Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom SOC ltd . - - National -
Organization Type
GOVERNMENT
Published
24 Aug 2026
OCDS Reference
ocds-9t57fa-166676
ESKOM real estate requires land management supervisory and advisory resources services for a period of five years. Bidders must commit to substantial supplier development and localisation obligations, including a 100% local procurement content target, b-bbee improvement milestones, and skills development of one candidate per r2 million received. The most consequential requirement is the mandatory subcontracting of at least 30% of contract value to qualifying emes or qses if the contract exceeds r30 million, which is a condition for award.
B-BBEE: Bidders must hold a valid B-BBEE certificate (SANAS accredited) or a sworn affidavit (if annual revenue is R10 million or less as an EME, or R50 million or less as a QSE that is at least 51% black-owned). Preference points are awarded per the PPPFA 80/20 or 90/10 system.
B-BBEE improvement: Bidders at Level 4 at award must migrate to Level 3 by the end of the first year; those at Level 5 to 8 or non-compliant must migrate to Level 4 by the end of the first year and improve one level each subsequent year. A B-BBEE improvement or retention plan must be submitted within 30 days of contract signing.
Local content: The local procurement content target is 100%. SBD 6.2 Declaration Form and Annexure C (Local Content Declaration-Summary Schedule) are mandatory returnables.
Subcontracting: For contracts above R30 million, the successful bidder must subcontract a minimum of 30% of the contract value to an EME or QSE that is at least 51% owned by black people, black women, black youth, black people with disabilities, black people in rural areas, cooperatives, or black military veterans. Proof of subcontract agreements, CSD reports, and subcontractor B-BBEE certificates are required.
Skills development: The successful bidder must skill one unemployed candidate for every R2 million received cumulatively, with candidates drawn from schools, universities, or TVET campuses. The bidder bears the full cost.
Reporting and retention: The bidder must submit SDL&I performance reports monthly or quarterly. A retention of 1.5% of every invoice amount (excluding VAT) will be applied for failure to submit reports or meet SDL&I obligations.
Closing date: Bids close on 10 September 2026 at 10:00. Submission method and address are not stated in the available document.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
Link on ITT
Categories
Request for Bid(Open-Tender)
Eskom SOC ltd . - - National -
AI Document Analysis Stages
Description
24 Aug
2026
Tender Published
Tender was published
10 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Land Management & supervisory service-QS BOQ.pdf
Eskom is procuring Land Management Supervisory and Advisory Services for a period of five years. The services include land management, firebreaks, land facilities maintenance, invasive species clearing, and asbestos removal.
Non-Disclosure Agreement (NDA) Vendors.pdf
Eskom Holdings SOC Ltd is seeking land management supervisory and advisory resources services for a period of five years.
240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to meet customer requirements and exceed customer expectations.
20250325_Cat4- Quality Req _ Land Management.pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to comply with ISO 9001 quality management system requirements. The tender is open nationally and closes on September 10, 2026, at 10:00:00 GMT+0000.
Tech Evaluation criterion Land Management Supervisory .pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years, to oversee and inspect work done by appointed contractors in areas such as land facilities maintenance, firebreaks, and alien invasive species.
20250325_ Form A Cat4 _ Land Management .pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to support Eskom's land management activities.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to support Eskom's land management activities.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf
Eskom is procuring land management supervisory and advisory resources services for a period of five years.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to support Eskom's land management activities.
SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services aim to support Eskom's real estate management goals.
20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf
Eskom is procuring Land Management Supervisory and Advisory Services for a period of five years. The services include land facilities maintenance, firebreaks, alien and invasive species management, and asbestos management.
Land Management & supervisory service-QS BOQ.xlsx
Eskom is procuring Land Management Supervisory and Advisory Services for a period of five years. The services include land management, firebreaks, land facilities maintenance, and invasive species clearing/maintenance. The contract will be based on NEC contract pricing, and Eskom reserves the right to split the contract based on operational need and competitiveness.
20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf
Eskom is procuring land management supervisory and advisory resources services for a period of five years. The services aim to ensure compliance with occupational health and safety regulations and standards. The procurement is open to all eligible bidders.
E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf
Eskom Holdings SOC Ltd is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to support Eskom's land management activities.
NEC Land Management Supervisory and Advisory Services_.pdf
Eskom Holdings SOC Ltd is procuring Land Management Supervisory and Advisory Services for a five-year term under an NEC3 Term Service Contract (Option A: Priced contract with price list). The appointed contractor will act as Eskom's agent to oversee and inspect work performed by other contractors across various Eskom properties nationwide, covering land facilities maintenance, firebreaks, alien and invasive species control, and asbestos removal advisory.
OHS Returnables- Contractual requirements.pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services include land management supervisory and advisory services, and the successful bidder will be required to provide these services in accordance with Eskom's SHE contractual requirements.
Quality thank.pdf
Eskom is procuring Land Management Supervisory and Advisory Services for a period of five years, with a contract value of R8 262 710.00. The services include overseeing and inspecting work done by appointed contractors on land facilities maintenance, firebreaks, and alien and invasive species.
20250408_Acknowledgement of SHE Requirements.pdf
Eskom is procuring Land Management Supervisory and Advisory Resources Services for a period of five years. The services are required to ensure compliance with Eskom's OHS requirements and statutory regulations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 184 230
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This is a five-year contract for land management supervisory and advisory resources services. The specification (240-105658000, QM 58, Revision 3) sets out Eskom's minimum quality requirements for suppliers. Suppliers must develop, implement, maintain, and improve a QMS conforming to ISO 9001. A Contract Quality Plan (CQP) per ISO 10005 and a Quality Control Plan (QCP)/Inspection and Test Plan (ITP) are required.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 10 September 2026 at 10:00. No briefing or site visit is stated in the document.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No named contacts are stated in the document. The specification is issued by Eskom's Quality Management functional area.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents: Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) must be completed, signed and returned with the bid. The List of Tender Returnables (240-12248652) specifies which quality category (1-4) applies and the exact returnables for that category. Bids must be submitted before the closing time; late submissions are disqualified. All returnable forms must be signed and complete.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom applies a quality-based evaluation under the PPPFA 80/20 or 90/10 preference point system. Suppliers are assessed against four quality categories (1-4) selected via Form A. Category 1 requires a valid ISO 9001 certificate, internal and external audit reports, a draft Contract Quality Plan per ISO 10005, and an ITP/QCP example. Category 2 requires documented evidence of a QMS with manual, policy, objectives, procedures, and audit reports. Category 3 requires QMS documentation plus a draft CQP and ITP/QCP example. Category 4 requires a quality method statement, quality policy, and quality objectives. Capability and capacity assessments are performed pre-award for high-risk, critical, or special-process supplies.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification (240-105658000, QM 58, Revision 3) sets out Eskom's minimum quality requirements for suppliers. Suppliers must develop, implement, maintain and improve a QMS conforming to ISO 9001. A Contract Quality Plan (CQP) per ISO 10005 and a Quality Control Plan (QCP)/Inspection and Test Plan (ITP) are required. QCP/ITPs must include hold and witness points, intervention points, and be accepted by Eskom before work starts. Suppliers must manage sub-supplier quality, including QMS verification, audits, and performance management. Special processes (welding, NDT, coatings) require qualified and certified personnel. A quality kick-off meeting is held at contract start. Eskom may appoint resident quality inspectors and an AIA or inspection agency. Suppliers must provide free workspace for Eskom inspectors. Preservation management programmes cover equipment, materials, and components, with clear sub-supplier responsibilities and Eskom access to records.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers must submit a quality method statement based on ISO 9001 and specific to the scope of work (Category 4). The method statement should address all business management processes to ensure Eskom's requirements are consistently met. Suppliers must provide a draft Contract Quality Plan per ISO 10005 and an ITP/QCP example where applicable.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality audits and quality performance reviews shall be carried out by trained, accredited, and experienced personnel. Personnel performing special processes must be certified competent through a certificate of competency or external certification body per SETA requirements. Welders must be qualified to the specified Codes of Construction.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, rates, bill of quantities, or payment schedules are stated in the document.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, bonds, guarantees, or payment terms are stated in the document.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)CSD registration and a valid tax clearance certificate are required. B-BBEE level 1 is the minimum. ISO 9001 certification is required unless excluded by the quality category. Suppliers must complete and sign Form A. Suppliers must submit a valid ISO 9001 certificate (Category 1) or documented QMS evidence (Categories 2-4). Internal and external audit reports, including nonconformity and corrective action reports, must be submitted. Suppliers must provide a draft Contract Quality Plan per ISO 10005 and an ITP/QCP example where applicable. Documented information for control of externally provided processes, products and services, and for roles, responsibilities and authorities, is required. Records of management review meetings must be retained.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727). Suppliers must comply with the SHEQ policy and relevant
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification applies to all Eskom divisions, subsidiaries, suppliers, and sub-suppliers and forms part of all RFIs, RFQs, and RFPs. Suppliers must maintain a QMS conforming to ISO 9001. Eskom reserves the right to access supplier premises, information, and records. Suppliers must manage sub-supplier quality and performance. Nonconformities must be managed and corrected. Repeated nonconformities within 6 months are escalated to management review committees. FIDIC/NEC contractual remedies apply for unresolved nonconformities.
Description
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdfEskom Real Estate Occupational Health and Safety Baseline risk assessment template: Land Management Supervisory and Advisory Services Next(everyReview2 years):Date Template identifier
Important Dates
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf (unknown){"briefingSession":{"date":null,"time":null,"venue":"ionalAppliacableproceduressafety heathactclientand","is_compulsory":false}}
Contact Information
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Date: 2025/04/08","address":null}
Evaluation Criteria
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf (unknown)Bidders must be registered with the relevant authorities, including the Construction Industry Development Board (CIDB) and the South African Revenue Service (SARS). Bidders must also have a valid tax clearance certificate and a B-BBEE level that meets the requirements of the tender.
Technical Specifications
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf (unknown)Eskom Real Estate Occupational Health and Safety Baseline risk assessment template: Land Management Supervisory and Advisory Services Next(everyReview2 years):Date Template identifier
Eskom Real Estate Occupational Health and Safety Baseline risk assessment template: Land Management Supervisory and Advisory Services Next(everyReview2 years):Date Template identifier
[Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf]
Compliance Requirements
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdf (unknown)No specific requirements found
Revision date: 30-Apr-25
Refer to Occupational Health and Safety Risk assessment procedure 32-520
List activity Hazard Identification Associated risk Risk type Whatconsequences?are the possible Existing Controls Control Owner LegalRequirementsand Other
implemented to Rating
hazards reduce the
of the riskoroccurring), Priority
implemented performed
immediate impact of tothereducerisk consideration thetaking Safety or health Considerwithoutthe worsecontrols?case scenario Include:-(controlseliminatelikelihoodand-(controlstheoccurring) to Risk EffectivenessRiskRCEControl implementingPersonresponsibilitycontrolsallocatedthe agreedforthe relevantEskomWhereprescriberequirementslegislativerelevant,the control.listandthethator beinvolved used, thein thepersonnelequipmenttask.intoto be Note:AnythingA hazardwithcanpotentialpose tomorecausethanofoneharm.risk. A chanceoccur asthata injuryresult, ofill healthuncontrolledor damagehazard.could Consequence Likelihood
controls
controls
protective equipment EliminationSubstitutionEngineeringAdministrativePersonal(PPE)
Physicalstressinjuries,attacksfactors,motor,conflicts,SHEQvehiclerelatedhighaccidents.exposureincident/ to health,Work andrelatedprojector induceddelays/schedulestress, Injuriesdisruption., ill- Safety PerformanceMissed targetsStatistics,health)(PoorInjuries,SHEQ ill- Currently no existing controls 4 E None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Specification,SHEQ Eskom Rules,whichwithapplicableincludes SHEand Safety Fatality, Multiple injuries Currently no existing controls 5 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
legislations and SANS by contractors
on standardssite.
Site inspections Slips, trips, and falls Improper footwear, poor housekeeping Safety Injury (minor to severe) Currently no existing controls 4 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Travelling to sites Road accidents Multiple Injuries Safety Injury or fatality Currently no existing controls 5 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
lead policywith
andto (OHS) laws or Safety Incorrect advice, legal implications Currently no existing controls 1 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand requirementsOccupationalIncomplete understandingHealthcantocompanyunsafea policiesSafetynon-compliance
Use of laptopstoolsand digital Ergonomic strain, eye strain DecreasedChronicMusculoskeletalfatiguemobilityor disordersdiscomfort,or flexibility Health Long-term musculoskeletal issue Currently no existing controls 4 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Engagingcontractorsstakeholders or Miscommunication or conflict NoFailureclearresponsibilitiestochainreportpoorof hazardscommunicationcommands,SHEnotorunderstood.incidentsrolesdueandto Safety Project delays,damagereputational Currently no existing controls 1 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Accessingriskworkareassite or high- Exposure to site hazards InjuryHealthor RisksFatality Safety Injury or exposure to risk Currently no existing controls 4 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
and
client AppliacableproceduressafetyAbatementheathact Inhalation of asbestos fibre Health Occupationali.e.Ocupationaldiseasecancer ofincludingthediseases;lungs.diseases;asbestosis,i.e. Lung Currently no existing controls 4 D I None Project Manager/SHEQOfficer OccupationalAsbestosRegulations, 2020
and
client AppliacableproceduressafetyAbatementheathact Ingestion of asbestos fibre Health Occupationali.e.Ocupationaldiseasecancer ofincludingthediseases;lungs.diseases;asbestosis,i.e. Lung Currently no existing controls 4 D I None Project Manager/SHEQOfficer OccupationalAsbestosRegulations, 2020
ppCompiledDesignation:..................................by: SHEQLungileOfficerMloyi
R Safety 1 A Fully effective I
Ii
N Health 2 B Mostly effectiv
Iii
Health & Safety
Source: 20250408_GFD_ERE_Land Management Supervisory_OHS Baseline risk assessment template - rev. 5.pdfRevision date: 30-Apr-25
Refer to Occupational Health and Safety Risk assessment procedure 32-520
List activity Hazard Identification Associated risk Risk type Whatconsequences?are the possible Existing Controls Control Owner LegalRequirementsand Other
implemented to Rating
hazards reduce the
of the riskoroccurring), Priority
implemented performed
immediate impact of tothereducerisk consideration thetaking Safety or health Considerwithoutthe worsecontrols?case scenario Include:-(controlseliminatelikelihoodand-(controlstheoccurring) to Risk EffectivenessRiskRCEControl implementingPersonresponsibilitycontrolsallocatedthe agreedforthe relevantEskomWhereprescriberequirementslegislativerelevant,the control.listandthethator beinvolved used, thein thepersonnelequipmenttask.intoto be Note:AnythingA hazardwithcanpotentialpose tomorecausethanofoneharm.risk. A chanceoccur asthata injuryresult, ofill healthuncontrolledor damagehazard.could Consequence Likelihood
controls
controls
protective equipment EliminationSubstitutionEngineeringAdministrativePersonal(PPE)
Physicalstressinjuries,attacksfactors,motor,conflicts,SHEQvehiclerelatedhighaccidents.exposureincident/ to health,Work andrelatedprojector induceddelays/schedulestress, Injuriesdisruption., ill- Safety PerformanceMissed targetsStatistics,health)(PoorInjuries,SHEQ ill- Currently no existing controls 4 E None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Specification,SHEQ Eskom Rules,whichwithapplicableincludes SHEand Safety Fatality, Multiple injuries Currently no existing controls 5 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
legislations and SANS by contractors
on standardssite.
Site inspections Slips, trips, and falls Improper footwear, poor housekeeping Safety Injury (minor to severe) Currently no existing controls 4 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Travelling to sites Road accidents Multiple Injuries Safety Injury or fatality Currently no existing controls 5 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
lead policywith
andto (OHS) laws or Safety Incorrect advice, legal implications Currently no existing controls 1 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand requirementsOccupationalIncomplete understandingHealthcantocompanyunsafea policiesSafetynon-compliance
Use of laptopstoolsand digital Ergonomic strain, eye strain DecreasedChronicMusculoskeletalfatiguemobilityor disordersdiscomfort,or flexibility Health Long-term musculoskeletal issue Currently no existing controls 4 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Engagingcontractorsstakeholders or Miscommunication or conflict NoFailureclearresponsibilitiestochainreportpoorof hazardscommunicationcommands,SHEnotorunderstood.incidentsrolesdueandto Safety Project delays,damagereputational Currently no existing controls 1 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
Accessingriskworkareassite or high- Exposure to site hazards InjuryHealthor RisksFatality Safety Injury or exposure to risk Currently no existing controls 4 E I None Project Manager/SHEQOfficer OccupationalAppliacableproceduressafety heathactclientand
and
client AppliacableproceduressafetyAbatementheathact Inhalation of asbestos fibre Health Occupationali.e.Ocupationaldiseasecancer ofincludingthediseases;lungs.diseases;asbestosis,i.e. Lung Currently no existing controls 4 D I None Project Manager/SHEQOfficer OccupationalAsbestosRegulations, 2020
and
client AppliacableproceduressafetyAbatementheathact Ingestion of asbestos fibre Health Occupationali.e.Ocupationaldiseasecancer ofincludingthediseases;lungs.diseases;asbestosis,i.e. Lung Currently no existing controls 4 D I None Project Manager/SHEQOfficer OccupationalAsbestosRegulations, 2020
ppCompiledDesignation:..................................by: SHEQLungileOfficerMloyi
R Safety 1 A Fully effective I
Ii
N Health 2 B Mostly effectiv
Iii
Important Dates
Source: OHS Returnables- Contractual requirements.pdf (unknown)Closing date: 2026-09-10T10:00:00.000Z. No other important dates specified.
Contact Information
Source: OHS Returnables- Contractual requirements.pdf (unknown)No contact information specified.
Submission Guidelines
Source: OHS Returnables- Contractual requirements.pdf (unknown)Bidders must submit all required documents, including the acknowledgement of Eskom's SHE rules and requirements, the Safety, Health and Environmental Plan, and the Baseline Risk Assessment. Returnable forms include: Valid Letter of Good Standing (COIDA or equivalent), SHE policy signed by CEO/ MD.
Evaluation Criteria
Source: OHS Returnables- Contractual requirements.pdf (unknown)Bidders must meet the requirements outlined in the tender document, including having a valid Letter of Good Standing, a SHE policy, and complying with Eskom's SHE contractual requirements.
Technical Specifications
Source: OHS Returnables- Contractual requirements.pdf (unknown)The scope of work includes Land Management Supervisory & Advisory Services. Bidders must provide a Baseline Risk Assessment (BRA) and Identification of Environmental aspect & impact register. The methodology used for the risk assessment must be provided together with the BRA.
Financial Requirements
Source: OHS Returnables- Contractual requirements.pdf (unknown)No financial requirements specified.
Compliance Requirements
Source: OHS Returnables- Contractual requirements.pdf (unknown)Bidders must comply with Eskom's SHE contractual requirements, including the OHS Act Section 7 or OSHAS 18001. A valid Letter of Good Standing (COIDA or equivalent) and a SHE policy signed by CEO/ MD are required.
Health & Safety
Source: OHS Returnables- Contractual requirements.pdf (unknown)Bidders must provide a Safety, Health and Environmental Plan (Applicable to high risk work only), including OHS organization within the Company, SHE Incident management, and Emergency planning and fire risk management.
Description
Source: Land Management & supervisory service-QS BOQ.xlsx (unknown)The tender covers Land Management Supervisory and Advisory Services. Bidders must tick the province they are tendering for and confirm they have a base office (footprint) in that province, specifying the base location.
Evaluation Criteria
Source: Land Management & supervisory service-QS BOQ.xlsx (unknown)Bidders must be registered on the Central Supplier Database (CSD), hold a valid tax clearance certificate, and comply with the B-BBEE Act. Where applicable, bidders must hold the necessary CIDB grading (for construction services) and professional registrations.
Technical Specifications
Source: Land Management & supervisory service-QS BOQ.xlsx (unknown)Bidders must indicate the province they are tendering for and confirm they have a base office (footprint) in that province, specifying the base location. The scope covers Land Management Supervisory and Advisory Services, including supervision of firebreaks, land facilities maintenance, and invasive species clearing/maintenance. Normal working hours are 08:00 to 16:30. Eskom reserves the right to split the contract based on operational need and competitiveness.
Financial Requirements
Source: Land Management & supervisory service-QS BOQ.xlsx (unknown)Pricing is under an NEC contract. Costs must be all-inclusive. Rates are split into basic rate (employee's wage only), indirect costs (benefits, allowances, overheads, profit), and final rate (all-in cost). Overtime factors: weekday/Saturday outside normal hours 0.5; Sunday/public holiday all hours 1.0. Overtime is calculated on the basic rate, with profit and overheads applied to all hours worked. Items marked ** (PPE, medicals, health and safety file) are paid once annually per resource. Items marked *** (safety training) require the contractor to identify the training required. Pricing items include: supervisors (per hour), communication (sum), PPE, medicals, health and safety file (each), transport (per km), accommodation (per night, 3-star equivalent including breakfast and dinner), asbestos removal procedure advisory (per hour), and advisory services for legal and regulatory compliance (per hour).
Compliance Requirements
Source: Land Management & supervisory service-QS BOQ.xlsx (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance certificate. B-BBEE compliance is required. CIDB grading and professional registrations are required where applicable.
Description
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)Land Management Supervisory and Advisory Services for a five-year period across nine South African provinces. Eskom may split the contract by province based on operational needs and competitiveness. Bidders must have a base office footprint in the province(s) tendered for. Services include supervision of firebreaks, land facilities maintenance, and invasive species clearing/maintenance, supported by communication, health and safety, transport, accommodation, and asbestos removal advisory services.
Important Dates
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)The provided document is a pricing schedule (Bill of Quantities) only. It does not contain closing date, closing time, briefing dates, site visit dates, or clarification deadlines. The tender record indicates a closing date of 2026-09-10T10:00:00.000Z.
Contact Information
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)The provided document is a pricing schedule (Bill of Quantities) only. It does not contain SCM or technical contact names, emails, phones, or submission addresses. Bidders must refer to the main tender document for contact information.
Submission Guidelines
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)The provided document is a pricing schedule (Bill of Quantities) only. It does not contain submission instructions, returnable forms list, submission channel, format, or disqualification criteria. Bidders must refer to the main tender document for submission guidelines.
Evaluation Criteria
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)The provided document is a pricing schedule (Bill of Quantities) only. It does not contain evaluation criteria, scoring split, minimum qualifying thresholds, preference point system, or evaluation stages. Bidders must refer to the main tender document for evaluation criteria.
Technical Specifications
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)Scope: Land Management Supervisory and Advisory Services for a period of five (5) years across nine provinces (Free State, Gauteng, KwaZulu-Natal, Limpopo, Mpumalanga, Eastern Cape, Northern Cape, North West, Western Cape).
Eskom reserves the right to split the contract based on operational need and competitiveness.
Bidders must indicate the province(s) tendered for and confirm a base office footprint in that province.
Normal working hours: 08:00 – 16:30.
Supervisory resources required per province (1 person each):
Communication costs: lump sum (daily/weekly/monthly rate).
Health and Safety (priced per resource, annually where marked **):
Miscellaneous costs:
Asbestos Removal advisory services (hourly rate):
All costs to be all-inclusive (basic rate + indirect costs including benefits, allowances, overheads, and profit).
Overtime factors: Weekday/Saturday (outside normal hours) 0.5; Sunday/Public holiday (all hours) 1.0. Employer compensates contractor for profit and overheads on all hours worked; overtime factor applied to basic rate only.
Methodology
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)Overtime Calculation Method: Employer fully compensates the Contractor for profit and overheads on all hours worked. Normal hours (up to 12 hours/day) paid at final all-inclusive rate. Overtime hours paid at basic rate × overtime factor (Weekday/Saturday 0.5, Sunday/Public Holiday 1.0) with profit and overheads applied to all hours. Example: 12-hour day at R100 basic rate → Normal Time: 12 hrs × R100 × 1.00 = R1,200 (includes profit/overheads); Overtime: 4 hrs × R45 × 0.50 = R90; Total: R1,290.
Pricing Schedule
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)NEC contract pricing schedule (Bill of Quantities) with separate tables for each of nine provinces. Structure per province:
Pricing components: Basic Rate (wage only), Indirect Costs (benefits, allowances, overheads, profit), Final Rate (all-inclusive), Amount. Overtime factors and calculation method defined. No total contract value provided.
Financial Requirements
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)Pricing format: NEC contract pricing schedule (Bill of Quantities) with rates per hour, per km, per night, and lump sums. Bidders must provide:
Separate pricing tables for each of the nine provinces.
Health and Safety items (PPE, Medicals, Health and Safety File) paid once annually per resource.
Communication costs priced as a lump sum (daily/weekly/monthly).
Transport priced per kilometre.
Accommodation priced per night (3-star equivalent, breakfast and dinner included).
Asbestos advisory services priced per hour.
Overtime calculation: normal hours paid at final rate (includes profit and overheads); overtime hours paid at basic rate × overtime factor (0.5 or 1.0) plus profit and overheads on all hours.
No bond, guarantee, insurance, or payment terms specified in this document.
Compliance Requirements
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)The provided document is a pricing schedule (Bill of Quantities) only. It does not specify CSD registration, tax clearance, B-BBEE level, CIDB grading, CIPC registration, professional body registrations, or local content requirements. Bidders must refer to the main tender document for compliance requirements. The currentAnalysis mentions SBD 1, 3.1, 3.2, 3.3, 4, 6.1, 6.2, 7.1, 8, 9 but these are not detailed in the extracted pricing document.
Health & Safety
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)Health and Safety requirements priced per resource (annually where marked **):
All costs to be all-inclusive. Overtime provisions apply to supervisory staff working outside normal hours (08:00–16:30).
Environmental
Source: Land Management & supervisory service-QS BOQ.pdf (unknown)Asbestos Removal advisory services required:
These are advisory services only; actual asbestos removal work is not priced in this schedule.
Description
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)The scope of work as described in the document/ RFQ relevant discipline.
Contact Information
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ){"name":null,"email":null,"phone":null,"department":"as per tender Number/ Contract","address":"lationships with interested"}
Evaluation Criteria
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)No eligibility criteria specified. The primary focus of quality personnel in the organisation is to meet customer requirements and to strive to exceed customer expectations.
Technical Specifications
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)The scope of work includes land management supervisory and advisory resources services for a period of five years.
Methodology
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)Data will be collected from this contract and analysis will be carried out to assist with decision making in the future.
Experience & Qualifications
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)Competency, empowering and engaging people throughout the organization to enhance its capability to create value.
Quality Management
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)The organization's mission, vision, strategy, policies and processes are communicated throughout the organization.
Compliance Requirements
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)No specific requirements found
Health & Safety
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)PPE that is required in executing the scope of work.
Section
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.pdf (RFQ)Risks that affect outputs of the processes and overall outcomes of the SOW are identified and managed.
Submission Guidelines
Source: 20250408_Acknowledgement of SHE Requirements.pdf (unknown)The main contractor/supplier must demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers. The main contractor/supplier must provide notification to Eskom prior to the appointment of contractors or suppliers for the commencement of work. The main contractor/supplier must ensure that contractors/suppliers have adequate resources and competencies.
Evaluation Criteria
Source: 20250408_Acknowledgement of SHE Requirements.pdf (unknown)Bidders must ensure that contractors/suppliers have adequate resources and competencies, and must be accountable for the management of its contractors/suppliers
Technical Specifications
Source: 20250408_Acknowledgement of SHE Requirements.pdf (unknown)The supplier/contractor/tenderer is expected to comply with the following documents when working at/rendering a service to Eskom: Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements provided, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act.
Compliance Requirements
Source: 20250408_Acknowledgement of SHE Requirements.pdf (unknown)The supplier/contractor/tenderer must comply with Eskom's OHS requirements, including Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements provided, Occupational Health and Safety Act, and Compensation for Occupational Diseases and Illnesses Act. Penalties shall be enforced on the main supplier for non-conformance/s.
Special Conditions
Source: 20250408_Acknowledgement of SHE Requirements.pdf (unknown)Ensure that all employees (contractors/suppliers) undergo the relevant Eskom induction and the company’s. The main contractor/supplier must demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers.
Description
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Important Dates
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Closing date and time: 10 September 2026 at 10h00 – South African Standard Time (SAST). Clarification meeting: 31 August 2026 at 10h00 (SAST). Tender validity period: 180 days from the closing date and time.
Briefing Session
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)A non-compulsory clarification meeting with representatives of Eskom will take place as follows: Date: 31 August 2026, Time: 10H00 (SAST), Venue: MS Teams https://teams.microsoft.com/meeting
Contact Information
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Name: Lebohang Motaung, Email: [email protected], Phone: 016 457 5015
Submission Guidelines
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Tenders must be submitted electronically via Eskom E-tendering site by the stipulated closing date and time. The documents need to be uploaded under the folder Technical, Commercial, Financial, and other. All documents need to be submitted in a PDF format. The price list needs to be submitted in PDF and a copy in excel format.
Returnable Documents
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline, including Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderers Particulars, and others.
Evaluation Criteria
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Prices will be evaluated as follows: Inclusive of VAT, Corrected for arithmetical errors, Excluding contingencies in any bill of quantities or activity schedule, Adjusted for any other acceptable variations, deviations, or alternative tenders submitted. Prices will be scored out of 80 points. Specific goals will be scored out of 20 points in accordance with the PPPFA.
Technical Specifications
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must provide the cataloguing information per item after contract award and will need to ensure that all materials delivered to Eskom are labelled in line with Eskom’s labelling specifications as may be stipulated by Eskom. The tenderer must provide proof of compliance with the Employment Equity Act, including proof of submission of the Employment Equity report to the Department of Labour.
Methodology
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must provide a technical proposal outlining its approach to delivering the services.
Experience & Qualifications
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must provide proof of its experience and qualifications to deliver the services, including its company profile, track record, and key personnel.
Pricing Schedule
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must provide a completed pricing schedule, including a copy in excel format, as part of its tender.
Financial Requirements
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Payment terms: For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying Suppliers within 30 days of receipt of undisputed invoices. For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying suppliers within 60 days of receipt of undisputed invoices.
Compliance Requirements
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must submit proof of valid and current CSD Registration (CSD number/CSD Report). The tenderer must provide proof of its B-BBEE status level of contributor as prescribed by the B-BBEE Codes of Good Practice. The tenderer must provide proof of compliance with the Employment Equity Act, including proof of submission of the Employment Equity report to the Department of Labour.
B-BBEE Requirements
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must submit proof of its B-BBEE status level of contributor as prescribed by the B-BBEE Codes of Good Practice.
Health & Safety
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The tenderer must provide proof of valid and current CSD Registration (CSD number/CSD Report) and other safety/quality documents as required.
Contractual Terms
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)The contract will be awarded to multiple suppliers. Each successful supplier will be allocated a minimum of one region and a maximum of three regions, provided that the supplier has an operational footprint and demonstrated capacity within the regions applied for.
Requirements
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)Tenderers must meet the eligibility criteria stated in the Tender Data. The tenderer, or any of its principals, must not be under any restriction to do business with Eskom or State-Owned Companies.
Section
Source: E1431TSERER_Invitation to Tender (ITT) Land Management_21 August 2026.pdf (TENDER)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Y
3.13 Functionality requirements Functionality requirements are applicable.
functionality criteria
Minimum Threshold 70%
Tenderers who do not meet the threshold for functionality scoring will
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Quality
not limited to quality management function/role)
services must include criteria for evaluation,
Important Dates
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The service period is Five (5) years. The assessment interval is Between the 15th days of each successive month. The period within which payments are made is 8 weeks.
Contact Information
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Service Manager is (name): []
Address: []
Tel: [●]
Fax: [●]
e-mail: [●]
Submission Guidelines
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The tenderer must submit the tender in accordance with the conditions of contract identified in the Contract Data. The tenderer must provide a tax invoice to the Employer within one week of receiving a payment certificate from the Service Manager. The tenderer must comply with all applicable environmental laws and regulations and rules, guidelines and procedures otherwise provided for under this contract.
Evaluation Criteria
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance (TCS pin). A valid B-BBEE verification certificate must be submitted. The Contractor must have the capacity to act as Principal Contractor under the Construction Regulations 2014 and comply with Eskom's Asbestos Standard 32-303.
Technical Specifications
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The service is for the provision of land management supervisory and advisory services on various Eskom properties. Contractors will be appointed as agents to act on behalf of Eskom to oversee and inspect work done by appointed contractors in the following categories: Land Facilities Maintenance, Firebreaks, and Alien and invasive species.
Methodology
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor will maintain an office for the purpose of the contract, which shall be the headquarters of the Contractor's representative and authorized to receive instructions or other communication or notices under the contract. The Contractor shall maintain up-to-date copies of the contract and contract-related documents at the office.
Experience & Qualifications
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor must have relevant qualifications and experience in land management, environmental control, and construction supervision.
Quality Management
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor must ensure that all activities are carried out in compliance with contract scope of work requirements and applicable legislation and regulations including National Building Regulations and Building Standards Act.
Financial Requirements
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor provides the insurances stated in the Insurance Table A from the starting date until the earlier of Completion and the date of the termination certificate. The Employer provides the insurances stated in the Insurance Table B.
Compliance Requirements
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor must comply with all applicable environmental laws and regulations and rules, guidelines and procedures otherwise provided for under this contract. The Contractor must ensure that all his subcontractors abide by the undertakings in this clause.
Health & Safety
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Employer ensures that the Ambient Air in the area where the Contractor will Provide the Services conforms to the acceptable prescribed South African standard for asbestos. The Contractor's personnel are entitled to stop working and leave the contaminated area forthwith until such time that the area of concern is declared safe by either Compliance Monitoring or an AAIA-approved control measure intervention.
Contractual Terms
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Contractor shall provide information which shows how each item description on the Price List relates to the operations on each plan which he submits for acceptance. The Contractor shall also provide a tax invoice to the Employer within one week of receiving a payment certificate from the Service Manager.
Requirements
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)The Employer requires the Contractor to ensure that all required permits are obtained and issued to contractors prior to the commencement of work, and that all activities are carried out in terms of time, scope, quality, and budget. The Contractor must also consult with local authorities, report on progress, and participate in meetings with the Employer, lessees, contractors, stakeholders, and representatives.
Section
Source: NEC Land Management Supervisory and Advisory Services_.pdf (unknown)3 Health and safety, the environment and quality assurance xi
3.3 Quality assurance requirements xi
Description
Source: Quality thank.pdf (unknown)Contractors will oversee and inspect work done by appointed contractors for Land Facilities Maintenance, Firebreaks, and Alien and invasive species control.
Important Dates
Source: Quality thank.pdf (unknown)The closing date is 2026-09-10T10:00:00.000Z. There are no specified briefing or site visit dates.
Contact Information
Source: Quality thank.pdf (unknown)The contact person is Lebohang Motaung, Officer Procurement, Procurement and Supply Chain, Corporate Services A3, Megawatt Park, Sunninghill Sandton. Email: [email protected]
Submission Guidelines
Source: Quality thank.pdf (unknown)Returnable forms must be completed and submitted with the quotation. The required forms include SBD 4 (Declaration of Interest) and SBD 9 (Certificate of Independent Bid Determination). Quotations must be received before the closing time to be considered.
Returnable Documents
Source: Quality thank.pdf (unknown)The required returnable documents include the Quality Method Statement, Quality Policy, and Quality Objectives. Fully completed and signed Form A is also required.
Evaluation Criteria
Source: Quality thank.pdf (unknown)Bidders must comply with the Supplier Quality Management Specification and have the necessary capacity and expertise. The evaluation criteria include the Quality Method Statement, Quality Policy, and Quality Objectives. The bidder must also submit all required tender returnables.
Technical Specifications
Source: Quality thank.pdf (unknown)The scope of work includes Land Facilities Maintenance, Firebreaks, and Alien and invasive species control. Contractors will be appointed as agents to act on behalf of Eskom to oversee and inspect work done by appointed contractors.
Methodology
Source: Quality thank.pdf (unknown)Tenderers must compile and submit a method statement based on the scope of work using the Method Statement template (Ref 240-126469599).
Quality Management
Source: Quality thank.pdf (unknown)The Supplier Quality Management Specification (QM58) applies. Tenderers must comply with selected requirements as per Category 4. A Quality Method Statement is required as part of the tender returnables.
Financial Requirements
Source: Quality thank.pdf (unknown)The estimated contract value is R8,262,710.00. The contract duration is five years.
Compliance Requirements
Source: Quality thank.pdf (unknown)Bidders must comply with the Supplier Quality Management Specification (QM58) and have a Quality Method Statement. End-user/Project Owners must monitor the implementation of the Quality Method Statement after award.
Section
Source: Quality thank.pdf (unknown)The evaluation criteria include the Quality Method Statement, Quality Policy, and Quality Objectives. Bidders must comply with the Supplier Quality Management Specification and have the necessary capacity and expertise.
Description
Source: 20250325_Cat4- Quality Req _ Land Management.pdf (unknown)The project title is Land Management Supervisory and Advisory Services. The date issued is 2025/03/25.
Contact Information
Source: 20250325_Cat4- Quality Req _ Land Management.pdf (unknown)No contact information is provided.
Submission Guidelines
Source: 20250325_Cat4- Quality Req _ Land Management.pdf (unknown)Returnable Documents: Form A must be completed and signed. The bidder must submit all required documents by the closing date and time.
Evaluation Criteria
Source: 20250325_Cat4- Quality Req _ Land Management.pdf (unknown)The bidder must have a quality management system that complies with ISO 9001. The evaluation criteria include:
Technical Specifications
Source: 20250325_Cat4- Quality Req _ Land Management.pdf (unknown)The technical specifications include:
Compliance Requirements
Source: 20250325_Cat4- Quality Req _ Land Management.pdf (unknown)The bidder must comply with ISO 9001 quality management system requirements. No other compliance requirements are specified.
Description
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Eskom requires Land Management Supervisory and Advisory Services for a five-year term service contract. Eskom has acquired properties across South Africa that support Generation, Transmission and Distribution of electricity, and leases them to various stakeholders. The supervisor will oversee and inspect work done by appointed contractors in three areas: Land Facilities Maintenance, Firebreaks, and Alien and Invasive Species clearing/maintenance. The supervisor ensures contractors perform duties per contract agreements, provides advisory services including asbestos removal procedures, and participates in stakeholder meetings. Services are required on an as-and-when-required basis. Suppliers may tender for provinces where they have footprint; charges are based on the province of work, not the supplier's base province. Scope areas are indicative and may change.
Important Dates
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Closing date: 10 September 2026 at 10:00 (from tender record). No compulsory briefing session or site visit dates are stated in the document.
Contact Information
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Contact information not specified in the tender document.
Submission Guidelines
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Bidders must submit their bids to the address specified in the tender document. The submission must include all required documents and information, and must be received by the closing date and time specified in the tender document.
Evaluation Criteria
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Technical evaluation uses a weighted scoring system with a minimum threshold of 70%.
Weighting breakdown:
Land Facilities Maintenance supervisory/advisory services: up to 10% (verifiable reference letters with contactable details, contracted period and location; >3 years = 10%, 2-3 years = 7%, 1-2 years = 5%, <1 year = 0%)
Firebreaks supervisory/advisory services: up to 10% (same scoring bands)
Alien Invader clearing and maintenance supervisory/advisory services: up to 10% (same scoring bands)
Land Facilities Maintenance: structure for key staff 2.5%, method statement 2.5% (incomplete = 0%)
Firebreaks: structure 2.5%, method statement 2.5% (incomplete = 0%)
Alien Invader clearing: structure 2.5%, method statement 2.5% (incomplete = 0%)
Supervisor Land Facilities Maintenance: qualification in Town Planning/Real Estate/Engineering (>National Diploma = 5%, National Diploma = 4%, <National Diploma = 0%) plus experience in Engineering/Land/Built Environment (>3 years = 10%, 2-3 years = 7%, 1-2 years = 5%, <1 year = 0%)
Supervisor Firebreaks: qualification in Environmental Management/Horticulture/Conservation/Social Sciences/Law/Agricultural Science (>National Diploma = 5%, National Diploma = 4%, <National Diploma = 0%) plus experience in Environmental Management/Agricultural Science/horticulture/conservation (>3 years = 15%, 2-3 years = 10%, 1-2 years = 7%, <1 year = 0%)
Supervisor Alien Invader clearing: qualification in Environmental Management/Horticulture/Conservation/Social Sciences/Agricultural Science (>National Diploma = 5%, National Diploma = 4%, <National Diploma = 0%) plus experience in Environmental Management/Agricultural Science/Horticulture/Conservation, invader clearing and herbicide/pesticide management (>3 years = 15%, 2-3 years = 10%, 1-2 years = 7%, <1 year = 0%)
No mandatory gatekeeper criteria apply. Qualitative technical evaluation criteria are not applicable beyond the weighted criteria above.
Technical Specifications
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Scope: ERE Land Management Supervisory and Advisory Services on an as-and-when-required basis for five years, covering three work streams:
Provincial footprint requirements:
Normative reference: Eskom Procurement Policy (32-1034).
Methodology
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Method statement and structure requirements (15% of technical score):
Experience & Qualifications
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Experience and qualification requirements:
Company experience (verifiable reference letters with contactable details, contracted period and location):
Scoring per category: >3 years = 10%, 2-3 years = 7%, 1-2 years = 5%, <1 year = 0%
Key personnel (CVs required with three years' work experience):
Quality Management
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Quality management expectations embedded in scope:
Financial Requirements
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Financial requirements not specified in the tender document.
Compliance Requirements
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)No explicit compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, CIPC, professional registrations, local content) are stated in this technical evaluation criteria document. Standard Eskom procurement compliance requirements may apply per the referenced Eskom Procurement Policy (32-1034) but are not detailed here.
Health & Safety
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Health and safety requirements:
Environmental
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Environmental management requirements:
Requirements
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Mandatory submission requirements for technical evaluation:
Section
Source: Tech Evaluation criterion Land Management Supervisory .pdf (unknown)Technical evaluation strategy:
Description
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Land Management Supervisory and Advisory Services for a five-year period. Quality requirements governed by Eskom specification 240-105658000 (Category 4) and ISO 9001:2015. Category 4 (Pre-contract award quality requirements) is the only applicable category. Main Supplier and Sub-supplier Capability and Capacity Assessment is required. Post-contract award clauses include Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes.
Important Dates
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)The closing date for the tender is 2026-09-10T10:00:00.000Z. There are no specified briefing or site visit dates.
Contact Information
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Eskom Quality Representative: Bongi Tshabalala, Senior Advisor: Supplier Quality Management. Document authorised 2025-03-25. Enquiry reference: 240-105658000.
Submission Guidelines
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Bidders must complete and sign Form A (Category 4) to acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001:2015. The signed form constitutes acceptance of all applicable quality clauses and principles listed in the document.
Evaluation Criteria
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Evaluation includes compliance with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001:2015 quality management principles. Applicable clauses: Pre-contract award quality requirements (Category 4), Main Supplier and Sub-supplier Capability and Capacity Assessment, Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes. ISO 9001 principles assessed: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management.
Technical Specifications
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Scope: Land Management Supervisory and Advisory Services for a period of five (5) years. Quality requirements per Eskom specification 240-105658000 (Rev 3, authorised January 2022, review January 2027) and ISO 9001:2015. Category 4 applies (Pre-contract award quality requirements). Mandatory: Main Supplier and Sub-supplier Capability and Capacity Assessment. Post-contract award requirements: Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, Special Processes.
Methodology
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Methodology must align with ISO 9001:2015 quality management principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management. Execution per Eskom specification 240-105658000 clauses: Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, Management of Nonconformities, Special Processes. Capability and Capacity Assessment required for main supplier and sub-suppliers.
Quality Management
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Duplicate of quality_management section above. No additional tender-specific content.
Compliance Requirements
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Compliance with Eskom Supplier Quality Requirements specification 240-105658000 and ISO 9001:2015 standard. Bidders must demonstrate capability and capacity assessment for main supplier and sub-suppliers. No specific CSD, tax, B-BBEE, CIDB, or local content requirements stated in this document.
Section
Source: 20250325_ Form A Cat4 _ Land Management .pdf (unknown)Evaluation based on compliance with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001:2015 quality management principles. Applicable quality clauses: Pre-contract award (Category 4), Capability and Capacity Assessment, Contract Execution, Performance Monitoring, Access and Information Rights, Preservation, Audits, Nonconformity Management, Special Processes. ISO 9001 principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors.pdf (unknown)Bidders must have the necessary qualifications, experience and resources to provide the required services, and must comply with the terms and conditions of the Non-Disclosure Agreement
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors.pdf (unknown)provisions of this Agreement for
any purpose whatsoever other than the Project
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors.pdf (unknown)The document is a standard Eskom vendor non-disclosure agreement template, not a tender specification. It sets out confidentiality obligations for a receiving party. Key obligations include: confidential information may only be used for the stated project and not disclosed to third parties without written consent; the receiving party must protect information with at least a reasonable standard of care; on request, material must be returned or destroyed within 7 business days; the agreement endures for 3 years after termination of the relationship; breach must be remedied within 7 business days of written notice, failing which the disclosing party may seek legal remedies including urgent proceedings and damages; the agreement is governed by South African law; neither party may assign rights without prior written consent, though Eskom may cede to subsidiaries on notice.
Description
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThis pack is a PAYE questionnaire for service contracts to the Eskom Group. It applies only to contractors who supply Eskom Holdings SOC Ltd and its subsidiaries with services, or individual contractors providing Eskom with labour. The tool establishes whether an individual, close corporation, company or trust should be classified as an independent contractor, personal service provider, labour broker or dependent contractor, and the tax consequences of that classification. The pack is based on the 2025/2026 tax year and is subject to change.
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The pack applies from 1 March 2025 to 28 February 2026.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Group Tax email: [email protected]
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Returnable documents: the completed questionnaire (Evaluation Pack A for companies/CCs/trusts, or Pack B for individuals), the signed summary sheet, and the signed appendices indicated by the answers. The completed pack must be returned to Eskom, copying [email protected].
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The pack determines tax status, not bid evaluation. For companies/CCs/trusts (Pack A), tests cover residence, employee numbers, connected persons, income concentration, place of work, and control. For individuals (Pack B), tests cover service vs people, residence, employee numbers, place of work, and control. The Dominant Impression Test classifies the contractor as Independent or as a Personal Service Provider/Dependent Contractor, which determines whether PAYE is withheld.
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The document is a PAYE questionnaire for service contracts to the Eskom Group of Companies. It applies only to contractors supplying services to Eskom Holdings SOC Ltd and its subsidiaries, or individuals providing labour to Eskom. The questionnaire determines the contractor's tax classification and the associated PAYE withholding obligations.
Methodology
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The questionnaire is structured into Evaluation Pack A (for Companies/Close Corporations/Trusts) and Evaluation Pack B (for Individuals). Each pack contains a series of tests (Residence, Number of Employees Exclusion, Services Rendered by a Connected Person, More than 80% of Income Test, Place, Control and Supervision Test, Dominant Impression Test) with branching logic to determine the contractor's tax classification. The Dominant Impression Test requires summarising 'Yes' and 'No' answers to determine if the contractor is an Independent Contractor or a Personal Service Provider/Employee.
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe tax rates applicable are: For a Labour Broker: PAYE at individual rates, SDL 1% Employer contribution, UIF 1% Employer and 1% Employee contribution, certificate IRP5/IT3(a) code 3617, nature of person H. For a Personal Service Provider: PAYE at 28%, SDL N/A, UIF N/A, certificate IRP5/IT3(a) code 3601 or 3616, nature of person H. For an Independent Contractor: no PAYE, SDL N/A, UIF N/A, no certificate. VAT: PAYE is calculated on the VAT exclusive amount for VAT vendors.
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Contractor classification determines PAYE withholding. Labour Broker: PAYE at individual rates, SDL 1% employer, UIF 1% employer and 1% employee, certificate IRP5/IT3(a) code 3617. Personal Service Provider: PAYE at 28%, SDL and UIF not applicable, certificate IRP5/IT3(a) code 3601 or 3616. Independent Contractor: no PAYE, SDL and UIF not applicable, no certificate. For VAT vendors, PAYE is calculated on the VAT-exclusive amount. If an individual provides a valid IRP30 certificate, no employees' tax is withheld and an IT3(a) with code 3617 is issued; otherwise employees' tax is withheld at individual rates until a valid IRP30 is provided.
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The PAYE Questionnaire must be completed truthfully by the contractor or authorised representative. It applies to contractors supplying services to Eskom Holdings SOC Ltd and its subsidiaries. The pack is based on the 2025/2026 tax year and is subject to change. The contractor is responsible for the accuracy and completeness of all information provided. The pack will not be automatically updated with changes in legislation.
Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The contractor or its duly authorised representative must declare that all questions have been answered truthfully. Answering the questions directs the contractor to the next step. The contractor acknowledges and accepts that definitions per the Income Tax Act are listed in Appendix 10, that it is responsible for the accuracy and completeness of all information provided, and that the pack will not be automatically updated with changes in legislation.
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)The closing date for tender submission is 2026-09-10T10:00:00.000Z. Tenderers must attend a site visit and/or clarification meeting if stipulated as compulsory in the Tender Data. Failure to attend a compulsory meeting will result in disqualification.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must direct all communication to the Eskom Representative only, in writing. The contact details for the Eskom Representative are not specified in the provided text.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must submit their tenders in paper form, with one original and one copy, to the specified address by the closing date and time. For e-tendering, tenders must be submitted via the Eskom Tender bulletin site. Late tenders will not be accepted. The tenderer is responsible for ensuring that the documents are submitted and accessible for downloading/evaluation without any challenges.
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Mandatory tender returnables must be submitted by closing date/time; all documents must be completed. Original tender plus one copy in paper form required; if not submitted, disqualification. For e-tendering, submit via Eskom Tender bulletin site in English. Sign the tender; signatory held liable. Package originals and copies separately, mark as ORIGINAL/COPY/ELECTRONIC COPY, seal in outer package marked Confidential with required details.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)The evaluation criteria include functionality, price, and B-BBEE level. Tenderers will be scored against the functionality criteria and must meet the minimum threshold stated in the Tender Data to proceed to further evaluation. The price will be evaluated in accordance with the criteria/requirements in the Tender Data, considering factors such as CPA, FOREX, commodity exposure, discounts, technical adjustment, PV, and forecasted rates of invoicing.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)The technical specifications are not clearly outlined in the provided text. However, it is mentioned that tenderers must comply with relevant legislation and regulatory instruments, including Instruction Notes issued by National Treasury, CIDB Regulations for construction works, and Eskom's requirements for Safety, Health, Environment, and Quality (SHEQ).
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must comply with the quality standards and QA/QC requirements as specified in the Invitation to Tender.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must include all duties, taxes (including VAT), and levies in their rates and prices. Prices must be fixed for the duration of the contract unless otherwise provided for in the Invitation to Tender. Tenderers must state their rates and prices in South African Rand unless instructed otherwise.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must comply with relevant legislation and regulatory instruments, including Instruction Notes issued by National Treasury, CIDB Regulations for construction works, and Eskom's requirements for Safety, Health, Environment, and Quality (SHEQ). Proof of SHEQ systems, policies, and capabilities must be provided at the closing date and/or contract award.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must provide proof of safety, health, environmental, and quality (SHEQ) systems, policies, and capabilities at the closing date and/or contract award.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)The tender validity period will be specified, and tenderers must hold their tenders valid for acceptance within this period. Tenderers may be required to extend the validity period upon request from Eskom.
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must comply with the eligibility criteria stated in the Tender Data and must not be under restriction to do business with Eskom or State-Owned Companies.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Compliance with relevant legislation: Comply with NT instructions, CIDB regulations, PPPFA, B-BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements, and other applicable legislation. Proof of SHEQ systems, policies, capabilities required at closing date and/or contract award; costs reflected in tender.
Description
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)The contractor provides land management supervisory and advisory services on behalf of Eskom Real Estate, overseeing and inspecting work by appointed contractors in land facilities maintenance, firebreaks, and alien and invasive species control, and advising on asbestos management.
Contact Information
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)Vusi Mashele, SHEQ Officer, compiled the specification on 2025/04/08. No other contact details are provided.
Submission Guidelines
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)Returnable documents: the SHE specification is the only document provided. No SBD or MBD forms are included in this pack. Bidders must submit a compliant SHE plan and all required Eskom and legislative documentation as detailed in the specification.
Evaluation Criteria
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)No evaluation criteria are stated in the document. The SHE specification sets out Eskom's minimum requirements that the contractor must meet, but no scoring or weighting is provided.
Technical Specifications
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)The contractor is appointed as an agent of Eskom to oversee and inspect work by appointed contractors in three areas: land facilities maintenance, firebreaks, and alien and invasive species. The contractor must also appoint an accredited authority to advise on all aspects of asbestos, from identification and risk assessment through treatment and removal. The contractor must develop a SHE plan, maintain a SHE file, and ensure all employees are familiar with applicable Eskom SHE documentation. A copy of the scope of works must be retained by the contractor.
Methodology
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)The contractor must appoint an Asbestos AIA to verify and approve all asbestos work plans and declare the competence of those responsible for asbestos training. Environmental practitioners oversee asbestos disposal, keep records, and report on disposal practices. The project manager must appoint a competent and accredited asbestos contractor.
Quality Management
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)The contractor must implement a non-conformance procedure for issuing to subcontractors for transgressions, which may include quality-related issues. Where Eskom issues non-conformances, the contractor must explain the cause and the plan to prevent recurrence. The contractor must maintain a SHE file and comply with the SHEQ Policy 32-727.
Compliance Requirements
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)Bidders must hold a valid COID registration and a letter of good standing from the compensation commissioner. Bidders must be registered with the relevant professional or industry body where applicable. Bidders must comply with the OHS Act, NEMA, the National Road Traffic Act, and the Constitution of South Africa. A Section 37(2) agreement must be signed between Eskom and the principal contractor at contract award, and the principal contractor must sign a similar agreement with each appointed contractor. The alcohol and drug permissible level is 0%, and ad hoc alcohol testing applies. Medical surveillance must be conducted by an Occupational Health Practitioner.
Health & Safety
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)The contractor must develop a SHE plan meeting Eskom and legislative requirements. Key obligations: sign a Section 37(2) agreement; maintain a SHE policy signed by the CEO; hold COID registration with a valid letter of good standing; comply with a 0% alcohol and drug level with ad hoc testing; conduct medical surveillance with entry, periodic and exit examinations; carry out risk assessments; investigate incidents per GAR 8 and 9; manage asbestos including notification, exposure limits of 0.2 fibres per millilitre over four hours, training, PPE, labelling, and disposal; and run emergency drills.
Environmental
Source: 20250408_GFD_ERE_Land Management Supervisory_SHE specification.pdf (unknown)The contractor must comply with NEMA and the Environmental Conservation Act. Asbestos waste must be disposed of at sites approved under these Acts. The contractor has a duty of care to prevent and minimise pollution or environmental degradation, and to rectify any harm caused. Asbestos waste must be contained, labelled, and transported to prevent fibre release.
Description
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Scope: Land management supervisory and advisory resources services for a period of five (05) years.
Important Dates
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Closing date: 10 September 2026 at 10:00 (from tender metadata).
Contact Information
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Buyer: Lebohang Motaung (Eskom Real Estate).
Submission Guidelines
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Returnable documents:
Disqualification risks:
Returnable Documents
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)The following documents are required to claim preference points: Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPS affidavit; Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding breakdown; Certified ID copies of shareholder(s); Proof of Disability (where applicable).
Evaluation Criteria
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Evaluation follows the Preferential Procurement Policy Framework Act (PPPFA).
Technical Specifications
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Scope: Land management supervisory and advisory resources services for a period of five (05) years.
Methodology
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Skills development methodology:
Financial Requirements
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Pricing format: Tenderer's response must be separated into components as per the Price Schedule included with the tender documents.
Compliance Requirements
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)B-bbee:
Local content:
Subcontracting:
Skills development:
Reporting:
B-BBEE Requirements
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)B-BBEE points for specific goals:
Contractual Terms
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)SDL&I Retention and Performance Security:
Reporting and Monitoring:
Section
Source: SDL&I stragety for Bidders Land Management Supervisory and Advisory 2.pdf (unknown)Evaluation criteria:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Eskom SOC ltd . - - National -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
25 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.