Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
DRYDOCK DURBAN - Durban - Durban - 4001
Organization Type
GOVERNMENT
Published
14 Aug 2026
OCDS Reference
ocds-9t57fa-165699
Concrete repairs inside a drydock at the port of durban for a six-month contract. Bidders must comply with transnet's extensive environmental management specifications, including appointing a qualified environmental officer and obtaining a site access certificate before starting work.
Environmental compliance: Bidders must comply with the Contractor Environmental and Sustainability Specification Guidelines (CESSG), the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP), and the Project Environmental Specification (PES).
Environmental Officer: The contractor must appoint an Environmental Officer (EO) with qualifications and experience acceptable to Transnet; no construction may take place without a duly appointed EO.
Site Access Certificate: The contractor must obtain a Site Access Certificate from the Transnet Project Manager before accessing the site.
Environmental file: The contractor must submit an environmental file for approval by the Transnet Project Environmental Resource (PER), including the EO's CV, site layout plan, method statements, and an activity-based environmental risk assessment.
Environmental induction: All management, workforce, sub-contractors, suppliers, and visitors must attend the Transnet Environmental Induction Programme before starting work.
Waste management: All waste must be classified as general or hazardous, managed according to the waste management hierarchy, and removed to licensed facilities with documented disposal certificates; no burning, burying, or dumping of waste is permitted.
Performance standard: The minimum requirement for all environmental inspections is 90%.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 09 September 2026 - 14:00
Venue
223 Maydon Road, Maydon Wharf, Durban
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
DRYDOCK DURBAN - Durban - Durban - 4001
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFQ Concrete Repairs in the Port of Durban.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
14 Aug
2026
Tender Published
Tender was published
09 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ Concrete Repairs in the Port of Durban.pdf
Transnet National Ports Authority is procuring concrete repairs inside the drydock at the Port of Durban over a six-month contract period under an NEC3 Engineering and Construction Contract. Bidders must be registered with the CIDB at 2CE grade or higher and submit electronically via the Transnet e-Tender Submission Portal.
Annexure C- DRYDOCK STAIRCASE drawing.pdf
The Transnet National Ports Authority is procuring concrete repairs inside the drydock in the Port of Durban for a period of six months. The bidder must provide concrete repairs services, including repair of existing concrete structures, application of epoxy mortar, and pouring of new concrete.
Annexure A- Contractor Health and Safety Specification Guideline.pdf
Concrete repairs inside the drydock at the Port of Durban for a period of six months, issued by Transnet National Ports Authority in KwaZulu-Natal.
Annexure B- Contractor Environment and Sustainability Specifications.pdf
Provision of concrete repairs inside the drydock at the Port of Durban for a period of six months, issued by Transnet National Ports Authority in KwaZulu-Natal. The supplied document is the Transnet Contractor Environmental and Sustainability Specification Guidelines (TRN-IMS-GRP-GDL-014.4, Version 3.0), which sets the minimum environmental management obligations any awarded contractor must meet on site.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 3 033 051
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdfThis document is a Transnet Contractor Health and Safety Specification Guideline, not the full tender pack. It sets the minimum health and safety requirements for all persons working on or visiting Transnet-managed projects, as required by the Construction Regulations 2014, regulation 5(1)(b).
Important Dates
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion and Procurement ......................................................... 32","is_compulsory":false}"}
Contact Information
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ion and Offensive Weapons ........................................................... 46","address":null}
Evaluation Criteria
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdf (unknown)This specification development guideline identifies and encompass the working behaviours and safe
work practices that are expected of all Transnet SOC Ltd employees, Contractors, Consultant,
Visitors and Suppliers, engaged on Transnet managed projects as required by Construction
Regulation of 2014, regulation 5(1)(b).
All contractors and service providers must take careful note of these requirements and must ensure
that adequate provision has been made to ensure compliance.
This Specification development guideline has been compiled to cover a wide range of construction/
work activities and should serve as a guideline for Safety Agents to develop site specific
specifications for construction projects. In order to determine which requirements are applicable,
the contractor must conduct a health and safety risk assessment specific to the project and specific
to the contractor’s scope of work. All applicable requirements must be addressed in the Contractor’s
Health and Safety Management Plan.
This Specification development guideline will be reviewed and updated periodically as and when
necessary) to address and / or include:
The specification development guideline provides the minimum requirements for site specific
specification and should be used as a guide to develop the site specific specification as it is
required by the Construction Regulation of 2014.
This Specification applies to all project sites, and to all persons working on or visiting the Transnet
managed projects. The requirements specified in this document are applicable to the contractor as
well as any sub-contractors, EPCM Contractors, Consultant, Vendors and Visitors that may be
appointed by Transnet as an Employer. It is the contractor’s responsibility to ensure that all sub-
contractors comply fully with all legal requirements as well as the requirements of this health and
safety specification.
Acceptable Risk
A risk that has been reduced to a level that can be tolerated having regard for the applicable legal
requirements and the Health and Safety Policy adopted for the project.
ALARP (As Low As Reasonably Practicable)
The concept of weighing a risk against the sacrifice needed to implement the measures necessary
to avoid the risk. With respect to health and safety, it is assumed that the measures should be
implemented unless it can be shown that the sacrifice is grossly disproportionate to the benefit.
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Applicant (Permit to Work)
A person requesting permission to perform work for which a Permit to Work is required. Applicants
must be authorised (in writing) to receive (or accept) Permits to Work and must be competent to
do so by virtue of their training, experience and knowledge of the area or plant in which the work
is to be performed.
Authorised Person (Permit to Work)
A person (typically a Project employee or an employee of the client) who has been authorised (in
writing) by the nominated project management representative to issue Permits to Work within the
scope of his designation. A person may only be appointed to issue Permits to Work if he has
undergone training and has been assessed and found competent in systems, plant and equipment
operation within the scope of his designation.
Barricade
A temporary structure that is erected as a physical barrier to prevent persons from inadvertently
coming into contact with an identified hazard.
Battering
Sloping the sides of an excavation to a predetermined angle (usually less than the natural angle of
repose) to ensure stability.
Benching
The creation of a series of steps in the sides of an excavation to prevent collapse.
Consequence
The outcome of an event expressed qualitatively or quantitatively.
Contractor
An employer (organisation) or a person who performs ANY work and has entered into a legal
binding business agreement contract to supply a product or provide services to Transnet. This
applies to the Suppliers, Vendors, and Consultants, Service providers or Contractors performing
construction work
NB: A Contractor is an employer in his/her own right
Competent Person
A person who has in respect of the work or task to be performed the required knowledge, training,
experience and as per act cr2014.
Construction Supervisor
A competent person responsible for supervising construction activities on a construction site
Clearance Certificate
A signed declaration by an Isolation Officer that a specified hazardous energy source associated
with a particular system, plant or item of equipment has been isolated in accordance with an
approved Isolation and Lockout Procedure.
Discipline Lock (many locks with a restricted number of identical keys)
Attached at a Lockout Station or at a Local Isolation Point in order to lock out a system, plant or
equipment. A Discipline Lock (e.g. A Low Voltage Electricity Discipline Lock) is owned by an
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Isolation Officer who has been authorised in writing to isolate and lockout a particular hazard (e.g.
Low voltage electricity).
Equipment Lock (many locks with one unique key)
Attached directly to pieces of equipment in order to lock them out. Equipment Locks may only be
used by Isolation Officers who have been authorised in writing to perform isolation and lockout
procedures. The key must have a solid key ring that fits over an Isolation Bar.
Excavation
Any man-made cut, cavity, pit, trench, or depression in the earth's surface formed by removing
rock, sand, soil or other material using tools, machinery, and / or explosives. Tunnels, caissons and
cofferdams are specifically excluded and are not addressed in this standard.
First-Aid Injury (FA)
A first-aid injury is any one time treatment and any follow up visit for observation of minor
scratches, cuts, burns, splinters and the like which do not normally require medical care. Such
treatment is considered to be first aid even if administered or supervised by a medical practitioner.
First aid includes any hands on treatment given by a first aider. (E.g. Band-Aid, washing, cleansing,
pain, relief). The following procedures are generally considered first aid treatment:
conjunction with more serious injuries, consequently injuries requiring these shots may be
recordable for other reasons.
one time administration of oxygen for several minutes.
tweezers or other simple technique.
medication on first visit for any minor injury or discomfort.
Hazard
A source of potential harm in terms of human injury or ill health, or a combination of these.
Hierarchy of Controls
A sequence of control measures, arranged in order of decreasing effectiveness, used to eliminate
or minimise exposure to workplace health and safety hazards:
mechanical aids, barriers, machine guarding, interlocks, extraction, ventilation or insulation.
reduce the exposure of persons to a hazard. This may include the provision of specific training
and supervision.
protect persons from a hazard (i.e. Prevent contact with the hazard).
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Isolation and Lockout Procedure
A plant or equipment-specific procedure that describes the method, and sequence to be followed,
for rendering equipment, plant and systems safe to work on.
Isolation Bar
A device used at a Lockout Station to which anyone is able to attach a Personal Lock making it
impossible for an Isolation Officer to remove the key to the Equipment Locks, thus preventing the
de-isolation of a system, plant or equipment while it is still being worked on. A Discipline Lock must
always be the first lock attached to an Isolation Bar and last to be removed.
Isolation Officer
A person (typically a Project employee or an employee of the client) who has been authorised (in
writing) by the nominated project management representative to perform isolation and lockout
procedures. A person may only be appointed as an Isolation Officer if he has undergone training
and has been assessed and found competent in the isolation and lockout of systems, plant and
equipment within the scope of his designation.
Incident
An event (or a continuous or repetitive series of events) that results or has the potential to result
in a negative impact on people (employees, contractors and visitors), the environment, operational
integrity, assets, community, process, product, legal liability and / or reputation.
Likelihood
A description of probability or frequency, in relation to the chance that an event will occur.
Lost Time Injury (LTI)
Any occurrence that resulted in a permanent disability or time lost from work of one day/shift or
more.
If an employee is injured and cannot return to work in the next shift (will ordinarily miss one whole
shift), and the department brings the employee in to only receive treatment by the Supervisor/
Return to Work Coordinator in that shift, this is still considered an LTI.
Lost Time Injury Frequency Rate (LTIFR) - Number of LTI’s multiplied by 1 million or 200,000 and
divided by labour hours worked.
Light Vehicle
A vehicle that:
Can be licensed and registered for use on a public road;
Has four or more wheels, and seats a maximum of 12 adults (including the driver);
Requires the driver to hold only a standard civil driving licence; and
Does not exceed 4.5 tonnes gross vehicle mass (GVM), which is the maximum loaded mass of
the motor vehicle as specified by:
The vehicle’s manufacturer; or
An approved and accredited automotive engineer, if the vehicle has been modified to the
extent that the manufacturer’s specification is no longer appropriate.
Examples of light vehicles include passenger cars, four-wheel drive vehicles, sports utility vehicles
(SUVs), pick-ups, minibuses, and light trucks.
Any vehicle falling outside of this definition must be considered mobile equipment.
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Medical Treatment Injury (MTI)
A work injury requiring treatment by a Medical Practitioner and which is beyond the scope of normal
first aid including initial treatment given for more serious injuries. The procedure is to be of an
invasive nature (e.g. Stitches, removal of foreign body).
The following procedures are generally considered medical treatment:
Application of sutures (stitches).
Cutting away dead skin (surgical debridement).
Loss of consciousness due to an injury or exposure in the work environment.
Positive X-Ray diagnosis (fractures, broken bones etc.).
Removal of foreign bodies embedded in the eye.
Removal of foreign bodies from the wound by a physician due to the depth of embedment,
size or shape of object or the location wound.
Reaction to a preventative shot administered because of an occupational injury.
Sprains and strains - series (more than one) of hot and cold soaks, use of whirlpools, diathermy
treatment or other professional treatment.
Treatment of infection.
Treatment for second or third degree burns
Use of prescription medications (except a single dose administered on first visit for minor injury
or discomfort.)
Mobile Equipment
A vehicle (wheeled or tracked) that generally requires:
The driver to hold a specific state or civil license; or
The operator to hold a nationally recognized certificate of competency.
Examples of mobile equipment include, but are not limited to, dump trucks, water trucks, graders,
dozers, loaders, excavators, forklifts, tractors, back-actors, bobcats, mobile cranes, tele-handlers,
drill rigs, buses and road-going trucks.
Near Hit
An incident that has occurred that did not result in any injuries, illnesses, environmental or property
damage but had the potential to cause an injury, illness, environmental or property damage.
Personal Lock
A single lock with one unique key controlled by the owner. Used for personal protection.
Regulation
In the context of this guideline, ‘Regulation(s)’ refers to the Construction Regulations, 2014
required by Section 43 of the Occupational Health and Safety Act , published under
Government Notice R 84 in Government Gazette 37305 of February 2014.
Risk
A combination of the likelihood of an occurrence of a hazardous event or exposure and the severity
of injury or ill health that can be caused by the event or exposure.
Risk Assessment
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
A process of evaluating the risk arising from a hazard, taking into account the adequacy of any
existing control measures, and deciding on whether or not the risk is acceptable.
Risk Management
The systematic application of management policies, processes and procedures to identifying
hazards, analysing and evaluating the associated risks, determining whether the risks are
acceptable, and controlling and monitoring the risks on an ongoing basis.
DSTI - Daily Safety Task Instruction
CR – Construction Regulations
EPC - Engineering Procurement and Construction
EPCM - Engineering Procurement and Construction Management
HIRA - Hazard Identification and Risk Assessment
HEALTH AND SAFETY - Integrated Management System
MS - Management System
OHS Act - Occupational Health and Safety Act
SOC - Safety Observation and Conversation
VFL - Visible Felt Leadership
OHS - Occupational Health and Safety
SACPCMP - The South African Council for Project and Construction Management Professions, here
in refer to as they register of Health and Safety Professionals
The contractor must prepare, implement and maintain a project-specific SHE Management Plan.
The plan must be based on the requirements set out in this specification as well as all applicable
legislation. It must cover all activities that will be carried out on the project site(s), from mobilisation
and set-up through to rehabilitation and decommissioning.
The plan must demonstrate the contractor’s commitment to HEALTH AND SAFETY and must, as a
minimum, include the following:
A copy of the contractor’s Health and Safety Policy; in terms of the OHS Act section 7
Procedures concerning Hazard Identification and Risk Assessment, including both
Baseline and Task-Based Risk Assessments;
measures to ensure compliance with these requirements, and measures to ensure that this
information is accessible to relevant personnel;
objectives (and developing associated action plans) to drive continual improvement;
assignment of specific health and safety responsibilities to individuals in accordance with legal
or project requirements, including the appointment of a Project Manager, Health and Safety
Officers, Supervisors, Health and Safety Representatives, and First Aiders;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
ensure that each employee is suitably trained and competent, and procedures must be in place
for identifying training needs and providing the necessary training;
safety, including Safety Observations and Coaching, Toolbox Talks, Daily Safe Task
Instructions, project health and safety meetings, and notice boards;
effective management of health and safety on the project must be developed and maintained,
and processes must be in place for the control of these documents;
requirements (typically contained in Safe Work Procedures) for effectively managing health
and safety risks, particularly critical risks associated with working at heights, confined spaces,
mobile equipment and light vehicles, lifting operations, hazardous chemical substances, etc.;
Emergency Preparedness and Response procedures;
Management of Change – a process must be in place to ensure that health and safety risks
are considered before changes are implemented;
sub-contractors and suppliers with regard to health and safety requirements and performance
(before any contract or purchase order is awarded);
employee exposure to hazardous substances or agents (e.g. Noise, dust, etc.) In order to
determine the effectiveness of control measures;
with regard to incident reporting, recording, investigation and analysis;
corrective actions;
performance reporting, monthly internal audits to assess compliance with the project health
and safety requirements, and daily site health and safety inspections; and
health and safety management efforts.
Prior to mobilisation, the HEALTH AND SAFETY Management Plan must be forwarded electronically,
and as a hard copy, to the nominated project management representative for review. The plan will
be audited for completeness and, if found to be adequate, will be accepted (typically “with
comments”). Work may not commence until the plan has been accepted.
Once the plan has been accepted, the contractor must action and resolve any issues within 30 days
from the start of work.
If the issues requiring corrective action are not resolved within this 30 day period, the contractor
will be required to stop any work related to the outstanding actions until they have been resolved.
Any proposed amendments or revisions to the contractor’s Health and Safety Management Plan
must be submitted to the nominated project management representative for acceptance.
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Should it be identified that the contractor has overlooked a high risk activity, and as a result has
omitted the activity and associated control measures from the Health and Safety Management Plan,
the plan will not be approved.
The contractor must develop, display and communicate a Health and Safety Policy that clearly
states the contractor’s values and objectives for the effective management of health and safety as
required by OHS Act of 1993, 7(3). These values and objectives must be endorsed by the
contractor’s management representatives and must be consistent with those adopted for the
project.
The policy must be signed and dated, and must be reviewed annually.
The policy must commit to:
Compliance with all applicable legal requirements in the TCP regulatory universe;
The effective management of health and safety risks;
The establishment of measurable objectives for improving performance, and the provision of
the necessary resources to meet these objectives;
The prevention of incidents; and
Achieving continual improvement with regard to health and safety performance.
All employees of the contractor as well as the employees of any sub-contractors that may be
appointed by the contractor must be made aware of the policy. This must be done through Health
and Safety Induction Training and Toolbox Talks (refer to Sections 10 and 11).
A copy of the policy must be displayed in each meeting room and on each notice board.
Detailed hazard identification and risk assessment processes must be followed for all work to be
performed as well as for all associated equipment and facilities as required by the Construction
regulation of 2014, regulation 9(1) – (7).
The client will provide a baseline risk assessment informing contractor on the hazards and risks on
site. Contractor must ensure that effective procedures and risk assessment systems are in place to
control hazards and to mitigate risks to levels that are as low as is reasonably practicable.
The risk assessment processes must be applied to:
The full life cycle of the project;
Routine and non-routine activities;
Planned or unplanned changes (refer to Section 15);
All employees, sub-contractors, suppliers and visitors; and
All infrastructure, equipment and materials.
The risk assessment processes and methodologies must be appropriate for the nature and scale of
the risks, and must be implemented by competent persons.
The process of analysing and managing risk must include the following:
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Identifying hazards and determining possible risk scenarios (unwanted events);
Evaluating risks and assigning ratings (classification);
Recording the risk analysis in a risk register;
Managing risks according to their classification (prioritising for action);
Identifying and implementing control measures (through the application of the Hierarchy
of Controls) to ensure that risks are managed to levels that are as low as is reasonably
practicable (ALARP);
Developing action plans for reducing risk levels (where possible);
Verifying the completion of actions;
Re-evaluating the risks and classifications as appropriate; and
Reviewing and updating the risk register.
7.1 Baseline Risk Assessments
Prior to site establishment, the client must conduct a detailed Baseline Risk Assessment identifying
foreseeable hazards and risk scenarios associated with the contractor’s scope of work on the project
site(s) as required by Construction Regulations of 2014, regulation 5(1)(a) . Details concerning
proposed control measures must be included. The risk assessment process must be facilitated by
a competent person who has been appointed in writing and must involve the participation of the
contractor’s site management representatives, supervisory personnel and technical experts (as
required). An attendance register must be completed and retained for reference purpose. The
Baseline Risk Assessment must be reviewed and approved by the Project Health and Safety
Manager and Project Construction Manager.
When carrying out a Baseline Risk Assessment or a Task-Based Risk Assessment (refer to Section
6.2), Hazard (Energy) Types must be specified in accordance with the categorisation detailed in
Table 6-1. Risk scenarios must be described indicating the manner in which a person may come
into contact with, or be exposed to, a specific hazard.
An initial risk rating must be assigned to each risk scenario without taking any control measures
into consideration. Control measures for managing the risks to levels that are as low as is
reasonably practicable must then be identified for implementation on the project, and a residual
risk rating must be assigned to each risk scenario taking the identified control measures into
consideration.
Ratings must be assigned qualitatively using TCP consequence and likelihood scales and descriptors
(i.e. TCP 5x5 qualitative risk matrix). Refer to Tables 6-2, 6-3 and 6-4.
Table 7-1: Hazard (Energy) Types
A Risk Register comprised of all significant risks (i.e. Risks rated as major or catastrophic) identified
for the project will be compiled using the information contained in the project Baseline Risk
Assessment as well as the contractor’s Baseline Risk Assessment. Key control measures for
managing each of these risks will be specified in the register.
For the significant risks in particular, action plans will be developed for reducing the risk levels
(where possible).
The project Risk Register will be reviewed and, if necessary, updated:
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
That result in a change to the risk profile; and
The contractor must ensure that the hazards, risk scenarios and control measures identified in the
contractor’s Baseline and Task-Based Risk Assessments are taken into consideration when
developing, implementing and maintaining the various elements of the contractor’s health and
safety management system for the project (e.g. Competence, training and awareness
requirements).
All persons potentially affected must be made aware of the hazards, risk scenarios and control
measures identified in the contractor’s risk assessments. This must be done through training,
Toolbox Talks, and Daily Safe Task Instructions (refer to Sections 10 and 11).
7.2 Task-Based Risk Assessments
The contractor must carry out detailed project-specific Task-Based Risk Assessments which must
be reviewed and approved by the Client’s Project Health and Safety Manager and Contract Manager
prior to the commencement of any work.
The risk assessment process must be facilitated by a competent person who has been appointed
in writing in terms CR 9 sub regulation (1). The contractor’s site management representatives,
supervisory personnel, technical experts (as required) and workforce personnel directly involved
with the task being examined must participate in the risk assessment process. An attendance
register must be completed and retained.
Please Note: Under no circumstances may a Contractor Health and Safety Officer perform a risk
assessment in isolation. The active participation of all persons referred to above is mandatory.
A Task-Based Risk Assessment must at least:
job or task is to be performed in a logical and sequential manner);
Provide a breakdown of the job or task into specific steps;
Identify the hazards and potential risk scenarios associated with each step;
Include consideration of possible exposure to noise, heat, dust, fumes, vapours, gases,
chemicals, radiation, vibration, ergonomic stressors, or any other occupational health hazard
or stressor;
to levels that are as low as is reasonably practicable; and
residual risk rating (taking the identified control measures into consideration) to each risk
scenario.
A Task-Based Risk Assessment must be reviewed and, if necessary, updated:
On an annual basis (as a minimum);
When changes are made to the associated Work Method Statement; and
Following an incident.
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
7.3 Pre-Task Hazard Assessments
A pre-task hazard assessment must be completed whenever a change is identified while carrying
out an activity. Any deviation from what was discussed during the Daily Safe Task Instruction (prior
to the activity commencing), or anything that was not discussed, constitutes a change.
Before carrying out the particular task that involves the identified change, a few minutes must be
spent identifying the hazards and risks associated with that task as well as suitable control
measures.
The Contractor must comply with the requirements of all applicable legislation as well as Transnet
and project-specific standards and procedures as amended from time to time.
The Contractor must compile and maintain a register of all legal and other requirements applicable
to the work that will be carried out and / or services that will be provided. This register must be
updated regularly to ensure that it remains relevant.
Applicable laws and standards must be appropriately communicated to all employees of the
contractor (as well as the employees of any sub-contractors that may be appointed by the
contractor) through training, Toolbox Talks, and Daily Safe Task Instructions (refer to Sections 10
and 11).
In order to drive continual improvement, the contractor must set project-specific objectives, and
must develop improvement action plans to achieve these objectives. The contractor’s objectives
must be aligned with the objectives set for the project as a whole as required by the Construction
regulations of 2014, regulation 7.
Eliminating hazards, minimising risks, preventing incidents, injuries and illnesses, and ensuring
legal compliance must be the primary considerations for setting objectives.
When setting objectives, consideration must be given to the following:
observations;
Lagging indicators (i.e. Incidents including Near Hits);
Leading practices and lessons learnt; and
Injury frequency rates with due understanding that the goal is “no harm”.
The objectives must be specific and measurable. The improvement action plans must specify the
resources (both human and financial) required to achieve the objectives, the person’s responsible,
and realistic timeframes for completion. The contractor must ensure that adequate resources are
allocated and that progress towards meeting the objectives is monitored regularly.
The objectives and associated improvement action plans must be documented and must be
communicated to all contractor employees. Furthermore, to ensure that the objectives remain
relevant, they must be reviewed on a quarterly basis and whenever significant change has taken
place on the project (i.e. Changes to activities, scope of work, operating conditions, etc.).
Performance reviews must be carried out at quarterly intervals to assess and document
performance against these personal or team objectives.
If a reward or incentive scheme is introduced, it must be designed in such a manner that health
and safety performance is not compromised in order to maximise financial reward.
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
The Contractor must adequately allocate resources, responsibility and accountability to ensure the
effective implementation, maintenance and continual improvement of the contractor’s HEALTH
AND SAFETY management system on the projects required by Construction regulation 0f 2014,
regulation 7(2)(c)
For each role that carries health and safety accountability and / or responsibilities (including
legislative requirements), a role description detailing the accountability and / or responsibilities
must be documented.
All appointments (i.e. the assignment of specific SHE responsibilities to individuals in accordance
with legal or project requirements) must be done in writing. Documented proof of each
appointment (i.e. a signed appointment letter) must be retained.
Contractor should not discharge any legal responsibilities to employees who are not legally
appointed.
The contractor must comply with the requirements of all applicable legislation concerning health
and safety related appointments and delegations for the project.
A Organogram specific to the project must be documented and maintained. All roles that carry
SHE accountability and / or responsibilities must be included, and all individuals that carry health
and safety appointments must be clearly identified.
The provision of dedicated professionals on the project must be appropriate for the nature and
scale of the work to be carried out.
The contractor is solely responsible for carrying out the work under the contract whilst having the
highest regard for the health and safety of all persons on the project site(s).
Health and safety is the responsibility of each and every individual on the project site(s), but in
particular, it is the responsibility of the contractor’s management team who must set the tone.
Visible commitment is essential to providing and maintaining a safe workplace. The contractor’s
managers and supervisors at all levels must demonstrate their commitment and support by
adopting a risk management approach to all health and safety issues. These individuals must
consistently take immediate and firm action to address violations of health and safety rules, and
must actively participate in day to day activities with the objective of preventing harm.
The contractor’s management representatives are responsible and accountable for health and
safety performance on the project. Key responsibilities include the following:
specific to the work that will be carried out (refer to Section 4);
ensure that all work is carried out in compliance with the requirements of this specification,
the contract, and all applicable legislation;
management processes and procedures to ensure that all reasonably foreseeable hazards are
controlled in order to minimise risk (refer to Section 6);
Section 9);
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
health and safety, and that these responsibilities are clearly communicated and understood
(refer to Section 9);
skills and competence (refer to Section 10);
competent personnel are permitted to work on the project site(s) (refer to Section 10);
processes concerning health and safety for the duration of the contract (refer to Section 11);
as the public (refer to Section 13);
procedures (refer to Section 14);
procedures (refer to Section 15);
processes and procedures (refer to Section 18);
procedures (refer to Section 20); and
that the system continues to be effective in managing health and safety performance and
meeting project requirements (refer to Section 21).
All costs associated with meeting these responsibilities shall be borne by the contractor.
Any cost associated with any work stoppage due to non-compliance with a health and safety
requirement shall be for the contractor’s account.
10.1 Contractor Construction Manager
The Contractor must appoint a competent Construction Manager who shall be responsible for the
successful and safe completion of all work to be carried out by the contractor as required by the
Construction regulations of 2014, regulation 8(1).
The contractor’s Project Manager shall be responsible for:
objectives for the effective management of health and safety on the project is in place and is
communicated to all contractor and sub-contractor employees;
complied with at all times;
and implemented for all work to be carried out by the contractor;
establishment);
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
carried out by the contractor;
Driving the achievement of agreed health and safety objectives;
Ensuring that the necessary resources are made available for the effective implementation of
the contractor’s Health and Safety Management Plan;
Ensuring that all work is adequately and competently supervised;
Ensuring that all contractor employees have clearly defined responsibilities with regard to
health and safety (assigned in writing), and that these responsibilities are clearly
communicated and understood;
is competent to perform his role, and has received appropriate workplace health and safety
training and instruction;
Managing all appointed sub-contractors with regard to health and safety performance;
Establishing and maintaining effective communication and consultative processes to ensure
that all contractor and sub-contractor employees are kept up to date with regard to health and
safety information (e.g. Incidents and lessons learnt, leading practices, hazards, risks and
control measures, etc.) And that feedback is provided promptly regarding issues and / or
concerns raised;
Participating in the project’s Visible Felt Leadership (VFL) programme;
Chairing monthly Contractor Health and Safety Meetings and attending monthly Site Health
and Safety Meetings;
for suggestions made by contractor and sub-contractor employees;
Procedures;
transgresses a health and safety rule or requirement;
Ensuring that an effective management of change process is in place;
Implementing, testing and maintaining an effective Emergency Response Plan for all contractor
and sub-contractor activities, and ensuring that the plan is adequately resourced;
substances or agents is measured and monitored to determine the effectiveness of controls
and compliance with legal (and project) requirements;
Ensuring that all incidents are reported without delay and are investigated thoroughly;
Participating in investigations into significant incidents;
Ensuring that accurate health and safety statistics are maintained, and that health and safety
performance reports are compiled as required;
conducted, and supporting the auditing process;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Are implemented, and that adequate resources are provided for this purpose; and
10.2 Contractor Health and Safety Officers
The contractor must appoint a full-time Health and Safety Officer for the duration of the contract
who is registered with the SACPCMP (The South African Council for Project Construction
Management Professions). The project site(s) (directly or through sub-contractors), must at least
appoint two full-time Health and Safety Officers depending on the scope, complexity, budget and
high risk activities involved, as required by the Construction regulations of 2014, regulation 7(2)(c).
The Health and Safety Officer must be on site when work commences at the start of the day and
must remain on site until all activities for that day (including the activities of sub-contractors) have
been completed. A Health and Safety Officer must be present during all shifts, so if work is carried
out over more than one shift per day, the contractor must make provision for an additional Health
and Safety Officer.
Each Contractor Health and Safety Officer shall be responsible for:
guidance to contractor and sub-contractor personnel (particularly the contractor’s Project
Manager) to help ensure compliance at all times;
processes for all work to be carried out by the contractor;
establishment) and ensuring that identified control measures are implemented;
the contractor and ensuring that identified control measures are implemented;
personnel;
contractor;
personnel (e.g. Incidents and lessons learnt, leading practices, hazards, risks and control
measures, etc.);
Carrying out Safety Observations and Coaching (one per day);
Evaluating (on a daily basis) the content of the Daily Safe Task Instructions (DSTI’s) conducted
by the contractor’s appointed supervisors, and attending at least one DSTI each day;
Attending monthly Contractor and Site Health and Safety Meetings;
Assisting with the implementation of the contractor’s Health and Safety Management Plan and
associated Safe Work Procedures;
Carrying out Planned Task Observations on an ad hoc basis;
Assisting with the implementation, testing and maintenance of an effective Emergency
Response Plan for all contractor and sub-contractor activities;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Participating in incident investigations;
Maintaining accurate health and safety statistics (for the contractor and all sub-contractors),
and compiling health and safety performance reports as required;
and each sub-contractor on a monthly basis to assess compliance with the project health and
safety requirements; and
investigations, audits, inspections, etc.).
The contractor must ensure that each Health and Safety Officer is adequately equipped to enable
him to perform his duties effectively. Each Health and Safety Officer must be provided with the
following:
A computer with access to all necessary systems, including access to e-mail and the internet;
A mobile telephone on contract or with adequate pre-paid airtime; and
A vehicle where required or instructed by a nominated project management representative
(depending on the size and location of the project site(s)).
A Health and Safety Officer must over and above the SACPCMP registration as an Officer; be
computer literate, fluent in English, and must have the following minimum qualifications, training
and experience:
At least 5 years’ experience as a Health and Safety Officer on construction projects;
SAMTRAC,NEBOSH or an equivalent training course with accredited health and safety service
provider as a minimum qualification ;
safety management system compliant with national legislation or an international standard;
and risk management processes;
and causation analysis;
Health and safety auditing experience and training;
A valid First Aid certificate of competency;
Fire prevention and protection training; and
A valid Driving Licence (light motor vehicle).
Registered as a Health and Safety Officer or Health and Safety Manager with SACPCMP
depending on the size of the project and on the risk.
Before placing a Health and Safety Officer on the project site(s), the contractor must forward a
copy of the person’s CV to the nominated project management representative or to the Programme
Health and Safety manager for review and acceptance. A proposed candidate may be rejected
should he not meet the experience and / or qualification requirements, or due to poor work
performance on previous projects.
10.3 Contractor Supervisors
The contractor must ensure that all project and / or construction works are supervised at all times
by an adequate number of qualified, competent and appointed supervisors who have experience
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
in the type of work being carried out as required by Construction regulations of 2014, regulation
8(7).
No work may be carried out without an appointed supervisor being physically present in the work
area and daily safety task instruction.
Each Contractor Supervisor shall be responsible for:
requirements of all applicable legislation, rules, standards, specifications, plans and
procedures;
Participating in Baseline and Task-Based Risk Assessments;
Ensuring that all employees under his supervision are made aware of the hazards, risk
scenarios and control measures identified in relevant risk assessments;
are implemented fully for all work carried out under his supervision;
necessary;
Driving the achievement of health and safety objectives set for his team;
Ensuring that the necessary written appointments are in place for each employee under his
supervision (e.g. First aider, mobile crane operator, etc.);
Ensuring that all employees under his supervision attend all required training;
Ensuring that no employee carries out any work that he is not competent to perform or has
not been appointed to perform;
Identifying training needs within his team;
Carrying out Safety Observations and Coaching (one per day);
Conducting a weekly Toolbox Talk with his team;
Leading a Daily Safe Task Instruction discussion with his team;
Attending Health and Safety Meetings as required;
Maintaining a Health and Safety Management Information Notice Board in the work area for
which he is responsible;
occupation) of the personnel on site under his supervision (e.g. 5 bricklayers, 2 carpenters, 3
welders, 22 general workers, and 1 supervisor);
are adhered to and are fully implemented;
supervision does not adhere to a rule or requirement;
Carrying out Planned Task Observations (one per day);
Ensuring that emergency response procedures are understood by all employees under his
supervision and that these procedures are followed in the event of an emergency;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
lessons learnt to all employees under his supervision, and implementing corrective actions
where required; and
Each supervisor must accept these responsibilities in writing as part of his appointment.
Each supervisor must be equipped with a mobile telephone to ensure that effective communication
can be maintained for the duration of the contract.
10.4 Health and Safety Representatives
The team of employees on site must have a health and safety representative deployed on the
project site(s), a Health and Safety Representative must be elected and appointed. Taking into
consideration the number of employees deployed, the geographical area in which the work is taking
place, the different work disciplines, and the shift pattern (if applicable), the contractor must ensure
that an adequate number of Health and Safety Representatives (at a minimum ratio of one Health
and Safety Representative per 50 employees) are elected and appointed to effectively represent
all site personnel as required by the OHS Act , section 17 - 18.
Each Health and Safety Representative must attend an accredited training course for health and
safety representatives. The cost of this training shall be for the contractor’s account.
The contractor must make the necessary allowances for the Health and Safety Representatives to
carry out their duties as specified in the applicable legislation.
The contractor must ensure that an appropriate sticker is affixed to the safety helmet of each
Health and Safety Representative for identification purposes.
10.5 First Aiders
If 10 or more employees are deployed on the project site(s), at least one trained and competent
First Aider must be in place and must be appointed. Taking into consideration the number of
employees deployed, the geographical area in which the work is taking place, the different work
disciplines, and the shift pattern (if applicable), the contractor must ensure that an adequate
number of First Aiders (at a minimum ratio of one First Aider per 50 employees) are in place and
have been appointed to administer first aid treatment should this be required.
First Aid training must be done through an accredited training institution. The cost of this training
shall be for the contractor’s account.
The contractor must ensure that an appropriate sticker is affixed to the safety helmet of each First
Aider for identification purposes.
10.6 Duties of Client
As per the Construction regulations of 2014, regulation 5(1) – (8) a client must—
safety specification for the intended construction work based on the baseline risk
assessment contemplated in paragraph
paragraph (b);
consideration during the design stage;
regulation 6;
provision for the cost of health and safety measures;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
competencies and resources to carry out the construction work safely;
by the client to enable each of those contractors to comply with these Regulations;
registered and in good standing with the compensation fund or with a licensed
compensation insurer as contemplated in the Compensation for Occupational
Injuries and Diseases Act, 1993 (Act No. );
construction site;
contractor's health and safety plan contemplated in CR regulation 7(1), and must
thereafter finally approve that plan for implementation;
on request to an employee, inspector or contractor;
contemplated in
conducted at intervals mutually agreed upon between the principal contractor and
any contractor, but at least once every 30 days;
(o) is provided to the principal contractor within seven days after the audit;
the ensure that a copy of the health and safety audit report contemplated in
paragraph (o) is provided to the principal contractor within seven days after the
audit;
the health and safety of persons which is not in accordance with the client's health
and safety specifications and the principal contractor's health and safety plan for
the site;
sufficient health and safety information and appropriate resources available to the
principal contractor to execute the work safely; and
kept and maintained by the Principal contractor.
Where a client requires additional work to be performed as a result of a design change or
an error in Construction due to the actions of the client, the client must ensure that
sufficient safety information and appropriate additional resources are available to execute
the required work safely.
Where a fatality or permanent disabling injury occurs on a construction site, the client
must ensure that the contractor provides the provincial director with a report contemplated
in section 24 of the Act, in accordance with regulations 8 and 9 of the General
Administrative Regulations, 2013, and that the report includes the measures that the
contractor intends to implement to ensure a safe construction site as far as is reasonably
practicable.
Where more than one principal contractor is appointed as contemplated in sub-regulation
CR 5(1) (k), the client must take reasonable steps to ensure co-operation between all
principal contactors and Contractors in order to ensure compliance with these Regulations.
Where a construction work permit is required as contemplated in CR 3(1), the client must,
without derogating from his or her health and safety responsibilities or liabilities, appoint
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
a competent person in writing as an agent to act as his or her representative, and where
such an appointment is made the duties that are imposed by these Regulations upon a
client, apply as far as reasonably practicable to the agent so appointed.
Were notification of construction work is required as contemplated in CR regulation 4(1),
the client may, without derogating from his or her health and safety responsibilities or
liabilities, appoint a competent person in writing as an agent to act as his or her
representative, and where such an appointment is made the duties that are imposed by
these Regulations upon a client, apply as far as reasonably practicable to the agent so
appointed: Provided that, where the question arises as to whether an Agent is necessary,
the decision of an inspector is decisive.
An agent contemplated in CR sub-regulations (5) and (6) must—
Manage the health and safety on a construction project for the client; and
Be registered with a statutory body approved by the Chief Inspector as qualified to perform
the required functions;
When the chief inspector has approved a statutory body as contemplated in CR sub-
regulation (7) (b), he or she must give notice of that approval in the Gazette.
10.7 Duties of the Designer
As per the Construction regulations of 2014, regulation 6(1) – (2) a designer must –
under section 44 of the Act are compiled within the design;
that may affect the pricing of the construction work;
to the construction work, and make available all relevant information required for
the safe execution of the work upon being designed or when the design is
subsequently altered;
relating to any subsequent maintenance of the relevant structure and must make
provision in the design for that work to be performed to minimize the risk;
appropriate stages to verify that the construction of the relevant structure is carried
out in accordance with his design: Provided that if the designer is not so mandated,
the client’s appointed agent in this regard is responsible to carry out such
inspections;
is not in accordance with the relevant design’s health and safety aspects: Provided
that if the designer is not so mandated, the client’s appointed agent in that regard
must stop that contractor from executing that construction work;
accordance with the National Building Regulations, include the health and safety
aspects of the structure as far as reasonably practicable, declare the structure safe
for use, and issue a completion certificate to the client and a copy thereof to the
contractor; and
to minimize ergonomic related hazards in all phases of the life cycle of a
structure.
The designer of temporary works must ensure that -
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
supporting all anticipated vertical and lateral loads that may be applied;
design drawings issued by the contractor, and in the event of any uncertainty
consult the contractor;
kept at the office of the temporary works designer and are made available on
request by an inspector; and
indicated in the design.
10.8 Duties of Principal Contractor
As per the Construction regulations of 2014, regulation 7(1) – (8) a Principal Contractor
and Contractor must
coherent site specific health and safety plan, based on the client's documented health
and safety specifications contemplated in CR 5(1)(b), which plan must be applied
from the date of commencement of and for the duration of the construction work and
which must be reviewed and updated by the principal contractor as work progresses;
required in terms of the Act and these Regulations, which must be made available on
request to an inspector, the client, the client’s agent or a contractor; and
of the Act-
contractor, with the relevant sections of the health and safety specifications
contemplated in CR regulation 5(1)(b) pertaining to the construction work which has
to be performed;
for health and safety measures during the construction process;
principal contractor is reasonably satisfied that the contractor that he or she intends
to appoint, has the necessary competencies and resources to perform the
construction work safely;
in good standing with the compensation fund or with a licensed compensation insurer
as contemplated in the Compensation for Occupational Injuries and Diseases Act,
1993;
(a),
(2)(a), is available on request to an employee, an inspector, a contractor, the client
or the client's agent;
construction work and must, in addition to the documentation referred to in CR 7 sub-
regulation (2)(b), include a record of all drawings, designs, materials used and other
similar information concerning the completed structure;
paragraph (c)(v) and CR 7 sub-regulation (2)(b), include and make available a
comprehensive and updated list of all the contractors on site accountable to the
principal contractor, the agreements between the parties and the type of work being
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
principal contractor, the agreements between the parties and the type of work being
done; and
to the Construction work to be performed and issued by an occupational health
practitioner in the form of Annexure 3.
10.9 Duties of Contractor
A contractor must -
contractor a suitable and sufficiently documented health and safety plan, based on
the relevant sections of the client's health and safety specification) and provided by
the principal contractor), which plan must be applied from the date of commencement
of and for the duration of the construction work and which must be reviewed and
updated by the contractor as work progresses;
required and must be made available on request to an inspector, the client, the
client’s agent or the principal contractor;
satisfied that the contractor that he or she intends to appoint has the necessary
competencies and resources to perform the construction work safely;
to comply with the provisions of the Act; and
information which might affect the health and safety of any person at work carrying
out construction work on the site, any person who might be affected by the work of
such a person at work, or which might justify a review of the health and safety plan.
Where a contractor appoints another contractor to perform construction work, the duties
that apply to the principal contractor apply to the contractor as if he or she were the
principal contractor.
A contractor must take reasonable steps to ensure co-operation between all contractors
appointed by the principal contractor to enable each of those contractors to comply with
these Regulations.
No contractor may allow or permit any employee or person to enter any site, unless that
employee or person has undergone health and safety induction training pertaining to the
hazards prevalent on the site at the time of entry.
A contractor must ensure that all visitors to a construction site undergo health and A
contractor must ensure that all visitors to a construction site undergo health and safety
induction pertaining to the hazards prevalent on the site and must ensure that such
visitors have the necessary personal protective equipment.
A contractor must at all times keep on his or her construction site records of the health
and safety induction training and such records must be made available on request to an
inspector, the client, the client’s agent or the principal contractor;.
A contractor must ensure that all his or her employees have a valid medical certificate of
fitness specific to the construction work to be performed and issued by an occupational
health practitioner in the form of Annexure 3.
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
10.10 Management and supervision of Construction work
A principal contractor must in writing appoint one full-time competent person as the
construction manager with the duty of managing all the construction work on a single
site, including the duty of ensuring occupational health and safety compliance, and in the
absence of the construction manager an alternate must be appointed by the principal
contractor.
A principal contractor must upon having considered the size of the project, in writing
appoint one or more assistant construction managers for different sections thereof:
Provided that the designation of any such person does not relieve the construction
manager of any personal accountability for failing in his or her management duties in
terms of this regulation.
Where the construction manager has not appointed assistant construction managers as
in the opinion of an inspector, a sufficient number of such assistant construction
managers have not been appointed, that inspector must direct the construction manager
in writing to appoint the number of assistant construction managers indicated by the
inspector,
No construction manager appointed may manage any construction work on or in any
construction site other than the site in respect of which he or she has been appointed.
A contractor must, after consultation with the client and having considered the size of
the project, the degree of danger likely to be encountered or the accumulation of hazards
or risks on the site, appoint a full-time or part-time construction health and safety officer
in writing to assist in the control of all health and safety related aspects on the site:
Provided that, where the question arises as to whether a construction health and safety
officer is necessary, the decision of an inspector is decisive.
No contractor may appoint a construction health and safety officer to assist in the control
of health and safety related aspects on the site unless he or she is reasonably satisfied
that the construction health and safety officer that he or she intends to appoint is
registered with a statutory body approved by the Chief Inspector and has necessary
competencies and resources to assist the contractor
A construction manager must in writing appoint construction supervisors responsible for
construction activities and ensuring occupational health and safety compliance on the
construction site.
A contractor must, upon having considered the size of the project, in writing appoint one
or more competent employees for different sections thereof to assist the construction
supervisor and every such employee has, to the extent clearly defined by the contractor
in the letter of appointment, the same duties as the construction supervisor: Provided
that the designation of any such employee does not relieve the construction supervisor
of any personal accountability for failing in his or her supervisory duties in terms of this
regulation.
No construction supervisor appointed under may supervise any construction work on or
in any construction site other than the site in respect of which he or she has been
appointed: Provided that if a sufficient number of competent employees have been
appropriately designated on all the relevant construction sites, the appointed construction
supervisor may supervise more than one site.
10.11 Construction Health and Safety Agent
A Construction Health and Safety Agent, based on their experience, knowledge and
capabilities, as prescribed in the registration requirements for the Construction Health
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
and Safety Agent. A person will obtain registration once they have submitted the
required documentation and met the registration criteria in full.
Construction Health and Safety Agent an applicant must provide proof of:
construction experience
interview
A Construction Health and Safety Agent is required to comply with the Continuing
Professional Development (CPD) Policy Framework. A Construction Health and Safety
Agent shall be expected to demonstrate detailed knowledge of health and safety
requirements at all levels, with the capability to design, compile, implement and manage
the health and safety requirements for a construction project from Initiation and Briefing
to Project Close-out. A Construction Health and Safety Agent shall also be required to
show ability to mentor, coach and guide Construction Health and Safety Managers and
Construction Health and Safety Officers.
Construction project health and safety management systems.
A Construction Health and Safety Agent is expected to be experienced and
knowledgeable in:
a construction project
and risk management on a construction project
a construction project
system
10.12 Operational legal appointment letters
The contractor must ensure other legal appointment letter are compiled and be submitted
with the Contractor compliance plan, below is some appointment required as per the legislation,
the appointment letters varies based on the project;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Electrician (Inspector)
The safety agent, must be involved in all stages of project management and take
charge of all the health and safety related matters.
11.1 Stage 1 – Project Initiation and Briefing
The deliverables at this stage shall include agreeing client requirements and
preferences, assessing user needs and options, appointment of necessary
consultants in establishing project brief, objections, priorities, constraints,
assumptions and strategies in consultation with client.
Standard Services:
resource;
investigations where such information will be required for the next stage of the
project;
resources of the other consultants
project to the other consultants;
11.2 Stage 2 – Concept and Feasibility
Finalisation of the project concept and feasibility.
Standard Services:
consultants
and safety in conjunction with the other consultants;
TRN-IMS-GRP-GDL-014.3 Version 2.0 of 157
Contractor Management Procedure
©Transnet SOC Ltd
Methodology
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdfRisk assessments and associated Work Method Statements must be reviewed on an annual basis as a minimum, when changes are made to the Work Method Statement, and following an incident.
Experience & Qualifications
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdfPersons appointed to receive or accept Permits to Work must be authorised in writing and competent by virtue of training, experience and knowledge of the area or plant. Authorised Persons issuing Permits to Work must have undergone training and been assessed competent in systems, plant and equipment operation within their designation.
Contractor Supervisors must be qualified, competent and appointed, with relevant experience. Health and safety personnel must hold recognised and appropriate health and safety qualifications, relevant construction experience, and registration with SACPCMP (South African Council for the Project and Construction Management Professions). A contractor may be replaced if he does not meet experience or qualification requirements, or due to poor work performance on previous projects.
Quality Management
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdfThe contractor must prepare, implement and maintain a project-specific SHE Management Plan covering all activities from mobilisation to decommissioning. The plan must include:
The plan must be submitted electronically and as a hard copy to the nominated project management representative before mobilisation. Work may not commence until the plan is accepted. Issues must be resolved within 30 days of starting work; unresolved issues may stop work. Amendments require acceptance. If a high-risk activity is omitted, the plan will not be approved.
Compliance Requirements
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdf (unknown)completion certificate to the client and a copy thereof to the
appointment letters
appointment letter) must be retained
appointment letter are compiled and be submitted
appointment letters varies based on the project
Health & Safety
Source: Annexure A- Contractor Health and Safety Specification Guideline.pdfThe contractor must develop, display and communicate a Health and Safety Policy as required by the OHS Act, section 7(3). The policy must be signed, dated, reviewed annually, and commit to legal compliance, effective risk management, measurable objectives, incident prevention and continual improvement. All employees and sub-contractors must be made aware of it through induction and toolbox talks. Copies must be displayed in meeting rooms and on notice boards.
Detailed hazard identification and risk assessment processes must be followed for all work, equipment and facilities as required by the Construction Regulations 2014, regulation 9(1)-(7). The client will provide a baseline risk assessment; the contractor must implement effective risk assessment systems to control hazards to levels as low as reasonably practicable (ALARP). The process must cover the full project life cycle, routine and non-routine activities, planned or unplanned changes, all personnel, and all infrastructure. Risk assessments must be conducted by competent persons and include hazard identification, risk evaluation, control measures, action plans and regular review.
Prior to site establishment, the client must conduct a detailed Baseline Risk Assessment identifying foreseeable hazards and risk scenarios, facilitated by a competent person appointed in writing, with participation of contractor site management. The assessment must be reviewed and approved by the Project Health and Safety Manager and Project Construction Manager. Hazard types must be specified, initial and residual risk ratings assigned using a 5x5 qualitative risk matrix, and a Risk Register compiled for significant risks. The register must be reviewed quarterly, upon design or scope changes, and after incidents.
Important Dates
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)Compulsory briefing: 26 August 2026 at 10:00, at 223 Maydon Road, Maydon Wharf, Durban. Attendance is mandatory; latecomers will not have information repeated, and failure to attend disqualifies the bid. The briefing lasts approximately 2 hours. Site walk follows the briefing; PPE required (safety shoes, goggles, long sleeve shirts, high visibility vests, hard hats) and breathalyser testing applies. Closing: 09 September 2026 at 14:00 (electronic submission). Tender validity: 12 weeks from closing date.
Contact Information
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)Employer's Agent: Lwanda Mdontswa, Procurement Officer, 237 Mahatma Gandhi Road, Queens Warehouse. Email: [email protected]. Tender documents are downloadable from National Treasury eTender Portal (www.etenders.gov.za) and Transnet eTenders (https://transnetetenders.azurewebsites.net, use Google Chrome).
Submission Guidelines
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)Submission is electronic only via the Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net). Bidders must register a company profile, log an intent to bid, and upload bid documents against the tender. Each upload is limited to 30MB; multiple uploads are permitted. Bids must be uploaded timeously — Transnet recommends at least a day before closing to avoid internet or bandwidth issues; late submissions are not accepted. Telephonic, telegraphic, facsimile or e-mailed offers are not accepted. Bids must not be submitted through another company's profile; each bidder must use its own registered profile. Joint ventures may submit through one partner's profile. Documents must be in English and marked with the tender number, description, and bidder details. Returnable documents include: T2.2-01 Certificate of Attendance (signed at the compulsory briefing), T2.2-02 CIDB Registration, T2.2-03 Authority to Submit Tender, T2.2-04 Record of Addenda, T2.2-05 Letter of Good Standing (Workmen's Compensation Fund), T2.2-06 Schedule of Proposed Subcontractors, T2.2-07 Site Establishment Requirements, T2.2-08 Compulsory Enterprise Questionnaire (including SBD 4 and SBD 6.1), T2.2-09 Non-Disclosure Agreement, T2.2-10 RFQ Declaration, T2.2-11 RFQ Breach of Law, T2.2-12 Certificate of Acquaintance with Tender Document, T2.2-13 Service Provider Integrity Pact, T2.2-14 Supplier Code of Conduct, T2.2-15 Three years' audited financial statements, Form of Offer and Acceptance, Contract Data, Forms of Securities, Pricing Instructions, and the Bill of Quantities. The BOQ must be priced in full; failure to complete it may lead to disqualification. The Form of Offer and Acceptance must be completed in full and signed. No alternative tender offers will be considered.
Evaluation Criteria
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)Evaluation follows three stages. Stage One: administrative and substantive responsiveness — bid lodged on time, all returnables completed and returned, documents valid and signed, priced BOQ submitted, Form of Offer and Acceptance signed, and material compliance with scope. Stage Two: attendance at the compulsory clarification meeting by an authorised representative (or JV representative). Stage Three: CIDB registration at 2CE or higher. Only responsive tenders are evaluated under the 80/20 preference points system (applicable where the tender value is R50 million or less, all taxes included). Price and total cost of ownership score 80 points; specific goals score 20 points. Specific goals and points: B-BBEE Status contributor (Level 1 or 2) — 10 points; 30% Black Women Owned Entities — 5 points; EME or QSE 51% Black Owned — 5 points. Non-compliant or B-BBEE Level 3-8 contributors score 0. Evidence required: B-BBEE certificate, sworn affidavit, or B-BBEE CIPC certificate (consolidated scorecard accepted for JVs); certified ID copies of owners for Black Women Owned. Bidders without verification score zero for preferencing. Transnet may conduct an independent audit of scorecard components at any stage. Transnet may award to the highest scoring tenderer unless objective criteria justify otherwise, and may conduct a due diligence exercise.
Technical Specifications
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)Scope: provision of concrete repairs inside drydock in the Port of Durban for a period of six (6) months. The contract is an NEC3 Engineering and Construction Contract. Works Information and Site Information are provided in the tender documents. Bidders must complete the Bill of Quantities in full. Site establishment requirements must be indicated (T2.2-07). Subcontracting details must be provided (T2.2-06).
Financial Requirements
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)Pricing: Bill of Quantities must be priced in full; failure to complete may result in disqualification. Pricing instructions are provided (C2.1). Tenderers must submit three (3) years of audited financial statements (T2.2-15). Transnet may request audited financial statements or other documentation for due diligence. Transnet may perform a risk analysis on the preferred tenderer, including unduly high or low tendered rates. Transnet is not liable for preparatory costs. The 80/20 preference point system applies, indicating the estimated value does not exceed R50 million (all taxes included).
Compliance Requirements
Source: RFQ Concrete Repairs in the Port of Durban.pdf (RFQ)CIDB: registration at 2CE or higher class of construction work is required for eligibility. Joint ventures: every member must be CIDB registered; the lead partner must have a grading not lower than one level below the required class; combined grading must meet the requirement. A certified copy of the signed JV agreement must be provided; if incorporated, the Memorandum of Incorporation within 4 weeks of contract date. CSD: registration on National Treasury's Central Supplier Database is required; provide supplier number and unique registration reference. SARS: valid Tax Clearance Certificate and TCS PIN. B-BBEE: valid certificate from a SANAS-accredited verification agency, or sworn affidavit for EMEs/QSEs with 51% or more Black ownership. Workmen's Compensation Fund: Letter of Good Standing (or separate letters for each JV member). SBD 4 (Declaration of Interest) and SBD 6.1 (Preference Points Claim) are required as part of the Compulsory Enterprise Questionnaire. Bidders must not be listed on the Register of Tender Defaulters (Prevention and Combating of Corrupt Activities Act) or Transnet's restricted list. Bidders must disclose any serious breach of law in the past 5 years (T2.2-11).
Description
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdfStaircase flights 1, 2 and 3: construction of new concrete stair with stainless steel handrails, including dowel bars, blockwork, and structural repairs. Drawings show dimensions, reinforcement schedules, and details for handrails and concrete pours.
Contact Information
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdf (unknown){"name":"MR. MR.S","email":null,"phone":null,"department":"PRIVATE","address":null}
Evaluation Criteria
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdf (unknown)CSD registration, tax clearance (SARS TCS / tax pin), CIDB grading (construction), local content percentages
Technical Specifications
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdf (unknown)Scope: concrete repairs inside the drydock in the Port of Durban, including construction of new concrete staircases (flights 1, 2 and 3) with stainless steel handrails, dowel bars, blockwork and structural repairs.
Materials and standards:
Construction requirements:
Methodology
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdf (unknown)Construction notes: wet concrete surfaces before pouring, repair structural cracks with epoxy mortar, apply epoxy to cover voids, roughen existing concrete interface, chemically anchor dowel bars into existing concrete, and ensure dimensions are verified before construction.
Quality Management
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdf (unknown)Concrete must comply with SANS standards, be tested (cubes) at 7 and 28 days, achieve characteristic strength of 25 MPa (or 450 MPa for steel). Stainless steel must be grade 316L, passivated, and welds must be tested and comply with SANS 10100. All work must adhere to project specifications and be inspected by the engineer.
Compliance Requirements
Source: Annexure C- DRYDOCK STAIRCASE drawing.pdf (unknown)No specific requirements found
Description
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfThis document sets the minimum environmental management requirements for contractors working on Transnet SOC Ltd sites. It must be read with the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP). It applies to all contractors working on site under Transnet's authority.
Important Dates
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdf (TENDER){"closingDate":"01 July 2023","briefingSession":"{"date":null,"time":null,"venue":"est amendments and/or additions are reflected in italics in the body of the document.","is_compulsory":false}"}
Evaluation Criteria
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdf (TENDER)The supplied document does not state CIDB grading, B-BBEE level, CSD registration, SARS tax status, CIPC registration, professional-body registrations, local-content thresholds, financial-turnover thresholds, evaluation split (80/20 or 90/10), pricing format, mandatory briefing or site-visit details, named SCM or technical contacts, or the list of returnable forms. The only eligibility-type conditions stated are that the contractor must comply with the Contractor Environmental and Sustainability Specification Guidelines (CESSG), appoint an EO with qualifications and experience acceptable to Transnet, obtain a Site Access Certificate before site entry, and ensure all sub-contractors are bound by the same environmental requirements. Standard National Treasury forms (SBD series) and any tender-specific returnable schedules are not present in the supplied text.
Technical Specifications
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdf (TENDER)This annexure sets the minimum environmental management requirements for contractors working on Transnet sites. It must be read with the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP).
Methodology
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfEnvironmental Method Statements must be approved by the Transnet Construction Manager, PER and Environmental Control Officer (where relevant) before activities commence. Submissions must be made two weeks before the intended start date. All changes to approved method statements must be approved before implementation.
Experience & Qualifications
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfThe contractor's Environmental Officer (EO) must have relevant environmental qualifications and experience appropriate to the complexity of the scope of work and site sensitivity; competency is determined by Transnet during tender. If the EO is replaced, the contractor must submit a CV of an alternative EO with similar or better qualifications for approval by the Transnet PM and PER. No construction may take place without a duly appointed EO.
Quality Management
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfThe standard/minimum requirement for all environmental inspections is 90%. The contractor's EO must conduct inspections of all work areas at intervals agreed with the Transnet PER. The Transnet PER conducts monthly inspections. Environmental inspections and audits use interviews, document review, observations, monitoring, and measurement and verification.
Compliance Requirements
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdf (TENDER)The contractor must comply with the Contractor Environmental and Sustainability Specification Guidelines (CESSG), the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP), and the Project Environmental Specification (PES).
The contractor must appoint an Environmental Officer (EO) with relevant environmental qualifications and experience acceptable to Transnet; the level of competency is determined by Transnet during tender.
The contractor must obtain a Site Access Certificate from the Transnet Project Manager before accessing the site.
All sub-contractors must be bound by the same environmental requirements.
Each hazardous substance used on site must have a valid Safety Data Sheet (SDS) complying with the Occupational Health and Safety Act.
No specific CSD registration, tax clearance, B-BBEE level, CIDB grading, CIPC registration, professional-body registration, or local-content threshold is stated in this document.
Health & Safety
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfEach hazardous substance used on site must have a valid Safety Data Sheet (SDS) complying with the Occupational Health and Safety Act. The contractor must provide adequate sanitary facilities, including toilets, toilet paper and wash basins, serviced regularly with waste disposed at registered facilities. Toilets must be secured, not placed in flood-prone or high-wind areas, and kept clean and hygienic. The contractor must manage dust, noise, fire prevention, and hazardous substances as specified. Mobile refuelling requires secondary containment, absorbent pads or drip trays, a designated competent operator, and fuel tanks filled only to 90% capacity.
Environmental
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfThis document sets the minimum environmental requirements for contractors working on Transnet SOC Ltd sites, including requirements for environmental management plans, environmental officers, waste management, spill response, dust control, water protection, and rehabilitation.
Contractual Terms
Source: Annexure B- Contractor Environment and Sustainability Specifications.pdfEnvironmental non-conformances are treated as defects under the contract; the contractor must correct them within the timeframes specified in the Non-Conformance Report. Transnet may use contractual remedies such as retention moneys to rectify non-conformances. Transnet's approval of method statements or other communication does not indemnify the contractor from achieving required performance levels; the contractor remains responsible for performance.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
14 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-8589[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.