Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
04 Gomery road - Summerstrand - Gqerberha - 6001
Organization Type
GOVERNMENT
Published
01 Sept 2026
OCDS Reference
ocds-9t57fa-167704
Saeon elwandle node seeks a service provider to manage garmin inreach professional enable subscriptions for four existing gpsmap 86i devices over a five-year contract. The provider must facilitate activation, monthly payments, usage charges, and subscription changes, with a r30,000 provisional sum for ad-hoc costs. The single most consequential requirement is that the bidder must be an authorised garmin service provider, reseller, distributor or retail agent, proven by a letter of authorisation.
Closing date and time: 07 September 2026 at 11:00 am; electronic submission only via email to [email protected] in PDF format.
Mandatory returnable documents: signed SBD 1 (including SBD 4, SBD 6.1, Bid Submission Certificate), proof of authority (company resolution), CSD registration proof, Garmin authorisation letter, InReach knowledge demonstration, Garmin supply experience evidence, completed SBD 3.2 pricing schedule and detailed quotation on company letterhead.
Eligibility: CSD registration with Master Registration Number; SARS tax compliance (TCS PIN or certificate); no directors or members in service of the state.
Technical pre-qualification: must be an authorised Garmin service provider, reseller, distributor or retail agent (letter required); must demonstrate knowledge of the Garmin inReach Professional Enable package; must show previous experience supplying Garmin devices or subscriptions.
Contract period: five years with firm pricing for known expenditures and a R30,000 provisional sum for ad-hoc charges (usage, additional devices, changes, cancellations, Garmin-imposed changes).
Evaluation: 80/20 preference point system (Price 80 points, Specific Goals 20 points); B-BBEE certificate or sworn affidavit required to claim specific goal points; minimum technical threshold must be met to proceed to price scoring.
Performance penalties: 5% penalty for downtime due to non-payment of Garmin account without prior communication to SAEON; non-performance on 5-year account management may lead to contract termination (GCC 22).
Date & Time
Monday, 07 September 2026 - 11:00
Venue
null
Categories
Request for Quotation
04 Gomery road - Summerstrand - Gqerberha - 6001
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Description
Source: RFQ - inReach Subscriptions.pdf01 Sept
2026
Tender Published
Tender was published
07 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ - inReach Subscriptions.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 929 983
Range
Based on 14 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Introduction to the nrf
The National Research Foundation Act, Act , establishes the National Research
Foundation (“NRF”) as the juristic person that makes this bid invitation and will contract with the
awarded bidder. The Public Finance Management Act classifies the organisation as a Schedule
3A Public Entity.
Context of this procurement
SAEON conducts routine scientific fieldwork in remote coastal and estuarine environments
where cellular coverage is often limited or unavailable. To improve emergency communication
capability, SAEON intends to leverage the Garmin inReach functionality available on its existing
Garmin GPSMAP 86i devices, providing a reliable satellite-based communication solution
without the need for additional handheld hardware.
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Contract period
Five (5) years
Description of goods/detailed specification
The contract period will be five (5) years.
A. Garmin inReach Professional Enabled package
SAEON requires the appointment of a service provider to facilitate the subscription payments
and management of Garmin inReach Professional Enable packages for four (4) existing
Garmin GPSMAP 86i devices (Serial Number will be provided to winning bidder).
The service provider will be responsible for maintaining the subscriptions and facilitating
payment to Garmin on behalf of SAEON for the duration of the contract. This includes
activation, monthly subscriptions as well as charges associated by utilization of devices.
B. Ad-Hoc Expenses
During the contract period, SAEON must have the flexibility to add or remove devices and
increase or decrease the subscription package associated with individual devices, as
operational requirements change. Changes to the number of devices or subscription packages
must be accommodated without requiring a new contract. In addition, a provisional sum will be
set aside to cover ad-hoc service charges that may arise during the contract period. This may
include usage charges, additional subscriptions or devices, subscription changes, and
cancellation or suspension fees associated with the Garmin inReach service. The provisional
sum is not guaranteed expenditure and will only be utilised at the sole discretion of SAEON, as
and when required. SAEON is under no obligation to utilise the full provisional amount. A list of
expenditures covered by the provisional sum can be seen as follows:
points, where chargeable, weather requests, where chargeable, and other chargeable
inReach features specifically offered by Garmin and authorised by SAEON).
Sets of quotation documents required
Number of ORIGINAL bid documents for contract signing 1
Bidders must submit the above number of original documents in electronic format (email) to the
NRF. These serve as the original sets for the legal bid document and upon award , signature and
serve as the legal contract document between the bidder and the NRF.
Returnable documents checklist
The bidder is to complete this table and to supply the necessary page references to the
supporting documentation. A bidder failing to adequately provide any of the mandatory
documents will be disqualified.
Legislative/Technical Documents Compliance
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
(M – Mandatory); (O – Optional); Submitted Bid Section Reference to
(A- Administrative) Reference Bidder’s
document
Bidder Eligibility
Procurement Invitation (SBD 1), signed ❑
and completed including the SBD 4, 6.1 A Yes Pages 1-20
and signed Bid Submission Certificate ❑ No
form.
❑
Proof of authority must be submitted e.g. A Yes
company resolution ❑ No
❑ Proof of Registration on the
Government’s Central Supplier Database A Yes
(CSD). ❑ No
❑
A valid B-BBEE certificate or Sworn O Yes Pages 16-19
Affidavit ❑ No
Specification Eligibility
Garmin Authorisation - Supply a letter of ❑
authorisation confirming that the bidder is an
authorised Garmin service provider, reseller, M Yes
distributor or retail agent. ❑ No
InReach Knowledge - Demonstrate
knowledge of the Garmin inReach system by
providing a brief overview of the Garmin ❑
inReach Professional Enable package M Yes
requested by SAEON providing an evidence ❑ No
including the key features and services
included.
Garmin Supply Experience - Demonstrate
previous experience supplying Garmin ❑
devices and/or Garmin subscriptions by
Yes providing either a previous invoice, M
purchase order, or a contactable client ❑ No
reference.
Pricing Documents Compliance
Pricing (SBD 3.2) in this document to be ❑
completed and a detailed quotation supplied M Yes Pages 09-11
listing all required specifications ❑ No
Eligibility criteria (go/no-go)
Selection Element Meet Bid Section
Reference to
Specificati Reference
Bidder’s
on
document
Important Dates
Source: RFQ - inReach Subscriptions.pdf (RFQ)Closing date and time: 07 September 2026 at 11:00 am (compulsory). No compulsory briefing session or site visit (marked N/A). Validity period: 60 days from closing date. Contract period: Five (5) years from award.
Contact Information
Source: RFQ - inReach Subscriptions.pdf (RFQ)SCM enquiries: SCM section, email [email protected]. Technical enquiries: Werner Kuntz (Elwandle Technical), email [email protected]. Submission address: Electronic submission via email to [email protected] (PDF only).
Submission Guidelines
Source: RFQ - inReach Subscriptions.pdf (RFQ)Submission method: Email only to [email protected]. Only PDF documents are accepted. Closing date and time: 07 September 2026 at 11:00 am. Late submissions will not be considered. Validity period: 60 days from closing date. One original bid document set required in electronic format (email) for contract signing. Returnable forms (all mandatory unless marked optional): SBD 1 (Procurement Invitation) signed and completed including SBD 4, SBD 6.1 and signed Bid Submission Certificate; Proof of authority (e.g. company resolution); Proof of CSD registration; Valid B-BBEE certificate or Sworn Affidavit (optional for preference points); Garmin Authorisation letter confirming bidder is an authorised Garmin service provider, reseller, distributor or retail agent; InReach Knowledge demonstration — brief overview of Garmin inReach Professional Enable package with key features and services; Garmin Supply Experience — previous invoice, purchase order, or contactable client reference for Garmin devices/subscriptions; Pricing Schedule (SBD 3.2) completed and detailed quotation on company letterhead listing all required specifications. Disqualification risks: any mandatory returnable form left unsigned or omitted; submission after closing time; incomplete SBD 1, SBD 4, SBD 6.1 or Bid Submission Certificate; failure to provide proof of CSD registration; failure to provide Garmin authorisation letter.
Evaluation Criteria
Source: RFQ - inReach Subscriptions.pdf (RFQ)Evaluation follows a multi-stage process: Stage 1 — Compliance with submission requirements (returnable documents checklist). Stage 2 — Technical evaluation against specifications (minimum threshold required to proceed). Stage 2A — Written response evaluation per published criteria. Stage 2B — Due diligence interviews or proof of delivery/concept if justified. Stage 2C — Reference checks with referees. Stage 3 — Price/Preference scoring using 80/20 preference point system: Price maximum 80 points (lowest price receives maximum points, others ranked relative to lowest); Specific Goals maximum 20 points allocated per B-BBEE status level and ownership criteria: B-BBEE Level 1-3 = 8 points, Level 4-6 = 6 points, Level 7-8 = 2 points; ≥51% Black-owned = 3 points; ≥51% Black female-owned = 3 points; ≥51% Black youth-owned = 1 point; ≥51% owned by People with Disabilities = 1 point; EME or QSE = 4 points. Valid B-BBEE certificate or sworn affidavit required to claim specific goal points. Stage 4 — Tax compliance verification (7 working days to remedy non-compliance). Stage 5 — Award to highest combined score subject to administrative documentation. Price formula: Ps = 80 × (1 - (Pt - Pmin) / Pmin). Fair pricing tests applied; NRF may negotiate price only with highest-ranked bidder if outside fair price range.
Technical Specifications
Source: RFQ - inReach Subscriptions.pdf (RFQ)Scope: Appoint a service provider to manage Garmin inReach Professional Enable subscription payments for four (4) existing Garmin GPSMAP 86i devices (serial numbers provided to winning bidder) on behalf of SAEON Elwandle Node. Contract period: Five (5) years. Core services: Activation, monthly subscriptions, usage charges, subscription management and payment facilitation to Garmin. Ad-hoc flexibility: Ability to add/remove devices and change subscription packages without new contract. Provisional sum: R30,000 set aside for ad-hoc charges (usage charges, additional subscriptions/devices, subscription changes, cancellation/suspension fees, reactivation fees, Garmin-imposed service changes) — not guaranteed expenditure, utilised at SAEON's sole discretion. Service hours: Normal working hours Monday to Friday 08h30-17h00 excluding public holidays; additional hours by mutual agreement based on severity. Performance levels: Downtime due to non-payment of Garmin inReach account without prior communication to SAEON — 5% penalty, non-performance may lead to termination (GCC 22); 5-year account management failure to execute service plans per schedule — non-performance may lead to termination (GCC 22). Communication: Written only (mail, delivery, email) referencing contract and purchase order numbers. OHS: Personnel on NRF sites require safety induction, PPE (closed safety shoes, hard hats, height safety equipment, high-visibility vests), compliance with OHS Act, valid COID Letter of Good Standing, Section 37.2 agreement, health and safety plan, signed indemnity forms.
Pricing Schedule
Source: RFQ - inReach Subscriptions.pdfThe NRF compares each bidder’s pricing proposal on an equal and fair comparison basis
equitable to all bidders, taking into account all aspects of the bid’s pricing requirements
including the application of fair pricing tests as set out below in the section “Insufficiency of
Funds”.
Pricing (SBD 3.2) in this document to be ❑
completed and a detailed quotation supplied M Yes Pages 09-11
listing all required specifications ❑ No
Eligibility criteria (go/no-go)
Bidder’s
on
document
Minimum
2 Fully completed pricing schedule ❑ YES ❑ Documents’
(SBD 3.1) and a quotation on the NO Due diligence
company letterhead, and all Returnable of
returnable documents submitted. Eligibility on
Detailed specifications provided on ❑ YES ❑ Detailed
the quotation have met the scope of NO Specifications.
work required.
Sbd 3.2: Pricing detail
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Sbd 3.2: Pricing detail
specified NRF price delivery point and includes value- added tax, income tax,
unemployment insurance fund contributions, and skills development levies in terms of
General Conditions of contract clauses 12, 32.1 and 32.2.
Price Delivery Point: In cases where different delivery points influence the pricing, the
bidder submits a separate pricing schedule for each delivery point.
9 Detail Pricing Support: Detailed information e.g. costed bill of quantities is optional where
not stated in the price schedule below and is provided as an annexure to the details
included in this SBD 3
10 Application of Preference Points: Pricing is subject to the addition of Preference Points as
stipulated below - Standard Bidding Document 6.1 Preference claim form.
Pricing schedule 3.2
A. Known expenditures (Cost and services known over the duration of the contract period)
even where integrated in this document:
Invitation to Bid (SBD 1) Specification(s) set out in this Quotation Invitation
inclusive of any annexures thereto
Bidder’s responses to this invitation as Pricing Schedule(s) (SBD3) including detailed
attached to this document schedules attached
Local Content and Local Manufacturing Certification (SBD 6.2) in accordance with the SABS
standard
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Bid submission certificate form - (sbd 1)
Declaration of Interest (SBD4) General Conditions of Contract and
special/additional conditions of contract as set out in
this document
Preference (SBD 6.1) claims for Broad Based Black Economic Empowerment Status Level of
Financial Requirements
Source: RFQ - inReach Subscriptions.pdf (RFQ)Pricing schedule: SBD 3.2 (firm prices for known expenditures, estimated quantities for ad-hoc). Prices in South African Rands, fully inclusive of VAT, income tax, UIF, SDL. Price delivery point: as specified. Known expenditures (Year 1): Activation fee (once-off, 4 devices), Monthly fee (per device per month × 4 × 12 months), Service and subscription management fee (per device per year × 4). Estimated annual cost increases for Years 2-5: percentage increase for monthly fee and service/management fee per unit (for evaluation only, not guaranteed). Provisional sum: R30,000 for ad-hoc charges (not guaranteed). Contract ceiling price: cumulative verified invoices at contract expiry. Price adjustments: per Special Conditions of Contract clause 17.1, risk shared equally between NRF and contractor. Firm quantities for current period; estimated quantities for future periods. Written purchase orders issued for actual quantities with guaranteed funding. No two-envelope system. Validity period: 60 days from closing.
Compliance Requirements
Source: RFQ - inReach Subscriptions.pdf (RFQ)Mandatory: CSD registration (Master Registration Number); SARS tax compliance (TCS PIN or printed TCS certificate); SBD 1 signed and completed including SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), Bid Submission Certificate; Proof of authority (company resolution); Garmin Authorisation letter (authorised service provider/reseller/distributor/retail agent); InReach Knowledge demonstration; Garmin Supply Experience evidence (invoice, PO, or client reference); Completed SBD 3.2 pricing schedule and detailed quotation on company letterhead. Optional for preference points: Valid B-BBEE certificate or Sworn Affidavit (EME/QSE). Foreign bidders: complete SBD 1 tax questionnaire; NRF obtains SARS Confirmation of Tax Obligations letter. No bids from persons in service of the state, companies with directors in state service, or close corporations with members in state service. Fronting verification per DTI guidelines — 7 days to prove no fronting if notified, else bid/contract invalidated and possible 10-year restriction. Collusion, fraud, corruption disqualification. General Conditions of Contract (GCC) with Special Conditions of Contract (SCC) apply; SCC prevails over GCC.
Health & Safety
Source: RFQ - inReach Subscriptions.pdfof 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Terms and conditions for bidding (sbd 1b)
Stage 2A – Evaluation of Bids against Specifications including Quality
The NRF evaluates each bidder’s written response to the specifications issued in accordance
with published evaluation criteria set as in Section D.
Stage 2B – Due Diligence Interviews or Proof of Delivery/Concept against Specifications
offered. Where these tests reflect pricing outside of the established fair price range, the
evaluators may recommend price negotiation. The NRF only negotiates price, and no other
component, with the winning bidder or, where that bidder refuses negotiation, with the next
ranked bidder in the price/preference ranking until a market related price is achieved.
Sbd 1 signature
Nb: failure to provide / or comply with any of the above particulars may
where cellular coverage is often limited or unavailable. To improve emergency communication
capability, SAEON intends to leverage the Garmin inReach functionality available on its existing
Garmin GPSMAP 86i devices, providing a reliable satellite-based communication solution
without the need for additional handheld hardware.
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
The National Research Foundation cannot amend the National Treasury’s General Conditions
of Contract (GCC). The National Research Foundation therefore appends Special Conditions
of Contract (SCC) providing specific information relevant to a GCC clause to its the National
Treasury’s General Conditions of Contract. Special Conditions specific to this bid contract are
set out in this document.
of the NRF.
2 Communication: The contracted parties communicate in writing through mail, delivery,
or email. The contracted party states the contract number and purchase order number, if
the latter is applicable, on communication documentation. The contract party does not act
upon any communication without the contract number or must verify such communication
with the assigned NRF contract manager prior to acting upon it.
3 Occupational Health and Safety when working on NRF sites: All personnel
performing work on NRF site/s as part of this contract are responsible to obtain safety
induction.
Over and above the obligations provided by the Occupational Health and Safety Act (OHS
Act No and its Regulations, known as ‘the Act’), the contracted party meets
with all relevant health and safety instructions as given to them by site safety personnel,
where relevant. Personal protection equipment including closed safety shoes, hard hats,
height safety equipment, and high visibility vests are worn at all times while on the work
site. All personnel are to obey the relevant instructions, including signage, related to
restricted access and speed limits on all sites.
The contracted party, once signing the contract (SBD 7), is responsible for itself, its
employees, and those people affected by its operations in terms of the Act the regulations
promulgated in terms thereof. The contracted party performs all work and uses equipment
on site complying with the provisions of the Act.
this bid, where applicable. The contracted party furnishes its registration number with the
office of the Compensation Commissioner. The contracted party enters into a Section
37.2 agreement in terms of Occupational Health and Safety Act (OHS Act No
and its Regulations) that the NRF drafts.
the contracted party’s team (including sub-contracted personnel), submit a signed
indemnity form prior to entering the work site and kept in the contracted party’s health
and safety file.
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE IS
regarding this or any other Bid.
I certify that the information furnished in these declarations (SBD 3, SBD 4, SBD 6.1 and SBD 6.2 (if
applicable)) is correct and I accept that the NRF may reject the Bid or act against me should these
declarations prove to be false.
Contractual Terms
Source: RFQ - inReach Subscriptions.pdfassociates do not warrant its accuracy or completeness. The NRF makes no representation,
warranty, assurance, guarantee or endorsements to any provider/bidder concerning the
document, whether with regard to its accuracy, completeness or otherwise and the NRF shall
have no liability towards the responding service providers or any other party in connection
therewith.
increase or decrease the subscription package associated with individual devices, as
operational requirements change. Changes to the number of devices or subscription packages
must be accommodated without requiring a new contract. In addition, a provisional sum will be
set aside to cover ad-hoc service charges that may arise during the contract period. This may
include usage charges, additional subscriptions or devices, subscription changes, and
cancellation or suspension fees associated with the Garmin inReach service. The provisional
sum is not guaranteed expenditure and will only be utilised at the sole discretion of SAEON, as
and when required. SAEON is under no obligation to utilise the full provisional amount. A list of
expenditures covered by the provisional sum can be seen as follows:
points, where chargeable, weather requests, where chargeable, and other chargeable
inReach features specifically offered by Garmin and authorised by SAEON).
1 Pricing Schedule: In terms of General Conditions of contract clause 17.1, the price
schedule remains unchanged for the duration of the contract with the NRF accepting no
changes, extensions, or additional ad hoc costs to the pricing conditions of the contract with
the exception of any price adjustments authorised in the Special Conditions of Contract for
pricing set out below:
2 Firm Quantities over the Contract Period: The NRF requires firm set quantities during
the current period with the time of delivery being determined during the contract period.
3 Estimated quantities over the Contract Period: The NRF may require further quantities
during the current period with the actual quantity and time of delivery being determined
when such quantities are needed. For bidding purposes and to establish the contract ceiling
price, the NRF provides estimated quantities of what its requirements and estimated timing
during the contract period for bidders to establish their pricing. The NRF does not provide
guarantees or commitments that it will order this entire amount during the contract’s life.
and/or services is from the contracted party only.
4 Placement of written purchase orders for actual quantities ordered: The NRF
manages the execution of this contract through the issue of written purchase orders –
stipulating quantity, description, delivery date, and the unit price as et out in this contract -
for the contracted supplies. The NRF, when issuing the written purchase order, guarantees
that the funding is available.
5 Contract Ceiling Price: With these estimates in the bid contract, the contract ceiling price
includes both the firm quantities and the potential future quantities within the contract ceiling
price. The NRF manages the contract within the contract ceiling price by paying only for the
verified deliveries/performances in terms of the clauses of this contract. The cumulative
value of each of these invoices at the expiry of the contract is the actual total contract price.
6 Price Adjustments: In terms of General Conditions of Contract clause 17.1, the price
adjustments with the rules for application are set out below as special conditions of Contract
Clause 17.1.
2 Monthly fee 1x 4 x 12
year
Service and subscription Per device per 3 1 x 4 x 12
management fee year
Estimated Annual Cost Increase (%): Based on four (4) devices. The number of devices and subscription
packages may change during the contract period; therefore, the estimated annual increase is for evaluation
purposes only and does not guarantee the actual amount payable by SAEON.
Year Description Annual % increase
% cost per unit
Monthly fee % increase
Year 2
Service and subscription % cost per unit %
management fee increase
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Initial Purchase (Year 1)
% cost per unit Monthly fee %
increase
Year 3
Service and subscription % cost per unit %
management fee increase
% cost per unit Monthly fee %
increase
Year 4
Service and subscription % cost per unit %
management fee increase
% cost per unit Monthly fee %
increase
Year 5
Service and subscription % cost per unit %
management fee increase
A. Provisional Sum R30 000 (An amount set aside to cover ad-hoc service charges that may arise during
the contract period. This may include usage charges, additional subscriptions or devices, subscription
changes, and cancellation or suspension fees associated with the Garmin inReach service. The
provisional sum is not guaranteed expenditure and will only be utilised at the sole discretion of SAEON,
as and when required. SAEON is under no obligation to utilise the full provisional amount.)
Total contract value of above (ceiling price) r
material and adverse impact on the operations of NRF and that the damages from the
contracted bidder’s failure to meet any performance level is not susceptible to precise
determination.
to the extent that non-performance or delayed performance is solely and directly
attributable to an act or omission of the NRF or its staff or circumstances of force majeure
as referred to in this Agreement.
payment of Garmin live demonstration. termination of contract. (Also refer to GCC
inReach account, without 22)
prior communication with
5 % penalty may be applied SAEON
5 year account Supplier is unable to Issue non-performance which could lead to
management of Garmin execute service plans per termination of contract. (Also refer to GCC
inReach account. the required schedule and 22)
service agreement.
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Sbd 4 bidder’s disclosure
4.2 Name of company/firm...............................................................................
4.3 Company registration number: .....................................................................
4.4 Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.5 I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that the
points claimed, based on the specific goals as advised in the tender, qualifies the company/ firm
for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated in
paragraph 1 of this form;
iii) the event of a contract being awarded as a result of points claimed as shown in paragraphs 1.4
and 4.2, the contractor may be required to furnish documentary proof to the satisfaction of the
organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the conditions
of contract have not been fulfilled, the organ of state may, in addition to any other remedy it may
have –
(a) disqualify the person from the tendering process;
(b) recover costs, losses or damages it has incurred or suffered as a result of that
of 22 Ver. Standard 2018-6bRFQ/SAEON/ELWANDLE/INREACH SUBSCRIPTION/142/2026
Preference points claimed (sbd 6.1)
person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a result of having
to make less favourable arrangements due to such cancellation;
(d) recommend that the tenderer or contractor, its shareholders and directors, or only the
shareholders and directors who acted on a fraudulent basis, be restricted from
obtaining business from any organ of state for a period not exceeding 10 years, after
the audi alteram partem (hear the other side) rule has been applied; and
(e ) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ...............................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
Bid submission certificate form - (sbd 1)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
04 Gomery road - Summerstrand - Gqerberha - 6001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
01 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win government telecom contracts including fiber rollout, network infrastructure, mobile services, and broadband projects. ICASA licensing and compliance.
South Africa is bridging the digital divide. Explore the provincial and municipal broadband rollout projects and the technical requirements for bidding.
Avoid disqualification with our technical compliance checklist for IT bids. From OEM authorizations to POPIA and ISO standards.
Master the process of winning government IT tenders in South Africa. Learn about SITA registration, compliance requirements, and strategies for success.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Information and communication. Unlock full pricing strategies, bid frequency, and historical win rates.