Tender Type
Request for Bid(Open-Tender)
Delivery Location
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
Organization Type
GOVERNMENT
Published
19 Jul 2026
OCDS Reference
ocds-9t57fa-162799
This tender is for a 36-month integrated infrastructure maintenance and construction contract with ethekwini metropolitan municipality. IT covers general building, electrical engineering, and mechanical engineering works for municipal buildings and facilities. The tender document is primarily a detailed construction health and safety specification outlining the mandatory safety requirements for the successful bidder.
The successful Principal Contractor must develop, submit, and obtain approval for a comprehensive, site-specific Health and Safety Plan and start-up H&S File before starting any work.
The Principal Contractor and all sub-contractors must provide proof of Good Standing with the COIDA Commissioner prior to commencing work.
The Principal Contractor must appoint a full-time Construction Manager and a Construction Safety Officer registered with the South African Council for the Project and Construction Management Professions (SACPCMP).
The scope of work includes general building construction and maintenance, low-voltage electrical systems work, and HVAC&R mechanical engineering services for municipal facilities over 36 months.
The Principal Contractor must enter into a Mandatory Agreement with the Client per the OHS Act and ensure all sub-contractors do the same.
Adequate cost provision must be made in the tender for all health and safety measures, including a full-time safety officer, training, PPE, and medical certifications.
The Principal Contractor is responsible for conducting site-specific hazard identification and risk assessments and implementing all controls.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 21 August 2026 - 11:00
Venue
Moses Mabhida Stadium, Ground Floor Foyer
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
-A compulsory clarification meeting will be held at 11:00, on 2026-07-27, at the moses mabhida stadium foyer. -All questions and answers will be consolidated and posted on etenders/municipal website by 2026-08-13. -3 to 9GB/EB/ME and 4si or higher -mxolisi myeza (t) 031-311 7856 or nokuthula mokoape (t) 031-311 7492
Categories
Request for Bid(Open-Tender)
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
AI Document Analysis Stages
Important Dates
Source: 36585-1B Tender Document .pdf (TENDER)19 Jul
2026
Tender Published
Tender was published
21 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
36585-1B Tender Document .pdf
The eThekwini Metropolitan Municipality is establishing a 36-month framework panel for integrated infrastructure maintenance and construction works for buildings, facilities, and engineering systems. The panel will operate on an 'as-and-when-required' basis for scheduled, unscheduled, and emergency works, with no guaranteed quantum of work. Tenderers must submit rates for a basket of items, and future work packages will be issued via Works Package Orders using these rates.
csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdf
This tender document is a Construction Health and Safety Specification (CHSS) for a 36-month integrated infrastructure maintenance and construction project for Ethekwini Municipality. It outlines the client's mandatory occupational health and safety standards, compliance requirements, and the framework for the Principal Contractor's Health and Safety Plan. The scope covers general building works, electrical engineering, and mechanical engineering systems.
To download these documents and access AI-powered analysis, visit the main tender page.
Unlock eThekwini and Durban tenders using AI-Powered Matching, port-centric procurement intelligence, compliance analysis, and bid assembly tools.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Not enough data available to generate an estimate for this tender type.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: 36585-1B Tender Document .pdf (TENDER)Submission Guidelines
Source: 36585-1B Tender Document .pdf (TENDER)Evaluation Criteria
Source: 36585-1B Tender Document .pdf (TENDER)Estimated CIDB contractor grading designation of 3-9, except for SI (from 4SI or above). Tenderers must not be under any restriction to do business with the municipality. Joint ventures must submit separate tax compliance PINs and formalize agreements. Tenderers must have no undisputed municipal services arrears (or have formalized payment agreements).
Technical Specifications
Source: 36585-1B Tender Document .pdf (TENDER)Financial Requirements
Source: 36585-1B Tender Document .pdf (TENDER)Compliance Requirements
Source: 36585-1B Tender Document .pdf (TENDER)Description
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdfThis is a Construction Health and Safety Specification (CHSS) for a 36-month integrated infrastructure maintenance and construction project. The document outlines the client's (Ethekwini Municipality) requirements for occupational health and safety management on the construction site. It details the responsibilities of the Principal Contractor, including developing a Health and Safety Plan, conducting risk assessments, maintaining a Health and Safety File, and ensuring legal compliance with the OHS Act and Construction Regulations. The scope of work covers General Building, Electrical Engineering Works, and Mechanical Engineering services.
Evaluation Criteria
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdf (unknown)The Principal Contractor must demonstrate: Competence and resources to manage the defined scope of work (General Building, Electrical Engineering, Mechanical Engineering); A functional Health and Safety Management system; The ability to appoint legally compliant, competent personnel (e.g., SACPCMP Safety Officer, certified first aiders, competent inspectors); Financial provision for all mandated health and safety cost items; Compliance with the Occupational Health and Safety Act, Construction Regulations 2014, and all other applicable regulations.
Technical Specifications
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdf (unknown)The scope of work for this 36-month integrated infrastructure maintenance and construction contract includes:
The Principal Contractor must comply with the Occupational Health and Safety Act, all applicable Regulations, and this CHSS. The client's Agent will monitor compliance.
Methodology
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdfThe Principal Contractor's H&S Plan must include method statements, such as for the storage of flammable products.
Experience & Qualifications
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdfOH&S representatives must be experienced, permanently employed by the Principal Contractor or sub-contractors, formally trained, and able to move freely within their designated area of responsibility.
Quality Management
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdfThe Principal Contractor must ensure continuous monitoring and monthly inspections by appointed OH&S representatives, focusing on unsafe acts and conditions. OH&S representatives must participate in incident investigations and attend OH&S committee meetings.
The H&S Plan must include a baseline risk assessment, monthly risk and incident reports, incident registers, COIDA claim records, monthly H&S performance and audit reports, and endorsed minutes of H&S committee meetings.
The Principal Contractor must carry out regular safety planned task observations and planned H&S inspections, rectifying any unsafe acts or conditions. Inspection registers must correlate with site machinery and equipment, and inspectors must be appointed in writing with proof of training and competency.
Compliance Requirements
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdf (unknown)The Principal Contractor and all sub-contractors must submit proof of Good Standing with the COIDA Commissioner, or a licensed Mutual Association, prior to starting work. A copy of the Letter of Good Standing must be included in each contractor's H&S Plan and kept updated.
The Principal Contractor must enter into a Mandatory Agreement with the Client as per Section 37(2) of the OHS Act, and ensure all sub-contractors also enter into such agreements.
The Principal Contractor must appoint competent persons in writing for various statutory roles, including Construction Manager, Construction Safety Officer (registered with SACPCMP), Construction Supervisor, and others as required by the OHS Act and Construction Regulations.
The Principal Contractor must develop, submit, and obtain approval for a comprehensive, site-specific Health and Safety Plan and start-up H&S File before commencing any work. The H&S Plan must include detailed risk assessments, safe work procedures, and evidence of all required controls.
Health & Safety
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdfThis document is a comprehensive Construction Health and Safety Specification (CHSS) published under the OHS Act and Construction Regulations 2014.
Environmental
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdfThe CHSS includes chapters on Waste Management and Environmental Management.
The Principal Contractor's organogram must outline the site safety, health, and environmental management structure.
For work on greenfield sites, the induction must include control measures for exposure to snakes, such as animal and plant search and rescue, active monitoring, appropriate PPE, and sourcing a snake catcher if required.
Contractual Terms
Source: csa3600.36585-1B Intergrated infrastructure maintenace and construction for building (1).pdf (unknown)The Client has appointed an Agent responsible for approving H&S Plans and monitoring the Principal Contractor.
The Client or its Agent is not responsible for any acts or omissions of any contractor resulting from the application of the CHSS.
The Principal Contractor must enter into a Mandatory Agreement with the Client (Section 37(2) of OHS Act) and ensure all sub-contractors also enter into such agreements.
When appointing other contractors, the Principal Contractor must include in the agreement the Section 37(2) Mandatory Agreement and details of Section 16(2) appointees.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
19 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.