparty risk rating, identify material risks and red flags, and recommend mitigating controls.
Where sufficient information exists, recommend an appropriate counterparty exposure or credit limit.
Training
Perform due diligence audits with SANPC personnel from time to time for skills transfer.
Deliverables
Submit a report to SANPC within 5 days of receiving an instruction to perform a due diligence audit.
Notify SANPC of any delay no later than 2 days after receiving the instruction, with valid reasons.
The report must state findings on all areas above, or only the areas requested.
The service may also be required for new companies SANPC wishes to do business with.
Tender reviews
May be required to review tenders under evaluation, including confirming that evaluation criteria are applied consistently and that points awarded reflect the submissions.
General
Meet with SANPC as agreed to discuss service delivery issues.
Report to the Demand and Acquisitions Manager or their representative.
Experience & Qualifications
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf
The bidder must demonstrate at least 3 previous similar engagements in the last 5 years, with client details and contactable references, and must employ a qualified Senior Auditor with SA QC Certification and/or CIA Certification and/or RA Status.
For trading counterparty due diligence, the service provider must assess the counterparty's track record and experience in petroleum, energy or commodity trading.
Quality Management
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf
The bidder must employ a qualified Senior Auditor and submit CVs of nominated personnel with proof of SA QC Certification and/or CIA Certification and/or RA Status.
Compliance Requirements
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf (RFP)
Mandatory eligibility
CSD registration with a valid tax compliance status.
B-BBEE: a SANAS-approved certificate or affidavit applicable to the sector in which the bidder earns more than 50% of its revenue.
Technical pre-qualification (all three must be met, or the bid is disqualified):
At least 3 previous similar engagements in the last 5 years with client details and contactable references.
A qualified Senior Auditor in the bidder's employ with SA QC Certification and/or CIA Certification and/or RA Status, evidenced by CVs.
A full due diligence audit report completed within the last 5 years.
SBD 4 (Declaration of Interest): discloses state employment or connections to the department; a false declaration disqualifies the bid.
SBD 9 (Certificate of Independent Bid Determination): certifies independent pricing and no collusion.
Tax compliance status on CSD.
Disqualification risks
Failing any one of the three bid elimination criteria.
Omitting or leaving unsigned any returnable form.
A false SBD 4 declaration.
Environmental
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf
SANPC aims to use goods and services with South African content and to encourage international suppliers to establish local representation in South Africa.
Contractual Terms
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf
The service provider must comply with SANPC's Procurement Policy and Procedure, the PPPFA and its regulations, the National Industrial Participation Programme, PAIA, PAJA, the B-BBEE Codes of Good Practice, and the National Codes of Ethics.
The due diligence must confirm the bidding company's legal status, including its past supply chain practices (from National Treasury's website) and B-BBEE compliance.
A SANAS-approved B-BBEE certificate or affidavit must be provided, applicable to the sector in which the company earns more than 50% of its revenue.
Section
Source: Annexure A Scope of Work and Bid Elimination Evaluation Criteria.pdf
Bid elimination criteria (pass/fail, all must be met):
At least 3 previous similar engagements in the last 5 years with client details and contactable references, including the nature of services rendered.
A qualified Senior Auditor in the bidder's employ, evidenced by CVs of nominated personnel and proof of SA QC Certification and/or CIA Certification and/or RA Status.
A full due diligence audit report completed within the last 5 years (confidential information may be removed).
Failure on any criterion disqualifies the bid.
The document does not state the scoring split, preference point system or minimum qualifying score.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
151 Frans Conradie Dr, Avondale, Cape Town, 7500, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
07 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.