Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Lower Germiston Road - Roscherville - Johannesburg South - 2090
Organization Type
GOVERNMENT
Published
12 Oct 2026
OCDS Reference
ocds-9t57fa-173711
Design, manufacture and delivery of power transformer cores and shunts for transformers rated between 2 mva and 80 mva, under a five-year contract with ESKOM. the cores must match the original cores exactly in form and dimensions, and the supplier is responsible for taking all necessary dimensions from the original cores. The most critical requirement is that all cores must conform precisely to the original design, with core steel matching or exceeding moh 0.3 Quality.
Closing date: 30 October 2026 at 11:00.
Contract period: Five years for design and supply of transformer cores and shunts.
Scope: Design, manufacture and delivery of power transformer cores for 2 MVA to 80 MVA transformers.
Core conformance: Cores must match the original core's form and dimensions exactly; any deviation requires prior agreement.
Dimensional responsibility: The supplier must take all required dimensions from the original cores, which will be made available at ERI workshops or may be transported to the supplier's premises.
Core steel: Must match or exceed the quality, dimensions and form of the original core steel (typically MOH 0.3), unless otherwise agreed.
Assembly and hardware: Cores should preferably be delivered fully stacked and assembled with all clamping hardware; if original clamping plates are unavailable, the supplier must provide all required hardware based on the original design.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 30 October 2026 - 11:00
Venue
https://teams.microsoft.com/meet/366071683179821?p=ZiyMhQBixh5fkL71tZ
Categories
Request for Bid(Open-Tender)
Lower Germiston Road - Roscherville - Johannesburg South - 2090
AI Document Analysis Stages
Description
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)12 Oct
2026
Tender Published
Tender was published
30 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom requires the design and supply of transformer cores and shunts under a five-year contract, procured under specification 240-105658000. Bidders are assessed on quality management deliverables set out in a Supplier Quality Management returnables list, scored across Sections A to E.
240-106084675 Annexure C 3.docx
Design and supply of transformer cores and shunts to Eskom over a five-year contract period, with the work falling under Gauteng. The procurement carries an occupational health and safety returnable pack that bidders must complete and submit with their offer.
240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf
Eskom requires the design and supply of transformer cores and shunts for a period of 5 years, with mandatory compliance to Eskom SHE rules and contractor management requirements.
Invitation to Tender Shunts Cores 09102026.pdf
Eskom requires the design and supply of transformer cores and shunts over a five-year period, with the contract awarded to a panel of between two and five contractors. Supply is called off against task orders, and bidders are evaluated on technical capability, price and specific goals.
240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf
Design and supply of transformer cores and shunts to Eskom under a five-year contract, with work executed in Gauteng. The procurement carries an occupational health and safety compliance component that bidders must satisfy as part of their submission.
Shunts and cores Scope of Work.pdf
Eskom requires the design, manufacture and delivery of replacement power transformer cores and shunts for transformers rated between 2 MVA and 80 MVA, under a five-year contract. Cores must replicate the form and dimensions of the originals and are preferably supplied fully stacked and assembled with all clamping hardware.
E-tendering Help Manual for supplier - 27 January 2025.docx
Design and supply of transformer cores and shunts to Eskom over a five-year period. Bids are submitted electronically through the Eskom eTendering portal, which replaces physical delivery of tender documents to Eskom tender offices.
NEC-Complete Supply Contract-Transformer cores and shunts .pdf
Eskom Rotek Industries SOC Ltd requires the design and supply of transformer cores and shunts over a five-year period, delivered to Rosherville, Johannesburg. The contract is an NEC3 Supply Contract (SC3, April 2013) with a set of cores or shunts supplied each year depending on service requirements.
240-126469599 (Rev 2) - Method Statement - Template.docx
Eskom requires the design and supply of transformer cores and shunts under a five-year contract. Bidders must submit a method statement setting out how the scope of work, objectives, resources, risks and stakeholder relationships will be managed over the contract term.
Contractor Health and Safety Requirements (Latest Revision) (2).pdf
Eskom requires contractors to design and supply transformer cores and shunts over a five-year period, subject to Eskom's Contractor Health and Safety Requirements (standard 32-136, revision 4). The standard sets the minimum safety, health and environmental obligations a contractor must meet on Eskom sites, over and above South African statutory requirements.
Functional evaluation criteria- shunts and cores - Annexure 1.pdf
Eskom requires the design and supply of transformer cores and shunts over a five-year period, awarded through a technical evaluation of manufacturing capability. Bidders are scored on design and evaluation capability, core size range, clamping structure capability, delivery condition, shunt manufacture, track record with South African manufacturers, site visit outcome and delivery lead time.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom requires the design and supply of transformer cores and shunts over a five-year period, procured under its Supplier Quality Management Specification (240-105658000 / QM 58, Revision 3). Suppliers must operate a quality management system conforming to the latest ISO 9001 and submit the quality documentation required by the category selected in Form A for this procurement.
240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx
Eskom requires the design and supply of transformer cores and shunts over a five-year period. Bidders are assessed on environmental (SHE) management submissions, scored per KPI as 0 or 1 and totalled to Approved or Not Approved.
240-68099512 Form A_Cat 4_ Rev 9.pdf
Design and supply of transformer cores and shunts to Eskom under a five-year contract. Bidders must accept Eskom's supplier quality requirements under specification 240-105658000 and the ISO 9001 standard, and nominate a quality representative.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 5 140 500
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This specification (240-105658000, QM 58, Revision 3) defines the minimum quality requirements for all existing and potential Eskom suppliers. It applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for procurement of products and services. The specification requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001. It covers supplier and sub-supplier QMS requirements, quality plans, contract quality plans (CQPs), quality control plans (QCPs)/inspection and test plans (ITPs), four categories of quality requirements (1-4) with specific returnable documentation, supplier capability and capacity assessments, post-contract award quality performance monitoring, supplier quality audits, rights of access, Eskom rights to information, preservation requirements, management of nonconformities, and special processes.
Important Dates
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Closing date: 30 October 2026 at 11:00
No briefing or site visit dates are stated in the document.
Contact Information
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)No contact details are stated in the document.
Submission Guidelines
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Returnable documents (per the List of Tender Returnables, 240-12248652):
Submission method and address: not stated in the document.
Closing time: 11:00 on 30 October 2026 (per tender record).
Evaluation Criteria
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Quality requirements are classified into four categories (1, 2, 3, 4); only one category applies per procurement, as indicated in Form A.
Supplier capability and capacity assessments are performed before contract award for suppliers providing high-risk products/services, working on critical plant, supplying critical plant items, or providing special processes.
No scoring split or minimum qualifying score is stated in the document.
Technical Specifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Scope: Design and supply of transformer cores and shunts for a period of 5 years.
Quality management system requirements:
Contract Quality Plan (CQP):
Quality Control Plan (QCP/ITP):
Preservation:
Methodology
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Method statements and procedures:
Experience & Qualifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Personnel qualifications:
Quality Management
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Quality management system requirements:
Contract Quality Plan (CQP):
Quality Control Plan (QCP/ITP):
Pricing Schedule
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)No pricing schedule details are stated in the document.
Financial Requirements
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)ISO 9001 certification: required under Category 1 unless specifically excluded in the quality list of tender returnables.
QMS compliance: Categories 2 and 3 require objective evidence of a QMS complying with ISO 9001; Category 4 requires a quality method statement based on ISO 9001.
Form A: must be completed and signed.
Sub-suppliers: same QMS requirements apply.
Capability and capacity assessment: may be performed before contract award.
No CSD, tax, B-BBEE, CIDB, CIPC or local content requirements are stated in the document.
Health & Safety
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)No specific health and safety requirements are stated in the document beyond reference to Eskom's SHEQ Policy (32-727) as an informative reference.
Contractual Terms
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Preservation obligations:
Section
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Quality requirements are classified into four categories (1, 2, 3, 4); only one category applies per procurement, as indicated in Form A. The supplier must submit quality documentation per the selected category. Supplier capability and capacity assessments are performed before contract award for suppliers providing high-risk products/services, working on critical plant, supplying critical plant items, or providing special processes. No scoring split or minimum qualifying score is stated.
Description
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Each KPI is scored 0 or 1: 0 where the document is not submitted or fails to meet the minimum requirements, 1 where it is submitted and meets them.
Submission Guidelines
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Returnable documents for the environmental evaluation:
Evaluation Criteria
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Scoring: each KPI is scored 0 or 1 — 0 where the document is not submitted or does not meet the minimum requirements, 1 where it is submitted and meets them. The total score determines an outcome of Approved or Not Approved.
Part A KPIs:
Part B KPIs:
Technical Specifications
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Scope: design and supply of transformer cores and shunts over a five-year period.
Environmental obligations are graded by risk category (low, medium or high); the category determines the depth of the Environmental Management Plan and the supporting submissions required.
Financial Requirements
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)High-risk work only: bidders must submit a detailed, itemised costing for environmental management across the scope of work. A lump sum is not acceptable.
Compliance Requirements
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Mandatory environmental compliance:
Description
Source: Functional evaluation criteria- shunts and cores - Annexure 1.pdf (unknown)Design and supply of transformer cores and shunts for a period of 5 years.
Submission Guidelines
Source: Functional evaluation criteria- shunts and cores - Annexure 1.pdf (unknown)Returnable documents: evidence supporting each scored item in the functionality scoring sheet must be submitted with the tender. Failure to submit adequate documentary proof for any item results in a zero score for that item.
Evaluation Criteria
Source: Functional evaluation criteria- shunts and cores - Annexure 1.pdf (unknown)Technical evaluation is conducted in two stages:
Scoring sheet comprises eight weighted criteria, maximum 260 points:
Final score = sum of (Actual points / Max possible points) x Weighting %.
Technical Specifications
Source: Functional evaluation criteria- shunts and cores - Annexure 1.pdf (unknown)Scope: design and supply of transformer cores and shunts for a period of 5 years.
Core size capability: must be able to manufacture cores up to 80 MVA and above.
Delivery condition: fully assembled core together with clamping structures is the highest performance level.
Shunt manufacture: capability for complex non-rectangular or irregularly shaped winding shapes is the highest performance level.
Site visit will be conducted to verify conditions of design, manufacture and equipment.
Compliance Requirements
Source: Functional evaluation criteria- shunts and cores - Annexure 1.pdf (unknown)Minimum functionality/qualifying score: 70% overall across the two stages.
Section
Source: Functional evaluation criteria- shunts and cores - Annexure 1.pdf (unknown)Technical evaluation is conducted in two stages: Functionality (minimum threshold 60%) and Site Visit (weighting 10%). Bidders must achieve an overall minimum threshold of 70% across both stages. The functionality scoring sheet comprises eight weighted criteria with a maximum of 260 points: (1) Design/evaluation capability for core (weight 10%) — evidence: core specification, material specification evaluation, loss evaluation, flux density, all core types; scored Not Capable / Partially Capable / Fully Capable. (2) Core size capability (weight 20%) — list of core sizes manufactured (MVA): 0–10, 10–40, 40–80, and above. (3) Design/manufacturing capability of core/shunt clamping structures (weight 10%) — experience with examples and analysis; levels: None / Partial manufacturing capability only / Full manufacturing capability. (4) Delivery condition (weight 20%, verified during site visit) — levels: nothing submitted / partially assembled core plate stacks / fully assembled core together with clamping structures. (5) Shunt manufacture (weight 10%, verified during site visit) — levels: nothing submitted / simple banded shapes / complex non-rectangular or irregularly shaped winding shapes; full list of examples/designs required. (6) Number of years supplying cores to South African manufacturers (weight 10%) — levels: never to 1 year / longer than 1 up to 5 years / longer than 5 up to 10 years / longer than 10 years; provide list of orders/projects and OEMs involved. (7) Site visit (weight 10%) — suitability of design, manufacture and equipment: Unsuitable / Marginally acceptable / Acceptable / Excellent. (8) Delivery time from task order (weight 10%) — levels: less than 5 weeks / less than 6 up to 5 weeks / less than 7 up to 6 weeks / less than 8 up to 7 weeks / longer than 8 weeks. Final score = sum of (Actual points / Max possible points) x Weighting %. Evidence must be submitted with the tender for each item; failure to provide adequate documentary proof results in a zero score for that item.
Submission Guidelines
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Returnable documents:
Evaluation Criteria
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Bidders must sign the acknowledgement form as an authorised person (CEO/Director/Managing Director) and confirm understanding of the SHE requirements and consequences of non-compliance.
Technical Specifications
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)The main supplier must demonstrate the process and selection criteria used when appointing contractors and suppliers, and provide notification to Eskom before appointing them for work commencement.
Quality Management
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Financial penalties apply to the main supplier for non-conformances (identified for the main supplier and/or its sub-contractor and/or supplier) pertaining to Eskom and/or statutory SHE requirements. All employees (contractors/suppliers) must undergo relevant Eskom induction and company induction.
Compliance Requirements
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Compliance with Eskom SHE requirements is mandatory:
After contract award, the supplier must align company processes to Eskom's SHE requirements (policies, procedures, standards).
Health & Safety
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Mandatory SHE compliance documents include Eskom contractor Health and Safety requirements standards 32-136, the provided SHE specification, Occupational Health and Safety Act, Mine Health and Safety Act (where applicable), Compensation for Occupational Diseases and Illnesses Act, and National Environmental Management Act. After contract award, the supplier must fully align company processes to Eskom's SHE requirements (policies, procedures, standards). Work stoppages due to SHE issues do not warrant financial compensation claims against Eskom.
Contractual Terms
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Contractor management obligations:
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Eskom representative: Annah Serite
Date issued: 31 March 2026
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Returnable documents (Category 4 – Quality Requirements):
All required documents must be submitted with the bid; failure to provide them may affect evaluation.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Evaluation is based on Category 4 Quality Requirements deliverables, with an indicator = 1 for each applicable item. Scores are allocated per section as follows:
Total possible score: 6. The bidder must meet the quality requirements to be evaluated; no minimum qualifying score is stated.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Design and supply transformer cores and shunts for a period of 5 years.
Scope includes design, supply, and delivery of transformer cores and shunts.
Quality requirements per specification 240-105658000.
Method statement template reference: 240-126469599.
Contract quality plan reference: 240-109253698.
Quality control plan reference: 240-109253302.
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Quality management requirements include:
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Quality Management System (QMS) compliance is mandatory:
Evidence of QMS in operation is required (Section B).
No other compliance requirements (e.g., CSD, tax, B-BBEE) are stated in this document.
Section
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (TENDER)Quality requirements are evaluated per Category 4. Section A (QMS) offers two options: Option 1 (certified ISO 9001) or Option 2 (documented QMS). Section B requires evidence of QMS in operation. Section C requires a draft Contract Quality Plan. Section D requires a draft ITP/QCP. Section E requires Form A completed and signed. Scores are allocated per section as listed.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The source document is the Eskom eTendering System Suppliers Help Manual, which explains how to register and submit bids electronically. It does not contain the tender specification for transformer cores and shunts.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)For system problems, contact the buyer responsible for the published tender. No specific contact details are provided in the source document.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission is electronic only via the Eskom eTendering system.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)No evaluation criteria are stated in the source document. The document is a system help manual, not the tender specification.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The tender is for the design and supply of transformer cores and shunts for a period of 5 years. No further technical specifications are provided in the source document.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)A CSD number is required to access the eTendering system and submit a bid.
Submission Guidelines
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf (unknown)OHS returnable documents — submit with the bid, completed and signed:
No submission channel, address, copy count or closing time is stated in this annexure.
Evaluation Criteria
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf (unknown)OHS evaluation of the tenderer, recorded on the OHS tender evaluation form:
No price, functionality or preference point split is stated in this annexure.
Technical Specifications
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf (unknown)Scope of the OHS assessment:
Compliance Requirements
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf (unknown)OHS compliance items required from the tenderer:
Health & Safety
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf (unknown)OHS requirements for this tender (low OHS risk classification):
Submission Guidelines
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)Returnable document
Method statement content required
Evaluation Criteria
Source: Contractor Health and Safety Requirements (Latest Revision) (2).pdf (unknown)Bidders must comply with the Occupational Health and Safety Act 1993 and its regulations, the National Environmental Management Act 1998, the National Environmental Management: Waste Act 2008, the Mine Health and Safety Act 1996, the COID Act 1993, the National Road Traffic Act 1996, and all relevant national, provincial and municipal legislation.
Bidders must comply with Eskom's normative standards, including 32-296, 32-727, 32-726, 240-62196227, 32-529, 32-520, 32-418, 32-345, 32-123, 32-95, 32-37, 32-245, 32-477, 32-524, 32-407, 32-1112, 32-1113, 32-1034, 240-62946386, 240-44175038, and 240-46569633.
Bidders must be registered with the SACPCMP in the appropriate professional category for construction project management, construction management, and construction health and safety.
Where Construction Regulation 8(5) requires, a competent construction health and safety officer, registered with a statutory body approved by the Chief Inspector, must be appointed in writing.
A valid Medical Certificate of Fitness, issued by an occupational health practitioner registered with the Health Professions Council of South Africa (valid for one year), is required where medical surveillance applies.
A signed section 37(2) agreement under the OHS Act is mandatory. Joint venture partners must each be signatories and remain liable for their own contraventions.
Technical Specifications
Source: Contractor Health and Safety Requirements (Latest Revision) (2).pdf (unknown)Eskom is committed to safeguarding contractors and the environment from operational risks, aligning with its Safety, Health, Environmental and Quality Policy.
This standard establishes minimum legislative and organisational health and safety requirements for contractors, with the goal of achieving 'Zero Harm'.
Contractors are responsible for executing work safely, ensuring the health and safety of their employees and the public, and preventing environmental damage.
All contractors and their employees must comply with applicable occupational health and safety legislation and Eskom's policies and procedures.
This standard applies to all Eskom and subsidiary employees engaged in contract work for Eskom.
The client or agent is responsible for informing contractors of any document revisions they must adhere to.
This document becomes effective upon signature, with implementation monitoring commencing six months later.
Normative references include ISO 9001, Eskom SHE procedures, Life-Saving Rules Standard, and relevant South African legislation (OHS Act, NEMA). Informative references include public safety and asbestos handling procedures.
Key definitions include: Agent, Baseline Risk Assessment, Client, Competent Person, Contractor, Construction Work, Construction Vehicle, Duty of Care to the Environment, Employee, Employer, Environment, Fall Protection Plan, Hazard, Hazard Identification, Health and Safety File, Health and Safety Specification, Health and Safety Requirements, Life-Saving Rules, Medical Certificate of Fitness, Medical Surveillance, Method Statement, Risk Assessment, and Toolbox Talks.
Roles and Responsibilities:
Statutory and non-statutory appointments must comply with legislative requirements and Eskom Standard 32-296. All appointments must be included in the health and safety file.
Material and equipment must meet manufacturer and legislative health and safety standards. Reclaimed material must be safe for use. Health and safety factors must be considered for post-contract use.
Risk assessments are mandatory to identify hazards and implement controls. They must be updated, and high-risk work requires written safe work procedures. Method statements document safe work practices.
Record Keeping: All project records must be maintained per legislation and Eskom requirements. SHE files are required for the project duration, open to audit, and handed over upon completion.
A disciplinary process is required for addressing employee transgressions.
Life-Saving Rules: Zero tolerance for serious at-risk behaviours, including: Open, Isolate, Test, Earth, Bond and/or Insulate before Touch; Hook up at Heights; Buckle Up; Be Sober; Ensure Permit to Work. Violations lead to disciplinary action.
Incident Investigation: All incidents must be investigated per OHS Act and Eskom Procedure 32-95. Injuries must be reported to the Department of Labour. Use the General Administrative Regulation Annexure 1 form as a minimum.
Training: Employees must receive adequate training for their tasks, including induction.
Health and Safety Communication: Utilise various methods (posters, videos, newsletters) for effective communication.
Contractor Site Facilities: Must be provided to protect the public and workers.
Public Safety: Contractors must protect the public from risks associated with Eskom's activities.
Emergency Preparedness: Measures must be in place for fire, heat, and smoke protection, complying with legislation and policies.
Occupational Health and Hygiene: Medical fitness assessments are required. Occupational hygiene addresses workplace hazards causing illness or injury.
Transport/Mobile Plant Equipment: Construction vehicles and mobile equipment must be operated safely by competent drivers. Passenger transport in light delivery vehicles requires proper seating and seat belts.
Hazardous Materials/Chemicals Management: Purchases must be from compliant suppliers. Local by-laws and SANS standards apply.
Machinery, Tools, and Equipment: Must be used safely and comply with legislation.
Explosive-Powered Tools: Require extreme caution and specially trained operators.
Lifting Equipment: Governed by OHS Act regulation 18.
Working at Heights: Precautions must be taken to prevent falls, including fall arrest systems. Floor and wall openings require protection.
Excavations and Tunnelling: Must comply with Construction Regulation 13, with attention to air quality and confined space risks.
Barricading: Must be adequate to prevent unauthorised removal and protect against hazards.
Demolition Work: Must be conducted safely with appropriate precautions.
Substance Abuse: Must be managed to maintain operational integrity.
Statistical Reporting: Monthly OHS statistics (incidents, manpower, man-hours) are required for monitoring.
Housekeeping: Good housekeeping is essential for safety.
Workplace Signage and Colour Coding: Used for hazard communication.
Personal Protective Equipment (PPE): Must be of high standard and effective.
SHE Specification, Plan, and File: A SHE specification must be applied by all contractors. The SHE plan details omitted issues. The SHE file is maintained and handed over upon completion.
Hours of Work: Must be managed to prevent fatigue.
Environmental Care: Contractors must comply with environmental legislation and Eskom requirements.
Unlawful Orders: Employees must not comply with orders compromising safety.
Section 37(2) Agreement: Required for joint ventures and contractors.
Security: Contractors must comply with Eskom security requirements.
Compliance Requirements
Source: Contractor Health and Safety Requirements (Latest Revision) (2).pdf (unknown)Eskom Holdings SOC Ltd is the Area of Applicability.
Contractors must comply with all relevant South African legislation, including the OHS Act, NEMA, and Mine Health and Safety Act.
Contractors must adhere to Eskom's normative standards and procedures, including those related to SHE, quality management, and procurement.
Registration with the SACPCMP is required for relevant construction professionals.
Appointment of a competent construction health and safety officer is required where mandated by regulation.
A valid Medical Certificate of Fitness is required for employees subject to medical surveillance.
A Section 37(2) agreement under the OHS Act is mandatory, with joint venture partners each being signatories.
Contractual Terms
Source: Contractor Health and Safety Requirements (Latest Revision) (2).pdf (unknown)The Group Chief Executive (GCE) of Eskom, as the employer, holds overall responsibility and liability for the health and safety of all persons involved at Eskom sites. These duties may be delegated to section 16(2) appointees and responsible managers.
Eskom and its subsidiaries must take all reasonably practicable steps to prevent construction-related incidents, harm to people (including the public), and damage to property and the environment.
Contractors, as employers in their own right, must comply with Eskom's SHE requirements and relevant safety, health, and environmental legislation.
Appointed managers are responsible for health, safety, and the environment on sites under their control.
Project management involves planning, organising, motivating, and controlling resources to achieve specific goals within constraints of scope, time, quality, and budget.
Project managers administer and execute projects within cost, quality, and time parameters.
Eskom's Project Health and Safety Manager/Practitioner provides assurance, advice, and support to project managers, ensuring coordination among contractors and evaluation/approval of contractor health and safety plans.
Where appointed, a contractor's health and safety officer must be competent and registered as required by the OHS Act and project specifications.
In terms of the MHS Act, a contractor's health and safety officer assists the construction manager in fulfilling health and safety responsibilities and ensuring compliance with specifications and plans.
Construction Regulation 8(5) of the OHS Act may require a contractor to appoint a full-time construction health and safety officer, based on project size, danger, or accumulated risks.
Contractors' health and safety officers must be competent, have necessary resources, and be registered with a statutory body approved by the Chief Inspector.
Contractors remain accountable and responsible for their appointed contractors. The relationship is governed by contractual arrangements.
Contractors must carry out duties specified in sections 8 and 9, and regulation 7 of the Construction Regulations of the OHS Act.
All Eskom contractors must ensure compliance with legislative requirements and contractual agreements.
Construction supervisors are appointed in writing to supervise construction work. Assistant construction supervisors may also be appointed.
Contractor employees are responsible for their own health and safety and that of their colleagues. They must be aware of their contractor management's responsibilities.
Professionals managing construction projects, construction management, and construction health and safety must be registered with the SACPCMP.
For joint ventures, the requirements imposed on contractors apply to the joint venture partner. Each contractor is responsible for its organisation's health and safety. All organisations must be signatories to the section 37(2) agreement.
This document will be reviewed every five years or as required.
Description
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Design and supply of transformer cores and shunts over a 5-year contract period.
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Returnable document
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Pre-contract award quality requirements
Post-contract award quality requirements (Eskom)
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Scope
Quality framework
Methodology
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)ISO 9001 clauses 4 to 10 apply: context of the organisation, leadership, planning, support, operation, performance evaluation and improvement. The seven quality principles apply: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making and relationship management.
Quality Management
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)The tenderer selects the applicable pre-contract award quality category (Category 4 for this enquiry) and indicates whether a site assessment applies. Post-contract award requirements cover contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities and special processes. ISO 9001 clauses and quality principles apply as indicated.
Compliance Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Section
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Pre-contract award quality requirements are assessed under Category 4. Post-contract award obligations cover contract execution and supplier quality performance monitoring (clause 3.7) and quality audits (clause 3.8). ISO 9001 clauses and quality principles are applied as indicated on Form A. Eskom's quality representative signs the form (Annah Serite, Quality Officer, dated 31/03/2026).
Description
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Eskom Holdings SOC Ltd invites open tenders for the design and supply of transformer cores and shunts over a 5-year period. Tender number E2226TSSERI. The contract will be awarded to a panel of contractors, with a minimum of 2 and a maximum of 5.
Important Dates
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Closing
Clarification meeting (non-compulsory)
Clarification queries
Other dates
Briefing Session
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Clarification meeting (non-compulsory)
Contact Information
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Eskom Representative (all queries and clarifications)
Procurement
Fraud and corruption reporting
Submission channel
Note: queries may be addressed only to the Eskom Representative, in writing; no other Eskom official may be approached.
Submission Guidelines
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Submission method
Returnable forms — disqualifiable if not fully completed, signed and submitted by closing
Returnables required at closing but not disqualifying
Returnables required at closing for evaluation — missing items score zero
Joint ventures
Disqualification risks
Returnable Documents
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Disqualifiable returnables at closing
Non-disqualifiable returnables at closing
Returnables required at closing for evaluation
Mandatory contractual requirement
Evaluation Criteria
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Evaluation stages
Functionality scoring (maximum 260 points)
Price and preference points
Objective criteria
Contractual requirements
Technical Specifications
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Scope
Technical capability assessed
Verification
Not applicable
Experience & Qualifications
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Functionality criterion: the number of years the bidder has supplied cores to South African based manufacturers. Bidders must provide a list of orders or projects over the stated period and the OEMs involved. Scoring ranges from never to 1 year, up to 5 years, up to 10 years, and longer than 10 years.
Quality Management
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Quality is an objective criterion. Quality is assessed per the attached quality requirement checklist.
Pricing Schedule
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Pricing schedule/BOQ must be submitted in PDF with an Excel copy. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations and compared on a net present value basis. Unconditional discounts count for evaluation; conditional discounts do not count for evaluation but are implemented when payment is effected.
Financial Requirements
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Pricing
Payment terms
Security and financial capacity
Other
Compliance Requirements
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Mandatory contractual requirement
Tax
B-bbee
Employment Equity
Safety and quality
Local content
Eligibility
B-BBEE Requirements
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Preference points
Proof of B-BBEE status
Health & Safety
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Safety, Health and Environment is an objective criterion. SHE returnables are evaluated per Annexure C3 and C5.
Contractual Terms
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Contract form
Security and financial capacity
Payment
Other conditions
Requirements
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Eligibility
Section
Source: Invitation to Tender Shunts Cores 09102026.pdf (RFP)Functionality
Price and preference
Objective criteria
Description
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Design and supply of transformer cores and shunts over 5 years.
Contact Information
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Supply Manager
Roshland Office Park
Lower Germiston Road
Rosherville
Purchaser
Roshland Office Park
Lower Germiston Road
Rosherville
Delivery place
Technical Specifications
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Scope
Annual requirement
Delivery and programme
Testing and documentation
Methodology
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Design and supply of transformer cores and shunts.
Quality Management
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Quality
Pricing Schedule
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Pricing data (Part C2)
Financial Requirements
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Pricing
Payment
Delay damages
Price adjustment for inflation (Option X1)
Insurance and liability
Compliance Requirements
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)B-bbee
Joint ventures and consortia
Ethics and conduct
Tax
Health & Safety
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Health and safety
Environmental
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Environmental
Contractual Terms
Source: NEC-Complete Supply Contract-Transformer cores and shunts .pdf (unknown)Contract form: NEC3 Supply Contract (SC3), core clauses with options X1 (price adjustment for inflation), X2 (changes in the law), X7 (delay damages) and Z (additional conditions Z1–Z12).
Technical Specifications
Source: Shunts and cores Scope of Work.pdf (unknown)Scope: Design, manufacture and delivery of power transformer cores for transformers rated 2 MVA to 80 MVA.
Conformance: Cores must match the original core's form and dimensions exactly.
Assembly: Cores should preferably be delivered fully stacked and assembled with all clamping hardware and systems.
Clamping hardware: If original clamping plates and systems are available, they may be reused. Otherwise, the supplier must provide all required clamping hardware based on the original design.
Dimensions: The supplier must take all necessary dimensions from the original cores. The original cores will be made available at the ERI workshops or may be transported to the supplier's premises.
Core steel: Must match or exceed the quality, dimensions and form of the original core steel (typically MOH 0.3), unless otherwise agreed.
Loose laminations: Partial stacks of cut core steel laminations must be delivered on palettes for easy handling.
Description
Source: 240-106084675 Annexure C 3.docx (unknown)The tender is for the design and supply of transformer cores and shunts for a period of 5 years. The scope of work must be addressed in the OHS plan and baseline risk assessment.
Submission Guidelines
Source: 240-106084675 Annexure C 3.docx (unknown)Returnable documents for the OHS section:
For bidders certified for an auditable OHS system (Part B):
All required documents must be signed and submitted with the bid.
Evaluation Criteria
Source: 240-106084675 Annexure C 3.docx (unknown)OHS evaluation is a pass/fail gate. Bidders are recommended or not recommended based on submission of the required OHS returnables.
Part B applies only to suppliers/consultants/contractors certified for an auditable OHS system. Part B bidders must hold an ISO 45001 certificate or equivalent and a valid Letter of Good Standing (COIDA or equivalent).
All bidders must submit a valid Letter of Good Standing (COIDA or equivalent) and an OHS policy signed by the CEO that complies with Section 7 of the OHS Act.
Technical Specifications
Source: 240-106084675 Annexure C 3.docx (unknown)The tender is for the design and supply of transformer cores and shunts for a period of 5 years. The scope of work must be addressed in the OHS plan and baseline risk assessment.
Compliance Requirements
Source: 240-106084675 Annexure C 3.docx (unknown)OHS compliance:
No other compliance requirements (e.g., B-BBEE, CIDB) are stated in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lower Germiston Road - Roscherville - Johannesburg South - 2090
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
12 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.