Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
The South African Bureau of Standards (SABS)Location
Gauteng
Closing Date
15 Oct 2026
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1 Dr Lategan Road Groenkloof - Groenkloof - Pretoria - 0001
Organization Type
GOVERNMENT
Published
25 Sept 2026
OCDS Reference
ocds-9t57fa-171737
The south african bureau of standards (sabs) requires the supply, installation and commissioning of a new addressable fire detection and alarm system with audio evacuation for the sabs groenkloof campus in pretoria, covering multiple blocks (a, b, c, h, k, m, o, pt, rt, s, t, u, va, vl, y) to comply with SANS 10139:2021 category l1+m. The system must use addressable fire control panels networked by fibre link to a central graphic interface, with two-loop configuration per building, low-smoke zero-halogen ph30 cabling, and independent voice evacuation systems for block a and block c. The single most consequential bidder consideration is the mandatory fdia membership and saqcc fire registration for all on-site staff, alongside strict compliance with SANS 10139 and the requirement to report any specification shortfalls before installation begins.
Closing date and time: 15 October 2026 at 11:00.
Mandatory eligibility: Tenderer must be a current member of the Fire Detection Installers Association (FDIA).
Mandatory eligibility: All contractor staff on site must be registered with SAQCC Fire for the relevant category.
Mandatory eligibility: Tenderer must have a track record of similar projects and provide proof of training on the equipment to be installed.
System compliance: Installation must comply with SANS 10139:2021 category L1+M; any specification shortfalls not meeting this standard must be reported to the client before commencement.
Cabling: New low-smoke, zero-halogen PH30 fire-rated cables (multi-stranded, no joints), installed in 25 mm PVC conduit supported with steel saddles every 500 mm.
Manual call points: Maximum travel distance to manual call points must not exceed 45 metres; plastic flaps secured with plastic tie-downs required.
Warning devices: Combined siren/strobe warning devices must achieve 65 dB in all areas during commissioning.
Audio evacuation: Independent voice evacuation systems required for Block A and Block C; backup batteries rated for 4 hours operation plus 5 minutes evacuation tone.
Battery backup: Fire panel batteries sized for 24 hours mains failure plus 30 minutes full alarm; battery calculations required in handover documentation.
Documentation: Three operator and maintenance manuals (one electronic) including design/installation/commissioning certificates; as-built drawings; zone block plans adjacent to each panel with contractor contact details; logbook at each panel.
Testing: Contractor performance tests witnessed by client engineer; 2-week soak test; final inspection with trained sub-contractor representative.
Guarantee: 12 months from engineer's acceptance.
Working hours: Contractor must submit working hours for client engineer approval; occupied buildings, minimal disturbance required.
Third-party inspection: Client may request; first inspection at client cost, any rectifications at contractor cost.
Submission method and address: Not stated in the document; bidders should verify the full tender pack for standard forms (SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9) and proof of CSD registration and tax compliance.
Evaluation criteria, scoring split, preference point system and minimum qualifying score: Not stated in the document.
No named contacts, email addresses, telephone numbers or submission/delivery addresses are provided in the document.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 15 October 2026 - 11:00
Venue
1 Dr Lategan Road Groenkloof, Pretoria
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Proposal
1 Dr Lategan Road Groenkloof - Groenkloof - Pretoria - 0001
AI Document Analysis Stages
Description
Source: Tender Spec for Smoke detector.pdf (TENDER)25 Sept
2026
Tender Published
Tender was published
15 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender Spec for Smoke detector.pdf
The South African Bureau of Standards seeks a supplier to supply and install a smoke detection system at its Groenkloof campus, including an audio evacuation system and fire graphic display, with full compliance to SANS 10139:2021 category L1 + M.
RFP 202077 Smoke Detectors.pdf
The South African Bureau of Standards (SABS) invites experienced suppliers to submit proposals for the supply and installation of a smoke detection system at its Groenkloof premises in Pretoria. The contract includes a 1-year guarantee and 2 years of maintenance and operating system support. The tender follows an 80/20 preference point system with a mandatory functionality evaluation threshold of 70%.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
The South African Bureau of Standards (SABS)Contact Person
Lekgolo Lebepe
Phone
012-428-6691
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 285 125
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The SABS Groenkloof campus requires new fire detection and alarm systems with audio evacuation for multiple buildings to comply with SANS 10139:2021 category L1+M. The contractor must supply, install, commission and guarantee the system, including all cabling, conduit, devices, panels, networking, graphic interface, evacuation equipment, documentation, testing and training. Civil works for fibre trenching are included. Drawings will be provided at a briefing session.
Important Dates
Source: Tender Spec for Smoke detector.pdf (TENDER)Closing date and time: 15 October 2026 at 11:00.
Compulsory briefing or site visit: not stated in the document. Drawings referenced in the executive summary will be provided during a briefing session, but the date, time and venue are not given.
Contact Information
Source: Tender Spec for Smoke detector.pdf (TENDER)No named contacts, email addresses, telephone numbers or submission/delivery addresses are provided in the document.
Submission Guidelines
Source: Tender Spec for Smoke detector.pdf (TENDER)Submission method and address: not stated in the document.
Closing date and time: 15 October 2026 at 11:00 (from tender record).
Returnable documents: the document does not list specific returnable forms (SBD/MBD) or mandatory submission documents. Bidders should verify the full tender pack for standard forms such as SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9 and proof of CSD registration and tax compliance.
Evaluation Criteria
Source: Tender Spec for Smoke detector.pdf (TENDER)Evaluation criteria, scoring split, preference point system (80/20 or 90/10) and minimum qualifying score are not stated in the document.
Technical Specifications
Source: Tender Spec for Smoke detector.pdf (TENDER)Scope: Supply, install and commission a new addressable fire detection and alarm system with audio evacuation for the SABS Groenkloof campus (multiple blocks: A, B, C, H, K, M, O, PT, RT, S, T, U, VA, VL, Y) to comply with SANS 10139:2021 category L1+M.
System type: Addressable fire control panels networked by fibre link to a central graphic interface; two-loop configuration per building.
Cabling: New low-smoke, zero-halogen PH30 fire-rated cables (1 mm² 2-core silicone insulated, aluminium foil screen, compliant with BS 6387 3h @ 950 °C or IEC 60331 3h @ 750 °C), multi-stranded, no joints permitted; installed in 25 mm PVC conduit supported with steel saddles every 500 mm.
Devices: Analogue addressable optical smoke detectors, heat detectors, bases; manual call points with plastic flaps secured by plastic tie-downs (maximum travel distance 45 m); combined siren/strobe warning devices achieving 65 dB in all areas.
Audio evacuation: Independent voice evacuation systems for Block A and Block C; zone selection, booster amplifiers (360 W, 200 W or 120 W, 100 V line, 240 V 50 Hz input, <1% distortion, >-80 dB noise), ceiling speakers (150 mm, 5 W, 86 dB sensitivity, 4 Ω) and horn speakers (200 mm, 15 W RMS, 120 dB sensitivity, 110° dispersion, 8 Ω); backup batteries rated for 4 hours operation plus 5 minutes evacuation tone.
Interfaces: Fire system interfaced with access control to release turnstiles on fire condition.
Battery backup: Fire panel batteries sized for 24 hours mains failure plus 30 minutes full alarm; calculations required in handover documentation.
Documentation: Three operator and maintenance manuals (one electronic) including owner/occupant details, building location, system category, equipment schedule, panel instructions, design/installation/commissioning certificates, panel device print-out; as-built drawings (system schematic, site plan of device layouts and cable routes); zone block plans adjacent to each panel with contractor name and contact number; logbook in robust holder at each panel.
Testing: Contractor performance tests witnessed by client engineer; installation and commissioning certificate; 2-week soak test; final inspection with trained sub-contractor representative.
Training: Half-day client training on system operation and first-line maintenance.
Civil works: Contractor responsible for trenching and backfilling for fibre links.
Electrical isolators: Provided by client unless agreed otherwise.
Working hours: Contractor must submit working hours for client engineer approval; occupied buildings, minimal disturbance required.
Third-party inspection: Client may request; first inspection at client cost, any rectifications at contractor cost.
Guarantee: 12 months from engineer's acceptance.
Methodology
Source: Tender Spec for Smoke detector.pdf (TENDER)Installation approach: Conducted in accordance with design information and supplied drawings; cable routes and quantities verified by contractor; discrepancies reported to engineer for written approval before changes.
Fire panels: New addressable panels installed at agreed positions, networked by fibre to central graphic interface (latest Windows OS); two-loop configuration per building.
Cabling: New PH30 cables in 25 mm PVC conduit with steel saddles every 500 mm; loop-in system, no joints; multi-stranded only; fire-resistant screened cable per BS 6387 or IEC 60331.
Devices: Optical smoke detectors, heat detectors, bases, manual call points (plastic flaps, tie-downs, max 45 m travel), combined siren/strobes installed per drawings.
Audio evacuation: Independent systems for Block A and Block C; 19-inch racks with ventilation; zone selection, booster amplifiers, ceiling and horn speakers per specifications; integrated with fire detection for automatic zone evacuation; manual control from main/remote panels; announcement chimes precede public address.
Battery backup: Fire panel batteries calculated for 24 h mains failure + 30 min alarm; evacuation batteries for 4 h operation + 5 min tone; calculations in handover docs.
Zone block plans: Supplied, framed, correctly oriented, showing components, zones, contractor name/contact at each panel.
Logbook: Robust holder at each panel.
Labelling: All line devices labelled.
Interface: Fire system linked to access control for turnstile release.
Testing: Contractor performance tests witnessed by engineer; 2-week soak test; final inspection demonstration.
Documentation: Three manuals (one electronic), certificates, schedules, as-built drawings, zone plans.
Training: Half-day client session.
Civil works: Trenching and backfilling for fibre links by contractor.
Electrical isolators: By client unless agreed otherwise.
Quality Management
Source: Tender Spec for Smoke detector.pdf (TENDER)Applicable standard: SANS 10139:2021 (design, installation, commissioning, maintenance of fire detection and alarm systems in non-domestic premises).
System category: L1+M for all buildings unless otherwise specified.
Contractor responsibility: Ensure full compliance with category and code; report any shortfalls in specification to engineer before installation.
Third-party inspection: On client request to confirm operability and conformance; rectifications at contractor cost.
Acceptance tests: Contractor conducts performance tests witnessed by client engineer; installation and commissioning certificate required.
Soak test: 2 weeks.
Final inspection: Demonstration of full system functionality by trained sub-contractor representative with engineer and client representative present.
Documentation: Three operator/maintenance manuals (one electronic) with certificates of design, installation, commissioning, equipment schedule, panel device print-out; as-built drawings (system schematic, site plan of device layouts and cable routes); zone block plans at each panel; logbook at each panel.
Training: Half-day client training on operation and first-line maintenance.
Guarantee: 12 months defect-free from engineer's acceptance.
Financial Requirements
Source: Tender Spec for Smoke detector.pdf (TENDER)No pricing format, bid security, bonds, guarantees, retention, payment terms or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: Tender Spec for Smoke detector.pdf (TENDER)Mandatory eligibility:
Standard compliance (not detailed in document but typically required): CSD registration, valid tax compliance status (SARS PIN), B-BBEE certificate or sworn affidavit, CIPC registration. No specific B-BBEE level, CIDB grade or local-content thresholds are stated.
Health & Safety
Source: Tender Spec for Smoke detector.pdf (TENDER)Occupied buildings: Contractor must submit working hours for approval and ensure minimal disturbance.
Fire-rated cabling: Low-smoke, zero-halogen PH30 cables throughout.
Conduit support: Steel saddles every 500 mm.
Manual call points: Fitted with plastic flaps secured by plastic tie-downs (listed as design deviation) to protect against malicious action.
Sound levels: 65 dB minimum in all areas during commissioning.
Evacuation system: Automatic evacuation messages on fire detection; manual zone/evacuation activation from control panels; backup batteries for 4 hours operation plus 5 minutes evacuation tone.
Access control interface: Turnstiles released on fire condition.
Electrical work: By qualified electrician in accordance with SABS regulations.
Ventilation: Evacuation racks equipped with fan units to prevent overheating.
No joints permitted in cabling; loop-in system throughout.
Existing redundant cabling and devices to be stripped out.
Contractual Terms
Source: Tender Spec for Smoke detector.pdf (TENDER)Contract duration: not stated.
Guarantee period: 12 months from date of acceptance by the Engineer.
Final inspection: Trained sub-contractor representative performs tests and demonstrates full system functionality in presence of engineer and client representative.
Acceptance: Installation and commissioning certificate signed by contractor and supplied to client.
Third-party inspection: Client may request; first inspection at client cost, rectifications at contractor cost.
Electrical isolators: Provided by client unless otherwise agreed.
Working hours: Contractor submits for client engineer approval; occupied buildings, minimal disturbance.
Training: Half-day session for client on operation and first-line maintenance.
Documentation: Final payment withheld until full documentation accepted by engineer.
Civil works: Contractor responsible for trenching and backfilling for fibre links.
Special Conditions
Source: Tender Spec for Smoke detector.pdf (TENDER)Working hours subject to client engineer approval; occupied buildings require minimal disturbance.
Electrical isolators provided by client unless agreed otherwise.
Manual call point flaps with plastic tie-downs listed as design deviation.
Third-party inspection at client request; first inspection at client cost, rectifications at contractor cost.
Final payment withheld until documentation accepted by engineer.
Contractor responsible for trenching and backfilling for fibre links.
Half-day training session required.
12-month guarantee from engineer's acceptance.
Requirements
Source: Tender Spec for Smoke detector.pdf (TENDER)Mandatory: FDIA membership; SAQCC Fire registration for all site staff; proven track record on similar projects; proof of equipment training.
Technical: SANS 10139:2021 compliance; category L1+M; PH30 low-smoke zero-halogen cabling; addressable panels networked by fibre; two-loop configuration; manual call points with flaps (max 45 m); 65 dB sound levels; audio evacuation for Block A and C; 4-hour battery backup for evacuation; graphic interface on Windows; zone block plans; logbooks; as-built documentation; 12-month guarantee.
Operational: Working hours approved by engineer; minimal disturbance in occupied buildings; third-party inspection possible; half-day client training.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Dr Lategan Rd, Groenkloof, Pretoria, 0027, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
01 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
012-428-6691[email protected]www.sabs.co.za1 Dr Lategan Rd, Groenkloof, Pretoria, 0027, South Africa
Key Personnel
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog