Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Air Traffic and Navigation Services Company LimitedLocation
National
Closing Date
16 Nov 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
South Boulevard Road - Bruma - Bedfordview - 2198
Organization Type
GOVERNMENT
Published
02 Oct 2026
OCDS Reference
ocds-9t57fa-172744
Atns requires a turnkey replacement of its end-of-life high-frequency (hf) air-ground communication system used by oceanic air traffic controllers to communicate with aircraft over the south atlantic and indian ocean regions. The scope covers supply, delivery, installation, commissioning and 15-year maintenance of hf transmitters at a new delmas site, receivers at bapsfontein, remote control systems, fallback and disaster-recovery equipment at o.R. Tambo international airport, plus decommissioning of existing isando transmitters. Bidders must demonstrate full technical compliance against hundreds of individually scored paragraphs, where mandatory non-compliance triggers disqualification and every desirable requirement must be substantiated with proof.
Closing date: 16 November 2026 at 14:00. Submission method and address are not stated in this volume — bidders must confirm in the tender portal or Volume 1.
Mandatory (M) paragraphs: any non-compliance disqualifies the bidder from further evaluation; bidders must declare C/PC/NC/Noted for every paragraph with referenced proof.
Technical scoring: C = 2 points, PC = 1 point, NC = 0 points; unclear or missing responses are interpreted as NC even if the compliance box states otherwise.
System validation: the offered HF system must be currently operationally deployed in at least one ICAO member state.
Transmitter power output: 4 kW PEP (±500 W), 3–30 MHz, with strict IMD, harmonic, spurious and noise specifications; VSWR protection up to 3.1; frequency change time ≤100 ms.
Receiver quantities: 7 SAT + 1 spare, 5 INO + 1 spare; sensitivity ≤ -113 dBm, image/IF rejection ≥80 dB, tuning resolution ≤10 Hz, stability ±1 ppm.
Antenna cabling: 620 m total coaxial replacement (440 m at Delmas, 180 m at Bapsfontein) using existing omni-directional structures.
Environmental and power: outdoor IP65 minimum, -20°C to +60°C; indoor -5°C to +55°C; 400/230V 50 Hz 3-phase with ±10% voltage fluctuation and full backup power integration.
Cyber security: FIPS 140-3 cryptography, VPN-only remote access, TLS/IPsec, role-based access control, multifactor authentication, patch management, and full compliance with ATNS security policy.
15-year lifespan: all components and infrastructure must achieve 15 years; bidder must state interventions and price associated costs.
Scope includes EIAs, civil works, RCMMS installation at three sites, fallback and disaster-recovery duplication at FAOR SSS Building, and decommissioning/disposal of Isando equipment.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 16 November 2026 - 14:00
Venue
Meeting ID: 323 184 772 914 890 Passcode: HA6pa9bp
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
South Boulevard Road - Bruma - Bedfordview - 2198
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: Volume 1C - HF Replacement Final.xlsx02 Oct
2026
Tender Published
Tender was published
16 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Volume 3 - HF Replacement Final.docx
Analysis completed but response format was invalid
Volume 1C - HF Replacement Final.xlsx
Analysis completed but response format was invalid
Volume 4 - HF Replacement Final.docx
Supply, delivery, installation and commissioning of HF equipment at Bapsfontein and Delmas, with associated maintenance and support for Air Traffic and Navigation Services Company Limited. The procurement includes a 15-year maintenance and support contract, logistics support plans, training, spares, test equipment and documentation. Bids close on 16 November 2026 at 14:00.
Project Weightings_HF Replacement_Final.xlsx
Supply, delivery, installation and commissioning of HF equipment at Bapsfontein and Delmas, with associated maintenance and support, is required for Air Traffic and Navigation Services Company Limited. The scope covers transmitter and receiver stations, project management, support, training, spares and maintenance services.
Volume 1B - HF Replacement.docx
ATNS requires a service provider to supply, deliver, install and commission High Frequency (HF) radio equipment at Bapsfontein and Delmas sites, including a training system at the FAOR operational complex, with 15 years of maintenance and support and a mid-life upgrade. The contract spans 18 years: a 3-year acquisition phase (including a 12-month Period of Beneficial Use) followed by a 15-year maintenance and support phase.
Volume 2 - HF Replacement Final.docx
Supply, delivery, installation, commissioning and 15-year maintenance of HF communication equipment for air traffic control at Bapsfontein (receiver site) and Delmas (new transmitter site), with disaster recovery duplication at FAOR SSS Building. The system replaces obsolete equipment used for aircraft communication over the South Atlantic and Indian Ocean regions.
Volume 1A - HF Replacement Final.docx
ATNS requires a service provider to supply, deliver, install, and commission HF (High Frequency) communication equipment at Bapsfontein (receiver site) and Delmas (new transmitter site), with associated maintenance and support. The project replaces obsolete equipment at Isando and Bapsfontein sites used for air traffic control communication with aircraft in INO and SAT oceanic regions.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ATNS tenders with AI Discovery, aviation-systems intelligence, compliance analysis, and structured support for navigation and training contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
HF equipment items and associated costs for the system as specified in the tender price schedule (Appendix G3).
Important Dates
Source: Volume 1C - HF Replacement Final.xlsx (unknown)Closing: 16 November 2026 at 14:00
Technical Specifications
Source: Volume 1C - HF Replacement Final.xlsx (unknown)HF equipment supply, delivery, installation and commissioning at Bapsfontein and Delmas.
Description
Source: Volume 1A - HF Replacement Final.docxBidders Declaration and Structure Clarification Form: Bidders must specify bidding structure (individual, joint venture, consortium) and indicate primary bidding entity. Form requires details for individual bidder, lead JV member, or primary entity in consortium, plus details of any JV/consortium members. This form clarifies the legal structure of the bidder for evaluation purposes.
Important Dates
Source: Volume 1A - HF Replacement Final.docx (unknown)Closing date and time: 16 November 2026 at 14:00 CAT
Clarification queries deadline: 26 October 2026 at 17:00 CAT
Consolidated responses to queries: 02 November 2026 at 17:00 CAT
Bid validity period: 120 days from submission
Contact Information
Source: Volume 1A - HF Replacement Final.docx (unknown)Pre-bid enquiries: Specialist: Demand Management, Siyabonga Ncube, email: [email protected] (cc: [email protected])
Post-bid enquiries: Specialist: Acquisition Management, Lesedi Mashiloane, email: [email protected] (cc: [email protected])
Submission address (hard copy): ATNS Company Limited, Eastgate Office Park, Block C, South Boulevard Road, Bruma, 2298, South Africa
Submission Guidelines
Source: Volume 1A - HF Replacement Final.docx (unknown)Submission structure: three parcels
Parcel A – Administrative and Mandatory (Phase 1 and 2 Evaluation): Volume 1B (Conditions and form of contract/SLA), Volume 1A (General instructions and administrative requirements, excluding SBD 3.3 and 6.1)
Parcel B – Technical Proposal: Volume 2 (Technical specifications), Volume 3 (Project management specifications), Volume 4 (Logistics support specifications)
Parcel C – Price and Preference Points for Specific Goals (Phase 5 Evaluation): SBD 3.3 (Pricing Schedule – Professional Services), SBD 6.1 (Preference Points Claim Form), CSD Report, CIPC Documents, Shareholder Certificates, ID copies of shareholders, Valid B-BBEE Certificate or Sworn Affidavit (for EMEs/QSEs)
Closing date and time: 16 November 2026 at 14:00 CAT
Submission methods: online via e-Submission (e-Tender) system OR hard copy (one original, one copy, one PDF on USB)
Hard copy delivery address: ATNS Company Limited, Eastgate Office Park, Block C, South Boulevard Road, Bruma, 2298, South Africa
Bid validity: 120 days from submission
Clarification queries: use Form of Questionnaire (Appendix A) by 26 October 2026 at 17:00 CAT
Consolidated responses to queries: by 02 November 2026 at 17:00 CAT
Evaluation Criteria
Source: Volume 1A - HF Replacement Final.docx (unknown)Stage 1 – Administrative Requirements: non-compliance may result in rejection or 7 days to submit supplementary information (administrative only)
Stage 2 – Mandatory Requirements: must comply to proceed; failure leads to rejection
Stage 3 – Technical Evaluation: 100 points total; minimum sub-threshold 75% (75 points) for each of Volumes 2, 3, 4; overall minimum threshold 75 points (75%)
Stage 4 – Price and Preference Points for Specific Goals: 90/10 preference point system (per SBD 6.1); price points calculated per formula; specific goals points claimed via SBD 6.1 with supporting documents (CSD Report, CIPC documents, Shareholder certificates, ID copies, B-BBEE certificate or sworn affidavit)
ATNS evaluates per Preferential Procurement Regulations, 2022
Technical Specifications
Source: Volume 1A - HF Replacement Final.docx (unknown)Scope: Supply, delivery, installation, commissioning of HF equipment at Bapsfontein and Delmas with associated maintenance and support
Sites: Bapsfontein (Receiver site), Emergency (Disaster Recovery site), Delmas (Newly planned transmitter site), FAOR technical centre, Isando (Current transmitter site)
Purpose: Replace obsolete HF equipment at Isando and Bapsfontein; new HF Transmitter station at Delmas; maintain SLA for communication with aircraft in INO and SAT oceanic regions
Technical details in Volume 2 (Technical specifications), Volume 3 (Project management specifications), Volume 4 (Logistics support specifications)
Financial Requirements
Source: Volume 1A - HF Replacement Final.docx (unknown)Pricing: SBD 3.3 (Pricing Schedule – Professional Services) in separate envelope (Volume 1C); price must include all customs/duties, delivery, installation costs
Rate of exchange: ATNS not liable for exchange variation in Acquisition Phase; contract price fixed in Rands for Acquisition Phase; contractor bears exchange variation cost
Options/Contract Variation Orders: hedged upon receipt of Order; variation between quoted and hedged rate for contractor's account
Contract variations: only by Engineer approval; 30-day approval period
Maintenance phase: Contractor hedges foreign content annually; variation between spot rate and hedged rate for ATNS account/credit
Contractor must provide: total estimated foreign component cost of support maintenance, escalation percentages per year, total cost in foreign currency (Table A) and local currency (Table B)
Exchange cover: within 14 days of contract receipt, arrange exchange cover for total exchange amount
Performance security: within 30 days of contract award, furnish performance security per SCC (bank guarantee, irrevocable letter of credit, or cashier's/cheque)
Warranty: 12 months after goods delivery
Payment terms per GCC clause 16
Compliance Requirements
Source: Volume 1A - HF Replacement Final.docx (unknown)CSD registration mandatory (proof required with bid)
Valid tax compliance status (SARS PIN/TCS) – each JV/consortium party must submit separate proof
B-BBEE certificate or sworn affidavit (EMEs ≤R10m, QSEs ≤R50m)
CIPC registration documents
Shareholder certificates and ID copies of shareholders
Completed and signed standard forms:
No directors/shareholders employed by state or connected to ATNS employees
No collusive bidding (SBD 9 implied)
Acceptance of General Conditions of Contract
Professional body registration where applicable
Declaration of Interest mandatory
Invitation to Bid mandatory
Description
Source: Volume 3 - HF Replacement Final.docxATNS requires a service provider for the supply, delivery, installation and commissioning of HF (high frequency) equipment at two sites — Bapsfontein and Delmas — together with ongoing maintenance and support. This volume covers project management and systems engineering requirements only; technical specifications, pricing and commercial terms are in other volumes.
Contact Information
Source: Volume 3 - HF Replacement Final.docx (unknown)No contacts or addresses stated in this volume — refer to other tender volumes for SCM and technical contacts, submission address and service delivery addresses.
Submission Guidelines
Source: Volume 3 - HF Replacement Final.docx (unknown)Submit in English as per the General Information and Instructions to Bidders document.
Returnable forms and documents:
Compliance declaration format:
Disqualification risks:
Evaluation Criteria
Source: Volume 3 - HF Replacement Final.docx (unknown)Two-stage evaluation with compliance scoring per paragraph:
Mandatory requirements (M): proposals not complying are disqualified from further evaluation.
For PC or NC declarations, bidders must include a statement on the nature of the variation and may supply additional supporting information to demonstrate how the proposal may still meet ATNS's needs.
Preference point system: not stated in this volume — refer to tender conditions in other volumes.
Minimum qualifying score: not stated in this volume — refer to tender conditions in other volumes.
Technical Specifications
Source: Volume 3 - HF Replacement Final.docx (unknown)Scope: supply, delivery, installation and commissioning of HF equipment at Bapsfontein and Delmas, with associated maintenance and support.
Project management deliverables:
Systems engineering:
Testing and evaluation:
Installation and commissioning:
Site survey requirements (before any equipment ordered):
Key personnel:
ACSA permits for FAOR complex:
Financial Requirements
Source: Volume 3 - HF Replacement Final.docx (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms or financial capacity thresholds stated in this volume — refer to tender conditions and pricing schedules in other volumes.
Cost responsibility:
Compliance Requirements
Source: Volume 3 - HF Replacement Final.docx (unknown)Quality assurance:
Occupational health and safety:
Environmental:
No B-BBEE level, CIDB grade, CSD registration, tax clearance, CIPC registration, professional-body registration or local content percentage stated in this volume — refer to other tender volumes.
Description
Source: Volume 4 - HF Replacement Final.docxProcuring entity: Air Traffic and Navigation Services Company SOC Ltd (ATNS). Tender for supply, delivery, installation, commissioning, and 15-year maintenance and support of HF equipment at Bapsfontein and Delmas. Reference: ATNS/RFP05/09/2026/2027/HF_REPLACEMENT_RE_AD.
Important Dates
Source: Volume 4 - HF Replacement Final.docx (unknown)Closing date: 16 November 2026 at 14:00
Evaluation Criteria
Source: Volume 4 - HF Replacement Final.docx (unknown)Compliance-based evaluation: each requirement scored C (fully compliant, 2 points), PC (partly compliant, 1 point), NC (not compliant, 0 points). Mandatory requirements (marked M) must be met or bid disqualified. Bidders must respond to each paragraph with compliance declaration and supporting references. No overall price/functionality split or preference point system detailed in this volume.
Technical Specifications
Source: Volume 4 - HF Replacement Final.docx (unknown)Scope: Supply, delivery, installation, commissioning, and 15-year maintenance and support of HF equipment at Bapsfontein and Delmas.
Phases: Development (Phase 1A bid submission, Phase 1B contract baseline), Implementation (Phase 2 roll-out/installation), Validation (Phase 3 PBU – 1 year after Site Acceptance Test), Application (Phase 4 – 15-year operational life).
Performance requirements: System availability 99.98% (max 1.752 hours downtime/year), reliability 98.5% (max 4 failures/year over 15 years).
Support concept: Three-tier (Operator, Intermediate, Depot) aligned with ATNS maintenance model.
Key deliverables: Integrated Logistic Support Plan (ILSP), Logistic Support Plan (LSP), Reliability Availability Maintainability Plan (RAMP), Training Plan (operational training for 10 personnel, advanced technical maintenance for 8, hardware training, e-learning, on-the-job training), Spares Plan (15-year coverage, consumables for first 2 years), Test Equipment Plan, Documentation Plan, Package Handling Storage & Transport Plan, Configuration Management Plan, Interface Control Documents.
Maintenance & Support Contract: 15 years, quarterly invoicing in arrears, labour/service rates for local/overseas resources, LRU repair turnaround 45 business days, penalties for TAT breach, obsolescence management, emergency resource provision within 48 hours.
Severity levels and service level response times defined in Tables 3 and 4.
Financial Requirements
Source: Volume 4 - HF Replacement Final.docx (unknown)Pricing for Maintenance and Support contract to be submitted in Volume 1C only. Quarterly invoicing in arrears. Schedule of labour and service rates for local and overseas resources, normal hours, weekends, public holidays. Penalties for LRU repair turnaround time exceeding 45 business days: penalty formula based on priority factor, actual vs maximum response time, up to 10% of annual contract value per quarter, capped at annual value. No bid security, performance bond, or retention details in this volume.
Compliance Requirements
Source: Volume 4 - HF Replacement Final.docx (unknown)Mandatory compliance with all requirements marked (M) in this document; non-compliance leads to disqualification. Bidders must submit a compliance statement for each specification. No specific CSD, tax, B-BBEE, CIDB, or local content requirements detailed in this volume.
Description
Source: Volume 1B - HF Replacement.docxProcuring entity: Air Traffic and Navigation Services Company SOC Ltd (ATNS), a state-owned company (registration 1993/004150/30).
Tender reference: ATNS/RFP05/09/2026/2027/HF_REPLACEMENT_RE_AD
Document: Volume 1B — Conditions and Form of Contract (Service Level Agreement), October 2026.
Confidentiality: all information is confidential to ATNS and may only be used for preparing a response; no disclosure to third parties without written consent.
Contract precedence: this Contract and its annexures supersede conflicting requirements in associated documents.
Governing law: South African law, unless ATNS decides otherwise.
Order of precedence: special conditions prevail over general conditions where conflict exists.
Severability: illegal or unenforceable provisions are severed without invalidating the remainder.
Contra proferentem rule: does not apply — each provision negotiated for benefit of both parties.
Contact Information
Source: Volume 1B - HF Replacement.docx (unknown)No contacts stated in this volume — refer to Volume 1A for SCM and technical enquiry details.
Submission Guidelines
Source: Volume 1B - HF Replacement.docx (unknown)Submission method and address: not stated in this volume — refer to Volume 1A or the RFP invitation for closing time, address and channel.
Returnable forms required (standard ATNS tender pack, confirm in Volume 1A):
Disqualification risks: any unsigned or omitted returnable form; late submission; failure to submit required security or guarantees where called for.
Evaluation Criteria
Source: Volume 1B - HF Replacement.docx (unknown)Evaluation framework: not fully detailed in this volume — refer to Volume 1A for complete scoring methodology.
B-BBEE requirements found in this volume:
Preference points system: not stated in this volume — confirm 80/20 or 90/10 in Volume 1A.
Minimum qualifying score: not stated in this volume.
Technical Specifications
Source: Volume 1B - HF Replacement.docx (unknown)Scope: supply, delivery, installation and commissioning of HF (High Frequency) equipment at Bapsfontein and Delmas, with associated maintenance and support.
Additional deliverables:
Contract structure:
Key acceptance stages:
Guarantee Period: minimum 12 months per part, commencing on Acceptance.
Period of Beneficial Use (PBU): minimum 12 months from Site Acceptance to Final Acceptance.
Engineer: ATNS-appointed representative for contract administration and acceptance decisions.
Management plans required (Schedule C):
Language: English for all business and documentation.
Financial Requirements
Source: Volume 1B - HF Replacement.docx (unknown)Pricing components to be scheduled (Schedule A / A1):
Payment:
Price basis:
Performance security:
Insurance: contractor must maintain required insurance (details in contract clauses).
Retention: not explicitly stated in this volume.
Compliance Requirements
Source: Volume 1B - HF Replacement.docx (unknown)CSD registration: implied standard requirement (confirm in Volume 1A).
Tax compliance: SARS tax clearance or tax compliance status PIN implied for state-owned entity contracts.
CIPC registration: required as standard for juristic persons.
B-bbee:
CIDB: not applicable (non-construction procurement).
Local content: definitions provided; no minimum percentage stated in this volume — check SBD 6.2 and Volume 1A for threshold.
Professional registrations: not stated; aviation/telecommunications equipment expertise implied by scope.
Data sovereignty: assurances and safeguards required per clause 2.4.6.
Anti-bribery and anti-corruption: contractual obligations apply.
Legal compliance: all applicable South African legislation.
Description
Source: Project Weightings_HF Replacement_Final.xlsxInstallation, Transition and Commissioning (ITC) Plans are required as part of the Test and Evaluation Master Plan, weighted at 6% in Volume 3. The ITC Plans must detail the approach for installation, transition from existing systems, and commissioning of the new HF equipment at both sites.
Evaluation Criteria
Source: Project Weightings_HF Replacement_Final.xlsx (unknown)Evaluation criteria (technical functionality) split across three volumes, each totalling 100% weighting:
No minimum qualifying score stated. Preference point system (80/20 or 90/10) not specified in extracted text.
Technical Specifications
Source: Project Weightings_HF Replacement_Final.xlsx (unknown)Scope: Supply, delivery, installation, commissioning of HF equipment at Bapsfontein (receiver station) and Delmas (transmitter station) with associated maintenance and support.
Key technical requirements (from Volume 2 weightings):
Project Management deliverables (Volume 3): General Instructions, Relevant Project Experience, Project Management Plan, Project Status Reports, Master Project Schedule, Project Review Meetings, Work Breakdown Structure, Statement of Work, Resource Allocation Plan, Contract Data Requirements List, Resumes of Key Personnel, Technical Reviews, Risk Management Plan, Systems Engineering Master Plan, System Design Review, Test and Evaluation Master Plan, ITC Plans, Quality Assurance Plan, Occupational Health and Safety Plan, Site Survey, Environmental Management Programme, ACSA Permits.
Phases (Volume 4): Development Phase – System Performance Requirements, Support Concept, ILSP, LSP, RAMP, Training Plan (Operational, Technical Maintenance, Hardware), Spares Plan, Test Equipment Plan, Documentation Plan, Package Handling Storage & Transport Plan, Configuration Management Plan, System Lifespan, Interface Control Document. Implementation Phase – Deliverables. Validation Phase – PBU, PBU Verification, Updates. Application Phase – Application of Logistic Support Plan. Contract Data Requirement List (CDRL). System Failure Definition and Correction Service Levels. Maintenance and Support Contract Requirements.
Description
Source: Volume 2 - HF Replacement Final.docxProcuring entity: Air Traffic and Navigation Services Company SOC Ltd (ATNS).
Evaluation Criteria
Source: Volume 2 - HF Replacement Final.docx (unknown)Technical compliance scoring per paragraph:
Mandatory (M) requirements: non-compliance leads to disqualification.
Desirable (D) requirements: bidder must declare compliance level and provide supporting documents.
Information (I) paragraphs: bidder must respond and provide information if requested.
Optional (O) paragraphs: bidder may decide how to respond.
No overall evaluation methodology (price/preference point split, minimum qualifying score) is specified in this volume.
Technical Specifications
Source: Volume 2 - HF Replacement Final.docx (unknown)Scope: Turnkey HF system replacement for air-ground communication in South Atlantic (SAT) and Indian Ocean (INO) regions, including search and rescue.
Locations:
Key deliverables:
System requirements:
Transmitter (Delmas):
Receiver (Bapsfontein):
Rcmms:
Antenna:
Antenna coupler: Splitter to share antenna between two couplers
BITE: Tests for receiver/transmitter performance, SELCAL, syllabic mute, VCO, serial port
Interfaces:
Fallback system:
Disaster recovery:
Equipment cabinets: 19" racks, natural heat dissipation, cable management, maintenance access, layout drawings required
Software/security:
Validation: System must be operationally deployed in at least one ICAO member state
Computer application: Real-time frequency recommendation for INO/SAT based on ionospheric conditions, standalone PC with separate screen at ATC position
Environmental:
Power:
Lifespan: 15 years for system and components; interventions and costs for 15-year lifespan to be stated and priced
Reference documents: ICAO Annex 10 Vol III, SANS 10142
Compliance Requirements
Source: Volume 2 - HF Replacement Final.docx (unknown)Technical compliance with:
No CSD, tax, B-BBEE, CIDB, CIPC, professional registration, or local content requirements are specified in this volume.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
South Boulevard Road - Bruma - Bedfordview - 2198
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
04 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 298 080
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.