Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Passenger Rail Agency of South Africa (PRASA)Location
Gauteng
Closing Date
26 Nov 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
41A Carr Street, Braamfontein, Jhb - Johannesburg - Johannesburg - 2000
Organization Type
GOVERNMENT
Published
27 Oct 2026
OCDS Reference
ocds-9t57fa-175849
PRASA requires a service provider to supply, deliver and offload ballast across the metrorail gauteng region on an as-and-when-required basis for 36 months. The contract includes rehabilitation and upgrading of gravel and asphalt service roads, plus drainage maintenance for storm-water management. Evaluation uses an 80/20 preference-point system with a mandatory 80% technical threshold; only bidders meeting the technical minimum proceed to price and specific-goals scoring.
Compulsory briefing: 5 November 2026 at 10H00, 6th Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001 — non-attendance leads to disqualification.
Closing submission: 26 November 2026 at 12H00, Ground Floor, Shosholoza Meyl Junction, same address — late bids rejected.
Two-envelope submission: Envelope 1 (technical/compliance) and Envelope 2 (financial + specific goals) in separate sealed envelopes.
Mandatory Stage 1A documents (automatic disqualification if missing): Completed Form C and BOQ/Pricing (Annexure 5) in Envelope 2; completed Form D (briefing attendance certificate).
Stage 1B basic compliance (due within 3 days of award or award recalled): COID Letter of Good Standing, valid SARS TCS PIN, CSD supplier registration number, all RFT forms and annexures completed, signed JV/consortium/subcontract agreement with percentage split.
Technical threshold: Minimum 80% on functionality — track record of similar projects (supply/delivery of aggregates, bulk materials, quarry or railway materials) each valued at least R500,000, proven by appointment and completion letters on client letterhead with full project details; scoring: 1 project = 20 pts, 2 = 40 pts, 3 = 60 pts, 4 = 80 pts, 5 = 100 pts.
Specific Goals evidence for 20 points: Certified ID copies, municipal/ESKOM bill or chief letter (≤3 months), doctor's note, B-BBEE certificate/affidavit for Black women owned (4), Black youth owned (4), Rural areas (4), People with disabilities (4), 51% Black owned (4).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Thursday, 26 November 2026 - 12:00
Venue
6th Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
41A Carr Street, Braamfontein, Jhb - Johannesburg - Johannesburg - 2000
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: MQA Accreditation, SACNASP Registration
AI Document Analysis Stages
Description
27 Oct
2026
Tender Published
Tender was published
26 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf
Supply, delivery and offloading of ballast in the Metrorail Gauteng region on an 'as and when required' basis for a 36-month contract period. The service provider will be appointed by PRASA to support Perway operational requirements, including rehabilitation of service roads and drainage maintenance along the rail network.
ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdf
Supply, delivery and offloading of ballast in the Metrorail Gauteng region on an as-and-when required basis for a period of thirty-six months. The contract covers ballast supplied in AY-trucks and road trucks, with provisional plant hire for a TLB and a front-end loader.
ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdf
Supply, delivery and offloading of ballast in the Metrorail Gauteng region on an as-and-when-required basis for a 36-month period. The contract is a measurable, rates-based agreement with payments made strictly according to approved rates and actual quantities executed.
ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf
Supply, delivery and offloading of ballast in the Metrorail Gauteng region on an 'as and when required' basis for a period of thirty-six (36) months. The Passenger Rail Agency of South Africa (PRASA) requires a service provider for this contract, which is estimated to exceed R50 million (all applicable taxes included).
ANNEXURE 2 CLARIFICATION FORM FOR THE SUPLY,DELIVERY OFFLOADING OF THE BALLST_.pdf
Supply, delivery and offloading of ballast for the Metrorail Gauteng region on an as-and-when-required basis for a 36-month period. The Passenger Rail Agency of South Africa (PRASA) is the contracting authority.
Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdf
Supply, delivery and offloading of railway ballast in the Metrorail Gauteng region on an as-and-when-required basis for 36 months, including provision of plant (TLB and front-end loader) with operators. The appointed contractor must comply with SABS 1083 ballast specifications, safety requirements, and deliver within 14 days of a purchase order.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Passenger Rail Agency of South Africa (PRASA)Secure PRASA tenders with AI Matching & Recommendations, rail-infrastructure intelligence, compliance analysis, and bid support for rolling stock and station upgrades.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Procurement: Appointment of a service provider for supply, delivery and offloading of ballast in the Metrorail Gauteng region on an 'as and when required' basis for 36 months.
Background: PRASA's Perway infrastructure rehabilitation requires ballast for on-track machine packages (screening, tamping, stabilising, regulating). Existing ballast has reached end of life; shortages due to washaways, contamination, illegal trenching causing safety risks and service disruptions. No active ballast supply contract currently.
Objectives: Restore Perway infrastructure for safe train operations; enable reliable rail service; reduce maintenance costs and disruptions.
Scope: Gauteng Metrorail region (Johannesburg, Tshwane, East Rand, Soweto, Vaal Triangle, West Rand).
Related project: Replenishing ballast via on-track screening machine.
Important Dates
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (unknown)Closing date: 26 November 2026 at 10:00
No compulsory briefing or site visit dates stated in this specification.
Evaluation Criteria
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (unknown)Evaluation method not detailed in this specification document. The document references 'C2 - Evaluation method' but the content is incomplete. Bidders should refer to the main tender document for the evaluation criteria, scoring split, preference point system (80/20 or 90/10), and any minimum qualifying score.
Technical Specifications
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (unknown)Scope: Supply, delivery and offloading of ballast in the Metrorail Gauteng region on an 'as and when required' basis for 36 months.
Ballast specifications:
73.0 mm: 100% passing
63.0 mm: 90–100%
53.0 mm: 40–70%
37.5 mm: 10–30%
26.5 mm: 0–5%
19.0 mm: 0–1%
Delivery and offloading:
Plant and machinery:
Deliverables:
Key personnel:
Applicable standards:
Methodology
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdfExecution methodology:
Experience & Qualifications
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdfKey personnel requirements:
Pricing Schedule
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdfPricing structure:
Ballast by road: m³/km (quarry to offloading point).
Ballast by rail (AY wagons): m³.
Plant: R/hour.
Financial Requirements
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (unknown)Pricing: Prices must be total costs, final costs VAT inclusive.
Payment terms: Payments made monthly against approved work; payment within 30 days of approved invoice.
Units of measurement:
No payment for downtime due to inclement weather.
Contractor submits claim certificate checked by Project Manager; progress assessed jointly with PRASA Technical Officer.
No contract price adjustment.
Insurance: Contractor must provide all applicable insurance and any other insurance deemed necessary not covered by Employer.
Compliance Requirements
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (unknown)Mandatory compliance:
Health & Safety
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdfHealth and safety obligations:
Contractual Terms
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdfContract form: BESKOPE applicable.
Contract period: 36 months.
Penalties: 0.05% of Contract Price per delayed day per order, maximum 10% of Contract Price. Penalties do not relieve contractor from obligations. PRASA may set off or deduct penalties from fees due.
Insurance: Contractor provides all applicable insurance and any additional insurance not covered by Employer.
PRASA responsibilities: Provide bill of quantities and tender specifications.
Contractor responsibilities: Health and safety compliance on site; provide plant, machinery, operators; maintain plant; comply with all legislation and PRASA safety requirements; report incidents (fatalities/injuries immediately, others within 24 hours); ensure safety procedures for rail traffic; provide safety plan before site access certificate.
Liability: Contractor liable for damages to PRASA assets caused during execution.
Dispute resolution: Not specified in this document.
Termination: Not specified in this document.
Section
Source: Annexure 4 Scope of work.Specification- Supply and delivery of ballast in the Metrorail Gauteng Region.pdfEvaluation criteria not detailed in this specification. Document references 'C2 - Evaluation method' but content is incomplete. Bidders must refer to main tender document for evaluation stages, functionality/price split, preference point system (80/20 or 90/10), and minimum qualifying scores.
Description
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdfThis is a bespoke draft contract for the appointment of a service provider for the supply, delivery and offloading of ballast in the Metrorail Gauteng region on an "as and when required" basis for a period of 36 months. The contract is a measurable (rates-based) agreement inclusive of VAT, with payments made strictly according to approved rates and actual quantities executed on site. The contract incorporates numerous annexures covering scope of works, subcontractors, working hours, request for tender, OHS compliance (multiple annexures), general information, compensation for occupational injuries, contractual safety clauses, contractor confirmation, and PRASA specifications E4E (2004) and E7/1 (2012). Key contractual terms include 36-month duration from signature date with possible extension, defects liability of 12 months, strict subcontracting controls, change in control/BBBEE restrictions with immediate termination for breach, comprehensive indemnities, insurance requirements, and detailed dispute resolution, force majeure, confidentiality and publicity provisions. The contract acknowledges basis in GCC 2010 and FIDIC. Governing law is South African law; language is English.
Contact Information
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdf (unknown)Employer: Passenger Rail Agency of South Africa (PRASA)
Address: PRASA Umjantshi House, 30 Wolmarans Street, Braamfontein, 2017
Postal address: Private Bag X101, Braamfontein, 2017
Project Manager: Leepo Sebolai
Telephone: 083 386 8012
Email: [email protected]
Legal facsimile: +27 11 013 1600
Legal telephone: +27 11 774 6001
Technical Specifications
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdf (unknown)Scope: Supply, delivery and offloading of ballast in the Metrorail Gauteng region on an "as and when required" basis for 36 months.
Contract type: Measurable (rates-based) contract; payments made strictly according to approved rates and actual quantities executed on site.
Approved rates: Attached as an annexure.
Working hours: 07h00 to 17h00 Mondays to Fridays, excluding daily meal break, unless otherwise stipulated in Scope of Works (Annexure B).
Site access: Requires a Site Access Certificate from the Employer's operations division before proceeding onto site.
Applicable specifications: PRASA Specification E4E (2004) and Specification for Works on, over, under or adjacent to railway lines and near high voltage equipment E7/1 PRASA (2012).
Subcontracting: Only a portion of the Works may be subcontracted with written approval of the Employer; the Contractor remains fully liable for subcontractor acts, defaults and negligence.
Nominated subcontractors: May be instructed by the Employer; payment terms for subcontractors require payment within 7 days of receipt of payment certificate.
Experience & Qualifications
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdfContractor warranties: Must have necessary skill, expertise and capacity to deliver Works, including any subcontractors.
Subcontractor appointment: Contractor must consult Employer on proposed subcontractors, providing details of experience, financial standing and empowerment credentials; obtain Employer's written consent (not unreasonably withheld).
Subcontractor obligations: Subcontractors must undertake same obligations as Contractor; payment within 7 days of Contractor receiving payment certificate.
Site Agent: Must be competent, responsible, have adequate experience in similar work, exercise personal supervision, and be approved by Project Manager; must be available on site during Works.
Key personnel: Not explicitly detailed beyond Site Agent requirement.
Joint venture/consortium: If applicable, members jointly and severally liable; must notify leader with authority to bind; composition changes require Employer consent.
Quality Management
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdfProject Plan requirements: Initial and revised Project Plans must show and describe entire scope of work including commencement date, completion due date, sequence/timing/resources, site access/possession/approval/inspection/test dates, events influencing execution, other programming information from Scope of Work, and actual progress achieved on revised plans.
Quality standards: Works must comply with Good Industry Practice, Scope of Works (Annexure B), PRASA Specification E4E (2004), and Specification E7/1 (2012).
Defects liability: Contractor has right and obligation to make good defects in materials, plant and workmanship for 12 months from Certificate(s) of Completion.
Inspections and tests: Dates for inspections and tests must be included in Project Plan.
Approvals: Required approvals and instructions must be programmed in Project Plan.
Pricing Schedule
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdfPricing basis: Measurable (rates-based) contract; approved rates inclusive of VAT attached as annexure.
Payment: Strictly according to approved rates and actual quantities executed on site.
Bill of Quantities: Submitted by Contractor as part of Bid; forms basis for Contract Sum.
Contract Sum: Amount and rates as set out in clause 24.4.
Contract Price: Contract Sum subject to additions/deductions under contract provisions.
Performance bond: Not applicable (Annexure A).
Mobilisation fee: 10% of Contract Sum as advance payment per clause 24.5, but marked not applicable for this contract.
Subcontractor payment: Within 7 days of Contractor receiving Project Manager's payment certificate, without discount/deduction other than retention money.
Retention: May be specified in sub-contracts; retention money deducted from subcontractor payments.
Payment certificates: Issued by Project Manager; trigger subcontractor payment obligations.
Direct payment to nominated subcontractors: Employer may pay directly; Contractor's obligation discharged to extent of direct payment.
Final payment to nominated subcontractors: Engineer may include amount in payment certificate for Contractor to pay nominated subcontractor.
Settlement of accounts: Amounts paid to nominated subcontractors set against provisional sums; balance adjusted for Contractor's costs.
Financial Requirements
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdf (unknown)Pricing: Rates-based contract inclusive of VAT; approved rates attached as annexure.
Payment: Made strictly in accordance with approved rates and actual quantities executed on site.
Performance bond: Not applicable (Annexure A).
Mobilisation fee: 10% of Contract Sum as advance payment per clause 24.5, but marked not applicable for this contract.
Subcontractor payment: Contractor must pay subcontractors in full within 7 days of receipt of Project Manager's payment certificate, without discount or deduction other than retention money.
Retention: Retention money may be specified in sub-contracts.
Defects liability period: 12 months from issue of Certificate(s) of Completion.
Compliance Requirements
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdf (unknown)Legal entity: Must be duly incorporated and validly existing under South African law.
Tax compliance: Must be in good standing with respect to duties, taxes, levies and standing contributions (SARS tax compliance status PIN).
CSD registration: Implied mandatory for government contracts.
B-BBEE: BBBEE Status as indicated in the RFT; any change in BBBEE component requires prior written consent from Chief Procurement Officer and Group Chief Executive Officer.
CIDB: Not explicitly stated in extracted text; construction-related work may require grading.
OHS compliance: Must comply with Occupational Health and Safety Act, 1993 and Construction Regulations; obtain all necessary construction work permits.
Insurance: Must have all insurances required in terms of the contract (details in Annexures F–N).
Compensation for Occupational Injuries and Diseases Act: Compliance required (Annexure M).
Restricted Enterprise: Must not be listed on the register for tender defaulters under the Prevention and Combating of Corrupt Activities Act.
Corrupt activities: Must not have engaged in corrupt activities as defined in the Corrupt Activities Act.
Site Access Certificate: Required from Employer's operations division before site access.
Change in control/ownership: Any transfer of shares, change in composition, ownership, constitution or BBBEE component requires prior written consent from Chief Procurement Officer and Group Chief Executive Officer, unless no impact on BBBEE Status.
Health & Safety
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdfOHS compliance: Contractor must comply with Occupational Health and Safety Act, 1993 and Construction Regulations; obtain all necessary construction work permits.
Annexures covering OHS: Annexure F (General Administrative Regulation), Annexure G (General Safety Regulations 11(1)), Annexure H (General Safety Regulations 13D(3)(b)), Annexure I (OHS Act), Annexure J (Safety on Site), Annexure K (Compliance with OHS Act and Regulations), Annexure N (Contractual Safety Clauses).
Compensation for Occupational Injuries and Diseases Act: Compliance required (Annexure M).
Site safety: Contractor responsible for adequacy, stability and safety of all site operations, construction methods and Works.
Site Access Certificate: Required from Employer's operations division before proceeding onto site.
Safety on site: Detailed requirements in Annexure J and contractual safety clauses in Annexure N.
Reporting accidents: Refer to clause 33 (not detailed in extracted text).
Protection of persons and property: Refer to clause 29 (not detailed in extracted text).
Blasting and explosives: Refer to clause 27 (not detailed in extracted text).
Interference with Employer's assets/open lines: Refer to clause 26 (not detailed in extracted text).
Temporary level crossings: Refer to clause 25 (not detailed in extracted text).
Contractual Terms
Source: ANNEXURE 3-BESPOKE DRAFT CONTRACT.pdfContract duration: 36 months from Signature Date; Employer may extend on not less than 3 months' notice before expiry, and may terminate on 30 days' notice during extension period.
Commencement date: Signature Date.
Due completion date: As stated in Scope of Works (Annexure B), calculated from Commencement Date and adjusted for extensions/acceleration.
Defects liability period: 12 months from issue of Certificate(s) of Completion.
Priority of documents: 1) Contract including annexures; 2) RFT; 3) Contractor's Bid.
Condition precedent (not applicable): Performance bond and construction work permits within 30 business days of Signature Date; non-fulfilment voids agreement.
Assignment: Contractor may not assign contract or any part without written consent of Chief Procurement Officer and Group Chief Executive Officer.
Subcontracting: Whole contract may not be subcontracted; portions only with Employer's written approval; Contractor liable for subcontractor acts.
Nominated subcontractors: Employer may instruct use; treated as Contractor's subcontractor; payment within 7 days of payment certificate.
Joint and several liability: If Contractor is a joint venture/consortium, members jointly and severally liable; must notify leader; composition changes require Employer consent.
Change in control/BBBEE: No transfer of shares, change in composition, ownership, constitution or BBBEE component without prior written consent of Chief Procurement Officer and Group Chief Executive Officer, unless no impact on BBBEE Status; breach results in immediate termination.
Indemnities: Contractor indemnifies Employer against liability for damage/loss of property, injury/death of persons; liable for damage to Employer's property on site arising from Works.
Exclusions from liability: Permanent land use/occupation, unavoidable nuisance/disturbance, unavoidable interference with servitudes, injuries/damage from Employer's acts/omissions.
Insurance: Contractor must maintain all required insurances (details in Annexures F–N); Performance Bond not applicable.
Termination: Employer may terminate for breach, including failure to fulfil condition precedent, breach of change in control/BBBEE clause, or Contractor becoming a Restricted Enterprise.
Dispute resolution: Refer to clause 36 (not detailed in extracted text).
Force majeure: Refer to clause 32 (not detailed in extracted text).
Confidentiality: Both parties bound by confidentiality obligations (clause 38).
Public relations: No publicity without Employer consent (clause 37).
Notices: Written, delivered by registered post, hand, facsimile or email to addresses in clause 15.3.5; deemed receipt rules apply.
Domicilium citandi et executandi: Physical addresses in clause 15.3.5 serve as legal service addresses.
Governing law: Republic of South Africa.
Language: English.
Intellectual property: Contractor retains copyright in documents supplied; grants Employer non-terminable, non-transferable, non-exclusive, royalty-free licence to copy, use, communicate and modify for further work.
Drawings: Remain in Project Manager's custody; three copies free to Contractor; further copies at Contractor cost; one copy kept on site for inspection.
Heritage objects: Fossils, coins, articles of value/antiquity, geological/archaeological finds are Employer's property; discovery requires immediate notification, cessation of endangered work, and preservation.
Quality: Works must comply with Good Industry Practice, Scope of Works (Annexure B), and applicable specifications (E4E, E7/1).
Supervision: Contractor must exercise supervision at all times; competent Site Agent with adequate experience must be appointed and approved by Project Manager; Site Agent must be available on site during Works.
Access to site: Subject to Site Access Certificate from Employer's operations division.
Time for practical completion: Refer to clause 23 (not detailed in extracted text).
Price, payment and related matters: Refer to clause 24 (not detailed in extracted text).
Temporary level crossings: Refer to clause 25 (not detailed in extracted text).
Interference with Employer's assets/open lines: Refer to clause 26 (not detailed in extracted text).
Blasting and explosives: Refer to clause 27 (not detailed in extracted text).
Safety compliance: Refer to clause 28 and Annexures F–N (OHS Act, Construction Regulations, safety on site).
Protection of persons and property: Refer to clause 29 (not detailed in extracted text).
Quality and related matters: Refer to clause 30 (not detailed in extracted text).
Risks: Refer to clause 31 (not detailed in extracted text).
Reporting accidents: Refer to clause 33 (not detailed in extracted text).
Entire agreement: Contract constitutes entire agreement (clause 39).
Severability: Invalid provisions do not affect remainder (clause 40).
Independent status: Contractor is independent contractor, not employee/agent (clause 41).
Independent advice: Parties acknowledge opportunity for legal advice (clause 42).
Counterparts: Contract may be executed in counterparts (clause 43).
Description
Source: ANNEXURE 2 CLARIFICATION FORM FOR THE SUPLY,DELIVERY OFFLOADING OF THE BALLST_.pdfSupply, delivery and offloading of ballast in the Metrorail Gauteng Region, on an as-and-when-required basis, for a contract period of 36 months.
Technical Specifications
Source: ANNEXURE 2 CLARIFICATION FORM FOR THE SUPLY,DELIVERY OFFLOADING OF THE BALLST_.pdf (unknown)Scope
Description
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdfProcurement of railway ballast supply, delivery and offloading for the Metrorail Gauteng region.
Appointment is for 36 months on an as-and-when-required basis.
The works are priced per unit (m3, m3/km, and hourly plant rates).
Submission Guidelines
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdf (RFP)Complete and return Form C (Tender Form) with all requested details, including the authorised signatory and witnesses.
Submit a certified copy of the Resolution of the Board of Directors or Certificate of Partners/Members authorising the signatory.
Provide names and capacities of persons authorised to negotiate if PRASA enters post-tender negotiations.
All sections of the tender form must be completed; non-compliance with material terms may result in contract cancellation.
Evaluation Criteria
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdf (RFP)The document does not state a scoring method or preference point system (e.g., 80/20 or 90/10).
Bidders must submit Form C with a valid performance bond commitment.
No minimum qualifying score is specified.
Technical Specifications
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdf (RFP)Supply, deliver and offload railway ballast in the Metrorail Gauteng region on an as-and-when-required basis.
Contract period: 36 months.
Pricing items:
Plant (provisional items):
Prices to be quoted for each year of the 36-month term.
Financial Requirements
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdf (RFP)Performance bond: 10% of the contract price (VAT inclusive), issued by a South African registered bank.
Pricing must be submitted in the provided pricing schedule, VAT exclusive, with VAT at 15%.
Where items are arithmetically incorrect, the unit rate is decisive (except for architectural building work).
In case of discrepancy, the amount in words takes precedence over figures.
Compliance Requirements
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdf (RFP)Provide proof of Workmen's Compensation, securities and insurance coverage within 30 working days of contract award notification.
Sign the formal contract within 7 working days of notification that contract documents are ready.
Certified copy of Board Resolution or Certificate of Partners/Members must be annexed.
Contractual Terms
Source: ANNEXURE 5 - PRICING SCHEDULE (62.07.2026-GAU-PERWAY).pdfTender acceptance leads to a written contract between the bidder and PRASA.
Workmen's Compensation, securities and insurance proof required within 30 working days of award.
Formal contract signing required within 7 working days of notification.
A performance bond of 10% of the contract price (VAT inclusive) is required.
Non-completion of works may incur penalties under the Conventional Penalties Act.
Failure to sign contract or provide security may allow PRASA to recover costs of re-tendering.
In case of conflict, the project specification prevails over other tender documents; accompanying letters or correspondence prevail over specified documents.
Non-compliance with material terms is a material breach and grounds for contract cancellation.
Description
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdfPRASA requires a service provider for the supply, delivery and offloading of ballast in the Metrorail Gauteng Region, on an as-and-when-required basis, for a period of 36 months. The bid pack comprises Form A (Invitation to Bid), Form B (Terms and Conditions for Bidding), Form D (compulsory site inspection / pre-tender briefing), Form E (statement of works previously carried out), Form F (security screening), Form G (acknowledgment), SBD 4 and SBD 6.1.
Important Dates
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Compulsory briefing (attendance mandatory)
Document availability
Closing
Contact Information
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Submission and briefing venue
Passenger Rail Agency of South Africa
Shosholoza Junction / Shosholoza Meyl Junction
6th Floor
Cnr Leyds and Simmonds
Braamfontein
Johannesburg
Named contact
Submission Guidelines
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Submission method
Delivery address
Passenger Rail Agency of South Africa
Shosholoza Meyl Junction
6th Floor
Cnr Leyds and Simmonds
Johannesburg
Closing
Document collection
Returnable documents
Disqualification risks
Evaluation Criteria
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Preference point system
Price scoring
B-BBEE points
Evidence
Functionality
Technical Specifications
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Scope
Quantities and locations
Track record requirement
Financial Requirements
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Estimated value
Bid security, guarantees and payment terms
Compliance Requirements
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdf (RFP)Registration and tax
B-bbee
Security screening
Other
Section
Source: ANNEXURE 1 APPENDICE 62-07-2026-GAU-PERWAY.pdfThe bid is evaluated on the 90/10 preference point system because the estimated value exceeds R50 000 000 including taxes. Price carries 80 points and B-BBEE status level carries 20 points, for a total of 100. Price points are scored against the lowest acceptable tender. B-BBEE points run from 20 for Level 1 down to 2 for Level 8, with 0 for a non-compliant contributor. Bidders who do not submit a B-BBEE certificate or sworn affidavit forfeit the B-BBEE points. Preference claims may be audited before or after adjudication, and fraudulent claims attract disqualification, cost recovery, contract cancellation, restriction for up to 10 years and criminal referral. No minimum functionality score is stated.
Description
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfEvaluation methodology: Three-stage process
Stage 1: Compliance – Stage 1A mandatory (Form C, BOQ, briefing attendance) and Stage 1B basic (COID, SARS PIN, CSD, all docs, JV agreement)
Stage 2: Technical/Functionality – minimum 80% threshold on organizational experience (track record of similar projects ≥R500k each)
Stage 3: Price (80 pts) and Specific Goals (20 pts) using 80/20 preference point system
Evaluation levels: Verify completeness → Verify compliance → Detailed technical evaluation → Specific Goals → Price evaluation → Scoring → Recommendation → Best and Final Offer (if needed) → Approval
PRASA reserves right to split award, appoint other than highest scorer under certain conditions, negotiate market-related price, conduct BAFO
Important Dates
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)Issue date: 27 October 2026
Compulsory briefing: 5 November 2026 at 10H00 at 6th Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001
Closing date for questions: 10 November 2026 at 16H00
Closing date for responses to questions: 13 November 2026 at 16H00
Closing date for submission: 26 November 2026 at 12H00
Validity period: 90 working days from closing date
Briefing minutes/clarifications issued: 13 November 2026
Contact Information
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)SCM Contact: Gloria Mokgobi
Email: [email protected]
Telephone: 011 013 0343
Clarification submissions: [email protected] (using RFP Clarification Form Annexure 2)
Complaints email: [email protected]
Submission address: Ground Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001
Briefing venue: 6th Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001
Submission Guidelines
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)Submission method: Physical delivery in two sealed envelopes/boxes to PRASA tender box at Ground Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001
Envelope 1 (Technical/Compliance): Part A – Mandatory Requirements Response; Part B – Technical/Functional Response (scope of work)
Envelope 2 (Financial/Specific Goals): Part C – Financial Proposal and Specific Goals (BBBEE response) – separate sealed envelope
Copies required: 1 original, may submit copies and electronic version on memory card/external drive marked with bidder name
Closing date and time: 26 November 2026 at 12H00
Mandatory returnable documents (Stage 1A – automatic disqualification if missing):
Basic compliance documents (Stage 1B – must provide within 3 days of award or award recalled):
Standard forms to complete:
Disqualification risks: Late submission, missing mandatory documents, non-attendance at compulsory briefing, incomplete forms
Evaluation Criteria
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)Stage 1A – Mandatory Compliance (automatic disqualification if missing):
Stage 1B – Basic Compliance (due within 3 days of award):
Stage 2 – Technical/Functionality (minimum threshold 80%):
Stage 3 – Price and Specific Goals (80/20 preference point system):
Bidders scoring <80% on technical disqualified from Stage 3
PRASA reserves right to split award, negotiate market-related price, conduct Best and Final Offer (BAFO)
Technical Specifications
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)Scope: Supply, delivery and offloading of ballast in Metrorail Gauteng region on "as and when required basis" for 36 months
Background: Rehabilitation and upgrade of existing gravel and asphalt roads within Gauteng region, including cleaning and maintenance of drainage systems for effective storm water management
Service required: Upgrade gravel roads and perform drainage maintenance within PRASA Gauteng Region
Contract period: 36 months
Technical evaluation requirement: Track record of similar projects (supply/delivery of aggregates, bulk materials, quarry products, railway materials) with minimum value R500,000 per project
Evidence required: Appointment and completion letters from clients on letterhead, signed and dated by client official, with project description, client name, contact details, dates, contract value inclusive VAT
Detailed scope of work in Annexure 4 (not fully provided in extracted text)
Methodology
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfBid response methodology: Responses must be clear, concise, follow clear methodology explained in Executive Summary. Use numbered headings, bullet points, sections, appendices. Pages consecutively numbered. Address each RFP requirement succinctly. Use RFP terms and definitions. Original and copies must be identical. Submissions in English, A4 format (graphics up to A3). Neatly and functionally bound by sections. Signed by authorized person with board resolution/authority to sign.
Experience & Qualifications
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfExperience requirement: Track record on similar projects (supply/delivery of aggregates, bulk materials, quarry products, railway materials) with minimum value R500,000 per project
Evidence: Appointment and completion letters on client letterhead, signed/dated by client official, showing project description, client name, contact details (email/phone), start/end dates, extensions, contract value inclusive VAT
Scoring: 0 projects = 0 pts; 1 = 20 pts; 2 = 40 pts; 3 = 60 pts; 4 = 80 pts; 5 = 100 pts
Minimum technical threshold: 80% (80/100 points) to proceed to price evaluation
Quality Management
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfQuality management not explicitly detailed in extracted text. Evaluation includes technical/functional capacity testing and administrative/substantive responsiveness assessment. Procurement integrity, fairness, transparency, competitiveness and accountability emphasized throughout evaluation process.
Pricing Schedule
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfPricing submitted in Envelope 2 only: Form C (Pricing Schedule) and BOQ/Pricing (Annexure 5)
Two-envelope system: Envelope 1 = technical/compliance; Envelope 2 = financial + BBBEE
Pricing evaluation: 80/20 preference point system, 80 points for price using formula Ps = 80(1 − (Pt−Pmin)/Pmin)
Specific Goals: 20 points for ownership categories (Black women, youth, rural, disabilities, 51% Black owned)
PRASA may notify bidders of arithmetic errors/omissions on BOQ for clarity
Bid validity: 90 working days from closing
Performance/bid bonds where applicable
Total cost of ownership and continuous improvement initiatives considered
Financial stability assessment required
Financial Requirements
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)Pricing format: Form C (Pricing Schedule) and BOQ/Pricing (Annexure 5) submitted in Envelope 2 (separate sealed envelope)
Two-envelope system: Financial proposal separate from technical/compliance
Bid validity: 90 working days from closing date
Price evaluation: 80/20 preference point system, 80 points for price using formula Ps = 80(1 − (Pt−Pmin)/Pmin)
PRASA reserves right to negotiate market-related price with highest scoring bidder, then second, then third; may cancel if no agreement
Best and Final Offer (BAFO) process possible
Performance and bid bonds mentioned "where applicable" (Section 3 of Pricing Schedule)
National Industrial Participation Programme (NIPP) applies if imported content – SBD 5 required
Financial stability assessment (Section 7 of Pricing Schedule)
Total cost of ownership and continuous improvement initiatives considered (Section 6)
Compliance Requirements
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdf (RFP)CSD registration: Mandatory – provide supplier number and unique registration reference; only foreign suppliers with no local entity exempt
Tax compliance: SARS Tax Compliance Status (TCS) PIN required; must remain compliant throughout contract; verified via CSD
COID: Letter of Good Standing required (Stage 1B)
B-BBEE/Specific Goals: Points for Black women owned (4), Black youth owned (4), Rural areas (4), People with disabilities (4), 51% Black owned (4) – total 20 points
Evidence: Certified ID copies, municipal/ESKOM bill or chief letter (≤3 months), doctor's note, B-BBEE certificate/affidavit
Compulsory briefing attendance: Form D certificate and attendance register
Standard forms: SBD 4 (Declaration of Interest), SBD 5 (NIPP), SBD 6.1 (Preference Points Claim)
JV/Consortium: Signed agreement with percentage split and responsibilities; or written confirmation of intent to form JV
All RFT documentation must be completed
Legal compliance: Full compliance with all applicable laws and regulations
Protection of personal data: POPIA compliance
Health & Safety
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfHealth and safety requirements not explicitly detailed in extracted text. General legal compliance required (Section 10.2). Bidders must comply with all applicable laws and regulations. Specific OHS requirements may be detailed in Annexure 4 (Scope of Work) or Draft Contract (Annexure 3).
Contractual Terms
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfDisclaimer: RFP not comprehensive or guaranteed accurate; PRASA accepts no liability for information adequacy
Confidentiality: All RFP information confidential; bidders must certify acquaintance with Non-Disclosure Agreement; information remains PRASA property
PRASA rights: May modify RFP, withdraw/amend without notice, reject non-conforming proposals, disqualify late submissions, request additional documents, withdraw RFP, award contract at any time after closing, make no award, validate bidder information, request annual financial statements, not accept rate changes after closing/award unless contract provides
Data processing: PRASA may process bidder personal information for evaluation; may disclose to service providers, government agencies, regulators, auditors, law enforcement, banks, insurers; bidders consent by participating
Contract negotiation: PRASA negotiates final terms with successful bidder(s) including Enterprise Development, Supplier Development, B-BBEE Improvement Plan, price, delivery
Fairness and transparency: Evaluation committee members declare conflicts, provide confidentiality undertakings; process monitored and auditable
Section
Source: RFP-SUPPLY,DELIVERY & OFFLOADING BALLAST.pdfPrice formula: Ps = 80(1 − (Pt−Pmin)/Pmin) where Ps = points for price, Pt = tender price, Pmin = lowest acceptable tender
Specific Goals (20 points total): Black women owned (4), Black youth owned (4), Rural areas (4), People with disabilities (4), 51% Black owned (4)
Evidence: Certified ID copies, municipal/ESKOM bill or chief letter (≤3 months), doctor's note, B-BBEE certificate/affidavit
Award splitting: PRASA reserves right to split award among multiple providers
Alternative appointments: If successful bidder fails to sign contract within 14 days, provide security/bonds, meet conditions precedent, or final negotiations fail
Validity: 90 working days from closing date
NIPP: SBD 5 required if imported content
Post-tender negotiation: PRASA may negotiate with shortlist, request best and final offers, re-evaluate on 80/20
Final contract award: Negotiate terms including Enterprise/Supplier Development, B-BBEE Improvement Plan, price, delivery
Fairness: Evaluation committee declarations, confidentiality undertakings, monitored auditable process
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 29 of 1996
Relevant to mining and quarrying services where mine health and safety duties may apply.
Relevant because this tender appears to involve mining, minerals, quarrying, exploration, or regulated mining services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve mining, minerals, quarrying, exploration, or regulated mining services.
Act 36 of 1998
Relevant to water use, sanitation, bulk water infrastructure and DWS authorisations.
Relevant because this tender appears to involve mining, minerals, quarrying, exploration, or regulated mining services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve mining, minerals, quarrying, exploration, or regulated mining services.
Address
41A Carr Street, Braamfontein, Jhb - Johannesburg - Johannesburg - 2000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
6
Last checked
07 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Median Estimate
R 15 993 245
Range
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Mining and quarrying. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog