Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
200 Malibongwe Dr, Praegville - Randburg - Randburg - 2194
Organization Type
GOVERNMENT
Published
07 Sept 2026
OCDS Reference
ocds-9t57fa-169328
Date & Time
Friday, 09 October 2026 - 12:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
200 Malibongwe drive, G4 Auditorium
Tenders are to be submitted online using the online tender box that is located on the tender notice page, on the mintek website. Link: https://secure.sabeexdms.com/organisation/view/5496
Categories
Request for Bid(Open-Tender)
200 Malibongwe Dr, Praegville - Randburg - Randburg - 2194
AI Document Analysis Stages
Important Dates
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf (RFP)07 Sept
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf
C322 - Civils BOQ Estimate_ Mintek Rev.xlsx
DU2601-05_Rev A_Rebar Details.pdf
DU2601-01_Rev B_Site Layout.pdf
DU2601-02_Rev B_Concrete Details.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 5 750 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"09 October 2026","closingTime":"12h00","briefingSession":"{"date":"18 September 2026","time":"11:00","venue":"11:00 (Attendance is non","is_compulsory":true}"}
Contact Information
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf (RFP){"name":null,"email":"[email protected]","phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf (RFP)1.25 Only those tenderers who score a minimum score of 70 points and above in respect
of the functionality criteria will be considered.
1.26 The functionality criteria is contained towards the end of this document.
minimum quality criteria may be invited to an interview if there need arises.
B1 – financial offer forms
MTF 01: Financial Offer and Price Declaration
SBD 6.1: Preference Points Claim Form in terms of the Preferential Procurement
mandatory prequalification, mandatory technical, functionality, price and specific
Technical Specifications
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf (RFP)The purpose of this tender is to invite suitably contractor to submit proposals for the Mintek
Generator Farm Civil Works. The services are required at Mintek’s premises located at 200
Malibongwe Drive, Strydom Park, Randburg.
The civil works described in this scope of works relate to the construction of a generator farm and
associated infrastructure at Mintek’s facility in Randburg, Gauteng. The work is carried out in two
phases and comprises earthworks, concrete plinths and transformer bays, a cable trench system,
storm water drainage, yard surfacing, and perimeter fencing.
The works are to be executed in accordance with the Contract Documents, the project drawings
issued (Drawing Nos. DU2601-01, DU2601-02 and DU2601-05 see appendixes), and the
applicable SANS 1200 Standardised Specifications read together with Civil Engineering
Quantities, 1990 (SAICE). All concrete shall comply with SANS 920–2011.
The works are to be executed on an operational facility, and the Contractor shall at all-time
conduct his operations with due regard for the safety and continuity of Mintek's ongoing activities.
All works shall be carried out in strict compliance with the Occupational Health and Safety Act,
No. , and the Construction Regulations of 2014, as amended.
23.1 Site establishment
The Contractor shall establish on site prior to the commencement of any construction activities.
Site establishment shall include, but is not limited to, the following:
works.
contractor's site office, ablution facilities in compliance with the Construction Regulations,
a first aid station, and secure storage for materials and equipment.
and potable water for the duration of the contract.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
site and prevent unauthorised access during construction.
less than 1.8 metres in height, constructed from suitable materials such as diamond mesh
or shade netting on steel droppers, to demarcate the contractor's working area and
storage zone from the operational Mintek facility.
Health and Safety Act (Act ) and applicable regulations.
prior to the commencement of works.
agree on construction access routes, working areas, and any interface or sequencing
requirements.
drawings and to the approval of the Engineer.
where necessary, to prevent damage to buried infrastructure.
including water and electrical supply.
management and storm water pollution prevention measures.
the contract period and shall be removed and the site restored upon completion of the
works.
security.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
23.2 Earthworks
23.2.1 Site Clearance
Prior to the commencement of earthworks, the Contractor shall clear and grub the site within the
designated works area, including the removal of all vegetation, trees and stumps up to 1m girth,
and any boulders present. All cleared material shall be legally disposed of off-site.
Topsoil shall be stripped to a nominal depth of 150mm over approximately 900m2, stockpiled
within the site compound, maintained, and subsequently used on embankment areas as directed.
The Contractor shall retain disposal certificates and make these available to the Engineer on
request.
23.2.2 Location and Marking of Existing Services
Prior to any excavation, the Contractor shall be responsible for locating, identifying, and marking
all existing underground and above-ground services within and adjacent to the works area. This
shall include but not be limited to water mains, sewer lines, electrical cables, telecommunications
cables, and any process-related pipework. The Contractor shall engage with the relevant Mintek
facility team and utility service providers to obtain as-built drawings and service location
information.
Trial holes shall be excavated by hand where uncertainty exists regarding service positions. All
identified services shall be clearly marked on the ground surface with paint, stakes, or other
durable markers prior to the commencement of bulk excavation. The Contractor accepts full
responsibility for any damage to services resulting from failure to adequately locate and protect
same.
23.2.3 Bulk Earthworks and Subgrade Preparation
Bulk excavation for the formation of the general terrace level shall be carried out to a depth of
approximately 250mm below finished ground level (FGL), as indicated on Drawing DU2601-01.
Excavated material suitable for fill shall be used for embankment construction; unsuitable material
shall be disposed of off-site. Provisional allowances are included in the schedule for excavation
in intermediate material and hard rock.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
Following bulk excavation, the in-situ subgrade shall be ripped and compacted to a depth of
150mm and compacted to not less than 93% of modified AASHTO maximum dry density over
approximately 720m2.
A layer of imported G7 subgrade material, 100mm in compacted thickness, shall then be placed
and compacted to not less than 95% of modified AASHTO maximum dry density over the general
terrace area. Compaction testing shall be carried out by an independent geotechnical laboratory
approved by the Engineer, with the cost of testing included in the Contractor's rates.
The Contractor shall ensure that all excavations comply with the Construction Regulations
regarding shoring, benching, and inspection of excavations, and that no person works in an
unsupported excavation of depth exceeding 1.5 metres without adequate support measures in
place.
23.2.4 Restricted Excavations
Restricted excavations shall be carried out for the following elements, including a 600mm working
space allowance where applicable:
Provisional allowances are included in the schedule for restricted excavation in intermediate
material and hard rock, to be expended only as instructed by the Engineer. The Engineer shall
inspect and approve all foundation excavations prior to the placement of blinding concrete or fill.
The Contractor shall carry out Dynamic Cone Penetrometer (DCP) tests on all excavation bottoms
and submit results to the Engineer for approval. The design assumes a safe bearing capacity in
excess of 150kPa.
Where directed by the Engineer, weak-mix trench-fill concrete shall be placed under plinths
abutting the cable trench to provide additional support to the founding strata. This item is
provisional.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
23.2.5 Embankment Finishing
Embankment slopes shall be trimmed by hand to a neat and even finish, over approximately
96m2, to the lines, levels and gradients indicated on the drawings.
23.3 Concrete works
The Contractor shall construct reinforced concrete plinths to support the following containers:
The plinths shall be constructed in accordance with the structural drawings issued for the works.
Works shall include the supply and placing of all formwork, the cutting, bending, and placing of
all steel reinforcement in accordance with the reinforcement drawings, and the supply, placing,
and curing of concrete of the specified strength.
Formwork shall be of sufficient rigidity and quality to produce a sound and dimensionally accurate
finish.
Reinforcement shall be placed, tied, and supported on approved plastic or concrete chairs to
maintain specified cover at all times.
Concrete shall be properly vibrated to achieve full compaction and shall be cured for a minimum
of seven days using an approved curing method.
All works relating to concrete construction shall be executed in accordance with the applicable
requirements of SABS 1200G (Concrete, Reinforced Concrete and Precast Concrete Elements)
and SABS 1200D (Earthworks) as relevant to associated preparatory works.
Where any conflict exists between these standards and the project specification or drawings, the
more stringent requirement shall apply and the Engineer shall be consulted before proceeding.
23.3.1 General
All in-situ concrete shall comply with SANS 920–2011. Concrete strengths shall be as follows:
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
All unformed concrete surfaces shall receive a smooth steel float finish. All formed surfaces shall
receive a smooth finish. Exposed edges shall be chamfered 20mm x 20mm. No vehicles are
permitted on precast covers.
23.3.2 Formwork
Formwork shall be provided to all concrete elements as required by the design and in accordance
with the drawings. Rough formwork shall be provided to vertical edges of buried trench base
slabs. Smooth formwork shall be provided to the sides of all plinths, transformer bund walls, and
to plinth B3 faces as detailed. Chamfer strips shall be fixed to all exposed edges.
23.3.3 Reinforcement
All reinforcement shall comply with SANS 920–2011. Bar types are as follows:
MPa.
Minimum concrete cover to reinforcement shall be 40mm. Minimum lap length shall be 50 bar
diameters. The total reinforcement quantities are approximately 2.61 tonnes of high tensile steel
and 0.10 tonnes of mild steel. All reinforcement shall be approved by the Engineer before any
concrete is poured.
23.3.4 Blinding Concrete
Blinding concrete (10MPa/19mm) shall be placed as follows:
with a smooth floated surface, over approximately 60m2 (provisional)
23.3.5 Structural Concrete
Structural in-situ concrete shall be placed as follows:
slabs, and equipment plinths.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
of the cable trench.
The transformer slab shall receive a power float finish over approximately 29m2. Trench base
slabs, plinths, bund walls and wall tops shall receive a steel trowel finish over approximately 70m2.
23.3.6 Precast Concrete Culverts and Covers
The open cable trench shall be constructed using inverted precast concrete portal culvert units,
1200mm wide x 900mm nominal bore (Rocla or similar approved), seated on a smooth flat RC
base with 80mm bedding concrete. A total of 28 units are required, giving an approximate trench
run of 17 080mm. Units shall be seated on two layers of 90mm wide malthoid over the top of the
brick cavity walls, to provide a seal and cushion for the removable covers.
Removable precast concrete cover slabs (610mm x 1440mm x 100/120mm thick, with recessed
seating) shall be supplied and placed over the portal culverts. A total of 38 covers are required.
Lifting lugs shall be provided by the precast supplier. The rate for covers shall exclude
reinforcement. Transport, cranage and placement of all precast elements are included.
23.3.7 Transformer Bund
The Contractor shall construct a transformer bund to the dimensions and details shown on the
drawings. The bund shall be constructed of reinforced concrete and shall be designed to contain
the full oil volume of the transformer it serves, with an additional freeboard allowance in
accordance with standard practice. The internal faces of the bund shall be finished with an
approved chemical-resistant waterproof coating or screed to prevent seepage of transformer oil
into the ground if so noted on the drawings. A sump or drain arrangement as shown on the
drawings shall be constructed to facilitate removal of any accumulated fluid. All works shall comply
with the relevant requirements of SANS and environmental regulations applicable to the
containment of hydrocarbon fluids.
23.3.8 Brick Cavity Walls
Reinforced brick cavity walls (270mm nominal cavity, solid brick skins) shall be constructed to
both sides of the cable trench above the precast culvert units, as detailed on Drawing
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
DU2601-02. HDG wire cavity ties shall be provided. The cavity shall be filled with
30MPa/13mm concrete with reinforcement as detailed. A 230mm single-skin brick wall shall be
provided to the end(s) of the cable trench. Total cavity wall area is approximately 28m2.
23.4 Yard surfacing and drainage
Following completion of concrete construction, a non-woven geotextile fabric (200g/m2) shall be
placed over the full yard area, including minimum 300mm laps and 150mm turn-ups against all
concrete plinths and kerbs, over approximately 514m2.
A 100mm compacted layer of clean, single-sized 26.5–37.5mm crushed stone yard aggregate
(SANS 1083:2014 compliant, high resistivity, free from contamination) shall be placed over the
geotextile and lightly compacted to finished ground levels as indicated on Drawing DU2601-01.
Precast concrete barrier kerbs (100/150mm wide) shall be placed around the perimeter of the
yard stone area on a bedding and haunching concrete to contain the stone, approximately 103m
in total.
A 110mm PVC double-walled stormwater drainage pipe shall be installed to the cable trench,
including bedding and backfill, discharging to or connecting into the existing stormwater system.
Total length is approximately 21m.
23.5 Perimeter fencing
A 2.4m high anti-climb perimeter fence shall be installed around the generator farm in accordance
with the specification on Drawing DU2601-01, approximately 100m in total length. The fencing
system shall be the Invisible Wall high-security welded mesh panel system or equivalent
approved, and shall comply with the following:
finger or toe grip (anti-climb/anti-clamber design)
fixings, 90° top flange and 30° toe flange
of 75
Company Name: __________________________________ Initials: __________
Pricing Schedule
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdfand format. Any additional particulars should be furnished on this document where
appropriate, or in a separate annexure.
1.11 Should the bidder desire to make any departures from, or modifications to this tender/
bid or to qualify its quotation in any way, the tender shall clearly set out its tender
departure/ modification as an Annexure, or alternatively state the content in a
covering letter attached to the tender proposal referred to herein, failing which, the
tender shall be deemed to be unqualified unless it conforms exactly with the
requirements of this tender. Unless otherwise specified and stipulated in writing, any
part of the tenderer’s tender/bid which deviates from any terms and conditions stated
within the tender document, shall be of no force or effect.
1.12 This tender document, together with associated forms and annexures, may NOT be
retyped or re-drafted, but photocopies or reprints may be prepared and used.
1.13 Bidders should check the numbers of the pages and satisfy themselves that none
are missing or duplicated. No liability shall be accepted in regard to claims arising
from the fact that pages are missing or duplicated.
1.14 The tender price shall be open for acceptance for a period of at least 90 calendar
days after the closing date of the tender. It should be noted that Tenderers may
offer a shorter validity period, but their bid may in that event, be disregarded for such
a reason. Tenderers shall clearly state whether or not prices will remain firm for the
duration of the contract. Only firm prices will be accepted. Non-firm prices (including
prices subject to rates of exchange of variations) will not be considered. In cases
where different delivery points influence the pricing, a separate pricing schedule must
be submitted for each delivery point.
1.15 Failure to have the Price declaration of this tender document signed by a duly
authorized person will constitute non-commitment by the bidder of the tender price,
and the bid will be invalidated.
1.16 All prices shall be quoted in South African currency and be VAT inclusive.
1.17 Mintek reserves the right to only accept part of the submitted bid by a supplier.
1.18 Mintek reserves the right to withdraw this tender.
of 75
Company Name: __________________________________ Initials: __________
e. If the entity submitting a Tender is a Joint Venture or a Consortium or Partnership,
each party to that formation must submit all the above information. A JV /consortium
agreement must be submitted signed by all members of the JV.
f. The Tenderer must be in good standing to do business with the public sector in
terms of Regulation 38 of the Supply Chain Management Regulations (Government
Gazette May 2005).
g. Complies with the requirements of the Specification.
h. Adheres to Pricing Instructions.
i. Complies in full and observes the requirements of the Notice to Tenderers (if
applicable).
j. In addition to the terms and conditions stipulated in this document, for the Tender to
be considered responsive, the tenderer must submit the following tender information:
A fully completed and signed tender form;
The tenderer’s details;
The necessary document authorising the Representative to sign and submit the
Tender on the Tenderer’s behalf;
6.1 The Tenderer shall supply all the price information required in the price schedule,
failure to do so shall invalidate the Tender.
6.2 No claim for price escalation will be considered unless it is specifically stated that this
Compliance Requirements
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf (RFP)Minimum functionality/qualifying score: 70
minimum score of 70
tax compliance status must be submitted with the tender proposal on or before the
tax compliance
tax compliance status
tax compliance status (TCS) or pin may also be made via e-filing
CSD registration number attached to their proposals
CSD number
CSD number must be provided
Central supplier database (csd) registration
Central Supplier Database
central supplier database (CSD), a CSD number must be provided
Joint Venture agreement, the JV must be registered on CSD, and the
1.7 A tax compliance status must be submitted with the tender proposal on or before the
1.8 Each party to a consortium/ sub-contractors must submit a separate tax compliance
status. Application forms for the renewal of/ or application for a tax compliance status
disclose the VAT registration number of the recipient, with effect from 1 March 2005.
4.3 Application for tax compliance status (TCS) or pin may also be made via e-filing. In
must submit a separate proof of TCS / pin / CSD number.
4.6 Where no TCS is available but the bidder is registered on the central supplier
database (CSD), a CSD number must be provided.
B-BBEE Details: ............. 23
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
Section b: mintek tender forms (mtf) for completion
B1 – financial offer forms
B2 – standard bidding documents
Regulations 2022
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
Tender document
Section a: tender instructions & requirements
Tender number: mtk 10/2026
TENDER CLOSING DATE & TIME: 09 October 2026 at 12:00pm
Any enquiries relating to the bidding procedure and technical
Enquiries may be directed as follows:
All technical enquiries must be submitted in a written format. No questions will be answered
telephonically. All tender queries should be sent using the dedicated submit query button
accessible on the online tender box.
Requests for clarification or further information:
All communications relating to this RFP and the Tendering Process must be directed to the
Tender Officer through the submit query button on the online tender box.
All questions or requests for further information or clarification of this RFP or any other document
issued in connection with the Tendering Process must be submitted to the Tender Officer in
writing through the submit query button on the online tender.
Any communication by a Bidder to Mi
Health & Safety
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf1.1 Bids must be submitted with all official Bid Forms that are contained within this tender
document and duly completed.
1.2 Bids must be delivered at the platform that is indicated in the tender document, and
must be delivered timeously, as late bid submissions will NOT be accepted for
consideration.
1.3 Late submissions will not be accepted under any circumstances. The tender shall
be closed at exactly 12:00 Noon and tenders arriving only a second after 12:00 or
any time thereafter will not be accepted under any circumstance. Tenderers are
therefore strongly advised to ensure that their tenders when uploaded allow enough
time for any unforeseen events that may delay the delivery of the tender.
1.4 This Bid is subject to the Preferential Procurement Policy Framework Act and the
Preferential Procurement Regulations of 2022, the General Conditions of Contract
(GCC) as listed in this document and, if applicable, any other special conditions of
contract as specified.
1.5 The successful bidder will be reduced to a contract by signing the acceptance of
offer.
1.6 It is an absolute condition that the taxes of the bidder must be in order.
1.7 A tax compliance status must be submitted with the tender proposal on or before the
closing date and time of the tender.
1.8 Each party to a consortium/ sub-contractors must submit a separate tax compliance
status. Application forms for the renewal of/ or application for a tax compliance status
is available at any Receiver’s Office (SARS).
1.9 All the documents reflected to this RFP must be completed and returned with this
tender proposal. Failure to submit completed documents with the tender proposal
may invalidate the tender proposal.
1.10 Tender forms contained within the tender document requesting information have
been drawn up so that certain essential information is furnished in a specific manner
of 75
Company Name: __________________________________ Initials: __________
1.19 Mintek reserves the right not to award or cancel this bid at any time and shall not be
bound to accept the lowest or any bid.
1.20 Unless specifically provided for in the tender document, no tenders will be considered
if submitted or transmitted by telegram, telex, facsimile, e-mail or similar apparatus.
1.21 It should be noted that Mintek reserves the right to accept or reject any tender
proposal without being obliged to give any reasons in this respect.
1.22 The bidder’s company letterhead must be used for the proposal’s cover letter and
reflect the company name, address and contact details.
1.23 The correct Tender reference number (See the front page of this RFP for the tender
number) must be quoted and the bidding company’s name must appear on all pages
of the proposal.
1.24 All pages of the proposal must be initialled by the responsible person.
1.25 Only those tenderers who score a minimum score of 70 points and above in respect
of the functionality criteria will be considered.
1.26 The functionality criteria is contained towards the end of this document.
1.27 The persons named in the Schedule of Key Persons of tenderers who satisfy the
minimum quality criteria may be invited to an interview if there need arises.
1.28 Responsiveness criteria of submissions
20.1 All successful Tenderers, Tendering on items where labour and/or equipment are
included, shall enter into an agreement with Mintek, indemnifying Mintek from the
provisions of the Occupational Health and Safety Act (.
20.2 The Contractor is to ensure compliance with the provisions of the Occupational
Health and Safety Act () & all relevant regulations, inclusive of all its
employees & other Contractors on the site. The Tenderer shall provide a suitable
health and safety plan appropriate for the contract tendered for.
20.3 The Contractor shall comply with all laws relating to wages and conditions generally
governing the employment of labour.
issued (Drawing Nos. DU2601-01, DU2601-02 and DU2601-05 see appendixes), and the
applicable SANS 1200 Standardised Specifications read together with Civil Engineering
Quantities, 1990 (SAICE). All concrete shall comply with SANS 920–2011.
conduct his operations with due regard for the safety and continuity of Mintek's ongoing activities.
site and prevent unauthorised access during construction.
less than 1.8 metres in height, constructed from suitable materials such as diamond mesh
or shade netting on steel droppers, to demarcate the contractor's working area and
storage zone from the operational Mintek facility.
Health and Safety Act (Act ) and applicable regulations.
prior to the commencement of works.
agree on construction access routes, working areas, and any interface or sequencing
requirements.
drawings and to the approval of the Engineer.
where necessary, to prevent damage to buried infrastructure.
including water and electrical supply.
management and storm water pollution prevention measures.
the contract period and shall be removed and the site restored upon completion of the
works.
security.
of 75
Company Name: __________________________________ Initials: __________
designated works area, including the removal of all vegetation, trees and stumps up to 1m girth,
and any boulders present. All cleared material shall be legally disposed of off-site.
Topsoil shall be stripped to a nominal depth of 150mm over approximately 900m2, stockpiled
within the site compound, maintained, and subsequently used on embankment areas as directed.
approximately 250mm below finished ground level (FGL), as indicated on Drawing DU2601-01.
Excavated material suitable for fill shall be used for embankment construction; unsuitable material
shall be disposed of off-site. Provisional allowances are included in the schedule for excavation
in intermediate material and hard rock.
of 75
Company Name: __________________________________ Initials: __________
Minimum concrete cover to reinforcement shall be 40mm. Minimum lap length shall be 50 bar
diameters. The total reinforcement quantities are approximately 2.61 tonnes of high tensile steel
and 0.10 tonnes of mild steel. All reinforcement shall be approved by the Engineer before any
concrete is poured.
23.3.4 Blinding Concrete
Blinding concrete (10MPa/19mm) shall be placed as follows:
with a smooth floated surface, over approximately 60m2 (provisional)
23.3.5 Structural Concrete
drawings. The bund shall be constructed of reinforced concrete and shall be designed to contain
the full oil volume of the transformer it serves, with an additional freeboard allowance in
accordance with standard practice. The internal faces of the bund shall be finished with an
approved chemical-resistant waterproof coating or screed to prevent seepage of transformer oil
into the ground if so noted on the drawings. A sump or drain arrangement as shown on the
drawings shall be constructed to facilitate removal of any accumulated fluid. All works shall comply
with the relevant requirements of SANS and environmental regulations applicable to the
containment of hydrocarbon fluids.
23.3.8 Brick Cavity Walls
Reinforced brick cavity walls (270mm nominal cavity, solid brick skins) shall be constructed to
both sides of the cable trench above the precast culvert units, as detailed on Drawing
of 75
Company Name: __________________________________ Initials: __________
DU2601-02. HDG wire cavity ties shall be provided. The cavity shall be filled with
30MPa/13mm concrete with reinforcement as detailed. A 230mm single-skin brick wall shall be
provided to the end(s) of the cable trench. Total cavity wall area is approximately 28m2.
23.4 Yard surfacing and drainage
Following completion of concrete construction, a non-woven geotextile fabric (200g/m2) shall be
placed over the full yard area, including minimum 300mm laps and 150mm turn-ups against all
concrete plinths and kerbs, over approximately 514m2.
A 100mm compacted layer of clean, single-sized 26.5–37.5mm crushed stone yard aggregate
(SANS 1083:2014 compliant, high resistivity, free from contamination) shall be placed over the
geotextile and lightly compacted to finished ground levels as indicated on Drawing DU2601-01.
Precast concrete barrier kerbs (100/150mm wide) shall be placed around the perimeter of the
yard stone area on a bedding and haunching concrete to contain the stone, approximately 103m
in total.
A 110mm PVC double-walled stormwater drainage pipe shall be installed to the cable trench,
including bedding and backfill, discharging to or connecting into the existing stormwater system.
Total length is approximately 21m.
23.5 Perimeter fencing
A 2.4m high anti-climb perimeter fence shall be installed around the generator farm in accordance
with the specification on Drawing DU2601-01, approximately 100m in total length. The fencing
system shall be the Invisible Wall high-security welded mesh panel system or equivalent
approved, and shall comply with the following:
finger or toe grip (anti-climb/anti-clamber design)
fixings, 90° top flange and 30° toe flange
of 75
Company Name: __________________________________ Initials: __________
Contractual Terms
Source: MTK 10-2026 -Mintek Tender Document-Generator Farm Civil Work.pdf5.1 The supplier warrants that the goods supplied under the contract are new, unused,
of the most recent or current models, and that they incorporate all recent
improvements in design and materials unless provided otherwise in the contract. The
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
supplier further warrants that all goods supplied under this contract shall have no
defect, arising from design, materials, or workmanship (except when the design
and/or material is required by the purchaser’s specifications) or from any act or
omission of the supplier, that may develop under normal use of the supplied goods
in the conditions prevailing in the country of final destination.
5.2 This warranty shall remain valid for twelve (12) months after the goods, or any portion
thereof as the case may be, have been delivered to and accepted at the final
destination indicated in the contract, or for eighteen (18) months after the date of
shipment from the port or place of loading in the source country, whichever period
concludes earlier, unless specified otherwise.
5.3 The purchaser shall promptly notify the supplier in writing of any claims arising under
this warranty.
5.4 Upon receipt of such notice, the supplier shall, within the period specified and with
all reasonable speed, repair or replace the defective goods or parts thereof, without
costs to the purchaser.
5.5 If the supplier, having been notified, fails to remedy the defect(s) within the period
specified, the purchaser may proceed to take such remedial action as may be
necessary, at the supplier’s risk and expense and without prejudice to any other
rights which the purchaser may have against the supplier under the contract.
6.1 The Tenderer shall supply all the price information required in the price schedule,
failure to do so shall invalidate the Tender.
6.2 No claim for price escalation will be considered unless it is specifically stated that this
Tender is subject to adjustment. Failure to complete this clause will result in the
Tender prices being deemed to be firm.
6.3 Notwithstanding anything to the contrary contained in Mintek’s Conditions of Tender,
Memorandum of Agreement or the Price Schedule, any claim for an increase in the
Tender prices herein quoted shall be submitted in writing.
6.4 Mintek reserves the right to withhold payment of any escalation while only provisional
figures are available until the final (revised) figures are issued by the Government’s
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
Central Statistical Services. When submitting any such claim, the tenderer shall
indicate the actual amount claimed for each item. A mere notification of a claim
for an increase without stating the new price claimed for each item shall, for the
purpose of Prices charged by the supplier for goods delivered and services
performed under the contract shall not vary from the prices quoted by the supplier in
his Tender, with the exception of any price adjustments authorized or in the
purchaser’s request for Tender validity extension, as the case may be.
6.5 The method and conditions of payment to be made to the supplier under this contract
shall be specified.
6.6 The supplier shall furnish the purchaser with an invoice accompanied by a copy of
the delivery note and upon fulfilment of other obligations stipulated in the contract.
6.7 Payments shall be made promptly by the purchaser, but in no case later than thirty
(30) days after submission of statement by the supplier.
6.8 Payment will be made in Rand unless otherwise stipulated.
7.1 In cases where the estimated value of the envisaged changes in purchase does not
vary by more than 25% of the total value of the original contract, the Contractor may
be instructed to deliver the goods or render the services as such. In cases of
measurable quantities, the Contractor may be approached to reduce the unit price,
and such offers may be accepted provided that there is no escalation in price.
8.1 Delivery of the goods and performance of services shall be made by the supplier in
accordance with the time schedule prescribed by the purchaser in the contract.
8.2 If at any time during performance of the contract, the supplier or its sub-Contractor(s)
encounters conditions impeding timely delivery of the goods and performance of
services, the supplier shall promptly notify the purchaser in writing of the fact of the
delay, its likely duration and its cause(s). As soon as practicable after receipt of the
supplier’s notice, the purchaser shall evaluate the situation and may at his discretion
extend the supplier’s time for performance, with or without the imposition of penalties,
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
in which case the extension shall be ratified by the parties by the amendment of the
contract.
8.3 The right is reserved to procure outside of the contract small quantities or to have
minor essential services executed if an emergency arises if the supplier’s point of
supply is not situated at or near the place where the goods are required, or when the
supplier’s services are not readily available.
8.4 Except as provided under clause 11 (Force Majeure), a delay by the supplier in the
performance of its delivery obligations shall render the supplier liable to the
imposition of penalties, pursuant to clause 9, unless an extension of time is agreed
upon pursuant to clause 8.2 above without the application of penalties.
8.5 Upon any delay beyond the delivery period in the case of a goods contract, the
purchaser shall, without cancelling the contract, be entitled to purchase goods of a
similar quality and up to the same quantity in substitution of the goods not supplied
in conformity with the contract and to return any goods delivered later at the supplier’s
expense and risk, or to cancel the contract and buy such goods as may be required
to complete the contract and without prejudice to his other rights, be entitled to claim
damages from the supplier.
7.1 Subject to clause 11 (Force Majeure), if the supplier fails to deliver any or all of the
goods or to perform the services within the period(s) specified in the contract, the
purchaser shall, without prejudice to its other remedies under the contract, deduct
from the contract price, as a penalty, a sum calculated on the delivered price of the
delayed goods or unperformed services using the current prime interest rate
calculated for each day of the delay until actual delivery or performance. The
purchaser may also consider termination of the contract pursuant to clause 10
(Termination for default).
10.1 The purchaser, without prejudice to any other remedy for breach of contract, by
written notice of default sent to the supplier, may terminate this contract in whole or
in part:
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
a) if the supplier fails to deliver any or all of the goods within the period(s) specified
in the contract, or within any extension thereof granted by the purchaser pursuant
to clause 8.2;
b) if the supplier fails to perform any other obligation(s) under the contract; or
c) if the supplier, in the judgement of the purchaser, has engaged in corrupt or
fraudulent practices in competing for or in executing the contract.
10.2 In the event the purchaser terminates the contract in whole or in part, the purchaser
may procure, upon such terms and in such manner as it deems appropriate, goods,
works or services similar to those undelivered, and the supplier shall be liable to the
purchaser for any excess costs for such similar goods, works or services. However,
the supplier shall continue performance of the contract to the extent not terminated.
10.3 Where the purchaser terminates the contract in whole or in part, the purchaser may
decide to impose a restriction penalty on the supplier by prohibiting such supplier
from doing business with the public sector for a period not exceeding ten (10) years.
10.4 If a purchaser intends imposing a restriction on a supplier or any person associated
with the supplier, the supplier will be allowed a time period of not more that fourteen
(14) days to provide reasons why the envisaged restriction should not be imposed.
Should the supplier fail to respond within the stipulated fourteen (14) days the
purchaser may regard the intended penalty as not objected against and may impose
it on the supplier.
10.5 Any restriction imposed on any person by the Accounting Officer/ Accounting
Authority will, at the discretion of the Accounting Officer/ Accounting Authority, also
be applicable to any other enterprise or any partner, manager, director or other
person who wholly or partly exercises or exercised or may exercise control over the
enterprise of the first-mentioned person, and with which enterprise or person the first-
mentioned person, is or was in the opinion of the Accounting Officer / Accounting
Authority actively associated.
10.6 If a restriction is imposed, the purchaser must, within five (5) working days of such
imposition, furnish the National Treasury, with the following:
i. the name and address of the supplier and/or person restricted by the
purchaser;
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
ii. the date of commencement of the restriction;
iii. the period of restriction; and
iv. the reasons for the restriction.
The details will be loaded in the National Treasury’s central database of suppliers or
persons prohibited from doing business with the public sector.
10.7 If a court of law convicts a person of an offense as contemplated in sections 12 or 13
of the Prevention and Combating of Corrupt Activities Act, No. , the court
may also rule that such person’s name be endorsed on the Register for Tender
Defaulters. When a person’s name has been endorsed on the Register, the person
will be prohibited from doing business with the public sector for a period of not less
than five (5) years and not more than ten (10) years. The National Treasury is
empowered to determine the period of restriction and each case will be dealt with on
its own merits. According to section 32 of the Act the Register must be open to the
public. The Register can be perused on the National Treasury website.
11.1 Notwithstanding the above provisions of clauses 9 (Penalties) and 10 (Termination
for default), the supplier shall not be liable for forfeiture of its performance security,
damages, or termination for default if and to the extent that his delay in performance
or other failure to perform his obligations under the contract is the result of an event
of force majeure.
11.2 If a force majeure situation arises, the supplier shall promptly notify the purchaser in
writing of such condition and the cause thereof. Unless otherwise directed by the
purchaser in writing, the supplier shall continue to perform its obligations under the
contract as far as is reasonably practical, and shall seek all reasonable alternative
means for performance not prevented by the force majeure event.
12.1 The purchaser may at any time terminate the contract by giving written notice to the
supplier if the supplier becomes bankrupt or otherwise insolvent. In this event,
termination will be without compensation to the supplier, provided that such
termination will not prejudice or affect any right of action or remedy, which has
accrued or will accrue thereafter to the purchaser.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
13.1 If any dispute or difference of any kind whatsoever arises between the purchaser and
the supplier in connection with or arising out of the contract, the parties shall make
every effort to resolve amicably such dispute or difference by mutual consultation.
13.2 If, after thirty (30) days, the parties have failed to resolve their dispute or difference
by such mutual consultation, then either the purchaser or the supplier may give notice
to the other party of his intention to commence with mediation. No mediation in
respect of this matter may be commenced unless such notice is given to the other
party.
13.3 Should it not be possible to settle a dispute by means of mediation, it may be settled
in a South African court of law.
13.4 Mediation proceedings shall be conducted in accordance with the rules of procedure
specified by the purchaser in accordance with best practice.
13.5 Notwithstanding any reference to mediation and/or court proceedings herein:
d) the parties shall continue to perform their respective obligations under the
contract unless they otherwise agree; and
e) the purchaser shall pay the supplier any monies due to the supplier.
14.1 The contract shall be written in English. All correspondence and other documents
pertaining to the contract that are exchanged by the parties shall also be written in
English.
15.1 The contract shall be interpreted in accordance with the laws of the Republic of South
Africa, unless otherwise specified.
16.1 The supplier shall not abandon, transfer, cede or assign, in whole or in part, its
obligations to perform under the contract, except with the purchaser’s prior written
consent.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
17.1 No agreement to amend or vary a contract or order or the conditions, stipulations or
provisions thereof shall be valid and of any force unless such agreement to amend
or vary is entered into in writing and signed by the contracting parties. Any waiver of
the requirement that the agreement be amended or varied shall be in writing, shall
also be in writing.
18.1 The Contractor agrees that the occupational use of Mintek’s premises and buildings
shall be at his own risk, and that he acknowledges the risks and dangers inherent
therein. The Contractor furthermore acknowledges that Mintek and / or its employees
shall not be liable or responsible for any loss, liability, damages, accident or injury,
whether fatal or otherwise, of whatsoever nature and howsoever arising, whether
directly from the permission granted by Mintek to execute certain events or
otherwise, including but not limited to, the use of the premises and / or buildings, and
indemnifies Mintek and/or its employees against all and any loss of / or damage to
property, or injury or death, and any claim for such loss, damage, injury or death,
from any cause whatsoever and howsoever arising, which may be suffered in this
regard.
18.2 The Contractor and / or its officers, employees, agents, concessionaires, suppliers,
Contractors or customers shall not have any claim of any nature against the Mintek
for any loss, damage, injury or death which any of them may directly or indirectly
suffer (whether or not such loss, damage, injury or death is caused through
negligence of Mintek or its agents or employees) or for:
any latent or patent defect in the premises;
a fire on the premises;
a theft from the premises;
the Premises or any part thereof being in a defective condition or state of disrepair;
force majeure of causus fortuitus or any other cause either wholly or partly beyond
the Mintek’s control;
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
consequential loss howsoever caused;
any loss or damage whether to persons or property caused by riots, civil
commotion, insurrection or actions taken by the Contractor or Mintek to mitigate
the effect of / or prevent the aforesaid; and any other cause whatsoever.
18.3 Save for any wilful acts or omission or gross negligence by Mintek, its officers,
employees, agents, concessionaires, suppliers and Contractors, the Contractor
indemnifies Mintek and holds it harmless from and against all claims, actions,
damages, liability and expense in connection with loss of life, personal injury and / or
damage to property arising from or out of any occurrence in, upon or at the premises
or the occupancy or use by the Contractor of the premises.
19.1 Without limiting the obligations of the Contractor in terms of this Agreement, the
Contractor shall effect and maintain the following insurances, covering:
and Mintek against liability for the death of / or injury to any person, or loss of / or
damage to any property, arising out of / or in the course of this agreement.
premises, in its own name.
19.2 In the case of an occurrence giving rise to claim (and in accordance with the
directives of the insurer), the Contractor shall proceed in the following manner:
conditions of this agreement, Mintek must immediately be notified telephonically
(and confirmed by means of a telefax or email ) of the circumstances, nature and
estimate of the loss or damage; and
Contractor.
such occurrence giving rise to a claim, and the Contractor shall assist Mintek in
this regard.
19.3 All insurance must remain in force for the duration of this agreement.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
19.4 Should the Contractor fail to arrange insurance or to maintain it, Mintek shall be
entitled to arrange for such insurance and to maintain it, and pay the premiums, as
may be necessary. Amounts for this purpose will be paid by Mintek as a debt of
Contractor.
19.5 The Contractor hereby guarantees that it shall make the necessary submissions of
insurance to the satisfaction of Mintek after awarding/acceptance of this contract, as
proof that the required insurances exist and that it will comply with all terms,
requirements and conditions in respect of insurance applicable to this agreement.
20.1 All successful Tenderers, Tendering on items where labour and/or equipment are
included, shall enter into an agreement with Mintek, indemnifying Mintek from the
provisions of the Occupational Health and Safety Act (.
20.2 The Contractor is to ensure compliance with the provisions of the Occupational
Health and Safety Act () & all relevant regulations, inclusive of all its
employees & other Contractors on the site. The Tenderer shall provide a suitable
health and safety plan appropriate for the contract tendered for.
20.3 The Contractor shall comply with all laws relating to wages and conditions generally
governing the employment of labour.
The Tenderer shall, prior to commencement of any work on site in terms hereof, give
written proof that he is registered as an employer in terms of Section 80 of the
Compensation for Occupational Injuries and Diseases Act, and the
Tenderer shall remain registered as such for the duration of the contract awarded
and shall pay all monies due to the Compensations Fund in terms of Section 15 of
Act . Failure to comply will result in the Tenderer being disqualified.
of 75
Company Name: __________________________________ Initials: __________
Mintek Request for Proposal
consist of the following:
Section a: tender instructions & requirements
General conditions of tender .................................................. 8
General conditions of contract (gcc) .................................. 13
of 75
Company Name: __________________________________ Initials: __________
3.1 The supplier shall indemnify the purchaser against all third-party claims of
infringement of patent, trademark, or industrial design rights arising from use of the
goods or any part thereof by the purchaser.
4.1 The supplier shall provide such packaging of the goods as is required to prevent their
damage or deterioration during transit to their final destination, as indicated in the
contract. The packaging shall be sufficient to withstand, without limitation, rough
handling during transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packaging, case size and weights shall take into
consideration, where appropriate, the remoteness of the goods’ final destination and
absence of heavy handling facilities at all points in transit.
4.2 The packaging, marking, and documentation within and outside the packages shall
comply strictly with such special requirements as shall be expressly provided for in
the contract, including additional requirements, if any, specified in any subsequent
instructions ordered by the purchaser.
5.1 The supplier warrants that the goods supplied under the contract are new, unused,
of the most recent or current models, and that they incorporate all recent
improvements in design and materials unless provided otherwise in the contract. The
of 75
Company Name: __________________________________ Initials: __________
supplier further warrants that all goods supplied under this contract shall have no
defect, arising from design, materials, or workmanship (except when the design
and/or material is required by the purchaser’s specifications) or from any act or
omission of the supplier, that may develop under normal use of the supplied goods
in the conditions prevailing in the country of final destination.
5.2 This warranty shall remain valid for twelve (12) months after the goods, or any portion
thereof as the case may be, have been delivered to and accepted at the final
destination indicated in the contract, or for eighteen (18) months after the date of
shipment from the port or place of loading in the source country, whichever period
concludes earlier, unless specified otherwise.
5.3 The purchaser shall promptly notify the supplier in writing of any claims arising under
this warranty.
5.4 Upon receipt of such notice, the supplier shall, within the period specified and with
all reasonable speed, repair or replace the defective goods or parts thereof, without
costs to the purchaser.
5.5 If the supplier, having been notified, fails to remedy the defect(s) within the period
specified, the purchaser may proceed to take such remedial action as may be
necessary, at the supplier’s risk and expense and without prejudice to any other
rights which the purchaser may have against the supplier under the contract.
in which case the extension shall be ratified by the parties by the amendment of the
contract.
8.3 The right is reserved to procure outside of the contract small quantities or to have
minor essential services executed if an emergency arises if the supplier’s point of
supply is not situated at or near the place where the goods are required, or when the
supplier’s services are not readily available.
8.4 Except as provided under clause 11 (Force Majeure), a delay by the supplier in the
performance of its delivery obligations shall render the supplier liable to the
imposition of penalties, pursuant to clause 9, unless an extension of time is agreed
upon pursuant to clause 8.2 above without the application of penalties.
8.5 Upon any delay beyond the delivery period in the case of a goods contract, the
purchaser shall, without cancelling the contract, be entitled to purchase goods of a
similar quality and up to the same quantity in substitution of the goods not supplied
in conformity with the contract and to return any goods delivered later at the supplier’s
expense and risk, or to cancel the contract and buy such goods as may be required
to complete the contract and without prejudice to his other rights, be entitled to claim
damages from the supplier.
7.1 Subject to clause 11 (Force Majeure), if the supplier fails to deliver any or all of the
goods or to perform the services within the period(s) specified in the contract, the
purchaser shall, without prejudice to its other remedies under the contract, deduct
from the contract price, as a penalty, a sum calculated on the delivered price of the
delayed goods or unperformed services using the current prime interest rate
calculated for each day of the delay until actual delivery or performance. The
purchaser may also consider termination of the contract pursuant to clause 10
(Termination for default).
10.1 The purchaser, without prejudice to any other remedy for breach of contract, by
written notice of default sent to the supplier, may terminate this contract in whole or
in part:
of 75
Company Name: __________________________________ Initials: __________
11.1 Notwithstanding the above provisions of clauses 9 (Penalties) and 10 (Termination
for default), the supplier shall not be liable for forfeiture of its performance security,
damages, or termination for default if and to the extent that his delay in performance
or other failure to perform his obligations under the contract is the result of an event
of force majeure.
11.2 If a force majeure situation arises, the supplier shall promptly notify the purchaser in
writing of such condition and the cause thereof. Unless otherwise directed by the
purchaser in writing, the supplier shall continue to perform its obligations under the
contract as far as is reasonably practical, and shall seek all reasonable alternative
means for performance not prevented by the force majeure event.
12.1 The purchaser may at any time terminate the contract by giving written notice to the
supplier if the supplier becomes bankrupt or otherwise insolvent. In this event,
termination will be without compensation to the supplier, provided that such
termination will not prejudice or affect any right of action or remedy, which has
accrued or will accrue thereafter to the purchaser.
of 75
Company Name: __________________________________ Initials: __________
13.1 If any dispute or difference of any kind whatsoever arises between the purchaser and
the supplier in connection with or arising out of the contract, the parties shall make
every effort to resolve amicably such dispute or difference by mutual consultation.
13.2 If, after thirty (30) days, the parties have failed to resolve their dispute or difference
by such mutual consultation, then either the purchaser or the supplier may give notice
to the other party of his intention to commence with mediation. No mediation in
respect of this matter may be commenced unless such notice is given to the other
party.
13.3 Should it not be possible to settle a dispute by means of mediation, it may be settled
in a South African court of law.
13.4 Mediation proceedings shall be conducted in accordance with the rules of procedure
specified by the purchaser in accordance with best practice.
13.5 Notwithstanding any reference to mediation and/or court proceedings herein:
d) the parties shall continue to perform their respective obligations under the
contract unless they otherwise agree; and
e) the purchaser shall pay the supplier any monies due to the supplier.
17.1 No agreement to amend or vary a contract or order or the conditions, stipulations or
provisions thereof shall be valid and of any force unless such agreement to amend
or vary is entered into in writing and signed by the contracting parties. Any waiver of
the requirement that the agreement be amended or varied shall be in writing, shall
also be in writing.
18.1 The Contractor agrees that the occupational use of Mintek’s premises and buildings
shall be at his own risk, and that he acknowledges the risks and dangers inherent
therein. The Contractor furthermore acknowledges that Mintek and / or its employees
shall not be liable or responsible for any loss, liability, damages, accident or injury,
whether fatal or otherwise, of whatsoever nature and howsoever arising, whether
directly from the permission granted by Mintek to execute certain events or
otherwise, including but not limited to, the use of the premises and / or buildings, and
indemnifies Mintek and/or its employees against all and any loss of / or damage to
property, or injury or death, and any claim for such loss, damage, injury or death,
from any cause whatsoever and howsoever arising, which may be suffered in this
regard.
18.2 The Contractor and / or its officers, employees, agents, concessionaires, suppliers,
for any loss, damage, injury or death which any of them may directly or indirectly
suffer (whether or not such loss, damage, injury or death is caused through
negligence of Mintek or its agents or employees) or for:
any latent or patent defect in the premises;
a fire on the premises;
a theft from the premises;
the Premises or any part thereof being in a defective condition or state of disrepair;
force majeure of causus fortuitus or any other cause either wholly or partly beyond
the Mintek’s control;
of 75
Company Name: __________________________________ Initials: __________
consequential loss howsoever caused;
any loss or damage whether to persons or property caused by riots, civil
commotion, insurrection or actions taken by the Contractor or Mintek to mitigate
the effect of / or prevent the aforesaid; and any other cause whatsoever.
18.3 Save for any wilful acts or omission or gross negligence by Mintek, its officers,
employees, agents, concessionaires, suppliers and Contractors, the Contractor
indemnifies Mintek and holds it harmless from and against all claims, actions,
damages, liability and expense in connection with loss of life, personal injury and / or
damage to property arising from or out of any occurrence in, upon or at the premises
or the occupancy or use by the Contractor of the premises.
and Mintek against liability for the death of / or injury to any person, or loss of / or
damage to any property, arising out of / or in the course of this agreement.
premises, in its own name.
19.2 In the case of an occurrence giving rise to claim (and in accordance with the
directives of the insurer), the Contractor shall proceed in the following manner:
conditions of this agreement, Mintek must immediately be notified telephonically
(and confirmed by means of a telefax or email ) of the circumstances, nature and
estimate of the loss or damage; and
Any claim settlement shall be subject to the approval of both Mintek and the
Mintek reserves the right to make enquiries regarding the cause and result of any
such occurrence giving rise to a claim, and the Contractor shall assist Mintek in
this regard.
19.3 All insurance must remain in force for the duration of this agreement.
of 75
Company Name: __________________________________ Initials: __________
19.4 Should the Contractor fail to arrange insurance or to maintain it, Mintek shall be
entitled to arrange for such insurance and to maintain it, and pay the premiums, as
may be necessary. Amounts for this purpose will be paid by Mintek as a debt of
19.5 The Contractor hereby guarantees that it shall make the necessary submissions of
insurance to the satisfaction of Mintek after awarding/acceptance of this contract, as
proof that the required insurances exist and that it will comply with all terms,
requirements and conditions in respect of insurance applicable to this agreement.
Description
Source: C322 - Civils BOQ Estimate_ Mintek Rev.xlsxCell B4: Measurement and payment shall be in accordance with Clause 8 of the relevant SANS 1200 Standardized Specification read in conjunction with Civil Engineering Quantities, 1990 (SAICE), unless otherwise stated.
Technical Specifications
Source: C322 - Civils BOQ Estimate_ Mintek Rev.xlsx (unknown)Cell B4: Measurement and payment shall be in accordance with Clause 8 of the relevant SANS 1200 Standardized Specification read in conjunction with Civil Engineering Quantities, 1990 (SAICE), unless otherwise stated.
Compliance Requirements
Source: C322 - Civils BOQ Estimate_ Mintek Rev.xlsx (unknown)No specific requirements found
Compliance Requirements
Source: DU2601-02_Rev B_Concrete Details.pdf (unknown)Insufficient searchable text - AI extraction recommended
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
200 Malibongwe Dr, Praegville, Randburg, 2194, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
+27 11 709 4111[email protected]www.mintek.co.za200 Malibongwe Dr, Praegville, Randburg, 2194, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
A meticulously organised tender submission can be the difference between a winning bid and one that hits the rejection pile. Learn how to package, structure, and present your tender response for maximum evaluator impact on South African government contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.