Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Limited-Tender
Delivery Location
Arnot Power Station - rietkuil - middelburg - 1097
Organization Type
GOVERNMENT
Published
02 Sept 2026
OCDS Reference
ocds-9t57fa-168794
ESKOM seeks a service provider to perform compressor maintenance at arnot power station in mpumalanga for a four-year period. The single most consequential requirement is the mandatory completion and submission of the supplier declaration of interest (ESKOM template 240-59385360 rev 3), which must disclose any ESKOM employment, family or associate relationships with ESKOM personnel involved in procurement, and any business courtesies exchanged in the past 12 months. Consultants must also declare other current services rendered to ESKOM entities and key suppliers.
Closing date and time: 18 September 2026 at 10:00 (submission method and address not stated in the provided document).
Mandatory returnable: Supplier Declaration of Interest (Eskom template 240-59385360 Rev 3) — completed, signed, and submitted with the bid.
Declaration content: Must disclose whether any director, shareholder, member, partner, or associate is employed by Eskom or serves as an Eskom director; whether any such person is a close family member or associate of an Eskom employee or director participating in the procurement process; and whether any business courtesy was given to or received from an Eskom employee or director in the past 12 months.
Consultant disclosure: If providing consulting services, must declare other services currently rendered to Eskom business units, divisions, subsidiaries, primary-energy suppliers, strategic-commodity suppliers, and key industrial customers.
False declaration consequence: Eskom reserves the right to act against the supplier and the signatory personally.
Eligibility and pre-qualification thresholds (CSD registration, tax clearance, B-BBEE level, CIDB grading, professional-body registrations, local content) are not stated in the provided document.
Pricing format, bond/guarantee/insurance requirements, evaluation split, minimum qualifying scores, financial capacity/turnover requirements, and named SCM/technical contacts are not stated in the provided document.
Date & Time
Friday, 18 September 2026 - 10:00
Venue
Arnot Power Station
Categories
Request for Bid(Limited-Tender
Arnot Power Station - rietkuil - middelburg - 1097
AI Document Analysis Stages
Description
Source: SHE Spec.pdf02 Sept
2026
Tender Published
Tender was published
18 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Scope of work.pdf
Eskom requires a four-year comprehensive maintenance contract for the entire compressor plant at Arnot Power Station in Mpumalanga. The scope covers 27 compressors (centrifugal and screw types), dryers, cooling towers, filtration systems, and all auxiliary equipment across North and South plants, FFP areas, and standby units. The contractor must provide a permanent on-site artisan, 24/7 breakdown cover, specialised technicians for major overhauls, and manage all spares inventory. The contract includes procurement, installation, and commissioning of new equipment when required.
NEC3 TSC for Compressor Maintenance Contract.pdf
Eskom Holdings SOC Ltd invites tenders for a four-year maintenance contract for the control air and station air compressor plant at Arnot Power Station in Mpumalanga. The contract is based on the NEC3 Term Service Contract (Option A: Priced Contract with Price List) and includes scheduled maintenance, breakdown response, and supply of spares for CompAir centrifugal and screw compressors, heatless absorption dryers, inline filters, and EVAPCO cooling towers.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx
Eskom Holdings SOC Ltd requires a confidentiality agreement to be signed by suppliers or tenderers before disclosing information related to the provision of compressor maintenance at Arnot Power Station over a four-year period.
Station HIRA.pdf
Eskom requires a service provider to perform compressor maintenance at Arnot Power Station in Mpumalanga for a four-year period. The tender closes on 18 September 2026 at 10:00 UTC.
Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls
Eskom requires a four-year compressor maintenance contract at Arnot Power Station in Mpumalanga.
SHE Spec.pdf
Eskom requires a contractor to provide comprehensive maintenance services for the compressor plant at Arnot Power Station in Mpumalanga for a four-year period. The scope covers daily inspections, routine services (minor, interim, major), repairs, overhauls, breakdown response, and the procurement, installation, and commissioning of compressors, dryers, cooling towers, and monitoring systems. A permanent qualified artisan/technician must be on-site with after-hours, weekend, and public holiday availability.
Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf
Eskom requires a contractor to provide comprehensive maintenance services for the compressor plant at Arnot Power Station in Mpumalanga for a four-year period. The scope covers Cameron TA2000 centrifugal compressors, CompAir L-Series and Ingersoll-Rand ML110 screw compressors, BAOFN screw compressors, diesel compressors, compressed air dryers, cooling systems, filters, cyclonic separators, and all auxiliary equipment.
Supplier Declaration of Interest.pdf
Eskom requires a supplier to provide compressor maintenance services at Arnot Power Station in Mpumalanga for a four-year period. The tender includes a mandatory Supplier Declaration of Interest form that must be completed and submitted with the bid.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 599 488
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with
its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
obligations. This OHS specification is Eskom Generation's minimum requirements which are
required to be met for the duration of the contract period by contractors/suppliers and, where
required, the delivery organisation. The contractor is expected to develop an OHS plan that
meets these requirements as well as all the relevant applicable legislation that they conform
to. Eskom in no way assumes the contractor’s legal responsibilities and liabilities. The
contractor is and remains accountable for the quality and execution of their health and safety
programme for their employees and appointed contractor employees. This OHS specification
reflects minimum requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable,
any requirements pertaining to local authorities, municipal by-laws, or environmental
legislation that must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Eskom Generation's tender/enquiry with the intention of entering a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
2.2.1 Normative
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
[5] NEC3 TSC Maintenance of Compressor Plant
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division and
its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred
to as the contract administrator/custodian or agent or project manager
(as defined in the contract). He/she is the person responsible for
ensuring that the works or services are executed in terms of the
contract, as well as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and training
are registered in terms of the South African Qualifications Authority Act,
1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Contract’s Manager/End User
Manager/End User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who receives
or is entitled to receive any remuneration or who works under the
direction or supervision of an employer or any other person
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Definition Explanation
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and remunerates
that person or expressly or tacitly undertakes to remunerate him/her,
but excludes a TES (ex labour broker) as defined in section 1(1) of the
Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical,
aesthetic, and cultural properties and conditions of the foregoing
that influence human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from
an elevated position, considering the nature of work undertaken, and
setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing
and safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety requirements pertaining to associated to a contract, so as to ensure the
specification health and safety of persons.
Occupational Health means comprehensive health and safety requirements for a contract,
and safety project, site, and scope of work. This specification is intended to ensure
requirements the health and safety of persons, both workers and the public, and the
duty of care to the environment. The health and safety requirements
must be specific to each contract, project, site, and scope of work
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Definition Explanation
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which
may include clinical examinations, biological monitoring, or medical
tests) of employees by an occupational health practitioner or, in
prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
National sourcing of services providers/contractors at the divisional level and not
Enquiries/contracts at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of
the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in section
1 of the OHS Act, who intends to tender for or has signed a contract
with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and Safety
Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Definition Explanation
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service
to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom
for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034) means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the identified
risks, and the control measures with all his/her team members on site
before commencing a specific task and documenting the agreed
strategy. (This shall be done to ensure common understanding of the
tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour (Inspection and Enforcement
services – Provincial office)
EP Emergency Preparedness
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Abbreviation Description
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS
file for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to
the project manager/end user who will facilitate the signing of the document by Eskom and
contractor representatives.
3.1 Scope of work
The Works for this Contract is for the maintenance of the compressor plant at Arnot Power
Station. These include the following Compressors and their auxiliary equipment but not limited
to, up to the receiver inlets for a period of four years.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
The scope is an all-inclusive maintenance agreement where the Contractor will maintain the
compressor trains from daily inspections, Minor-; Interim- and Major routine services, repairs,
day to day frontline maintenance, minor and major repairs, and overhauls. The Contractor will
be required to have trained artisans/technicians on site to cover the daily front line and routine
maintenance, call outs, fault finding and the specialised technicians for the servicing,
maintenance and overhauling of the three types of compressors and related equipment
(Centrifugal-; Rotary Screw- and Diesel Rotary Screw Compressors).
A permanent qualified artisan/technician is required on site to monitor, do day to day frontline
maintenance, fault finding and maintain the compressors to ensure compressor availability
and reliability. The Contractor will be required to ensure that the artisan/technician is available
for breakdowns after hours and weekends including public holidays to address any defect or
problem on the compressors as they arise. Specialised work to be done as per schedule or
breakdown by the trained and qualified technicians as the work arises or where the specialised
technical expertise is required.
The Contract is not limited to a maintenance agreement only but also including the
procurement, installation and commissioning of compressors, driers, cooling towers, control,
and condition monitoring system or equipment thereof when required, ensuring the availability
and reliability for the Compressed Air Plants.
The Contractor is required to compile a service and maintenance schedule, breakdowns and
maintenance requirements of the compressors and as listed in the Pricing Schedule.
The Contractor is to always take reasonable care to protect the Compressed Air Plant and all
items on site, belonging to the Employer from damage while providing the Service.
The works describe the “Maintenance” requirements on the control air and station air system.
All auxiliaries related to the compressors are applicable to the contract, the auxiliaries inclusive
of the pipework, valves, gauges, control panels, solenoids, all related measuring devices,
vessels, cooling towers, heatless absorption desiccant dryers, water cyclonic separators,
general purpose protection particulate filters, high efficiency oil removal coalescing filters, bag-
filter house forced draught cooling fans, ducting’s, filters and condensate drains.
A copy of the scope of work must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “Main
contractor” and any contractor appointed by the Main contractor will be known as the
“Appointed contractor"
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the
time of submitting the safety file. The main contractor must ensure that a section 37(2)
agreement is compiled between the main contractor and all their appointed contractors for the
contract. The original copy of the section 37(2) agreement must be retained by the contractor,
and a copy must be retained by the responsible project manager/end user. A copy of all the
agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom does not condone the use of child labour and, therefore, all effort must
be exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act
and regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
The Main contractor and all appointed contractors will comply with all the legislation pertaining
to this project being:
Bill of Rights).
project.
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of
their strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy
of the policy must be filed in the contractor's OHS files and attached as an annexure to the
OHS Plan.
The Contractor to submit with tender returnable as signed copy of their OH&S Policy
in line with Section 8 of the Occupational Health and Safety Act
3.5 Covid -19 policy
Due to the current pandemic the contractors are required to submit the Covid policy signed by
the most senior person. The policy must be displayed in a prominent place within the
workplace. A copy of the policy must be filed in the contractor's OHS files and attached as an
annexure to the OHS Plan.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
3.5.1 Covid -19 requirements
Covid-19 costs are not for profit making purpose and Eskom reserves the right to accept
and/or decline the list of PPE which will be listed in the detailed Covid-19 costs. Due to the
current pandemic the contractors are required to provide Eskom with a Covid-19 risk
assessment and a detailed plan on how to prevent the spread of the virus and what control
measures will be put in place to protect Eskom employees and members of the public. The
risk assessment must include the following but not limited to, adherence to Covid-19 protocols
in designated smoking areas. Covid-19 costs are applicable for the duration of the pandemic,
and the Covid-19 costs will be ceased once the country has declared that Covid-19 is no more
a pandemic. The contractors have an obligation to comply with the National Disaster
Management Act including the appointment of the Compliance Officer.
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor OHS files.
This requirement is not prescriptive in terms of the Compensation Insurance Body,
however it must be one of the South African recognised Insurance Bodies and must be
kept up to date (relevant) or renewed according to Insurance Bodies requirements
through out the duration of the Contract.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases etc.
OHS costing must reflect the amount of funds that will be allocated for OHS when the
project commences (This is a breakdown of the bulk OHS costing in the bill of
quantities) and it should be based on the scope of work and the associated risk. The
items to be included are not limited to the following:
PPE, OHS training, OHS professionals, first aid equipment, Ablution facilities, Safety
signs, safety campaigns or interventions, OHS equipment/instruments, medical
examinations etc
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will
comply with the OHS Act for the duration of the contract. Before requiring appointees to accept
an appointment, the employer must ensure that they have received appropriate training and/or
information about their responsibilities. The relevant statutory appointments must be made in
compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles. The following should be included in the statutory appointments, but not
limited to:
Inspector
3.8.1 Non statutory appointments
3.9 ESKOM life-saving rules
undertakes work for Eskom to do the same.
employees, agents, consultants, and contractors. Any Eskom employee or employee
of a Main Contractor or appointed contractor who fails to follow these rules would be
deemed a serious violation. These rules are in place to protect any employee, labour
broker, or contractor working from significant injury or death.
Eskom premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
(That is plant, any plant operating above 1000 V)
Hook up at heights
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Ensure safe live working
Ensure safe live working
To ensure safe live work, each live worker shall:
a) Ensure all live work basic principles are adhered to, as outlined (for the
method being used) in the High Voltage Live Working Standard for the
Rule 6 respective division.
b) Observe and maintain the minimum approach distance (MAD).
c) Only perform live work (never mix live and dead work on the same site at the
same time – Refer to ORHVS Section 7 and 5 handouts respectively).
d) Perform tasks they are authorised for and only undertake tasks that are
documented in the respective Task Manual (TM). Only work on one potential
(voltage) at a time.
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home to their
families safely.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
3.10 Substance abuse
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the
company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom's procedure 32-37 ("Substance Abuse Procedure"),
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"),
and anyone entering the Eskom site will be subjected to mandatory alcohol testing.
for alcohol on a regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge
before commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the
supervisors responsible for the contract. List the relevant positions held, names of appointees,
legal appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement.
The Main contractor is responsible for keeping copies of all the organograms’ as well as
submitting them with the OHS plan. All organograms shall be updated timeously when
appointments are changed.
This diagram must be kept up to date and filed in the project OHS files.
The Organogram must reflect the Health and Safety appointments as well, eg: Incident
Investigator, Risk Assessor, etc. As reflected in sub section 3.8.
3.11.2 Appointed Contractor/s Organogram
project on the company’s letter head, listing the reporting structure from their CE down
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
to their project supervisors. The diagram must list the names, positions held, any
appointments made and must be signed off by the company's 16(1) or 16 (2).
contractor and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved
in the day-to-day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
form part of the OHS Act and Regulation 7 of the Construction Regulations.
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act.
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
complied with on all work sites.
participation and cooperation.
safety records must be kept for each work site.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Commissioner’s valid letter of good standing before the commencement of work and
any future renewal letters obtained during the contract for record-keeping purposes.
The letter of good standing shall reflect the name of the contractor’s company.
Similarly, the Main contractor must provide the Eskom project manager with all the
valid letters of good standing from their appointed contractors.
Commissioner’s valid letter of good standing before the commencement of work and
any future renewal letters obtained during the contract for record-keeping purposes.
The letter of good standing shall reflect the name of the contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
health.
provision for the cost of safety and health measures throughout the project.
the health and safety of persons or a risk of degradation to the environment.
contractors, evaluate, and assess the appointed contractors OHS files. Only appoint
contractors who are competent to do work, have satisfied the OHS compliance
requirements and satisfied that the contractor has the necessary competencies and
resources to perform the work safely.
specified work throughout the contract period.
the site for which such supervisor has been appointed for.
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements.
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
to include site or emerging risks. This should be done by a competent person
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
appointed in writing with a view to identify hazardous and potentially hazardous work
operations.
to the starting of any new task, irrespective of whether it is a repetitive task or not.
the contract is in place and maintained.
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on
site, they will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
obtain his/her approval prior to them commencing work.
3.12.2 Contractor site supervisor
The contractor site supervisor must be trained in the following:
HIRA, Incident investigation training, Supervisor training, Legal liability, Plant Safety
Regulation understanding.
Must:
statutory and Eskom project requirements.
and specifications
action is in place.
in the first instance and thereafter the Eskom project manager in the second instance
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
relevant inspection reports.
incident statistics report etc
meetings.
to perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full/time
A part time Health and Safety officer is required for this project.
safety-related matters on the sites.
providing them with a health and safety service.
submitted to any appointed contractors.
committees’ meetings.
accordance with the principal contractor’s and or appointed contractors’ health and
safety plan which poses a threat to the health and safety of persons.
on, the premises / work sites and that no employee remains on site if he/she is under
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
to undergo breathalyser and drug testing while entering and/or being on any Eskom
work site by Eskom.
appointed contractors on instructions of their contractor.
monthly and any appointed contractors on instructions of their contractor.
The contractor health and Safety officer must be trained in the following:
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge
and understanding of ISO 45001: 2018, Minimum work experience 2yrs, OHS Diploma
(applicable to 3-5 years contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry
out risk assessments, to establish which risks and hazards are attached to the health and
safety of persons due to any work which is performed, any article or substance which is,
handled, stored, transported. A risk assessment is defined as an identification of the hazards
present in the activity, work, site, and an estimate of the extent of the risks involved,
considering whatever precautions are already being taken.
It is essentially a three-stage process:
identification of all hazards.
evaluation of the risks.
Measures to control the risks.
Risk assessments are required to be maintained. This means that significant changes to a
process or activity, or any new process or activity should be subjected to a risk assessment
and that if new hazards come to light during the work process, then these should also be
subjected to risk assessments. Risk assessments for long term processes should be
periodically reviewed and updated. Method statements or written safe work procedures are
an effective method as information and record of the way jobs / tasks must be performed.
Daily or issue based or task specific or on the job risk assessments must be conducted at the
place where work is to be performed/ conducted to allow managers and employees to assess
any inherent risks that could have been overlooked during the initial risk assessment or any
changes that might have occurred in a period of absence. For example, if a job / task is
extended over a day or halted due to inclement weather.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Guidelines for actual steps involved in a job/task specific risk assessment are:
work procedures exist for ladders.
taken to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
observation must be nominated.
representative for comment and approval.
to the Supervisor nominated as the responsible person; and the names of workmen
who have received instruction on the work content and the sequence of the activities
listed in the risk assessment shall be recorded, and their competence established.
This instruction shall be done through an interpreter if required and recorded on the
Pre-Job Brief (Daily Safe Task Instructions), with reference to applicable Risk
Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must
be aligned with the risk assessments. Method statements / written safe work procedure are
control measures used to prevent an incident from occurring during the execution of the
project. A written safe work procedure/ method statements provide guidance how to execute
the task safely. A safe working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task.
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task.
e. The tasks that are to be undertaken that pose risks.
f. The equipment and substances that are used in these tasks;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
g. The control measures that have been built into these tasks.
h. Any training or qualification needed to undertake the task.
i. The personal protective equipment to be worn.
J. Actions to be undertaken to address safety issues that may arise while
undertaking the task.
3.15 Flammable and combustible liquids
Manager. The volumes of fuel allowed to be stored will depend on site conditions and
Statutory Regulations e.g. by-laws.
of work and the approval to be obtained from the local Municipality and to be complied
with for the duration the project.
litres to be stored in a flammable/combustible liquid store with adequate spillage
retention and proper labelling.
of 4.5 kg, shall be provided, installed and maintained.
a. Storage should be well clear of buildings.
b. Storage areas must be kept free from all combustible materials.
c. All Safety signs must be prominently displayed i.e.
d. Adequate firefighting equipment must be available.
110% of tank capacity.
sealing material.
Bunded area shall have a drain valve.
No other material/equipment shall be stored in the bunded area.
For storage of hazardous and flammable liquids, the approval must be obtained from
the Fire department and/or the Municipality (if the services are rendered/available in
the local Municipality).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Eskom sites and the appropriate colour coding should be complied with.
3.15.1 Refuelling at Eskom sites
Before a machine/vehicle can be refuelled, the motor must be stopped. Refuelling shall take
place at designated safe areas and appropriate warning signs installed. Suitable drip trays
must be used to prevent spillage at the filling nozzle.
3.16 First aid and equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the legal requirements. Appointees must
be trained to level 2 and the training service provider must be registered in accordance
with section 26(1) of the Skills Development Amendment Act, Act No. . It is
good practice for all employees to be trained to at least level 1.
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
accessible for all employees.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
must be available and accessible for the immediate treatment of injured persons at the
workplace.
name and contact details of the First Aider of such first aid box or boxes shall be
erected.
arrangements be made for incidents occurring after working hours.
3.16.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a regular
basis, kept clean and dust free.
3.17 OHS communication systems
Main Contractor/s and their appointed contractors must develop a communication strategy
outlining how they intend to communicate OHS issues to their staff, the mediums they will
employ and how they will measure the effectiveness of their OHS communication. Below is a
brief on how communication should take place. Where project meetings are conducted on site,
OHS shall be included as a standing agenda point and minutes of these meetings shall always
be available on site. Minutes of meeting must be compiled and filed in the relevant OHS files.
All employees shall have access to these minutes. Attendance register shall be kept for all the
health and safety meetings.
3.17.1 Statutory Health and Safety Committees
Section 19 of the OHS Act. Similarly, appointed contractors shall establish their own
statutory health and safety committee.
All appointed contractors shall be members of the Main contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being
performed, training, upcoming work and OHS requirements, incidents and lessons
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
learned specific OHS problems, safety performance, action plans and other relevant
OHS issues. Listed below is a preferred agenda.
safety committees (Refer to Section 19 (2) (a) of the OHS Act).
Safety Representatives on that specific statutory health and safety committee. (Refer
to Section 19(2)(c) of the OHS Act)
(where medium to high-risk work is involved, more frequent if required), and all
appointed members of the committee shall attend the meeting.
contractor and the project manager and the Inspector at DEL.
and 25 incidents and other notified serious incidents.
recommendations and shall keep record of all recommendations made by the
committee.
of current standards, procedures and practices.
statutory health and safety committees carry out their duties.
by the contractor. The appointed chairperson must be competent to chair meetings
and be able to make informed decisions.
3.17.2 non-statutory health and safety committees
established within that worksite to assist with the communication of health and safety
related matters between the statutory health and safety committee and the workplace.
be the same as the statutory safety committee
3.17.2.1 Agenda
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Template
GENERATION COAL FIRED 32-726-03T Rev 2
Identifier
Stations OHS
Document SPECIFICATION FOR Rev
Identifier
High risk
Effective Date 16 February 2026 Compressor Plant Maintenance
Matters arising from previous minutes
Matters arising from Contractor’s OHS meetings.
Audit results and feedback
Review Health and Safety Representative Inspection Reports
Review
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation
reports
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
3.17.2.2 Minutes and action items for all health and safety committee meetings
meetings.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 48
Important Dates
Source: SHE Spec.pdf (unknown)Effective date of this OHS specification: 16 February 2026. The tender closing date from the tender record is 18 September 2026 at 10:00. No compulsory briefing session, site visit, or clarification deadline is mentioned in this document.
Contact Information
Source: SHE Spec.pdf (unknown)Eskom Service Manager: Gretchen Garner (dated 16/02/2026). Eskom SHE Officer: Hlengiwe Sibiya (dated 16/02/2026). Project address: Arnot Power Station, next to N4 Road, Rietkuil 1097. No email addresses or phone numbers are provided in this document.
Submission Guidelines
Source: SHE Spec.pdf (unknown)Submission method and address are not stated in the provided document. The document is an OHS specification (32-726-03T Rev 2) that forms part of the tender pack; it does not contain the bid submission instructions, closing time, or returnable forms list. Bidders must refer to the main tender document for submission channel, format, and the complete list of returnable forms (e.g. SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9, proof of CSD registration, tax compliance status PIN, signed SHEQ policy, COVID-19 policy, organograms, COID Letter of Good Standing, Section 37(2) agreement).
Evaluation Criteria
Source: SHE Spec.pdf (unknown)The OHS specification does not define the evaluation methodology, price/functionality split, preference point system (80/20 or 90/10), or minimum qualifying scores. It sets mandatory compliance requirements that will be assessed during evaluation: valid CSD registration, valid SARS tax compliance status PIN, compliance with OHS Act and all referenced regulations (Pressure Equipment Regulations, Hazardous Chemical Substances Regulations, etc.), valid COID Letter of Good Standing from a recognised South African compensation insurer, demonstrated capability to provide qualified artisans/technicians for centrifugal, rotary screw, and diesel compressor maintenance, capacity for 24/7 on-site presence including weekends and public holidays, submission of signed SHEQ policy (Section 8 OHS Act) and COVID-19 policy with tender returnables, organisational organograms with legal appointments, and all statutory appointment competency requirements. No specific CIDB grading, B-BBEE level, or local content percentage is stated in this document.
Technical Specifications
Source: SHE Spec.pdf (unknown)Scope: All-inclusive maintenance of compressor plant at Arnot Power Station for four years, covering the following compressors and auxiliary equipment up to receiver inlets:
Work includes daily inspections, Minor/Interim/Major routine services, repairs, day-to-day frontline maintenance, minor and major repairs, overhauls, fault finding, and specialised servicing/maintenance/overhauling of the three compressor types (Centrifugal, Rotary Screw, Diesel Rotary Screw).
A permanent qualified artisan/technician must be on site for daily frontline maintenance, monitoring, fault finding, and ensuring compressor availability and reliability. The artisan/technician must be available for breakdowns after hours, weekends, and public holidays.
Specialised work to be performed as per schedule or on breakdown by trained and qualified technicians.
Contract also includes procurement, installation, and commissioning of compressors, driers, cooling towers, control and condition monitoring systems/equipment when required.
Contractor must compile a service and maintenance schedule, breakdown and maintenance requirements as listed in the Pricing Schedule.
All auxiliaries related to compressors are included: pipework, valves, gauges, control panels, solenoids, measuring devices, vessels, cooling towers, heatless absorption desiccant dryers, water cyclonic separators, general purpose protection particulate filters, high efficiency oil removal coalescing filters, bag-filter house forced draught cooling fans, ducting, filters, and condensate drains.
Contractor must take reasonable care to protect the Compressed Air Plant and all Employer items on site from damage.
Methodology
Source: SHE Spec.pdfMethodology requirements:
Quality Management
Source: SHE Spec.pdfQuality management is embedded in OHS requirements: risk assessments per procedure 32-520, safe work procedures/method statements for all hazards, auditing of Main Contractor OHS plan (approval and compliance), Eskom OHS audits, Contractor audits, non-conformance and compliance management, contractor performance monitoring, incident investigation per procedure 32-95, and adherence to ISO 45001 as a normative reference. Competent persons must have knowledge, training, experience, and qualifications registered with SAQA where appropriate. Medical certificates of fitness valid for one year from HPCSA-registered practitioners. Medical surveillance programme required. Training requirements include Main Contractor induction, Appointed Contractor induction, visitor induction, and general training.
Pricing Schedule
Source: SHE Spec.pdfPricing Schedule referenced for maintenance requirements and breakdown/maintenance scheduling. OHS costing must be itemised in the Bill of Quantities covering: PPE, OHS training, OHS professionals, first aid equipment, ablution facilities, safety signs, safety campaigns/interventions, OHS equipment/instruments, medical examinations. COVID-19 costs listed separately, not for profit, subject to Eskom acceptance/decline, applicable only during pandemic period. No further pricing format, rates, or payment schedule details provided in this document.
Financial Requirements
Source: SHE Spec.pdf (unknown)OHS costing must be itemised based on the overall project scope and reflected in the Bill of Quantities. Items to be included (not limited to): PPE, OHS training, OHS professionals, first aid equipment, ablution facilities, safety signs, safety campaigns/interventions, OHS equipment/instruments, medical examinations. COVID-19 costs are not for profit; Eskom reserves the right to accept/decline the listed PPE. COVID-19 costs apply only for the duration of the pandemic and cease once the country declares the pandemic over. No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds are stated in this document.
Compliance Requirements
Source: SHE Spec.pdf (unknown)Mandatory compliance requirements:
No specific CIDB grading, B-BBEE level, or local content percentage is stated in this document.
Health & Safety
Source: SHE Spec.pdfComprehensive OHS specification (32-726-03T Rev 2) setting minimum requirements for the four-year compressor maintenance contract at Arnot Power Station. Key requirements:
Normative references include: Basic Conditions of Employment Act, OHS Act and Regulations, NEMA, National Road Traffic Act, Eskom procedures (32-37, 32-136, 32-95, 32-727, 32-418, 32-520, 240-62196227, 240-62946386), Plant Safety Regulations, ISO 45001, Pressure Equipment Regulations, COVID-19 policy, National Disaster Management Act.
Environmental
Source: SHE Spec.pdfContractors must comply with environmental legislation including National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998, and municipal by-laws. Duty of care to the environment requires reasonable measures to prevent pollution or degradation, and to minimise and rectify any harm. ISO 45001 and Eskom Environmental Regulations for Workplaces are normative references. COVID-19 waste and PPE disposal must follow National Disaster Management Act requirements. No specific environmental impact assessment or sustainability requirements are detailed in this document.
Contractual Terms
Source: SHE Spec.pdfContract duration: four years. Contractor must provide 24/7 on-site coverage including weekends and public holidays for breakdown response. Contract includes procurement, installation, and commissioning of compressors, driers, cooling towers, control and condition monitoring systems/equipment when required. Contractor must compile service and maintenance schedules as per Pricing Schedule. Contractor must take reasonable care to protect Eskom's Compressed Air Plant and all items on site from damage. Eskom retains the right to terminate the contract. Contract sign-off required. Contractor performance monitoring will be conducted. Hours of work provisions cover normal work, night work, and overtime. Work stoppage authority exists for safety non-compliance.
Section
Source: SHE Spec.pdffile for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to
its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
contractor is and remains accountable for the quality and execution of their health and safety
Important Dates
Source: Supplier Declaration of Interest.pdf (unknown){"closingDate":"01 February 2015"}
Contact Information
Source: Supplier Declaration of Interest.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s, Eskom Divisions, Eskom","address":"e/s of Contact person/s and contact details"}
Evaluation Criteria
Source: Supplier Declaration of Interest.pdf (unknown)feasibility studies, sourcing, evaluation, benchmarking, negotiation, approval and awarding or
Technical Specifications
Source: Supplier Declaration of Interest.pdf (unknown)supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to
act against the supplier named above or me personally in terms hereof, should this declaration prove to be
false.
Eskom employees and directors that engage in private work
Compliance Requirements
Source: Supplier Declaration of Interest.pdf (unknown)No specific requirements found
Health & Safety
Source: Supplier Declaration of Interest.pdfEffective Date 01 February 2015
Review Date February 2023
I, the undersigned [insert full name of signatory]................................................, in my capacity as
[insert capacity, i.e., member, director, partner, etc.] ................................................... of the
supplier [insert registered full legal name of the supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to
act against the supplier named above or me personally in terms hereof, should this declaration prove to be
false.
Evaluation Criteria
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)Bidders must comply with local content requirements for designated products: steel 100%, electric cables 90%, telecom cables 90%. Must complete and submit Annex C (Local Content Declaration Summary), Annex D (Imported Content Declaration), and Annex E (Local Content Declaration Summary Schedule). Must be registered on the Central Supplier Database (CSD) and have a valid tax compliance status (SARS TCS/tax PIN).
Compliance Requirements
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)CSD registration and valid SARS tax compliance status (TCS/tax PIN) are required. Local content thresholds apply: steel 100%, electric cables 90%, telecom cables 90%. Annex C, Annex D, and Annex E must be completed and submitted.
Contact Information
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"describe preventive, predictive, submitted with minor"}
Evaluation Criteria
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Mandatory technical evaluation criteria
3 OEM Quality Management Copy of valid ISO 9001:2015 certification
Tenderers who do not meet the mandatory technical evaluation will not be evaluated
on Qualitative Technical Evaluation criteria.
and Quality
1.2 Quality Submit project-specific Quality 15% 5 = 100% Comprehensive
points, witness points, inspection 4
Technical Specifications
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)and Quality
1.1. Method The Tenderer shall submit a detailed 25% 5 = 100% Fully compliant,
Statement – method statement demonstrating detailed, equipment-specific
how the maintenance services will and demonstrates full Maintenance
be executed in accordance with the understanding of the Scope Approach
NEC3 TSC Scope of Work. The of Work.
method statement shall clearly 4 = 80% Method Statement
describe preventive, predictive, submitted with minor
corrective and breakdown omissions but adequately
maintenance, daily on-site addresses majority of the
inspections, emergency response, Scope.
maintenance planning, reporting 2 = 40% Method Statement
procedures, inspection after repairs, submitted but lacks
risk assessments and maintenance equipment-specific
schedules. The method statement maintenance activities, daily
shall specifically address inspection requirements or
maintenance activities for the important technical aspects.
installed Cameron TA2000 0 = 0% No submission or
centrifugal compressors, CompAir technically non-responsive.
L-Series screw compressors,
of 4
The provision of Maintenance of the Compressor Plant at Arnot Power Station
Enquiry: E2896GXMPARNR
Ingersoll-Rand ML110
compressors, BAOFN screw
compressors, diesel
compressors, compressed air
dryers, cooling systems, filters,
cyclonic separators and all
auxiliary equipment listed in the
Scope of Work. General
compressor maintenance procedures
without equipment-specific
maintenance
activities will not be considered fully
compliant.
1.2 Quality Submit project-specific Quality 15% 5 = 100% Comprehensive
Control Plans Control Plans (QCPs) covering equipment-specific QCP
(QCPs) inspection and test plans, hold submitted.
points, witness points, inspection 4 = 80% Acceptable QCP
frequencies, reporting requirements, with minor technical risk.
acceptance criteria, responsibilities 2 = 40% QCP submitted but
and quality assurance procedures not fully aligned to the Scope.
applicable to centrifugal 0 = 0% No submission or
compressors, rotary screw technically deficient
compressors, diesel compressors,
air dryers, cooling systems, filters
and auxiliary compressed air
equipment. Generic QCPs not
aligned to the Scope of Work will
receive a reduced score.
and Technical
Capability
2.1 Company The Tenderer shall submit verifiable 20% 5 = 100% Ten (10) years or
Experience evidence of maintenance experience more relevant experience
on equipment like that installed at with verifiable references
Eskom Arnot Power Station. covering multiple compressor
Supporting documents shall include technologies.
things such as completion 4 = 80% Six (6)–Nine (9)
certificates, contracts, purchase years relevant experience.
orders or service agreements, project 2 = 40% Three (3)–Five (5)
descriptions and client references. years relevant experience.
Evidence shall clearly demonstrate 0 = 0% Less than three (3)
maintenance of Centrifugal years, no evidence or
compressors, Electric driven unverifiable references.
rotary screw compressors, Diesel
driven rotary screw, compressed
air dryers and associated cooling
systems. Experience shall be
equipment-specific and verifiable
minimum-10 years.
2.2 Key The Tenderer shall submit certified 40%
Personnel qualifications, trade certificates, OEM
(2.2.1 to 2.2.4) training certificates (where
of 4
The provision of Maintenance of the Compressor Plant at Arnot Power Station
Enquiry: E2896GXMPARNR
applicable), detailed CVs and
contactable references for all
proposed personnel. Personnel shall
collectively demonstrate competency
on centrifugal compressors, rotary
screw compressors, diesel
compressors, compressed air dryers
and cooling systems.
2.2.1 Site A N6 National Diploma with a Trade 10% 5 = 100% ≥5 years of
Manager test in Mechanical or Electrical relevant experience.
Engineering, OR alternatively a 4 = 80% 3–4 years
National Diploma in Mechanical or 2 = 40% 1–2 years.
Electrical Engineering, 0 = 0% Incomplete or missing
and 4 years post-qualification returnable or <1 year’s
experience in compressor experience.
maintenance. Experience shall
include screw compressors,
centrifugal compressors, diesel
compressors, air dryers and cooling
systems. (All the above returnable
are mandatory requirements.
Failure to submit any of the
required returnable will result in
the tenderer receiving a score of
zero for
this criterion).
2.2.2 Mechanical Following are acceptable: BTech/ 10% 5 = 100% ≥5 years of
/ Mechatronics BEng /BSc / Mechanical or relevant experience.
Mechatronics Engineering. Submit 4 = 80% 3–4 years Engineer
qualification certificates, CV and 2 = 40% 1–2 years.
references demonstrating 0 = 0% Incomplete or missing
compressor maintenance of returnable or <1 year’s
minimum 5 years’ experience. (All experience.
the above returnable are
mandatory requirements. Failure
to submit any of the required
returnable will result in the
tenderer receiving a score of zero
for this
criterion).
2.2.3 Artisan – Minimum N3 Certificates with Trade 10% 5 = 100% ≥5 years’
Fitter and Diesel Tests supported by CVs, and experience.
verifiable references demonstrate 4 = 80% 4 years. Mechanic
compressor maintenance experience 2 = 40% 3 years.
with a minimum of 5 years. (All the 0 = 0% Incomplete or missing
above returnable are mandatory returnable or <2 years’
requirements. Failure to submit experience.
any of the required returnable will
result in the tenderer receiving a
score of zero for
this criterion).
2.2.4 C&I Artisan Qualified C&I Artisan and Electrician 10% 5 = 100% ≥5 years’
and Electrician (N3 + Trade Test) with compressor experience.
maintenance experience. Submit 4 = 80% 4 years.
of 4
The provision of Maintenance of the Compressor Plant at Arnot Power Station
Enquiry: E2896GXMPARNR
qualifications, CVs and references 2 = 40% 3 years.
with a minimum of 5 years. (All the 0 = 0% < Incomplete or
above returnable are mandatory missing returnable or <2
requirements. Failure to submit years’ experience.
any of the required returnable will
result in the tenderer receiving a
score of zero for
this criterion).
Total 100% 5
Minimum threshold 80% 4
Tenders must meet a minimum threshold of 80% in order to be evaluated further. Tender who
do not meet the minimum threshold will be deemed technically non-responsive and they will
not be evaluated further.
Qualitative Evaluation Criteria Scoring:
Score % Definition
5 100 compliant
4 80 compliant with associated qualifications
Meet technical requirement(s) with:
2 40 non-compliant
Does not meet technical requirement(s) with:
0 0 totally deficient or non_responsive
Note 1: The scoring table does not allow for scoring of 1 and 3
Note 2: Foreseen acceptable and unacceptable risk(s), exceptions and
conditions shall be unambiguously defined in the relevant Tender Technical
Evaluation Strategy.
of 4
Compliance Requirements
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Minimum functionality/qualifying score: 80%
Contractual Terms
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfexisting or new warranty obligations, including
maintenance, repair, and spare supply coverage.
Description
Source: Scope of work.pdfFour-year all-inclusive maintenance contract for the entire compressor plant at Arnot Power Station (Mpumalanga). Scope covers 27 compressors (22 control air, 5 station air/standby) and all auxiliary systems: cooling towers, dryers, filter banks, fans, ducting, condensate drains, piping, valves, instrumentation, vessels, electrical controls. Compressor types: Cameron TA2000 centrifugal (Units 1–3, FFP 4A/4B, 5A/5B, 6A/6B) and CompAir screw (Units 4–6, station air, standby, fire system, water plant, mobile). Objective: ≥92% compressor availability, reliable control air at 590 kPa, compliance with safety/environmental/Eskom standards. Contractor provides permanent on-site artisan/technician, 24/7 standby, specialised technicians for scheduled/breakdown work. Includes procurement, installation, commissioning of compressors, dryers, cooling towers, condition monitoring when required. Contractor manages spares inventory, submits maintenance schedule with six-month forward planning. Performance tests (humidity, dew point, flow, pressure) by Employer before/after major services. Mobile compressor supplied by Contractor at own cost during major services.
Important Dates
Source: Scope of work.pdf (unknown)Contract duration: four years. No closing date, briefing date, site visit date, or clarification deadline is stated in the scope of work document. The tender record indicates a closing date of 2026-09-18T10:00:00.000Z, but this is not confirmed in the scope document.
Contact Information
Source: Scope of work.pdf (unknown)No named SCM or technical contacts, emails, or phone numbers are provided in the scope of work. Invoicing address: Finance Department (Accounts Payable Section), Arnot Power Station, P/Bag X2, Rietkuil, 1097. Employer's VAT registration number: 4740101508.
Submission Guidelines
Source: Scope of work.pdf (unknown)Submission method and address are not stated in the scope of work document. The document references standard Eskom returnable forms (SBD 1, SBD 3.1/3.2/3.3, SBD 4, SBD 6.1, SBD 6.2, SBD 7.2, SBD 8, SBD 9) and an Authority to Sign / Board Resolution, but does not specify the closing date, time, or submission channel. Bidders must obtain the full tender pack for submission details.
Evaluation Criteria
Source: Scope of work.pdf (unknown)Evaluation criteria are not detailed in the scope of work. The document specifies performance criteria with penalties: individual compressor availability ≥92% annually (penalty R10,000 per compressor per annum below threshold); individual compressor discharge pressure 600–620 kPa average annually (penalty R10,000 per compressor per annum below 600 kPa); 100% compliance with scheduled maintenance tasks (penalty R10,000 per compressor or dryer per annum for any missed service). The overall evaluation split (price vs functionality, 80/20 or 90/10) and minimum qualifying scores are not stated in this document.
Technical Specifications
Source: Scope of work.pdf (unknown)Scope: comprehensive maintenance of 27 compressors (22 control air, 5 station air/standby) and all auxiliary equipment at Arnot Power Station for four years. Compressor types: Cameron TA2000 centrifugal (32 m³/min, 186.425 kW, 380V) ×3 at North plant Units 1–3; CompAir screw compressors L55/L75/L110/L132/L160/L250 across South plant, standby, FFP, fire system, water plant, and mobile units. Auxiliaries: Evapco induced-draft cooling towers (9), heatless absorption desiccant dryers (AXS X23), filter banks (water cyclonic separators, particulate filters, coalescing filters), bag-filter house forced-draught fans, ducting, condensate drains, piping, valves, gauges, control panels, solenoids, vessels. Control air pressure targets: high 640 kPa, normal 590 kPa, low 480 kPa, lock-out 420 kPa. Maintenance regimes: screw compressors — minor service 8×, major service 4×, overhaul 1× per 4 years, V-belt/hose replacement 2×; centrifugal compressors — 3-monthly service 8×, 6-monthly 4×, 12-monthly 4× per 4 years; dryers — 6-monthly 4×, 12-monthly 4×, 36-monthly 1×, 60-monthly 1× per dryer; filters — 6-monthly change 8× per bank; cooling towers — 6-monthly service 7× per tower. Contractor must supply mobile compressor at own cost during major services. Spares management: bi-annual audits at South Contractor's Yard and CompAir Warehouse. Work hours: Mon–Thu 07h00–16h15, Fri 07h00–12h00; 24/7 standby for breakdowns. Emergency response within 45 minutes. Contractor's plan with QCP required at inception. Monthly contract progress meetings (last Tuesday).
Methodology
Source: Scope of work.pdfContractor must provide methodology of work execution and responsibilities for each person involved, with organogram showing line of authority. Contractor's plan at inception: service schedule based on running hours and defects, covering all servicing/maintenance interactions over four years, including spares and consumables management. Plan based on hours run or time-based as agreed, submitted to Service Manager. Daily plant walks to identify air leaks and deviations. Continuous communication with Service Manager, control room operators, shift supervisors. Immediate reporting of deviations, abnormalities, safety concerns. Adherence to Eskom safety, operational, reporting standards.
Experience & Qualifications
Source: Scope of work.pdfTechnical Specialist (Contract Manager): 5–10 years maintenance experience on Cameron TA2000 and CompAir screw compressors. Service Engineers (3 required, covering 24/7/365): 1–5 years on Cameron TA2000 and CompAir screw compressors; factory certified for Cameron TA2000; trained and in possession of CompAir Screw Compressor passport. On-site Technician: daily on site inspecting and maintaining compressor plant; familiar with Eskom policies and procedures; on standby 24/7; located within 55 km radius of Arnot Power Station; minimum 3 years first-line maintenance experience on Cameron TA2000 and CompAir screw compressors. Certificates of competency required for all employees executing work on Arnot compressor machines and auxiliary equipment.
Quality Management
Source: Scope of work.pdfContractor must implement and maintain a Quality System (minimum ISO 9001:2008). Quality Control Plans (QCPs) with hold, witness, and verification points required for each interim and major service on all 23 compressors, submitted for Employer approval. Inspection levels based on equipment criticality. Data packs to be compiled and submitted: test certificates, drawings, design reviews. Employer conducts periodic quality audits. All non-conformances must be corrected to Employer satisfaction. Contractor's plan must include quality management system implementation programme.
Pricing Schedule
Source: Scope of work.pdfPricing Schedule referenced as Section C2, Pricing Data Option A. Contractor compiles service and maintenance schedule aligned with Pricing Schedule. Spares list for all compressors per pricing list. Bi-annual spares audits at South Contractor's Yard and CompAir Warehouse to verify min/max stock levels. Compressor spares utilised at intervals per Contractor's maintenance schedule. Valuation of work based on Price List unless otherwise specified. Actual quantities confirmed per Task Order.
Financial Requirements
Source: Scope of work.pdf (unknown)Pricing based on Price List in Section C2 (Pricing Data Option A). Payment: within two working days of receiving Employer's payment certificate (core clause 51.1), Contractor submits tax invoice matching certificate amount. Invoice must include: contractor and Service Manager details, contract number and title, contractor VAT number, Employer VAT number 4740101508, description per Price List item, amounts excluding/including VAT. Spares procured through contract remain Employer property. No bond, guarantee, or insurance amounts stated in this document.
Compliance Requirements
Source: Scope of work.pdf (unknown)Mandatory: CSD registration; valid SARS tax clearance/tax pin; B-BBEE certification for preference points; ISO 9001:2008 (minimum) Quality System; Environmental Management System accepted by Employer; OHSA Section 37.2 appointment (Contractor deemed Employer); competent person appointments per statutory and Eskom regulations; PPE per OHSACT; MSDS for hazardous substances approved before use; compliance with Eskom chemical specification GGSS1181; Arnot site waste management, spill cleanup, environmental procedures. Personnel: Technical Specialist (Contract Manager) with 5–10 years on Cameron TA2000 and CompAir screw compressors; 3× Service Engineers with 1–5 years on same, factory certified on TA2000, CompAir Screw Compressor passport; On-site Technician daily on site, within 55 km radius, 3+ years first-line maintenance on TA2000 and CompAir screw, familiar with Eskom policies, 24/7 standby. Certificates of competency for all employees executing work. Standard returnable forms: SBD 1 (Invitation to Bid), SBD 3.1/3.2/3.3 (Pricing Schedule), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Local Production and Content), SBD 7.2 (Contract Form – Services), SBD 8 (Past SCM Practices), SBD 9 (Independent Bid Determination), Authority to Sign / Board Resolution.
Health & Safety
Source: Scope of work.pdfContractor bears costs for medicals and safety inductions. Must provide and enforce PPE per OHSACT. Submit MSDS for all hazardous substances; no use without approval. Adhere to Eskom chemical specification GGSS1181. Comply with Arnot site waste management, spill cleanup, environmental procedures. Implement and maintain approved safety policy covering PPE, safe work procedures, job-specific risk assessments, safety meetings. Subject to regular Employer audits. Unsafe practices or non-compliance may result in stop-work order. Conduct job observations and maintain continuous safety awareness. Contractor deemed Employer under OHSA Section 37. Must appoint competent persons per statutory and Eskom safety regulations. Contractor indemnifies Employer against legal/financial liabilities from SHEQ non-compliance. Permit-to-work system mandatory for all maintenance activities.
Environmental
Source: Scope of work.pdfContractor must implement an Environmental Management System (EMS) accepted by Employer. Comply with Arnot Power Station environmental procedures. Pass periodic environmental audits with corrective action as needed. Key areas: stormwater management (separate clean and polluted water); contaminated soil removal and disposal at approved sites; redundant material to reclamation yard upon Employer approval; noise/emissions/pollution control and removal of faulty equipment; wash-down facilities only in designated zones.
Contractual Terms
Source: Scope of work.pdfContract duration: four years. Work executed only under written Task Order issued by Employer. Valuation based on Price List unless otherwise specified. Actual quantities confirmed per Task Order. Contractor submits monthly assessments and Task Order-based evaluations for cost determination. Contractor's plan with service schedule and QCP required at inception. Monthly progress meetings (last Tuesday, Arnot or MS Teams). Specialist meetings as needed; minutes to Service Manager within five days. Contractor provides organogram with contact details, responsibilities, line of authority. Replacement cover required for site representative absence. NEC document format for early warning and compensation event notifications. Equipment and spares purchased through contract remain Employer property. All records, documentation, planning system data handed over on software at contract end. Modifications to plant only in consultation with Employer engineering.
Section
Source: Scope of work.pdfNo additional evaluation criteria beyond the performance criteria with penalties stated in the main evaluationCriteria section. The document references Quality Assurance Requirements (ISO 9001:2008, QCPs, audits) and Health, Safety, Environmental & Quality Assurance sections as contractual obligations, not as scored evaluation criteria.
Evaluation Criteria
Source: Station HIRA.pdf (unknown)No eligibility criteria specified
Compliance Requirements
Source: Station HIRA.pdf (unknown)Ergonomics Poorly designed tools and Ergonomics related health ergonomically unsound implications equipment Excavation works and open Falling through open holes and serious injuries and deaths trenches trenches Explosive atmosphere Presence or usage of explosive serious injuries and property substances and vessels under damages from emanating pressure explosions Hot works Sparks and fumes Fire and burns Lighting Poor lighting Tripping slipping and injuries Ladders Scaffold work and fall from ladder sand scaffolds use of unsafe or faulty ladders suspended platform and scaffolds Interfaces with third parties Work in coordination / poor Collision with tools and and contractors information / unknown presence materials and machinery, of personnel on site injuries resulting from falling tools Inclement weather working and driving in misty Reduced visibility conditions Vehicle and pedestrian improper operations and driving of incidents leading to serious interface vehicles at unacceptable speed injuries and death Systems designs Inappropriate designs injuries and accidents Management of change Absence of management of injuries and accidents from change mismanaged change
Health & Safety
Source: Station HIRA.pdfHazard identification and risk assessment for compressor maintenance work at Arnot Power Station:
Description
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docxThis is a standard Non-Disclosure Agreement template (File: 240-63152171 Rev 5) used by Eskom Holdings SOC Ltd for suppliers and tenderers. It governs the exchange of confidential information during commercial discussions and negotiations. The agreement defines confidential information broadly, restricts its use to the specified project, requires a reasonable standard of care, and provides for return or destruction of materials on request within 7 business days. The term endures for 3 years after termination of the relationship. Governing law is South African law. The template includes signature blocks for Eskom (Procurement Senior Manager or above) and the supplier/tenderer, with witness requirements.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)Eskom Holdings SOC Ltd: Physical address - Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton; Postal address - PO Box 1091, Johannesburg 2000; Telephone - +27 (number incomplete in template). The signatory for Eskom must be no lower than a Procurement Senior Manager. Supplier/tenderer contact details are to be inserted in the template.
Submission Guidelines
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)This document is a Non-Disclosure Agreement template, not a tender submission pack. It does not contain submission instructions, returnable forms, or a submission address for the compressor maintenance tender (E2896GXMPARNR). Bidders must obtain the full RFB document for submission requirements.
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)This NDA template does not contain evaluation criteria for the compressor maintenance tender. It only sets out the legal framework for confidential information exchange between Eskom and a supplier/tenderer. Evaluation criteria will be specified in the main RFB document.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)I. Eskom HOLDINGS SOC LTD a company incorporated under the laws of the Republic of South Africa, having its registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa, with registration number 2002/015527/06 [hereinafter referred to as “the Disclosing Party”.
Compliance Requirements
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)The supplier/tenderer must be a legally incorporated entity capable of entering into a binding agreement. The signatory must have authority to sign on behalf of the organisation at a level no lower than a senior manager with procurement delegation. No CIDB, B-BBEE, CSD, or other registration requirements are stated in this NDA.
Description
Source: NEC3 TSC for Compressor Maintenance Contract.pdfProject: Maintenance of Compressor Plant at Arnot Power Station for a Period of 4 Years. Contract structure: Part C1 Agreements & Contract Data, Part C2 Pricing Data, Part C3 Scope of Work. Scope: Maintenance of control air and station air compressors and related plant at Arnot Power Station, including mechanical and electrical systems forming part of compressor operating systems. Covers CompAir TA2000 Cameron Centrifugal Compressors, CompAir L-Series & Ingersoll-Rand ML110 Rotary Screw Compressors, CompAir AXS & AXN Series Heatless Absorption Dryers, CompAir "B" & "C" Inline Filters, EVAPCO Cooling Towers, BAOFN Inspections & Cleaning, BAOFN 7.5 Rotary Screw Compressors. Includes preliminary & general, health & safety, labour, maintenance spares, capital/critical spares for unforeseen failures.
Important Dates
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Closing date and time: 18 September 2026 at 10:00 (from tender record). Starting date: TBC (to be confirmed). Service period: 4 years. Contractor's first plan submission: within 2 weeks of Contract Date. Task Order programme submission: within 5 days of receiving Task Order. Payment assessment interval: between the 25th and last day of each successive month. Payment period: 30 calendar days after signed assessment and valid tax invoice (Eskom standard policy for contracts above R50 million incl. VAT is 60 days). Compensation event notification: within 8 weeks of becoming aware. B-BBEE status change notification: within 7 days; updated verification certificate within 30 days. No compulsory briefing or site visit dates are mentioned.
Contact Information
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Service Manager: details to be provided (name, address, telephone, fax, e-mail). Adjudicator nominating body: Chairman of ICE-SA (joint division of SAICE and ICE London) or successor; if no agreement, appointed by Arbitration Foundation of Southern Africa (AFSA). Arbitration per latest Rules of the Association of Arbitrators (Southern Africa); place of arbitration: South Africa. Engineering Contract Strategies contact: Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za (source for NEC3 documents).
Submission Guidelines
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Submission channel and address: Not stated in the document. The Form of Offer and Acceptance (C1.1) must be completed, signed by the duly authorised representative, and submitted as part of the returnable documents at award stage. The tenderer must provide the Schedule of Deviations (if any) with the Offer. After award, the Contractor must within two weeks contact the Employer's agent to arrange delivery of securities, bonds, guarantees, proof of insurance, and any other documentation required by the conditions of contract. Failure to fulfil these obligations constitutes repudiation.
Evaluation Criteria
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Contract type: NEC3 Term Service Contract (TSC3) Option A (Priced contract with price list) with secondary Options X1, X2, X18, X19, X20, W1, and Z1–Z14. Evaluation method not explicitly stated in the document. Key Performance Indicators (Option X20): Performance report against each KPI at intervals of [●] months (not used when Option X12 applies). Risk Register matters include Competency of Personnel, unavailability of Resources, replacement of personnel, Eskom/Contractor strikes, non-adherence to SHEQ Policy, Poor quality of work, and PSR Authorisation. No minimum qualifying scores, functionality thresholds, or preference point system (80/20 or 90/10) are specified in the provided text.
Technical Specifications
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Scope: Maintenance of control air and station air compressors and related plant at Arnot Power Station for 4 years. Affected Property: Control air and station air compressors and plant associated and forming part of the compressor operating systems – mechanical and electrical. Equipment covered: CompAir TA2000 Cameron Centrifugal Compressors (Unit Control Air 1 & 3 Old Generation, Unit Control Air 2 New Generation), CompAir L-Series & Ingersoll-Rand ML110 Rotary Screw Compressors, CompAir AXS & AXN Series Heatless Absorption Dryers, CompAir "B" & "C" Inline Filters, EVAPCO Cooling Towers, BAOFN Inspections & Cleaning, BAOFN 7.5 Rotary Screw Compressors. Services include: preliminary & general (site establishment, de-establishment, accommodation, travelling, tools & equipment), health & safety, labour (Site Artisan, Service Technician), standby allowance, maintenance spares (scheduled minor, interim, major services with specific part numbers and quantities), capital/critical spares for unforeseen failures, and provision for new items. Detailed quantities: Site Artisan – 9,568 hrs, 112,424 km, 1,376 accommodation days over 4 years; Service Technician – 11,136 hrs, 612,950 km, 259 accommodation days; Standby allowance – 1,460 days. Service Information located in Part C3 Scope of Work and referenced documents/drawings.
Methodology
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Contractor's plan requirements: First plan submitted within 2 weeks of Contract Date (clause 21.1). Plan must link operations to Price List items (clause 21.4). Task Order programme submitted within 5 days of receiving Task Order (Option X19.5). Price List preparation requires linking operations on plan to priced items for satisfactory cash flow (clause 11.2(17)).
Experience & Qualifications
Source: NEC3 TSC for Compressor Maintenance Contract.pdfKey personnel requirements per Contract Data Part 2: Contractor to provide details of key people including Name, Job, Responsibilities, Qualifications, Experience. CVs required. Risk Register includes Competency of Personnel and unavailability of Resources as risk matters.
Quality Management
Source: NEC3 TSC for Compressor Maintenance Contract.pdfQuality implications: Contractor warrants Prices include sufficient amount for proper compliance with Construction Regulations, all applicable H&S laws/regulations, and H&S rules/guidelines/procedures (Z6.1). Compliance with environmental laws/regulations/rules/guidelines/procedures (Z6.2). Asbestos compliance monitoring per Standard 32-303 and regulations (Z14). Measurements by SANAS-accredited AAIA. Parallel Measurements evaluated against SA statutory limits. Control measures per AAIA-approved asbestos work plan. Key Performance Indicators (Option X20) require performance reports at intervals of [●] months. Risk Register includes Competency of Personnel and unavailability of Resources as risk matters.
Pricing Schedule
Source: NEC3 TSC for Compressor Maintenance Contract.pdfPricing Option: TSC3 Option A (Priced contract with price list). Price List structure (C2.2): Preliminary & General: Site Establishment (ea, qty 1), Site De-establishment (ea, qty 1), Accommodation (Site Artisan, Service Technician), Travelling (Site Artisan km, Service Technician km), Tools and Equipment (ea). Health & Safety: Health and Safety costs for 4 yr (ea). Labour Rates: Labour Fixed rates (Site Artisan hrs, Service Technician hrs), Standby Allowance (days). Maintenance Spares: CompAir TA2000 Cameron Centrifugal Compressors (ea), CompAir L-Series & Ingersoll-Rand ML110 Rotary Screw Compressors (ea), CompAir AXS & AXN Series Heatless Absorption Dryers (ea), CompAir "B" & "C" Inline Filters (ea), EVAPCO Cooling Towers (ea), BAOFN Inspections & Cleaning (ea), BAOFN 7.5 Rotary Screw Compressors (ea). Capital / Critical Spares: Centrifugal Compressors (ea), Screw Compressors (ea). New Items: Provision for additional items. Pricing assumptions (C2.1): Option A priced contract; Price List is not Service Information; Contractor links plan operations to Price List items; Price List inclusive of everything necessary for service per Service Information; lump sum items not adjusted for quantity changes; compensation events only basis for Price changes. Price List format: Lump sum items – Price column only; rate-based items – Rate × Expected Quantity = Price; time-proportional items – Unit of time and Expected Quantity in time units. Detailed quantity breakdowns: Site Establishment, De-establishment, Tools & Equipment, Health & Safety: Itemised detail tables (descriptions, units, quantities, rates, prices to be filled). Site Artisan (Labour, Travelling, Accommodation): Normal Work Week 40 hrs × 196 weeks = 7,840 hrs; Normal travelling 470 km/week × 196 weeks = 92,120 km; Accommodation 344 days/year × 4 years = 1,376 days; Breakdowns/unforeseen call-outs (3/month): 24 hrs, 152 km, 48 days per event × 282 events = 6,768 hrs, 42,864 km, 13,536 days; Planned overtime: 8 hrs × 72 weeks = 576 hrs, 94 km × 72 = 6,768 km. Totals: 9,568 hrs, 112,424 km, 1,376 days. Service Technician (Labour, Travelling, Accommodation): Totals: 11,136 hrs, 612,950 km, 259 days. Standby Allowance: 365 days/year × 4 years = 1,460 days. CompAir TA2000 Cameron Centrifugal Compressors: Detailed service breakdowns for Unit Control Air 1 & 3 (Old Generation) and Unit Control Air 2 (New Generation) including 3-monthly minor services (8 services/4 yrs/2 machines), 6-monthly interim services (4 services/4 yrs/2 machines), 12-monthly major services (4 services/4 yrs/2 machines) with specific part numbers, quantities, labour hours, travel km, accommodation days.
Financial Requirements
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Pricing Option: TSC3 Option A (Priced contract with price list). Price List structure: Preliminary & General (lump sum and rate items), Health & Safety (lump sum for 4 years), Labour Rates (fixed hourly rates for Site Artisan and Service Technician), Standby Allowance (daily rate), Maintenance Spares (per equipment type), Capital/Critical Spares (per compressor type), New Items (provision for additional costed items). Price adjustment for inflation (Option X1): Base date [●]; proportions – 15% Fixed, 18% Labour (SEIFSA Table C3(a)), 2% CPI (SEIFSA Table D4), 30% Material (SEIFSA Table O2), 35% Foreign Currency (SEIFSA Table U3(a)). Payment: assessment interval 25th to month-end; payment within 30 calendar days after signed assessment and valid tax invoice (Eskom policy 60 days for contracts >R50m incl. VAT). Interest: prime rate of Standard Bank of South Africa (365-day year). Tax invoice: Contractor must provide within 1 week of payment certificate per Employer's procedures; must include Employer VAT number 4740101508. Late invoice extends payment period equally. Insurance: Contractor provides Insurance Table A cover from starting date until Completion/termination – loss/damage to Employer's property, Plant & Materials, Equipment (replacement cost or Employer's policy deductible), third-party property (replacement cost), bodily injury/death to non-employees (statutory amount), employee injury/death (statutory amount). Employer provides Insurance Table B per policy documents. Limitation of liability (Option X18): Contractor's indirect/consequential loss liability R0.00; loss/damage to Employer's property limited to insurance deductibles per event; Defects due to design limited to greater of total Prices at Contract Date and excluded insurance amounts plus deductibles; total liability limited to total of Prices (excl. additional excluded matters); additional excluded matters unlimited (design defects, manufacture outside Affected Property, third-party property damage, death/injury, IP infringement); end of liability date 12 months after service period end.
Compliance Requirements
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)Mandatory returnable documents: C1.1 Form of Offer and Acceptance (signed by duly authorised representative), Schedule of Deviations (if any). Contract Data Part 2 (C1.2b) to be completed by Contractor including: Contractor details, direct fee percentage, subcontracted fee percentage, Risk Register matters, Service Information for plan, first plan, key personnel details (Name, Job, Responsibilities, Qualifications, Experience, CVs), price list, tendered total of Prices. Joint ventures: joint and several liability; notify key person with binding authority within 2 weeks of Contract Date; no composition change without Employer's written consent. B-BBEE: notify Employer within 7 days of any status change; submit updated verification certificate within 30 days; decreased status allows renegotiation or termination; failure to notify may constitute termination reason. Confidentiality: no disclosure of contract information; images of Affected Property require prior written consent; subcontractors bound. Health & Safety (Z6): Contractor accepts appointment as Principal Contractor under Construction Regulations 2014; warrants Prices include sufficient amount for compliance; ensures subcontractors/employees comply. Environmental (Z6.2): compliance with all applicable environmental laws/regulations. Tax compliance: VAT Act compliance; include Employer VAT number 4740101508 on invoices. Ethics (Z11): no Prohibited Actions (Coercive, Collusive, Corrupt, Fraudulent, Obstructive); Employer may terminate if Prohibited Action occurs and Contractor didn't prevent/remedy; cooperation with investigations required. Asbestos (Z14): Contractor may stop work if asbestos identified above Action Level (0.1 fibres/ml); area must be declared safe via Compliance Monitoring or AAIA-approved intervention; dates adjusted for regulatory notification periods. Nuclear liability (Z13): Employer indemnifies Contractor for nuclear damage per Nuclear Energy Act except unlawful intent/unauthorised presence at Koeberg. Insurance certificates to be provided when requested. CSD registration, SARS tax clearance, CIDB grading, and specific B-BBEE level requirements are not explicitly stated in the document.
B-BBEE Requirements
Source: NEC3 TSC for Compressor Maintenance Contract.pdf (unknown)B-BBEE status change provisions per Z3: Contractor must notify Employer within 7 days of any change in legal status, ownership, business composition or dealings affecting B-BBEE status. Updated verification certificate and supporting documentation required within 30 days of notification or as instructed by Service Manager. If B-BBEE status decreases since Contract Date, Employer may renegotiate or terminate Contractor's obligation to Provide the Service. Failure to notify may constitute reason for termination (termination procedures P1, P2, P4 per clause 92; amounts due A1, A3 per clause 93).
Health & Safety
Source: NEC3 TSC for Compressor Maintenance Contract.pdfHealth & Safety requirements per Z6: Contractor undertakes all reasonable precautions for health and safety; accepts appointment as Principal Contractor under Construction Regulations 2014 (OHSA); warrants Prices include sufficient amount for compliance with Construction Regulations, all applicable H&S laws/regulations, and contract H&S rules/guidelines/procedures; ensures subcontractors/employees/others comply. Compliance with all applicable environmental laws/regulations/rules/guidelines/procedures; ensures subcontractors/employees/others comply. Asbestos management per Z14: Employer ensures Ambient Air conforms to SA asbestos standards (GNR Feb 2002, OHSA 1993). OEL: 0.2 regulated asbestos fibres/ml (4-hr TWA); STEL: 0.6 fibres/ml (10-min TWA). Measurements by independent SANAS-accredited AAIA. Contractor may perform Parallel Measurements at own expense. Employer manages asbestos/ACM per Standard 32-303. If asbestos identified: risk assessment, immediate control measures if above Action Level (0.1 fibres/ml), air monitoring. Contractor may stop work and leave until area declared safe via Compliance Monitoring or AAIA-approved intervention. Dates adjusted for regulatory notification periods (Regulations 3 and 21). Removal/disposal by registered asbestos contractor at Employer's expense. Insurance requirements per Z12 Table A: Contractor covers loss/damage to Employer's property, Plant & Materials, Equipment (replacement cost or Employer's policy deductible); third-party property (replacement cost); bodily injury/death to non-employees (statutory amount); employee injury/death (statutory amount). Employer provides Table B: Assets All Risk, Contract Works, Environmental Liability, General & Public Liability, Transportation (Marine), Motor Fleet & Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage & Business Interruption, Nuclear Material Damage Terrorism.
Environmental
Source: NEC3 TSC for Compressor Maintenance Contract.pdfEnvironmental compliance per Z6.2: Contractor complies with all applicable environmental laws, regulations, rules, guidelines, and procedures; ensures subcontractors/employees/others comply. Environmental Liability insurance per Z12 Table B (Employer-provided): Per insurance policy document. Nuclear liability per Z13: Employer (Koeberg operator) solely responsible for and indemnifies Contractor against nuclear damage liabilities per Nuclear Energy Act, except for unlawful intent or unauthorised presence at KNPS; waives recourse except per section 30(7) of Act; protection until KNPS decommissioned. Asbestos management per Z14: Employer manages asbestos/ACM per Standard 32-303; ensures Ambient Air conforms to standards; measurements by SANAS-accredited AAIA; risk assessment and control measures if asbestos identified; removal/disposal by registered asbestos contractor at Employer's expense per SA legislation.
Contractual Terms
Source: NEC3 TSC for Compressor Maintenance Contract.pdfContract type: NEC3 Term Service Contract (TSC3) with Option A (Priced contract with price list), dispute resolution Option W1, and secondary Options X1 (Price adjustment for inflation), X2 (Changes in the law), X18 (Limitation of liability), X19 (Task Order), X20 (Key performance indicators), and Z (Additional conditions of contract Z1-Z14). Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Service Manager: Details to be provided (name, address, tel, fax, e-mail). Affected Property: Control air and station air compressors and plant associated and forming part of the compressor operating systems – mechanical and electrical. Service: Arnot control air and station air compressor and related plant maintenance. Risk Register matters: Competency of Personnel, unavailability of Resources, replacement of personnel, Eskom/Contractor strikes, not adhering to SHEQ Policy, Poor quality of work and PSR Authorisation. Service Information location: Part 3: Scope of Work and all documents and drawings to which it makes reference. Governing law: Law of the Republic of South Africa. Language: English. Period for reply: One working week. Contractor's first plan submission: Within 2 weeks of Contract Date. Starting date: TBC. Service period: 4 years. Assessment interval: Between the 25th and last day of each successive month. Currency: South African Rand. Payment period: 30 calendar days after signed assessment by both Parties and valid Tax Invoice. Note: Eskom's standard policy for contracts above R50 million (incl. VAT) is 60 days. Interest rate: Publicly quoted prime rate of Standard Bank of South Africa Limited (365-day year). Compensation events: Any unforeseen scope of work not covered by contract but within scope of compressor maintenance/services (refer to NEC TSC3 clause 60.1). Employer's additional risks: Labour unrest (Strike Action); Low skill level on compressors – Eskom personnel. Termination: Managed per core clause 9 of NEC3 TSC. Option A data: Contractor prepares forecasts of final total of Prices at intervals no longer than [●] weeks. Option W1 (Dispute resolution): Adjudicator selected from ICE-SA Division of SAICE Panel of Adjudicators; if no agreement, appointed by Arbitration Foundation of Southern Africa (AFSA). Tribunal: arbitration per latest Rules for Conduct of Arbitrations by Association of Arbitrators (Southern Africa). Place of arbitration: South Africa. Arbitrator selection: Chairman of Association of Arbitrators (Southern Africa) or nominee. Option X1 (Price adjustment for inflation): Base date for indices [●]. Price Adjustment Factor proportions: 15% Fixed (Fixed Portion), 18% Labour (SEIFSA Table C3(a)), 2% CPI (SEIFSA Table D4), 30% Material (SEIFSA Table O2 General & Special Purpose Machinery), 35% Foreign Currency (SEIFSA Table U3(a)). Option X2 (Changes in law): Becomes compensation event only if changes in Law of Republic of South Africa took place after Contract Date. Option X18 (Limitation of liability): Contractor's liability for indirect/consequential loss limited to R0.00. Liability for loss/damage to Employer's property limited to insurance deductibles per event. Liability for Defects due to design limited to greater of total Prices at Contract Date and amounts excluded/unrecoverable from Employer's insurance plus deductibles. Total liability limited to total of Prices (excluding additional excluded matters). Additional excluded matters (unlimited): Defects due to design/plan/specification, Defects due to manufacture/fabrication outside Affected Property, loss/damage to property other than Employer's, death/injury to person, infringement of intellectual property right. End of liability date: 12 months after end of service period. Option X19 (Task Order): Contractor submits Task Order programme within 5 days of receiving Task Order. Option X20 (KPIs): Performance report against each KPI at intervals of [●] months. Z1 (Cession/delegation/assignment): Contractor requires Employer's written consent; Employer may cede to subsidiaries/divisions resulting from ESI restructuring. Z2 (Joint ventures): Joint and several liability; notify key person with authority within 2 weeks of Contract Date; no composition change without Employer's written consent. Z3 (B-BBEE status change): Contractor must notify Employer within 7 days; submit updated verification certificate within 30 days; decreased status allows Employer to renegotiate or terminate; failure to notify may constitute termination reason. Z4 (Confidentiality): No disclosure of contract information; exceptions for public domain or prior possession; images of Affected Property require prior written consent; subcontractors bound by same. Z5 (Waiver/estoppel): Extensions/concessions/waivers do not constitute waiver of rights or estoppel unless agreed in writing. Z6 (Health, safety, environment): Contractor takes all reasonable precautions; accepts appointment as Principal Contractor under Construction Regulations 2014; warrants Prices include sufficient amount for compliance; complies with all applicable H&S and environmental laws; ensures subcontractors/employees comply. Z7 (Tax Invoice and interest): Contractor provides tax invoice within 1 week of payment certificate per Employer's procedures; late invoice extends payment period equally; VAT Act compliance required; include Employer's VAT number 4740101508 on invoices. Z8 (Compensation event notification): Contractor must notify within 8 weeks of becoming aware, else not entitled to Price change. Z9 (Employer's limitation of liability): Employer's liability for Contractor's indirect/consequential loss limited to R0.00; indemnity limited to compensation per core clause 63 and X19.11. Z10 (Termination addition): Includes business rescue order as termination event. Z11 (Ethics): Defines Prohibited Actions (Coercive, Collusive, Corrupt, Fraudulent, Obstructive); Committing Party may not take Prohibited Actions; Employer may terminate if Prohibited Action occurs and Contractor didn't prevent/remedy; no court finding required; cooperation with investigations required. Z12 (Insurance): Replaces core clauses 83 and 86. Contractor provides Insurance Table A cover from starting date until Completion/termination: loss/damage to Employer's property (replacement cost or Employer's policy deductible), Plant & Materials (replacement cost or deductible), Equipment (replacement cost or deductible), third-party property (replacement cost), bodily injury/death to non-employees (statutory amount), employee injury/death (statutory amount). Employer provides Insurance Table B: Assets All Risk, Contract Works, Environmental Liability, General & Public Liability, Transportation (Marine), Motor Fleet & Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage & Business Interruption, Nuclear Material Damage Terrorism – all per policy documents. Z13 (Nuclear liability): Employer (Koeberg operator) indemnifies Contractor against nuclear damage liabilities per Nuclear Energy Act, except for unlawful intent or unauthorised presence at KNPS; waives recourse except per section 30(7) of Act; protection until KNPS decommissioned. Z14 (Asbestos): Definitions per Employer's Asbestos Standard 32-303. OEL: 0.2 fibres/ml (4-hr TWA); STEL: 0.6 fibres/ml (10-min TWA). Employer ensures Ambient Air conforms to SA standards (GNR Feb 2002, OHSA 1993). Measurements by SANAS-accredited AAIA. Contractor may perform Parallel Measurements at own expense. Employer manages asbestos per Standard. If asbestos identified: risk assessment, control measures, air monitoring. Contractor may stop work until area declared safe. Dates adjusted for notification periods per Asbestos Regulations 2001. Removal/disposal by registered asbestos contractor at Employer's expense.
Section
Source: NEC3 TSC for Compressor Maintenance Contract.pdfKey Performance Indicators per Option X20: Performance report against each KPI provided at intervals of [●] months (not used when Option X12 applies). Risk Register matters: Competency of Personnel, unavailability of Resources, replacement of personnel, Eskom/Contractor strikes, non-adherence to SHEQ Policy, Poor quality of work, PSR Authorisation.
Description
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfProvision of maintenance services for the compressor plant at Arnot Power Station for a period of 4 years, executed in accordance with the NEC3 TSC Scope of Work. Equipment includes Cameron TA2000 centrifugal compressors, CompAir L-Series screw compressors, Ingersoll-Rand ML110 compressors, BAOFN screw compressors, diesel compressors, compressed air dryers, cooling systems, filters, cyclonic separators and all auxiliary equipment. Maintenance covers preventive, predictive, corrective and breakdown maintenance, daily on-site inspections, emergency response, maintenance planning, reporting, inspection after repairs, risk assessments and maintenance schedules. Evaluation uses mandatory technical criteria (warranty takeover, OEM spares supply, ISO 9001:2015) followed by qualitative technical evaluation (100% total, 80% minimum threshold) covering maintenance and quality (40%) and competencies and technical capability (60%).
Returnable Documents
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Mandatory returnable documents:
All personnel returnables are mandatory; failure to submit any required returnable results in a score of zero for that criterion.
Evaluation Criteria
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Mandatory technical evaluation criteria (all must be met to proceed to qualitative evaluation):
Qualitative technical evaluation (total 100%, minimum threshold 80%):
Site Manager (10%): N6 National Diploma with Trade Test in Mechanical/Electrical Engineering OR National Diploma in Mechanical/Electrical Engineering, plus 4 years post-qualification compressor maintenance experience (screw, centrifugal, diesel compressors, air dryers, cooling systems).
Mechanical/Mechatronics Engineer (10%): BTech/BEng/BSc in Mechanical or Mechatronics Engineering, minimum 5 years compressor maintenance experience.
Artisan – Fitter and Diesel Mechanic (10%): minimum N3 Certificates with Trade Tests, minimum 5 years compressor maintenance experience.
C&I Artisan and Electrician (10%): qualified C&I Artisan and Electrician (N3 + Trade Test), minimum 5 years compressor maintenance experience.
All personnel must submit certified qualifications, trade certificates, OEM training certificates (where applicable), detailed CVs and contactable references. Failure to submit any required returnable for a role results in a score of zero for that criterion.
Scoring scale: 5 = 100% (fully compliant, no foreseen risk), 4 = 80% (compliant with acceptable qualifications/risk), 2 = 40% (non-compliant, unacceptable risk), 0 = 0% (totally deficient/non-responsive). Scores 1 and 3 are not used. Tenders scoring below 80% overall are deemed technically non-responsive and will not be evaluated further.
Technical Specifications
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Scope: provision of maintenance services for the compressor plant at Arnot Power Station for a period of 4 years, executed in accordance with the NEC3 TSC Scope of Work.
Equipment to be maintained:
Maintenance activities required:
Quality requirements:
Warranty and spares:
Methodology
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Method statement: detailed, equipment-specific method statement demonstrating how maintenance services will be executed in accordance with the NEC3 TSC Scope of Work. Must clearly describe preventive, predictive, corrective and breakdown maintenance, daily on-site inspections, emergency response, maintenance planning, reporting procedures, inspection after repairs, risk assessments and maintenance schedules. Must specifically address maintenance activities for Cameron TA2000 centrifugal compressors, CompAir L-Series screw compressors, Ingersoll-Rand ML110 compressors, BAOFN screw compressors, diesel compressors, compressed air dryers, cooling systems, filters, cyclonic separators and all auxiliary equipment. General compressor maintenance procedures without equipment-specific activities will not be considered fully compliant.
Quality Control Plans: project-specific QCPs covering equipment-specific inspection and test plans, hold points, witness points, inspection frequencies, reporting requirements, acceptance criteria, responsibilities and quality assurance procedures for all equipment types. Generic QCPs not aligned to the Scope of Work will receive reduced scores.
Experience & Qualifications
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfCompany experience: minimum 10 years verifiable maintenance experience on equipment like that installed at Eskom Arnot Power Station, covering centrifugal compressors, electric-driven rotary screw compressors, diesel-driven rotary screw compressors, compressed air dryers and associated cooling systems. Supporting documents: completion certificates, contracts, purchase orders, service agreements, project descriptions, client references.
Key personnel (all returnables mandatory per role):
All personnel must submit certified qualifications, trade certificates, OEM training certificates (where applicable), detailed CVs and contactable references. Personnel collectively must demonstrate competency on centrifugal compressors, rotary screw compressors, diesel compressors, compressed air dryers and cooling systems. Failure to submit any required returnable for a role results in a score of zero for that criterion.
Quality Management
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfValid ISO 9001:2015 certification is mandatory. Project-specific Quality Control Plans (QCPs) must be submitted covering equipment-specific inspection and test plans, hold points, witness points, inspection frequencies, reporting requirements, acceptance criteria, responsibilities and quality assurance procedures for centrifugal compressors, rotary screw compressors, diesel compressors, air dryers, cooling systems, filters and auxiliary compressed air equipment. Generic QCPs not aligned to the Scope of Work will receive reduced scores.
Compliance Requirements
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdf (unknown)Mandatory compliance requirements:
Health & Safety
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfMethod statement must include risk assessments as part of the maintenance approach. No further health and safety requirements are specified in the provided text.
Contractual Terms
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfContractor must assume existing and new warranty obligations for all installed equipment, including maintenance, repair and spare supply coverage. A letter of confirmation listing the equipment is required.
Section
Source: Tender Tech Criteria for 4yr Compressor Maintenance Contract Rev.2.pdfMandatory technical evaluation criteria (all must be met to proceed):
Qualitative technical evaluation (total 100%, minimum threshold 80%):
Scoring: 5=100% (fully compliant), 4=80% (compliant with qualifications), 2=40% (non-compliant), 0=0% (deficient). Scores 1 and 3 not used. Below 80% overall = technically non-responsive.
Evaluation Criteria
Source: Supplier Declaration of Interest.pdf (unknown)No explicit eligibility criteria such as CIDB grading, B-BBEE level, or financial thresholds are stated in the provided document. Bidders must be registered on the Central Supplier Database (CSD) and have valid tax compliance status as per standard Eskom requirements, though not detailed in this extract.
Compliance Requirements
Source: Supplier Declaration of Interest.pdf (unknown)Returnable form — must be completed, signed and submitted with the bid:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Arnot Power Station - rietkuil - middelburg - 1097
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
03 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.