Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
Organization Type
GOVERNMENT
Published
19 Jul 2026
OCDS Reference
ocds-9t57fa-162801
This tender is for the construction of 54 top-structure housing units at the ntuzuma d phase 2 and 3 extension housing project in ward 43. IT is issued by the ethekwini metropolitan municipality and requires the contractor to manage a wide range of construction activities and associated health and safety risks. The project demands strict compliance with occupational health and safety legislation.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 21 August 2026 - 11:00
Venue
17 Doveside Place, Canehaven Drive
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
-A compulsory clarification meeting will be held at 10:00, on 2026-07-27, at 17 doveside place, phoenix. -All questions and answers will be consolidated and posted on etenders/municipal website by 2026-08-13. -5gb or higher -technical: charmaine kok (t) 031-311 3025 general: mandisa nogwaza (t) 031-311 2475
Categories
Request for Bid(Open-Tender)
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Redcliff Double storey raft details Model (1).pdf, Double storey Tank platform detail Model (1).pdf, -Precast Slab Type A Model (1).pdf and 4 more. You don’t need to refresh — this page will pick up the updated review automatically.
19 Jul
2026
Tender Published
Tender was published
21 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Double storey Unit - Staicase details Model (1).pdf
Double storey Apron slab detail Model (1).pdf
Ntuzuma D Ph 2 & 3 LOCATION.pdf
Double storey Tank platform detail Model (1).pdf
-Precast Slab Type A Model (1).pdf
Architectural Drawing Double storey semi detached unit Model (1).pdf
Redcliff Double storey raft details Model (1).pdf
34951-1H Tender Document .pdf
Tender for construction of 54 top-structure housing units in Ntuzuma D Phase 2 & 3 Extension, Ward 43, issued by Ethekwini Metropolitan Municipality. Estimated CIDB grade 5GB required. Uses SAICE GCC contract with 80/20 preferential procurement system.
Ntuzuma D Phase 2 and 3 Ext - Specification.pdf
This is a Site-Specific Health and Safety Specification document issued by the Ethekwini Municipality for the construction of 54 top-structure housing units. It defines the mandatory health and safety management requirements for the Principal Contractor, outlining roles, responsibilities, plans, and procedures to ensure compliance with the Occupational Health and Safety Act and Construction Regulations (2014).
Ntuzuma D Phase 2 and 3 Ext - Baseline.pdf
This document is a Baseline Risk Assessment (BRA) for the construction of 54 housing units in Ntuzuma, KwaZulu-Natal, prepared by the Ethekwini Municipality's Occupational Health & Safety Directorate. It identifies, evaluates, and plans to mitigate health and safety risks across 12 key construction activities. The assessment is a mandatory component of the tender (Contract 34951-1H) and forms part of the required Health and Safety Plan.
To download these documents and access AI-powered analysis, visit the main tender page.
Unlock eThekwini and Durban tenders using AI-Powered Matching, port-centric procurement intelligence, compliance analysis, and bid assembly tools.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
RÂ 264Â 500
Range
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdf (unknown)Contact Information
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s at Ntuzuma","address":"gement & First Aid"}
Evaluation Criteria
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdf (unknown)Key eligibility hinges on demonstrating the ability to meet the stringent health and safety management requirements. This includes: 1. Capacity to appoint personnel with the specified competencies (SACPCMP registration for Safety Officer). 2. Financial provision for all mandated health and safety cost items listed in Section 5. 3. Valid Letter of Good Standing with the Compensation Fund (COIDA). 4. A history of compliance and ability to implement the detailed plans and procedures specified throughout the document.
Technical Specifications
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdf (unknown)Client Refers to eThekwini Municipality
COIDA Means Compensation for Occupational Injuries and Diseases
Act
Construction Site Means the premises and grounds where construction work is
being performed
Principal Contractor Means an employer appointed by the Client to perform
construction works
CR Refers to the Construction Regulations of 2014
DSTI Refer to Daily Safety Task Instruction
H&S Refers to Health and Safety
Medical Certificate of Fitness Means a valid medical certificate of fitness issued by an
occupational medicine practitioner, such medical testing shall
be relevant to the risks of the construction work on the
construction site and shall conform to the Occupational Health
and Safety Act and Regulations and to the requirement of this
Health and Safety Specification
Method Statement Refer to a document detailing the key activities to be performed
in order to reduce as reasonably as practicable the hazards
identified in the Risk Assessment
OHSA Refer to the Occupational Health and Safety Act
Regulations Refer to the Regulations stipulated in the OHSA
S Refer to a section in the OHSA
SACPCMP Means the South African Council for the Project and
Construction Management Professions
Sub-Contractor Means an employer appointed by the Principal Contractor
Please refer to the BOQ on the tender document.
The Principal Contractor shall enter into a Mandatory Agreement with the Client, as defined in
Section 37(2) of the Occupational Health and Safety ACT.
The Principal Contractor shall ensure that each contractor appointed by the Principal
Contractor and each sub-contractor appointed by a contractor also into a Mandatory
Agreement with the Principal Contractor, as defined in Section 37(2) of the Occupational Health
and Safety ACT. These agreements shall be included in the Principal Contractor’s H&S File on
site and be valid for the duration of the contractors’ work on the construction site.
This document defines the minimum management requirement that is to be implemented by
the Principal Contractor/Contractor for the management of Health and Safety on any eThekwini
Municipality project.
The aim of this document is to present the health and safety aspects that need to be controlled
and managed on the project.
This Health and Safety specification identifies and encompasses the working behaviours and
safe work practices that are expected of all employees, Vendors and Contractors, SubContractors and Visitors, engaged on construction site.
Providing a guideline to comply with best Health & Safety practices and the Occupational
Health and Safety Act85/1993 as amended, including reference to applicable legislative
requirement.
The Client must ensure that potential Principal Contractor submitting tenders have made
adequate provision for the cost of health and safety measures.
The Principal Contractor shall allow in their cost provision for complying with the requirements
of this Construction Health and Safety Specification; resources for the following Health and
Safety controls shall be in place.
H&S cost item Description
officer required to ensure that the health and safety plan is
implemented on site. The Safety officer must be
registered with SACPCMP as a CHSO
aider; fall protection planner
4 Medical certificate of fitness Medical examination of all employees and
certification of fitness by an Occupational Medicine
Practitioner
Pre- employment and annual
5 PPE Personal Protective Equipment to be provided as per
risk exposure, including but not limited to:
respiratory protection, hearing protection, hand
protection, eye and face protection and fall
protection
6 Temporary work Compliance with Temporary work Regulations
7 Public safety Notices; signage; barricade ect.
8 Employee facilities Refer to the Facilities Regulations (ablution toilets)
9 Signage All construction safety signage required for the
project
10 Environmental management Compliance with all applicable Environmental
Management Regulations
11 Fall protection planning Compliance with all protection and prevention
measures
The works/ risk assessments must include but not limited to:
Site establishment
Site clearing
Electrical installations
Hand tools and electrical tools
Construction vehicles and mobile plants
Public safety
Elevated positions
Excavations
Concrete works
Blockwork
Roof work
Temporary works
The Principal Contractor, each contractor and each sub-contractor shall submit proof of Good
Standing with COIDA Commissioner or a Mutual Association licensed in terms of Section 30 of
COIDA, prior to starting any work on site. A copy of the Letter of Good Standing with COIDA
Commissioner must be included in the H&S Plan of each contractor working on the site and
must remain updated for the duration of the construction work.
The Principal Contractor must at least 7 days before that work is to be carried out notify
the provincial director in writing in a form similar to Annexure 2 if the intended construction
work will—
Include excavation work;
Include working at a height where there is risk of falling;
Include the demolition of a structure; or
Include the use of explosives to perform construction work.
A contractor who intends to carry out construction work that involves construction of a
single storey dwelling for a client who is going to reside in such dwelling upon completion, must
at least 7 days before that work is to be carried out notify the provincial director in writing in a
form similar to Annexure 2.
During the submission of your health and safety file for approval, please ensure that at least the
following appointments are submitted with the file
9.1 Construction Manager
The Principal Contractor shall appoint a full time competent person as the construction
manager with the duty of managing all construction on the site including the duty of ensuring
occupational health and safety compliance. The Construction Manager must demonstrate
competency in relation to work being performed and the ability to manage construction work
which may include making all statutory appointments in terms of health and safety. The
experience/ competency must be as indicated in the tender document.
9.2 Construction health and safety officer
The Principal Contractor shall appoint a Part-time competent SACPCMP registered Construction
Health and Safety Officer for the construction work, with at least 2 years in the construction
industry as a construction health and safety officer.
9.3 Construction Supervisor
A Construction Manager must in writing appoint construction supervisors responsible for
construction activities and ensuring occupational health and safety compliance on the
construction site. A contractor must, upon having considered the size of the project, in writing
appoint one or more competent employees for different sections thereof to assist the
construction supervisor contemplated in sub regulation (7), and every such employee has, to
the extent clearly defined by the contractor in the letter of appointment, the same duties as the
construction supervisor: Provided that the designation of any such employee does not relieve
the construction supervisor of any personal accountability for failing in his or her supervisory
duties in terms of this regulation.
The Principal Contractor shall submit a suitable, sufficiently documented and coherent specific
health and safety plan based on the Client documented Health and Safety Specification. The
health and safety plan shall include but not limited to the following.
The Principal Contractor shall before commencement of any construction and during such
construction works have risk assessments performed by appointed competent person in writing
which forms part of the health and safety plan to be applied.
The provisions of Regulation 9 of the Construction Regulations shall be followed in every
detail.
The Client must discuss and negotiate with a Principal Contractor the content of the Health
and Safety Plan and thereafter finally approve the Health and Safety plan for
implementation. The recommended Health and Safety file shall include the following:
will be subcontracted, please provide subcontractor’s registration as an electrical installation contractor)
site. No not generalise)
Must detail step by step execution of tasks)
Health and Safety Representatives
appointed in writing and exercise their functions as defined in OHSA.
regardless of the number of employees on the site.
Officer and Construction Manager.
Health and Safety Committee
H&S committee meeting; contractors with more than 20 employees shall have an H&S
representative at each committee meeting and each contractor shall have a
management member attending each H&S committee meeting.
The Principal Contractor shall compile a consolidated H&S file and hand over to EThekwini
municipality, Human settlements Directorate. OHS Directorate will conduct a project close out
using the appropriate checklist before the completion of the project. The closeout file forms
part of the project completion requirements for the retention payment.
The Principal Contractor shall ensure that employees are trained on health and safety measures
this shall include but not limited to:
All incidents and accidents as per Section of the Act must be reported, recorded and
investigated as per General Administration Regulation 8 & 9. Where a fatality or permanent
disabling injury or incident occurs on the Construction site, the Client must ensure that the
Principal Contractor provides the Provincial Director with a report contemplated in Section 24
of the Act and the report includes the measures that the Principal Contractor intends to
implement to ensure a safe construction site.
The Client must ensure that periodic health and safety audits are conducted at intervals
mutually agreed upon between the Principal Contractor and the Client at least every 30 days,
the copy of the health and safety audit report must be provided to the Principal Contractor
within seven days after the audit.
The Principal Contractor shall provide suitable fire extinguishers which shall be serviced
regularly in accordance with the manufactures recommendations. Safety signage shall be
prominently displayed in all areas where fire extinguishers are located. The Principal Contractor
shall arrange for training of the relevant personnel, in the use of fire extinguishers.
The provisions of Regulation 29 of the Construction Regulations as well as Regulation 9 of
Environmental Regulation for Workplaces shall be followed in every detail.
The Principal Contractor shall ensure that every employee is issued with, and wears SANSapproved P.P.E. as per the conducted risk assessment. Failure to use protective equipment as
per the risk assessment shall require disciplinary intervention and this process shall be
documented in the induction. No employer shall in respect of anything which he is in terms of
this Act required to provide or to do in the interest of health or safety of an employee make any
deductions from any employee’s remuneration or require or permit any employee to make any
payment to him or to any other person.
The provisions of Regulation 2 of the General Safety Regulations shall be followed in every
detail.
The Principal Contractor shall erect and maintain quality safety signage. The signage shall
include but is not limited to:
by the Principal Contractor when accessing the site
indicated as per the specific methods defined in the H&S Plan.
Contractors and sub-contractors must be given a copy of the H&S specification and any
additional specification issued by the Client and shall comply with these specifications
integrally. All employers working on the site shall conform to the standard in the CHSS. All the
duties of the Principal Contractor in this CHSS equally apply, in full, to contractors of such
Principal Contractor and to sub-contractors of such contractors. The Principal Contractor shall
ensure that the comprehensive and updated list of all the contractors and sub-contractors on
site includes:
37(2) agreements with the Principal Contractor
The provisions of Regulation 7 of the Construction Regulations shall be followed in every
detail.
No night or weekend work shall be performed unless authorized by the Principal Agent or Lead
Engineers. Where week end work is planned the Principal Contractor shall ensure that its
construction supervisor is on site, this applies even if only contractors or sub-contractors are
working on the site. Where week end work is planned each contractor or sub-contractor shall
ensure that its construction supervisor is on site, this applies even if the Principal Contractor’s
manager or supervisor is on the site.
The Principal Contractor shall provide at or within reasonable access of every construction site,
the following clean, hygienic and maintained facilities:
(a) Shower facilities after consultation with the employees or employees
representatives, or at least one shower facility for every 15 persons;
(b) at least one sanitary facility for each sex and for every 30 workers;
(c) changing facilities for each sex; and
(d) sheltered eating areas.
The provisions of Regulation 2, 3, 4, 6, 7, 9 of the Facilities Regulations shall be followed in
every detail.
No flammable substances must be stored on site unless these are stored in a flammable store
or cabinet approved by the Municipal Chief Fire Officer, no other materials shall be stored in
the flammable store or cabinet. Where required the H&S Plan shall include a method statement
detailing the safe use, storage, decanting and spill controls for all flammable liquids used and
stored on site.
The provisions of Regulation 25 of the Construction Regulations shall be followed in every
detail.
With respect to hazardous chemical substances used, the contractor shall ensure that:
are addressed in a method statement(s) included in the H&S Plan.
chemical handling is included in the H&S File.
Any hazardous chemical substance intended to be applied on site during the project (i.e. after
approval of the H&S Plan) shall be subject to an issue-based risk assessment and method
statement which must be presented to the Client Agent prior to the substance being introduced
on site.
The provisions of Regulation 3, 5, 7, 8, 9, 9A, 10, 11, 14, 15 of the Hazardous Chemical
Substances Regulations shall be followed in every detail.
The Principal Contractor shall appoint a person responsible for general housekeeping and
stacking and storage of materials and equipment on the entire site.
The provisions of Regulation 27 of the Construction Regulations shall be followed in every
detail.
A Principal Contractor must ensure that all his or her employees have a valid medical certificate
of fitness specific to the construction work to be performed and issued by an Occupational
Health Practitioner in the form of Annexure 3.
A Principal Contractor must, in addition to compliance with the provisions for the stacking of
articles in the General Safety Regulations, 2003, ensure that—
A competent person is appointed in writing with the duty of supervising all stacking
and storage on a construction site;
Adequate storage areas are provided;
There are demarcated storage areas; and storage areas are kept neat and under control.
No contractor may allow or permit any employee or person to enter any site, unless that
employee or person has undergone health and safety induction training pertaining to the
hazards prevalent on the site at the time of entry.
A contractor must ensure that all visitors to a construction site undergo health and safety
induction pertaining to the hazards prevalent on the site and must ensure that such visitors
have the necessary personal protective equipment.
A contractor must at all times keep on his or her construction site records of the health
and safety induction training contemplated in sub-regulation (6) and such records must be
made available on request to an inspector, the client, the client’s agent or the principal
contractor. The Principal Contractor must ensure that the toolbox talks are conducted on
weekly basis and the training records kept on the safety file
For any use of construction vehicle and mobile plant in the construction site, contractor must
comply with all the provisions of Construction Regulation 23.
Contractor shall submit an organogram outlining the site safety, health and environmental
management structure as per appointment. The organogram must reflect the project and the
company name and must have legal references
Quality Management
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdfall work carried out from the fall risk position and the safe work procedures. All employees
working from fall risk position are subject to medical examination. The Training Program must
be in place for employees working from a fall risk position. The procedures addressing the
inspection, testing and maintenance of all fall risk protection equipment. The rescue plan
detailing procedure, personnel and suitable equipment to be used to rescue a person. The
Compliance Requirements
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdf (unknown)appointment letter in terms of CR 5
appointment letter of the
Health & Safety
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdfSite Specific Health and Safety Specification in terms of 2014
Construction Regulations 5.1(b)
Construction of 54 top-structure units at Ntuzuma
Project Name D Phase 2 and 3 Extension Housing Project, ward
43 34951-1H
Contract Number 34951-H
Internal reference no. SSHSS34/06/2026
Compiled by (Safety officer) Name and surname: Siya Nkosi
Date: 05/06/2026
Reviewed by (Manager: Safety& Risk) Name and surname: Arty Zondi
9.1 Construction Manager
9.2 Construction health and safety officer
9.3 Construction Supervisor
Principal contractor’s health and safety plan
Close–out and Consolidated Health and Safety File
Personal Protective Equipment (PPE) and Clothing
occupational medicine practitioner, such medical testing shall
be relevant to the risks of the construction work on the
construction site and shall conform to the Occupational Health
and Safety Act and Regulations and to the requirement of this
in order to reduce as reasonably as practicable the hazards
identified in the Risk Assessment
Section 37(2) of the Occupational Health and Safety ACT.
Agreement with the Principal Contractor, as defined in Section 37(2) of the Occupational Health
and Safety ACT. These agreements shall be included in the Principal Contractor’s H&S File on
site and be valid for the duration of the contractors’ work on the construction site.
the Principal Contractor/Contractor for the management of Health and Safety on any eThekwini
Health and Safety Act85/1993 as amended, including reference to applicable legislative
requirement.
adequate provision for the cost of health and safety measures.
of this Construction Health and Safety Specification; resources for the following Health and
officer required to ensure that the health and safety plan is
implemented on site. The Safety officer must be
registered with SACPCMP as a CHSO
7 Public safety Notices; signage; barricade ect.
8 Employee facilities Refer to the Facilities Regulations (ablution toilets)
following appointments are submitted with the file
9.1 Construction Manager
manager with the duty of managing all construction on the site including the duty of ensuring
occupational health and safety compliance. The Construction Manager must demonstrate
competency in relation to work being performed and the ability to manage construction work
which may include making all statutory appointments in terms of health and safety. The
experience/ competency must be as indicated in the tender document.
9.2 Construction health and safety officer
Health and Safety Officer for the construction work, with at least 2 years in the construction
industry as a construction health and safety officer.
9.3 Construction Supervisor
construction activities and ensuring occupational health and safety compliance on the
construction site. A contractor must, upon having considered the size of the project, in writing
appoint one or more competent employees for different sections thereof to assist the
construction supervisor contemplated in sub regulation (7), and every such employee has, to
the extent clearly defined by the contractor in the letter of appointment, the same duties as the
construction supervisor: Provided that the designation of any such employee does not relieve
the construction supervisor of any personal accountability for failing in his or her supervisory
duties in terms of this regulation.
health and safety plan based on the Client documented Health and Safety Specification. The
health and safety plan shall include but not limited to the following.
construction works have risk assessments performed by appointed competent person in writing
which forms part of the health and safety plan to be applied.
The provisions of Regulation 9 of the Construction Regulations shall be followed in every
detail.
and Safety Plan and thereafter finally approve the Health and Safety plan for
implementation. The recommended Health and Safety file shall include the following:
will be subcontracted, please provide subcontractor’s registration as an electrical installation contractor)
site. No not generalise)
Must detail step by step execution of tasks)
appointed in writing and exercise their functions as defined in OHSA.
regardless of the number of employees on the site.
this shall include but not limited to:
mutually agreed upon between the Principal Contractor and the Client at least every 30 days,
the copy of the health and safety audit report must be provided to the Principal Contractor
within seven days after the audit.
regularly in accordance with the manufactures recommendations. Safety signage shall be
prominently displayed in all areas where fire extinguishers are located. The Principal Contractor
shall arrange for training of the relevant personnel, in the use of fire extinguishers.
The provisions of Regulation 29 of the Construction Regulations as well as Regulation 9 of
per the risk assessment shall require disciplinary intervention and this process shall be
documented in the induction. No employer shall in respect of anything which he is in terms of
this Act required to provide or to do in the interest of health or safety of an employee make any
deductions from any employee’s remuneration or require or permit any employee to make any
payment to him or to any other person.
The provisions of Regulation 2 of the General Safety Regulations shall be followed in every
detail.
include but is not limited to:
by the Principal Contractor when accessing the site
indicated as per the specific methods defined in the H&S Plan.
the following clean, hygienic and maintained facilities:
(a) Shower facilities after consultation with the employees or employees
representatives, or at least one shower facility for every 15 persons;
(b) at least one sanitary facility for each sex and for every 30 workers;
(c) changing facilities for each sex; and
(d) sheltered eating areas.
The provisions of Regulation 2, 3, 4, 6, 7, 9 of the Facilities Regulations shall be followed in
every detail.
are addressed in a method statement(s) included in the H&S Plan.
chemical handling is included in the H&S File.
Any hazardous chemical substance intended to be applied on site during the project (i.e. after
approval of the H&S Plan) shall be subject to an issue-based risk assessment and method
statement which must be presented to the Client Agent prior to the substance being introduced
on site.
The provisions of Regulation 3, 5, 7, 8, 9, 9A, 10, 11, 14, 15 of the Hazardous Chemical
articles in the General Safety Regulations, 2003, ensure that—
employee or person has undergone health and safety induction training pertaining to the
hazards prevalent on the site at the time of entry.
induction pertaining to the hazards prevalent on the site and must ensure that such visitors
have the necessary personal protective equipment.
and safety induction training contemplated in sub-regulation (6) and such records must be
made available on request to an inspector, the client, the client’s agent or the principal
contractor. The Principal Contractor must ensure that the toolbox talks are conducted on
weekly basis and the training records kept on the safety file
working around the existing services, disconnection and connection of services is done in a way
that does not affect the health or safety of any employee or public member whether direct or
indirect. The disconnection and connection of services must not interrupt the provision of
services to the public. The contractor must explain how communication will be maintained with
the affected parties during this process.
construction risk areas. Appropriate health and safety signage shall be posted and access
control to site must be exercised via a single access point. All members entering the site must
indicate in what capacity them visiting the site. The access point must be designed and
constructed to allow for temporary parking, entry of construction vehicles, entry of personnel
transport vehicles and entry of individual workers and other persons. The principal Contractor
shall ensure that each person visiting the site shall be inducted to the site and such abridged
induction shall outline the hazards from on-site activities and the precautions to be observed to
avoid or minimize those risks. Visitors must only enter when accompanied by a responsible
person designated by the Principal Contractor.
competent person(s) appointed as temporary works supervisor in the Health &Safety Plan. The
temporary works supervisor shall supervise all temporary works operations and shall ensure
that all equipment used in temporary works structure are carefully examined and checked for
suitability before being used.
The provisions of Regulation 12 of the Construction Regulations shall be followed in every detail.
Contractual Terms
Source: Ntuzuma D Phase 2 and 3 Ext - Specification.pdf (unknown)and who is appointed in writing
Submission Guidelines
Source: Redcliff Double storey raft details Model (1).pdf (unknown)Returnable Documents:
Compliance Requirements
Source: Redcliff Double storey raft details Model (1).pdf (unknown)Insufficient searchable text - AI extraction recommended.
Submission Guidelines
Source: Double storey Tank platform detail Model (1).pdf (unknown)Returnable Documents:
Submission Guidelines
Source: -Precast Slab Type A Model (1).pdf (unknown)Returnable Documents:
Submission Guidelines
Source: Architectural Drawing Double storey semi detached unit Model (1).pdf (unknown)Returnable Documents: (Specific documents not listed in available text. Check tender documentation for required forms and submission details.)
Submission Guidelines
Source: Double storey Apron slab detail Model (1).pdf (unknown)Returnable Documents:
Submission Guidelines
Source: Ntuzuma D Ph 2 & 3 LOCATION.pdf (unknown)Returnable Documents: No specific submission guidelines or returnables are detailed in the extracted text. Bidders should refer to the full tender document for submission instructions, required forms, and disqualification risks.
Compliance Requirements
Source: Ntuzuma D Ph 2 & 3 LOCATION.pdf (unknown)Insufficient searchable text - AI extraction recommended. Bidders must consult the full tender document for detailed compliance requirements such as CSD, tax, B-BBEE, CIDB, CIPC, professional registrations, and local content.
Description
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdfEvaluation Criteria
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdf (TENDER)While explicit financial or operational criteria are not in this document, eligibility is implicitly contingent on the bidder's ability to demonstrate a robust understanding and management of the high health and safety risks outlined. The contractor must have competent, trained personnel for high-risk activities (e.g., plant operators, roof erectors) and proven experience in managing public safety on construction sites.
Technical Specifications
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdf (TENDER)Compliance Requirements
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdf (TENDER)Health & Safety
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdfEnvironmental
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdfSection
Source: Ntuzuma D Phase 2 and 3 Ext - Baseline.pdfImportant Dates
Source: 34951-1H Tender Document .pdf (TENDER)Contact Information
Source: 34951-1H Tender Document .pdf (TENDER)Submission Guidelines
Source: 34951-1H Tender Document .pdf (TENDER)Evaluation Criteria
Source: 34951-1H Tender Document .pdf (TENDER)CIDB contractor grading designation of 5 GB or higher. Valid B-BBEE certificate. Tax compliance status. No undisputed municipal rates/taxes arrears. Registered on National Treasury Central Supplier Database, eThekwini Supplier Portal, and eThekwini JDE System. Not under restriction to do business with employer. Tenderer must have firm intention and capacity to proceed.
Technical Specifications
Source: 34951-1H Tender Document .pdf (TENDER)Financial Requirements
Source: 34951-1H Tender Document .pdf (TENDER)Compliance Requirements
Source: 34951-1H Tender Document .pdf (TENDER)Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
19 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.