Tender Type
Expression of interest
Delivery Location
1 JONES RD - KEMPTON PARK - JOHANNESBURG - 0186
Organization Type
GOVERNMENT
Published
10 Sept 2026
OCDS Reference
ocds-9t57fa-169940
Acsa is seeking expressions of interest for the design, supply, install, integrate, commission, support, decommission, and maintenance of an integrated aviation security screening solution across its airport network, with an anticipated lifecycle of approximately ten (10) years. The solution must cover cabin baggage screening using 3D/CT x-ray technology, full-body scanners, automated lanes, arch way metal detectors, and goods/outsize baggage x-ray machines, meeting strict SACAA, tsa/ecac, and national department of health compliance. Bidders must note the mandatory requirement for a full engineering, risk, and environmental management plan, including insurance cover and contingency planning to prevent business interruption.
Bidders must provide a detailed contingency plan to prevent business interruption during installation, covering equipment damage, rigging deviations, environmental occurrences, damage to building, and injury to staff or passengers.
Bidders must confirm that the Estimated Maximum Loss (EML) of potential occurrences is covered by the bidder's insurance program.
A detailed environmental management plan is mandatory, including safe handling and disposal of radioactive materials, adherence to Department of Health guidelines, and ensuring no negative impact on flora and fauna.
Bidders must submit a Class 2 cost estimate, with engineering and structural due diligence, method statements, and process and instrumentation diagrams approved by a Professional Engineer.
Bidders must provide plans for commissioning and decommissioning, including reliability testing, and must address decommissioning and safe disposal of current equipment.
Bidders must include a risk assessment covering all likely occurrences with monetised mitigation, and provide Builders All Risk and Third-Party Liability insurance policy wording project-specific to ACSA.
Bidders must provide a maintenance regime, including preventative and reactive cost estimates for the equipment's useful life, a list of critical spares and holding costs, and a training program for ACSA staff.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 09 October 2026 - 12:00
Venue
OR TAMBO INTERNATIONAL AIRPORT: ACSA Media Room OR Tambo International Airport Next to the Term
An ms teams invite will be sent to respondents who cannot attend physically upon request via email. The last date for an email request will be on the 22nd of september 2026 at 9am.
Categories
Expression of interest
1 JONES RD - KEMPTON PARK - JOHANNESBURG - 0186
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: SAIDSA Accreditation, ISO 18788 (Security Operations Management)
AI Document Analysis Stages
Description
Source: TECHNICAL SPECIFICATION.pdf (unknown)10 Sept
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
TECHNICAL SPECIFICATION.pdf
Airports Company South Africa (ACSA) is procuring a 10-year integrated aviation security screening solution covering design, supply, installation, integration, commissioning, support, decommissioning, processing capacity testing, project management and maintenance across its airport network. The solution includes 3D/CTX cabin baggage X-ray machines, full body scanners, automated lanes, archway metal detectors, dual-view goods X-ray machines and remote screening rooms, with mandatory compliance to SACAA, TSA/ECAC and South African Department of Health standards.
COR8203 2026 EOI - ACSA SMART DETECTION.pdf
Airports Company South Africa (ACSA) is seeking expressions of interest from suitably qualified entities for the potential future design, supply, installation, integration, commissioning, support, decommissioning, processing capacity testing, project management and maintenance of an integrated aviation security screening solution across its nine airports, with an anticipated lifecycle of approximately ten years. The solution includes 3D cabin baggage screening systems with automated lanes, goods screening machines, passenger screening X-ray systems, and the design and operationalisation of remote screening rooms.
SCOPE OF WORKS.pdf
An integrated aviation security screening solution is being procured for the Airports Company South Africa (ACSA) network, covering design, supply, installation, integration, commissioning, support, decommissioning, processing capacity testing, project management, and maintenance over an anticipated lifecycle of approximately ten years. The solution encompasses cabin baggage screening (3D X-ray), goods and supplies X-ray (2D), full body scanners, automated lanes, archway metal detectors, and a remote screening room.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 343 700
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tender is for the supply, installation, and commissioning of Explosive Detection Systems (EDS) and Advanced Imaging Technology (AIT) at ACSA airports. The equipment includes automated screening lanes, remote screening rooms, archway metal detectors, and full body scanners. The project requires integration with existing airport operations, including passenger flow management and baggage handling. The equipment must meet SACAA and ACSA technical specifications, including detection performance, processing capacity, and environmental compliance.
Contact Information
Source: TECHNICAL SPECIFICATION.pdf (unknown){"name":"Mr Irvin","email":null,"phone":"+27 11 723 1400","department":"of Health of South","address":null}
Evaluation Criteria
Source: TECHNICAL SPECIFICATION.pdf (unknown)The extracted document does not state general eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or local content percentages. Mandatory technical compliance includes: ECAC or TSA approval for all screening equipment; full body scanners and archway metal detectors must comply with National Department of Health of South Africa legislation; all equipment must meet SACAA minimum detection settings as specified. Bidders must provide a Class 2 cost estimate and engineering plans approved by a Professional Engineer. Bidders must confirm that Estimated Maximum Loss (EML) is covered by their insurance program. Bidders must provide a Builders All Risk insurance program and Third-Party Liability policy wording. Bidders must provide a detailed environmental management plan for radioactive materials handling and disposal, with daily radioactivity test certificates. Bidders must provide a construction completion guarantee and reliability test program. Bidders must provide a risk assessment with monetary evaluation of loss events. Bidders must provide a maintenance regime and life cycle costing as specified.
Technical Specifications
Source: TECHNICAL SPECIFICATION.pdf (unknown)Design
Minimum of 10 years
‘uptime’ 99% under realistic operating conditions
items. TSA or ECAC
which enable faster and more accurate decision-making and reduce operational overheads. Africa
of an ever-expanding list of prohibited items (latest threats) improving security outcomes and al
efficiency. ORTIA 3000 3000
Processing (pax/hr) Full body scanner
prohibited items. Speed To meet the Processing rate
Max Radiation Less than 0.1 mR/hr
Climatic Humidity = 5 to 93%
Condition Temperature = 0 to 400C
Confidential
Confidential Confidential
screening).
PAREMETER Requirement
Advanced Imaging Technology (AIT) – millimeter wave or backscatter
Technology
(non-imaging or privacy-preserving) with automated target recognition.
Must detect metallic and non-metallic threat objects (including explosives,
Detection capability
Full body scanner firearms, knives) concealed on the body
Automated target recognition (ATR) ATR required; no operator-viewable detailed body image
Detection probability (Pd) 95% for all defined threat objects in the NASP
False alarm rate (FAR) 15% per screening
Throughput 180 persons/hour per lane
No storage of unblurred images; images deleted immediately after analysis;
Privacy safeguards
remote screening rooms must comply with data protection requirements
Machine Operational Requirements Technical Specification
Automated Lanes
(Atr)
to available space.
Conveyor height divests 750/800/850
Confidential
Confidential Confidential
improved passenger experience. solution
the process moving by addresses the key issues of passenger divestment:
Maximum Conveyor Load (kg/ o tray loading and return. 25
conveyor zone) o re- routing suspicious items.
Less than or equal to o and ‘reclaim’space at the end of the checkpoint. Sound pressure 65 dB
different requirements and expand to handle increasing passenger traffic. Operating temperature 0 to 400C
systems and functions. Design Lifespan Min 7 years
Average ‘uptime’ 99% components.
by more than 100% compared to conventional checkpoints. 40-90% non-
o Remote screening
o Automatic and random diversion
Machine Operational Requirements Technical Specification
Arch Way Metal
Detector
non-iron-based)
Average ‘uptime’ conditions
Confidential
Confidential Confidential
adjustable. National Department of Health of
Detection zones multiple
detected. 0-100 or more adjustable or
as nearby electronic equipment. Power Supply 220V AC ± 10%, single phase, 50Hz
and alarm counts.
frequency variation = +/-1%
battery operation signalling. Maximum Distance 0,3 at low sensitivity and 0,5 at high
equipment guarantees and warranties should be provided by the manufacturer.
Arch Way Metal
Detector (Walk
Through Metal
PAREMETER Requirement
Detector)
Test object detection 100% detection of specified test objects (e.g., 100 g ferrous blade, 50 g
non-ferrous handgun replica).
Confidential
Confidential Confidential
Uniformity Must detect metallic and non-metallic threat objects (including
explosives, firearms, knives) concealed on the body
Discrimination Capability to discriminate between ferrous and non-ferrous metals
False alarm rate (FAR) 5% under ambient electromagnetic conditions
Calibration Multi-zone (6 zones) with visual indicator of alarm location
Goods and Supplies
Xray machine
(Dual View)
coding
which enable faster and more accurate decision-making and reduce operational overheads. Minimum Tunnel 100x100 as per advice
assets are well protected from cyber-attacks. phase, 50Hz
on bag contents. 1%
Confidential
Confidential Confidential
Storage format 1280x720 PXL
Obj, fbx, gitf, jpeg,
Export of Images
Tiff, png, gif, psd.
Processor and OS Latest Windows OS
Self-diagnostic software Provider to Specify
Memory (RAM) Provider to Specify
Memory (HDD Storage
Provider to Specify
capacity)
Image Archiving Minimum 4000 Images
Sealed oil bath with forced
Cooling air
Duty Cycle 100 % Automatic Start-up
Generator imaging type Dual Generator Imaging
Operating temperature 0 to 400C
Relative humidity 10 to 95%
Design Lifespan Min 10 years
Average ‘uptime’ 99%
Maximum leakage radiation Less than 0.1 mR/hr
Goods and Supplies
Xray machine
(Dual View) PAREMETER Requirement
Confidential
Confidential Confidential
Equipment type Large-tunnel X-ray (minimum tunnel dimensions: 1.0 m width × 1.0 m height)
Wire resolution 0.2 mm (AWG 32) copper wire visible in both orientations
Steel penetration 30 mm steel (high penetration mode)
Material discrimination Dual-energy with colour coding
Must detect threat objects (including improvised explosive devices) with Pd 98%
Threat detection at FAR 20% when using automatic detection; if manual image interpretation,
operator training and certification required
In-line or integrated explosive trace detection (ETD) with minimum detectable
Trace detection (ETD) mass 100 ng for RDX, TNT, PETN; analysis time 15 seconds
away from the physical checkpoint.
PAREMETER Requirement
Maximum expectancy between image capture and display at remote screening
Image latency
station 1 second (end-to-end)
Image quality (spatial resolution, contrast, colour fidelity) identical to that of the
Remote Screening Image resolution local screening workstation
Rooms
Fully redundant network and power; loss of communication must trigger local
System redundancy alarm and revert to local screening mode
Encrypted communication between equipment and remote station; isolated
Cybersecurity network segment (no internet connectivity)
Two-factor authentication for remote screeners; all accesses logged; remote
Access control
stations located in physically secured rooms with restricted entry
Full audit trail of all remote screening actions, including time stamps, screener
Audit trail identity, alarm handling, and any override commands
Confidential
Confidential Confidential
Manual override: if remote screening is degraded, local screening capability
Fallback mode must remain available within 5 minutes
Continuous CCTV coverage of all remote screening workstations with recording
CCTV coverage retention 90 days
General
Calibration &
Operator test protocol.
Methodology
Source: TECHNICAL SPECIFICATION.pdf (unknown)Appendix D – Engineering, Risk, and Technical Information (part of technical proposed solution). D.1 Contingency planning: describe situations/incidents that could occur during installation and contingency plan to prevent business interruption; provide view of how redundancy of current system/s can be leveraged to continue operation while new devices are being installed; at minimum, contingency planning for equipment damage during installation, deviations in rigging plan, environmental occurrence, damage to building, injury to staff and/or passengers; ACSA expects Estimated Maximum Loss (EML) of these occurrences to be covered by Bidder's insurance program – bidders to confirm. D.2 Detailed environmental management plan: mandatory requirement for handling and disposal of radioactive materials; handling in live operating environment; provide isotope half-lives and daily test certificates that radioactivity is within acceptable limits; guidelines for handling radioactive substances prescribed by Department of Health with completion of certain forms and arrangements for inspection services and on-site presence; environmental program must ensure equipment replacement does not negatively impact flora and fauna; ACSA environmental management commitments cannot be compromised as they would threaten operating permits; bidders to provide such plan. D.3 Detailed engineering, technology and quality plans: ACSA expects Class 2 cost estimate; engineering and structural due diligence, method statements, process and instrumentation diagrams, battery limit conditions, assurance plan approved by Professional Engineer; ensure ACSA terminal building infrastructure not compromised during build program; failing this, work permit to perform replacement cannot be issued. D.4 Plans for commissioning and decommissioning: duration of program important for each airport to enable ACSA to alert stakeholders and provision for movement of materials to and from staging area; plans for decommissioning and safe disposal of current equipment assets; start-up, declaring beneficial operation, and reliability testing; reliability test condition and report required to provide assurance that safety and equipment deviations (if any) are manageable. D.5 Construction completion guarantee and reliability test program: incomplete construction renders airport operations at risk of disruption for extended period; risk of radioactive incident, contamination, human and environment radiation, permanent damage to high value equipment; ACSA requires risk suitably covered in Builders All Risk insurance program; underwriting technical report should consider these situations; clear remedy in favour of ACSA and stakeholders that business can fulfil payment obligations; business interruption is well-known insurance risk; ACSA expects instrument that addresses and covers such risk. D.6 Risk management and safety plan: ACSA has OHS processes for construction and stakeholders – to be adhered to and provided in tender data-room; risk assessment should be performed and all risks evaluated from monetary perspective to enable determination of loss events; crucial in determining insurance claims procedure and recurrences. D.7 Insurance program: ACSA requires policy wording for Builders All Risk and Third-Party Liability that would be project specific; ACSA and stakeholders to be named insured; expects copy of underwriting technical manuscript; submission will form part of work permit. D.8 Maintenance regime and cost: provide details of preventative maintenance regime over useful life of equipment; indication of cost and duration; assessment of top 10 recurring failures; time to repair and component replacements; cost estimate in each case; view of maintenance team required; training and development program plus costs to capacitate staff to maintain/operate equipment. D.9 Life cycle costing: capital cost (equipment); preventative maintenance cost estimate for duration of useful life; reactive maintenance cost estimate; list of critical spares and spares holding cost per site; establishment/set-up costs to enable maintenance and oversight; operating overheads to enable asset management program; cost to inspect and certify equipment from time to time.
Quality Management
Source: TECHNICAL SPECIFICATION.pdf (unknown)improved passenger experience. solution
the process moving by addresses the key issues of passenger divestment:
Maximum Conveyor Load (kg/ o tray loading and return. 25
conveyor zone) o re- routing suspicious items.
Less than or equal to o and ‘reclaim’space at the end of the checkpoint. Sound pressure 65 dB
different requirements and expand to handle increasing passenger traffic. Operating temperature 0 to 400C
systems and functions. Design Lifespan Min 7 years
Average ‘uptime’ 99% components.
by more than 100% compared to conventional checkpoints. 40-90% non-
o Remote screening
o Automatic and random diversion
request
Bidders to provide such a plan in their bids
ACSA expects a Class 2 cost estimate for this proposal. The level
ACSA receives of detail for such an estimate is contained in Appendix 1.
assessments of the
D.3 Detailed suitability of the process and instrumentation diagrams, battery limit conditions,
engineering, terminal infrastructure and assurance plan. This should be approved by a Professional
technology and and obligations to Engineer.
quality plans ensure that the quality
management program
not be compromised during the build program. Failing this, a work is executed
permit to perform the replacement cannot be issued.
D.9 Life Cycle equipment
of ownership for the
Costing
equipment
oversight of equipment.
Pricing Schedule
Source: TECHNICAL SPECIFICATION.pdf (unknown)equipment
(3D X-ray machine) reports. Processor and OS Latest Windows OS
Provider to Specify
Provider to Specify
judgement on bag contents. Image Archiving Minimum 4000 Images
inside the bags. W As per floor plan
Compliance Requirements
Source: TECHNICAL SPECIFICATION.pdf (unknown)Data logging: All screening events, alarms, and system parameters shall be logged and retained for a minimum of 90 days.
Configuration management: Any change to detection settings (including software updates affecting detection algorithms) requires prior CAA approval and re-validation.
Provide distributed load per machine in kg/m2 Confidential Confidential Confidential Appendix D – Engineering, Risk, and Technical Information (part of the technical proposed solution) Rationale for ACSA Requirement Additional Comments/Guideline to Bidders request
Describe the situations/incidents that could occur during the installation and the contingency plan to prevent business interruption.
Provide a view of how redundancy of the current system/s can be Outline the situations leveraged to continue operation while the new devices are being that can cause D.1 Contingency installed. business interruption planning to prevent during the installation
ACSA further expects that the Estimated Maximum Loss (EML) of these occurrences will be covered by the insurance program of the Bidder. Bidders to confirm this.
This is a mandatory requirement for a project of this nature. Particularly on the matter of handling and disposal of radioactive materials. The handling of such matters will be in a live operating environment. Irrespective of whether work will be done after hours, aspects such as isotope half-lives will need to be provided and test certificates issued on a daily basis that radioactivity is within acceptable limits Assessing the impact D.2 Detailed on the environment,
ACSA expectation is that the environmental program will ensure that the equipment replacement does not negatively impact flora and fauna. ACSA environmental management commitments cannot be compromised as they would threaten our operating permits. of 56 ConfidentialConfidential ConfidentialConfidential Rationale for ACSA Requirement Additional Comments/Guideline to Bidders request
Bidders to provide such a plan in their bids
ACSA expects a Class 2 cost estimate for this proposal. The level ACSA receives of detail for such an estimate is contained in Appendix 1. assessments of the
The duration of the program is important for each airport to enable Ensuring the Airport ACSA to alert stakeholders and provision for movement of Operations value materials to and from the staging area chain functions during D.4 Plans for the program as well
ACSA requires the policy wording for the Builders All Risk D.7 Insurance Stakeholders are program and Third-Party Liability that would be project specific. program for the name insured.
ACSA also expects to receive a copy of the underwriting technical replacement plus Suitable coverage manuscript. This will be a submission that will form part of the policy wording and coverage areas work permit. indicated
Provide details of the preventative maintenance regime to be followed over the useful life of the equipment. Provide indication of cost and duration to perform such work.
Assessment of the top 10 recurring failures on such equipment. Determine the D.8 Maintenance The time taken to repair and the components replacements for maintenance program Regime and Cost such work. Provide cost estimate in each case. and associated cost
View of the maintenance team required to provide maintenance services on such equipment.
Training and development program plus costs to capacitate staff to maintain/operate such equipment
Capital cost (Equipment)
Preventative maintenance cost estimate for the duration of the useful live
Reactive Maintenance cost estimate for the duration of the Assess the total cost D.9 Life Cycle equipment of ownership for the Costing
Establishment/Set-up costs to enable the maintenance and oversight of equipment.
Operating overheads to enable the asset management program.
Cost to inspection and certify equipment from time to time Confidential Confidential Confidential Confidential Annexure E: Processing Capacity Targeted Bidder Additional Pax % increase No. of No. of Guaranteed Current Processing Proposed from Targeted from targeted lanes Machines Availability Processing rate Capacity Capacity Capacity Capacity (Pax/Hr) (Pax/hr) (Pax/hr) (Pax/hr) ORTIA 2160 3000 Domestic CTIA 2315 2400 KSIA 1191 1750 ORTIA 2880 3000 International CTIA 750 1250 KSIA 332 350 CDSIA 421 450 George 355 450 KPA 317 500Local Airports BFIA 243 300 Kimberley 125 150 Upington 37 120 Confidential
Health & Safety
Source: TECHNICAL SPECIFICATION.pdf (unknown)Appendix C – Technical Specification
Equipment type Large-tunnel X-ray (minimum tunnel dimensions: 1.0 m width × 1.0 m height)
Wire resolution 0.2 mm (AWG 32) copper wire visible in both orientations
Steel penetration 30 mm steel (high penetration mode)
CCTV coverage retention 90 days
Appendix D – Engineering, Risk, and Technical Information (part of the technical
proposed solution)
management and
enable suitable
safety plan to These should be adhered to and will be provided in the tender
insurance coverage
enable issue of data-room.
and to understand the
works permits
of 56
Contractual Terms
Source: TECHNICAL SPECIFICATION.pdf (unknown)Contract duration: The contract will be for a period of 5 years, subject to annual performance reviews. Termination: ACSA may terminate the contract with 30 days written notice for convenience, or immediately for breach. Penalties: Liquidated damages of 0.5% of the contract value per day for delay in completion, up to a maximum of 10%. Insurance: The bidder must maintain comprehensive insurance, including public liability and professional indemnity, with coverage for Estimated Maximum Loss (EML). Environmental compliance: The bidder must comply with ACSA environmental management commitments; failure may result in termination as it threatens operating permits.
Section
Source: TECHNICAL SPECIFICATION.pdf (unknown)Additional evaluation criteria: Bidders must provide a detailed project plan, including installation schedule and contingency plans. Bidders must demonstrate the ability to maintain operations during installation. Bidders must provide a plan for handling radioactive materials and environmental incidents. Bidders must confirm that the equipment will not compromise ACSA environmental management commitments. Bidders must provide a cost estimate for each requirement. Bidders must provide a processing capacity table as per Annexure E, showing current and targeted processing rates.
Contact Information
Source: SCOPE OF WORKS.pdf (unknown){"name":"Mr Irvin","email":null,"phone":"+27 11 723 1400","department":null,"address":"ed passenger experience."}
Evaluation Criteria
Source: SCOPE OF WORKS.pdf (unknown)(3D X-ray
Technical Specifications
Source: SCOPE OF WORKS.pdf (unknown)maintenance.
blackout and battery operation signalling.
Quality Management
Source: SCOPE OF WORKS.pdfand an improved passenger experience.
the process moving, by addresses the key issues of passenger divestment.
o tray loading and return.
o re- routing suspicious items.
o and ‘reclaim ‘space at the end of the checkpoint.
to meet different requirements and expand to handle increasing passenger traffic.
inspection systems and functions.
checkpoint components.
operation increase by at least 15% compared to conventional checkpoints.
o Remote screening
o Automatic and random diversion
is the first image reviewed.
of 56
Compliance Requirements
Source: SCOPE OF WORKS.pdf (unknown)The machine shall ensure automatic threat detection of explosives, flammable explosive, narcotics alert and prohibited items.
The machine shall be able to store, export and import images.
The machine shall ensure advanced detection algorithms which includes automatic target recognition – which enable faster and more accurate decision-making and reduce operational overheads.
The machine shall have an automated object recognition software which allows for automated detection of an ever-expanding list of prohibited items (latest threats) improving security outcomes and efficiency.
The machine shall be installed with security features and controls to ensure that customer data and assets are well protected from cyber-attacks. Cabin baggage
The machine shall have the capability of producing screener performance detection (TIP) Screening report. Equipment
The machine shall reduce human errors, enhance efficiency and increase detection accuracy.
The machine shall have a high detection rate combined with extremely low false alarm rates.
The supplier shall provide a manufacturer’s machine specific standard test piece (STP) per machine.
The machine shall have the ability to screen bags with electronics inside including laptops and with liquids inside the bags.
The machine shall have the ability to produce 360 rotatable 3D images.
The machine shall be ECAC or TSA approved.
Radiation safety certificate by South African Health Products Regulatory Authority (SAHPRA) Tel +27 11 723 1400 Fax +27 11 453 9354 Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa, 1632 P O Box 75480, Gardenview, Gauteng, South Africa, 2047 www.airports.co.za Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: Mr Irvin Phenyane (Chairperson), Dr Kgabo Badimo, Ms Dudu Hlatshwayo, Mr Andile Khumalo, Ms Lwazikazi Nopece, Mr Roy Mnisi, Mr Surendra Sooklal, Ms Xoliswa Daku, Ms Keitumetse Mahlangu, Mr Charles Shilowa (Acting Chief Executive Officer), Mr Luzuko Mbotya (Chief Financial Officer), Ms Fefekazi Sefara (Company Secretary) ConfidentialConfidential System Sub- Component
The machine shall be capable of accommodating bigger and out of gauge consignments.
The machine shall be capable of detecting opaque and dense objects.
The machine shall have advanced detection algorithms and AI applications – including automatic target recognition – which enable faster and more accurate decision-making and reduce operational overheads.
The machine shall have the capability of producing screener performance detection (TIP) report.
The machine shall produce quality images to allow Screener to have a better and accurate judgement on bag contents.
The machine shall reduce human errors and enhance efficiency and increase detection Goods and accuracy. Supplies Xray
The machine shall have an automated object recognition software which allows for automated detection of an ever-expanding list of prohibited items, improving security outcomes and efficiency.
The machine shall be installed with security features and controls to ensure that customer data and assets are well protected from cyber-attacks.
The machine shall reduce the amount of time and resources by collapsing decision making levels 1 and 2 into a single and seamless decision-making process.
The machine shall be capable of explosive detection, explosive trace detection, and improvised explosives detection.
Radiation safety certificate by South African Health Products Regulatory Authority (SAHPRA) Full body scanner Detection Capabilities
The scanner shall have the capability to detect anomalies from head to toe. of 56 ConfidentialConfidential ConfidentialConfidential System Sub- Component
The scanner shall have automatic threat detection of explosives and plastic explosives and prohibited items.
The scanner shall have advanced detection algorithms and AI applications – including automatic target recognition – which enable faster and more accurate decision-making and reduce operational overheads.
The scanner shall have a very high detection speed {up to 15m/s}. Build-in operational and technical functional.
The scanner shall have an automated object recognition software which allows for automated detection of an ever-expanding list of prohibited items, improving security outcomes and efficiency. Privacy Control
The scanner shall be installed with security features and controls to ensure that customer data and assets are well protected from cyber-attacks.
Description
Source: SCOPE OF WORKS.pdfThe scope of works includes the supply and installation of security screening equipment at airport checkpoints. The equipment must be capable of detecting threats including explosives, weapons, and contraband. The system must integrate with existing security infrastructure and support remote screening capabilities. The automated lanes system must improve passenger flow and operational efficiency.
Evaluation Criteria
Source: SCOPE OF WORKS.pdf (unknown)The document does not specify eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or local content requirements. Bidders must comply with the requirements for ECAC or TSA approval and SAHPRA radiation safety certificates for the equipment. The tender includes standard National Treasury forms (SBD) which are not detailed in the provided content.
Methodology
Source: SCOPE OF WORKS.pdf (unknown)Functional requirements for the cabin baggage screening equipment (3D X-ray machine): automatic threat detection of explosives, flammable explosive, narcotics alert and prohibited items; store, export and import images; advanced detection algorithms including automatic target recognition; automated object recognition software; security features to protect customer data from cyber-attacks; capability of producing screener performance detection (TIP) report; TIP library expandable to include new threat images; produce quality images; reduce human errors, enhance efficiency and increase detection accuracy; high detection rate with low false alarm rates; supplier to provide manufacturer's machine specific standard test piece (STP) per machine; ability to screen bags with electronics and liquids; ability to produce 360 rotatable 3D images; ECAC or TSA approved; radiation safety certificate by SAHPRA.
Contractual Terms
Source: SCOPE OF WORKS.pdfThe contract will be for a period of 12 months from the date of acceptance, with an option to renew for a further 12 months. The supplier must deliver and install the equipment within 90 days of the order. Liquidated damages of 0.5% of the contract value per day will apply for late delivery. The supplier must provide a warranty of at least 24 months on all equipment. The supplier must maintain the equipment for the duration of the contract, with a response time of 24 hours for breakdowns.
Section
Source: SCOPE OF WORKS.pdfIn addition to functionality and price, the following will be evaluated: the supplier's ability to provide local support and spare parts; the equipment's compliance with international standards (ECAC/TSA); the supplier's track record in similar installations; the proposed training programme for operators and maintenance staff.
Description
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)ACSA operates South Africa's nine principal airports. The Enterprise Security and Compliance Division is mandated to implement security measures to prevent acts of unlawful interference by deploying security screening detection equipment at passenger screening points in accordance with SACAA standards and ECAC/TSA global best practices. The current equipment has reached end-of-life and ACSA seeks to replace it with the latest technology, including 3D X-ray machines, automated lanes, and remote screening capabilities. The purpose is to improve operational efficiency, detect metallic and non-metallic threats, enhance passenger experience, and comply with multilateral agreements.
Important Dates
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI){"closingDate":"09 OCTOBER 2026","closingTime":"12H00","briefingSession":"{"date":"22 September 2026","time":"10H00","venue":"e / Time : 22 September 2026 at 10H00","is_compulsory":true}"}
Briefing Session
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)A non-compulsory briefing session will be held on 22 September 2026 at 10:00 AM at the ACSA Media Room, OR Tambo International Airport, next to Terminal A International Arrivals, between the Post Office and the Inter Africa Bureau de Change kiosks. An MS Teams invite will be sent to respondents who cannot attend physically upon request via email. The last date for an email will be 9 AM on 22 September 2026. Non-compulsory site inspection: Not applicable.
Contact Information
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI){"name":"Mr Thami","email":"[email protected]","phone":"061 653 0462","department":"where the EOI will close.","address":"l anticipated lifecycle of approximately ten (10) years."}
Submission Guidelines
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)Returnable Documents: PLEASE NOTE THAT BOTH METHODS MUST BE UTILISED. RESPONDENTS SHOULD NOT
Evaluation Criteria
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)Respondents must be suitably qualified and experienced entities. They must submit a completed EOI response on official forms, signed by an authorised person with proof of authority (e.g., company resolution). Foreign respondents must complete the questionnaire regarding residency, branch, permanent establishment, source of income, and tax liability in South Africa; if not liable for tax, they are not required to register for a SARS Tax Compliance Status System PIN. Respondents must not be barred from doing business with the state. The EOI is not a tender; no pricing is required at this stage. There is no mandatory briefing or site inspection. The response must be submitted both physically and electronically by the closing time; late submissions will not be considered. Respondents must not contact ACSA employees other than the named contact. The EOI response must remain valid for 120 business days. No specific B-BBEE level, CIDB grading, or CSD registration is stated as a precondition for this EOI.
Technical Specifications
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)Potential future Design, Supply, Install, integrate, Commission, Support, decommission,
Processing Capacity Testing, Project Management and Maintenance of an integrated aviation
security screening solution across the Airports Company South Africa airport network for an
overall anticipated lifecycle of approximately ten (10) years.
EOI response documents must be deposited in the bid box situated at (street address)
ACSA, Tender Box,
Third Floor, North Wing Office Block,
OR Tambo International Airport
EOI response procedure enquiries must be directed
To technical enquiries must be directed to:
CONTACT PERSON Thami Mncube CONTACT PERSON Thami Mncube
Telephone
Telephone number 061 653 0462 number 061 653 0462
Facsimile
FACSIMILE NUMBER n/a NUMBER n/a
E-MAIL ADDRESS [email protected] E-MAIL ADDRESS [email protected]
Respondents information
Name of
Respondent
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration
Number
Rep compliance tax central
Status compliance supplier
Or
System pin: database
No: MAAA
Are you the
ACCREDITED Yes No
Are you a foreign based
REPRESENTATIVE IN Yes No
Supplier for the goods
South africa for [if yes, answer the
/Services offered?
The goods [if yes enclose proof] questionnaire below]
/Services offered?
Questionnaire to submitting foreign respondents
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Is the entity a resident of the republic of south africa (RSA)? yes NO
Does the entity have a branch in the RSA? yes NO
Does the entity have a permanent establishment in the RSA? yes NO
Does the entity have any source of income in the RSA? yes NO
Is the entity liable in the RSA for any form of taxation? Yes NO
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance
Status system pin code from the south african revenue service (SARS) and if not register as per 2.3
Below.
Part b
Terms and conditions for responding
1.1. EOI response documents must be delivered by the stipulated time to the correct address. Late
EOI resposnes may not be considred.
1.2. All EOI responses must be submitted on the official forms provided (not to be re-typed) or in the
Manner prescribed in the EOI document.
Signature of respondent: ...................................................
Capacity under which this EOI response submission is signed: ...................................................
(Proof of authority must be submitted e.g. company resolution)
Date: .................................
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Standard Notice and Invitation to submit an Expression of Interest
Expressions of interest are invited for the POTENTIAL FUTURE REQUIREMENT FOR DESIGN,
provision of SUPPLY, INSTALL, INTEGRATE, COMMISSION,
Support, decommission, processing
Capacity testing, project management and
Maintenance of an integrated aviation
Security screening solution across the
Airports company south africa airport
Network for an overall anticipated
Lifecycle of approximatelyten (10) years
The Employer is
Airports company south africa (acsa)
Access to Expression of Interest DOCUMENTS ARE TO BE DOWNLOADED FROM THE
Documents NATIONAL TREASURY ETENDERS WEBSITE
And the acsa website
https://www.airports.co.za/Pages/Tender-Bulletin.aspx
Mr Thami Mncube Queries relating to the issues of these
[email protected] documents may be addressed to:
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Potential future design, supply, install, integrate, commission,
Support, decommission, processing capacity testing, project
Management and maintenance of an integrated aviation security
Screening solution across the airports company south africa airport
Network for an overall anticipated lifecycle of approximately ten
(10) years
Tender Number: : COR8203/2026/EOI
Issue Date : 10 September 2026
Closing Date : 09 October 2026 @ 12H00 Midday
Non-Compulsory Briefing
Session Date / Time : 22 September 2026 at 10H00
Non - Compulsory Site
: Not Applicable Inspection
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
1.1. Disclaimer: nature and purpose of this Expression of Interest
1.1.1. This Expression of Interest (EOI) is issued by Airports Company South Africa SOC Limited
(ACSA) for the purpose of identifying and assessing suitably qualified, experienced and
capable entities that may have the technical, operational, financial, regulatory and
commercial capability to participate in any subsequent procurement process relating to the
design, supply, project management, installation, integration, testing, commissioning,
handover, maintenance and/or de-commissioning of security detection and screening
equipment and associated systems at ACSA airports.
1.1.2. The EOI constitutes an invitation for interested parties to submit information demonstrating
their capability, experience, capacity and suitability in relation to the requirements
described in this document.
1.1.3. This EOI is not a request for a tender, bid, proposal or offer capable of acceptance by
ACSA and shall not constitute an offer or an invitation to contract.
1.1.4. No respondent shall, by submitting a response to this EOI, acquire any right or expectation
that ACSA will proceed with a procurement process, invite the respondent to participate in
any subsequent procurement process, or appoint the respondent for any goods or services.
1.1.5. ACSA may, following the EOI process, determine whether to proceed with a subsequent
procurement process and, if so, the form, scope, procurement methodology and terms
applicable to such process.
1.1.6. Participation in this EOI shall not create any contractual relationship between ACSA and
any respondent, other than such obligations as are expressly stated in this EOI to apply to
the EOI process.
1.2. Access to EOI documents
1.2.1. EOI documents are available on www.etenders.gov.za and www.airports.co.za. Kindly
print and complete.
1.3. Submission of EOI response documents
1.3.1. The envelopes containing EOI response submission must have on the outside the
respondent’s return address, the full description of the response, EOI reference number
and the details of the Supply Chain Management department where the EOI will close.
The response documents response must be signed and completed by a person who has
been given authority to act on behalf of the respondent. The bottom of each page of the
EOI response documents must be signed or stamped with the respondent’s stamp as
proof that the respondent has read the EOI response documents. EOI response
documents must be submitted on or before 12h00 (AM) Midday on 09th of October
2026 using the following method(s):
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Please note that both methods must be utilised. Respondents should not
Choose just one of them and the physical submission information will take
Precedence should there be a discrepancy between the two submission
Methods.
Failure to submit the physical documents before the closing time will
Result in the EOI response not being considered.
1.3.2. Hand delivery:
The Expression of Interest response must be delivered to the address below and must be addressed
as follows:
Tender box:
The Tender Box is located at:
Airports Company South Africa SOC Limited Tender Box
Third Floor
North Wing Offices
OR Tambo International Airport
Late or NO submission of physical pack will result in the response not
Being considered.
1.3.3. Email submissions:
Electronic copies/links of the EOI response are to be e-mailed to the following email address:
Ensure that the electronic copy is well labelled in separate
Annexures as per the returnables schedule
your EOI responses into small attachments of not more than 4MB each.
format will be acceptable.
1.3.4. EOI responses must be in printed format (an original and a copy) together with an
electronic copy of the EOI response documents using an accessible link. The original,
in the event of discrepancies between any of the submitted documents, will take
precedence.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
1.4. Alternative EOI Responses
1.4.1. As a general rule, ACSA only accepts EOI response documents which have been
prepared in response to the EOI invitation. However, for this EOI, alternative EOI
response documents will be accepted provided the alternative EOI response is
accompanied by the original EOI response document which materially complies with
the specifications of this EOI invitation. The alternative EOI response document will
only be considered where the respondent has submitted together with its alternative
EOI response, a submission which materially complies with the requirements of this
EOI.
1.5. Late EOI Response
EOI responses submitted after the closing date and time will not be considered.
1.6. Clarification and Communication
Name: Thami Mncube
Designation: Specialist Category Management
Email: [email protected]
1.6.1. Request for clarity or information on the EOI may only be requested until 2nd of
October 2026 close of business. Any responses to queries or for clarity sought by a
respondent will also be sent to all the other entities which have responded to the
Expression of Interest invitation.
1.6.2. Respondents may not contact any ACSA employee on this EOI other than those listed
above. Contact will also only be permissible in the case of pre-existing commercial
relations which do not pertain to the subject of this EOI.
1.7. Non-Compulsory Briefing Session
A non-compulsory briefing session will be held on the 22ND of September 2026 at 10:00 (AM). The
session will be held at the following location:
ACSA Media Room
OR Tambo International Airport
Next to the Terminal A International Arrivals
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Between the Post Office and the Inter Africa Bureau de Change kiosks.
An ms teams invite will be sent to respondents who cannot attend physically
Upon request via email. The last date for an email will be 9am on the 22nd of
September 2026
1.8. Non – Compulsory Site Inspection
Not Applicable
1.9. EOI Responses
1.9.1. A response submitted pursuant to this EOI shall be regarded solely as a submission of
information for purposes of ACSA’s assessment of the respondent’s capability and
suitability. The submission of a response shall not constitute an offer, tender, bid or
proposal capable of acceptance by ACSA and shall not create any obligation on ACSA to
accept, negotiate or contract with the respondent. A respondent shall not state or imply in
its response that the submission constitutes a binding offer to ACSA.
1.9.2. No pricing submitted, if requested by ACSA for market-information purposes, shall
constitute a firm or binding quotation or offer and shall not be used as the basis for the
award of a contract under this EOI. Any future procurement process shall be conducted in
accordance with the procurement documentation issued for that process, and participation
in this EOI shall not confer any right to participate in or be appointed through such
subsequent process.
1.10. No Commitment to Procure
1.10.1. ACSA is under no obligation to proceed with a subsequent procurement process following
the conclusion of this EOI.
1.10.2. ACSA reserves the right, in its sole discretion and subject to applicable law and its
procurement policies and procedures, to:
a) proceed with a subsequent procurement process;
b) amend, refine, reduce, expand or otherwise modify the requirements identified in this
EOI;
c) issue a subsequent Request for Proposals, Request for Bids, Request for Quotations,
competitive negotiation process or other appropriate procurement instrument;
d) invite all, some or none of the respondents to participate in a subsequent procurement
process;
e) undertake further market engagement or request additional information from
respondents; or
f) cancel, withdraw or discontinue the EOI process.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
1.10.3. No respondent shall have any claim against ACSA arising solely from ACSA’s decision
not to proceed with a subsequent procurement process or not to invite that respondent to
participate in such process.
1.11. Validity Period
1.11.1. The information submitted in response to this EOI should remain materially accurate
for 120 (one hundred and twenty) business/working days following the closing date.
This does not constitute a price validity period or an undertaking by a respondent to
maintain any price.
1.12. Pricing
1.12.1. Respondents shall not be required to submit firm prices, rates or financial offers as part
of this EOI.
1.12.2. Where ACSA requests indicative pricing or cost information for purposes of market
assessment, benchmarking, affordability assessment or procurement planning, such
information shall be clearly identified as indicative and shall not constitute a binding
quotation or offer. Any indicative pricing provided shall not be regarded as a
commitment by the respondent to supply the relevant goods or services at the stated
price.
1.12.3. Pricing, commercial terms and financial evaluation, where applicable, shall be
addressed in the subsequent procurement process and shall be subject to the
procurement requirements applicable to that process.
1.13. Contract duration
1.13.1. ACSA is considering a potential programme with an anticipated lifecycle of
approximately ten (10) years. Any contract duration, commercial structure, warranties,
maintenance obligations and service levels will be determined in any subsequent
procurement process.”
1.14. Confidentiality of Information
1.14.1. ACSA will not disclose any information disclosed to ACSA through this EOI process to
a third party or any other respondent without any written approval from the respondent
whose information is sought. Furthermore,
1.14.2. ACSA will not disclose the names of respondents until the EOI process has been
finalised.
.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
1.15. Hot – Line
ACSA subscribes to fair and just administrative processes. ACSA therefore urges its clients,
suppliers and the general public to report any fraud or corruption to:
Airports Company South Africa TIP-OFFS ANONYMOUS
Free Call: 0800 00 80 80 or 086 726 1681
Email: [email protected]
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Section 2: background, purpose, and scope of work
2.1 Background and/or Purpose of this EOI
Since its inception 33 (Thirty-three) years ago, Airports Company South Africa SOC Limited (ACSA)
has transformed into a focused commercial enterprise that is market-driven and customer service
oriented. The company was formed in 1993 as a public company under the Companies Act of 1973,
as amended, and the Airports Company Act of 1993, as amended.
ACSA operates South Africa’s Nine (9) principal airports, comprising of the country’s major
international airports, namely, O.R. Tambo (ORTIA), Cape Town (CTIA) and King Shaka (KSIA) and
the smaller regional airports, namely, Chief Dawie Stuurman International Airport (PLZ), King Phalo
Airport (ELN), George Airport (GRJ), Bram Fischer (BRAM), Kimberley Airport (KMB), Upington
(UTN). ACSA’s registered corporate office operates from Airport Park in Kempton Park right next to
the OR Tambo International Airport.
ACSA’s vision is to be the most sought-after partner in the world for the provision of sustainable
airport management solutions by 2030. ACSA’s strategy is to create and operate world-class airports
measuring up to international standards, its strategic intent is supported by three strategic pillars,
namely:
2.2 Purpose
The ACSA Enterprise Security and Compliance Division is mandated to implement security
measures that will prevent acts of unlawful interference by deploying security screening detection
equipment at passenger screening points in accordance with South African Civil Aviation Authority
(SACAA) standards as well as European Civil Aviation Conference (ECAC) and Transportation
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Security Administrations (TSA) global best practices. As part of implementing this mandate,
Enterprise Security and Compliance seeks to:
a) Adopt a risk-based security initiative to address evolving global threats.
b) Enable focused resource mitigation risks based on advanced detection of metallic or non-
metallic anomalies.
c) Improve passenger processing to positively impact the airport’s brand by reducing dwell
times.
d) Introduce new technology to allow focused screening on threat items that are considered
most relevant in today’s risk context.
The Detection Equipment and Automated Lanes concept provides a long-term plan towards the
global adoption of risk-based security initiatives.
The current equipment has reached the end of its life span and is prone to frequent breakdowns.
ACSA seeks to replace the old screening equipment with the latest technology available on the
market. The new technology must be able to:
(a) Screen all bags without removing contents (laptops & LAGS) and enable higher
throughput capacity.
(b) Create efficiencies through more advanced penetration and detection through slicing
contents of the bag. CTX technology uses algorithms and an expanded data library to
detect anomalies.
Security screening is a mandatory requirement to maintain the airport license to operate in
accordance with CARS Part 139. The screening detection equipment will enhance security,
operational efficiency, effectiveness, and accuracy of the screening process to assist in better
penetration and detection of explosives, improvised explosive devices, home-made explosives,
and prohibited items.
The equipment should allow screening of baggage of persons entering restricted areas to detect
any potential hidden objects, explosives, and weapons.
Further, the capital investment used to purchase the equipment will reduce the current operating
cost and enable the achievement of total cost of ownership targets. This demand requisition will
enable the procurement process of security screening detection equipment and automated lanes.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
The purpose of this program is to replace the current Security Detection equipment (standard 1
single view X-ray machines) with standard 3 (3D) X-ray machines at security Central Search Points
(CSP) (both International and Domestic) including the implementation of automated lanes and
goods screening (dual view) at all ACSA airports.
To keep abreast with emerging aviation security trends, this program entails the implementation
of Cabin Baggage Screening System with Automated Tray Return (ATR) & Centralized passenger
Screening System at the Airport in a time bound manner to be able to:
a) Improve Operational Efficiency and effectiveness at the central search points.
b) Detect metallic and non-metallic threats at the airports.
c) Enhance airport safety and security for passengers, employees, stakeholders and the airport
community.
d) Increase search point throughput and optimise asset utilisation.
e) Improve passenger experience, reduce queues and passenger waiting time.
f) Improve ability to counter threats, focus on resources where risk is greater and to leverage
investment made on existing technology.
g) Create security screening points that allow for less intrusiveness for the passenger (Light and
heart-warming to passengers; ensure passengers do not feel stressed and anxious).
h) Faster, more convenient, and less intrusive security screening.
i) Reduction in departure delays and higher passenger satisfaction.
j) Increase Baggage Security.
k) Improve Focus on Checkpoint Operations and Security Issues.
l) Ensure future expansion through a Modular Design.
m) Rapid Return on Capital Investment.
n) Low Operating Costs.
o) Continuously measure the number of Passengers being processed.
Consequently, the successful implementation of this replacement Programme will result in the:
a) Compliance with multilateral agreements with ECAC, TSA and ICAO.
b) Replacement of the current equipment and conventional machines at airports that have
reached end-of-life, which often fail and thus creating operational inefficiencies.
c) High-throughput, multi-modal security systems that are fully integrated with automated lanes
and remote screening capabilities.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3 Scope of Work
2.3.1 Brief description of specifications or scope of works
Design, Supply, Installation, Integration, Commissioning, Support, Training, decommissioning,
Processing Capacity Testing, Project Management and Maintenance of integrated aviation
security screening and detection solution across ACSA’s airport network. The solutions should
demonstrate the inclusion of the following subsystems:
2.3.1.1 Automated tray return (ATR) at Central Search points,
2.3.1.2 Cabin Baggage screening equipment at Central Search points,
2.3.1.3 Full body scanners for passenger screening at Central Search points
2.3.1.4 Trace detection where required in accordance with regulations
2.3.1.5 Goods screening equipment at other security gates
2.3.1.6 Archway walk-through metal detectors for people screening at other security
gates,
2.3.1.7 Centralised screening control and image management systems,
2.3.1.8 Data transmission and cybersecurity architecture,
2.3.1.9 The proposed solution should be delivered in a 3-phase approach:
equipment to fully meet functional and technical requirements as prescribed in the
scope
components and maintenance from the date of commissioning
management recommendations
2.3.1.10 The replacement should ensure no major building modification take place; thus,
the technology shall be retrofitted in the current positions and commissioned for
full operations.
2.3.1.11 Equipment should reliably detect threat objects as outlined in the National
Aviation Security Programme (NASP) and latest threat assessment, meeting or
exceeding the detection performance standards.
2.3.1.12 Screening systems should support passenger and baggage volumes consistent
with operational demands without compromising security effectiveness.
2.3.1.13 The scope of the EOI covers the following:
2.3.1.13.1 Design and implementation of automated lanes with automated tray handling
Systems.
2.3.1.13.2 Supply, installation and commissioning of 3D X-ray (CT) carry-on baggage
scanners.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.1.13.3 Supply, installation and commissioning of Full-body scanners (millimetre-
wave or backscatter technology).
2.3.1.13.4 Supply, installation and commissioning of Archway walk-through metal
detectors.
2.3.1.13.5 Design and implementation of Remote / multiplexed screening capability for
centralised operator review.
2.3.1.13.6 Supply, installation and commissioning of Bulk goods/cargo X-ray screening
machines with integrated weighing scales.
2.3.1.13.7 Decommissioning of current equipment to be replaced.
2.3.1.13.8 Maintenance support of the new equipment.
2.3.1.13.9 Training of users through Train-the-Trainer (TTT) course.
2.3.2 Regulatory certification
The equipment will conform, meets and or exceed:
2.3.2.1 TSA or ECAC.
2.3.2.2 Electrical Safety requirement for CE.
2.3.2.3 ISO Standards (Quality & Safety related standard).
2.3.2.4 The X-ray systems must be certified to be in full compliance with radiation
safety requirements and external radiation limits.
While SACAA recognises certifications from TSA or ECAC as international benchmarks.
The respondent should demonstrate that the equipment will be certified by internationally
recognised bodies and comply with all applicable national and international aviation
security standards.
2.3.3 Project plan
It is the responsibility of the respondent to ensure that the proposed solution is
accommodated within the plot space and infrastructure limitations of the current central
search points equipment. The dimensions of these spaces will be provided to the
interested parties upon site briefing date. Further, the infrastructure integrity should not be
compromised with the installation (load bearing, strength and stability). The requirement
for adequate lighting and suitable site conditions (temperature, moisture content etc..)
should be confirmed by the Contractor through a professional engineering assessment.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.4 The maintenance contract approach
There will be a requirement for the signing a separate contract for the Annual Maintenance
for five (5) years as per the terms and conditions decided by ACSA.
Respondents may provide indicative information regarding the proposed maintenance
model and cost drivers. Detailed pricing and commercial proposals, if required, will be
requested as part of any subsequent procurement process. The maintenance contract
will also entail a Subject Matter Expert condition assessment and a middle of life
refurbishment program on all equipment. ACSA will award the contract based on TOTAL
COST OF OWNERSHIP, that is OPEX and CAPEX. It will be the responsibility of the
respondent to ensure that the targeted maintenance is achieved per quarter for the
duration of the contract. Items that are excluded from the maintenance contract should be
stipulated. It will also be a requirement that strategic spares holdings will always be
available to enable the achievement of Mean Time to Repair (MTTR). The Operating Cost
will also entail the certification and training of maintenance staff for the duration of the
contract. The training and development of Security Staff (content and frequency) should
also be stipulated as part of the returnable. Reliability, Maintainability and Availability
metrics of the technology will need to be maintained to ensure operational availability.
2.3.5 SCREENING EQUIPMENT (X-ray machines, Full body scanners, Arch way metal
detectors)
2.3.5.1 It is important for the respondents to note the following requirements of the
National Aviation Security Program.
2.3.5.2 South African Civil Aviation Authority (SACAA) will determine minimum
specifications of screening equipment intended for use at designated airports.
2.3.5.3 Before a piece of equipment is deployed operationally, the following will be
considered:
2.3.5.3.1 Size of items to be screened.
2.3.5.3.2 Size and mass of the equipment.
2.3.5.3.3 Screening capacity (throughput and hourly screening capacity).
2.3.5.3.4 Availability, reliability and maintainability.
2.3.5.3.5 Integrity (possible sources of interference).
2.3.5.3.6 Licensing, such as of frequency bands used by the equipment.
2.3.5.3.7 Safety requirements.
2.3.5.3.8 Automation.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.5.3.9 Operator interface.
3.5.3.10. Power requirements.
3.5.3.11. Data recording.
3.5.3.12. Threat image projection capability.
3.5.3.13. Training requirements.
3.5.3.14. Ease of use.
3.5.3.15. Environmental constraints (e.g. temperature and humidity); and
3.5.3.16. Networking.
The supplier will have to provide details of how information on an operation is secured,
including arrangements for ongoing support and maintenance.
2.3.6 Automated lanes
The automated lanes shall include
2.3.6.1 Full lane design and installation for high-throughput passenger flow or
screening as per the provided screening capacity requirements, in Table 1.
2.3.6.2 Automated tray handling system including the tray supply, collection, return and
tracking.
2.3.6.3 Conveyor system and integration with the 3D CT scanners and remote
monitoring
The respondent should provide all information on the capability to provide all design,
engineering, labour and materials, equipment transport, installation, testing,
commissioning, decommissioning, reliability testing, guarantee certificates, and
operational handholding services for at least 90 (ninety) days, as required to achieve the
project objectives.
The respondent should provide all information on the capability to supply all necessary,
required material (hardware and software), including Networking switches and cabling for
back-end connectivity to realise the 3D screening machines with Automated Tray Return
(ATR), Recheck Workstation/s and Centralised Screening, workstations, as described in
this document, and with consideration of the operational and security requirements. This
must strictly be done in line with ACSA IT standards.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.7 Automation elements
The physical layout of each airport is different and may require different or scalable or
modular configurations based on the following five primary automation elements:
2.3.7.1 Parallel Divestiture
A divestiture element provides divest space and a powered means for conveying
articles from the point of divestiture to the input. The parallel capability modifies the
current serial approach (“First-in-First-Out” scenario) where queuing passengers must
wait for the previous passengers to divest before submitting their own items for
screening. This new process is to provide improved system utilisation that allows for
higher capacity per screening lane and is to be both intuitive to the passengers using
it and not require significant modification of space. This is a guideline from ACSA while
the supplier will be held accountable for the processing capacity within the spatial
layout. It is imperative for the supplier to design a solution that guarantees the
technical and business requirements stipulated by ACSA.
2.3.7.2 Diverter
Automatically, without physical human intervention, sends a bin to:
2.3.7.2.1 The re-composure conveyor (for cleared bins).
2.3.7.2.2 The secondary screening conveyor (for threat bins) after an X-ray operator
has determined that the contents of the bin are either a threat or not; or
2.3.7.2.3 Threat Containment. The Automated Diverter also decreases or
eliminates access control incidents by maintaining control of the bins on a
roller bed that is not physically accessible to the public. The diverter
element is a powered means to automatically and accurately separate
items based on security screening decisions.
2.3.7.3 Secondary Screening (Escalation)
2.3.7.3.1 The secondary screening element is a powered or unpowered means to
stage and hold suspected bins until a secondary screening security officer
can convey the bag to a secondary search area.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.7.4 Re-Composure
The re-compose element is a powered or unpowered system which queues cleared
bins, allowing individuals to retrieve their items in a convenient and efficient manner.
2.3.7.5 Bin Return
The bin return element is a powered system that transports empty bins from the re-
composure or secondary screening areas to the divestiture area for retrieval by
passengers. This is to facilitate the expedited flow of passengers by providing an
intuitive process during re-composure for returning bins back into the system for
automatic return to the divest stations. This also eliminates the resource intensive task
of manually moving empty bins to the front of the conveyor.
2.3.7.6 Threat Containment
2.3.7.6.1 Automatically diverts bins to isolate bins that have been identified as
high/obvious threats during primary viewing, but allows the lane to continue
to screen items, which eliminates the need for a screening officer to manually
handle the item. If an item such as a bomb or firearm is detected, an alarm
will flag, and the screener will follow the dictates of the SOP.
2.3.7.6.2 All screened items and trays are tracked throughout the screening process.
Trays are tagged (RFID or other enabling technology) to support tracking of
accessible property throughout the screening process (enables each tray to
be sent for action appropriate to its contents). The tracking capability
associates screening images and Optical Overhead Photo to the appropriate
tray and provides the ability to recall the image as needed for any secondary
screening area (not necessarily the viewing station for the same lane that the
images were captured). The tracking capability also provides input to
Enhanced Data Capture & Reporting regarding the operator's image
interpretation and performance.
2.3.7.7 Optical Overhead Photo
The system will capture optical overhead photos and associate them with screened
items and bins via tracking capability. The photo will be associated with screening
images for display during primary and secondary viewing.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.7.8 Cross-Lane and Remote Operation
The screening equipment shall be provided for cross-lane and remote primary viewing
station operation of screening functions. Cross-Lane operation is defined as the
capability to serve images to an available operator and associated primary viewing
station within the checkpoint (and not necessarily the operator located directly beside
a specific location). Remote operation is defined as the capability to serve images to
operators and associated primary viewing stations located physically separate from
the checkpoint in a viewing room. The purpose of this is to position X-ray operators in
a remote location to facilitate economy of resources (each operator is able to view
images from multiple lanes) while providing an environment for the operators that is
designed to maximise security effectiveness by removing unnecessary distraction.
2.3.7.9 Enhanced Data Capture & Reporting
Provide enhanced automated data capture regarding system operation, screening
functions, and provide the ability to deliver captured data in a standard report format.
2.3.7.10 Cyber-Security
Maintain the construction of current ACSA network configuration (i.e., information
sharing between components making up the system but not outside of the system)
with documented additional connections to enable the operation of the section of
Automation Elements.
2.3.8 Screening capacity
It is important to note that the security screening equipment has a useful life of a minimum
of ten (10) years; the approach to screening capacity proposed by Respondents should
target the terminal design capacity. The table that follows outlines details of the security
checkpoints, current operating capacity, and the target terminal design capacity. The
proposed solution to handle traffic as per show on Table 1 below:
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Table 1: The proposed solution to handle traffic
Airport Area Airport Current Future
Processing Processing
Rate (Pax/Hr) Rate
(Pax/Hr)
Domestic ORTIA 2160 3000
Ctia 2315 2400
Ksia 1191 1750
International ORTIA 2880 3000
Local Airports CTIA 750 1250
Ksia 332 350
Cdsia 421 450
George 355 450
Kpa 317 500
Bfia 243 300
Kimberley 125 150
Upington 37 120
At a minimum, respondents must demonstrate a processing rate and layout plan that
provides processing capacity that exceeds current capacities and is measured during
normal operation. Respondents who can demonstrate processing capabilities closer to the
future processing requirements or higher, within the set footprint, will score higher in the
assessment process.
The processing capacity should be achieved within the targeted availability of equipment.
This means that the respondent should make provision for redundancy (breakdowns,
inspections, training, simulations, servicing) before the processing capacity can be
determined. The processing capacity will be determined through a reliability test with a
duration of no less than 45 (forty-five) days of operation of the central search points and
goods receiving. A failure in the testing resets the 45-day period. The processing capacity
will be information that will be segmented into periods of high processing, normal
processing; and low processing periods.
2.3.9 CSP Floor Space
ACSA will provide dimensions of current CSP areas. This floor space will set the boundary
within which the proposed layout should be accommodated. Additionally, ACSA Airports
are designed on an "optimum" design basis. The figure that follows provides the acceptable
processing waiting times and the minimum queue width that should be adhered to.
Minimum queue width = 1.2m
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Queuing time at Security checkpoint for economy class passengers = 5 — 10 minutes (LOS
Optimum(C), Refer IATA Spec)
2.4 Pricing Schedule
Respondents must provide the queuing time for their proposed designs. Respondents who can
demonstrate shorter queuing time for a target capacity will score higher. The minimum queue width
of 1.2m is mandatory. Proposals that are below this threshold should not be considered.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.9 Goods screening solution
Table 2: Current Goods Screening Arrangement and Configuration
Airport # of Area Area # of Sub-Area Machine Size Total
Machines Machines Machines
ORTIA 3 International 1 150x150 4
entrance
International 2 Lane 1:150x150
exit Lane 2: 100x100
1 Domestic 1 100x100
KSIA 2 Basement 1 150x150 2
South (Dom)
Basement 1 100x100
North (Int.)
CTIA 2 Domestic 1 150x150 2
International 1 150x150
UPN1 1 N/A 1 100x100 1
KIM 1 N/A 1 75x55 1
Cdsia 0 n/a 0 n/a 0
Kpa 0 n/a 0 n/a 0
Bfia 0 n/a 0 n/a 0
Grj 0 n/a 0 n/a 0
The proposed solution for the international and regional airports shall be the same arrangement.
The weighing scale shall be provided at each screening point to avoid overloading of the screening
machines which may result in damaging the conveyor belts and reducing the reliability of the
machines.
It is also recommended that other auxiliary equipment to support the goods screening process be
considered, this includes lighting, HVAC, CCTV, as well as data logging and data storage/archiving.
2.3.10 Central screening remote room
The respondent shall design, construct, and set-up secure rooms for centralised image and alarm
review. The central screening remote room shall form an integral part of the integrated airport
security detection system. This should allow the AVSEC screener (video operator) to analyse the
Xray/ CT images away from the CSP in a dedicated and controlled environment. The concept
should cover International departures screening lanes, Domestic lanes and Transfer
screening areas at international airports and only domestic lanes for local airports.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
The respondent will have to demonstrate that they can do capacity planning based on screening
lanes assumptions, operator ratio (multiplexing) and determine the number of workstations for
supervisors and operators. The rooms must be protected from cyber-attacks and as such the
respondent must demonstrate how this will be accomplished. The respondent should provide
information regarding the provision for redundancy as part of the designs.
The central screening remote room should make provision for the following zones or operational
areas:
2.3.10.1 Screening Operations Room:
Main area with operator workstations
Clear sightlines for supervision
Low-light environment
2.3.10.2 Supervisor & Control Area:
Overlooks screening room
Monitoring dashboards
2.3.10.3. Server / Equipment Room:
Must be physically secured
Climate-controlled
2.3.10.4Support Areas:
Staff break room
Lockers
2.3.11 Intergration
Interoperate within the existing checkpoint environment, including infrastructure,
electrical and mechanical interfaces and existing screening equipment. Full integration of
all devices with Automated screening lanes and remote screening rooms. Integration
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
with airport IT, CCTV, access control, baggage management and alarm reporting
system. Support the multiplexed remote operation, allowing centralised operators to
manage multiple lanes and devices simultaneously.
2.3.12 IT systems and network
The respondent should provide information with regard to a solution that will enable monitoring
of equipment and processing performance through suitable IT systems. These IT systems
should enable remote monitoring of CSP operation, monitor processing of passengers, provide
data on processing and incident records, provide statistics such as equipment downtime,
machine resetting/restarts, positive ID of test pieces and/or mock testing of screeners, and
equipment monitoring data such as radiation levels, temperature, etc. Furthermore, these IT
systems should have the capability to store at least a 60 (sixty)-day record of all items’
processes. The technical specifications for IT systems and redundancy will be provided by
ACSA (servers, cooling redundancy in data rooms, back-up power system, information back-
up requirements, connectivity of systems to ACSA IT network, information storage devices,
etc.).
2.3.10. Commissioning and testing
Factory Acceptance Testing (FAT) and site Acceptance Testing for all equipment and
automated lanes.
Operational readiness validation, including throughput, detection performance, remote
screening and weighing accuracy.
Regulatory approvals by the South African Civil Aviation Authority
2.3.11. Threat image projection (tip) specification
TIP software facility should be incorporated in the offered X Ray machine to assist the
supervisors in testing the operator’s alertness and training X Ray screener / operator to
improve the ability in identifying specific threat objects. TIP software should be compatible with
other X Ray technologies. All X Ray image functions should be available at the same time along
with TIP. The TIP facility should have an image library of sufficient capacity and variety. The
library should be able to expand and to incorporate additional images by users without the
assistance of the manufacturer. The image library should contain images of threats at different
orientations; both plane and end – on orientation should be used. All image projection images
should be realistic, representative and non-distinguishable from real threat items.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
The programming facility should be available to project images in different intervals. Once the
screener has responded to identify the computer-generated threat image, it should remain on
the screen for a predefined user programmable time for analysis. The image should be
highlighted upon identification, and feedback message shall be visible to the screener. The
system should have to bypass the TIP facility, if programmed so, by the system administrator.
It is to be ensured that the TIP software should not be a hindrance to normal functioning of X
Ray Machines. All data should be stored on the system for a minimum period of 60 (sixty) days
(two (2) months), after it has been downloaded. No individual, regardless of access rights to
the TIP components, should be able to delete or amend any of the TIP data. The feedback
should clearly indicate in a screen that:
The system should automatically prepare the daily log of events for each shift and for each
screener’s performance. The system should be able to generate daily, weekly and monthly
reports as well as for any given time and period.
2.3.12. General
The latest screening technology including 3D X-ray machines, AMD, full body scanners with
ATR shall:
2.3.15.1 Improve the passenger flow at security checkpoints to support passenger growth
and reduce waiting times as well as delays.
2.3.15.2 Automate the dispensing, movement, sortation and collection of Hand baggage
trays. All tray transportation units should be motorised and work synchronously
with the X-Ray Baggage Inspection System.
The suppliers shall be expected to provide a technology and layout that meets ACSA’s needs
with regard to the processing speed and the available space that is aligned to the maximum
processing capacity of the infrastructure. The new technology will have to cater for the needs
of the airport capacity for at least ten (10) years (or the useful life of the screening equipment)
and to consider the passenger processing forecasts.
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
2.3.16 Aesthetics:
The latest Screening Technology with ATR shall have a modern look and feel, matching the
airport design and décor. The colour scheme and Logo for screening technology with ATR shall
correspond to the branding at ACSA Airports and be finalised in collaboration with ACSA.
The following capabilities are desired by ACSA from an integrated technology solution and
concept:
2.3.16.1 Checkpoint Performance Improvements
2.3.16.2 Provide effective and efficient screening of accessible property.
2.3.16.3 Require comparable or more efficient staffing as a standard to carry-on
screening lane configuration.
2.3.17 Access control
2.3.17.1 Maintain item control from entry (divestiture) to exit (re-compose).
2.3.17.2 Ability to automatically divert items requiring additional screening.
2.3.17.3 Ability to manage item spacing to reduce item re-runs.
2.3.18 Out of scope
The provision as well as maintenance of the following is out of scope where the services
are the responsibility of ACSA’s Internal infrastructure teams:
2.3.18.1 IT network infrastructure (switches, routers, LAN and WAN including cabling);
2.3.18.2 Datacentre.
2.3.18.3 Wire Centre equipment.
2.3.18.4 Servers.
2.3.18.5 External Electrical Power; and
2.3.18.6 Cooling in the Data Centre
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Section 3: expression of interest instructions
Proposal Procedure
This section outlines the procurement process that will be followed:
Phases
o Focus on capability, methodology, resources, and compliance with functional criteria.
o Employer evaluates these proposals against pre-disclosed functionality criteria.
o Only tenderers meeting minimum technical requirements proceed to Stage 2.
o Shortlisted tenderers receive procurement documents (including full scope and contract
details).
o They submit priced offers based on updated information.
o Evaluation at this stage considers price and preference points (e.g., B-BBEE).
COR8203/2026/EOI
ConfidentialConfidential
ConfidentialConfidential
Section 4: assessment criteria
4.1 Assessment of Responses
4.1.1. ACSA will assess the information submitted by respondents against the requirements and
assessment criteria stated in this EOI.
4.1.2. The purpose of the assessment is to determine the extent to which respondents demonstrate
relevant experience, technical capability, operational capacity, regulatory compliance, financial
and organisational capacity, and the ability to deliver solutions of the nature contemplated by
Acsa.
4.1.3. The assessment of an EOI response shall not constitute an award, appointment or selection of
a preferred bidder.
4.1.4. ACSA may use the information obtained through this EOI to inform the development of the
scope of work, technical requirements, procurement strategy, evaluation criteria and other
requirements for any subsequent procurement process.
4.1.5. ACSA may request clarification or additional information from a respondent where ACSA
considers such clarification or information necessary to properly understand the respondent’s
submission.
4.2 Assessment Criteria
4.2.1. Responses may be assessed against the following criteria:
a) experience in the provision and implementation of comparable security screening and
detection solutions;
b) technical capability and technological expertise;
c) experience with aviation security screening environments;
d) experience with ECAC and/or TSA-approved or qualified technologies, where applicable;
e) experience in the design, integration, installation, testing and commissioning of comparable
systems;
f) maintenance, support and lifecycle capability;
g) operational capacity and availability of suitably qualified resources;
h) experience in implementation within live airport or other security-sensitive environments;
i) regulatory and statutory compliance;
j) organisational and financial capacity; and
COR8203/2026/EOI
ConfidentialConfidential
Methodology
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)The scope of work includes design, supply, installation, integration, commissioning, support, training, decommissioning, processing capacity testing, project management, and maintenance of an integrated aviation security screening solution. The solution should include automated tray return (ATR) at central search points, cabin baggage screening equipment, full body scanners, trace detection, goods screening equipment, archway walk-through metal detectors, centralised screening control and image management systems, and data transmission and cybersecurity architecture. The solution should be delivered in a 3-phase approach: three years for design, delivery, installation, commissioning and decommissioning; two years full on-site warranty; and five years comprehensive maintenance. The technology shall be retrofitted in current positions without major building modification. The scope also covers automated lanes, remote/multiplexed screening, decommissioning of current equipment, maintenance support, and training through Train-the-Trainer.
Quality Management
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)Regulatory certification: The equipment will conform, meet or exceed TSA or ECAC standards, Electrical Safety requirement for CE, ISO Standards (Quality & Safety related standard). The X-ray systems must be certified to be in full compliance with radiation safety requirements and external radiation limits. SACAA recognises certifications from TSA or ECAC as international benchmarks. The respondent should demonstrate that the equipment will be certified by internationally recognised bodies and comply with all applicable national and international aviation security standards.
Contractual Terms
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)This EOI is not a request for a tender, bid, proposal or offer capable of acceptance by ACSA and shall not constitute an offer or an invitation to contract. No respondent shall acquire any right or expectation that ACSA will proceed with a procurement process. ACSA may determine whether to proceed with a subsequent procurement process and the form, scope, procurement methodology and terms. Participation in this EOI shall not create any contractual relationship. ACSA is under no obligation to proceed with a subsequent procurement process. ACSA reserves the right to amend, refine, reduce, expand or modify the requirements, issue a subsequent procurement instrument, invite all, some or none of the respondents, undertake further market engagement, or cancel, withdraw or discontinue the EOI process. No respondent shall have any claim against ACSA arising solely from ACSA's decision not to proceed. The information submitted should remain materially accurate for 120 business days following the closing date. Respondents shall not be required to submit firm prices, rates or financial offers as part of this EOI. Any indicative pricing provided shall not be regarded as a commitment. Pricing, commercial terms and financial evaluation shall be addressed in the subsequent procurement process. ACSA is considering a potential programme with an anticipated lifecycle of approximately ten years. Any contract duration, commercial structure, warranties, maintenance obligations and service levels will be determined in any subsequent procurement process. ACSA will not disclose any information disclosed to ACSA through this EOI process to a third party or any other respondent without written approval. ACSA will not disclose the names of respondents until the EOI process has been finalised.
Requirements
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)EOI response documents must be delivered by the stipulated time to the correct address. Late EOI responses may not be considered. All EOI responses must be submitted on the official forms provided (not to be re-typed) or in the manner prescribed. The response documents must be signed and completed by a person who has been given authority to act on behalf of the respondent. The bottom of each page must be signed or stamped as proof that the respondent has read the documents. Both hand delivery and email submission methods must be utilised. Hand delivery to the Tender Box at ACSA, Third Floor, North Wing Offices, OR Tambo International Airport. Email submissions to [email protected], with attachments not more than 4MB each. EOI responses must be in printed format (original and copy) together with an electronic copy using an accessible link. The original takes precedence in case of discrepancies. Alternative EOI responses will be accepted only if accompanied by the original EOI response document which materially complies with the specifications. EOI responses submitted after the closing date and time will not be considered.
Section
Source: COR8203 2026 EOI - ACSA SMART DETECTION.pdf (EOI)Respondents must demonstrate capability in capacity planning, including screening lane assumptions, operator ratios (multiplexing), and determining the number of screening lanes required. The system must automatically prepare daily logs of events for each shift and each screener's performance, and generate daily, weekly, monthly reports. The solution must include redundancy provisions and comply with SACAA minimum specifications for screening equipment. Operating costs must include certification and training of maintenance staff for the contract duration.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve guarding, access control, CCTV, surveillance, or private security services.
Act 56 of 2001
Relevant where security providers, guards, access control or private security services are required.
Relevant because this tender appears to involve guarding, access control, CCTV, surveillance, or private security services.
Address
1 JONES RD - KEMPTON PARK - JOHANNESBURG - 0186
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
13 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How small security companies and BEE-certified guarding firms use Joint Ventures to compete for PSIRA-regulated government security tenders.
How security installation companies, technology integrators, and electronic security providers can win government tenders for CCTV, access control, alarm monitoring, and integrated electronic security systems in South Africa.
In 2026, Western Cape’s security procurement landscape remains one of the most active in South Africa, with 176 live security tenders signaling strong demand for compliant service providers. For security contractors, PSIRA compliance is non-negotiable—failing to verify company and guard registrations before submission can lead to immediate disqualification. With government buyers prioritizing regulatory adherence, suppliers must adopt a proactive approach to ensure all certifications are current, accurate, and aligned with tender requirements.
As Gauteng’s security tender landscape intensifies in 2026, contractors must navigate a complex compliance environment where a single oversight can disqualify an entire bid. With over 300 active security tenders in the province, regulatory adherence—particularly PSIRA registration—remains the non-negotiable foundation for participation. This guide clarifies the legal obligations, verification processes, and documentation required to ensure your submission meets the strict standards of South African procurement law.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Security and investigation activities. Unlock full pricing strategies, bid frequency, and historical win rates.