Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Nuclear Energy Corporation LimitedLocation
North West
Closing Date
14 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality -
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169453
Necsa is procuring a welding management system (wms) to replace manual spreadsheets and paper-based records, providing full traceability, compliance with welding codes, and audit readiness. The system must be cloud-hosted (saas), on-premises, or hybrid, with cloud hosting exclusively within south africa, and must meet detailed functional requirements covering weld traceability, wps/pqr management, welder qualifications, ndt, non-conformances, documents, and reporting. The most consequential requirement is the mandatory south african hosting for any cloud deployment, alongside full traceability and code-compliance features.
Bidders must propose a system deployable as cloud-hosted (SaaS), on-premises, or hybrid, with any cloud hosting exclusively within South Africa.
The system must be a multi-user, role-based web application compatible with the latest two major versions of Chrome, Edge, and Firefox.
The system must provide full forward and backward traceability for each weld, linking raw material heat/lot, filler material certificate, approved WPS/PQR, qualified welder record, NDT results, and non-conformances.
The system must support WPS management compliant with ASME Section IX (QW-482), EN ISO 15609, and AWS, including status management and alerts when a WPS is used outside its qualified scope.
The system must manage welder qualifications, automatically calculating approval ranges and preventing assignment of welders with expired or non-applicable qualifications.
The system must support NDT management with structured checklists, automatic sampling plans, accept/reject determination, and electronic signatures on NDT reports.
The system must export data in open, machine-readable formats (JSON, XML, PDF/A, CSV) and provide standard reports (weld log, welder qualification matrix, WPS index, NDT summary, NCR register, weld completion status) exportable to PDF, Excel, and CSV.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 14 October 2026 - 11:00
Venue
null
Categories
Request for Bid(Open-Tender)
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality -
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Compliance Requirements
Source: 6. SHEQ-INS-5450-REV5.0.pdf (unknown)08 Sept
2026
Tender Published
Tender was published
14 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
6. SHEQ-INS-5450-REV5.0.pdf
5. SHEQ-INS-0100 Rev 9.0_NECSA Safety, Health and Environmental Policy.pdf
4. Necsa Confidentiality Agreement.pdf
1.Main.docx
7. SHEQ-INS-0102 Rev 4.0 Alcohol & Drugs Control Procedures.pdf
2. SBD.docx
No summary available
3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf
Necsa is procuring a welding management cloud software system and support for its Advanced Manufacturing unit, under a three-year contract. The contract is governed by Necsa's standard terms and conditions, which include provisions on payment, penalties, confidentiality, and intellectual property.
GIT-EA-URS-0015_Welding management.pdf
Supply of a cloud-hosted welding management system (WMS) and support to Necsa Advanced Manufacturing for three years. The system must manage welder qualifications, WPS/PQR records, weld traceability, NDT integration, non-conformance, and reporting, with strict data integrity and audit requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African Nuclear Energy Corporation LimitedContact Person
Buyani Nsibande
Phone
012-305-6072
Secure NECSA tenders with AI Matching & Recommendations, nuclear-science intelligence, compliance analysis, and structured support for research and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 268 545
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Insufficient searchable text - AI extraction recommended
Description
Source: 1.Main.docxThis bid is subject to the preferential procurement policy framework act and the preferential procurement regulations, 2022, the general conditions of contract (gcc) and, if applicable, any other special conditions of contract.
Technical Specifications
Source: 1.Main.docx (unknown)This bid is subject to the preferential procurement policy framework act and the preferential procurement regulations, 2022, the general conditions of contract (gcc) and, if applicable, any other special conditions of contract.
Compliance Requirements
Source: 1.Main.docx (unknown)No specific requirements found
Description
Source: 2. SBD.docx (unknown)The tender is for the supply, delivery, installation, and support of a welding cloud to Necsa (Advanced Manufacturing) for a period of three years.
Submission Guidelines
Source: 2. SBD.docx (unknown)Deposit the bid response in the bid box at the street address stated in the tender documents. Bids must be submitted on the official forms provided and must not be retyped. Late bids will not be accepted for consideration. The closing time is 11:00.
Evaluation Criteria
Source: 2. SBD.docx (unknown)Preference points will be awarded for price and specific goals under the Preferential Procurement Regulations 2022. The applicable system (80/20 or 90/10) will be determined based on the tender value. Bidders must indicate how they claim points for each preference point system.
Technical Specifications
Source: 2. SBD.docx (unknown)Nb: failure to provide / or comply with any of the above particulars may render the bid invalid.
Description
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)This is a set of standard terms and conditions governing contracts issued by NECSA for the supply of goods, works, or services. It defines key terms such as Agreement, Bid Documents, Fees, Order, and NECSA Data. It sets out general provisions on interpretation, contract formation, subcontracting, confidentiality, intellectual property, dispute resolution, notices, and governing law.
Contact Information
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"Service Provider jointly."}
Evaluation Criteria
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)Bidders must have a valid tax clearance certificate from SARS. Bidders must not have tax matters that are not in order. Bidders must be able to enter into a contract governed by South African law. Bidders must agree to the terms and conditions, including indemnity, confidentiality, and intellectual property clauses. Bidders must not assign or subcontract without Necsa's prior written consent. Bidders must give preference to Black Empowerment Companies as subcontractors.
Technical Specifications
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)supply of goods or works or rendering of services
Quality Management
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)Reports and deliverables must conform to NECSA requirements; if non-conformity is found during the evaluation period, the Service Provider must promptly correct it at its own expense.
Pricing Schedule
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)8.1. Subject to the provisions of clause 11 (Penalties), where applicable, NECSA shall
pay the Service Provider Fees as set out in the Pricing Schedule in the manner
specified in the SLA as an Annexure “E” for full and complete performance of the
Financial Requirements
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)Payment Terms: Payment Terms ........................................................................................................6
B-BBEE Requirements
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)In subcontracting, the Service Provider shall give preference to Black Empowerment Companies as subcontractors.
Health & Safety
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)1.1 Clause headings in this Agreement are for convenience and reference purposes
only and shall not affect the interpretation of the Agreement.
1.2 Where the context requires words implying the singular only shall also include the
plural and vice versa and words signifying one gender shall signify all genders.
1.3 In this Agreement the following words and expressions shall have the meanings
hereby assigned to them except where the context otherwise requires:
1.3.1 “Agreement” means these Terms and Conditions of Contract including all
attachments and appendices hereto and all documents incorporated by
reference therein and, where applicable, special conditions of contract.
1.3.2 “Bid Documents” means Bid Specification, Request for Proposal, Request
for Quotation documents, or any other document, used by NECSA to solicit
the supply of goods or works or services.
1.3.3 “Fees” means the contract price(s) as set out in the Pricing Schedule,
attached as Annexure “E” in the accompanying SLA, which are payable to
the Service Provider under this Agreement for the full and proper
performance of the Service Provider’s contractual obligations.
1.3.4 “Order” means an official written Purchase Order issued for the supply of
goods or works or for the rendering of a service. A copy of the Order must
be attached in the accompanying SLA as Annexure “C”.
1.3.5 “The South African Nuclear Energy Corporation SOC Ltd” hereinafter
referred to as NECSA
1.3.6 “NECSA Data” means information, reports or data and related matter,
whether of a confidential or proprietary nature or not, belonging to NECSA or
in the possession, or under the control of NECSA provided by NECSA to
9.1. Where the carrying out of the Services requires reports to be submitted as
deliverables, interim and final reports in connection therewith must be furnished to
Contractual Terms
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)The contract is governed by South African law. Disputes are first referred to project managers for resolution within 7 days, then escalated to senior management for 10 days, before legal remedies may be pursued. Either party may claim specific performance for breach. The contract includes provisions on assignment, subcontracting, indemnity and limitation of liability, insurance, confidentiality, termination for insolvency, non-solicitation of personnel, and warranties. The Service Provider warrants goods are new, unused, current models, free from defects for 12 months after delivery or 18 months after manufacture. No variation is valid unless in writing. Force majeure excuses performance. Tax clearance certificate required before award.
Special Conditions
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)A Service Level Agreement (SLA) may be attached as Annexure C to address specific conditions, and in case of conflict, the SLA supersedes these Terms and Conditions. The Project Plan and Schedule of Deliverables is attached as Annexure B. Variations to the project plan may be agreed if unforeseen circumstances arise.
Section
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)No specific evaluation criteria are stated in this document. The document focuses on contractual terms rather than bid evaluation.
Description
Source: GIT-EA-URS-0015_Welding management.pdf (unknown)The purpose of this document is to define the user and business requirements for a Welding Management System (WMS). The system shall support cloud-based deployment hosted exclusively within South Africa, and shall support concurrent users without performance degradation, with defined SLAs for response time (≤2 seconds for standard transactions under normal load).
Contact Information
Source: GIT-EA-URS-0015_Welding management.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"weld joint."}
Evaluation Criteria
Source: GIT-EA-URS-0015_Welding management.pdf (unknown)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. Bidders must comply with the functional and technical requirements in the user requirements specification.
Technical Specifications
Source: GIT-EA-URS-0015_Welding management.pdf (unknown)The system shall capture and store weld joint attributes (joint number, weld type, joint configuration, base material specification, thickness, diameter, batch/heat number, certificate reference). It shall record governing codes and acceptance criteria per weld joint. It shall provide full forward and backward traceability linking raw material heat/lot, filler material certificate, approved WPS/PQR, qualified welder record, NDT/inspection results, and non-conformances. It shall support weld repairs, re-welds, and cut-outs with immutable history. It shall maintain filler material inventory (AWS/EN classification, brand, heat/lot, expiration date). It shall alert when a WPS is used outside its qualified scope. It shall support multi-code welder qualification tracking. It shall record NCRs linked to weld records, root cause analysis, corrective action, and close-out. It shall enforce document version control (check-in/check-out, revision history, supersession). It shall support categorization, tagging, and full-text search. It shall provide ad-hoc query and report builder. It shall support offline capability with encrypted local storage and automatic synchronization with conflict resolution. It shall export data in open, machine-readable formats (JSON, XML, PDF/A, CSV).
Methodology
Source: GIT-EA-URS-0015_Welding management.pdf (unknown)MAT-007
requirements and alert users when limits are approached or exceeded.
MAT-009
provide alerts for approaching expiration.
4.4 Welding procedure specification (wps)
Quality Management
Source: GIT-EA-URS-0015_Welding management.pdf (unknown)Mnyani s
Approved General Manager
Advanced manufacturing
Distribution
Doc. No GIT-EA-URS-0015
User requirements for a welding
Revision 01
Management system
of 12
Table of contents
Approval & distribution ............................................................................................. 1
Revisions .......................................................................................................................... 3
1 purpose ..................................................................................................................... 4
2 business objectives .............................................................................................. 4
3 references, abbreviations and definitions ................................................ 4
4 requirements .......................................................................................................... 5
4.1 General System Requirements ............................................................................... 5
4.2 Weld Tracking and Traceability ............................................................................... 6
4.3 Materials Traceability .............................................................................................. 7
4.4 Welding Procedure Specification (WPS) ................................................................. 7
4.5 Procedure Qualification Record (PQR) Management .............................................. 8
4.6 Welder and Welding Operator Qualification Management ....................................... 8
4.7 Inspection and Non-Destructive Testing (NDT) Integration ..................................... 9
4.8 Repair and Non-Conformance Management ........................................................... 9
4.9 Documentation and document control ................................................................... 10
4.10 Reporting and Analytics ........................................................................................ 10
4.11 Data Migration and Legacy Integration .................................................................. 11
4.12 End-of-life and data extraction ............................................................. 11
4.13 Testing requirements ............................................................................................ 11
5 support ................................................................................................................... 12
Doc. No GIT-EA-URS-0015
User requirements for a welding
Revision 01
Management system
of 12
Revisions
This document has been revised in accordance with the following schedule:
Rev. No. Date approved Nature of Revision Revision Date Prepared
01 Refer to cover page First issue
Doc. No GIT-EA-URS-0015
User requirements for a welding
Revision 01
Management system
of 12
Approval & distribution ............................................................................................. 1
Revisions .......................................................................................................................... 3
1 purpose ..................................................................................................................... 4
2 business objectives .............................................................................................. 4
3 references, abbreviations and definitions ................................................ 4
4 requirements .......................................................................................................... 5
4.1 General System Requirements ............................................................................... 5
4.2 Weld Tracking and Traceability ............................................................................... 6
4.3 Materials Traceability .............................................................................................. 7
4.4 Welding Procedure Specification (WPS) ................................................................. 7
4.5 Procedure Qualification Record (PQR) Management .............................................. 8
4.6 Welder and Welding Operator Qualification Management ....................................... 8
4.7 Inspection and Non-Destructive Testing (NDT) Integration ..................................... 9
4.8 Repair and Non-Conformance Management ........................................................... 9
4.9 Documentation and document control ................................................................... 10
4.10 Reporting and Analytics ........................................................................................ 10
4.11 Data Migration and Legacy Integration .................................................................. 11
4.12 End-of-life and data extraction ............................................................. 11
4.13 Testing requirements ............................................................................................ 11
5 support ................................................................................................................... 12
Doc. No GIT-EA-URS-0015
Management System (WMS). The system shall provide comprehensive lifecycle management of
welding operations including, but not limited to: welder qualification lifecycle management, Welding
Procedure Specification (WPS) and Procedure Qualification Record (PQR) control, weld traceability
and mapping, inspection and Non-Destructive Testing (NDT) integration, quality control, compliance
monitoring, and reporting and analytics.
Improve weld traceability and visibility.
Eliminate manual spreadsheets and paper-based records.
Improve compliance with welding standards and customer requirements.
Reduce welding defects and rework.
Improve audit readiness.
Provide real-time project status reporting.
Centralize welding documentation.
Improve productivity and quality control.
GEN-016 tablets and a dedicated mobile app (iOS/Android) for offline data capture of inspections,
weld logs, and NDT results.
Doc. No GIT-EA-URS-0015
the source raw material heat/lot (via material heat number), the filler material certificate,
WTR-004
the approved WPS/PQR, the qualified welder record, the NDT/inspection results, and
any non-conformance or repair records.
of 12
4.7 Inspection and non-destructive testing (ndt) integration
NDT-001
visual examination per code requirements.
The system shall support the generation and management of Inspection Requests (IR)
NDT-002 and Inspection Release Notes (IRN) with assigned inspector, required date, and linked
weld records.
Weld inspection logs shall capture: inspection date and time, inspector identity and
certification level (e.g., CSWIP 3.1, AWS CWI, EN ISO 9712 Level 2), inspection
NDT-003 method, acceptance criteria applied (code and clause reference), findings/defect
observations (using standard defect notation), and accept/reject disposition with
justification.
The system shall support the recording and tracking of non-conformances (NCRs)
NDT-004 raised during inspection, linking each NCR to the affected weld record(s), the root
cause analysis, corrective action, and close-out evidence.
NDT-014
expiration.
4.8 Repair and non-conformance management
REP-005 welds, with structured fields for defect description, root cause, disposition, and
corrective action.
REP-006 approval, corrective action tracking, and closure with appropriate signature
requirements.
REP-007 The system shall support configurable NCR categorization and severity classification.
4.9 Documentation and document control
EOL-002 extracts all weld records, documents, audit trails, and images in open, machine
readable formats (JSON, XML, PDF/A, CSV).
EOL-003 The export utility shall be validated and made available at no additional cost during the
notice period.
4.13 Testing requirements
areas:
An overview of the customer support and maintenance services offered.
The cost of the annual maintenance plan.
Provision of 3 years of post-implementation support to assist with system stabilization.
A commitment to regularly train service and support staff, as necessary, to ensure up-to-date
knowledge and skills.
Delivery of service and support in accordance with the agreed Service Level Agreement
(SLA).
After-hours emergency contact details, including applicable service rates for support provided
outside regular business hours.
Detailed information on the frequency of new software version releases.
A proposed plan for implementing new releases and upgrades (e.g., scheduling during
weekends or non-business hours).
The process followed for testing new versions, upgrades, and patches prior to deployment.
A detailed migration process to be followed when upgrading to new software versions.
Compliance Requirements
Source: GIT-EA-URS-0015_Welding management.pdf (unknown)4.1 GENERAL SYSTEM REQUIREMENTS Req. ID Requirement Statement The system shall be deployable as a cloud-hosted (SaaS), on-premises, or hybrid solution, configurable per organizational security policy. GEN-001 Where a cloud-based deployment model is proposed, the system shall be hosted exclusively within the borders of South Africa. The system shall be a multi-user, role-based web application accessible via standard GEN-002 modern web browsers (Chrome, Edge, Firefox — latest two major versions) The system shall support concurrent users without performance degradation, with GEN-003 defined SLAs for response time (≤2 seconds for standard transactions under normal load). GEN-004 The system shall provide a configurable, role-based access control (RBAC) framework The system shall support single sign-on (SSO) via SAML 2.0, OAuth 2.0, or OpenID GEN-005 Connect, and integrate with enterprise directories (Active Directory, LDAP). The system shall provide a documented RESTful API and/or OData interface for GEN-006 integration with enterprise systems including ERP, PLM, MES, CMMS, and document management systems. The system shall comply with 21 CFR Part 11 and EU Annex 11 requirements for GEN-007 electronic records and electronic signatures where applicable. The system shall enforce electronic signatures that are unique to the individual, include GEN-008 date/time stamp Electronic signatures shall be linked to their respective electronic records such that GEN-009 signatures cannot be excised, copied, or otherwise transferred to falsify records. The system shall provide administrative interfaces for configuration of: organizational GEN-010 structure, projects, user roles, workflows, code libraries, material libraries, and system parameters. The system shall maintain a complete, immutable, computer-generated audit trail that GEN-011 independently records the date, time, user identity, and nature of all record creation, modification, and deletion actions. Audit trail entries shall not be modifiable or deletable by any user, including system GEN-012 administrators. The system shall support configurable data retention periods aligned with code GEN-013 requirements. The system shall provide archival functionality that preserves records in unalterable, GEN-014 retrievable format. The system shall maintain record accessibility and readability throughout the defined GEN-015 retention period, including after system upgrades or migrations. The system should provide a responsive mobile access web interface optimized for GEN-016 tablets and a dedicated mobile app (iOS/Android) for offline data capture of inspections, weld logs, and NDT results. Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 Req. ID Requirement Statement Offline Capability – When disconnected, the mobile app shall store data locally GEN-017 (encrypted) and synchronize automatically when connectivity is restored, with conflict resolution rules defined. 4.2 WELD TRACKING AND TRACEABILITY Req. ID Requirement Statement The system shall assign and manage unique weld identification numbers to each weld WTR-001 record upon creation. The numbers must be configurable to organisational conventions, and shall not be reused or modified after creation. The system shall capture and store weld joint attributes including: joint number, weld WTR-002 type (butt, fillet, socket, etc.), joint configuration, base material specification, thickness, diameter, batch/heat number and certificate reference. The system shall record the governing code(s) and acceptance criteria applicable to WTR-003 each weld joint. The system shall provide full forward and backward traceability for each weld, linking: the source raw material heat/lot (via material heat number), the filler material certificate, WTR-004 the approved WPS/PQR, the qualified welder record, the NDT/inspection results, and any non-conformance or repair records. The system shall support the recording of weld repairs, re-welds, and cut-outs, maintaining a complete and immutable history of all work performed on a given joint. WTR-005 Original weld records shall not be deleted; repair cycles shall be appended as child records. The system shall track real-time weld status through configurable workflow states (e.g., WTR-006 Pending, In Progress, Fit-Up Complete, etc.). The system shall enforce workflow rules preventing progression to subsequent states WTR-007 without completion of prerequisite activities (e.g., no NDT release without completed VT). WTR-008 The system shall flag and report non-conforming welds The system should allow bulk weld record import via a validated, versioned CSV or WTR-009 Excel template with field-level validation and error reporting prior to commit. Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 4.3 MATERIALS TRACEABILITY Req. ID Requirement Statement The system shall maintain a materials register linking all base materials to their CMTRs, MAT-001 heat numbers, material specifications (ASTM, EN, etc.), and mill source. The system shall capture all essential, supplementary essential, and non-essential MAT-002 variables as defined by the applicable code. The system shall enforce material specification compatibility checks between base MAT-003 material and selected WPS. The system shall support Positive Material Identification (PMI) result capture and MAT-004 linkage to material records. The system shall maintain filler material inventory with tracking by AWS/EN MAT-005 classification, brand, heat/lot number, and expiration date (where applicable). The system shall track filler material receipt, storage conditions (rod oven temperatures, MAT-006 exposure time limits), issue, return, and consumption. The system shall enforce low-hydrogen electrode exposure time limits per code MAT-007 requirements and alert users when limits are approached or exceeded. The system shall track shielding and backing gas batch/lot numbers and link MAT-008 consumption to specific weld joints. The system shall prevent issuance of expired or non-conforming consumables and MAT-009 provide alerts for approaching expiration. 4.4 WELDING PROCEDURE SPECIFICATION (WPS) Req. ID Requirement Statement The system shall provide structured templates for Welding Procedure Specifications WPS-001 compliant with ASME Section IX (QW-482), EN ISO 15609, and AWS requirements. The system shall validate that WPS parameters fall within the qualified ranges WPS-002 established by supporting PQR(s). The system shall support multiple PQRs supporting a single WPS and multiple WPSs WPS-003 derived from a single PQR, with managed linkages. The system shall enforce version control with full revision history, preventing WPS-004 unauthorized modification of approved WPSs. The system shall provide WPS approval workflow with configurable review/approval WPS-005 stages and electronic signatures. The system shall alert users when a WPS is used outside its qualified scope (material, WPS-006 thickness, diameter, position, process). The system shall support WPS status management (Draft, Under Review, Approved, WPS-007 Superseded, Withdrawn) with status-based access controls. The system shall generate formatted, print-ready WPS documents conforming to code- WPS-008 required formats. Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 4.5 PROCEDURE QUALIFICATION RECORD (PQR) MANAGEMENT Req. ID Requirement Statement The system shall provide a structured PQR data entry module capturing all test weld PQR-001 parameters, mechanical test results (tensile, bend, impact, hardness, macro- examination), and NDT results as required by the applicable qualification standard. The system shall capture all essential, supplementary essential, and non-essential PQR-002 variables as defined by the applicable code. The system shall record all mechanical test results (tensile, bend, impact, macro, PQR-003 hardness, etc.) with linkage to applicable test reports and certificates. The system shall support attachment and linkage of NDT reports, photographs, and PQR-004 supporting documentation to PQR records. The system shall calculate and validate whether recorded mechanical test results meet PQR-005 the minimum acceptance criteria defined by the applicable code. Failing results shall be highlighted and shall prevent PQR approval. PQR-006 The system shall enforce electronic signature workflow for PQR review and approval. The system shall generate a formatted, print-ready PQR report matching the layout PQR-007 requirements of QW-483 (ASME IX) and the equivalent EN ISO 15614 forms, including all test data, witness signatures (electronic), and supporting document references. 4.6 WELDER AND WELDING OPERATOR QUALIFICATION MANAGEMENT Req. ID Requirement Statement The system shall maintain a centralised Welder Qualification Register recording the full WQM-001 qualification history of every registered welder, including apprentice and contractor personnel. The system shall support simultaneous qualification tracking under multiple codes and standards for a single welder (e.g., ASME IX, EN ISO 9606-1, AWS D1.1). WQM-002 Qualifications under each standard shall be maintained as discrete records with independent validity periods. The system shall support multi-code qualification tracking, allowing a single test to WQM-003 qualify a welder under multiple codes (ASME, EN ISO, AWS) with code-specific scope calculations. The system shall automatically calculate and display the full range of approval (qualified WQM-004 range) for each welder qualification based on the essential variables defined in the applicable code. The system shall automatically calculate qualification expiry dates in accordance with WQM-005 the relevant code. WQM-006 The system shall issue automated, configurable alerts prior to qualification expiry The system shall automatically prevent a welder whose qualification has expired or is WQM-007 not applicable to the assigned WPS from being assigned to a weld record. This shall be a hard system control, not a warning. The system shall maintain complete qualification history including all renewals, WQM-008 extensions, lapses, and revocations. Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 4.7 INSPECTION AND NON-DESTRUCTIVE TESTING (NDT) INTEGRATION Req. ID Requirement Statement The system shall provide structured inspection checklists for fit-up, in-process, and final NDT-001 visual examination per code requirements. The system shall support the generation and management of Inspection Requests (IR) NDT-002 and Inspection Release Notes (IRN) with assigned inspector, required date, and linked weld records. Weld inspection logs shall capture: inspection date and time, inspector identity and certification level (e.g., CSWIP 3.1, AWS CWI, EN ISO 9712 Level 2), inspection NDT-003 method, acceptance criteria applied (code and clause reference), findings/defect observations (using standard defect notation), and accept/reject disposition with justification. The system shall support the recording and tracking of non-conformances (NCRs) NDT-004 raised during inspection, linking each NCR to the affected weld record(s), the root cause analysis, corrective action, and close-out evidence. The system shall manage NDT requirements by weld joint, automatically applying NDT-005 sampling plans and extent of examination per code, client, or project specification. The system shall generate and manage NDT work packages with weld lists, required NDT-006 methods, and scheduled dates. The system shall track NDT status by weld joint through workflow states (Scheduled, In NDT-007 Progress, Evaluated, Accepted, Rejected, Pending Repair). The system shall capture and store defect indications with location NDT-008 (linear/circumferential position), size, characterization, and disposition. The system shall apply acceptance criteria from governing code and automatically NDT-009 determine accept/reject status where criteria are deterministic. The system shall require NDT operator/evaluator and reviewer electronic signatures on NDT-010 NDT reports. The system shall link NDT reports to weld joints, enabling consolidated view of all NDT-011 examinations performed on a given weld. NDT-012 The system shall maintain NDT personnel certification records The system shall enforce restrictions preventing NDT personnel from evaluating or NDT-013 approving examinations outside their certified scope. The system shall provide advance notification alerts for approaching NDT certification NDT-014 expiration. 4.8 REPAIR AND NON-CONFORMANCE MANAGEMENT Req. ID Requirement Statement The system shall enforce structured repair workflow including: defect identification, REP-001 repair procedure assignment, repair execution, and re-examination. The system shall track repair iterations per weld joint, enforcing maximum repair REP-002 attempt limits per code or project specification. Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 Req. ID Requirement Statement The system shall link all repair activities to the original weld joint while maintaining REP-003 distinct traceability for each repair cycle. The system shall require use of approved repair WPS for all repair welding and validate REP-004 welder qualification for repair scope. The system shall generate or integrate with non-conformance reports for rejected REP-005 welds, with structured fields for defect description, root cause, disposition, and corrective action. The system shall support NCR workflow including initiation, review, disposition REP-006 approval, corrective action tracking, and closure with appropriate signature requirements. REP-007 The system shall support configurable NCR categorization and severity classification. 4.9 DOCUMENTATION AND DOCUMENT CONTROL Req. ID Requirement Statement The system shall provide integrated document management for all welding-related DOC-001 documents including WPSs, PQRs, WPQRs, NDT procedures, ITPs, specifications, and drawings. The system shall enforce document version control with check-in/check-out, revision DOC-002 history, and supersession management. The system shall support document approval workflows with configurable DOC-003 review/approval stages and electronic signatures. DOC-004 The system shall maintain document distribution control with acknowledgment tracking. DOC-005 The system shall support document categorization, tagging, and full-text search. The system shall prevent access to superseded or withdrawn documents in normal DOC-006 workflows while maintaining archival access for audit purposes. 4.10 REPORTING AND ANALYTICS Req. ID Requirement Statement The system shall provide standard report templates including: weld log, welder RPT-001 qualification matrix, WPS index, NDT summary, NCR register, and weld completion status. All standard reports shall be exportable in PDF (with embedded audit metadata), Excel RPT-002 (XLSX), and CSV formats. PDF exports shall be non-editable and shall include the system-generated electronic signature display block where applicable. RPT-003 The system shall provide ad-hoc query and report builder functionality allowing users to create custom reports without vendor intervention. The system shall provide customizable report templates (Work pack management, RPT-004 production report, project data books, Management of repairs (linking repair slip to Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 Req. ID Requirement Statement rejected welds), welder performance report & repair rate, Project Reports (project analysis, final manufacturing report, weld progress report (i.e. total vs completed, % exportable in Pdf/excel) and KPIs & report follow-up. The system shall support scheduled report generation and automated distribution via RPT-005 email to configurable recipient lists at defined intervals (daily, weekly, monthly, or triggered by threshold breach). Real Time Dashboards and Trend Analysis – The system shall provide configurable, live dashboards with graphical KPIs: first pass yield, welder defect rate, NDT backlog, RPT-006 repair rate by WPS, project progress, defect rate over time, and welder performance trending. Dashboards shall be exportable as PDF/PNG. 4.11 DATA MIGRATION AND LEGACY INTEGRATION Req. ID Requirement Statement The vendor shall provide a documented data migration plan covering extraction, DML-001 cleansing, transformation, load, validation, and rollback. The system shall support batch import of legacy weld data (CSV, Excel, or XML) with DML-002 field level validation and error reporting before commit. DML-003 Post migration, the system shall generate a reconciliation report showing record counts and exceptions. 4.12 END-OF-LIFE AND DATA EXTRACTION Req. ID Requirement Statement The vendor shall provide a minimum 24 months’ written notice before discontinuing any EOL-001 version or the entire product. Upon termination, the vendor shall provide a documented data export utility that EOL-002 extracts all weld records, documents, audit trails, and images in open, machine readable formats (JSON, XML, PDF/A, CSV). EOL-003 The export utility shall be validated and made available at no additional cost during the notice period. 4.13 TESTING REQUIREMENTS Req. ID Requirement Statement For every new version (major, minor, patch), the supplier shall provide an upgrade test TES-001 plan that includes: backup/restore validation, forward compatibility of existing data, and rollback procedure validation. Doc. No GIT-EA-URS-0015 USER REQUIREMENTS FOR A WELDING Revision 01 MANAGEMENT SYSTEM of 12 Req. ID Requirement Statement TES-002 An upgrade test report shall be signed off by both supplier and NECSA before the upgrade is applied to production. TES-003 The supplier shall assist NECSA with UAT, Integration test, performance test etc. of the upgrades and new installation of the application. 5 SUPPORT The bidder/service provider is required to provide comprehensive information addressing the following areas: An overview of the customer support and maintenance services offered. The cost of the annual maintenance plan. Provision of 3 years of post-implementation support to assist with system stabilization. A commitment to regularly train service and support staff, as necessary, to ensure up-to-date knowledge and skills. Delivery of service and support in accordance with the agreed Service Level Agreement (SLA). After-hours emergency contact details, including applicable service rates for support provided outside regular business hours. Detailed information on the frequency of new software version releases. A proposed plan for implementing new releases and upgrades (e.g., scheduling during weekends or non-business hours). The process followed for testing new versions, upgrades, and patches prior to deployment. A detailed migration process to be followed when upgrading to new software versions.
B-BBEE Minimum Level: 2
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
12 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Information service activities. Unlock full pricing strategies, bid frequency, and historical win rates.