Tender Type
Request for Quotation
Delivery Location
71 York Street - George - George - 6530
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169415
Date & Time
Tuesday, 22 September 2026 - 12:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
null
Categories
Request for Quotation
71 York Street - George - George - 6530
AI Document Analysis Stages
Important Dates
Source: Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdf (unknown)08 Sept
2026
Tender Published
Tender was published
22 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
ADVERT.pdf
Quote GMQ109 - CIDB bidding document.pdf
Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdf
HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Win George tenders with AI Tender Matching, Garden Route compliance, and intelligence for the Western Cape's Garden Route capital.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 275 825
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"11 August 2026"}
Contact Information
Source: Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdf (unknown){"name":"Mr. Xavier","email":"[email protected]","phone":"+27 78 546 3529","department":null,"address":"▪ Fire exit door interfaces and related ancillary equipment."}
Technical Specifications
Source: Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdf (unknown)Risk profile
Baseline Risk Assessment
Annexure of Acknowledgement
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
Client baseline risk assessment
The project entails the construction of the Replacement of Fire Alarm at the Main Building: George Municipality.
The scope for the project includes but not limited to:
XP95/AriTech XP95 protocol field devices, including but not limited to:
▪ Smoke detectors;
▪ Heat detectors;
▪ Manual call points;
▪ Door interface units;
▪ Lift control interfaces;
▪ Fire exit door interfaces and related ancillary equipment.
required for complete operation.
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
The risk profile is identifying the key areas of risk exposure that the client is highlighting to be considered by the respective
contractors as part of the construction of the infrastructure:
The risks identified in this assessment relates to the client’s duties, the principal contractor and all other contractors appointed on this project
will be required to develop a details baseline risk assessment on the risk exposures experienced on site and relevant to the project scope of
works.
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
No Processes or Conditions Potential Hazards Risk
implementation management approvals conducted delays resulting into cost implication
Electrocution, sewer/ water leaks Shock, burns, death,
electricity and sewer
communities members of public, deaths
works and Client employees/visitors hazards.
Community unrest Unforeseen unrest from community members Property damage, project delays
Rigging – off loading- placement of containers Falling objects - Sliding objects
Site camp erection & dismantling and machinery Cuts and lacerations – crush injuries
materials movement of equipment Ergonomic strain, crush, death
Stacking & Storage
picking off stacks injuries
Dust exposure Construction activities generating dust
illness, poor visibility on site
Noise exposure Construction activities generating noise Noise induce hearing loss
Whole Body and hand vibration
electrical or mechanical equipment strain
Compliance Requirements
Source: Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdf (unknown)No specific requirements found
Health & Safety
Source: Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdfPROJECT NAME : Replacement of Fire Alarm at the main building: George Municipality
DOCUMENT TITLE : Client baseline risk assessment for the Replacement of Fire Alarm at the main building: George Municipality
Document number : XAKS-BRA-WC-G-102
Date: Name: X. Redcliffe Name: L. Mzamo Name: L. Mzamo
13-08-2026 Signature: Signature: Signature:
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
11 August 2026.
Client: george municipality
Document name: client baseline risk assessment
Project name: replacement of fire alarm at the main building: george municipality
HEALTH AND SAFETY AGENT: XAKS CONSULTING (Pty) Ltd
contractors as part of the construction of the infrastructure:
The risks identified in this assessment relates to the client’s duties, the principal contractor and all other contractors appointed on this project
will be required to develop a details baseline risk assessment on the risk exposures experienced on site and relevant to the project scope of
works.
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
works and Client employees/visitors hazards.
I,______________________________________________________representing
____________________________________________________ Principal Contractor have satisfied myself with the content of the Baseline
Risk Assessment (BRA) and shall ensure that the personnel and other people visiting site comply with all relevant obligations in respect
thereof.
Environmental
Source: Client B.R.A - Replacement of Fire Alarm at the Main Building George Municipality.13-08-2026.pdfunauthorizing dumping dumping
Hand tools- small portable electrical tools-
General construction work exposure, dust exposure –ergonomic
manual handling- sharp articles –electricity
strain –electrical shock -fire
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
No Processes or Conditions Potential Hazards Risk
Severe to fatal injuries
and machinery energy, hydraulic or coil energy, nip points
Exposure to elements and environment Sun, wind, temperature, emissions Skin cancer, heat exhaustion, lung cancer
Mobile plant operations Mobile plant and truck movement Accidents
Serious injuries and amputations
electrical equipment And placement of equipment
Working on slippery structures/surface Slipping and falling Serious injuries, deaths
Working with hand tools Unsafe hand tools Injuries
Working with portable electrical tools Unsafe electrical tools Burns, injuries, electrocution
Working at heights Slip trips and falls Serious injuries- multiple persons-
fatality
Electrical work Unsafe electrical exposure
property due to fire
Mechanical work Severe injuries
energy, hydraulic or coil energy, nip points
Use of ladder Collapsing –fall -drop Severe injury- fatality
Working in area with insufficient lighting Trips and falls Severe injuries
Use of chemical substances Cement-dust, diesel, Paint HCS-specific illness
Housekeeping Trips and falls causing injuries
causing obstructions
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
Acknowledgement of the Client Baseline Risk Assessment for the Project
Annexure of acknowledgement must be signed and issued to XAKS Consulting.
Acknowledgement:
I,______________________________________________________representing
____________________________________________________ Principal Contractor have satisfied myself with the content of the Baseline
Risk Assessment (BRA) and shall ensure that the personnel and other people visiting site comply with all relevant obligations in respect
thereof.
Signature of Principal Contractor Date
Signature of Agent Date
BRA – Replacement of Fire Alarm at the Main Building: George Municipality of 9 XAKS-BRA-WC-G-102 Rev0 11/08/2026
Waste management
unauthorizing dumping dumping
Description
Source: ADVERT.pdfAPPOINTMENT OF A Kwotasies word hiermee ingewag vir :AANSTELLING VAN
Service
Important Dates
Source: ADVERT.pdf (unknown){"closingDate":"22 September 2026","closingTime":"12:00"}
Contact Information
Source: ADVERT.pdf (unknown){"name":"Mr. A Joseph","email":"[email protected]","phone":"044 801 9111","department":"Supply Chain Management","address":"Financial Services, Supply Chain Management Munisipaliteit, Vyfde Vloer, Direktoraat: Finansiële Dienste,"}
Technical Specifications
Source: ADVERT.pdf (unknown)APPOINTMENT OF A Kwotasies word hiermee ingewag vir :AANSTELLING VAN
Service
Compliance Requirements
Source: ADVERT.pdf (unknown)tax compliance information must be moet ingesluit wees by die kwotasie dokument
TCS PIN” vir kwoteerders se belasting nakoming inligting
TCS PIN for bidders’ tax compliance information must be moet ingesluit wees by die kwotasie dokument
Central Supplier Database (CSD)
Kwoteerders moet by die CIDB geregistreer wees en ditBidders must be registered with the CIDB and it is
estimated that bidders should have a grading word geraam dat tenderaars ‘n CIDB
Important Dates
Source: Quote GMQ109 - CIDB bidding document.pdf (unknown){"briefingSession":"{"date":"22 September 2026","time":"12H00","venue":"FOR BRIEFING SESSION : N/A","is_compulsory":true}"}
Contact Information
Source: Quote GMQ109 - CIDB bidding document.pdf (unknown){"name":"MR ALWYN","email":"[email protected]","phone":"044 801 9111","department":", York","address":"nce or contact with the"}
Financial Requirements
Source: Quote GMQ109 - CIDB bidding document.pdf (unknown)Bid Bond: Form of Guarantee 69
PART C2 Pricing Data 70
C2.1 Pricing Instructions 71
C2.2 Pricing Schedule 72-73
PART C3 Scope of Work 74-76
C3 Scope of Work 74-76
PART C4 Site Information 77
PART C5 Health and Safety Specification 78
Quotation GMQ109/25-26,
The Tender Part T1
George municipality
Directorate: corpo
Compliance Requirements
Source: Quote GMQ109 - CIDB bidding document.pdf (unknown)No specific requirements found
Points Allocation: 3 points
B-BBEE Details: 26
Quotation for the appointment of a service provider for
The supply, replacement & installation of an obsolete
Fire alarm control panel & related material
Enquiries: mr alwyn joseph issued by:
York street george municipality
George p o box 19
(044) 801 9111 ext. 1344 GEORGE
6530
Summary for quotation opening purposes
Name of bidder: .....................................................................................................
Supplier database NO.: maaa ............................................
Total for rates (all appliable taxes
R
Included)
Preferences claimed for:
B-BBEE Status Level of Contributor and Point Claimed: Level: ____________ Point Claimed: _____
Locality Status and Point Claimed: Locality: __________ Point Claimed: _____
B-BBEE certificates submitted with the quotation document MUST be VALID ORIGINAL B-
BBEE CERTIFICATES or VALID CERTIFIED COPIES OF THE B-BBEE CERTIFICATES
Quotation closes at 12h00 on tuesday, 22 september 2026
Bidder contact details
This information shall be used for any correspondence or contact with the
bidder.
Please indicate whether you want to receive any correspondence via e-mail
or send to your postal address by registered mail.
Mark choice of
Name of Bidding Company: .................................................................... correspondenc
e with X
Postal ..............................................................................................
Address:
..............................................................................................
..............................................................................................
.................................................. Postal Code: ....................
Address: ...............................
Important Dates
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdf (TENDER){"closingDate":"12 August 2026"}
Contact Information
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdf (TENDER){"name":"Mr. Xavier","email":"[email protected]","phone":"+27 78 5463529","department":null,"address":"g either from, off or into."}
Evaluation Criteria
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdf (TENDER)Technical Specifications
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdf (TENDER)Designer responsibility
Compensation for Occupational Injuries and Diseases Act
Notification of Construction Works
Construction Manager
Construction Safety Officer
Staffing on site
Inspections, Monitoring and Reporting
Hazard Identification and Risk Assessment
Health & Safety Plan and File
Health and Safety Competency
First Aid Management
Facilities for employees
Close-out and Consolidated H&S file
Induction and H&S awareness
Incidents, Accidents and Emergencies
Fire Risks, Fire Extinguishers and Fire Fighting Equipment
Live Energy Work and Electrical Reticulations and Machinery
Ladders
Scaffolding & Fall Protection
Public Health & Safety
Waste
This Construction Health & Safety Specification is published in terms of the Occupational
Health & Safety Act of 1993 (OHS Act), Construction Regulations 2014, Regulation 5(1)(b).
specification as required in terms of the Regulations. Partial references to or quotes from
the Regulations do not imply that the sections not referred to or quoted from are of lesser
importance or are not applicable.
address all requirements and standards of the Occupational Health and Safety Act,
Regulations and the full Construction Regulations in the Health and Safety Plan and the
implementation thereof.
specific Construction Health & Safety Specifications which deal with health & safety issues
as these arise.
Limitation of liability
The client or its Agent shall not be responsible for any acts or omissions of any Contractor
which may directly or indirectly result from the application of the CHSS or any project
specific version thereof.
practices are, at all times, compliant to the legal requirements as these apply.
Client Requirements only.
agreements with the Client such as Consultants, Principal Contractors, and Principal
Contractors achieve an acceptable level of OHS performance. No advice, approval of any
document required by the CHSS or the Agent, such as hazard identification and risk
assessment action plan or any other form of communication from the client or the Agent
shall be construed as an acceptance of any obligation that absolves the Principal
Contractor from achieving the required level of performance and compliance with legal
requirements. Further, there is no acceptance of liability by the client or the Agent which
may result from the Principal Contractor failing to comply with the CHSS.
defined in Section 37(2) of the Occupational Health and Safety Act. The Principal
Contractor shall ensure that each contractor appointed by the Principal Contractor and
each and sub-contractor appointed by a contractor also enter into a Mandatary Agreement
with the client, as defined in Section 37(2) of the Occupational Health and Safety Act.
Regulations of 2014. In terms of CR5.1.k.
file on site and be valid for the duration of the contractor’s work on the construction site.
Purpose of the Construction H&S Specification
The purpose of the CHSS is to be used as the standard of H&S on this project on which
Principal Contractors’, Designers and other project representatives plan their project
implementation thus ensuring safe work execution and legal compliance.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
This CHSS will be applicable to all construction work at this project.
All employees working on this site shall conform to the standard in the CHSS. All the duties
of a Principal Contractor in this CHSS equally apply, in full, to contractors of such Principal
Contractor and to sub-contractors of such contractors.
a professional service on the project.
Implementation of the Construction H&S Specification
This CHSS forms an integral part of the Contract, and Principal Contractors are required to
make it an integral part of their contracts with subcontractors and suppliers.
a. Adequate provision for the cost of health and safety measures.
b. The principal contractor’s access to and intention to appoint persons with the
necessary competencies to carry out the construction work safely.
c. The principal contractor’s access to the necessary resources to carry out the
construction work safely and without risk to the health of the workers.
d. The principal contractors’ planning of construction activities within the special
requirements emanating from personnel deployment, time constraints and
language barriers.
The project entails the Replacement of Fire Alarm at the Main Building: George Municipality
The scope of works for the project includes but not limited to:
alarm control panel.
Apollo
XP95/AriTech XP95 protocol field devices, including but not limited to:
▪ Smoke detectors;
▪ Heat detectors;
▪ Manual call points;
▪ Door interface units;
▪ Lift control interfaces;
▪ Fire exit door interfaces and related ancillary equipment.
Evacuation System.
communication cards, cabling and accessories required for complete operation.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
upon completion.
Tender Document and BOQ.
Occupational Health and Safety related risks, problems, incidents and injuries during the
construction work on site.
promotion of a health and safety culture amongst those working on site.
associated with activities that impact on human health and safety.
Regulations and this CHSS.
the OHSA and the approved H&S Plan.
Designer Responsibility
The Designer must ensure that all designer’s duties defined in the Construction Regulation
2014 are complied with thus taking into consideration the applicable SANS requirements
during the design development.
consider suitable ergonomic design principles for all phases of the project life cycle.
potential cost implication for the design considering the geotechnical-science aspects and
the loading that the structure is designed to withstand.
Make available all relevant information required for the safe execution of the work.
Refrain from including anything in the design necessitating the use of dangerous procedures
or materials hazardous, which can be avoided by modifying the design or by substituting
materials.
must make provision in the design for that work to be performed to minimize the risk.
carried out in accordance with the design.
the relevant design’s H&S aspects. Inspect the completed structure and declare the structure
safe for use.
implementation.
Compensation for Occupational Injuries and Diseases Act
The Principal Contractor, each contractor and each sub-contractor shall submit proof of Good
Standing with the COIDA Commissioner, or a Mutual Association licensed in terms of Section
30 of COIDA, prior to starting any work on the site.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
H&S Plan of each contractor working on the site and must remain updated for the duration of
the construction work.
site.
1.The Principal Contractor ensure an assessment be done to determine if the project triggers
the Notification of Construction Works to the Department of Labour.
project H&S file.
Construction Manager
The principal contractor shall appoint a full-time competent person as the construction
manager with the duty of managing all the construction work on the Site.
The construction manager must be exclusively dedicated to this project/site.
Proof of competency of the construction manager shall be incorporated in the H&S file; the
client or its Agent shall only allow work to commence if the designated construction manager
has sufficient evidence of H&S competence and, as a minimum this shall include:
a. Proof of professional training
b. Proof of experience in the construction scope of work relevant to this project nature
c. Proof of experience in general H&S management for work as defined in the scope
executed and shall actively communicate with the client-agent in order to:
a. Confirm and provide proof of compliance; and
b. Discuss any compliant constraints which may be experienced.
arrangement is planned, the H&S plan of the Principal Contractor shall clearly define the
respective duties of the construction manager and of the safety officer.
included in the signed letter of appointment.
health and safety specifications to the client agent and shall discuss and amend the H&S plan
until finally approved by the Agent
of and for the duration of the construction work.
progresses.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
that, at all times, this file is on site and available to an inspector, the client, the client’s
agent or a contractor.
The construction manager shall provide contractors and sub-contractors with this CHSS.
The construction manager with support of the safety officer shall only approve a H&S plan
of a contractor and a sub-contractor if there is sufficient evidence that the contractor:
a. Has made sufficient provision for health and safety measures during the construction
process
b. Has the necessary competencies to perform the construction work safely; and
c. Has made the necessary resources available to perform the construction work safely.
Contractor have an approved H&S plan, prior to appointing the contractor and prior to
allowing the contractor to start working on site.
and good standing in terms of COIDA and shall not permit any contractor to start work or to
continue with work on site unless a valid Certificate of Good Standing is on site.
Construction Safety Officer
The Principal Contractor shall appoint a competent Construction safety officer for the
construction work.
three years working experience as a safety officer within the construction industry.
file.
Staffing on site
The Principal Contractor shall compile a list of all employees on site indicating:
a. Name and ID number
b. Designation (job title)
c. Date of OHS Induction for the site
d. Date of expiry of medical
e. Where applicable, competency in the safe work instructions included in the H&S plan.
This employee list shall be included in the start-up H&S file and maintained thereafter.
The H&S plan shall include a method statement on communication on site; this shall address:
a. Language and translation controls
b. Communication methods within and between teams (radio controls and permits)
c. Emergency communication methods
d. Regular planned meeting and communication sessions planned by the Principal
Contractor.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
Inspections, Monitoring and Reporting
The Principal Contractor shall carry out daily safety planned task observations and planned
H&S inspections on the site (or more frequent, where so required in the Regulations), and
shall take steps to rectify any unsafe condition of which he is aware.
and the Health & Safety Officer shall perform regular inspections and document these in the
H&S File.
H&S Plan.
kept on site:
a. The templates must correlate with the machinery and equipment listed on site.
b. The inspector responsible for the inspection and maintenance of the register must
be appointed in writing. Proof of training and competency in the performance of
the inspections must be documented.
Hazard Identification and Risk Assessment
The Principal Contractor shall appoint a competent person to perform a site-specific
baseline- and, thereafter, ongoing issue-based hazard identification and risk assessment.
There may be more than one risk assessor appointed if this is required.
construction site.
and the site-specific machinery, equipment and structures applied during the construction on
this project.
Agent for verification when:
a. A new machine is introduced onto site
b. A system for work is changed or operations altered
c. After an incident or near miss has occurred
d. New knowledge comes to light and information is received which may influence the
level of risk to employees on site.
methodology and control measure must comply to the hierarchy of controls prior to
commencement of work and in accordance with the provisions of the CR.
a. The baseline risk assessment shall document.
b. Issue-based risk assessment, risk monitoring and risk review shall be done at the
hand of pre-task risk assessment communicated to all employers; a system of daily
safe task instructions may be used. The risk assessment must include:
i. A daily tasks/activity list, step by step
ii. A daily documented listing of hazardous events
iii. A daily documented listing of H&S risk controls
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
iv. Proof of communication of the above to all employees: the client requires
that the Principal Contractor shall ensure that all employees on site are
conversant with the content of all relevant risk assessments, the
appropriate measures to either eliminate or reduce the identified risks. The
Principal Contractor shall outline to employees what role they are expected
to play in the Risk Assessment and control measure process.
are adequately managed
commence any work without a compliant risk assessment, or should the risk assessment not
reflect the activities being undertaken, the responsible contractor may be instructed to be
immediately stop that specific activity, and the Principal Contractor will have no claim
against the client in such a case for lost time or costs, irrespective of whether it can be
demonstrated that the work was being safely undertaken.
H&S Plan & File Requirements
The Principal Contractor shall provide and maintain an H&S File, containing all relevant
documents as prescribed in the OHSS, the Construction Regulations of 2014 and all forms or
records referred to that has relevance to specific legislation.
Department of Labour’s Inspectors.
The content of the file is included in this specification, but additional items may be added.
The H&S plan should include and project background/introduction section taking into
consideration the following:
I. Project name
II. Client details, name of responsible person and the business address
III. Principal Contractor, name of responsible person (16.2 appointee) and business address
IV. Completion project scope
controlled by the Principal Contractor, whether directly or through the services of a
contractors or sub-contractors.
include all machinery and plant directly or indirectly (through the services of a
contractor or sub-contractor) controlled by the Principal Contractor.
H&S Plan Content & Numbering
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
Experience & Qualifications
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdfclient or its Agent shall only allow work to commence if the designated construction manager
has sufficient evidence of H&S competence and, as a minimum this shall include:
a. Proof of professional training
b. Proof of experience in the construction scope of work relevant to this project nature
c. Proof of experience in general H&S management for work as defined in the scope
executed and shall actively communicate with the client-agent in order to:
a. Confirm and provide proof of compliance; and
b. Discuss any compliant constraints which may be experienced.
competent persons and evidence of competency (registrations, qualifications and
other proof of competency)
Quality Management
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdfH&S inspections on the site (or more frequent, where so required in the Regulations), and
shall take steps to rectify any unsafe condition of which he is aware.
and the Health & Safety Officer shall perform regular inspections and document these in the
kept on site:
a. The templates must correlate with the machinery and equipment listed on site.
b. The inspector responsible for the inspection and maintenance of the register must
be appointed in writing. Proof of training and competency in the performance of
the inspections must be documented.
a. The provision of facilities for safekeeping and changing
b. The method of ensuring that employees requiring to change on site can do so in privacy
c. The provision of an eating area
d. The provision and maintenance of sufficient toilets on site.
a. Fixed so as to avoid becoming wind-blown, location of toilets to be determined on site
considering the length of the road.
b. Sign-written: ‘Male’ and ‘Female’ use
c. Sanitised daily; an inspection and sanitising record must be kept in the H&S file
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
d. Inspected daily and, where bucket collections are in place, emptied at least twice a
week and one of these occasions must be on Fridays.
tools, including leads. The letter of appointment and template of this inspection register shall
be included in the H&S file.
contain the following:
a. The need for the use of fall prevention- or fall arrest harnesses
b. The safe application, attachment and maintenance processes for harnesses
c. The type of harness and the type of hook to be used and the specific attachment
points applicable to the fall risk work
d. The method of storing the harnesses when not in use
e. The method and register for the safety inspection of harnesses
f. A fall recovery method statement.
(PJS)is issued for each job title on the construction site. The PJS specification should be sent
with each employee to the occupational medical practitioner in order for the medical testing
and assessment to be relevant to the statutory requirements and the risk exposures.
Compliance Requirements
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdf (TENDER)Proof of experience in the construction scope of work relevant to this project nature
Proof of experience in general H&S management for work as defined in the scope
appointment letters
Appointment letter
appointment letter and proof of competency of the
appointment letter and proof of competency
Environmental
Source: HSS - Replacement of Fire Alarm at the main building George Municipality.13-08-2026.pdfH&S File Content & Numbering
Health and Safety Policy
competent persons and evidence of competency (registrations, qualifications and
other proof of competency)
a. Employees H&S Induction records
b. Visitors Induction records
c. Records of training and competency for method statements
management procedure
H&S Inspection Registers, list should be provided in the H&S Plan
PPE Issue Register
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
Internal Audits
Letters of approval of contractors and sub-contractors H&S Plans
Letters appointment of contractors and sub-contractors
Principal contractor’s contractor- and sub-contractor audits
DSTI’s
Audits by Client Agent
Corrective / Preventive Action plans for client audits
All supporting evidence deriving from the H&S Plan
Health and Safety Competency
The principal Contractor shall ensure that the H&S plan includes evidence of such
competence for every competent person designated to this construction site.
each person designated in the H&S plan; unless otherwise specified in this CHSS and as a
minimum, this shall include:
a. Proof of training in the OHSA, CR and evidence that a training provider certifies the
designated person to be familiar with the OHSA and with the applicable regulations
made under the OHSA.
b. Proof of competency in the specific skill of the designation; amongst other this may
include supervisory training, risk assessment training, equipment (such as ladders,
lifting equipment, fire extinguishers, portable electrical machinery etc.) or high risk
construction (such as excavation, measures and any other H&S skills.
First Aid Management
The Principal Contractor shall ensure that adequately trained first aiders are on site at all times
when construction employees are on site; this applies even if less than 10 employees are on
site.
trained First Aider on site regardless of number of labour on site.
first aid box.
requirements listed under General Safety Regulation 3, and any additional items identified in
the risk assessment.
All the above controls shall be documented in the H&S Plan.
Facilities for employees
The Principal Contractor shall document the construction site’s method to ensure the statutory
application of employee’s rights in terms of employee facilities as defined in the OHSA, the
General Safety Regulations and the Construction Regulation, including:
a. The provision of facilities for safekeeping and changing
b. The method of ensuring that employees requiring to change on site can do so in privacy
c. The provision of an eating area
d. The provision and maintenance of sufficient toilets on site.
a. Fixed so as to avoid becoming wind-blown, location of toilets to be determined on site
considering the length of the road.
b. Sign-written: ‘Male’ and ‘Female’ use
c. Sanitised daily; an inspection and sanitising record must be kept in the H&S file
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
d. Inspected daily and, where bucket collections are in place, emptied at least twice a
week and one of these occasions must be on Fridays.
at strategic points on site where works will be performed.
Close-Out and Consolidated H&S file
The Principal contractor shall compile a consolidated H&S file with supporting evidence as
requested and hand this to the Agent at the end of the construction for review and approval.
The consolidated H&S file shall be in electronic USB format.
The consolidated file shall include:
a. A copy of the Principal Contractor Contractual Appointment letter
b. The signed Principal Contractor Appointment with the Client
c. The signed 37.2 Agreement with the Client
d. Copy of the Notification of Construction Works
e. A copy of the approved construction footprint drawing
f. The H&S file of the Principal Contractor, which, amongst the other, shall have
dedicated chapters dealing with:
i. Project H&S plan Approvals Record
ii. Project H&S management plans, Fall Protection, Emergency plan, Storm
water management, Traffic management
iii. Project Contractor Baseline Risk Assessments
iv. Designer inspections/assessments and confirmation of conformance
v. Incidents registers & IOD investigation record
vi. COIDA Claim incidents and supporting medical treatment record
vii. Total Man-hours and Disabling Injury Frequency Rate statistics
viii. Monthly H&S performance report
ix. Monthly H&S audit reports from the consultants
x. Minutes of the monthly Health and Safety Committee meetings
xi. Pre- employment, annual and exit medicals records
xii. Record of project inductions
xiii. List of equipment and physical conditions inspections conducted, samples
included in the close out folder.
xiv. List of DSTI’s conducted samples included in the close out folder.
xv. List of awareness talks conducted; samples included in the close out folder.
xvi. List of employees on the project with exit medicals
xvii. HIV Aid Program “what was done on the project in summary” with
supporting evidence.
been demobilized (i.e., when nil man-hours are recorded).
Induction and H&S awareness
The Principal Contractor shall develop a documented project-specific induction training plan
that must be submitted for approval by the Agent, to ensure that all employees on site are
conversant with:
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
to whom the Construction Manager, Supervisors and Safety Officer is on site.
training before commencing duties on site.
inducted will be documented in the H&S file and the Principal Contractor is advised that a
generic induction or a human-resource induction shall not be sufficient for the client to accept
the H&S planning for the construction work.
site, including management, shall complete the principal contractors’ induction; the principal
contractor shall ensure that none of his or his contractors’ employees accesses the site unless
having been inducted by the principal contractor. Each visitor to the site shall be inducted in
the risks and risk controls which the visitor may be exposed to; the visitor’s induction and
method to ensure compliance shall be documented in the H&S file.
H&S awareness
b. The Principal Contractor shall conduct, on site, periodic toolbox talks, preferably
weekly or before any hazardous work takes place. The talks shall cover the relevant
activity and an attendance register must be kept and signed by all attendees.
c. A record of who attended and the content of the topic will be kept on the site
health and safety file as evidence of training.
i. Awareness training of management responsibility on site must be conducted
with all management representatives including contractors and sub-
contractors.
Incidents, Accidents, Near Misses and Emergencies
All near misses, incidents and accidents must be recorded, investigated and managed in
accordance with the statutory provisions.
a template of the register shall be included in the H&S file.
safety officer of the principal contractor becomes aware of it.
a. Such reporting must occur via direct contact (person-to-person, via telephone or email)
b. Incident Investigation process must be followed by competent role players and a
preliminary investigation report must be submitted to the Agent within 24 hours for
review and comment.
c. Final investigation must be finalized by the Principal Contractor and submitted to the
Agent within 7 working days, unless requested otherwise.
shall be made available to the client without exception; this includes records relating to
Section 24 of the OHSA.
on the construction site, the Principal Contractor must ensure that the provincial director is
provided with a report contemplated in section 24 of the Act, in accordance with regulations 8
and 9 of the General Administrative Regulations, 2013, and that the report includes the
measures that the Principal Contractor intends to implement to ensure a safe construction site
as far as is reasonably practicable.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
a. A comprehensive emergency and evacuation plan
b. An emergency flow chart
c. An updated list of emergency telephone numbers
site.
Fire Risks, Fire Extinguishers and Fire Fighting Equipment
No open fires are allowed on site.
No smoking is allowed on site, except in designated smoke areas, identified by the Principal
Contractor. The H&S Plan shall include the Principal Contractors’ arrangements for managing
smoking on site.
documented in a method statement in the H&S file.
regularly, in accordance with the manufacturer’s recommendations.
The Principal Contractor shall arrange for the training of the relevant personnel, in the use of
fire extinguishers.
inspector shall be included in the H&S file.
Live Energy Work and Electrical Reticulations and Machinery
The Principal Contractor shall appoint a competent electrician who shall ensure zero potential
of all electrical reticulations worked on and who shall ensure that dedicated power sources are
safely removed during the construction.
shall be included in the H&S File.
shall take adequate steps to ensure that employees and members of the public are prevented
from accessing any electrical cables.
All existing electrical services must be assumed live at all times.
No live energy work shall be performed.
Contractors will ensure that all energy is isolated, that residual energy is purged, that energy
sources are switched off and locked out by all employees working in the danger zone and are
tagged, prior to any work being performed on the energy source or reticulation. The
contractor shall include a zero Potential, Lock Out and Tag Out method statement and safe
work instruction(s) in the H&S file.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
shall take immediate steps to prevent employees or members of the public from gaining access
to the dangerous installation and the area surrounding it.
tools, including leads. The letter of appointment and template of this inspection register shall
be included in the H&S file.
electrical tools, including the management of the hazards of extension leads.
the H&S file.
Ladders
Ladders shall be compliant to the statutory requirements.
Ladders shall only be used for the purpose for which they are designed.
Ladders shall be identified, inspected regularly and the record of the inspection shall be kept in
the H&S file.
A-frame ladders shall have a patent spreader bar system.
Ladders shall extend at least 90 cm above any level or opening accessed with the ladder.
No vertical ladders shall be accessed by any person unless firmly attached at the bottom and
top or held in place by a fixed installation or a buddy.
Scaffolding & Fall Protection
The Principal Contractor shall submit the appointment letter and proof of competency of the
competent persons appointed as:
a. Scaffold erectors
b. Competent person to inspect, maintain, move or dismantle scaffolds,
c. Competent person to supervise all scaffolding operations.
The H&S Plan must include the signed letters of appointment and the proof of competency.
The Principal Contractor shall ensure that all scaffolding complies with the requirements of
the OHSA and Regulations and with the requirements of Temporary Works in this CHSS.
training must conform to the requirements of SANS 10085.
prior to use and weekly by the scaffold inspector. All scaffolds on site must be individually
identified and display a safe/not safe sign.
register; a template of the tag and of the register shall be included in the H&S file.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
hatches must close ladder-openings in decks.
there from falling off.
be fitted with scaffold hooks only.
scaffolds and the method of ensuring competency.
may be included in the H&S file and all such scaffolds on site must conform to this
standard.
Fall Protection and Fall Risk Work
The construction work includes high-risk fall risk work.
The Principal Contractor shall submit the name and the curriculum vitae of the competent
person who has been appointed to prepare a fall protection plan together with the signed
letter of appointment, in the H&S file.
SANS10085-1, and the planning shall be commensurate with the fall risk work.
contractors or sub-contractors.
a. All fall risk work is planned and forms part of the daily safe task instructions; note
that :
i. Work from a ladder or work where ladders are used as access tool are
potential exposures of employee to falling either from, off or into and such
work is considered ‘heights work’
ii. There is no minimum of maximum height defining fall risk
iii. Fall risk work done on an ad hoc basis or which forms part of abnormal or
emergency processes shall be risk assessed and employees shall be
instructed in the safe work process prior to work commencing
b. Only trained and competent persons with a valid medical certificate of fitness are
permitted to perform fall risk work
c. All medical certificates of fitness for fall risk work are issued by a registered
occupational medical practitioner and are included in the H&S file
d. All elevated areas are reached by means of a ladder, scaffold or man cage; and
climbing on machinery, installations or make-shift means of access is not permitted
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
e. No person must be allowed to work under an area where there is a risk of falling
tools or materials
f. As far as reasonably practical all openings through which persons can fall are closed
off with material which can support the weight of a person; such material shall be
permanently fixed over the opening
g. Where openings cannot be closed, a sturdy barricade of at least 1.5 m high, which
adequately prevents persons from falling through the opening, shall be in place at
all times
h. Man-lift machinery is not used for lifting of materials in position
must be included in the H&S file.
contain the following:
a. The need for the use of fall prevention- or fall arrest harnesses
b. The safe application, attachment and maintenance processes for harnesses
c. The type of harness and the type of hook to be used and the specific attachment
points applicable to the fall risk work
d. The method of storing the harnesses when not in use
e. The method and register for the safety inspection of harnesses
f. A fall recovery method statement.
Public Health and Safety
The principal contractor shall at all times ensure that members of the community is informed
of the work and the hazards and risk associated on project. Site supervision should ensure all
signage, barricading control measures to ensure member of the public is not exposure to
construction work activities. It must be noted that works will be performed at an
operational facility and therefore provision for barricading must be made on site.
maintained at the site, site camp, and construction work areas.
register should be completed and on record by the principal contractor.
the site and such induction shall outline the hazards likely to arise from on-site activities and
the precautions to be observed to avoid or minimise those risks.
scrap, waste and debris.
construction site.
CHSS – Replacement of Fire Alarm at the Main Building: George Municipality XAKS-SPEC-WC-G-102
file. Such method statement shall include all liquid, gaseous or solid waste produced during
the construction process.
Waste management must comply with the Environmental legislation.
All waste skips removed from site must be recorded and a proof of final deposit at a registered
waste site (waste disposal certificate) must be on record in the H&S file.
Provision must be made to remove rubble from site.
Waste management
scrap, waste and debris.
file. Such method statement shall include all liquid, gaseous or solid waste produced during
the construction process.
waste site (waste disposal certificate) must be on record in the H&S file.
Please be advised in terms of the Construction Regulation of 2014, the principal contractor is
required to develop and submit a consolidated Health, Safety and Environmental management file
at project completion. The submission should be in electronic format and must be submitted to the
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
71 York Street - George - George - 6530
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.