Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Bethal/ Standerton Road - Standerton - Mpumalanga - 2430
Organization Type
GOVERNMENT
Published
26 Aug 2026
OCDS Reference
ocds-9t57fa-166964
ESKOM invites bids for the manufacture, supply, delivery, removal and installation of air heater element packs for three units at tutuka power station in mpumalanga. The tender is an open request for bid with electronic submission only via the ESKOM tender bulletin e-tendering portal. The single most consequential requirement is that bidders must attend any compulsory site visit or clarification meeting stipulated in the tender data; failure to attend results in automatic disqualification.
Closing date and time: 28 September 2026 at 10:00 SAST; submission only via Eskom Tender Bulletin e-tendering portal (no physical tender box deposits).
Compulsory site visit or clarification meeting: details in Tender Data; non-attendance leads to disqualification.
Mandatory returnables: completed Acknowledgement Form (stating whole or part tender), proof of authority to act as agent if applicable, all forms fully completed, valid/current certificates and registrations for entire tender validity period.
Eligibility: must meet Tender Data criteria, not be restricted from doing business with Eskom or State-Owned Companies; 100% sub-contracting of scope of work is prohibited.
Registration and compliance: CSD registration, valid SARS tax pin, valid B-BBEE certificate/affidavit/CSD report (proof at closing if pre-qualification criterion), CIDB registration at required grade (proof at closing, or proof of application with registration by award) where Tender Data stipulates.
SHEQ: proof of safety, health, environmental and quality systems, policies and capabilities to Eskom's satisfaction at closing and/or contract award; all SHEQ costs and personnel reflected in tender.
Pricing: all duties, taxes (including VAT) and levies as applicable 14 days before closing included in rates; prices fixed for contract duration in ZAR unless otherwise stated; security for performance requires naming at least two financial institutions.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 28 September 2026 - 10:00
Venue
Tutuka Conference room
Tenders are to be submitted electronically via ESKOM e-tendering site by the stipulated closing date and time
Categories
Request for Bid(Open-Tender)
Bethal/ Standerton Road - Standerton - Mpumalanga - 2430
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Annex-c_Local content Declaration-Summary Schedule.pdf, Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf, Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
26 Aug
2026
Tender Published
Tender was published
28 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-68099512 Form A_Cat 1_ Rev 9.pdf
Eskom requires the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga.
Authorisation Form - 08 November 2024.pdf
Eskom requires the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender closes on 28 September 2026 at 10:00 UTC.
Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf
Eskom requires a supplier to manufacture, supply, deliver, remove and install air heater element packs for Boilers 1 to 5 at Tutuka Power Station in Mpumalanga. The tender will be evaluated on a technical threshold of 70%, split between supply criteria (workshop capability, reference list, packaging procedure, lead time, quality control) and service criteria (ISO 3834 welding certification, removal/installation experience, key personnel experience, execution schedule, quality control).
Invitation to Tender Air Heater Element Packs.pdf
Eskom Holdings SOC Ltd invites tenders for the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The contract will be based on the NEC3 Engineering and Construction Contract with specific additional conditions.
Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdf
Eskom is procuring the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The scope includes supply of hot end, intermediate and cold end element packs, spacer boxes, U-brackets and safe working platforms, as well as on-site removal of old packs, repair of stator radial and divisional plates, installation of new packs, and welding of U-channels.
OHS Specification - Air Heater Element Packs.pdf
Eskom requires a contractor to manufacture, supply, deliver, remove and install air heater element packs for three units at Tutuka Power Station in Mpumalanga. The work includes design and supply of spacer boxes, safe working platforms, U-brackets, removal of existing packs, inspection and repair of radial and divisional plates, installation of new packs, seal setting, and test runs. The contract is governed by a detailed OHS specification (Template R 32-726-03T 1) effective 17 June 2026.
Annex-c_Local content Declaration-Summary Schedule.pdf
NEC ECC Air Heater Element Packs .pdf
Eskom Holdings SOC Ltd invites tenders for the manufacture, supply, delivery, removal and installation of air heater element packs for three units (Units 1, 4 and 5, left-hand and right-hand) at Tutuka Power Station in Mpumalanga. The contract will be based on the NEC3 Engineering and Construction Contract (April 2013) with main Option A (Priced contract with activity schedule) and multiple secondary options including price adjustment for inflation, sectional completion, delay damages, performance bond, retention, limitation of liability and key performance indicators.
Integrity declaration form.pdf
Eskom requires the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender closes on 28 September 2026 at 10:00 UTC.
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
Annexure L- E-tendering Help Manual for supplier.pdf
Eskom is procuring the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. Submissions must be made electronically via the Eskom eTendering portal.
Annexure D - Integrity Declaration Form - 29 July 2026.pdf
Eskom invites tenders for the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender includes a mandatory Integrity Declaration Form (Annexure D) requiring disclosure of conflicts of interest, fair tendering practices, and shareholding or beneficiary details.
240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf
Eskom requires the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga.
Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf
Eskom requires the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender includes mandatory Safety, Health and Environment (SHE) compliance requirements that the successful bidder and any subcontractors must adhere to throughout the contract period.
Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf
Eskom is procuring the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender includes mandatory Supplier Development, Localisation and Industrialisation (SDL&I) obligations with contractual penalties for non-compliance.
Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training.pdf
Eskom invites tenders for the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender includes a mandatory Reverse E-auction process for which bidders must confirm training completion.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf
This document is Eskom's PAYE Questionnaire for Service Contracts (2026/2027 tax year) used to determine the tax classification of contractors supplying services to Eskom Group companies. It contains Evaluation Pack A for Companies/Close Corporations/Trusts and Evaluation Pack B for Individuals, with a series of tests (residence, employee count, connected persons, income source, place/control/supervision, dominant impression) to classify contractors as Independent Contractors, Personal Service Providers, Labour Brokers, or Dependent Contractors, determining whether PAYE must be withheld.
Annexure J - SBD 4 - Tenderer's Disclosure.pdf
Eskom invites tenders for the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender closes on 28 September 2026 at 10:00 UTC.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom is procuring the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The contract will be governed by Eskom's General Conditions of Purchase effective 31 May 2024.
Risk Analysis.pdf
Eskom requires the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The work involves high-risk activities during power station outages and carries a closing date of 28 September 2026 at 10:00 UTC.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf
Eskom Holdings SOC Ltd requires a Non-Disclosure Agreement (NDA) to be executed by tenderers prior to disclosing confidential information related to the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The NDA governs the handling of proprietary technical, commercial, and operational information exchanged during the tender process.
Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf
Eskom is conducting an open tender for the manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station in Mpumalanga. The tender follows Eskom's Standard Conditions of Tender (Rev 12, effective 1 February 2025) and closes on 28 September 2026 at 10:00 SAST.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 442 703
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Project: Manufacture, Supply, Delivery, Removal and Installation of Air Heater Element Packs for Three Units at Tutuka Power Station. Enquiry number: E3417GXMPTUT. Air heaters are Rothemühle twin flow type VU 13.2-6.23, stator with 64 radial plates and 7 rings forming 448 cells. Element packs: hot end (600mm, 0.5mm mild steel), intermediate (655mm, 0.5mm), cold end (300mm, 0.8mm). Scope includes design and manufacture of spacer boxes (~355mm), supply of safe working platforms, site establishment/de-establishment, equipment for transport and lifting, removal of existing packs, inspection and repair of plates, installation of new packs, seal setting, and test running. Reference detailed scope in document 15ENG GEN-778.
Important Dates
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Closing date: 28 September 2026 at 10:00. No mandatory briefing or site visit date provided in the document.
Contact Information
Source: OHS Specification - Air Heater Element Packs.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s at Tutuka Power Station","address":"moval and Installation of Air Heater Element"}
Returnable Documents
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Required documents: Section 37(2) agreements (original with contractor, copy with project manager, copy in OHS file), Main contractor organogram on letterhead (signed by 16(1)/16(2), submitted with OHS plan), Appointed contractor organograms (on letterhead, signed, copy to main contractor and in OHS file), SHEQ policy (signed by CEO/16(2), displayed, filed in OHS file, attached to OHS Plan), COID Letter of Good Standing (valid throughout contract, filed in OHS file), OHS Plan (meeting specification and legislation), Risk assessments (per 32-520), Method statements/safe work procedures, Fall protection plan (for working at heights), Medical certificates of fitness (valid 1 year, in OHS file), First aider certificates (Level 2), Training records (induction, general training, toolbox talks), Incident investigation reports (per 32-95), Emergency plan, OHS files (maintained on site), Audit records, Equipment inspection/maintenance records, Packaging and preservation/storage procedures for element packs, General arrangement drawings of spacer boxes for Eskom acceptance.
Evaluation Criteria
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Main and appointed contractors must: be registered on CSD; have valid SARS tax clearance/tax pin; hold valid COID Letter of Good Standing; comply with OHS Act, Construction Regulations, NEMA, National Water Act, National Road Traffic Act, and ISO 45001:2018; appoint competent persons for all statutory roles (Section 16(2), GAR 9(2), Section 17, GMR 2(1), HCS Reg 3(3), GSR 3(4), Pressure Equipment Regs 11&12); submit organograms signed by CEO/16(2) appointee; ensure all employees undergo Eskom induction and sign Life-Saving Rules pledge; provide itemised OHS costing; maintain OHS file on site; zero tolerance for substance abuse (0% limit); no child labour permitted.
Technical Specifications
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Scope: manufacture, supply, delivery, removal, and installation of air heater element packs for three units at Tutuka Power Station. The air heaters are Rothemühle twin flow type VU 13.2-6.23 (0.655 + 0.655 + 0.3C). Each stator has 64 radial plates and 7 rings forming 448 cells. Element packs consist of three layers: hot end (600mm, 0.5mm mild steel SAE 1008), intermediate (655mm, 0.5mm), and cold end (300mm, 0.8mm). Supply includes spacer boxes (~355mm height), U-bracket supports, safe working platforms, and packaging. Site work includes: site establishment, equipment provision (forklift, tractor, compressor, hoists, I-beams, chain blocks), cutting access holes, gouging out U-channels and pack supports, removing thermocouples, extracting all packs, inspecting and repairing radial/divisional plates, disposing old packs, installing new U-brackets, hoisting and installing new packs (cold end with spacer boxes, then intermediate and hot end), installing and welding U-channels, grinding welds, seal setting, closing access doors, test running air heaters, and recording drive motor currents. Reference detailed scope in document 15ENG GEN-778.
Methodology
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Method statements required for all tasks per risk assessments. Specific methodology for air heater element pack replacement: site establishment, equipment provision (forklift, tractor, compressors, hoists, I-beams, chain blocks), access door cutting and hole cutting (Eskom scaffolding partner erects scaffolding and removes lagging), equipment installation for hoisting and in-air heater work, gouging out U-channels and pack supports, thermocouple removal, pack extraction with safe working platform coverage, plate inspection and repair, old pack disposal, new U-bracket installation, new pack transport and hoisting, cold end pack installation with spacer boxes, intermediate and hot end installation, U-channel installation and welding, weld grinding, equipment removal, seal setting and locking, access door closure, test running.
Experience & Qualifications
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Competent person defined as having knowledge, training, experience, and qualifications specific to the work, registered with SAQA where appropriate. Statutory appointments require qualified individuals per OHS Act criteria. Non-statutory appointments (Risk Assessor, Safety Officer, Working at Heights Planner) require competence. First aiders trained to Level 2 with registered provider. Health and Safety Officer full-time required. Contractor site supervisor and H&S officer roles defined. Medical certificates of fitness valid for one year from HPCSA-registered practitioner. Medical surveillance programme required. Training: induction, risk assessment, method statement, working at heights, scaffolding, confined space, etc.
Quality Management
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Quality requirements include ISO 45001:2018, applicable SANS standards, manufacturer's equipment maintenance and calibration, preservation and storage procedures for element packs, weather-resistant packaging with positive identification, inspection and repair of radial/divisional plates, grinding of U-channel welds to prevent excessive rubbing, seal setting per data sheet, test running air heaters and recording drive motor currents.
Pricing Schedule
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)OHS costs to be itemised in the bill of quantities as per OHS Act and regulations, inline with the scope of work.
Financial Requirements
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)OHS costing must be itemised in the bill of quantities in accordance with the OHS Act and regulations, and inline with the scope of work.
Compliance Requirements
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Health & Safety
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Full OHS specification applies. Key requirements: OHS Act compliance, Section 37(2) agreement, COID LoG, SHEQ policy, statutory appointments, Eskom Life-Saving Rules (6 rules: open/isolate/test/earth/bond, hook up at heights, buckle up, be sober, permit to work, safe live working – zero tolerance, non-compliance = serious misconduct/dismissal), substance abuse (0% level, ad hoc testing), full-time H&S officer, risk assessments, method statements, fire equipment, first aid, OHS training, inductions, contractor site establishment, vehicle management, housekeeping, stacking/storage, tools and equipment inspections, ladders/scaffolding, working at heights, PPE, incident investigation, emergency management, OHS file, work stoppage, hours of work, contractor performance monitoring.
Environmental
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Environmental compliance per National Environmental Management Act, Environment Conservation Act, National Water Act, and duty of care to prevent pollution. Waste management required through housekeeping, stacking, storage, and site de-establishment. Environmental Regulations for Workplaces (ERfW) referenced.
Contractual Terms
Source: OHS Specification - Air Heater Element Packs.pdf (unknown)Section 37(2) agreements required between Eskom and main contractor, and between main contractor and appointed contractors. Eskom does not assume contractor's legal liabilities. Contractor accountable for quality and execution of OHS programme. OHS specification is minimum requirements; not all-encompassing. Contractor performance monitoring. Contract sign-off. Eskom may terminate contract for safety non-compliance. Work stoppage provisions: Eskom can stop work for safety violations; no additional costs or time extensions for stoppages due to housekeeping or defective equipment.
Compliance Requirements
Source: Annex-c_Local content Declaration-Summary Schedule.pdf (unknown)Insufficient searchable text - AI extraction recommended
Description
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdfAir heater element packs for Rothemühle twin flow air heaters (VU 13.2-6.23) at Tutuka Power Station Boilers 1 to 5 wear over time and become partially blocked. Worn packs cannot be refurbished and must be replaced at intervals defined by the maintenance philosophy. Pack wear measurements during major outages inform replacement planning. This scope of work document (15ENG GEN-3206 Rev 2) defines the supply, delivery, removal and installation of air heater element packs, spacer boxes, U-bracket pack supports, U-channels, safe working platforms, and associated equipment (forklift, compressor, hoists, extraction equipment) for three units. The work is divided into supply/delivery and on-site installation. Normative references: Eskom Outage Philosophy (15ENG GEN-0903), Draught Plant Maintenance Execution Strategy (15ENG STR-001), SHEQ Policy (32-727). Informative reference: ISO 9001.
Important Dates
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdf (unknown)Closing date and time: 28 September 2026 at 10:00 (UTC). Submission method and address not stated in the scope document; refer to the formal tender invitation for submission details.
Evaluation Criteria
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdf (unknown)Scope: Manufacture, supply, delivery, removal and installation of air heater element packs for three units (Boilers 1 to 5) at Tutuka Power Station.
Air heater type: Rothemühle twin flow, size VU 13.2-6.23 (0.655 + 0.655 + 0.3C). Stator: 64 radial plates, 7 rings, 448 cells per air heater.
Element packs: Three layers — hot end (600 mm high, 0.5 mm mild steel SAE 1008, HC11 profile), intermediate (655 mm high, 0.5 mm mild steel SAE 1008, HC11 profile), cold end (300 mm high, 0.8 mm mild steel SAE 1008, HC11 profile). Pack dimensions sized to stator cells.
Supply quantities (total for three boilers):
Installation scope: Site establishment/de-establishment; provide forklift, tractor, compressor, hoists for lifting packs to 33 m level; supply extraction equipment (I-beams, chain blocks); cut access holes in each air heater (rear/boiler side); Eskom scaffolding partner erects scaffolding and removes lagging; gouge out radial and ring 2/3 divisional U-channels (cold and hot ends); gouge out existing pack bottom supports; remove fire detection thermocouples on cold ends; extract all packs; cover empty cells with safe working platforms; inspect radial/divisional plates for deformation and erosion; repair defects; lower old packs to ground for scrap; install new U-bracket bottom supports; transport and hoist new packs; install cold end packs with spacer boxes; install intermediate and hot end packs; install and weld U-channels on radial and ring 2/3 divisional plates (cold and hot ends) level with hubs and stator flanges; grind U-channel welds flush; remove equipment; carry out seal setting on cold and hot ends per data sheet; close access doors and cut-out openings; test run air heaters and record drive motor currents.
General: Eskom provides scaffolding and cladding removal via another provider; Eskom arranges scrap collection of old packs under existing scrap metal contract.
Normative references: 15ENG GEN-0903 (Outage philosophy), 15ENG STR-001 (Draught Plant Maintenance Execution Strategy), 32-727 SHEQ Policy.
Informative reference: ISO 9001 Quality Management Systems.
Packaging: Weather-resistant, allows positive identification through packaging; supplier to replace damaged packaging; supplier to provide preservation and storage procedures.
Quality Management
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdfApplicable quality references: ISO 9001 Quality Management Systems (informative). Eskom normative documents: 15ENG GEN-0903 Outage Philosophy, 15ENG STR-001 Draught Plant Maintenance Execution Strategy, 32-727 SHEQ Policy. Supplier must provide preservation and storage procedures for element packs. Spacer box general arrangement drawings require Eskom acceptance before manufacture. Seal setting on cold and hot ends must follow data sheet specifications. Drive motor currents recorded during test run after installation.
Pricing Schedule
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdfBill of materials / quantities (Table 1) with 35 line items for pricing:
1-7: Hot end element packs (ring numbers 1-7, materials 0590952, 0590947, 0590950, 0590896, 0590895, 0590898, 0590955) — 378 each.
8-14: Intermediate element packs (ring numbers 1-7, materials 0590904, 0590903, 0590900, 0590905, 0590894, 0590946, 0590949) — 378 each.
15-21: Cold end element packs (ring numbers 1-7, materials 0590953, 0590951, 0590892, 0590897, 0590893, 0590948, 0590954) — 378 each.
22: U-brackets/supports (material 0774092) — 10 584.
23-29: Spacer boxes (ring 1 to ring 7) — 378 each.
30: Safe working platforms (materials 0775110 & 0775111) — 1 set (64 platforms).
31: U-channels 6 m length (material 0737609) — 1 080.
32: Transportation of element packs & U-brackets.
33: Transportation of spacer boxes.
34: Transportation of safe working platforms.
35: Services for removal & installation of packs for 3 boilers including pack replacement equipment and equipment for transporting element packs from storage area.
Costing sheet requires unit price and total price per line item, with a grand total.
Financial Requirements
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdf (unknown)Pricing schedule (Appendix A – Costing sheet) requires unit prices and total prices for each of the 35 line items covering all element packs (hot, intermediate, cold across 7 rings each), spacer boxes (7 ring types), U-brackets/supports (10 584), safe working platforms (1 set), U-channels (1 080), transportation of element packs & U-brackets, transportation of spacer boxes, transportation of safe working platforms, and services for removal & installation for three boilers including pack replacement equipment and transport equipment. No bond, guarantee, insurance, or payment terms stated in this document.
Compliance Requirements
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdf (unknown)No specific requirements found
Health & Safety
Source: Scope of work for replacement of boilers 1 to 5 Air Heater Element Packs.pdfWork at height: air heater area at 33 m level; hoisting of element packs to working platforms and into air heaters required. Confined space work inside air heater cells (448 cells per air heater). Hot work: gouging out U-channels and pack supports, welding new U-channels on radial and divisional plates, grinding welds flush. Heavy lifting: forklifts, tractors, compressors, hoists, chain blocks, I-beams with wheeled supports. Hazardous energy: removal of fire detection thermocouples. Structural integrity: inspection and repair of deformed/eroded radial and divisional plates. Eskom scaffolding partner provides scaffolding platforms and lagging removal. Safe working platforms must cover cells from which packs have been removed. Compliance with Eskom SHEQ Policy (32-727) and Outage Philosophy (15ENG GEN-0903) required.
Compliance Requirements
Source: Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf (unknown)Local content declaration required: bidders must complete and submit Annex C (Local Content Declaration) and its supporting schedule (Annex e) to claim preference points for designated local production and content. The declaration must be signed by an authorised signatory and submitted with the bid.
Important Dates
Source: Annexure L- E-tendering Help Manual for supplier.pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: Annexure L- E-tendering Help Manual for supplier.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: Annexure L- E-tendering Help Manual for supplier.pdf (TENDER)Bidders must be registered on the National Treasury Central Supplier Database (CSD) and have a valid CSD number to access the eTendering system. A valid email address and South African cellphone number (with +27 prefix) are required for registration and OTP verification.
Technical Specifications
Source: Annexure L- E-tendering Help Manual for supplier.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Compliance Requirements
Source: Annexure L- E-tendering Help Manual for supplier.pdf (TENDER)CSD number to gain access to
Description
Source: NEC ECC Air Heater Element Packs .pdf (unknown)The tender is for the Manufacture, Supply, Delivery, Removal and Installation of Air Heater Element Packs for three units at Tutuka Power Station. The Works Information is identified as Part 3 Scope of Work (Unique Identifier 15ENG GEN-3206 titled Replacement of Boiler 1 to 5 Air Heater Element Packs), including all referenced documents and drawings. The site boundaries are Tutuka Power Station (Unit 1, 4 and 5 Left Hand and Right-Hand Air Heaters). The Risk Register includes risks such as industrial action, adverse weather, late delivery, health and safety incidents, plant access restrictions, contractor interface management, testing/commissioning failures, damage to existing plant, lifting/rigging risks, and inadequate supervision. Key Performance Indicators are per Annexure B (monitoring only, no incentives) with monthly reporting.
Contact Information
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Employer: Eskom Holdings SOC Ltd, registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Project Manager and Supervisor: Tutuka Power Station, Bethal Road, Standerton, 2430. The Project Manager is the employer's agent for securities, bonds, guarantees, and insurance. Adjudicator nominating body: Chairman of ICE-SA (www.ice-sa.org.za). Arbitration body: Association of Arbitrators (Southern Africa), seat Mpumalanga.
Submission Guidelines
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance (must be signed and submitted with the offer), C1.2b Contract Data provided by the Contractor, and any schedule of deviations. The Offer is submitted by signing the Offer part of C1.1. Pricing data (Part C2) and completed activity schedule must be included. No other returnable forms are explicitly listed in the provided text.
Evaluation Criteria
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Evaluation criteria are not specified in the provided document. The document is a contract template (NEC3 ECC) rather than a tender evaluation document. No scoring split, minimum thresholds, or preference points are stated.
Technical Specifications
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Scope: Manufacture, Supply, Delivery, Removal and Installation of Air Heater Element Packs for three units (Unit 1, 4 and 5) at Tutuka Power Station. Works Information is in Part 3 Scope of Work (Unique Identifier 15ENG GEN-3206, titled Replacement of Boiler 1 to 5 Air heater Element Packs) and all referenced documents and drawings. Site boundaries: Tutuka Power Station (Unit 1, 4 and 5 Left Hand & Right-Hand Air Heaters). The supply items include Cold End, Intermediate, and Hot End Element Packs (each with 7 stock codes, Qty 378 per item), U-brackets/supports (Qty 10584), Spacer box rings (Qty 378 per ring), Safe working & platform (1 set), U-channels 6m length (Qty 1080), and transportation of these items. Removal and installation activities include removal of old packs, installation of new packs, provision of equipment, inspections, and repairs of relevant areas.
Methodology
Source: NEC ECC Air Heater Element Packs .pdf (unknown)The Contractor must submit a first programme within 2 weeks after the Contract Date. Revised programmes must be submitted at intervals no longer than 2 days during unit outages. The programme must show how each activity on the Activity Schedule relates to the operations. The tendering contractor should develop a high-level programme, resource each activity, and arrive at lump sum prices. The Activity Schedule is only a pricing document; the Works are performed per the Works Information. The Risk Register is maintained throughout execution. Key dates are tied to the Accepted Programme per unit. Access dates are per the outage listing.
Experience & Qualifications
Source: NEC ECC Air Heater Element Packs .pdf (unknown)The Contractor must nominate key persons with details of name, job, responsibilities, qualifications, and experience. CVs are appended to a Tender Schedule. The Contractor must provide direct fee percentage and subcontracted fee percentage. The tendered total of the Prices (excluding VAT) and the activity schedule location must be provided.
Quality Management
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Defects date is 52 weeks after Completion. Defect correction period is 48 hours after notification. Key Performance Indicators (Option X20) are listed in Annexure B and are for monitoring only (no incentives). Monthly performance reporting against each KPI is required.
Pricing Schedule
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Pricing is under NEC3 Option A: lump sum per activity on the Activity Schedule. Only completed activities are assessed for payment; no part payment for incomplete activities. The Activity Schedule is not Works Information or Site Information (clause 54.1). The tendering contractor prepares the activity schedule by breaking down the work into activities. The activity schedule items include:
Preliminary and General items include office and storage shed, overheads, forklift, compressor, crane, safety file, and medicals/inductions/PPE.
Financial Requirements
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Pricing format: NEC3 Option A — Priced contract with activity schedule (lump sum per activity). Only completed activities are assessed for payment; no part payment for incomplete activities. The activity schedule is a pricing document only, not Works Information. Assessment interval: 4 weeks. Payment period: 60 days after submission of a valid invoice. Interest rate: Standard Bank prime rate (Rands) or LIBOR (other currencies). Performance bond: 10% of the total of the Prices. Retention: 5% from each amount due, accumulated to 5% of total Prices (50% released at Completion, 50% at Defects Date). Delay damages: 1% of the section Prices per day, capped at 10% per section, total capped at 10% of total Prices. Price adjustment for inflation (Option X1) applies; base date for indices is one month prior to enquiry closing date; 15% non-adjustable. Contractor's liability for indirect/consequential loss limited to R0. Contractor's total liability limited to total of Prices (except excluded matters: design defects, off-site manufacture, property damage, death/injury, IP infringement).
Compliance Requirements
Source: NEC ECC Air Heater Element Packs .pdf (unknown)CSD registration: Required. Tax compliance: Valid SARS tax clearance certificate or tax compliance status PIN required. B-BBEE: Valid verification certificate required to claim preference points. The contract includes a B-BBEE status change clause (Z3): notify Employer within 7 days of any change, submit updated certificate within 30 days; decreased status may lead to renegotiation or termination. CIDB grading: Not explicitly stated in the provided text. Parent company guarantee (Option X4) required if the Contractor is a subsidiary. Key personnel: Must be nominated with CVs appended to a Tender Schedule. Construction Regulations 2014 compliance required. Asbestos Standard 32-303 compliance required. No Prohibited Actions (corrupt, fraudulent, coercive, collusive, obstructive practices). Insurance: Contractor provides insurance per Insurance Table A (works/plant/equipment, property, employee injury); Employer provides insurance per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, Public Liability, etc.).
Health & Safety
Source: NEC ECC Air Heater Element Packs .pdf (unknown)The Construction Regulations 2014 (under OHSA) apply. The Contractor may be appointed as Principal Contractor. The Contractor warrants that the total of the Prices includes sufficient amount for compliance with all health & safety laws. The Contractor must comply with all applicable environmental laws. Asbestos management: The Employer ensures ambient air meets SA standards (OEL 0.2 fibres/ml as 4-hour TWA; STEL 0.6 fibres/ml as 10-minute TWA). Certification by a SANAS-accredited AAIA. The Contractor may perform parallel measurements at own expense. If asbestos is identified above the Action Level (0.1 fibres/ml), immediate control measures are implemented. Personnel may stop work and leave the area until declared safe. Asbestos removal and disposal are done by a registered asbestos contractor at the Employer's expense.
Environmental
Source: NEC ECC Air Heater Element Packs .pdf (unknown)The Contractor must comply with all applicable environmental laws, regulations, rules, guidelines, and procedures. Environmental Liability insurance is provided by the Employer per Insurance Table B. Asbestos management is required per Eskom's Asbestos Standard 32-303. Nuclear liability: The Employer (as operator of Koeberg Nuclear Power Station) indemnifies the Contractor for nuclear damage, except for unlawful intent or unauthorised presence.
Contractual Terms
Source: NEC ECC Air Heater Element Packs .pdf (unknown)The contract is the NEC3 Engineering and Construction Contract (April 2013) with main Option A (Priced contract with activity schedule), dispute resolution Option W1, and secondary Options X1 (Price adjustment for inflation), X2 (Changes in the law), X4 (Parent company guarantee), X5 (Sectional Completion), X7 (Delay damages), X13 (Performance Bond), X16 (Retention), X18 (Limitation of liability), X20 (Key performance indicators), and Z (Additional conditions Z1-Z15). Governing law: South Africa. Language: English. Currency: South African Rand. Defects date: 52 weeks after Completion of the works. Defect correction period: 48 hours after notification. The Employer may terminate the contract if delay damages reach the stated limits. Additional conditions cover cession/delegation, joint ventures, B-BBEE status changes, confidentiality, waiver/estoppel, health/safety/environment, tax invoices, compensation events, employer liability limitation, termination for business rescue, delay damages termination, ethics (prohibited actions), insurance, nuclear liability, and asbestos management.
Section
Source: NEC ECC Air Heater Element Packs .pdf (unknown)Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Project Manager: Tutuka Power Station, Bethal Road, Standerton, 2430. Supervisor: Tutuka Power Station, Bethal Road, Standerton, 2430. Employer's agent for securities/bonds/guarantees/insurance: Project Manager (details in Contract Data). Adjudicator nominating body: Chairman of ICE-SA (joint Division of SAICE and London ICE), www.ice-sa.org.za. Arbitration body: Association of Arbitrators (Southern Africa) or successor, seat Mpumalanga, South Africa.
Description
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)The main supplier must demonstrate the process and selection criteria applied when appointing contractors and suppliers, and notify Eskom prior to such appointments for the commencement of work.
Submission Guidelines
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)Returnable documents: Annexure B Acknowledgement Form for Eskom SHE Rules and other Requirements (document identifier 240-43921804 Rev 5) must be completed, signed by an authorised person (CEO/Director/Managing Director), dated, and witnessed by two witnesses. The signed form confirms the tenderer has obtained and understands the referenced SHE documents and accepts the consequences of non-compliance.
Technical Specifications
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)Scope: Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station. The main supplier must demonstrate the process and selection criteria used when appointing contractors and suppliers, notify Eskom prior to any such appointments, ensure appointed parties have adequate resources and competencies, and remain accountable for their SHE compliance. The main supplier must monitor contractors and suppliers through audits and assessments, define grounds for termination of sub-contracted work, and manage all non-conformances through performance and penalty processes. Eskom reserves the right to verify compliance and may request testimonials, references and client contact details for previous similar work.
Quality Management
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)Financial penalties will be enforced on the main supplier for non-conformances to Eskom or statutory SHE requirements, including those by sub-contractors or suppliers. Work stoppages due to SHE-related issues do not warrant financial compensation claims against Eskom. All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's own induction.
Financial Requirements
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)Financial penalties will be enforced on the main supplier for any non-conformances to Eskom or statutory SHE requirements, including those by sub-contractors or suppliers. Work stoppages initiated due to SHE-related issues do not entitle the supplier to any financial compensation claim against Eskom.
Compliance Requirements
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)Mandatory compliance with the following when working at or rendering services to Eskom: Eskom Contractor Health and Safety Requirements Standard 32-136; the SHE specification provided; Occupational Health and Safety Act; Mine Health and Safety Act (where applicable); Compensation for Occupational Diseases and Illnesses Act; National Environmental Management Act. After contract award, the supplier must fully align its processes to Eskom's SHE requirements (policies, procedures, standards). All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's own induction.
Contractual Terms
Source: Annexure B Acknowledgement form for Eskom SHE Rules and other Requirement.pdf (unknown)The main supplier must demonstrate the process and selection criteria used when appointing contractors and suppliers; notify Eskom prior to any appointments; ensure appointed parties have adequate resources and competencies; remain accountable for their compliance with applicable legal and Eskom requirements; monitor them through audits and assessments; define grounds for termination of sub-contracted work; manage all non-conformances through performance and penalty processes; and accept that Eskom may verify compliance and request testimonials, references and client contact details for previous similar work.
Description
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Important Dates
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Issue date: 26 August 2026
Closing date and time: 28 September 2026 at 10h00
Tender validity period: 12 weeks from closing date and time
Clarification meeting / site visit (non-compulsory): 3 September 2026, 10h00–12h00, Outside Conference Room next to East Gate, Tutuka Power Station. Tenderers must confirm attendance with Eskom Representative (name, position, contact details of each attendee).
Clarification queries deadline: 7 working days before tender closing date (i.e., by 17 September 2026).
Alternative tenders: not allowed.
Contact Information
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Eskom Representative (procurement): Bishop Chabalala
Telephone: 017 749 9607
Email: [email protected]
Fraud/corruption reporting: 0800 11 2722 / [email protected]
Submission address: Electronic via Eskom E-tendering portal (Eskom Tender Bulletin site).
Senior Advisor Procurement (signatory): Noma Zulu
Submission Guidelines
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Submission method: electronic only via the Eskom E-tendering portal (Eskom Tender Bulletin site). No hard copies accepted. No zip or compressed files. Each document must be in PDF format; the pricing schedule must also be provided in Excel. Upload size limit: 500 MB per document, 4 GB total. Documents must be uploaded under the folders Technical, Commercial, Financial, and Other. Submission status must show as complete. If a tender is resubmitted, only the latest version is accepted; previous submissions are void.
Mandatory returnables at closing (disqualifiable if missing or unsigned):
Returnables at closing (non-disqualifiable; 5 working days to remedy if missing):
Returnables required prior to contract award:
Evaluation Criteria
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Two-stage evaluation: functionality (technical) first, then price and specific goals (90/10).
Functionality criteria (threshold 70%):
Total technical criteria weight: 100%. Minimum weighted score: 70%. Tenderers below threshold are disqualified.
Price evaluation (90 points): prices inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations/deviations, compared on Net Present Value basis using tendered programme, price adjustment factors, exchange fluctuations, and risk parameters. Unconditional discounts considered; conditional discounts not considered for evaluation but applied at payment.
Specific goals (10 points): scored per PPPFA 2022 regulations. Failure to submit evidence yields 0 points for that goal but does not disqualify.
Ranking: combined price (90) + specific goals (10) = total score; ranked highest to lowest.
Contractual requirements (CSD registration, SHEQ, financial viability, CSDG, CPG) are not evaluation criteria; assessed after ranking. Failure to meet them by stipulated deadlines may render tenderer non-responsive and ineligible for award.
Technical Specifications
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Scope: Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station.
Key technical requirements:
Methodology
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)tenderer must select a minimum of two (2) financial institutions that it
is likely to approach from the list provided of Eskom-approved
financial institutions.
3.4 Tender Opening For E-tendering. There will be no public opening of tenders. Tenders
will be downloaded electronically.
3.5 Tender Prices Prices will not be read out.
3.9 Basic Compliance Basic compliance with this Invitation to Tender requires a tenderer to
meet all the following requirements:
Experience & Qualifications
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)work that has to be done, has the required
training, knowledge and experience, and, where
applicable, qualifications relevant to that work or
task. Provided that where appropriate
qualifications and training are registered in terms
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
of the provisions of the National Qualifications
qualifications and training must be regarded as
the required qualifications and training, and is
familiar with the Act and applicable regulations
made under the Act.
− First aider
− OHS professional
− Incident investigator
Quality Management
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Tenderer to demonstrate ability 20%
to package and preserve the air
heater element packs for
storage.
Provide lead times for delivery 20%
of first set of air heater element
packs from previous purchase
order. This should include a
breakdown of activities (with
durations) to be carried out
from the time a purchase order
is placed.
Tenderer to demonstrate ability 10%
to carry out quality control in
manufacturing of air heater
element packs and to compile
data books.
Technical Criteria 100%
Threshold 70%
The minimum weighted final score (threshold) required for a tender to
be considered from a technical perspectives is 70%
SECTION A: Quality Management System
Requirements ISO 9001
(Option 1) Valid certification of Quality Management
A.1 Product / Service Scoping on ISO 9001 certificate
is defined and relevant
A.2 Certificate by Approved and Authorized
certification authority
A.3 Certification Authority has Recognized
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
and Responsibility matrix (must include but not limited
to quality management function/role)
(Clause 5.3 of ISO 9001:2015)
B.2 Documented information for Control of Externally
include criteria for evaluation, selection, monitoring of
performance, and re-evaluation of external providers
(Clause 8.4 of ISO 9001:2015)
B.3 Latest copy of an internal management system
audit report (with Nonconformity, Correction and/ or
Corrective Action Reports) - Report must include but
not limited to Objective, Scope, Criteria and outcomes
of the audit.
(Clause 9.2 of ISO 9001:2015)
B.4 Latest copy of a certification management system
audit report not older than 12 months (with
Reports)
B.5 Records of Management Review meetings
(minutes, attendance registers etc.)
SECTION C: Contract Quality Plan Requirements
(Ref 240-105658000 and 240-109253698)
work as described in the tender documents (Ref ISO
NB! Draft Contract/Project Quality Plan has
important QA deliverables
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
SECTION D: Quality Control Plan Requirements
(Ref 240-105658000 or 240-109253302)
QCP/Checklist/ ITP (Quality Control Plans) as per
Scope of Works (Ref ISO 10005)
NB! Draft/ Example of an Inspection and Test Plan
(ITP) or Quality Control Plan (QCP) on similar and/ or
previous work done
SECTION E: User defined additional
Requirements & miscellaneous (Ref 240-
E.1 Form A is completed and signed.
E.2 Add other requirements (if applicable) as per the
scope of work and/ or specification
Other safety/quality √
documents as
required per scope
of works
Environmental ENVIRONMENTAL REQUIREMENTS √
Pricing Schedule
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Effective Date 07 April 2026
Review Date April 2031
Number Description Annexure Attached (Y /
N / n/a)
1.1.19 NEC or other Contract Y
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Y
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 90/10 system. Eskom will add the score from Pricing and Specific
Eskom must, within 21 working days from date when
contractors offer to perform a construction works contract is
accepted in writing, register and publish the award of all
contracts equal to or exceeding R10 M inclusive of VAT.
2.29 Contract Skills Development 1. The CSDG applicable to this tender is in terms of the Engineering
Goals (CSDG) is not and Construction Works contract with respect to the
applicable __________________ class of works or__________ class of works
[delete “or” where only one class of construction works is applicable]
and the applicable percentage is ___ % and is contained in the
relevant BOQ/Pricing schedule attached.
Or
following ways: -
by multiplying 150 against the total estimated contract value in the
relevant BOQ/Pricing schedule to derive the relevant hours required
in terms of this CSDG; or
by main contractor devolving its obligations required in terms of the
CSDG to respective sub-contractor; or
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Pricing format: completed pricing schedule/BOQ (PDF and Excel) submitted with tender. Prices inclusive of VAT. Tender validity: 12 weeks from closing.
Price evaluation adjustments: arithmetic error correction, exclusion of contingencies, adjustment for variations/deviations, Net Present Value comparison using tendered programme, price adjustment factors, exchange fluctuations, risk parameters. Unconditional discounts considered for evaluation; conditional discounts applied at payment only.
Payment terms: contracts below R50 million (incl. VAT) – payment within 30 days of receipt of undisputed invoice; contracts above R50 million – payment within 60 days.
Financial viability: submission of latest 18 months comparative financial statements required as contractual requirement (compulsory for CIDB-related transactions from R30 000 excl. VAT).
Performance security: performance bond required (NEC3 clause X13); tenderer must select at least two Eskom-approved financial institutions.
Retention: applicable (NEC3 clause X16).
Price adjustment for inflation: applicable (NEC3 clause X1).
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Main contractors discouraged from subcontracting with subsidiaries; if done, must be declared in tender documents.
Compliance Requirements
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Eligibility:
Mandatory registrations and certifications:
Returnable forms (disqualifiable if missing at closing):
Returnable forms (non-disqualifiable; 5 working days to remedy):
Contractual requirements assessed after evaluation (must be met prior to award):
Health & Safety
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)Effective Date 07 April 2026
Review Date April 2031
Number Description Annexure Attached (Y /
N / n/a)
1.1.13 Reverse e-auction process (if applicable) N/A
1.1.14 E-tendering Help Manual acknowledgement form Y
1.1.15 E-tendering Help Manual for supplier Y
1.1.16 CIDB Contract Skills Development Goals (CSDG) Y
(if applicable)
a) a contract of R5 million or more, in the case of a
professional service or service contract or an order
issued in terms of such a contract; or
b) a CIDB grading designation of grade 8ME or higher,
in case of an engineering and construction works, or
design and build contract or an order issued in terms of
such a contract.
1.1.17 Contract Participation Goals (CPG) N/A
(if applicable)
[Note that the requirements of a contract participation
goal relating to the engagement of targeted enterprises
as established in the aforesaid standard applies to:
(a) construction works contracts in the General Building
(GB) and to Civil Engineering (CE) classes of
construction works;
(b) construction works contracts of an estimated
minimum project duration of 6 months; and
(c) construction works contracts in which at least 25%
of the main contract could reasonably be expected to
be subcontracted out in one or more of the following
applicable:
(financial analysis is compulsory as a contractual requirement
for CIDB-related transactions from R30 000 excluding VAT);
and/or
(Annexure A-Targeted Enterprise Declaration Affidavit; Project Interim
Report, Project Completion Report and Declaration) that may be
required as returnables after contract award and as stipulated by
Clause 3.3 of the Standard for Indirect Targeting for Enterprise
Development through Construction Works Contract (published in GN
1779, Government Gazette No. April 2023)
2.28 CIDB Requirements (where CIDB Requirements are applicable
applicable for Engineering and
Construction Works Contracts) 1. It is estimated that tenderers must have a Construction
Industry Development Board (CIDB) contractor grading of
through Infrastructure contracts (published in GN 1779,
Government Gazette No. April 2023)
a framework agreement that has a duration of 12 months or
more, and to:
a) contract of R5 million or more, in the case of a professional
service or service contract or an order issued in terms of
such a contract; or
b) a cidb grading designation of grade 8ME or higher, in case
of an engineering and construction works, or design and
build contract or an order issued in terms of such a
contract].
2.30 Contract Participation Goals is Contractor shall achieve in the performance of the contract the
not applicable Contract Participation Goals (CPG) relating to the engagement
of targeted enterprises as established in the CIDB Standard for
Construction Works Contract (published in Government
Gazette No. February 2013)
the engagement of targeted enterprises as established in the
aforesaid standard applies to:
a) construction works contracts in the General Building (GB)
and to Civil Engineering (CE) classes of construction
works;
b) construction works contracts of an estimated minimum
project duration of 6 months; and
c) construction works contracts in which at least 25% of the
main contract could reasonably be expected to be sub-
contracted out in one or more of the following CIDB
classes of construction works:
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
requirements (Annexure B)- Ensure that all
applicable rules and requirements are referenced
in this form in order for the supplier to
acknowledge and comply with them. Ensure that
this completed form is included in the enquiry
procurement package. To be signed and
submitted by the tenderer.
routine and non-routine tasks.
address the scope of work OHS risk(s) and
aligned with the health and safety specification or
requirements)
have or may have an impact on the environment. The
methodology used must be provided together with the
identified activities that have been identified, based
on the scope of work, that have an impact on the
environment and the controls that will be in place in
contract execution.
Environmental
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)minimum:
recycling, disposal).
incidents.
Commitment to: (1) compliance to environmental
compliance obligations; and (2) environmental duty of
care.
Due
Contractual Terms
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)sanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
W1- Dispute resolution procedure
X1 - Price adjustment for inflation
X2 - Changes in the law
X5 - Sectional Completion
X7 - Delay damages
X13 - Performance bond
X16 - Retention
X18 - Limitation of liability
X20 – Key performance indicators
Z – Additional conditions of contract
The recommended supplier shall submit all the documentation (Form
A2 Baseline Training Plan, Form A3 Project Interim Report, Form A4
Supervisor Agreement, Form A5 Project Completion Report) that may
be required as returnables after contract award as stipulated by
Clause 4 of the Contract Skills Development Goals Standard
published in GGN 36760 of March 2020.
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
the Compensation Commissioner (COID) or a
licenced mutual company or an equivalent of it
(for international bidders). If a company has only
one employee (CEO, owner), the supplier shall
submit an insurance letter that covers accidental
death and disability to the value of R500 000 as a
minimum.
Section
Source: Invitation to Tender Air Heater Element Packs.pdf (TENDER)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Y
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
to carry out quality control in
Threshold 70%
The minimum weighted final score (threshold) required for a tender to
be considered from a technical perspectives is 70%
Tenderers who do not meet the threshold for functionality scoring will
3.15 Evaluation of
evaluation purposes but will be implemented when payment is
Prices will be scored out of 90 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 10 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 90/10 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
Important Dates
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Closing date and time: 28 September 2026 at 10:00 (from tender record).
No compulsory briefing session, site visit or clarification deadline is mentioned in this document.
Contact Information
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Fraud and corruption reporting (anonymous): 0800 11 2722 or [email protected].
No SCM or technical enquiry contacts are provided in this document.
Submission Guidelines
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Returnable forms — all must be completed, signed and submitted with the tender:
Disqualification risks:
Evaluation Criteria
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Mandatory pre-qualification:
No functionality, price/preference split or minimum qualifying scores are stated in this document.
Technical Specifications
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Supply chain management system should this
Declaration prove to be false.
.............................. .....................................................
Signature Date
.............................. ......................................................
Position Name of bidder
Controlled Disclosure
Anonymously report fraud, corruption a
Compliance Requirements
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Mandatory compliance:
Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown){"closingDate":"31 May 2024"}
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"note specifying the means of transport, weight, number or volume as appropriate and"}
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Supplier must accept Eskom General Conditions of Purchase. Must be registered on the Central Supplier Database (CSD) and possess a valid SARS tax clearance certificate or tax compliance status pin. Must comply with all statutory requirements under South African law. No specific CIDB grading, B-BBEE level, or local content percentage is stated in the provided document.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)supply the goods or
execute the works
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Quality and rejection provisions:
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Pricing and payment terms:
Important Dates
Source: Annexure D - Integrity Declaration Form - 29 July 2026.pdf (RFP)Effective date of the form template: 21 February 2025. Review date: February 2030. The tender closing date is 28 September 2026 at 10:00 (from tender record).
Submission Guidelines
Source: Annexure D - Integrity Declaration Form - 29 July 2026.pdf (RFP)Returnable documents — the Integrity Declaration Form (Annexure D) must be fully completed, signed and submitted by the stipulated deadline. The form requires declarations on conflicts of interest, fair tendering practices, shareholding/beneficiary information, and consent for verification. Joint ventures must complete the form for each JV member. All information must be true and correct; false declarations lead to rejection and action by Eskom.
Evaluation Criteria
Source: Annexure D - Integrity Declaration Form - 29 July 2026.pdf (RFP)Disqualification criteria: tenderers or their directors/shareholders listed on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters; convicted of fraud or corruption in procurement processes in the past five years; prohibited from doing business with international financial institutions; history of failing to meet contractual obligations with the State or State Owned Entities; restricted by Eskom. Employees of the State may not conduct business with organs of state. All declarations must be true and complete; false information leads to rejection.
Technical Specifications
Source: Annexure D - Integrity Declaration Form - 29 July 2026.pdf (RFP)appointment or election of,
directors of that company who control a majority of the votes at a meeting of the board;
(b) in the case of a juristic person that is a close corporation, that first person owns the majority
of the members’ interest, or controls directly, or has the right to control, the majority of
members’ votes in the close corporation;
C
Compliance Requirements
Source: Annexure D - Integrity Declaration Form - 29 July 2026.pdf (RFP)Mandatory completion of Annexure D (Integrity Declaration Form) covering: declaration of interest (conflicts with Eskom employees/directors, related parties, controlling partners); declaration of fair tendering practices (no bid rigging, collusion, fraud); declaration of shareholding/beneficiary information for all individuals and entities; consent for verification and sharing of information with third parties. Tenderers must not be listed on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters. No convictions for fraud/corruption in procurement in past five years. No prohibition from international financial institutions. No history of failing contractual obligations with State/SOCs. Not restricted by Eskom. State employees prohibited from conducting business with organs of state.
Description
Source: Risk Analysis.pdf (unknown)Risk analysis for the manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station. Identifies eight key risk areas with mitigation actions: dimensional mismatch/fabrication errors, rework from inadequate QA/QC, safety incidents/OHSA non-compliance, schedule conflicts/access delays, delays from unavailability of dependent service providers, disputes over progress valuation, environmental non-compliance, and acceptance/commissioning disputes.
Technical Specifications
Source: Risk Analysis.pdf (unknown)Scope: Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station.
Key technical requirements:
Methodology
Source: Risk Analysis.pdf (unknown)Develop a detailed outage interface and dependency plan to manage schedule conflicts and access delays during outage work. Define responsibilities, interfaces, and lead times in the outage plan to avoid delays from unavailability of dependent service providers. Include an environmental management plan compliant with ISO 14001. Attach approved design drawings with revision control in contract documents. Include a detailed QA/QC plan aligned with Eskom standards for welding, alignment, and seal settings. Include requirement for OHS-compliant method statements and a safety plan for all high-risk tasks. Define clear deliverables linked to payment milestones (e.g., per boiler or phase). Use the standard for air leakage tests or performance benchmarks for acceptance and commissioning.
Quality Management
Source: Risk Analysis.pdf (unknown)Include a detailed QA/QC plan aligned with Eskom standards for welding, alignment, and seal settings. Attach approved design drawings with revision control in contract documents to prevent dimensional mismatch or fabrication errors.
Health & Safety
Source: Risk Analysis.pdf (unknown)Include requirement for OHS-compliant method statements and a safety plan for all high-risk tasks, specifically lifting and working-at-height activities, to ensure OHSA compliance and prevent safety incidents.
Contractual Terms
Source: Risk Analysis.pdf (unknown)Define clear deliverables linked to payment milestones (e.g., per boiler or phase) to avoid disputes over progress valuation. Use the standard for air leakage tests or performance benchmarks for acceptance and commissioning to prevent disputes.
Important Dates
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Clarification meeting and reverse e-auction training date: to be filled in by the bidder on the acknowledgement form. No closing date or other mandatory dates are stated in this document.
Contact Information
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP){"name":"_____________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Returnable document: Annexure A.1 Acknowledgement Form – Reverse E-auctioning Training must be completed, signed and submitted. The form requires the bidder to confirm attendance at the clarification meeting and reverse e-auction training, or to confirm self-training via the uploaded video, and to declare ability to operate the reverse e-auction system if recommended.
Evaluation Criteria
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Bidders must be registered on the Central Supplier Database (CSD), hold valid tax clearance (SARS TCS/tax pin), and meet any applicable B-BBEE, CIDB, or local content requirements as per standard Eskom procurement policy. Specific eligibility thresholds not detailed in this document.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)This Supplier Evaluation Pack (applicable 1 March 2026 to 28 February 2027) is a PAYE questionnaire used by Eskom to classify contractors for tax purposes under the Fourth Schedule to the Income Tax Act. It determines whether a contractor is an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor, which dictates PAYE withholding and IRP5/IT3(a) coding. The pack contains Evaluation Pack A (for Companies, Close Corporations, Trusts) and Evaluation Pack B (for Individuals), each with a series of yes/no questions covering residence, employee count, connected persons, income concentration, place/control/supervision, and a dominant impression test. Based on answers, contractors must sign specific affidavits (Appendices 1–9) and a summary declaration. Completed packs (signed summary sheet and affidavits) are returned to the Eskom representative with a copy to Group Tax ([email protected]). Eskom accepts no liability for use of the pack. Definitions per the Income Tax Act are in Appendix 10.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)The Supplier Evaluation Pack applies from 1 March 2026 to 28 February 2027 (2026/2027 tax year). No tender closing date, briefing dates, or site visit dates are stated in this document.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)Eskom Group Tax contact for submission of completed packs: [email protected]. Eskom Holdings SOC Ltd and its listed subsidiaries (Eskom Rotek Industries SOC Ltd, Eskom Enterprises SOC (Pty) Ltd, Escap SOC (Pty) Ltd, Eskom Finance Company SOC (Pty) Ltd, Eskom Foundation NPC, Eskom National Transmission Company SA). No SCM or technical tender contacts are provided.
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)This document is a PAYE Questionnaire (Supplier Evaluation Pack) for tax classification, not a tender submission pack. It does not contain tender submission instructions, closing dates for bids, or returnable forms for a procurement process. Contractors complete the questionnaire and return the signed summary sheet and signed affidavits to their Eskom representative, copying Group Tax at [email protected].
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)The document does not contain procurement evaluation criteria. It provides a tax classification questionnaire (Evaluation Pack A for companies/CCs/trusts and Evaluation Pack B for individuals) to determine whether a contractor is an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor under the Fourth Schedule to the Income Tax Act. Classification outcomes dictate PAYE withholding and IRP5 coding (codes 3601, 3616, 3617).
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)The document specifies no technical scope, deliverables, quantities, standards, or service levels for the air heater element packs tender referenced in the tender record. It is solely a tax compliance tool to classify contractors for PAYE purposes under the Income Tax Act.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)No pricing schedule, bill of quantities, or rates for the air heater element packs tender are included. The document only addresses tax withholding outcomes: PAYE deducted at individual tax rates for Personal Service Providers, Dependent Contractors, and Labour Brokers without a valid IRP30 certificate; no PAYE for Independent Contractors and Labour Brokers with a valid IRP30 (IT3(a) issued with code 3617, reason code 07). IRP5 codes 3601 (PSP/Dependent Contractor), 3616 (Independent Contractor), and 3617 (Labour Broker) apply.
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)Tax withholding outcomes based on classification:
No pricing schedule, bonds, guarantees, or payment terms for the tender are included.
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)Contractors must complete the applicable Evaluation Pack (A for Company/CC/Trust, B for Individual) and sign the required appendices based on questionnaire outcomes:
All affidavits require a Commissioner of Oaths. Contractors must notify Eskom in writing of any status changes. CSD registration, B-BBEE, CIDB, and other procurement compliance requirements are not addressed in this document.
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027..pdf (unknown)The document does not contain tender evaluation criteria. It provides a tax classification decision matrix: for companies/CCs/trusts, answers to Questions 6(i)–6(xi) are tallied as 'Independent' or 'PSP'; if any of 6(i), 6(iii), 6(v), 6(vi), 6(ix) are 'PSP', or more than 50% of 6(ii), 6(iv), 6(vii), 6(viii), 6(x), 6(xi) are 'PSP', the contractor is classified as a Personal Service Provider (PAYE withheld, IRP5 code 3601). Otherwise, if Appendix 7 was not already signed at Questions 4 or 5, the contractor signs Appendix 8 as an Independent Supplier (no PAYE, IT3(a) code 3616). For individuals, a similar matrix uses 'Employee' vs 'Independent' outcomes; 'Employee' on key questions or >50% on others leads to Dependent Contractor classification (PAYE withheld, IRP5 code 3601/3616).
Important Dates
Source: Authorisation Form - 08 November 2024.pdf (unknown)Document effective date: 08 November 2024. Document review date: November 2029. No tender closing date, briefing, or site visit dates are stated in this document.
Contact Information
Source: Authorisation Form - 08 November 2024.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"nd to sign all documents in connection with the tender and any contract that may result from it on"}
Submission Guidelines
Source: Authorisation Form - 08 November 2024.pdf (unknown)Returnable form: Eskom Authorisation Form (Document 240-15811258 Rev 2). The tenderer must complete the certificate corresponding to its entity type (company, close corporation, partnership, joint venture, sole proprietor, or trust) and attach certified proof of authorisation (board resolution, members' resolution, power of attorney, or trustees' resolution). The authorised signatory must also complete and sign the declaration table at the end of the form. All sections must be fully completed and signed.
Evaluation Criteria
Source: Authorisation Form - 08 November 2024.pdf (unknown)Eligibility requires the tenderer to be a legally constituted entity (company, close corporation, partnership, joint venture, sole proprietor, or trust). The authorised signatory must be duly appointed by resolution or power of attorney as specified for the entity type. Certified proof of authorisation must be submitted with the tender. No technical or financial evaluation criteria are stated in this document.
Compliance Requirements
Source: Authorisation Form - 08 November 2024.pdf (unknown)Entity-specific compliance: Company — certified copy of board resolution; Close corporation — certified copy of members’ resolution; Partnership — signed by all partners necessary to commit the partnership; Joint venture — power of attorney signed by authorised signatories of all JV members plus certified copy of JV agreement stating joint and several liability, lead member, and work/payment ratios; Sole proprietor — confirmation of sole proprietorship; Trust — certified copy of trustees’ resolution. All tenderers must complete the signatory declaration table.
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Market research: no current suppliers providing the services; potential suppliers from open market.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Tender closing: 28 September 2026 at 10:00 (from tender record).
No compulsory briefing, site visit, or clarification deadline is mentioned in the SDL&I strategy document.
Post-award deadlines:
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Department of Trade, Industry and Competition (dtic) — for NIPP obligation agreement (applicable if imported content ≥ USD 5 million).
Eskom SDL&I representative — for submission of SDL&I Implementation Schedule and quarterly reports.
No named individuals, emails, phone numbers, or physical submission address are provided in this document.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Submission method and address are not stated in the SDL&I strategy document. The tender itself closes on 28 September 2026 at 10:00 (per the tender record).
Returnable documents required to claim preference points:
Additional contractual deliverables after award:
Returnable Documents
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Sworn affidavit validity requirements: deponent name/ID/designation; enterprise name/address per CIPC; black ownership percentages (including black female and designated groups; Statement 004 beneficiaries if applicable); total revenue and basis (audited/management accounts); financial year end; single B-BBEE status level; empowering supplier status (QSE basis); matching deponent and commissioner of oath dates; commissioner not employed by enterprise.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Preference point system: 90/10 (price 90 points, specific goals 10 points).
B-BBEE status level points (90/10): Level 1 = 10, Level 2 = 9, Level 3 = 6, Level 4 = 5, Level 5 = 4, Level 6 = 3, Level 7 = 2, Level 8 = 1, Non-compliant = 0.
Failure to submit B-BBEE documentation does not disqualify but limits score to 90/100 (0 for specific goals).
Objective criteria: stated as a condition for contract award; failure to meet them may result in the second-ranked tenderer being recommended for award. The specific objective criteria are not detailed in this document.
SDL&I commitments (B-BBEE improvement, local content, black-owned procurement, jobs, skills) do not form part of scoring but become contractual obligations.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Scope: Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station (per tender record).
SDL&I contractual obligations (not scored but binding):
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Skills development delivery: tenderers participate directly and through supply network; SETA-accredited training providers may be approached. Tenderers bear full cost; Eskom contributes no funding. Tenderers advised to access SETA grants/subsidies and SARS tax rebates. SDL&I Implementation Schedule due 28 days post-award; quarterly reporting via Data Collection Template; Eskom reviews within 30 days; corrective measures required before next report or retention clauses invoked.
Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Tender response must separate local and imported components per the Price Schedule included with tender documents. Local procurement content = total spending minus imported component. Eskom target: 100% local content.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Pricing: tender response must separate local and imported components per the Price Schedule included with the tender documents.
Penalties and security:
No bond, guarantee, or insurance requirements are stated in this document. Payment terms not specified.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Mandatory for contract award:
B-BBEE improvement milestones (contractual, non-negotiable):
NIPP obligation: if imported content ≥ USD 5 million, winning bidder must negotiate and sign NIPP obligation agreement with dtic before Eskom contract signing.
Sworn affidavit validity requirements: deponent name/ID/designation, enterprise name/address, black ownership percentages, total revenue and basis (audited/management accounts), financial year end, single B-BBEE status level, empowering supplier status, matching deponent and commissioner of oath dates, commissioner not employed by enterprise.
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Duplicate of bbbee above — same content.
Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Penalty: 2.5% of contract value for failure to meet SDL&I obligations. Retention: 2.5% of every invoice (excl. VAT) held as security for contract duration; released only upon full SDL&I fulfilment. Quarterly SDL&I reports via Data Collection Template; Eskom review within 30 days; corrective measures required before next reporting period or retention clauses invoked. SDL&I Implementation Schedule due 28 days post-award for monitoring reference.
Special Conditions
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Reporting and monitoring: quarterly SDL&I reports via Data Collection Template; Eskom review within 30 days; written notification of non-compliance; corrective measures required before next report or retention clauses invoked. SDL&I Implementation Schedule due 28 days post-award for monitoring reference.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy -Air Heaters Element Packs.pdf (unknown)Duplicate of evaluation_criteria above — same content.
Important Dates
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Document issued: 06 August 2026 (Eskom representative Dimpho Mnisi). Tender closing date per tender record: 28 September 2026 at 10:00. No compulsory briefing, site visit or clarification deadline stated in this document.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Eskom representative: Dimpho Mnisi. Department: Tutuka Power Station. No email, phone or submission address provided in this document.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Returnable documents required with the tender submission:
Organisation chart and responsibility matrix including quality management function/role (ISO 9001:2015 Clause 5.3).
Documented information for control of externally provided processes, products and services, including criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers (ISO 9001:2015 Clause 8.4).
Latest internal management system audit report (not older than 12 months) with nonconformity, correction and/or corrective action reports, showing objective, scope, criteria and outcomes (ISO 9001:2015 Clause 9.2).
Latest certification management system audit report (not older than 12 months) with nonconformity, correction and/or corrective action reports.
Records of management review meetings (minutes, attendance registers).
Submission method, address, format and closing time are not stated in this document; refer to the main tender invitation.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Quality requirements evaluation (Category 1) scored per the following sections:
Total Category 1 score: 13 points. No price/functionality split, preference point system (80/20 or 90/10), or minimum qualifying thresholds are stated in this document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Scope: Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station (Eskom).
Quality requirements per Eskom specification 240-105658000 and related references 240-109253698 (Contract Quality Plan) and 240-109253302 (Quality Control Plan/ITP).
Bidders must demonstrate a functioning ISO 9001:2015 Quality Management System with relevant scope, and provide project-specific Contract Quality Plan and Inspection/Test Plans.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Mandatory:
No CSD registration, tax compliance status, B-BBEE level, CIDB grading, CIPC registration, professional body registration, local content percentage, or financial capacity thresholds stated in this document.
Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Mandatory quality management requirements:
Description
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station. Quality requirements per Eskom specification 240-105658000 and ISO 9001. Pre-contract award Category 1 selected (clause 3.5). Post-contract award requirements include Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, Nonconformity Management, and Special Processes (all clause 3.7/3.8).
Contact Information
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Eskom Quality Representative: Dimpho Mnisi, Officer Quality Assurance, signed 06.08.2026.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Pre-contract award quality assessment: Category 1 capability and capacity assessment per specification 240-105658000 clause 3.5. Post-contract award quality requirements: Contract Execution (clause 3.7), Supplier Quality Performance Monitoring Phase (clause 3.7), Eskom Rights of Access (clause 3.8), Eskom Rights to Information (clause 3.8), Preservation (clause 3.8), Quality Audits Related Conditions (clause 3.8), Management of Nonconformities and Nonconforming Outputs Identified by Eskom (clause 3.8), Special Processes (clause 3.8). ISO 9001 clauses applicable: 4 Context of the Organisation, 5 Leadership, 6 Planning, 7 Support, 8 Operation, 9 Performance Evaluations, 10 Improvement. Quality principles applicable: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence based decision making, Relationship Management. Tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements per 240-105658000 and ISO 9001.
Technical Specifications
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Manufacture, supply, delivery, removal and installation of air heater element packs for three units at Tutuka Power Station. Quality requirements governed by Eskom specification 240-105658000 and ISO 9001:2015. Pre-contract award: Category 1 selected (clause 3.5). Post-contract award requirements: Contract Execution (clause 3.7), Supplier Quality Performance Monitoring Phase (clause 3.7), Eskom Rights of Access (clause 3.8), Eskom Rights to Information (clause 3.8), Preservation (clause 3.8), Quality Audits Related Conditions (clause 3.8), Management of Nonconformities and Nonconforming Outputs Identified by Eskom (clause 3.8), Special Processes (clause 3.8).
Methodology
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Quality approach must address ISO 9001 clauses 4-10 and seven quality principles. Specific methodology requirements per Eskom specification 240-105658000 for air heater element pack manufacture, supply, delivery, removal and installation at Tutuka Power Station. Pre-contract Category 1 capability demonstration. Post-contract execution, monitoring, audit access, information rights, preservation, nonconformity management, and special process controls.
Quality Management
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Duplicate of quality_management section above — same content regarding ISO 9001 clauses 4-10, quality principles, Eskom specification 240-105658000 pre/post-contract requirements, Form A sign-off, and Eskom Quality Representative Dimpho Mnisi.
Compliance Requirements
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)CSD registration and valid SARS tax clearance certificate or tax compliance status PIN required (per tender record). Quality compliance: ISO 9001:2015 certification or alignment with clauses 4-10. Eskom specification 240-105658000 compliance. Form A (240-68099512 Rev 9) must be completed and signed by tenderer's quality representative to acknowledge and accept Eskom Supplier Quality Requirements.
Section
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Evaluation includes pre-contract award quality capability and capacity assessment (Category 1 per clause 3.5 of 240-105658000). Post-contract award quality performance monitoring against ISO 9001 clauses 4-10 and quality principles. Tenderer must sign Form A acknowledging Eskom Supplier Quality Requirements.
Contact Information
Source: Integrity declaration form.pdf (RFP){"name":null,"email":null,"phone":null,"department":"y), should the resulting tender, or part thereof, be awarded to such natural/legal person,","address":"ERING PRACTICES"}
Submission Guidelines
Source: Integrity declaration form.pdf (RFP)The Integrity Declaration Form (Eskom form 559-1848080 Rev 1) must be fully completed, signed, and submitted as a mandatory returnable. Failure to do so will result in the tender not being evaluated further.
Evaluation Criteria
Source: Integrity declaration form.pdf (RFP)Tenderer must not be listed on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters. No director, member or shareholder may have been convicted of fraud or corruption in procurement processes in the past five years. No prohibition from doing business with international financial development/funding agencies. No history of failing to meet contractual obligations with any state-owned company. Must declare all relationships with Eskom employees, directors, contractors or consultants, and with other tenderers. Must provide complete shareholding information for all individuals and entities.
Technical Specifications
Source: Integrity declaration form.pdf (RFP)provisions above, please complete the table hereunder with all required information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer Number details (including Capacity/Position of knowledge
(e.g. employee/ Director/ employee number) if Eskom employee/ is this
member/ owner/ you are a State/State director
Compliance Requirements
Source: Integrity declaration form.pdf (RFP)Integrity Declaration Form (Eskom form 559-1848080 Rev 1): must be fully completed, signed, and submitted. The form requires disclosure of any relationships with Eskom or state employees, declaration of fair tendering practices, and full shareholding information. Disqualification applies if the bidder is on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters, or if any director/member/shareholder has been convicted of fraud or corruption in procurement in the past five years, or has a history of failing contractual obligations with a state-owned company.
Description
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)This document is the technical evaluation strategy for the replacement of boilers 1 to 5 air heater element packs at Tutuka Power Station. The scope includes supply, delivery, removal, and installation. The strategy defines mandatory and qualitative evaluation criteria and TET member responsibilities. The document applies to Tutuka Power Station.
Contact Information
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)Phone: 0168966153
Department: Supply Chain Management
Submission Guidelines
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)Returnable Documents: None N/A N/A Tender Technical Evaluation Strategy for Replacement of Unique Identifier: 559-62120360 Boilers 1 to 5 Air Heater Element Packs Revision: 1 Page: 3.3 QUALITATIVE TECHNICAL EVALUATION CRITERIA Table 2A: Qualitative Technical Evaluation Criteria for supply Qualitative Technical Criteria Reference to Technical Specification / Criteria Weighting Criteria Sub Weighting Description Tender Returnable (%) (%) Returnables: Provide proof of supplier 1. Tenderer to demonstrate ability to 25 or principal of agent has own workshop supply the air heater element packs. or workshop lease agreement and This is through tenderer’s ownership equipment and tools to manufacture workshop or workshop lease element packs. A utility bill/ statement is agreement and manufacturing acceptable proof of own workshop. equipment and tools to execute the, 100% (5): Proof of own workshop or works. lease agreement and list including pictures including pictures of equipment and tools for manufacturing element packs, 40% (2): Proof of own workshop or lease agreement but with no list including pictures of equipment and tools for manufacturing element packs, 0% (0): No submission Returnables: Provide a list of previous 2. Tenderer to demonstrate through 25 purchase orders/contracts for supply of verifiable reference list of at least 3 air heater element packs completed by previous purchase orders for supply the company/supplier within the last 5 of air heater element packs to Eskom years. Include contact details (contact or other companies within the last 5 person and contact number for each years. order/contract)., 100% (5): List with 3 or more purchase orders for air heater element packs in the last 5 years Tender Technical Evaluation Strategy for Replacement of Unique Identifier: 559-62120360 Boilers 1 to 5 Air Heater Element Packs Revision: 1 Page, 80% (4) List with 2 purchase orders for supply of air heater element packs in the last 5 years, 40% (2) List with 1 purchase order for supply of air heater element packs in the last 5 years, 0% (0): No submission Returnables: Provide detailed 3. Tenderer to demonstrate ability to 20 procedure for packaging and preserving package and preserve the air heater air heater element packs for storage. element packs for storage., 100% (5): Detailed procedure for packaging and preserving air heater element packs for storage, 40% (2): Procedure for packaging and preserving the air heater element packs not detailed, 0% (0): No procedure for packaging and preserving air heater element packs for storage Returnables: Provide an approved 4. Provide lead times for delivery of first 20 delivery schedule indicating expected set of air heater element packs from lead times from a previous purchase previous purchase order. This should order/ contract. include a breakdown of activities, 100% (5): Lead time ≤ 12 weeks (with durations) to be carried out with a schedule of activities from the time a purchase order is placed.
Evaluation Criteria
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)Technical evaluation threshold: minimum 70% weighted final score.
Mandatory criteria: none.
Qualitative criteria for supply (total 100%):
Qualitative criteria for services (removal & installation) (total 100%):
Acceptable technical risks: lease workshop, awaiting ISO3834 certificate, at least 1 PO for supply and 1 for removal/installation.
Unacceptable technical risks: no workshop, no previous POs, no packaging procedure, lead time >24 weeks, no QCP/data book, no ISO3834 accreditation.
Technical Specifications
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)Scope: Manufacture, supply, delivery, removal, and installation of air heater element packs for boilers 1 to 5 at Tutuka Power Station.
Reference documents include: 15ENG GEN-3206 (Scope of Work), 240-106628253 (Eskom Welding Requirements), 240-53665024 (Engineering Quality Manual), QM58 (Eskom Quality Requirements), ISO 9001 (informative).
Experience & Qualifications
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)For services (removal & installation): Site Manager with at least 5 years experience in replacing air heater element packs; at least 2 Supervisors with 5 years experience; at least 4 Artisans (fitters, boilermakers, welders, riggers) with 3 years experience. Proof of previous experience with at least 3 purchase orders for removal/installation in last 5 years.
Quality Management
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)Quality control plans (QCPs) and data books from previous manufacturing are required for supply (weighting 10%). Comprehensive QCP from previous replacement is required for services (weighting 15%). References to Eskom Quality Manual and ISO 9001.
Compliance Requirements
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)ISO3834 accreditation (or evidence of successful completion of certification process) for welding is required.
Failure to provide ISO3834 accreditation or acceptable evidence is an unacceptable risk.
Section
Source: Tender Technical Evaluation Strategy for supply of boiler 1 to 5 AH element packs.pdf (unknown)Technical evaluation threshold: 70%.
Mandatory criteria: none.
Qualitative criteria for supply (5 criteria, 100% total) and services (5 criteria, 100% total) as detailed in evaluation criteria section.
Acceptable risks: lease workshop, awaiting ISO3834, at least one PO for each.
Unacceptable risks: no workshop, no previous POs, no packaging procedure, lead time >24 weeks, no QCP/data book, no ISO3834.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf (unknown)The tenderer must be a legally incorporated entity capable of entering into a binding agreement under South African law. It must have authorised signatories with the power to bind the company. No specific B-BBEE level, CIDB grading, CSD registration, or tax clearance requirements are stated in this NDA document. The NDA itself is a precondition for participation in the tender process for the air heater element packs project.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf (unknown)provisions of this Agreement for any
purpose whatsoever other than the Project
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)General: Eskom conducts the tender process fairly, equitably, transparently, competitively and cost-effectively. The Eskom Representative and tenderers must act timeously and ethically.
Interpretation: Terms in italics vary per tender; details are in the Tender Data.
Tender Documents: The Invitation to Tender documents comprise the Invitation to Tender documents (including annexures) and/or additional requirements stated in the Tender Data. Documents required from the tenderer may form part of any resulting contract if stated in the Tender Data. The Standard Conditions of Tender and the Tender Data do not form part of any contract.
Type of Invitation: Open tenders advertised on Eskom Tender Bulletin and NT e-Tender Portal (and other media if required). Closed tenders sent directly to identified tenderers. Sole/single source per Eskom Procurement Procedure 32-1034. Addenda published/issued same way as original Invitation.
Eskom's Rights: May accept or reject any variation, deviation or alternative tender; accept whole or part of tender; cancel tender at any time before contract conclusion with written reasons; abandon proposed goods/work/services, perform otherwise, or re-issue similar invitation. Eskom and related parties not liable for losses/claims/damages from participation, amendment, termination, suspension, or exclusion.
Eskom's Right to Negotiate: Reserves right to enter mandated negotiations with selected tenderer(s) per approved procurement policies.
Disclaimer: Eskom takes reasonable measures for accuracy but makes no representations or warranties, express or implied; disclaims all liability for accuracy/completeness of tender document information.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Closing date and time: 28 September 2026 at 10:00 SAST (South African Standard Time, GMT+2). The Telkom time signal is used and strictly adhered to.
Compulsory briefing/site visit: A site visit and/or clarification meeting may be stipulated as compulsory in the Tender Data. Failure to attend a compulsory meeting results in disqualification. Details (date, time, venue) are stated in the Tender Data.
Extended closing date: If Eskom extends the closing date and time, the Standard Conditions of Tender apply equally to the extended date. Tenderers must check the Eskom Tender Bulletin and NT e-Tender Portal regularly for changes and addenda.
Clarification requests: Must be addressed in writing to the Eskom Representative identified in the Invitation to Tender, allowing reasonable time for Eskom to respond and for tenderers to adjust tenders before closing. Responses are published to all tenderers on the platform where the tender was advertised.
Briefing Session
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Site visit and/or clarification meeting: Tenderers must attend if stipulated as compulsory in the Tender Data. Failure to attend a compulsory meeting results in disqualification. Details (date, time, venue) are stated in the Tender Data. Tenderers are entitled to ask questions for clarity during the site visit or clarification meeting.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)All communication must be directed to the Eskom Representative identified in the Invitation to Tender documents. Communication must be in writing (hand-written, typed, printed or electronic) and in English. Eskom takes no responsibility for non-receipt of communications. Clarification requests and queries must be addressed only to the Eskom Representative; no other Eskom official may be contacted. Eskom publishes all clarification requests and responses (without divulging the tenderer's name) on the platform where the tender was advertised (Eskom Tender Bulletin and NT e-Tender Portal). Tenderers are responsible for checking these platforms regularly for updates, addenda and responses.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Submission method: Electronic submission only via the Eskom Tender Bulletin site (E-tendering page). No physical tender box deposits are accepted. Tenders must be uploaded and finalised before the closing date and time; the system will not allow changes or submission after closing.
Documents required: Complete original tender plus one complete hard copy (both in paper form) unless e-tendering applies. For e-tendering, submit in the Technical, Commercial and Financial folders as indicated on the e-tendering page. All documents must be in English, accessible, not corrupt, and readable (PDF/Excel). Written tenders must be completed in ink, not pencil.
Packaging (paper submissions): Original and copy as separate packages marked "ORIGINAL" and "COPY". If an electronic copy is required, package it separately marked "ELECTRONIC COPY". Each package must show the Eskom submission address, Invitation to Tender number, tenderer name, physical address, email and contact number of the authorised signatory. Seal the packages together in an outer package marked "Confidential" bearing the same details.
Signing: Sign the original tender (or the electronic tender for e-tendering). The named signatory is held liable for the tender.
Mandatory returnables: Acknowledgement Form (completed and submitted with the tender, stating whether the tender is for the whole or part of the works/services/supply). Proof of authority to act as agent (authenticated copy) where an agent submits on behalf of a principal. All mandatory returnables must be submitted by the closing date and time; returnables required for contract award must be submitted before contract award. Every returned document, form, data sheet and schedule must be fully completed. Certificates, registrations and proofs must be valid, current and original where stipulated, for the entire tender validity period.
Disqualification risks: Late submission (no late tenders accepted, regardless of reason). Missing original or copy (paper submissions). Any mandatory returnable left unsigned, incomplete or omitted. Failure to attend a compulsory site visit or clarification meeting. Misrepresentation or falsification of any information, certificate, affidavit or document.
Tender validity: Hold the tender valid for acceptance within the validity period after closing. Extend the validity if Eskom requests; agreeing to extend does not permit modification. Refusing an extension excludes the tenderer. If validity expires before contracts are concluded, the procurement process ends without award.
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Mandatory tender returnables must be submitted by closing date and time for evaluation purposes; returnables required for contract award must be submitted before contract award. All documents returned (including forms, data, schedules) must be completed without exception. Certificates, documents, proof of registration must be valid, current, and original where stipulated, for the entire tender validity period. Acknowledgement Form must be completed and submitted with the tender, stating if tender is for whole or part of works/services/supply. Proof of authority to act as agent (authenticated copy) must be submitted as a tender returnable where an agent submits on behalf of a principal. B-BBEE certificate/affidavit/CSD report must be provided at closing if B-BBEE level is a pre-qualification criterion. Sub-contractors' B-BBEE status and CSD number/certificate/affidavit must be provided at closing if sub-contracting to designated groups is a pre-qualification criterion. Designated materials and thresholds information must be submitted no later than contract award. Cataloguing information per item may be required after contract award; pricing schedule must include a line item for cataloguing if required.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Evaluation follows a phased approach. No criterion is measured twice across phases (no double-dipping).
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Pricing Schedule: Rates and prices must include all duties, taxes (including VAT) and other levies applicable 14 days prior to closing. Rates and prices fixed for contract duration, not subject to adjustment except as provided in the Invitation to Tender. State in South African Rand unless instructed otherwise; submit Rand rates/prices per exchange rate and base date stipulated in the Invitation. If a bill of quantities or pricing schedule applies, complete it fully; omissions lead to arithmetical error corrections. Arithmetical errors checked: decimal point misplacement, omissions, multiplication errors, addition errors, fewer than four decimal places on exchange rate, incorrect exchange rate. Amount in words prevails over figures. Correction rules: line-item total prevails over rate error; total of prices prevails over addition errors. Tenderer must accept corrected prices or confirm original; failure leads to rejection. Price evaluation per Tender Data criteria, considering CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, present value, forecasted invoicing rates. Reverse e-auction may be used (90/10 or 80/20); if so, indicated in Invitation to Tender; tenderers submit complete tender without prices.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Pricing: Include in rates, prices and the tendered total all duties, taxes (including VAT) and other levies payable by the tenderer if successful, as applicable 14 days prior to the closing date and time. Rates and prices must be fixed for the duration of the contract and not subject to contract price adjustment except as provided for in the Invitation to Tender. State rates and prices in South African Rand unless instructed otherwise; the Invitation to Tender may provide for part payment in other currencies — submit Rand rates/prices in accordance with the exchange rate and base date stipulated in the Invitation.
Security for Performance: Where required, the tenderer must indicate the names of at least two financial institutions likely to be approached for the required form of security. Eskom reserves the right to reject any financial institution found unsuitable.
Insurance: The extent of insurance provided by Eskom (if any) may not be the full cover required in the conditions of contract. Tenderers are advised to seek qualified advice regarding insurance.
Financial Analysis: Eskom evaluates the tenderer's financial statements to determine financial risk. Mitigating factors or requirements may be identified; tenderers not considered for award if risk is too high, mitigating factors insufficient or not agreed.
Cost of Tendering: Eskom does not compensate tenderers for any costs incurred in preparation and submission of the tender, including testing costs to demonstrate compliance with evaluation criteria, or negotiation costs.
Arithmetical Errors: Amount in words prevails over figures. Corrections follow specified rules (line-item total prevails over rate error, etc.). Tenderer must accept corrected prices or confirm original; failure to do so leads to rejection.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Eligibility: Tenderer (including any joint venture or consortium) must comply with eligibility criteria stated in the Tender Data and must not be under any restriction to do business with Eskom or State-Owned Companies. 100% sub-contracting of the scope of work is not permitted; such tenders are deemed ineligible and disqualified.
CSD Registration: Tenderer must be registered on the Central Supplier Database (CSD).
Tax Compliance: Valid tax compliance status (SARS tax pin) required.
B-BBEE: Valid B-BBEE certificate, affidavit or CSD report. If B-BBEE level is a pre-qualification criterion, proof must be submitted at closing or the tender is disqualified. Fraudulent/expired proof leads to disqualification and reporting to the B-BBEE Commission. For PPPFA point allocation only, zero points if no valid proof at closing, but tender not disqualified if otherwise responsive. Sub-contractors' B-BBEE status and CSD number/certificate/affidavit must be provided at closing if sub-contracting to designated groups is a pre-qualification criterion.
CIDB: Where the Tender Data stipulates CIDB grading, tenderer must be registered with the Construction Industry Development Board at closing, or capable of registration within 21 working days. Proof of CIDB registration (printout from CIDB database) is mandatory at closing; if only proof of application is available at closing, it must be submitted then and actual proof of registration by contract award. Failure to provide as stipulated leads to disqualification.
SHEQ: Proof of safety, health, environmental and quality (SHEQ) systems, policies and capabilities must be provided to Eskom's satisfaction at closing and/or contract award. All SHEQ costs and personnel must be reflected in the tender.
Legislation: Comply with National Treasury Instruction Notes, CIDB Regulations, designated local content/materials (dtic), PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements, and any other legislation indicated in the Invitation to Tender.
Contract Skills Development Goals (CSDG): Applicable if contract duration is 12 months or more, and either contract value is R5 million or more (professional/service contracts) or CIDB grade 7 or higher (engineering/construction works).
Contract Participation Goals (CPG): Applicable to construction works contracts in General Building (GB) and Civil Engineering (CE) classes, estimated minimum project duration of 6 months, where at least 25% of the main contract could reasonably be subcontracted in CE, EB, GB or ME classes.
SDL&I Undertaking: Must be completed fully and submitted by contract award; failure to do so means the tender will not be considered for award.
Designated Materials: Information on designated materials and thresholds must be submitted no later than contract award; failure to submit means tender not considered for award.
Cataloguing: Successful tenderer may be required to provide cataloguing information per item after award; pricing schedule must include a line item for cataloguing if required.
Misrepresentation: Any misrepresentation or falsification of information, certificate, affidavit or document leads to disqualification, reporting to the B-BBEE Commission, and potential suspension from state business for up to 10 years.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)OHS Act compliance is mandatory. Tenderers must comply with Eskom's requirements for Safety, Health, Environment and Quality (SHEQ). Proof of SHEQ systems, policies and capabilities must be provided to Eskom's satisfaction at the closing date and time for tender submission and/or contract award. All costs and personnel associated with SHEQ must be reflected in the tender.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Tender Closing Time: South African Standard Time (SAST, GMT+2). Telkom time signal used and strictly adhered to.
Extended Closing Date: Standard Conditions apply equally to any extended date. Tenderers must check Eskom Tender Bulletin and NT e-Tender Portal regularly for changes and addenda.
Late Tenders: Not accepted under any circumstances. No responsibility for misplacement or premature opening if outer package not sealed or addressed incorrectly. No responsibility for courier/postal delays, transit delays, or delivery to wrong location. E-tendering system prevents submission after closing. Eskom employees may not deposit tenders on behalf of tenderers.
Cost of Tendering: Eskom does not compensate tenderers for preparation, submission, testing or negotiation costs.
Submitting a Tender: Check documents on receipt; notify Eskom Representative of discrepancies or omissions. Original tender plus one complete hard copy required at closing (paper submissions); both must be submitted or tender is disqualified. E-tendering: upload and finalise via Eskom Tender Bulletin site by closing; documents must be accessible, not corrupt/unreadable; only electronic submission accepted.
Tenders in English; written tenders in ink, not pencil.
Signing: Sign original tender (or electronic tender for e-tendering); named signatory held liable.
Packaging (paper): Original and copy as separate packages marked "ORIGINAL" and "COPY"; electronic copy separate marked "ELECTRONIC COPY". Each package shows Eskom address, Invitation to Tender number, tenderer name, physical address, email, contact number of authorised signatory. Packages sealed together in outer package marked "Confidential" with same details. E-tendering: documents updated in Technical, Commercial and Financial folders.
Tender Validity: Hold tender valid for acceptance within validity period after closing. Extend if Eskom requests; agreeing to extend does not permit modification; refusing extension excludes tenderer. Requested to extend until contracts concluded; request not a representation of acceptability. If validity expires before contracts, procurement concludes without award.
Confidentiality: Treat all procurement matters as confidential; use/copy documents only for preparing/submitting tender.
Standardised Specifications: Obtain and familiarise with latest revision of standardised specifications/other documents incorporated by reference.
Insurance: Eskom-provided insurance may not be full cover; tenderer advised to seek qualified advice.
Pricing: Include all duties, taxes (including VAT), levies payable if successful; rates/prices fixed for contract duration, not subject to adjustment except as provided; state in South African Rand unless instructed otherwise; selected conditions of contract may allow part payment in other currencies; submit Rand rates/prices per exchange rate and base date in Invitation.
Alterations: No alterations/additions to tender documents except to comply with Eskom Representative instructions or correct tenderer errors; all alterations initialed by all signatories; no correction fluid/tape.
Alternative Tenders: Only if main tender also submitted and permitted by Invitation; based only on criteria in Tender Data.
Clarification and Correction of Prices: Provide clarification/documents as required by Eskom Representative during evaluation; mandatory returnables not requested/submitted after closing; breakdown of rates/prices may not change prices/substance except to correct arithmetical errors; corrected total binding.
Sign Form of Agreement: Undertake to check final draft contract and sign.
Proof of Authority: Authenticated copy of authority to act as agent must be submitted as tender returnable where an agent submits on behalf of a principal.
Eskom's Obligations: Respond to clarification requests before closing; publish responses to all tenderers. Issue addenda on same platform; tenderers responsible for checking. Return late tenders unopened. Open tenders in presence of tenderers' representatives (paper); for e-tendering, no public opening, names published on Bulletin/Portal. Announce tenderer names; prices announced if stated in Tender Data. Non-disclosure of evaluation information until after award unless required by law. Reject tenders for proven influence, collusion, bid-rigging, fraud. Seek clarification on ambiguous matters; mandatory returnables not requested but clarity may be sought. Prepare contract documents incorporating addenda, returnables, negotiated changes. Arrange authorised signatories to sign Form of Agreement.
Special Conditions
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Eskom's Obligations:
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Eligibility: Tenderers must comply with eligibility criteria in the Tender Data and not be restricted from doing business with Eskom or State-Owned Companies. 100% sub-contracting of the scope of work is prohibited and leads to disqualification.
CIDB: Where CIDB grading is stipulated, tenderers must be registered with the Construction Industry Development Board at closing, or capable of registration within 21 working days. Proof of registration (CIDB database printout) mandatory at closing; if only proof of application available, submit at closing and actual proof by contract award. Failure to provide as stipulated leads to disqualification.
Contract Skills Development Goals (CSDG): Applicable to contracts of 12 months or more duration, and either R5 million or more (professional/service contracts) or CIDB grade 7 or higher (engineering/construction works).
Contract Participation Goals (CPG): Applicable to construction works contracts in General Building (GB) and Civil Engineering (CE) classes, estimated minimum project duration of 6 months, where at least 25% of the main contract could reasonably be subcontracted in CE, EB, GB or ME classes.
Legislation Compliance: National Treasury Instruction Notes, CIDB Regulations, designated local content/materials (dtic), PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements, and any other legislation indicated in the Invitation to Tender.
SHEQ: Proof of SHEQ systems, policies and capabilities to Eskom's satisfaction at closing and/or contract award. All SHEQ costs and personnel reflected in tender.
SDL&I Undertaking: Complete and submit by contract award; failure means tender not considered for award.
Security for Performance: Indicate names of at least two financial institutions likely to be approached for performance security; Eskom may reject unsuitable institutions.
Designated Materials: Information on designated materials and thresholds submitted no later than contract award; failure means tender not considered for award.
Cataloguing: Successful tenderer may be required to provide cataloguing information per item after award; pricing schedule must include cataloguing line item if required.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Evaluation follows a phased approach with no double-dipping across phases:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Bethal/ Standerton Road - Standerton - Mpumalanga - 2430
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
23
Last checked
26 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.