Tender Type
Request for Bid(Open-Tender)
Delivery Location
2A Walter Sisulu - Aerorand - Middelburg - 1050
Organization Type
GOVERNMENT
Published
19 Aug 2026
OCDS Reference
ocds-9t57fa-166067
Nkangala district municipality is procuring construction of the ESKOM mv bulk electrical connection (hare & mink line sections to pump stations 3 & 4) for the loskop regional bulk water supply scheme in thembisile hani local municipality, work package 6c. Bidders must be accredited with ESKOM, hold professional indemnity insurance, and submit a full set of compulsory returnable documents by 12:00 on 17 september 2026.
Closing: Bids must be deposited in the bid box at Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050, by 12:00 on 17 September 2026; late bids will not be accepted.
Eskom accreditation: Bidders must provide proof of accreditation with Eskom (Form O) and hold professional indemnity insurance (Form P).
Tax compliance: Bidders must submit a valid SARS Tax Compliance Status (TCS) PIN or CSD number; a valid Tax Clearance Certificate must accompany the bid, and each consortium/JV/sub-contractor party must submit separate proof.
Returnable documents: All compulsory forms (A to P) must be fully completed and signed; failure renders the bid unresponsive. Forms Q to W are required for evaluation.
Financial references: A bank letter not older than three months (Form H) and a municipal utility account not older than three months (Form I) must be submitted; failure renders the bid unresponsive.
Evaluation: The 80/20 preference point system applies (estimated value not exceeding R50 million); 80 points for price and 20 for specific goals, with points for black, women, disability, youth, military veteran, and local enterprise ownership.
Eligibility: Bidders must not be in the service of the state, not be listed on the National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters, and not owe municipal rates or taxes in arrears for more than three months.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 17 September 2026 - 12:00
Venue
Nkangala District Municipality
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Only the ESKOM accredited contractors who are listed on eskom’s national database of accredited contractors may submit tenders.
Categories
Request for Bid(Open-Tender)
2A Walter Sisulu - Aerorand - Middelburg - 1050
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 2 Contents Notice - PRINT IN WHITE.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
19 Aug
2026
Tender Published
Tender was published
17 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
8.2 Safety Agreement - PRINT ON YELLOW.pdf
Construction of the Loskop Regional Bulk Water Supply Scheme in the Thembisile Hani Local Municipality, specifically Work Package 6C, which covers the Eskom MV bulk electrical connection for the Hare and Mink line sections to Pump Stations 3 and 4. The employer is the Nkangala District Municipality.
11.2 Standard Spec - PRINT IN BLUE.pdf
Construction of the ESKOM MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, Mpumalanga, for the Nkangala District Municipality.
4 Returnable Documents Cover page - PRINT IN YELLOW.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, procured by Nkangala District Municipality under project number 150362/6C.
10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf
Construction of the Eskom medium-voltage bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, Mpumalanga. The works include pole planting, MV structures, stays, conductor stringing, equipment installation, earthing, cable laying, termination, labelling, pre-commissioning, testing, and dismantling of existing equipment.
9 Pricing Instructions - PRINT IN YELLOW.pdf
Construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, specifically Work Package 6C covering the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4.
3 Tender data - PRINT IN PINK NDM.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, for Nkangala District Municipality.
11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf
Construction of a 22kV Eskom medium-voltage bulk electrical connection, comprising a 5.4km Hare line and a 14km Mink line, to supply Pump Stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme. The works include new pole lines, a recloser structure, a CT/VT unit, and dismantling the existing Dennilton line, with the completed assets to be handed over to Eskom.
6 The Contract - PRINT IN YELLOW.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, for Nkangala District Municipality.
2 Contents Notice - PRINT IN WHITE.pdf
Construction of the Eskom MV bulk electrical connection (Hare & Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, issued by Nkangala District Municipality.
5 List of Returnables - PRINT IN YELLOW NDM.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, Mpumalanga, for Nkangala District Municipality.
7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, procured by Nkangala District Municipality under project number 150362/6C.
11.3 Project Spec - PRINT IN BLUE .pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, on behalf of Nkangala District Municipality.
8.1 Performance Guarantee - PRINT ON YELLOW.pdf
Construction of the Eskom medium-voltage bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, procured by Nkangala District Municipality.
10 Bill of Quantities Cover - PRINT IN YELLOW.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, for Nkangala District Municipality.
8 Contract Data - PRINT ON YELLOW NDM.pdf
Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, for Nkangala District Municipality.
1. COVER PAGE - PRINT IN COLOUR.pdf
Construction of the Eskom medium-voltage bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, issued by Nkangala District Municipality under project number 150362/6C.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 5 312 500
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)Construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality – Work Package 6C, specifically the Eskom MV bulk electrical connection (Hare and Mink line sections to Pump Stations 3 and 4).
Contact Information
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"eptance control on products and workmanship,"}
Evaluation Criteria
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)The document does not specify eligibility criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading. Bidders must complete the standard tender forms (SBD/MBD) as required by the employer.
Technical Specifications
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)Scope: Construction of the Loskop Regional Bulk Water Supply Scheme, Work Package 6C, comprising the Eskom MV bulk electrical connection (Hare and Mink line sections to Pump Stations 3 and 4).
Methodology
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)The contractor must provide a bar-chart programme showing activities in detail as required by the Employer's Agent, updated monthly in accordance with progress.
Quality Management
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)The Employer's Agent will undertake acceptance control tests for workmanship and quality, but this does not relieve the contractor of maintaining their own quality control system. The Agent will assess test results and measurements. For small quantities, a lot means a full day's production for a specific item subject to acceptance control testing.
Pricing Schedule
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)Pricing is based on a Bill of Quantities. Rates are inclusive of all costs; VAT is excluded and provided as a lump sum in the Summary of Bill of Quantities.
Financial Requirements
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)Pricing format: Bill of Quantities with rates inclusive of all costs; VAT excluded from rates and provided as a lump sum in the Summary of Bill of Quantities.
Compliance Requirements
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)Occupational Health and Safety: contractor must provide for costs related to the Occupational Health and Safety Act, including preparation of a Health & Safety Plan, risk assessment prior to construction, H&S induction training, compilation and maintenance of H&S file, and implementation of the plan over the construction period. These are paid as separate sum items on successful completion.
Health & Safety
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)Occupational Health and Safety: contractor must provide for costs related to the Occupational Health and Safety Act, including preparation of a Health & Safety Plan, risk assessment prior to construction, H&S induction training, compilation and maintenance of H&S file, and implementation of the plan over the construction period. These are paid as separate sum items on successful completion.
Contractual Terms
Source: 11.3 Project Spec - PRINT IN BLUE .pdf (unknown)The contractor must set up and maintain organisation, camps and plant on site, effect insurances and indemnities required by the General Conditions of Contract, and meet all other general obligations and liabilities not specifically measured for payment.
Description
Source: 1. COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Project No. 150362/6C: Construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality – Work Package 6C (Eskom MV Bulk Electrical Connection (Hare & Mink Line Sections to Pump Stations 3 & 4). Issued by Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050.
Contact Information
Source: 1. COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Issued by Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050.
Submission Guidelines
Source: 1. COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Returnable documents: the tender cover page must be completed and signed, showing the tenderer's name, CSD registration number, and total amount excluding VAT. The cover page must be printed in colour.
Evaluation Criteria
Source: 1. COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD) and provide their CSD registration number. No other eligibility criteria are stated in the available document.
Technical Specifications
Source: 1. COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Project No. 150362/6C: Construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality – Work Package 6C (Eskom MV Bulk Electrical Connection (Hare & Mink Line Sections to Pump Stations 3 & 4).
Compliance Requirements
Source: 1. COVER PAGE - PRINT IN COLOUR.pdf (TENDER)CSD registration is required; the CSD registration number must be provided on the cover page.
Important Dates
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)Compulsory briefing session: 24 August 2026 at 11:00, physically at Nkangala District Municipality.
Closing: 17 September 2026 at 12:00.
Contact Information
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)Technical and administrative queries: Mr SI Masilela, Nkangala District Municipality, 013-249-2104/5/6/7.
Submission Guidelines
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)Tenders must be completed in black ink and in accordance with the conditions and rules in the tender documents. Sealed envelopes must be endorsed with the project number and description and deposited in the Tender Box, Ground Floor, Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, Mpumalanga, at or before 12:00 on 17 September 2026. Tenders will be opened publicly immediately after closing. Telegraphic, telephonic, fax, telex, e-mail or late tenders will not be accepted. Tenders must remain valid for 120 days from the closing date. Returnable documents include the Form of Offer and Acceptance, Contract Data, Form of Guarantee, Safety Agreement, Pricing Instructions, Bills of Quantities, and the Scope of Work.
Evaluation Criteria
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)Tenders will be evaluated in accordance with the Supply Chain Management Policy of Nkangala District Municipality. The lowest or any tender will not necessarily be accepted. The municipality reserves the right to accept the tender in whole or part and not to consider any tender not suitably endorsed or comprehensively completed.
Technical Specifications
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)The scope of work is the construction of the Loskop Regional Bulk Water Supply Scheme, Work Package 6C, comprising the Eskom MV bulk electrical connection (Hare & Mink line sections to pump stations 3 & 4). The work is to be executed in accordance with the Scope of Works (SANS 10403:2003), standard and particular specifications, and the project specification. Site information and geotechnical reports are provided. Drawings and the DWS 9900 C1 standard specification form part of the contract.
Financial Requirements
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)A Form of Guarantee is required. Pricing must be submitted in accordance with the Pricing Instructions and the Bills of Quantities.
Compliance Requirements
Source: 2 Contents Notice - PRINT IN WHITE.pdf (TENDER)Bidders must be suitably qualified and Eskom Accredited Service Providers. Suppliers/Service Providers must be registered on the Central Supplier Database (CSD).
Evaluation Criteria
Source: 8.1 Performance Guarantee - PRINT ON YELLOW.pdf (unknown)No specific eligibility criteria (such as CIDB grading, B-BBEE level, or CSD registration) are stated in the provided document. The only requirement is the completion of the Performance Guarantee form.
Financial Requirements
Source: 8.1 Performance Guarantee - PRINT ON YELLOW.pdf (unknown)Performance Guarantee (C1.3 pro forma) must be completed and submitted. The bidder selects either a Variable or Fixed Performance Guarantee. The Guaranteed Sum is the maximum aggregate amount payable, to be inserted. For a Variable Guarantee, liability reduces after the interim payment certificate certifying more than 50% of the Contract Sum; the amount payable from signing until that certificate, and the amount from then until the Expiry Date or Certificate of Completion, must be stated. For a Fixed Guarantee, liability is limited to the Guaranteed Sum for the period from signing until the Expiry Date, Certificate of Completion, or full payment of the Guaranteed Sum, whichever occurs first. The Guarantor must pay certified sums within seven calendar days of a first written demand. The guarantee is non-negotiable, non-transferable, and expires at the Expiry Date; the original must be returned to the Guarantor after expiry. The Contract Sum is the accepted amount inclusive of tax, to be inserted.
Compliance Requirements
Source: 8.1 Performance Guarantee - PRINT ON YELLOW.pdf (unknown)No specific requirements found
Contractual Terms
Source: 8.1 Performance Guarantee - PRINT ON YELLOW.pdf (unknown)The contract is governed by the General Conditions of Contract for Construction Works, 3rd Edition, 2015. The Employer's Agent issues Interim Payment Certificates, Final Payment Certificates, and the Certificate of Completion. The Performance Guarantee is a payment obligation only, not a suretyship. The Guarantor's maximum liability is limited to the Guaranteed Sum (or the diminishing amounts for a Variable Guarantee). The Guarantor must pay on first written demand if the Contractor defaults or is sequestrated/liquidated. The Employer may call the guarantee if the Contractor fails to pay a certified sum within seven calendar days of a written demand. The guarantee is a liquid document for court purposes. The Guarantor consents to the jurisdiction of the Magistrate's Court. The guarantee expires on the Expiry Date, defined as the date of the Certificate of Completion or termination of the contract, whichever comes first.
Description
Source: 4 Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)The project involves the construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, specifically Work Package 6C, which covers the Eskom MV bulk electrical connection (Hare and Mink line sections to Pump Stations 3 and 4).
Submission Guidelines
Source: 4 Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Bidders must complete and submit the T2 Returnable Documents cover page, which includes witness signature blocks for the tenderer and the employer. All returnable documents must be signed and submitted with the bid.
Returnable Documents
Source: 4 Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)The T2 Returnable Documents cover page includes witness signature blocks for the tenderer and the employer. Bidders must complete and sign this page as part of their submission.
Evaluation Criteria
Source: 4 Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)No specific evaluation criteria are stated in the provided document.
Technical Specifications
Source: 4 Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)The tender is for the construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, specifically Work Package 6C, which involves the Eskom MV bulk electrical connection (Hare and Mink line sections to Pump Stations 3 and 4).
Important Dates
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Compulsory clarification meeting: 24 August 2026 at 11h00, at Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050. Attendance is compulsory; non-attendance renders the tender non-responsive. No individual may represent more than one tenderer at the briefing. Closing date: 17 September 2026 at 12h00, at the same venue.
Briefing Session
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)A compulsory clarification meeting will be held on 24 August 2026 at 11h00 at Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050. Attendance is compulsory; non-attendance renders the tender non-responsive. No individual may represent more than one tenderer. Incomplete attendance register fields may lead to automatic disqualification.
Contact Information
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Accounting Officer: Mr ML Mahlangu, P.O. Box 437, Middelburg, 1050, Tel: 013 249 2104 / 5 / 7. Procurement Enquiries: Mr SI Masilela, Supply Chain Unit, P.O. Box 437, Middelburg, 1050, Tel: 013 249 2006. Technical Enquiries: Mr Peter Bouwer, Endecon Ubuntu Consultants, Tel: 079 889 9009.
Submission Guidelines
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Tenders must be submitted on the Council's official tender document, with all returnable documents completed and returned. Deposit the tender in the tender box at the Main Entrance, Ground Floor, Nkangala DM Building, 2A Walter Sisulu Street, Middelburg 1050, clearly marked with the project number. Telephonic, telegraphic, telex, facsimile or emailed tenders will not be considered. Tenders cannot be withdrawn or substituted after submission. Tenders will be opened in public at the closing time and prices read out. The tender offer must remain valid for 120 days from the closing date. Proposals must be in English, black font, Arial size 12, one-and-a-half spacing, and not more than 30 pages excluding appendices. Returnable documents include the List of Returnable Papers, Form C1.1 (Form of Offer and Acceptance), Form F (Authority of Signatory), and a Board Resolution authorising the signatory. Failure to complete and sign Form C1.1 automatically disqualifies the tender. No alterations may be made to the tender document; any amendments must be initialled. No alternative tender offers will be considered.
Evaluation Criteria
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)The bid is estimated not to exceed R50 million (all taxes included), so the 80/20 preference point system applies: 80 points for price and 20 points for specific goals. Evaluation follows the NDM Supply Chain Management Policy, balancing financial offer and functionality. Responsiveness is determined by compliance with key requirements: Organising and Staffing (45 points), Plant & Equipment (20 points), and Experience (35 points), totalling 100 points. A firm must obtain a minimum of 60 out of 100 points on functionality to be considered. Functionality scoring covers key personnel (Contracts Manager, Site Supervisor, Line Construction Resource, Truck Mounted Crane Operator, Safety Officer), plant and equipment, and company experience. Company experience: 3 projects or below scores 0 (eliminating), 4–8 projects scores 20, 9 and above scores 35. Proof of completed projects via appointment letters and completion certificates is required; otherwise zero points. Evaluation steps include checking completeness, responsiveness, reasonableness, preferential points eligibility, expertise and experience, financial offer points, ranking, and risk analysis via credit record.
Experience & Qualifications
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Key personnel requirements: Contracts Manager must have at least a National Diploma in Electrical Engineering (NQF Level 6) and be professionally registered with ECSA (Pr. Techni Eng, Pr. Tech. Eng, or Pr. Eng). Site Supervisor must have at least N2 in Electrical Engineering and hold Eskom Authorisation MV Outcome 3. Line Construction Resource: at least three MV/LV Line Construction Resources with Eskom-approved (EAL) training certificates (ELW002 to ELW012). Truck Mounted Crane Operator must have valid training certificates or permits for cranes mounted on a truck (e.g., C32 or F32). Safety Officer must be registered with SACPCMP as a Construction Health and Safety Officer. CVs must include position, qualifications, professional registrations, relevant experience with dates and durations, language proficiency, and references. Foreign qualifications must be verified by SAQA. Proof of employment history and project involvement must be detailed in CVs. Nominated staff must be assigned as proposed; failure may annul acceptance. Company experience: minimum prescribed years of proven experience in similar projects; attach appointment letters and completion certificates (or reference letters if completion certificates unavailable).
Pricing Schedule
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Rates and prices must be stated in Rand. The pricing data includes a Pricing Instruction, Contract Data, and Bill of Quantities. The schedule of quantities must be completed as required; providing only lump sums is a disqualification. Scratching out or using tippex/erasable ink on rates without initialling is unacceptable.
Financial Requirements
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Rates and prices must be stated in Rand. The pricing data includes a Pricing Instruction, Contract Data, and Bill of Quantities. The bid value is estimated not to exceed R50 million (all applicable taxes included). Bidders must hold a valid public liability and works indemnity insurance policy cover of not less than R10 million. Bidders must also hold a valid professional indemnity insurance policy cover of not less than R10 million per claim. The employer may request increased insurance if needed. The employer will not compensate tenderers for costs incurred in preparing or submitting a tender.
Compliance Requirements
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)Eligibility: Only Eskom-accredited contractors listed on Eskom's National database of accredited contractors may tender; provide proof of registration on the Eskom DT website. CIDB registration: Bidders must be registered with the CIDB, or capable of being so prior to evaluation, in a contractor grading designation equal to or higher than determined by the sum tendered, for a 7EP class of construction work. Joint ventures: every member must be CIDB-registered; the lead partner must have a 7EP grading; combined grading must meet the requirement. Financial capacity: Company financial statements for the past three financial years with average annual turnover of R200 million or more, and similar project experience. Tax compliance: A valid tax clearance certificate or tax document with a PIN from SARS (TCS) must be submitted, and the latest CSD report showing tax clearance status must be affixed. Municipal arrears: Bidders or directors owing municipal rates or service charges for more than three months are disqualified. Past performance: Bidders who failed to perform satisfactorily on a previous contract with the municipality or other organ of state in the last five years are disqualified. Returnable forms: Form C1.1 (Form of Offer and Acceptance) and Form F (Authority of Signatory) with Board Resolution. POPI Act compliance: Bidders consent to processing of personal information and must have obtained all required consents.
Health & Safety
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)A Safety Officer must be proposed and scored. The Safety Officer must be registered as a Construction Health and Safety Officer with SACPCMP; lack of registration scores 0 and is an eliminating factor. Points are awarded for years of experience after qualification: 0–2 years scores 0 (eliminating), 3–6 years scores 3, 7 and above scores 5.
Contractual Terms
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)The employer reserves the right not to accept the lowest tender and to accept the whole or part of any tender. After tender opening, no information about clarification, evaluation, or award recommendations may be disclosed until the award is announced. Bidders must hold valid public liability and works indemnity insurance of at least R10 million, and professional indemnity insurance of at least R10 million per claim; the employer may require increased cover. The employer may cancel the contract and impose penalties if preference points were obtained fraudulently or specific goals are not met, including financial penalties and restriction from doing business with Nkangala District Municipality for 5 years.
Section
Source: 3 Tender data - PRINT IN PINK NDM.pdf (TENDER)The bid is estimated not to exceed R50 million (all taxes included), so the 80/20 preference point system applies: 80 points for price and 20 points for specific goals. Functionality scoring: Organising and Staffing (45), Plant & Equipment (20), Experience (35) – total 100. A minimum of 60 points on functionality is required. Company experience: 3 projects or below scores 0 (eliminating), 4–8 projects scores 20, 9 and above scores 35. Proof of completed projects via appointment letters and completion certificates is required.
Description
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The termination point of the Eskom supply will tie in with the Water Treatment Works Contract currently in progress. The Electrical Contractor will have to liaise with the Civils Contractor. The Contractor shall provide a rain gauge close to the office of the Employer's Agent or as directed, with precautions to restrict access.
Contact Information
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown){"name":null,"email":null,"phone":null,"department":"at Pum Station 3 and 4 POC as per D-DT","address":null}
Evaluation Criteria
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The contractor must comply with the Occupational Health and Safety Act and the Explosives Act for blasting operations. Points will be assigned for the number of plant supplied as per Returnable Schedule O, including crane trucks, TLBs, compactors, and LDVs. Points will be allocated for the qualifications and experience of key personnel listed in the Returnable Schedules under Tender Data. The contractor must submit a preliminary programme with the tender, and a construction programme in Microsoft Projects. The contractor must comply with SANS 1921:2004 parts 1, 2, and 3. Tenderers may submit an alternative Time for Completion in addition to the specified one, each with a preliminary programme and financial implications. All materials must bear the SABS mark where applicable. The contractor must provide a rain gauge, temperature gauge, and measuring wheel for the Engineer's use. The contractor must provide a chemical ablution unit with separate male and female facilities. The contractor must provide a meeting table with a surface area of at least 3 m² and 12 chairs. The contractor must provide carports with concrete floors or a layer of broken stone. The contractor must provide a first aid kit at the site office and in site staff vehicles. The contractor must provide a daily site diary and record deliveries, rainfall, daily progress, plant, staff, and general daily events. The contractor must ensure that the site remains clear of all rubbish. The contractor must protect trees and shrubs as per the Environmental Management Plan (EMP) and Record of Decision (ROD). The contractor must use only approved spoil areas for disposal of material. The contractor must manage and dispose of water and stormwater on site properly. The contractor must maintain access roads to the works at all times. The contractor must keep access to all properties affected by construction activities open. Hours of work are daylight hours from Monday to Saturday. The contractor must institute a Quality Assurance (QA) system on site. The contractor must arrange for process control tests and submit proof of materials and workmanship for acceptance. The contractor must comply with the Environmental Plan in the Particular Specification. The contractor must ensure that road signs, barricades, delineators, flagmen, and speed controls are effective. The contractor must provide and grant access to persons whose properties fall within or adjoin the area in which they are working. The contractor must liaise with the Civils Contractor on site. All communication must be done via electronic mails. Site meetings will be held every two weeks, and technical meetings every other two weeks, at the site office. A daily site diary must be kept and signed off by both the Site Agent and the Employer's Agent's Representative. The contractor must provide a set of standard Quality Control Check sheets for monitoring quality. The contractor must comply with the Baseline Risk Assessment and Health and Safety Specifications in the Annexures.
Technical Specifications
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The project entails constructing a new Electrical MV Line to supply Pump Station 3 and 4, which will be taken over by Eskom after completion. The works include: constructing a 5.4 km 22 kV Hare line between AMD252 (APW302) and AMD292 (APW349), and a 14 km 22 kV Mink line from AMD292 (APW350) to Pump Station 4 APW533, both to be built next to the existing Dennilton line as replacements. Excavate and plant new poles along the proposed routes as per drawings D-DT-1740 Rev 5 sht 2, D-DT-1745D Rev 0 sht 1, D-DT-1747 Rev 5 sht 1, D-DT-1748a Rev 0 sht 1, D-DT-1748b Rev 0 sht 1, D-DT-1748c Rev 0 sht 1, and D-DT-1749 Rev 8 sht 1. Construct new Recloser structures and CT/VT units at Pump Stations 3 and 4 POC as per D-DT-1829 Rev 2 and D-DT-1840 Rev 4. Dismantle the existing Dennilton line from AMD252 (APW302) to Pump Station 4 (APW533) only after Eskom has transferred customers to the new line. Conduct testing and commissioning of constructed assets. The site is near the Loskop dam area within the Nkangala District Municipality in Mpumalanga Province, traversing Thembisile Hani LM, Steve Tshwete LM, and Elias Motsoaledi LM. Site coordinates: 25°27.973'S, 29°4.163'E. No temporary works are required. The permanent works have been designed by the Employer's Agent; the Employer's Agent will provide one full set of Spanplan drawings for construction, used exclusively for recording as-built information. The contractor must mark up these drawings with any changes and hand them to the Employer's Agent at the issue of the Certificate of Completion. Additional construction drawings will be issued per Clause 5.9 of the General Conditions of Contract. The contractor's establishment on site is required. Electrical works include the supply, construction, and installation of MV electrical network and equipment required for the operation of the Water Treatment Works, to be carried out by the Main Contractor.
Methodology
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The contractor must include a preliminary programme with the tender in the form of a simplified bar chart showing how the works will be performed within the time for completion. The programme must indicate the proposed contract period, plant and personnel requirements, quantity of work per bar item, monthly budget of completed work, critical path, and schedule of plant and resources. All programmes must be compiled in Microsoft Projects. The contractor may programme the work to ensure completion within the duration stated in the Contract Data. Tenderers may submit alternative tenders for a different Time for Completion, each including a preliminary programme and stating financial implications. The contractor is deemed to have allowed for all possible delays due to normal adverse weather and special non-working days. The contractor must ensure the site remains clear of all rubbish. Blasting operations must adhere to the Occupational Health and Safety Act and the Explosives Act. Spoil sites shall be determined on site with the Employer's Agent, PSC, and local authority, and only approved spoil areas may be used. The contractor must manage and dispose of water and stormwater on site, keeping completed works dry and properly drained. Access roads must be maintained, and access to affected properties must remain open. Hours of work are daylight hours from Monday to Saturday. The contractor must provide facilities including offices with meeting table of at least 3 m² and 12 chairs, electric power plug points, lighting, chairs, and air-conditioning units or heaters where required. Car ports must protect vehicles from direct sun, with concrete or broken stone floors, at least 3.0 m wide, 6.0 m long, and 2.5 m high, with waterproof roofs. A chemical ablution unit with hot and cold water and water-borne sewerage must be provided for the Engineer's facilities, with separate rooms for males and females. The contractor must provide adequate storage for construction activity needs and equipment. No temporary services will be supplied by the Employer. No additional advertising is allowed other than branding of vehicles, equipment, and employee clothing. The contractor shall supply 2 name boards as per construction drawings for the entire contract duration. The contractor shall make his own arrangements for a suitable supply of water for the project, with all costs deemed included in tendered rates. Water for concrete must be suitable and approved by the Engineer. Water may not be abstracted from local rivers, streams, or irrigation canals without a request to the Employer's Agent including necessary permissions, permits, or licenses. The Employer's Agent will provide survey beacons. The contractor is responsible for the true and proper setting out of the Works and for the correctness of position, levels, dimensions, and alignment, providing all necessary instruments, appliances, and labour. The contractor must ensure property beacons, trigonometrical survey beacons, or setting-out beacons are not displaced or destroyed without consent. Displaced or destroyed beacons must be replaced by a registered land surveyor, with costs borne by the contractor. The contractor is referred to SANS 1921:2004 parts 1, 2, and 3 for Construction and Management Requirements for Works Contracts. Particular and generic specifications are referenced in Part C3.4. The contractor must ensure the travelling public has the right of way on public roads and use approved methods to control movement of equipment and vehicles. All road signs, barricades, delineators, flagmen, and speed controls must be effective, and courtesy extended to the public. Failure to maintain road signs may result in suspension of work. The contractor may not commence construction affecting existing roads before adequate traffic accommodation is provided per the South African Road Traffic Signs Manual. The contractor shall construct and maintain all temporary drainage works for temporary deviations and provide access to persons whose properties fall within or adjoin the working area. The contractor's tendered rates include full compensation for all possible additional costs arising from traffic accommodation. All communication to be done via electronic mails. Key personnel must be as stipulated in the Returnable schedules under Tender Data, with points allocated for qualifications and experience. Site meetings are held every two weeks at the site office, attended by Contract manager, Site Agent, Health and Safety Officer, and sub-contractor representatives as required. Technical meetings are held every other two weeks at the site office with the same attendance. Forms for contract administration to be formalized after appointment. Requirements for electronic payments to be communicated by the Employer after appointment. A daily site diary must be kept recording deliveries, rainfall, daily progress, plant, staff, and general daily events, signed off by both the Site agent and Employer's Agent's Representative at the end of each day.
Experience & Qualifications
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)Key personnel must be as stipulated in the Returnable schedules under Tender Data. Points will be allocated for the qualifications and experience of the key personnel listed.
Quality Management
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The contractor is solely responsible for producing work that complies with the Specifications to the satisfaction of the Engineer. The contractor must institute an appropriate Quality Assurance (QA) system on site, which the Engineer will audit regularly. The contractor must arrange for his own process control tests and submit proof of material supplied and supplier names when submitting work for acceptance. The Engineer will have his own acceptance control tests carried out by the dedicated Eskom Clerk of Works. The contractor will be provided with a set of standard Quality Control Check sheets to monitor quality, and each portion of the works must be signed off by the Employer's Agent and the Site Agent.
Financial Requirements
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)Payment certificates are as specified in the Contract Data. The contractor's tendered rates for relevant items in the Bill of Quantities shall include full compensation for all possible additional costs arising from traffic accommodation and other modus operandi; no claims for extra payment due to inconvenience will be considered. The contractor must make adequate provision in his tender for all negotiations and procurement of water for construction activities, with all related costs deemed included in his tendered rates. Bonds and guarantees are as specified in the Contract Data. Insurance provided by the employer is as specified in the Contract Data.
Compliance Requirements
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The contractor must comply with the Occupational Health and Safety Act and the Explosives Act, 1956 for blasting operations. Health and Safety requirements are detailed in the Baseline Risk Assessment and Health and Safety Specifications contained in the document's annexures. The contractor must comply with SANS 1921:2004 parts 1, 2, and 3 for Construction and Management Requirements for Works Contracts. All materials must bear the SABS mark where applicable. The contractor must provide proof of compliance with the law as per Contract Data. No permits are foreseen to be required, excluding statutory permits.
Health & Safety
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)Blasting operations must adhere to the Occupational Health and Safety Act and the Explosives Act, 1956. Health and Safety requirements are detailed in the Baseline Risk Assessment and Health and Safety Specifications contained in the document's annexures.
Environmental
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)Protection of trees and shrubs must be as per the Environmental Management Plan (EMP) and Record of Decision (ROD). Spoil sites shall be determined on site in conjunction with the Employer's Agent, the PSC, and the local authority, and only approved spoil areas may be used. The contractor must pay special attention to the management and disposal of water and stormwater on site, ensuring completed works are kept dry and properly drained. Refer to the Environmental Plan in the Particular Specification.
Contractual Terms
Source: 11.1 Scope of Work - PRINT IN BLUE R1 d PLP.pdf (unknown)The contractor shall repair any services damaged directly due to construction activities, with costs covered by the rate for crossing services in the bill of quantities. The contractor is responsible for the true and proper setting out of the Works and for the correctness of position, levels, dimensions, and alignment. Property beacons and trigonometrical survey beacons displaced or destroyed without consent must be replaced by a registered land surveyor at the contractor's cost. The contractor shall maintain access roads and ensure access to affected properties remains open, with temporary closures arranged in writing. The travelling public shall have the right of way on public roads, and the contractor must use approved methods to control movement of equipment and vehicles. The contractor may not commence construction affecting existing roads before adequate traffic accommodation is provided. The contractor's tendered rates include full compensation for all possible additional costs arising from traffic accommodation. Bonds and guarantees, payment certificates, permits, proof of compliance with the law, and insurance provided by the employer are as specified in the Contract Data. No permits are foreseen to be required, excluding statutory permits.
Important Dates
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)The closing date is 2026-09-17T12:00:00.000Z. No other important dates are specified.
Contact Information
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)The department is the Supply Chain Management. No contact name, email, phone, or address is provided.
Submission Guidelines
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)Bidders must submit their bids to the Supply Chain Management department. The submission method is not specified. Returnable forms include the Form of Offer and Acceptance and the Performance Guarantee.
Evaluation Criteria
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)Bidders must complete and sign the Form of Offer and Acceptance. A Performance Guarantee is required. Bidders must comply with the Supply Chain Management Policy. No specific CIDB grading, B-BBEE level, or local content percentage is stated.
Financial Requirements
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)A Performance Guarantee is required. The pricing format is not specified, but the bill of quantities is mentioned.
Compliance Requirements
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)Bidders must comply with the Supply Chain Management Policy. No specific requirements for CSD registration, tax clearance, B-BBEE level, CIDB grading, CIPC registration, or local content percentage are stated.
Health & Safety
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)The contract includes occupational health and safety specifications, as well as a geotechnical report and environmental management plan.
Contractual Terms
Source: 6 The Contract - PRINT IN YELLOW.pdf (unknown)The contract includes agreements and contract data, such as the Form of Offer and Acceptance, Contract Data, Performance Guarantee, and Safety Agreement.
Submission Guidelines
Source: 7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Returnable documents: the Form of Offer and Acceptance (C1.1) must be completed, signed by a duly authorised representative, and submitted with the offered total price in words and figures. The Schedule of Deviations must be signed by both parties if deviations are agreed. The tenderer must contact the Employer's agent within two weeks of receiving the signed Agreement to arrange delivery of bonds, guarantees, proof of insurance, and other documentation. Failure to fulfil these obligations constitutes repudiation of the Agreement.
Technical Specifications
Source: 7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)The works comprise the construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, specifically Work Package 6C: Eskom MV bulk electrical connection (Hare and Mink line sections to Pump Stations 3 and 4).
Pricing Schedule
Source: 7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)The contract documents include Part 1 Agreements and Contract Data, Part 2 Pricing Data, Part 3 Scope of Work, and Part 4 Additional Documentation. The offered total of the prices inclusive of VAT must be stated in words and figures.
Financial Requirements
Source: 7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)The offered total of the prices inclusive of VAT must be stated in words and figures. The contract price will be determined in accordance with the Conditions of Contract identified in the Contract Data. The contract documents include Part 1 Agreements and Contract Data, Part 2 Pricing Data, Part 3 Scope of Work, and Part 4 Additional Documentation. The tenderer must provide bonds, guarantees, and proof of insurance as required by the Conditions of Contract.
Compliance Requirements
Source: 7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)No specific compliance requirements are stated in the provided document. The tenderer must be duly authorised to sign the Offer. The Conditions of Tender and Tender Data may contain further requirements.
Contractual Terms
Source: 7 Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)The tenderer must contact the Employer's agent within two weeks of receiving the signed Agreement to arrange delivery of bonds, guarantees, proof of insurance, and other documentation as required by the Conditions of Contract. Failure to fulfil these obligations constitutes repudiation of the Agreement.
Evaluation Criteria
Source: 10 Bill of Quantities Cover - PRINT IN YELLOW.pdf (unknown)No eligibility criteria specified
Description
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)Construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality – Work Package 6C, comprising the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4.
Contact Information
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)Employer: Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050; P O Box 437, Middelburg, 1050; telephone 013 249 2000; fax 013 249 2145.
Employer's Agent: Endecon Ubuntu (Pty) Ltd, 9 Ehmke Street, Nelspruit, 1200; telephone 013 741 4499 / 082 804 4948; e-mail [email protected].
Submission Guidelines
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)Returnable documents: the Form of Offer and Acceptance and the completed Contract Data (Part 2: Data Provided by the Contractor, naming the Contractor and address). All pages of the Contract Data must be signed and witnessed by the Tenderer and two witnesses. The Employer's Agent accepts communication by e-mail or courier, signed for by the recipient.
Evaluation Criteria
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)No explicit evaluation criteria (e.g., price/functionality split, preference points, minimum qualifying scores) are stated in the provided document. The Employer's Agent must obtain specific Employer approval for variation orders that increase the Contract Price by more than R50,000.
Technical Specifications
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)The works comprise the Eskom MV bulk electrical connection (Hare and Mink line sections) to Pump Stations 3 and 4 as part of the Loskop Regional Bulk Water Supply Scheme. The contract is a re-measurement contract. Practical Completion requires an Eskom completion certificate and electrification of WP4's Reservoirs and Pump Station 5. The Contractor must employ Targeted Labour from the local area(s) and use local labour in accordance with the Scope of Work.
Pricing Schedule
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)The pricing strategy is a re-measurement contract. The Employer's Agent accepts communication by e-mail or courier. The copyright in all documents, drawings and records related to the Works vests in the Employer or the Employer's Agent; the Contractor must not furnish information without prior approval. The Employer's Agent must obtain specific Employer approval for variation orders increasing the Contract Price by more than R50,000.
Financial Requirements
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)Pricing strategy: re-measurement contract.
Security: fixed performance guarantee of 5% of the Contract Sum, plus retention of 10% of the value of works completed.
Retention: 10%, with a limit of 10% of the Contract Price.
Advance on materials not yet built into the Permanent Works: 80%.
Insurance: professional fees for repairing damage and loss covered to R10,000,000; limit of indemnity for liability insurance R10,000,000.
Penalty for late completion: R2,000 per day.
Final statement due within 14 days after final approval.
Compliance Requirements
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)The contract is governed by the General Conditions of Contract for Construction Works, Third Edition (2015) (SAICE).
The Contractor must comply with the Occupational Health and Safety Act, 1993 and the Construction Regulations, 2014, and must have an approved Health and Safety Plan before commencing work, submitted to the Employer's Agent within 14 days of the agreement.
The Contractor accepts sole liability as mandatory for OHSA compliance (Section 37(2) agreement).
The Contractor must notify the Employer of all investigations, complaints, or criminal charges under OHSA.
Design documentation required: Certificate of Stability signed by a registered Professional Engineer, proof of professional indemnity insurance, design calculations, engineering drawings, and As-Built drawings in DXF format.
The Contractor is responsible for the design of Temporary Works and must comply with OHSA for such design.
The Contractor must employ Targeted Labour from the local area(s).
Health & Safety
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)The Contractor must comply with the Occupational Health and Safety Act, 1993 and the Construction Regulations, 2014. The Contractor must have an approved Health and Safety Plan before commencing work and submit it to the Employer's Agent within 14 days of the agreement. The Contractor accepts sole liability for compliance with OHSA as a mandatory. The Contractor must notify the Employer of all investigations, complaints, or criminal charges under OHSA. The Contractor and designer accept full responsibility for OHSA compliance in designing Temporary Works and any Permanent Works they design.
Contractual Terms
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)The contract is a re-measurement contract. The Defects Liability Period is 365 days. Practical Completion must be achieved within 180 calendar days. The Employer is Nkangala District Municipality; the Employer's Agent is Endecon Ubuntu (Pty) Ltd. The Employer's Agent must obtain specific Employer approval for issuing suspension orders, variation orders increasing the Contract Price by more than R50,000, and approving claims. The Contractor must provide design documentation including Certificates of Stability, professional indemnity insurance proof, design calculations, engineering drawings, and As-Built drawings in DXF format. The Contractor is responsible for Temporary Works design. The Contractor must employ Targeted Labour from the local area and use local labour per the Scope of Work. Documentation required before commencement includes Health and Safety Plan, Initial Programme, cashflow forecast, security, and insurance; these must be submitted within 14 days. Site access is not exclusive to the Contractor. Instructions to expedite progress do not entitle the Contractor to additional compensation unless explicitly stated. Non-working days are Sundays and South African statutory holidays. The penalty for late completion is R2,000 per day. Practical Completion requires an Eskom completion certificate and electrification of WP4's Reservoirs and Pump Station 5. Security is a 5% performance guarantee plus 10% retention. Advance on materials is 80%. Retention is 10% with a limit of 10% of Contract Price. Final statement is due 14 days after final approval. Professional fees insurance amount is R10,000,000; limit of indemnity insurance is R10,000,000. One Adjudication Board Member is to be appointed.
Section
Source: 8 Contract Data - PRINT ON YELLOW NDM.pdf (unknown)The Employer's Agent must obtain specific Employer approval for variation orders that increase the Contract Price by more than R50,000, and for the evaluation of all variation orders.
Evaluation Criteria
Source: 8.2 Safety Agreement - PRINT ON YELLOW.pdf (unknown)The document provided is a Safety Agreement (C1.4) that must be signed by the successful bidder. It does not contain the tender's eligibility criteria, such as CSD registration, tax clearance, or B-BBEE requirements.
Compliance Requirements
Source: 8.2 Safety Agreement - PRINT ON YELLOW.pdf (unknown)The document is a Safety Agreement (C1.4) under Section 37(2) of the Occupational Health and Safety Amendment Act, 1993. The contractor must:
Health & Safety
Source: 8.2 Safety Agreement - PRINT ON YELLOW.pdf (unknown)The contractor must sign the C1.4 Safety Agreement, which is a memorandum of agreement between the employer (Nkangala District Municipality) and the contractor under Section 37(2) of the Occupational Health and Safety Amendment Act, 1993. The contractor undertakes to:
Description
Source: 9 Pricing Instructions - PRINT IN YELLOW.pdfThe project is the construction of the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality, Work Package 6C, covering the ESKOM MV bulk electrical connection (Hare & Mink line sections to pump stations 3 & 4).
Contact Information
Source: 9 Pricing Instructions - PRINT IN YELLOW.pdf (unknown){"name":null,"email":null,"phone":null,"department":"The unit of measurement for each item of Service provided as defined in the Standardized,","address":null}
Evaluation Criteria
Source: 9 Pricing Instructions - PRINT IN YELLOW.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin). Bidders must meet applicable B-BBEE requirements and complete the required SBD forms: SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination). A valid CIDB grading may be required for construction work. All forms must be completed and submitted with the tender.
Pricing Schedule
Source: 9 Pricing Instructions - PRINT IN YELLOW.pdfPricing must be completed on the Schedule of Activities and Bills of Quantities. All rates and amounts must be filled in by hand in black ink. Prices must be exclusive of VAT and include all costs, general risks, liabilities, and obligations. Unpriced items will be deemed covered by other items. Payment is based on monthly invoicing for completed activities, not exceeding the allocated budget. The total price cannot be exceeded without prior written client approval. The employer may use inserted rates for additional work.
Financial Requirements
Source: 9 Pricing Instructions - PRINT IN YELLOW.pdf (unknown)Pricing must be submitted on the Schedule of Activities and Bills of Quantities. All rates and amounts must be completed by hand in black ink. Prices must be exclusive of VAT and cover all costs, general risks, liabilities, and obligations. Unpriced items will be deemed covered by other items. Payment is based on monthly invoicing for completed activities, not exceeding the allocated budget. The total price cannot be exceeded without prior written client approval. The employer has the right to use inserted rates for additional work.
Description
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdfThe works comprise the construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 for the Loskop Regional Bulk Water Supply Scheme. The project number is 150362/6C.
Contact Information
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf (unknown)Employer contact: Victor Sambokwe, telephone 082 804 4948, address 3 Le Roux Street, Nelspruit. No email or fax provided.
Submission Guidelines
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf (unknown)Returnable documents: the completed Bill of Quantities (C2.2) with all rates and totals filled in, signed by the tenderer and two witnesses. The Bill of Quantities must be printed in yellow as per the document title. No other returnable forms are specified in this document.
Evaluation Criteria
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf (unknown)No explicit eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the extracted document. Bidders must complete the standard National Treasury forms (SBD/MBD) as applicable, including the Invitation to Bid (SBD 1), Pricing Schedule (SBD 3), Declaration of Interest (SBD 4), Preference Points Claim (SBD 6.1), Declaration for Local Production and Content (SBD 6.2), Contract Form (SBD 7), Declaration of Bidder's Past SCM Practices (SBD 8), and Certificate of Independent Bid Determination (SBD 9).
Technical Specifications
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf (unknown)Scope: Construction of the Eskom MV bulk electrical connection (Hare and Mink line sections) to pump stations 3 and 4 for the Loskop Regional Bulk Water Supply Scheme. Work includes: pegging out, bush clearing and tree felling, digging holes, supply and planting of wooden poles (7m to 16m), assembly of MV structures (intermediate, strainer, terminal, take-offs), MV stays, conductor stringing (ACSR Mink 10.98D UNGRS – 46,200 m; ACSR Hare 14.16D UNGRS – 16,500 m; plus full tension joints and bird flappers), equipment installation (pole-mounted reclosers, CT-VT units, surge arresters, transformers), earthing installation, laying and termination of LV and metering cables, labeling, pre-commissioning (as-built drawings), equipment tests (phasing, continuity, earth resistance), and dismantling of existing MV equipment and structures. Metering equipment includes kWh meters, modems, antennas, kiosks, CT/VT units, brackets, and labels.
Pricing Schedule
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdfPricing is on the Bill of Quantities (C2.2). Bill 1 – Preliminaries includes fixed charge and value related items (contractual requirements, site establishment, facilities for Engineer and Contractor, ablution, water/power/communications, dealing with water, removal of site establishment), time related items (supervision, overheads, security), provisional sums (Project Liaison Officer, Project Liaison Committee, Trainee Technician, As Built Survey, services instructed by Client's Representative), dayworks (labourers, foreman, crane truck, excavator, compactors, LDV, materials), and provisions for OHS and environmental compliance. Bill 2 – Bill of Structures covers pegging out, bush clearing, digging holes, supply and planting poles, MV structures, stays, conductor stringing, equipment installation, earthing, cable laying and termination, labeling, pre-commissioning, equipment tests, and dismantling. Bill 3 – Metering covers meters, modems, antennas, kiosks, brackets, and labels. A 10% contingency is applied to the subtotal.
Financial Requirements
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf (unknown)Pricing must be submitted on the provided Bill of Quantities (C2.2). The BOQ includes a 10% contingency on the subtotal. Prices are to be quoted excluding VAT, with VAT added to arrive at the grand total. The BOQ is divided into three bills: Bill 1 – Preliminaries (fixed charge, time-related items, provisional sums, dayworks, OHS and environmental provisions), Bill 2 – Bill of Structures (all construction items), and Bill 3 – Metering (materials).
Compliance Requirements
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdf (unknown)No specific compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in this document. Bidders must comply with the Occupational Health and Safety Act, 85 of 1993, including preparation of a Health and Safety Plan, risk assessment, induction training, and maintenance of a Health and Safety file. Environmental compliance with the EMP is required.
Health & Safety
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdfBidders must comply with the Occupational Health and Safety Act, 85 of 1993. Required: preparation of a Health and Safety Plan, compilation of a risk assessment prior to construction, health and safety induction training for employees, compilation and maintenance of a Health and Safety file, and implementation of the plan over the entire construction period. A provisional sum is included for these items.
Contractual Terms
Source: 10.1 Bill of Quantities - PRINT IN YELLOW rev d PLP r1.pdfThe contract includes provisions for dismantling and removal of existing MV equipment and structures, with transport to Eskom stores. Pre-commissioning requires as-built drawings per D-DT 0857 and D-DT 0858. Equipment tests include phasing, continuity, and earth resistance tests.
Description
Source: 11.2 Standard Spec - PRINT IN BLUE.pdfThe contract is based on SANS 1200 standard specifications. Referenced SANS specifications include SANS 10396:2003 (Targeted Procurement Procedures), SANS 1914-1 to 6 (2002) (Targeted Construction Procurement), SANS 1921-1 and 1921-2 (2004) (Construction and Management Requirements for Works Contracts), and SANS 241-1:2015 (South African Drinking Water Standard). The contractor is advised to obtain these from Standards South Africa (SABS) in Pretoria.
Technical Specifications
Source: 11.2 Standard Spec - PRINT IN BLUE.pdf (unknown)The contract is based on the SANS 1200 standard specifications. The following SANS specifications are referenced and the contractor is advised to obtain them from Standards South Africa (a division of SABS) in Pretoria, but not limited to:
Important Dates
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)Closing date: 17 September 2026, closing time: 12:00.
Contact Information
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)Bidding procedure enquiries: SCM Department, contact SI Masilela, telephone 013-249-2104/5/7/2096, email [email protected]. Technical information: Endecon Ubuntu Consultants, contact Peter Bouwer, telephone 079 889 9009, email [email protected]. POPI Information Officer: Mr. M.L Mahlangu (Municipal Manager), telephone 013 249 2000/2006, email [email protected].
Submission Guidelines
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)Bids must be delivered to the bid box at Nkangala District Municipality, 2A Walter Sisulu Street, Middelburg, 1050, by 12:00 on 17 September 2026. Late bids will not be accepted. All bids must be submitted on the official forms provided (not re-typed) or online. Compulsory returnable documents (Forms A to P) must be completed, signed, and submitted; failure to fully complete any will render the tender unresponsive. Forms Q to W are required for evaluation purposes. Signatures certify accuracy of information; false information may lead to contract termination.
Returnable Documents
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)Compulsory bid documents: Form A (MBD 1 Part A & B), Form B (Compulsory Enterprise Questionnaire for Consortia or Joint Ventures), Form C (POPI Notice and Consent), Form D (Declaration of Bidder's Past SCM Practices), Form E (Declaration of Interest), Form F (Authority of Signatory), Form G (Declaration of Good Standing Regarding Tax), Form H (Financial References), Form I (Municipal Utility Account), Form J (Preference Schedule), Form K (Certificate of Independent Bid Determination), Form L (Declaration of Tenderer's Litigation History), Form M (Declaration for Procurement Above R10 Million), Form N (Proof of Good Standing with Compensation Commission), Form O (Proof of Accreditation with Eskom), Form P (Professional Indemnity Insurance). Returnables for evaluation: Form Q (Tender Project Structure), Form R (Proposed Key Personnel), Form S (Schedule of Previous Experience), Form T (Schedule of Current Projects), Form U (Schedule of Infrastructure and Resources), Form V (Schedule of Proposed Sub-contractors), Form W (Record of Addenda to Tender Documents).
Evaluation Criteria
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)The 80/20 preference point system applies (estimated value not exceeding R50 million). Maximum 80 points for price, 20 points for specific goals. Price points calculated as Ps = 80(1 - (Pt - Pmin)/Pmin). Specific goals and maximum points: Black ownership 25% (5 points), Women ownership 15% (3 points), People with disabilities 15% (3 points), Youth ownership 15% (3 points), Military veterans 15% (3 points), Local enterprise within Nkangala District Municipality 15% (3 points). Points for ownership categories: 51-100% gets full allocation, 11-50% gets half, 0-10% gets zero. Proof via CSD full report; failure to submit proof results in zero points for that goal, but is not an eliminating factor.
Technical Specifications
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)The works comprise the Eskom MV bulk electrical connection (Hare & Mink line sections to Pump Stations 3 & 4) for the Loskop Regional Bulk Water Supply Scheme in Thembisile Hani Local Municipality. Bidders must be accredited with Eskom (Form O) and hold professional indemnity insurance (Form P). The municipality will verify professional membership of the firm and project personnel, vet qualifications of proposed project personnel, and verify proof of previous company experience.
Experience & Qualifications
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdfThe municipality will verify professional membership of the firm and project personnel, vet qualifications of proposed project personnel, and verify proof of previous company experience. Bidders must submit Forms Q to U (project structure, key personnel, previous experience, current projects, infrastructure and resources).
Pricing Schedule
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdfThe bid is subject to the 80/20 preference point system. Price points are calculated using the formula Ps = 80(1 - (Pt - Pmin)/Pmin). No specific pricing format (e.g., schedule of rates) is stated in the available document.
Financial Requirements
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)Bidders must submit a bank letter not older than three months confirming bank account details (Form H); failure renders the bid unresponsive. Bidders must also submit a municipal utility account not older than three months (Form I), or a lease agreement if the company leases its premises. The declaration confirms the bidder and directors do not owe municipal rates or charges in arrears for more than three months.
Compliance Requirements
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)Bidders must be tax compliant: submit a valid SARS Tax Compliance Status (TCS) PIN or CSD number. A valid Tax Clearance Certificate must be submitted with the bid; failure invalidates the bid. Each party in a consortium/JV/sub-contracting arrangement must submit separate TCS/PIN/CSD. Bidders must not be persons in the service of the state. Bidders must not be listed on the National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters, and must not have been convicted of fraud or corruption in the past five years. Bidders must not owe municipal rates or taxes in arrears for more than three months. Bidders must be accredited with Eskom (Form O) and hold professional indemnity insurance (Form P). For consortia/JVs, a special resolution must be signed by all duly authorised representatives, accepting joint and several liability, and providing 30 days' notice for termination. Required attachments for consortia/JVs include CK1/CK2 for closed corporations, certificate of incorporation and shareholders register for companies, joint venture agreement for JVs, ID copies for partnerships, and sole trader ID. A signed authority of signatory on company letterhead is required. A CSD full report containing ownership information must be submitted.
B-BBEE Requirements
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)The 80/20 preference point system applies. Specific goals and points: Black ownership 25% (5 points), Women ownership 15% (3 points), People with disabilities 15% (3 points), Youth ownership 15% (3 points), Military veterans 15% (3 points), Local enterprise within Nkangala District Municipality 15% (3 points). Proof via CSD full report; failure to submit proof results in zero points for that goal.
Contractual Terms
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdfJoint venture resolution: Enterprises in a consortium/JV accept joint and several liability for due fulfilment of obligations under the contract. Any enterprise intending to terminate the consortium/JV agreement must give the department 30 days written notice, but remains jointly and severally liable. No enterprise may cede rights or assign obligations without prior written consent of other enterprises and the municipality. The consortium/JV chooses a domicilium citandi et executandi for all purposes arising from the agreement and contract.
Requirements
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdf (TENDER)POPI notice and consent: Nkangala District Municipality collects, holds, uses and discloses personal information for supply chain processes in accordance with Section 217 of the Constitution and SCM regulations. Consent is required to share information with institutions for verification purposes including CIPC, SARS, municipal utility accounts, financial institutions, Compensation Commissioner, CIDB, professional memberships, qualifications vetting, and previous experience verification. The Information Officer is Mr. M.L Mahlangu (Municipal Manager), contact 013 249 2000/2006, email [email protected].
Section
Source: 5 List of Returnables - PRINT IN YELLOW NDM.pdfThe 80/20 preference point system applies. Price points formula: Ps = 80(1 - (Pt - Pmin)/Pmin). Specific goals and points as per the Preferential Procurement Regulations 2022.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
2A Walter Sisulu - Aerorand - Middelburg - 1050
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
19 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.