Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Winnie Madikizela-Mandela Local MunicipalityLocation
National
Closing Date
06 Nov 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Winnie Madikizela Mandela - Bizana - Bizana - 4800
Organization Type
GOVERNMENT
Published
28 Oct 2026
OCDS Reference
ocds-9t57fa-176113
The winnie madikizela-mandela local municipality requires a suitably qualified service provider to deliver pre-capacity building and skills training for 90 beneficiaries linked to three planned manufacturing hubs in bizana. The six-month programme covers plumbing, carpentry, brick laying, mechanical, health and safety, quality assurance, finance for non-finance, and project steering committee training, all delivered physically. Bidders must score at least 70% on functionality to proceed, and the local content threshold is 100%.
Closing: 6 November 2026 at 12h00; submit by email to [email protected] only.
Functionality minimum: score 70% or more on Stage 1 (100 points) to be considered for award.
Experience: traceable record of at least 1 training programme (10 points) or 2 training programmes (20 points); reference letters must be no older than 3 months.
Accreditation: SETA accreditation (15 points), QCTO or professional registration board (10 points), registered assessor with SETA (10 points), team CVs with roles and references (15 points).
Local content: minimum threshold is 100%; submit MBD 6.2 and Annex C, calculated per SATS 1286:2011.
VAT: bidders with taxable turnover above R2.3 million must be VAT registered or the bid may be rejected.
Returnables: original municipality-issued bid document, entity registration, certified director IDs (not older than 3 months), CSD proof, SARS PIN, MBD 1, 4, 6.1, 8, 9, municipal rates clearance, and signed letter confirming no outstanding municipal accounts.
Date & Time
Friday, 06 November 2026 - 12:00
Venue
null
Categories
Request for Bid(Open-Tender)
28 Oct
2026
Tender Published
Tender was published
06 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf
The Winnie Madikizela-Mandela Local Municipality requires a qualified service provider to conduct pre-capacity building for 90 beneficiaries of its three planned manufacturing hubs. The six-month programme covers training in plumbing, carpentry, brick laying, mechanical work, health and safety, quality assurance, finance for non-finance, and project steering committee skills. The provider must deliver all training logistics, materials, and reports, with a mandatory 100% local content threshold.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Median Estimate
R 552 000
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Winnie Madikizela Mandela - Bizana - Bizana - 4800
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfThe municipality is developing 3 manufacturing hubs to produce high-quality building material through technology-driven machinery. The feasibility study (geotechnical, land survey, environmental impact assessment, architectural designs) is underway. The hubs aim to increase local production, create jobs, reduce economic leakages, and support SMMEs in Mbizana and the Alfred Nzo District. The project will upskill 3 communities to participate in the hubs.
Important Dates
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)No compulsory briefing session or site visit is mentioned.
Contact Information
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)Technical enquiries:
Supply Chain Management enquiries:
Submission:
Municipality postal address:
P O Box 12
Mbizana
4800
Submission Guidelines
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)Tenders must be emailed to [email protected] before the closing time. Only bids submitted on the original municipality-issued documentation will be considered; each page must be initialled by an authorised person. Bids must be clearly marked with the project name and reference number. Unauthorised alterations to the pricing schedule or bid documents invalidate the bid. Hand-delivered, late, incomplete or facsimile bids are rejected.
Returnable forms (all must be completed and signed):
Evaluation Criteria
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)Bids are evaluated in two stages.
Stage 1 – Functionality (minimum qualifying score: 70/100):
Only bidders scoring 70% or more proceed to Stage 2.
Stage 2 – Preference points (80/20 or 90/10 system):
Technical Specifications
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)The municipality requires a service provider to conduct pre-capacity building for 3 manufacturing hubs in Bizana. The programme must upskill 3 identified communities and create a pool of skilled workers who may later participate in the hubs.
The hubs will produce SABS-approved building materials such as building blocks, concrete, slabs and paving blocks.
Specific training programmes (critical milestones):
Project Steering Committee training content: time management (Level 2), communication techniques (Level 1), conflict management (Level 2), leadership concepts (Level 2), and finance for non-finance (Level 1).
Training delivery: all training conducted physically, not virtually (rural area); COVID-19 regulations apply. The service provider must arrange the training facility, accommodation and transport where applicable, meals (breakfast and lunch) and water for sessions longer than 5 hours, all training material (projector, flip chart, pens, files, note pads), and protective clothing (gloves, boots, hats, overalls) where applicable.
Project deliverables:
Project duration: 6 months from date of appointment. Timeframes are strict; milestones and compensation amounts must be stated in the implementation plan.
Methodology
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfThe provider must prepare an inception report with a clear methodology for all training areas, work plan, staffing, timeline, logistics, organisation, and evaluation plan. Training is delivered through lectures, interactive methods, group discussions, and practical testing and licensing. The provider must arrange facilities, meals, materials and protective clothing. The methodology must cover scope of work, quality management, risk management, communication and time frames. An implementation plan with the ability to start immediately and sustain the project until completion is required.
Experience & Qualifications
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfMandatory: the project leader must hold at least a diploma or degree in Project Management, Human Resource Management, or Business Administration.
Track record: bidders must have conducted at least 1 training programme (10 points) or 2+ training programmes (20 points) for functionality. Appointment letters and reference letters (not older than 3 months) must be attached.
Team skills required: research, analytical, writing, communication, understanding of local economic development, records management, project administration, outcome-based assessment, facilitation, skills development, information gathering, strategic planning, report writing, presentation.
Submit a list of team members with names, qualifications, experience and roles, and a company/team profile. Team members must attend all progress meetings and cannot be changed without municipality approval.
Quality Management
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfThe training programme must include quality assurance training for 8 people at Level 4. The methodology must include quality management (4 points). The service provider must ensure quality delivery and adhere to agreed deliverables. Quality assurance steps must be indicated in the proposal. Final report must detail achievements, challenges, lessons learned, and include registers, certificates and licences.
Pricing Schedule
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfPricing schedule must be submitted on a separate sheet from the technical proposal. It must include the names of the project personnel, amounts in South African Rand, disbursements separate and inclusive, and VAT included. Pricing must state bid price excluding VAT (y) and imported content (x) for local content calculation. Payments are made per the payment schedule in the SLA. Financial penalties apply for late milestones.
Financial Requirements
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)Compliance Requirements
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdf (TENDER)Health & Safety
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfTraining must comply with applicable COVID-19 regulations. Health, Safety & Environmental training for 8 people (Level 4) is required. The provider must supply protective clothing (gloves, boots, hats, overalls) where applicable. Inception report must include health and safety methodology.
Environmental
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfAn environmental impact assessment is part of the feasibility study for the manufacturing hubs. The environmental training component is included in the capacity building programme.
Contractual Terms
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfThe contract is subject to the municipal Supply Chain Management general conditions and a written Service Level Agreement signed upon appointment. Staffing must remain unchanged for the project duration unless approved in writing. Confidentiality and copyright: all documents and data prepared belong to the municipality; no information may be used for other purposes without written authorisation. The municipality may terminate for non-performance. The service provider may be required to make a presentation at their own cost. Financial penalties for delays as per the schedule.
Section
Source: CAPACITATION OF 90 MANUFACTURING HUBS BENEFICIARIES-update.pdfEvaluation is two-stage: (1) Functionality (minimum 70/100) covering previous experience (30 points), capacity and expertise (50 points), and methodology (20 points); (2) Preference points on the 80/20 or 90/10 system (price and specific goals). See main evaluationCriteria section for full breakdown.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Winnie Madikizela-Mandela Local MunicipalityContact Person
Mr. B. Hlangabezo
Phone
039-251-0230
[email protected]
Address
Mbizana, 4800, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
29 Oct 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win Winnie Madikizela-Mandela tenders with AI Matching & Recommendations, rural development intelligence, and application support for Bizana area projects.
Key Personnel
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Data conflicts
None detected
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.