19 Richards Drive - Halfway House - Himdrand - 1685
Organization Type
GOVERNMENT
Published
17 Nov 2026
OCDS Reference
ocds-9t57fa-178550
Summary
Mict seta requires a service provider to conduct workplace approval site visits and compliance audits for all its occupational qualifications across six provinces: gauteng, kwazulu-natal, eastern cape, western cape, free state and north west. The scope covers desktop application assessment, physical and virtual site visits, mentor and legal compliance checks, workplace approval recommendations, remediation tracking, database and mentor matrix maintenance, annual monitoring visits, and monthly, quarterly and close-out reporting under an initial twelve-month contract. Bidders must prove an operational footprint in all six provinces and score at least 75 out of 100 on functionality before price and specific-goal points are evaluated under the 80/20 system.
Key Requirements
Closing: email one soft copy to [email protected] by 23 November 2026 at 11:00 South African time; late or incomplete submissions are not considered.
Mandatory footprint: documentary proof of an operational presence in all six MICT SETA provinces is required, or the bid is declared unresponsive.
Functionality threshold: bids are scored out of 100 points and must reach at least 75 to proceed to price and specific-goal evaluation under the 80/20 system.
Returnable documents: CSD registration report, valid tax clearance certificate or SARS verification PIN, SBD 4 Bidder's Disclosure, SBD 6.1 Preference Points Claim Form, CIPC document, shareholding certificate, certified director identity copies not older than six months, Form A Bidder's Eligibility, and the completed pricing schedule.
Key personnel: a designated Project Manager with at least five years' experience and CVs of three or more auditors or assessors registered with a SETA, QCTO or equivalent body, each with at least three years' site visit experience.
Geographic capacity: own transport or verified access to transport and demonstrated ability to conduct physical site visits across all six provinces.
Quote validity: prices must remain binding for 90 days from the closing date, with VAT at 15% shown on the 12-line pricing schedule.
19 Richards Drive - Halfway House - Himdrand - 1685
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
RFQRFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdfReview complete
Description
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
Important Dates
17 Nov
2026
PUBLICATION
Tender Published
Tender was published
23 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The MICT SETA requires a service provider to conduct desktop compliance assessments, workplace approval site visits and compliance audits, workplace learning implementation monitoring visits, and related reporting for all MICT SETA occupational qualifications across all provinces in which it operates. The appointment covers application pre-visit assessment, physical and/or virtual site visits, approval recommendations, remediation tracking, database management, monitoring visits and stakeholder engagement, for an initial period of twelve (12) months from signature of the Service Level Agreement, with a right of extension by a further twelve (12) months subject to satisfactory performance and mutual agreement.
Media, Information and Communication Technologies Sector Education and training Authority (MICT SETA)
Google
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Context
MICT SETA is a public entity established under the Skills Development Act and a QCTO-recognised Quality Partner, responsible for developing and quality assuring occupational qualifications in five sub-sectors: Advertising, Film and Electronic Media, Electronics, Information Technology, and Telecommunications.
Occupational qualifications combine knowledge, practical skills and work experience. Learners must complete the work experience component in an employer workplace approved by MICT SETA before they may sit the External Integrated Summative Assessment.
No employer may host learners for work-based learning without formal MICT SETA workplace approval, which applies to both full and part qualifications.
Approval requires assessment of site resources, mentor capacity (minimum 1 mentor per 10 learners), legal compliance (COIDA, OHS, UIF, EMP201/SDL) and workplace suitability.
Applicants who fall short receive 10 working days to remedy gaps. Approved workplaces receive an approval letter and a unique Workplace Approval Number per qualification.
Applications are growing across five sub-sectors and all provinces, which is why the function is being outsourced.
Important Dates
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf (RFQ)
RFQ issued: 17 November 2026
Closing: 23 November 2026 at 11:00 South African time
Compulsory briefing session: none
Quote validity: 90 days from the closing date
Contact Information
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf (RFQ)
Closing: 23 November 2026 at 11:00 South African time; submissions received after this are not considered
The full RFQ document must be completed, signed and returned as a whole by an authorised company representative
Returnable documents
CSD registration report.
Pricing schedule completed with unit rates, sub-total, VAT at 15% and total.
Valid tax clearance certificate, SARS proof of application, or a SARS-issued verification PIN.
SBD 4 — Bidder's Disclosure: declares any state employment or connection between the bidder's principals and the procuring institution.
SBD 6.1 — Preference Points Claim Form: claims specific-goal points under the 80/20 system.
Certified copies of directors' identity documents, not older than six months.
CIPC document.
Shareholding certificate.
Form A — Bidder's Eligibility: declares no National Treasury procurement prohibition, no bankruptcy, no corrupt or fraudulent practice, and no pending litigation that would impair operations.
Documentary proof of an operational footprint in all six provinces.
Disqualification risks
Late submission.
Incomplete submission or unsigned forms.
No proof of footprint in all six provinces.
Functionality score below 75 out of 100.
Evaluation Criteria
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf (RFQ)
Stage 1 — Mandatory
National operational footprint covering all six provinces: Gauteng, North West, Free State, Western Cape, Eastern Cape and KwaZulu-Natal.
Evidence accepted: registered branch offices, lease agreements or municipal/utility accounts per province, and/or signed sub-contractor or partnership agreements stating the provinces covered, the scope of work and the duration.
Failure means the bid is declared unresponsive and is not evaluated further.
Stage 2 — Functionality (100 points, minimum qualifying score 75)
Company profile: 30 points. Five or more years' relevant experience plus five or more SETA/QCTO projects = 30; four years/four projects = 20; three/three = 15; two/two = 10; one/one = 5; none = 0. The profile must table the client, project start and end dates, and the nature of the work.
Methodology: 30 points. Six elements — end-to-end approval process, application review, site visit protocol, reporting, remediation tracking, monitoring visit. All six = 30; five = 25; four = 20; three = 15; two = 10; one = 5; none = 0.
Project team: 25 points. CVs of three or more auditors/assessors. Experience component (15): three with three or more years' site visit experience = 15; two = 10; one = 5; none = 0. Registration component (10): three registered with a SETA, QCTO or equivalent body = 10; two = 5; one = 2; none = 0.
Reference letters: 15 points. Five signed, dated, contactable letters on client letterhead from different clients for QCTO-aligned site visit work = 15; four = 10; three = 8; two = 6; one = 4; none = 0. Where sub-contracting, the main bidder's own letters must be supplied.
Bidders scoring below 75 are not evaluated on price and specific goals.
Stage 3 — Price and specific goals (80/20)
Price: 80 points.
Specific goals: 20 points — at least 51% owned by historically disadvantaged persons = 10; at least 51% owned by historically disadvantaged women = 5; at least 51% owned by historically disadvantaged youth = 5. Enterprises not owned by historically disadvantaged persons score 0.
Highest total points wins.
Specific-goal claims require CIPC documents, a shareholding certificate showing each director's percentage, and certified director identity copies not older than six months; without them the points are not claimed.
Technical Specifications
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf (RFQ)
Purpose
Appoint a service provider to run MICT SETA's workplace approval process for occupational qualifications: desktop compliance assessment, physical and virtual site visits, compliance audits, monitoring visits and related reporting.
Covers all MICT SETA occupational qualifications across all provinces in which it operates.
Coverage required (six provinces)
Gauteng — Head Office, Midrand: Block 2, Level 3 West Wing, Gallagher House, 19 Richards Drive
Eastern Cape — East London: 12 Esplanade, Quigney, East London, 5201
Western Cape — Cape Town: The Boulevard Office Park, Block F, Searle Street, Woodstock
Free State — Bloemfontein: Motheo TVET College, Cnr Goddard Street / O.R. Tambo
North West — Klerksdorp: Vuselela TVET College, Jouberton Centre for Engineering Studies
Scope of services
Application processing: receive and review employer applications and supporting documents; assess completeness and eligibility against the Workplace Approval Policy; issue a compliance report to MICT SETA.
Pre-visit remediation: notify applicants of gaps and allow 10 working days to close them; close the application if the gaps remain.
Site visits: physical and/or virtual, assessing site resources (equipment, practical facilities, internet access, records storage), mentor compliance (qualifications, experience, appointment letters, CVs, 1:10 mentor-to-learner ratio or as specified per qualification), legal compliance (COIDA letter of good standing, OHS declaration and compliance certificate, UIF compliance, EMP201/SDL payment declaration) and workplace suitability (public transport access, sanitation, health and safety).
Attendance: the employer representative and nominated mentor representative must be present during the visit.
Recommendations: Approved, Conditionally Approved or Declined, with motivation, for each workplace.
Remediation tracking: monitor non-compliant applications through the 21-day remediation window.
Database: maintain a register of approved workplaces with the qualification(s) and unique Workplace Approval Number; maintain a Mentor Matrix per workplace (names, years of experience, designation, qualification levels); flag changes in employer status, mentors or compliance.
Monitoring: scheduled and unannounced visits to approved workplaces, at least once a year each, or more often as directed.
Stakeholder work: attend ETQA meetings and stakeholder sessions; deliver employer briefing sessions on the approval process as directed.
Deliverables and deadlines
Inception report: within 10 working days of appointment.
Pre-visit assessment report per application batch: within 5 working days of receiving the batch.
Site visit report per workplace, on the MICT SETA template: within 5 working days of the visit.
Approval recommendation letter per workplace: issued together with the site visit report.
Remediation tracking report per non-compliant application: per 21-day cycle from the inspection date.
Updated workplace approval database: monthly, by the 5th.
Monitoring visit report per approved workplace: annually, or as directed.
Monthly status report: by the 10th of each month.
Quarterly progress report to the ETQA division: within 10 working days after quarter end.
Final close-out report: 30 days before contract expiry.
Methodology
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
The methodology is scored out of 30 and must address six elements: the end-to-end workplace approval process, application review, site visit protocol, reporting, remediation tracking and monitoring visits.
Full marks require all six elements; each missing element costs 5 points, down to 5 points for one element and 0 for none.
Expected delivery sequence: inception report within 10 working days of appointment; pre-visit assessment per application batch within 5 working days of receipt; site visit and recommendation per workplace within 5 working days of the visit; remediation tracking over the 21-day cycle; monthly database update by the 5th; monthly status report by the 10th; quarterly report within 10 working days of quarter end; final close-out report 30 days before expiry.
Site visits may be physical or virtual; the employer representative and nominated mentor representative must attend.
Monitoring visits to approved workplaces must take place at least once a year each, scheduled or unannounced.
Experience & Qualifications
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
Company profile: at least 5 years' experience in quality assurance, compliance auditing or skills development auditing, plus 5 or more completed projects in the SETA/QCTO environment, tabled with client, start and end dates and nature of work.
Project Manager: designated, with at least 5 years in skills development, quality assurance or audit management.
Auditors/assessors: at least three proposed, each with 3 or more years' site visit experience and registration with a SETA, QCTO or equivalent professional body, with industry knowledge in at least one of the five MICT SETA sub-sectors.
Reference letters: at least five, from different clients, signed on client letterhead, dated, contactable, describing QCTO-aligned site visit work. Where sub-contracting, the main bidder's own letters must be submitted.
Geographic: demonstrated national footprint or partnerships covering all six provinces, with own transport or verified access to transport.
Organisational: knowledge of the QCTO Occupational Qualifications Sub-Framework, the Skills Development Act and the MICT SETA Workplace Approval Policy, and capacity to run high volumes across provinces simultaneously.
Quality Management
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
A defined quality management system covering site visit and reporting processes is a stated requirement.
All site visit reports must use MICT SETA's prescribed templates and be submitted within 5 working days of the visit.
Each assessment must produce a written recommendation — Approved, Conditionally Approved or Declined — with motivation, issued together with the site visit report.
Non-compliant applications are tracked through a 21-day remediation window, with a tracking report per cycle.
Consolidated monthly status reports are due by the 10th of each month; quarterly progress reports go to the ETQA division within 10 working days after quarter end.
The service provider must keep an up-to-date register of approved workplaces and a Mentor Matrix per workplace, and must alert MICT SETA to changes in employer status, mentors or compliance.
Employer and learner information must be handled confidentially and securely in line with POPIA.
Pricing Schedule
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
Quote a unit rate against 12 line items, with sub-total, VAT at 15% and total including VAT.
Items: pre-visit application assessment per application; physical site visit local (same city as a MICT SETA office) per visit; physical site visit out-of-area within province per visit; virtual site visit per visit; workplace approval recommendation report per workplace; remediation tracking and follow-up per application; monitoring visit per workplace per annum; monthly status report; quarterly progress report; database management and maintenance per month; stakeholder engagement or briefing session per session; final close-out report once-off.
An additional cost breakdown may be provided under each line item.
Prices must remain binding for 90 days from the closing date.
Bidders must indicate the delivery period after order receipt, whether the delivery period is fixed, whether prices are fixed, and whether the quote is strictly to specification.
Delivery address on the schedule: MICT SETA Head Office, Level 3 West Wing, Gallagher House, 19 Richards Drive, Halfway House, Midrand.
Financial Requirements
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf (RFQ)
Pricing
Quote against the 12-line pricing schedule at a unit rate per item, showing sub-total, VAT at 15% and total including VAT.
Line items: pre-visit application assessment per application; physical site visit local (same city as a MICT SETA office) per visit; physical site visit out-of-area within province per visit; virtual site visit per visit; workplace approval recommendation report per workplace; remediation tracking and follow-up per application; monitoring visit per workplace per annum; monthly status report; quarterly progress report; database management and maintenance per month; stakeholder engagement or briefing session per session; final close-out report once-off.
A further cost breakdown may be provided under each line item.
Prices must remain binding for 90 days from the closing date.
Bidders must state the delivery period after order receipt, whether the delivery period is fixed, whether prices are fixed, and whether the quote is strictly to specification.
VAT: 15%.
No bid security, performance guarantee or retention is stated.
All costs of preparing and submitting a quote are for the bidder's account.
Compliance Requirements
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf (RFQ)
Registration and tax
CSD registration with National Treasury is required before submission; a CSD registration report must be included.
Valid tax clearance certificate, or SARS proof of application, or a SARS-issued verification PIN.
Ownership and statutory documents
CIPC document and a valid shareholding certificate showing each director's percentage shareholding.
Certified copies of directors' identity documents, not older than six months.
Mandatory footprint (Stage 1)
Proof of presence in all six provinces: registered branch offices, lease agreements or municipal/utility accounts, and/or signed sub-contractor or partnership agreements stating the provinces covered, scope of work and duration.
Bidders without this proof are declared unresponsive.
Capability requirements
Track record in quality assurance auditing, skills development or compliance work in the South African skills development environment.
Knowledge of the QCTO Occupational Qualifications Sub-Framework, the Skills Development Act and the MICT SETA Workplace Approval Policy.
A defined quality management system for site visits and reporting.
Capacity to handle high application and visit volumes across provinces simultaneously.
Designated Project Manager with at least 5 years in skills development, quality assurance or audit management.
Auditors/assessors with industry knowledge in at least one of the five sub-sectors, registered as assessors or moderators with a SETA or QCTO-aligned body, or holding equivalent credentials.
Own transport or verified access to transport for site visits.
Records system able to maintain the workplace database and mentor matrices.
POPIA-compliant handling of employer and learner information.
Preference
Specific goals are claimed on SBD 6.1, supported by CIPC documents, a shareholding certificate and certified director identity copies.
Health & Safety
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
Health and safety compliance forms part of every workplace assessment: the service provider must verify the employer's OHS declaration and compliance certificate, COIDA letter of good standing, UIF compliance and EMP201/SDL payment declaration.
Workplace suitability assessment covers sanitation, health and safety compliance and access to public transport.
Contractual Terms
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
Duration: 12 months from the date both parties sign the Service Level Agreement.
Extension: MICT SETA may extend by a further 12 months, subject to satisfactory performance, mutual agreement and applicable supply chain management regulations.
No binding contract arises until a formal contract or letter of intent is signed.
MICT SETA may decline any or all quotes, negotiate with preferred bidders, seek clarification from one bidder without informing others, award to more than one bidder, accept part of a quote, withdraw or cancel the RFQ at any stage, and select on best overall benefit rather than lowest price.
Bidders carry all costs of preparing and submitting a quote.
The National Treasury General Conditions of Contract govern the appointment.
Section
Source: RFQ-MICT-91-2026 - WORKPLACE SITE VISITS.pdf
Three-stage evaluation
Stage 1 mandatory: proof of operational footprint in all six provinces; failure means the bid is declared unresponsive.
Stage 2 functionality: 100 points, minimum qualifying score 75. Weighting — company profile 30, methodology 30, project team 25, reference letters 15.
Stage 3 price and specific goals: 80/20 preference point system under the Preferential Procurement Regulations 2022 — 80 for price and 20 for specific goals (historically disadvantaged persons 10, historically disadvantaged women 5, historically disadvantaged youth 5).
Award goes to the bidder with the highest total points.
Bidders who do not submit CIPC and director identity proof score zero on specific goals.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Gallagher Ave, Halfway House, Midrand, 1685, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
17 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.