Airports Company South Africa (ACSA)Location
Eastern Cape
Closing Date
28 Sept 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Allister Miller Dr - Walmer - Gqeberha - 6070
Organization Type
GOVERNMENT
Published
07 Sept 2026
OCDS Reference
ocds-9t57fa-169209
Acsa requires a supplier to maintain generators and low-voltage systems at its eastern cape site. The bid is awarded on functionality and price, but bidders must first score at least 50 points in the functionality evaluation, which weighs company experience, site manager, electrician and diesel mechanic credentials.
Bidders must achieve a minimum functionality score of 50 points to be considered; functionality covers company experience (less than 5 similar projects scores 0, 5 or more scores 20) and key personnel.
The site manager must have 3+ years of relevant experience in project management; CVs must show years of experience clearly, with dates (e.g. 10 May 2010 – 30 June 2025).
The electrician must have a trade test certificate in electrical (N3 or higher) and at least 3 years’ experience in generator and LV installation, commissioning and maintenance.
The diesel mechanic must have a certified qualification (N3 mechanical + trade test preferred) and at least 3 years’ relevant experience in generator and LV systems.
CVs for all key team members must state experience, qualifications and references, and be submitted with the bid.
Bidders must provide contactable references with project details and scope of work for the company experience claim.
The client reserves the right to veto any proposed subcontractor.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 28 September 2026 - 13:00
Venue
Information desk, Chief Dawid Stuurman Airport
None.
Categories
Request for Quotation
Allister Miller Dr - Walmer - Gqeberha - 6070
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
07 Sept
2026
Tender Published
Tender was published
28 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC-TSC - Generator Maintanance 6 Months Contract.pdf
No summary available
RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf
Analysis completed but response format was invalid
EVALUATION CRITERIA.pdf
The Airports Company of South Africa seeks a contractor for the maintenance of generators and low voltage (LV) systems at its Eastern Cape location for a period of six months. The tender is evaluated on functionality criteria, with a minimum threshold of 50 points, and bidders must provide evidence of relevant experience and key personnel qualifications.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 680 000
Range
Based on SITA benchmarks. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdf (RFQ){"name":null,"email":null,"phone":null,"department":null,"address":"Capacity . . . . . . . . . . . . . . . . . . . . . . ."}
Evaluation Criteria
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdf (RFQ)No eligibility criteria specified
Technical Specifications
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdf (RFQ)Maintenance 6 Months Contract.
Contract volume 1
Confidential
Confidential
Generator Maintenance
Quality Management
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdfat Chief Dawid International Airport.
Repairs – responding to breakdowns, callouts and restoring the equipment to safe working conditions
within agreed timelines
Performance Test – Testing equipment performance against the original equipment manufacturers and
return to service purposes.
Reporting – diagnosing faults and breakdowns and providing failure analysis and recommendation
reports on a timely basis.
Pricing Schedule
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdfPart C1: Agreements and contract data, (which includes this agreement)
Part C2: Pricing data and Price List
Part C3: Service information.
Part C4: Site information
and schedules, drawings and documents or parts thereof where so indicated.
Firstly, the Service information (C3) and Annexes thereto shall prevail;
Secondly the Contract Data (C1.2) and Conditions of Contract;
Thirdly the General Conditions of Contract;
Fourthly the Pricing data;
11.2 The following matters will be included
in the Risk Register
The plan identified in the Contract Data In Section C3, the Service Information
is
Option The price list is In Section C2.2 of the Pricing Data of this contract
A
Option The tendered total of the Prices is R ........................................................ (excluding VAT)
A
(in words) ..........................................................................................
.................................................. (excluding VAT)
Contract Data C1.2b
C2.1 Pricing Instructions
The intended pricing strategy to be followed in this tender is according to the Price List (including the activity
schedule).
no other items will be measured. Costs not covered by the items may be included in the most appropriate items
listed. The Contractor has the liberty to insert items, quantities and rates of his own choosing in the said schedule
as a separate line item.
all general risks, liabilities, obligations, profit, expenses, costs, bonuses, all allowances such as shift and standby
allowances, sick-leave, other leave, brackets, fixings, incidentals, consumables etc. that will be required to
successfully complete this contract as set forth or as implied in the documents on which this Contract is based.
used in this schedule means the complete system or unit as specified in the particular document.
wording will apply.
measured and priced at the rates entered in the Activity Schedule, where appropriate, and shall form an addition
to or deduction from the total of the Accepted Contract Amount. Any items or variations for which rates have not
been included in the Activity Schedule shall be agreed and priced as non-scheduled items.
quantity of equipment.
Pricing Instructions C2.1
(.......... %) 1 R x .........% R
Pricing Data C2.2
Any work not included under part 1 shall be deemed additional work or non-scheduled items and will be charged at
the following rates:
Site Manager R 6 R
Technician/ Electrician (normal hours) R 8 R
Pricing Data C2.2
breakdown maintenance. The Contractor must ensure that no scheduled maintenance work is carried over to the
following week.
All Preventative Maintenance shall be scheduled, at least, to the requirements of the annexures (The Contractor
must ensure that sufficient allowances for all these items are made with his/her pricing in the Activity Schedule.)
Compliance Requirements
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdf (RFQ)Z17.1 The Contractor shall be expected to annually present a compliant BEE Certificate and a Tax Clearance Certificate. Failure to do adhere to these requirements shall be considered a material breach of the conditions of this Contract, the sanction for which may be a cancellation of this Contract. Z18 Communication Z18.1 Add a new Core Clause 14.5 and 14.6 to read as follows: The Service Manager requires the written consent of the Employer if an action will result in a change to the design, scope, and Service information that is 5% or more Contract Data C1.2a Confidential Confidential Z18.2 The Service Manager requires the written consent of the Employer if an action will result in the Completion Date being extended by more than 30 days. Z19 Delegation As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the Contractor agrees to the following: Z19.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with duties as prescribed in the Occupational Health and Safety Act No as amended and agree to ensure that all work being performed, or Equipment, Plant and Materials being used, are in accordance with the provisions of the said Act, and in particular with regard to the Construction Regulations. Contract Data C1.2a Confidential Confidential C1.2 b - DATA PROVIDED BY THE CONTRACTOR Clause Statement Data 10.1 The Contractor is (Name): Address: Telephone No Email Address: Represented by: Title: Address: Telephone: Email Address: The direct fee percentage is: .........% The subcontracted fee percentage is: .........% 11.2 The working areas are refer to C3 ‘Service Information’ 24.1 The Contractor’s key persons are: CV’s to be appended to resource proposal
Name: Responsibility: Site Manager The Contractor will respect OEM warrantees to ACSA always when procuring spare parts, products or 3rd party services. It will be the Contractor’s sole responsibility to ensure that OEM warranty requirements are adhered to always. Where Contractors use or quote on spare parts of a lower quality than recommended by the OEM, or parts not recommended by the OEM, this shall be clearly indicated to the Service Manager on the quotation. This also implies that the Contractor must build relationships with the various key OEM’s. The Contractor must adhere to all airport requirements regarding fire, health and safety when procuring replacement parts. No casual labour (i.e. “off the street” labour) may be employed by the Contractor unless pre-arranged with ACSA. Whenever this is required, the Contractor shall come to a suitable arrangement with ACSA regarding sourcing and screening of such individuals. Subcontracting Service information C3 Confidential Confidential No part of this Contract may be subcontracted unless with written approval from ACSA. ACSA shall be under no obligation to grant such approval. Should any part of this Contract be subcontracted, the Contractor will be responsible for all Works (or failure to affect the Works) as if it was done so by the Contractor. Service information C3 Confidential Confidential MANAGEMENT Management of the works Particular / generic specifications All work shall conform to all relevant of the OHS ACT, SANS 10142-1 Standard. All work shall be carried out in accordance with prevailing industry norms and best practice and will always comply with OEM requirements. Planning and programming All maintenance work shall be scheduled, and a roster presented to the Service Manager at the end of the preceding month. Work shall be scheduled in a manner as not to interfere with any normal airport operations. Normal working Hours shall be 07H00-17H00 As a minimum requirement, the Contractor shall roster scheduled preventative maintenance activities. Maintenance teams will attend to scheduled preventative maintenance, non-scheduled maintenance and breakdown maintenance. The Contractor must ensure that no scheduled maintenance work is carried over to the following week. All Preventative Maintenance shall be scheduled, at least, to the requirements of the annexures (The Contractor must ensure that sufficient allowances for all these items are made with his/her pricing in the Activity Schedule.) Methods and procedures The Contractor must accept and respect the fact that the Airport is continuously undergoing construction and improvement and that a variety of stakeholders are involved in ACSA’s business. Therefore, within reason and with prior arrangement with the Contractor, ACSA might require the following from time to time
Assisting with emergency repairs on
Assisting with airport operations Re-scheduling of work to accommodate other contractors
Allowing access and aiding OEM suppliers to correct defects on equipment and/or systems
Pointing out services to consultants or other contractors
Providing access to other contractors
Attending co-ordination and planning meetings
Removing rubble and/or equipment from site relating to this contract
Training of ACSA operators and/or technicians
Providing of system data and/or statistics to ACSA
Recommending improvements on maintenance procedures
Recommending improvements on operational procedures
Co-operating with ACSA Security relating to security issues The ACSA Service Manager may instruct operational and works procedures to the Contractor as might be required from time to time. The Contractor will instruct his/her staff accordingly and implement measures to ensure that these procedures are strictly adhered to. Quality plans and control All work must be executed in accordance with prevailing industry norms and standards relating to quality. In this regard, the Contractor will be expected to draft quality plans for the Service Manager from time to time. Emphasis must be on improving system reliability and on ensuring that rostered maintenance work is indeed performed as and when required. Environment The Contractor will keep noise and dust levels to a minimum. At no time, shall his/her work result in nuisance, interference or danger to the public or any other person working at the Airport. At no time, shall the Contractor
allow any pollutive or toxic substance to be released into the air or storm water systems
interfere with, or put at risk, the functionality of any system or service
cause a fire or safety hazard Format of communications Work instructions, daily check sheets, monthly maintenance reports, breakdown reports, exception reports, etc. will all be in a format as agreed with the Service Manager. Service information C3 Confidential
B-BBEE Details: appoints an Eng. [email protected]
Arbitrator listed in the Panel of Mr. Sam Amod Gauteng [email protected]
Arbitrators below
Adv. Sias Ryneke SC Gauteng 083 653 2281
Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z16 Notification of a compensation event
Z16.1 Delete “eight weeks” in clause 61.3 and replace with “four weeks”. Delete the words “unless the event arises
from the Service Manager or the Supervisor giving an instruction, issuing a certificate, changing an earlier
decision or correcting an assumption.
Z17 BBBEE and Tax Clearance
Certificates
Z17.1 The Contractor shall be expected to annually present a compliant BEE Certificate and a Tax Clearance
Certificate. Failure to do adhere to these requirements shall be considered a material breach of the conditions
of this Contract, the sanction for which may be a cancellation of this Contract.
Z18 Communication
Z18.1 Add a new Core Clause 14.5 and 14.6 to read as follows:
The Service Manager requires the written consent of the Employer if an action will result in a change to the
design, scope, and Service information that is 5% or more
Contract Data C1.2a
Confidential
Confidential
Z18.2 The Service Manager requires the written consent of the Employer if an action will result in the Completion
Date being extended by more than 30 days.
Z19 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the
Contractor agrees to the following:
Z19.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with
duties as prescribed in the Occupational Health and Safety Act No as amended and agree to
ensure that all work being performed,
Health & Safety
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdfThe General Conditions of Contract comprise the NEC3 Term Service Contract, April 2013, published by the NEC,
and the following “Particular Conditions”, which include amendments and additions to such General Conditions.
W1.4(2) The tribunal is: Arbitration
W1.4(5) The arbitration procedure is The arbitration procedure is set out in The Rules for the
Conduct of Arbitrations 2013 Edition, 7th Edition, published
by The Association of Arbitrators, (Southern Africa)
estoppel unless the Parties agree otherwise and confirm such agreement in writing.
Z2 Providing the Service:
Z2.1 Delete core clause 20.1 and replace with the following:
Z18.2 The Service Manager requires the written consent of the Employer if an action will result in the Completion
Date being extended by more than 30 days.
Z19 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the
Z19.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with
duties as prescribed in the Occupational Health and Safety Act No as amended and agree to
ensure that all work being performed, or Equipment, Plant and Materials being used, are in accordance with
the provisions of the said Act, and in particular with regard to the Construction Regulations.
Contract Data C1.2a
*By Tools, equipment and consumables is also meant cleaning materials, fasteners, lubricants, chemicals,
electronic devices, etc. that are required to do any corrective or preventive maintenance, and measurements
(multi-meters, etc.). The Contractor must submit a list of tools that will be used on this contract at the start of the
contract. This tools list must be inspected and verified by ACSA monthly prior to payment.
Part 1 – Preventative Maintenance (CHIEF DAWID STUURMAN INTERNATIONAL AIRPORT)
(Please note: Maintenance cost for items are inclusive of labour, tools, consumables, PPEs and travelling)
CDSIA Generator and LV Switchgear Maintenance 6 Months Contract
Generator and LV Switchgear Maintenance: Maintenance as per scope.
(a) (b) (c) (d) Price per year
Sub-total Excluding VAT: PART A R
*Only actuals will be claimed for. Approved reports will be used as “delivery notes” prior to claiming
Part 2 Provisional Amounts: CHIEF DAWID STUURMAN INTERNATIONAL AIRPORT
(Provisional amount will be paid on proven cost and must be on pre-approval basis. Supporting documents will be
requested at claiming)
Item Description Quantity Amount (per single Annual Cost
no. item)
1 Permits 1 R R
2 Safety file 1 R R
3 Insurance cover premium (All ACSA
required insurance) – Once off Sum Sum R R
Rates are inclusive (include travelling, averaged for public holidays and after hour, admin and fees on overheads,
PPE and tools allowance)
the levels of switch gear enclosure.
clusters
improvement and that a variety of stakeholders are involved in ACSA’s business. Therefore, within reason and with
prior arrangement with the Contractor, ACSA might require the following from time to time:
Assisting with emergency repairs on
Assisting with airport operations Re-scheduling of work to accommodate other contractors
Allowing access and aiding OEM suppliers to correct defects on equipment and/or systems
Pointing out services to consultants or other contractors
Providing access to other contractors
Attending co-ordination and planning meetings
Removing rubble and/or equipment from site relating to this contract
Training of ACSA operators and/or technicians
Providing of system data and/or statistics to ACSA
Recommending improvements on maintenance procedures
Recommending improvements on operational procedures
Co-operating with ACSA Security relating to security issues
allow any pollutive or toxic substance to be released into the air or storm water systems
interfere with, or put at risk, the functionality of any system or service
cause a fire or safety hazard
Environmental
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdfdelivering, unloading, storing, unpacking, hoisting, setting, fitting and fixing in position, cutting and waste,
patterns, models and templates, plant, temporary works, return of packaging, establishment charges, profit and
all other obligations arising out of the contractual conditions.
Contractual Terms
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdfPart C1: Agreement and Contract Data
C1.1 Form of Offer and Acceptance
C1.2 Contract Data
C1.4 Insurance Schedule
Part C2: Pricing data
C2.1 Pricing Instructions
C2.2 Price List (including the Activity Schedule)
Part C3: Service information
C3 Service Information
Part C4: Site information
C4 Site Information
deviations (if any), contact the employer’s agent (whose details are given in the contract data) to arrange the delivery
of any bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the conditions
of contract identified in the contract data. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option: W1: Dispute resolution procedure
and secondary Options: X1: Price Adjustment for inflation
X18: Limitation of Liability (as amended in Option Z)
Z: Additional conditions of contract
of the NEC3 Term Service Contract (April 2013)
10.1 The Employer is: Airports Company South Africa SOC Limited
Reg. No 1993/004149/30 VAT no 4930138393
83.1 The Employer provides these insurances from the (i) Insurance against loss of or damage to the services,
& Air Cargo insurance; and
(ii) Insurance (Public Liability Insurance) against liability for
loss or damage to property (except the services, Plant
and Materials and Equipment) and liability for bodily
injury to or death of a person (not an employee of the
Contractor) caused by activity in connection with the
contract;
Note: The terms and other matters applicable to these
insurances provided by the Employer (and to insurances
generally) are detailed in the insurance schedule attached as
section C1.4 to the contract (“the Insurance Schedule”).
83.1 The Contractor provides these additional The terms and other matters applicable to this insurance
insurances provided by the Employer are likewise detailed in section C1.4
to the contract.
83.2 The minimum amounts of cover or minimum limits Refer to section C1.4.
of indemnity required for the insurance table
Contract Data C1.2a
arbitrator when a dispute arises in terms of the relevant Z Clause, from
the Panel of Arbitrators provided under the relevant Z clause
if the arbitration procedure does not state who selects an
arbitrator. The Arbitrator nominating body is the Chairman of
the Johannesburg Advocates Bar Council.
X1 Price Adjustment for inflation The index referred to in this clause shall be deemed to refer to
the CPI index on the starting date. Price adjustment for inflation
shall only take place on contract anniversary
X17 Low service damages refer to service level table in C3
X18 Limitation of liability
Contract Data C1.2a
X18.1 The Contractor’s liability to the Employer for Nil - Neither Party is liable to the other for any consequential or
indirect or consequential loss is limited to: indirect loss, including but not limited to loss of profit, loss of
income or loss of revenue
X18.2 For any one event, the Contractor’s liability to The total damages suffered and/or costs incurred as a result of
the Employer for loss of or damage to the damage to the employer's property
Employer’s property is limited to:
X18.3 The Contractor’s total liability to the Employer The total damages suffered and/or costs incurred as a result of
for defects due to his design which are not listed damage to the employer's property
on the Defects Certificate is limited to:
X18.4 The Contractor’s total liability to the Employer The Contractor’s total direct liability to the Employer for all
for all matters arising under or in connection matters arising under or in connection with this contract, other
with this contract, other than excluded matters, than the excluded matters, is limited to the total damages
is limited to: suffered and/or costs incurred as a result of damage to the
employer's property and applies in contract, tort or delict and
otherwise to the extent allowed under the law of the contract.
as stated in this contract for:
infringement of an intellectual property right
X19 Task Order Task Order shall be issued in line with the Employers Supply
of the Service, when complete, shall be fit for their intended purpose.
Z5 Termination
Z5.1 Add the following to core clause 91.1, at the second main bullet, fifth sub-bullet point, after the words
“assets or”: “business rescue proceedings are initiated, or steps are taken to initiate business recue
proceedings”.
Z7 Limitation of liability:
Insert the following new clause as Option X18.6:
Z7.1 The Employer's liability to the Contractor for the Contractor's indirect or consequential loss is limited to R0.00
Z7.2 Notwithstanding any other clause in this contract, any proceeds received from any insurances or any proceeds
which would have been received from any insurances but for the conduct of the Contractor shall be excluded
from the calculation of the limitations of liability listed in the contract
Contract Data C1.2a
Z10.2 The Contractor’s breach of this clause constitutes grounds for terminating the Contractor’s obligation to
Provide the Works or taking any other action as appropriate against the Contractor (including civil or criminal
action). However, lawful inducements and rewards shall not constitute grounds for termination.
Z10.3 If the Contractor is found guilty by a competent court, administrative or regulatory body of participating in illegal
or corrupt practices, including but not limited to the making of offers (directly or indirectly), payments, gifts,
gratuity, commission or benefits of any kind, which are in any way whatsoever in connection with the contract
with the Employer, the Employer shall be entitled to terminate the contract in accordance with the procedures
stated in core clause 92.2. the amount due on termination is A1.
Z11 Confidentiality
Z11.1 All information obtained in terms of this contract or arising from the implementation of this contract shall be
treated as confidential by the Contractor and shall not be used or divulged or published to any person not
being a party to this contract, without the prior written consent of the Service Manager or the Employer, which
consent shall not be unreasonably withheld.
Z11.2 If the Contractor is uncertain about whether any such information is confidential, it is to be regarded as such
until otherwise notified by the Service Manager.
Z11.3 This undertaking shall not apply to –
Z11.3.1 Information disclosed to the employees of the Contractor for the purposes of the implementation of this
agreement. The Contractor undertakes to procure that its employees are aware of the confidential nature of
the information so disclosed and that they comply with the provisions of this clause;
Z11.3.2 Information which the Contractor is required by law to disclose, provided that the Contractor notifies the
Z11.5 The Contractor ensures that all his Subcontractors abide by the undertakings in this clause.
Z12 Employer’s Step-in rights
Z12.1 If the Contractor defaults by failing to comply with his obligations and fails to remedy such default within 2
weeks of the notification of the default by the Service Manager, the Employer, without prejudice to his other
rights, powers and remedies under the contract, may remedy the default either himself or procure a third party
(including any subcontractor or supplier of the Contractor) to do so on his behalf. The reasonable costs of
such remedial works shall be borne by the Contractor
Z12.2 The Contractor co-operates with the Employer and facilitates and permits the use of all required information,
materials and other matter (including but not limited to documents and all other drawings, CAD materials, data,
software, models, plans, designs, programs, diagrams, evaluations, materials, specifications, schedules,
reports, calculations, manuals or other documents or recorded information (electronic or otherwise) which
have been or are at any time prepared by or on behalf of the Contractor under the contract or otherwise for
and/or in connection with the works) and generally does all things required by the Service Manager to achieve
this end.
Z13 Liens and Encumbrances
Z13.1 The Contractor keeps the Equipment used to Provide the Services free of all liens and other encumbrances
at all times. The Contractor, vis-a-vis the Employer, waives all and any liens which he may from time to time
have, or become entitled to over such Equipment and any part thereof and procures that his Subcontractors
similarly, vis-a-vis the Employer, waive all liens they may have or become entitled to over such Equipment
from time to time
Z14 Intellectual Property
Z14.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design, copyright, trade mark, trade
name, trade secret or other intellectual or industrial property right relating to the Works.
Z14.2 IP rights remain vested in the originator and shall not be used for any reason whatsoever other than carrying
out the works.
Z14.3 The Contractor gives the Employer an irrevocable, transferrable, non-exclusive, royalty free licence to use and
copy all IP related to the works for the purposes of constructing, repairing, demolishing, operating and
maintaining the works
Z14.4 The written approval of the Contractor is to be obtained before the Contractor's IP made available to any third
party which approval will not be unreasonably withheld or delayed. Prior to making any Contractor's IP
available to any third party the Employer shall obtain a written confidentiality undertaking from any such third
party on terms no less onerous than the terms the Employer would use to protect its IP
Z14.5 The Contractor shall indemnify and hold the Employer harmless against and from any claim alleging an
infringement of IP rights (“the claim”), which arises out of or in relation to:
Z14.5.1 the Contractor’s design, manufacture, construction or execution of the Works
Z14.5.2 the use of the Contractor’s Equipment, or
Z14.5.3 the proper use of the Works.
Z14.6 The Employer shall, at the request and cost of the Contractor, assist in contesting the claim and the Contractor
may (at its cost) conduct negotiations for the settlement of the claim, and any litigation or arbitration which
may arise from it.
Z15 Dispute resolution:
Contract Data C1.2a
a dispute arises, from the Panel of
dispute arises from the Panel of
C1.4 Insurance Schedule
Part 1:
1.1 Contract Works
of R250 000.
1.2 Public Liability
consultant will be responsible for a deductible (excess) of R275 000
consultant will be responsible for a deductible (excess) of R500 000
1.3 Professional Indemnity
scope, are responsible for Professional Indemnity cover of R5million
signed between ACSA and the contractor and/or consultant.
2.1 Contract Works
of R250 000.
2.2 Public Liability
contractor / consultant will be responsible for a deductible (excess) of R525 000
contractor / consultant will be responsible for a deductible (excess) of R750 000
consultant will be responsible for a deductible (excess) of R750 000
Insurance Schedule C1.3
2.3 Professional Indemnity
scope, are responsible for a Professional Indemnity cover of R5million.
signed between ACSA and the contractor and/or consultant.
Part 2:
cover:
rands).
(a) ensure that all potential and appointed Sub-Contractors are aware of the whole contents of this
clause, and
(b) enforce the compliance by Sub-Contractors with this clause where applicable.”
Insurance Schedule C1.3
How did the loss /damage/injury/death occur (cause)?
Insurance Schedule C1.3
Insurance Schedule C1.3
Signed by: .................................................................. Signature:
......................................................................................
Company: ................................................................... Date:
......................................................................................
Insurance Schedule C1.3
this item must be regarded as provisional and will only be payable to the Contractor if and when a written order
to this effect has been issued.
C2.2 Price List
The following Activity Schedule is provided “as-is” for the benefit of the Tenderer. ACSA cannot guarantee that it
is complete in all respects. The Tenderer is responsible for providing an Activity Schedule which is accurate,
complete and in accordance with their proposal. Also, refer to C3 (Service information) for activities that need to
be priced. Only items listed in this Activity Schedule may be billed to the Employer.
Preventative Maintenance Sub-Total D (per year) R
aAll rates to exclude vat. Subject to agreement between the Service Manager and the Contractor, the number of
staff allocated to the contract may be increased/decreased to cater for special needs that may arise from time to
time. Labour rates shall include all personnel insurance, holidays with pay, incentive bonuses. No labour shall be
charged for travel or travelling. Labour time shall be calculated for the time spent on site. Time spend on site must
be proved by a job card signed by both the Employer’s representative and the Contractor on the day(s) which the
activities are performed. The job card must have the following information as a minimum:
Annual Service
re-grease
conducted and provide Infrared scan reports
record readings
report
Requirements
The Contractor will respect OEM warrantees to ACSA always when procuring spare parts, products or 3rd party
services. It will be the Contractor’s sole responsibility to ensure that OEM warranty requirements are adhered to
always.
regard, the Contractor will be expected to draft quality plans for the Service Manager from time to time. Emphasis
must be on improving system reliability and on ensuring that rostered maintenance work is indeed performed as
and when required.
Section
Source: NEC-TSC - Generator Maintanance 6 Months Contract.pdfsoftware, models, plans, designs, programs, diagrams, evaluations, materials, specifications, schedules,
Note these are for evaluation purposes 80/20 maintenance principle applied.
Where Contractors use or quote on spare parts of a lower quality than recommended by the OEM, or parts not
Important Dates
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)Closing date and time: 28 September 2026 at 13:00. Non-compulsory briefing/site inspection: 15 September 2026 at 10:00 at the Information desk, Dawid Stuurman International Airport. The site inspection is compulsory (despite the briefing being non-compulsory). Closing date for enquiries: 21 September 2026.
Contact Information
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)Bidding procedure enquiries: Joseph Rulash, telephone 011 409 3943, email [email protected]. Technical enquiries: not provided. All communication during the tender period must be directed to ACSA's Supply Chain Department, not the Principal Agent.
Submission Guidelines
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)Bids must be delivered to the Tender Box at the Administrator Office, Aeropark Office Complex, Block A, 1st Floor, Allister Miller Drive, Walmer, Eastern Cape, South Africa (P O Box 5787, Walmer, Gqeberha, 6065) by 13:00 on 28 September 2026. The Tender Deposit Register must be completed and signed by the person depositing the bid. Submit during working hours Monday to Friday. Bids must be on the official forms provided, not re-typed. Submit an original plus one copy and an electronic format (USB Flash Drive), with the original and copy sealed as separate packages marked 'ORIGINAL' and 'COPY'. The outer package must show the employer's address and the bidder's return address. Late bids will not be accepted and will be returned unopened. Telephonic, telegraphic, telex, and facsimile tenders will not be accepted. The bid document and the contract document (Appendix 1) must be completed and returned in their entirety. Bidders must sign the attendance list at the briefing/site inspection; addenda will be issued only to those on the attendance list. Tender offers must remain valid for 12 weeks (84 days) after closing. Returnable documents include the completed and signed Form of Offer and Acceptance, pricing schedules, and all other returnable schedules listed in Part T2.
Evaluation Criteria
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)Evaluation is in stages: Stage 1 tests responsiveness; Stage 2 checks mandatory administration criteria (fully completed and signed form of offer, and CIDB contractor grading of 3 EB or higher); Stage 4 is functionality evaluation with an overall minimum threshold of 50 out of 100 points to proceed to price and preference; Stage 4 (price and preference) uses the 80/20 preference point system for bids up to R50 million, with 80 points for price and 20 for specific goals. Specific goals points: B-BBEE Level 1 = 5, Level 2 = 4.5, Level 3 = 4, Level 4 = 3, Level 5 = 2, Level 6 = 0.5, Level 7 = 0.3, Level 8 = 0.1; Black youth majority-owned = 5, Black women majority-owned = 5, company majority owned by people with disabilities = 5; non-compliant contributor = 0. Proof must be provided for claimed preference points (e.g., sworn affidavit or B-BBEE certificate from a SANAS accredited agency; for JV, a consolidated certificate). Stage 5 applies objective criteria in line with PPPFA.
Technical Specifications
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)The scope is generator and LV systems maintenance for a period of 6 months at Chief Dawid Stuurman Airport. Specific technical details are not provided in the extracted text; refer to the attached evaluation criteria document and the scope of work (Part C3).
Financial Requirements
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)Prices must be fixed for the full duration of the contract; no contract price adjustments. Rates and prices must be in Rand, excluding VAT (VAT shown separately). The contract is not subject to price adjustments for foreign fluctuations. Bidders must submit securities, bonds, guarantees, policies, and certificates of insurance as required before contract formation. Insurance requirements are in Appendix 2 and the Contract Data.
Compliance Requirements
Source: RFQ_16846_ Generator and LV Systems maintenance for a period 6 months.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD) or provide a SARS Tax Compliance Status (TCS) PIN. For consortia/JVs/sub-contractors, each party must submit a separate TCS certificate/PIN/CSD number. CIDB contractor grading of 3 EB or higher is mandatory. B-BBEE status level must be claimed with proof (sworn affidavit or SANAS accredited certificate). Foreign suppliers must complete the questionnaire. Proof of authority to sign (e.g., company resolution) must be submitted.
Important Dates
Source: EVALUATION CRITERIA.pdf (unknown){"closingDate":"10 May 2010"}
Evaluation Criteria
Source: EVALUATION CRITERIA.pdf (unknown)Bidders must score at least 50 points in the functionality evaluation to be considered. The evaluation awards points for company experience (minimum 5 projects for any points) and for key personnel experience and qualifications. No other eligibility criteria (e.g., CSD, tax, B-BBEE) are stated in the provided document.
1.1 Functionality Criteria:
Reject all tenders that fail to score a minimum of 50 points i.e. Number of years of
experience clearly written on CV E.g.: 10 May 2010 – 30 June 2025
Total 50 100
The client reserves the right to veto any proposed subcontractor.
[Source: EVALUATION CRITERIA.pdf]
Technical Specifications
Source: EVALUATION CRITERIA.pdf (unknown)Minimum Weight
Experience & Qualifications
Source: EVALUATION CRITERIA.pdfKey personnel must submit completed CVs clearly stating experience, qualifications, and references. Number of years of experience must be written clearly on the CV (e.g., 10 May 2010 – 30 June 2025).
Site manager: Relevant experience (project details and reference to be supplied) – >5 years = 10 points, 3–5 years = 5 points, <3 years = 0 points. Relevant education (Qualification in Contract/Project Management) – Higher Diploma = 10 points, 5 points, 5 points, 10 points.
Electrician: Relevant experience (project details and reference to be supplied) – >5 years = 10 points, 3–5 years = 5 points, <3 years = 0 points. Relevant education (Trade test certificate in Electrical) – > N3 Electrical + Trade Test = 10 points, N3 Electrical + Trade Test = 5 points, No relevant submissions = 0 points.
Mechanic: Relevant experience (project details and reference to be supplied) – >5 years = 10 points, 3–5 years = 5 points, <3 years = 0 points. Relevant education (certified qualification certificate to be provided) – > N3 Mechanical + Trade Test = 10 points, N3 Mechanical + Trade Test = 5 points, No relevant submissions = 0 points.
Company experience: 5 projects = 20 points, greater than 5 projects = 40 points. Contactable references must include company letterhead, site where project was done, and scope of work.
Total for functionality = 100 points. Minimum qualifying score = 50 points.
Compliance Requirements
Source: EVALUATION CRITERIA.pdf (unknown)No specific requirements found
Section
Source: EVALUATION CRITERIA.pdfFunctionality evaluation criteria as described in the evaluation criteria section. The client reserves the right to veto any proposed subcontractor.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Allister Miller Dr - Walmer - Gqeberha - 6070
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.