Works description: Construction of new ablution facilities at Mfundisweni Senior Secondary School.
Site: the existing school premises.
Contract form: JBCC Series Edition 4.1, March 2005, with JBCC Series 2000 Preliminaries, as amended.
Bills of Quantities measured in accordance with the Standard System of Measuring Building Work, Seventh Edition.
General Preambles for Trades 2017 apply, with supplementary preambles taking precedence.
Contractor to provide all temporary works, including water, electricity, telecommunications, and ablution facilities on site.
Contractor to provide a 4 x 3 m site office with concrete floor, lockable, with tables and chairs.
Contractor to provide a lockable storage container with concrete or steel floor.
Contractor to erect and maintain hoardings, safety screens, barriers, and access gates for public protection.
Contractor to provide one main notice board.
As-built drawings: three full sets to be submitted within 14 days after practical completion.
Site instruction book and daily record book to be maintained on site.
Weekly labour and plant records to be submitted to the principal agent.
Method statement to be produced when required by the principal agent.