The belt splicing, belt repairs, belt inspections and pully lagging at grootvlei power station on an “as and when required basis” basis for a period of 60 months.
N3 South, Between Heidelberg and Villiers. - Grootvlei - Grootvlei - 2420
Organization Type
GOVERNMENT
Published
22 Jul 2026
OCDS Reference
ocds-9t57fa-163212
Summary
ESKOM is tendering for a 60-month term service contract for belt splicing, repairs, inspections, and pulley lagging at grootvlei power station on an as-and-when-required basis. This contract is aimed at contractors specializing in conveyor belt maintenance and repair services for a power generation facility. The work will be executed under an nec3 term service contract (tsc3) with option a (priced contract with price list).
Key Requirements
The contract duration is 60 months, with services provided on an as-and-when-required basis at Grootvlei Power Station.
Bidders must have a valid CIDB registration and comply with B-BBEE requirements; changes in B-BBEE status must be reported within seven days.
Pricing must be submitted using the NEC3 TSC3 Option A price list format, with payments assessed monthly and made in South African Rand within four weeks.
Contractors must comply with all health, safety, and environmental regulations, including the Construction Regulations 2014 and specific asbestos handling procedures.
Performance will be reviewed every three months against criteria including milestone targets, SHEQ compliance, lost time injuries, rework, and weekly reporting, with penalties for non-compliance.
The contract includes specific insurance requirements and mandates confidentiality of all contract-related information.
Submissions require the C1.1 Form of Offer and Acceptance, including the CIDB registration number, and failure to provide required post-award documentation may lead to contract repudiation.
The belt splicing, belt repairs, belt inspections and pully lagging at Grootvlei Power Station on an “as and when required basis” basis for a period of 60 months.
Tender context
Return to this tender’s issuing organisation, province, or category.
The belt splicing, belt repairs, belt inspections and pully lagging at grootvlei power station on an “as and when required basis” basis for a period of 60 months.
Review in progress · 0 of 13 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Document32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdfReview complete
Description
Important Dates
22 Jul
2026
PUBLICATION
Tender Published
Tender was published
21 Aug
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf
Eskom is seeking a contractor to provide belt splicing, belt repairs, belt inspections, and pulley lagging services at Grootvlei Power Station on an as-and-when-required basis for 60 months. The scope includes emergency repairs, routine inspections, and compliance with strict quality, safety, and technical standards (e.g., SANS, Eskom-specific standards). The contractor must guarantee workmanship for 3 years and provide 24/7 standby for emergencies.
The tender is for belt splicing, belt repairs, belt inspections, and pulley lagging services at Grootvlei Power Station on an as-and-when-required basis for 60 months. The contract emphasizes safety, quality, compliance, and risk management, with specific requirements for SHE (Safety, Health, Environment) plans, risk assessments, training, and adherence to Eskom standards.
32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf
Eskom is seeking a contractor for belt splicing, repairs, inspections, and pulley lagging at Grootvlei Power Station on an as-needed basis for 60 months. The scope includes conveyor belt splicing, lagging of pulleys, emergency breakdown services, inspections (including NDT for steel cord belts), and root cause analysis of failures. The contractor must comply with Eskom’s OHS (Occupational Health and Safety) specifications, legal requirements, and provide 24/7 standby for emergencies with a response time of 210 minutes. The contract requires adherence to strict quality control, documentation, and reporting standards, including a 3-year workmanship guarantee and 1-year guarantee against steel cord oxidation.
240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf
Eskom tender for belt splicing, repairs, inspections, and pulley lagging at Grootvlei Power Station on an as-needed basis for 60 months. The document focuses on OHS (Occupational Health and Safety) evaluation criteria for high-risk work.
Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf
Eskom is seeking a contractor for belt splicing, repairs, inspections, and pulley lagging at Grootvlei Power Station on an as-needed basis for 60 months. The tender emphasizes strict environmental compliance, including adherence to ISO 14001, Eskom's environmental policies, and South African environmental laws.
240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf
Eskom is seeking a service provider for conveyor belt splicing, repairs, inspections, and pulley lagging at Grootvlei Power Station on an as-and-when-required basis for 60 months. The tender emphasizes compliance with ISO 9001 (Quality Management System) and other technical/quality standards.
GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf
Eskom is seeking a service provider for belt splicing, repairs, inspections, and pulley lagging at Grootvlei Power Station on an as-needed basis for 60 months. The tender emphasizes Safety, Health, and Environmental (SHE) compliance, requiring documented policies, management plans, legal protections, and trained personnel.
The tender is for belt splicing, belt repairs, belt inspections, and pulley lagging services at Eskom's Grootvlei Power Station on an as-needed basis over 60 months. The scope requires adherence to a structured Contract Quality Plan (QCP) aligned with SANS 466:2005/ISO 10005:2005, emphasizing quality management, documentation, and compliance with technical standards.
Eskom is seeking a service provider for belt splicing, belt repairs, belt inspections, and pulley lagging at Grootvlei Power Station on an 'as and when required' basis for a 60-month period. The tender requires a detailed method statement outlining scope, objectives, resources, risks, and stakeholder management.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf
Eskom is seeking a contractor for belt splicing, repairs, inspections, and pulley lagging services at Grootvlei Power Station on an 'as and when required' basis for a 60-month period. The tender emphasizes a rigorous Quality Control Plan (QCP) and Inspection and Test Plan (ITP) framework.
Eskom seeks a contractor for belt splicing, repairs, inspections, and pulley lagging services at Grootvlei Power Station on an 'as and when required' basis for a 60-month period under an NEC3 Term Service Contract (TSC3).
Eskom is inviting tenders for belt splicing, repairs, inspections, and pulley lagging at Grootvlei Power Station on an as-and-when-required basis for 60 months. The tender emphasizes B-BBEE compliance, subcontracting, skills development, and local procurement. Points are awarded based on B-BBEE status and price, with additional contractual obligations for Socio-Economic Development, Localization, and Industrialization (SDL&I).
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf
Project: Splicing of all conveyor belts and lagging of conveyor pulleys for coal handling plant at Eskom Grootvlei Power Station.
OHS specification: Outlines Eskom's minimum OHS requirements for contractors during the 60-month contract period.
Applicability: Applies to any contracting organisation responding to Eskom Generation's tender with intention to enter contract.
Note: Requirements are contract-specific and do not supersede organisational OHS requirements; existing organisational requirements must be incorporated into OHS plans.
Evaluation Criteria
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf (unknown)
Legal
Must be a registered entity in South Africa (compliance with Companies Act).
Valid COID (Compensation for Occupational Injuries and Diseases) registration and Letter of Good Standing (LoG).
Compliance with all relevant labor laws (e.g., Basic Conditions of Employment Act).
No history of child labor or violation of Hazardous Work by Children regulations.
Technical
Proven experience in conveyor belt splicing, repairs, and pulley lagging (preferably in power stations or similar industrial environments).
Capability to perform NDT (Eddy Current Analysis) for steel cord belts.
Access to calibrated equipment (presses, tools) and certified materials (SANS-compliant rubber).
Ability to provide 24/7 emergency response within 210 minutes.
Financial
Financial stability to sustain operations for 60 months.
Ability to provide guarantees (3-year workmanship, 1-year steel cord oxidation).
Safety
Valid OHS compliance certificates (e.g., ISO 45001).
History of adherence to OHS Act and Eskom’s SHEQ policies.
Technical Specifications
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf (unknown)
Scope: Belt splicing, belt repairs, belt inspections, and pulley lagging at Grootvlei Power Station's coal handling plant on an as-and-when-required basis for 60 months.
Pre-work requirements: Contractor must provide a splice design drawing, list of tools/materials/equipment, and a Quality Control Plan (QCP) for client approval before arrival.
Site preparation: Contractor must determine splicing workstation position, verify belt specifications, and conduct a risk assessment. Client will apply for permit to work.
Equipment: Contractor provides all belt splicing equipment (presses, tools, consumables) and must maintain and inspect it. Calibration certificates and material datasheets must be available.
Service works: Contractor must conduct thorough inspections, determine root causes of failures, and recommend corrective actions.
Reporting: Provide completed QCP and work report/job card for each job, including technical specifications and findings, within 24 hours of completion.
Inspections: For steel cord belts, implement Non-Destructive Testing (NDT) using Eddy Current Analysis. For fabric belts, conduct visual inspections. Submit detailed reports with splice conditions, damage documentation, and recommendations.
Emergency works: Provide 24/7 standby service and be on site within 210 minutes of a call-out.
Equipment specifications: Press must exert required pressure and temperature, with platens at least 100mm wider than the belt. Materials must comply with SANS 1366 and SANS 1173, stored at 16°C to 18°C.
Guarantees: Workmanship and materials guaranteed for minimum 3 years; steel cord belting has 1-year guarantee against visual oxidation/corrosion.
Methodology
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf (unknown)
Inspection technique: Use Eddy Current Analysis for steel cord belts to measure condition, identify damage, fraying, pitting corrosion, and analyse splices.
Reporting: Generate detailed report with analysis results, recommendations on potential failures, end-of-life predictions, and corrective actions.
Quality Management
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf
Quality Control Plan (QCP): Must be approved by client prior to splicing. No work without approved QCP.
Reporting: Provide completed QCP and work report/job card for each job, including technical specifications, findings, and client sign-off.
Inspections: Conduct thorough inspections for root cause analysis; submit reports with recommendations.
Documentation: Submit Material Safety Data Sheets (MSDS), Equipment Calibration Certificates, and Method Statement.
Compliance: Follow Eskom's Substance Abuse Procedure and Life-Saving Rules; adhere to alcohol and drug policy (0% level).
Compliance Requirements
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf (unknown)
Legal compliance: Contractors must comply with all applicable legislation including the OHS Act, National Environmental Management Act, National Road Traffic Act, Compensation for Occupational Injuries and Diseases Act, and SANS standards.
OHS requirements: Contractor must develop an OHS plan meeting Eskom's minimum requirements and all relevant legislation. Eskom does not assume contractor's legal responsibilities.
SHEQ Policy: Contractor must have an organisational SHEQ policy signed by the CE or appointed assistant, displayed prominently and filed in OHS files.
COVID-19 Policy: If required, submit a signed COVID-19 policy, risk assessment, and control plan. Costs are not for profit-making.
COID: Main contractor and all appointed contractors must be registered with compensation commissioner and have valid Letter of Good Standing (LoG).
Statutory appointments: Appoint competent workers complying with OHS Act, including Incident Investigators, Health and Safety Committee Members, First Aiders, etc.
Eskom Life-Saving Rules: Must be obeyed by all contractors and employees, with zero-tolerance for non-compliance.
Substance abuse: Alcohol and drug level is 0%. Follow Eskom's Substance Abuse Procedure; employees may be subjected to alcohol testing.
Organisational structure: Provide organisational organogram on company letterhead, signed by company's 16(1) or 16(2), depicting responsibility levels from CE to supervisors.
Roles and responsibilities: Contractors must carry out duties under OHS Act, ensure employee safety, keep records, provide LoG, appoint competent staff, and ensure compliance with Eskom OHS requirements.
Risk assessment: Conduct risk assessments as per OHS Act Section 8(2)(d), including hazard identification, evaluation, and control measures.
Safe work procedures: Develop written safe work procedures/method statements aligned with risk assessments for all activities.
Health and safety training: Contractor site supervisor must be trained in HIRA, incident investigation, supervisor training, authorised person & PSR, legal liability. Health and Safety officer requires SAMTRAC, HIRA, incident investigation, legal liability, ISO 45001 knowledge, minimum 2 years experience, OHS Diploma for 3-5 year contracts.
Working at heights: Follow fall protection measures; use barricades, warning signs, and drop zones where necessary.
Confined spaces: Comply with Plant Safety Regulation 240-150642762; ensure trained personnel for rescue and risk assessment.
Fire equipment: Maintain clearly labelled, numbered firefighting equipment; inspect monthly and service annually.
Flammable liquids: Storage limited to 40 litres unless approved; follow safety signage and firefighting requirements.
Health & Safety
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf
OHS plan: Contractor must develop OHS plan meeting Eskom's minimum requirements and legislative obligations.
Legal compliance: Comply with OHS Act, regulations, and Eskom requirements including SHEQ Policy, COVID-19 Policy, and Life-Saving Rules.
Statutory appointments: Appoint competent workers for roles like Incident Investigator, Health and Safety Committee Member, First Aider, etc.
Training: Site supervisor requires HIRA, incident investigation, supervisor training, authorised person & PSR, legal liability. Health and Safety officer requires SAMTRAC, HIRA, incident investigation, legal liability, ISO 45001 knowledge, minimum 2 years experience, OHS Diploma for 3-5 year contracts.
Risk assessment: Conduct risk assessments as per OHS Act; identify hazards, evaluate risks, implement control measures.
Safe work procedures: Develop written safe work procedures/method statements for all activities.
Working at heights: Implement fall protection measures; use barricades, warning signs, drop zones.
Confined spaces: Comply with Plant Safety Regulation; ensure trained personnel for rescue and risk assessment.
Fire equipment: Maintain and inspect firefighting equipment monthly; service annually.
Induction: Arrange employee induction with Business Unit for site access.
Emergency: Provide 24/7 standby service for breakdowns; respond within 210 minutes.
Contractual Terms
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf
Guarantee: Contractor guarantees workmanship and materials for minimum 3 years after splice completion.
Steel cord belting: 1-year guarantee against visual evidence of oxidation/corrosion.
Repairs: All repairs carry same guarantee as parent belt.
Requirements
Source: 32-726-03T - High Risk OHS Specification for Coal stations @ 2025-08-05.pdf (unknown)
Main contractor: Defined as employer who tenders for or has signed contract with Eskom for services.
Organisational structure: Provide organogram on company letterhead showing levels from CE to supervisors, signed by company's 16(1) or 16(2).
Site supervisor: Must ensure compliance with Eskom standards, inspect work, monitor OHS performance, submit reports, and participate in incident investigations.
DocumentEnvironmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdfReview complete
Description
Source: Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf
Scope: Provision of belt splicing, belt repairs, belt inspections, and pulley lagging services at Grootvlei Power Station on an as-and-when-required basis for a period of 60 months.
Evaluation Criteria
Source: Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf (unknown)
Mandatory
Must have a documented and implemented EMS (preferably ISO 14001 certified)
Must demonstrate experience in belt splicing, repairs, inspections, and pulley lagging
Must comply with all Eskom and South African environmental regulations
Must have financial capacity to cover environmental liabilities (polluter pays principle)
Must be able to provide method statements for environmentally significant activities
Preferred
Prior experience working with Eskom or in power station environments
Existing ISO 14001 certification
Proven track record in environmental compliance and incident management
Technical Specifications
Source: Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf (unknown)
Scope: Belt splicing, belt repairs, belt inspections, and pulley lagging at Grootvlei Power Station on an as-and-when-required basis for 60 months.
Methodology
Source: Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf
Requirements:
Contractor Environmental File must be updated and documents readily available for auditing purposes.
Eskom Grootvlei Power Station will issue non-conformances for deviations from station procedures or other environmental requirements.
Method statements must be provided for activities with significant environmental impacts, detailing how environmental impacts and risks will be managed.
Contractor must allocate funds for the implementation of environmental requirements.
Must adhere to the Duty of Care as stipulated in Section 28 of the National Environmental Management Act.
Compliance Requirements
Source: Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf (unknown)
Environmental Compliance: Contractor must have a documented and implemented Environmental Management System (EMS) aligned with ISO 14001. Must comply with Eskom Grootvlei Power Station environmental policies, standards, and procedures. Polluter pays principle applies: contractor is responsible for cleaning spillages and rehabilitating polluted land at their own cost. Must adhere to the Duty of Care as per Section 28 of the National Environmental Management Act.
Environmental
Source: Environmental Contractor Requirements- belt splicing @ 2025-08-05 (1).pdf
Requirements:
Contractor must have a documented and implemented Environmental Management System (EMS) e.g., environmental policy, operational procedures.
Must comply with all Eskom Grootvlei Power Station environmental policies, standards, and procedures (work instructions).
Must appoint personnel in writing with basic environmental knowledge to implement all environmental/SHE requirements on site.
EMS must be established, implemented, and maintained in accordance with ISO 14001 International Standard.
All EMS requirements must be adhered to where applicable.
Environment must be considered when executing activities.
Polluter pays principle applies: contractor is responsible for cleaning spillages and rehabilitating polluted land, including associated costs.
Environmental audits/assessments will be conducted by Eskom according to the Station Audit Management Procedure and Programme.
Contractor Environmental File must be updated and documents readily available for auditing.
Eskom will issue non-conformances for deviations from station procedures or environmental requirements.
All incidents must be managed and reported according to Eskom Environmental Incident Management Procedure (240-133087117).
Station Waste Management Procedure and color coding must always be adhered to.
Document240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdfReview complete
Submission Guidelines
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf (unknown)
Submit the following returnable documents:
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
Health and Safety Plan aligned with the scope of work and OHS specifications.
Detailed OHS costing (broken down, not lump sum), based on the scope of work and risk assessment.
Baseline OHS Risk Assessment (BRA) with methodology.
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by CEO, compliant with OHS Act Section 7.
CVs, qualifications, and certificates for OHS competency (aligned with scope, risks, and OHS plan).
Returnable Documents
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf (unknown)
Required returnable documents:
Annexure B (signed acknowledgement of Eskom's OHS legal and other requirements).
Health and Safety Plan.
Detailed OHS costing (broken down).
Baseline OHS Risk Assessment (BRA) with methodology.
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by CEO.
CVs, qualifications, and certificates for OHS competency.
Evaluation Criteria
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf (unknown)
Must submit all OHS returnables listed in Annexure C1; Must demonstrate OHS competency aligned with scope and risks; Must have valid COIDA compliance; Must provide CEO-signed OHS policy; Must provide detailed OHS costing and risk assessment.
Technical Specifications
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf (unknown)
Scope of work:
Splicing of all conveyor belts for the coal handling plant at Eskom Grootvlei Power Station.
Lagging of conveyor pulleys for the coal handling plant.
Services to be provided on an 'as and when required' basis over a 60-month period.
Experience & Qualifications
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf
Bidder qualifications and experience:
Submit CVs, qualifications, and certificates for key personnel.
Competencies must align with the scope of work, risks, and OHS plan.
Compliance Requirements
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf (unknown)
Mandatory compliance requirements:
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by CEO, compliant with OHS Act Section 7.
Submission of Annexure B (acknowledgement of Eskom's OHS legal and other requirements).
Baseline OHS Risk Assessment (BRA) with methodology.
Health and Safety Plan aligned with project OHS risks and specifications.
Detailed OHS costing (broken down, not lump sum).
CVs, qualifications, and certificates for OHS competency.
Health & Safety
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf
OHS policy requirements:
Policy must be signed by the CEO.
Policy must comply with OHS Act Section 7.
Section
Source: 240-77471651 (Tender high risk) C1 @ 2025-08-05 (1).pdf
Evaluation is conducted using the OHS Tender Evaluation Template (High Risk, Document Identifier 240-77471651 Rev 3). Criteria include:
Submission of Annexure B (signed acknowledgement of OHS legal requirements).
Health and Safety Plan addressing project OHS risks and aligned with specifications.
Detailed OHS costing (broken down by scope and risk assessment).
Baseline OHS Risk Assessment (BRA) with methodology.
Valid Letter of Good Standing (COIDA or equivalent).
Returnable Documents: Not explicitly listed in the provided document. Suppliers must ensure all required forms (e.g., method statement, compliance certificates) are submitted as per the tender/RFQ instructions.
Document240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdfReview complete
Description
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf
Project: Tender for lagging services at Grootvlei Power Station.
Important Dates
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf (TENDER)
Document issued date: 25 June 2024
Contact Information
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf (TENDER)
Eskom Representative: Mmaphuti Moloto
Submission Guidelines
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf (TENDER)
Submit the following returnable documents: Form A must be completed and signed.
Returnable Documents
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf (TENDER)
Required returnable document: Form A must be completed and signed.
Evaluation Criteria
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf (TENDER)
Qms Compliance
Must comply with either Option 1 (ISO 9001 certified) or Option 2 (documented QMS aligning with ISO 9001).
Technical Compliance
Must provide evidence of equipment calibration, compliance certificates, and NDT methods.
Documentation
Must submit all required quality plans (CQP, QCP/ITP) and operational evidence.
Form A
Form A must be completed and signed.
Technical Specifications
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf (TENDER)
Scope of work includes the provision of the following services at Grootvlei Power Station on an as-and-when-required basis for 60 months:
Conveyor belt splicing
Belt repairs
Belt inspections
Pulley lagging
Section
Source: 240-12248652 - Category2- List of Tender Returnables Documents Rev 6 - Conveyor belt splicing @ 2025-06-24.pdf
Quality requirements are evaluated across SECTIONS A-E with weighted scoring:
SECTION A: ISO 9001 QMS certification (Option 1: 4 points) or documented QMS compliance (Option 2: 7 points).
SECTION B: Evidence of QMS in operation (5 points), including infrastructure maintenance and equipment certifications.
SECTION C: Draft Contract Quality Plan (1 point, 20% weight).
SECTION D: Draft Inspection and Test Plan (ITP) or Quality Control Plan (QCP) (1 point, 20% weight).
SECTION E: Form A completion (1 point, 10% weight).
DocumentGVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdfReview complete
Evaluation Criteria
Source: GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf (unknown)
Must submit all compulsory documents listed in the evaluation summary.
Must demonstrate capability, expertise, and capacity to perform the required services.
Must comply with Eskom’s SHE and environmental standards, including NEMA regulations.
Must have a valid SHE Policy and Environmental Management Plan.
Must appoint a qualified SHE Officer and provide proof of environmental training.
Technical Specifications
Source: GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf (unknown)
The tender requires an objective technical evaluation of the supplier’s and/or contractor’s:
Capabilities
Expertise
Experience
Capacity
Processes
Facilities and/or equipment
The purpose is to confirm the ability to provide belt splicing, belt repairs, belt inspections, and pulley lagging services at Grootvlei Power Station on an as-and-when-required basis for 60 months.
Compliance Requirements
Source: GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf (unknown)
Mandatory SHE (Safety, Health, Environment) compliance requirements:
SHE Policy: A signed Environmental (or SHE/SHEQ) Policy demonstrating commitment to environmental compliance and pollution prevention, signed by the Company Owner/CEO/MD.
Environmental Management Strategy: A site/work-specific Environmental Management Plan must be presented.
Legal Protection: A letter from top management guaranteeing the protection of workers refusing to perform environmentally hazardous work, in terms of Section 29 of NEMA 107 of 1998.
SHE Officer: Appointment of an Environmental or SHE Officer with basic environmental knowledge.
Environmental Training: Proof of environmental and related training for relevant personnel.
Health & Safety
Source: GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf
SHE (Safety, Health, Environment) requirements:
A signed SHE/SHEQ Policy demonstrating commitment to environmental compliance and pollution prevention.
A site/work-specific Environmental Management Plan.
A letter from top management guaranteeing protection for workers refusing hazardous environmental work (Section 29 of NEMA 107, 1998).
Appointment of a SHE Officer with basic environmental knowledge.
Proof of environmental and related training for personnel.
Special Conditions
Source: GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf (unknown)
Document control conditions:
When downloaded from the document management system, the document is uncontrolled. Users must ensure it aligns with the authorised version.
No part of the document may be reproduced without the expressed consent of Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Section
Source: GVLF 0183 Environmental Evaluation Form @ 2025-08-05 (1).pdf
Evaluation criteria focus on the supplier’s/ contractor’s SHE compliance and technical capability to deliver the required services.
Scope: Provide belt splicing, belt repairs, belt inspections, and pulley lagging services at Grootvlei Power Station on an as-and-when-required basis for 60 months. Quality Focus: The Contract Quality Plan (CQP) template guides suppliers in meeting Eskom’s quality management expectations, referencing SANS 466:2005 / ISO 10005:2005.
Returnable Documents: Submit all required documentation as per the Contract Quality Plan (CQP) template. This includes signed-off QCPs, technical assurance reports, warranty certificates, material certificates, dimension reports, and test reports.
Quality Standards: Compliance with SANS 466:2005 / ISO 10005:2005. Documentation: All quality-related documents (e.g., QCPs, inspection reports) must be submitted and retained as per Eskom’s requirements. Traceability: Ensure identification and traceability of all scope-related activities.
Document240-77471499 - Annexure B @ 2025-08-05.pdfReview complete
Returnable Documents
Source: 240-77471499 - Annexure B @ 2025-08-05.pdf (unknown)
Acknowledgement Form Requirements:
Signed acknowledgement by an authorised person (CEO/Director/Managing Director) confirming understanding of OHS requirements and consequences of non-compliance.
Form must include:
Company/Supplier Name.
Name of Authorised Person.
Signature and Date.
Witness 1 and Witness 2 signatures.
Evaluation Criteria
Source: 240-77471499 - Annexure B @ 2025-08-05.pdf (unknown)
Unable to extract eligibility criteria
Compliance Requirements
Source: 240-77471499 - Annexure B @ 2025-08-05.pdf (unknown)
Mandatory OHS Compliance:
Must comply with Eskom Contractor Health and Safety Requirements Standard 32-136.
Must adhere to provided OHS specifications/requirements.
Must follow the Occupational Health and Safety Act.
Must comply with the Compensation for Occupational Diseases and Illnesses Act.
After contract award, align company processes with Eskom’s OHS policies, procedures, and standards.
Penalties:
Non-conformance (by main supplier, contractors, or subcontractors) to Eskom or statutory OHS requirements will result in penalties.
Induction and Training:
All employees (including contractors/suppliers) must undergo relevant Eskom induction and company-specific training.
Contractor/Subcontractor Management:
Main supplier must demonstrate selection criteria and processes for appointing contractors/suppliers.
Must notify Eskom prior to appointing contractors/suppliers for work commencement.
Must ensure contractors/suppliers have adequate resources and competencies.
Accountable for ensuring contractors/suppliers comply with applicable legal and Eskom requirements.
Must monitor contractors/suppliers via audits/assessments for OHS compliance.
Must provide grounds for termination of contractor/supplier work if non-compliant.
All non-conformances by contractors/suppliers must be addressed directly with the main supplier via performance and penalty processes.
Eskom reserves the right to verify compliance and may request testimonials/references or client contact details (including Eskom) for similar past work.
Health & Safety
Source: 240-77471499 - Annexure B @ 2025-08-05.pdf
Mandatory OHS Requirements:
Comply with Eskom Contractor Health and Safety Requirements Standard 32-136.
Adhere to provided OHS specifications/requirements.
Follow the Occupational Health and Safety Act.
Comply with the Compensation for Occupational Diseases and Illnesses Act.
After contract award, align company processes with Eskom’s OHS policies, procedures, and standards.
Penalties:
Non-conformance (by main supplier, contractors, or subcontractors) to Eskom or statutory OHS requirements will incur penalties.
Training:
All employees (including contractors/suppliers) must undergo relevant Eskom induction and company-specific training.
Contractual Terms
Source: 240-77471499 - Annexure B @ 2025-08-05.pdf
Contractor/Subcontractor Management Obligations:
Demonstrate selection criteria and processes for appointing contractors/suppliers to Eskom.
Notify Eskom prior to appointing contractors/suppliers for work commencement.
Ensure contractors/suppliers have adequate resources and competencies.
Accountable for ensuring contractors/suppliers comply with legal and Eskom requirements during contract execution.
Monitor contractors/suppliers via audits/assessments for OHS compliance.
Provide grounds for termination of contractor/supplier work if non-compliant.
Address all non-conformances by contractors/suppliers directly via performance and penalty processes.
Eskom reserves the right to verify compliance and may request testimonials/references or client contact details for similar past work.
Document240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdfReview complete
Description
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf
The document is a Quality Control Plan/Inspection and Test Plan (QCP/ITP) template for Eskom:
It includes approval signatures and an intervention point legend with categories: Hold Points, Witness Points, Document Review.
Surveillance (S) and Verification (V) may be required by an Approved Inspection Authority (AIA).
Activities are listed with description/requirement, date, statutory/non-statutory category, inspection and test method, controlling document, acceptance criteria, and records for supplier and Eskom inspections.
Inspection and test methods include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current, etc.
Acceptance criteria include functionality requirements, performance measures, regulatory compliance, chemical tests, etc.
Abbreviations: NOBO (Notification Body), TPI (Third Party Inspection).
The document is uncontrolled when downloaded; users must ensure alignment with the authorised version.
Reproduction is prohibited without Eskom's consent.
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf (unknown)
Returnable Documents: The document does not specify submission details, address, deadline, or required forms. Bidders must refer to the main tender invitation for submission instructions.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf (unknown)
Specific eligibility criteria are not explicitly detailed in the provided excerpt. However, applicants must demonstrate capability to implement the required QCP/ITP, comply with Eskom's document management system, and likely possess relevant experience in industrial belt maintenance and power station operations. Subcontractor arrangements must be declared.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf (unknown)
The document specifies a Quality Control Plan/Inspection and Test Plan (QCP/ITP) for the scope of work:
The plan requires approvals with names and signatures from contractor/supplier, subcontractor (where applicable), and Eskom.
Intervention points are defined: Hold Points (document requires approval), Witness Points (witnessing required), and Document Review points (information only or review required).
Surveillance (S) and Verification (V) may be applied by an Approved Inspection Authority (AIA).
Activities are listed with description/requirement, date, statutory/non-statutory category, inspection and test method, controlling document, acceptance criteria, and records for supplier and Eskom inspections involving AIA/NOBO or internal/TPI.
Inspection and test methods include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current, etc.
Acceptance criteria include functionality requirements, performance measures, regulatory compliance, chemical tests, etc.
Abbreviations: NOBO (Notification Body), TPI (Third Party Inspection).
The document is uncontrolled when downloaded; users must ensure alignment with the authorised version on Eskom's system.
Reproduction is prohibited without Eskom's consent.
Quality Management
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf
The document outlines quality management requirements through a Quality Control Plan/Inspection and Test Plan (QCP/ITP):
Approvals required with names and signatures from contractor/supplier, subcontractor (where applicable), and Eskom.
Intervention points include Hold Points (document requires approval), Witness Points (witnessing required), and Document Review points.
Surveillance (S) and Verification (V) may be applied by an Approved Inspection Authority (AIA).
Activities are listed with description/requirement, date, statutory/non-statutory category, inspection and test method, controlling document, acceptance criteria, and records.
Inspection and test methods include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current, etc.
Acceptance criteria include functionality requirements, performance measures, regulatory compliance, chemical tests, etc.
Abbreviations: NOBO (Notification Body), TPI (Third Party Inspection).
Section
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2 @ 2025-08-05.pdf
The document references inspection and test methods and acceptance criteria for quality control:
Inspection and test methods include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current, etc.
Acceptance criteria include functionality requirements, performance measures, regulatory compliance, chemical tests, etc.
The Quality Control Plan/Inspection and Test Plan (QCP/ITP) form includes approval signatures and an intervention point legend.
DocumentRisk Assessment - belt splicing @ 2025-08-05.pdfReview complete
Description
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf
The contract involves belt splicing, belt repairs, belt inspections, and pulley lagging at Grootvlei Power Station. Services are required on an as-and-when-required basis for a period of 60 months.
Evaluation Criteria
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf (unknown)
General
Must be a registered and compliant supplier (CIDB compliance preferred).
Experience in belt splicing, repairs, inspections, and pulley lagging in power stations or similar industries.
Ability to provide SHE plans, risk assessments, and quality control documentation.
Capacity to meet Eskom’s technical and safety standards.
Financial stability to handle contingency costs and implementation expenses.
Specific
Must submit a valid SHE plan accepted by Eskom’s Service Manager.
Must have a proven track record in similar projects (references may be required).
Must employ qualified personnel and provide training as specified.
Must comply with local employment and skills development requirements.
Must adhere to Eskom’s contractual and legal frameworks (e.g., NEC).
Methodology
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf (unknown)
An implementation program is required as part of the contract. Timelines and deadlines must be met. Effective communication and supervision are mandatory to avoid delays.
Experience & Qualifications
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf
Employment requirements: Only qualified personnel may be employed. Contractor must adhere to employment requirements stipulated in the contract. Non-adherence is a risk.
Quality Management
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf
Compliance to specific standards: Contractor must work according to approved specifications and standards. Non-adherence to contract specifications is a risk.
Compliance Requirements
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf (unknown)
Compliance requirements include:
Submission of a SHE (Safety, Health, Environment) plan compliant with the OHS Act. Non-compliance may result in disqualification.
Submission of safety risk assessments to the Employer.
Medical and induction costs for contractor employees are included in SHEQ requirements. Non-compliance with these requirements will result in loss of site access.
IBI (Interactive Behavior-Based Intervention) training must be provided by the contractor for their employees as specified in the contract.
Contractor must adhere to employment requirements, including the use of only qualified personnel.
Compliance with Eskom specifications and approved standards is mandatory.
Contractor must include a Disaster Recovery Plan with control measures for disaster management.
Legal requirements: Contractual agreement must be signed by all parties (NEC contract).
Health & Safety
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf
IBI training must be provided by the contractor for their employees as specified in the contract. This is to prevent re-occurrence of errors due to lack of information or misunderstanding.
Contractual Terms
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf (unknown)
Procurement risks: Tender office backlog risks are incorporated in the commercial plan. Contract Supervisor must motivate for an earlier date to avoid delays.
Section
Source: Risk Assessment - belt splicing @ 2025-08-05.pdf
Technical evaluation will be conducted by the Service Manager. Key criteria:
Supplier qualifications and experience will be assessed to ensure competence and mitigate risks of poor workmanship.
Quality requirements and objectives are set in the contract. Use of IBI tools (e.g., job observations, pre-job debriefs) is mandatory.
A quality control plan must be adhered to by the contractor.
DocumentNEC (5).pdfReview complete
Contact Information
Source: NEC (5).pdf (unknown)
For contract-related queries, contact Engineering Contract Strategies: Phone: 011 803 3008, Fax: 086 539 1902, Website: www.ecs.co.za. Service Manager is based at Grootvlei Power Station, Private Bag X, Grootvlei, 2420. Eskom Holdings SOC Ltd registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Phone: 011-800 2101, Fax: 011-800 5684.
Submission Guidelines
Source: NEC (5).pdf (unknown)
Submit the following returnable documents: C1.1 Form of Offer and Acceptance. Include your CIDB registration number in the form. The Employer accepts the offer by signing the Acceptance part of the form and returning one copy to the tenderer. Failure to submit required securities, bonds, guarantees, proof of insurance, or other documentation as per the contract terms after award may result in repudiation of the agreement.
Evaluation Criteria
Source: NEC (5).pdf (unknown)
Contractor must be legally registered (registration number required). Must have CIDB registration number (indicated in Form of Offer). Must comply with South African B-BBEE legislation and provide verification certificates. Joint ventures are permitted but members are jointly and severally liable. Contractor cannot cede or assign rights without Eskom's written consent.
Experience & Qualifications
Source: NEC (5).pdf
Contractor must provide details of key personnel, including names, job titles, responsibilities, qualifications, and experience. CVs and further key personnel data must be submitted. Contractor must demonstrate capability to perform belt splicing, repairs, inspections, and pulley lagging as per the scope of work.
Pricing Schedule
Source: NEC (5).pdf
Pricing is based on a detailed price list (Option A) with items categorized into Preliminaries and Generals (e.g., safety file, PPE, inductions, travel), Normal Time, After Hours/Saturday Call-outs, and Sunday/Public Holidays Call-outs. Each item includes a description, unit, quantity, rate, and total price. Contractor must ensure prices cover all necessary and incidental costs for providing the service as per the Service Information. Lump sum items are not adjustable unless due to a compensation event. Contractor must link operations in their plan to items in the price list.
Financial Requirements
Source: NEC (5).pdf (unknown)
Pricing is based on a priced contract with a price list (NEC3 TSC3 Option A). The Price List includes lump sum and rate-based items. Payments are assessed monthly between the 25th of each month. Payment terms: currency is South African Rand, payment period is four weeks. Interest on late payments is calculated at the Standard Bank of South Africa’s prime rate (for Rands) or LIBOR (for other currencies). Contractor must submit a tax invoice within one week of receiving a payment certificate. VAT number 4740101508 must be included on all invoices. No adjustments to lump sum prices unless due to a compensation event.
Compliance Requirements
Source: NEC (5).pdf (unknown)
CIDB registration is mandatory. B-BBEE compliance is required; any change in B-BBEE status must be notified to the Employer within seven days, with updated verification certificates submitted within 30 days. Failure to notify may result in contract termination. Joint ventures or consortia must notify the Service Manager of the key person authorized to bind the Contractor within two weeks of the contract date. The Contractor must comply with all applicable health, safety, and environmental laws, including the Construction Regulations 2014 and Occupational Health and Safety Act. Asbestos handling must comply with the Employer’s Asbestos Standard 32-303 and South African legislation. Confidentiality of contract-related information is mandatory.
Health & Safety
Source: NEC (5).pdf
Contractor must take all reasonable precautions to maintain health and safety, including compliance with Construction Regulations 2014 and Occupational Health & Safety Act. Employer may appoint the Contractor as the Principal Contractor. Contractor must ensure compliance from subcontractors, employees, and others under their control. SHE specification 240-73418055 must be used for compiling the SHE file. Risks include adverse weather, injuries due to non-compliance with EHS regulations, theft, and encounters with snakes/bees/wasps/spiders. Contractor must have a snake handling procedure in place. Contractor’s prices must include sufficient amounts for health and safety compliance.
Environmental
Source: NEC (5).pdf
Contractor must comply with all applicable environmental laws and regulations. Asbestos management: Employer ensures ambient air meets South African asbestos standards (OEL: 0.2 fibres/ml over 4 hours, short-term limit: 0.6 fibres/ml over 10 minutes). Contractor may request certification of safe asbestos levels. If asbestos is identified, risk assessments and control measures must be implemented. Contractor’s personnel may stop work and leave contaminated areas until declared safe. Contractually agreed dates may be extended due to asbestos-related delays. Asbestos removal and disposal must be done by a registered contractor at Employer’s expense.
Contractual Terms
Source: NEC (5).pdf
Contract is governed by NEC3 Term Service Contract (TSC3) with main Option A (Priced contract with price list) and secondary Options: W1 (Dispute resolution), X1 (Price adjustment for inflation), X2 (Changes in the law), X17 (Low service damages), X18 (Limitation of liability), X19 (Task Order), and Z15 (Additional conditions). Contract period: 60 months. Contractor must submit a first plan for acceptance within the first week of contract inception. Task Order programme must be submitted within one day of receiving a Task Order. Employer may terminate the contract if the contract value is exhausted, Grootvlei Power Station stops operating, or in cases of business rescue. Contractor’s liability for indirect or consequential loss is limited to R0.00. End of liability date is 12 months after the end of the service period. Insurance requirements: Contractor must provide certificates for loss/damage to Employer’s property, Plant, Materials, Equipment, and liability for bodily injury/death. Employer provides insurances as per Insurance Table B (e.g., Assets All Risk, Contract Works, Environmental Liability). Nuclear liability is covered by the Employer for Koeberg Nuclear Power Station.
DocumentSDL&I Requirements.pdfReview complete
Contact Information
Source: SDL&I Requirements.pdf (TENDER)
Business Unit: Grootvlei Power Station.
Name of Buyer: Michael Dube.
Evaluation Criteria
Source: SDL&I Requirements.pdf (TENDER)
General
Open to all national suppliers (no designated sector restrictions).
Must comply with Eskom’s SDL&I and B-BBEE policies.
Non-compliant contributors score 0 for specific goals but are not disqualified.
Subcontracting
Mandatory for contracts > R10M (10% to EME/QSE with 51% black ownership in rural/underdeveloped areas).
Skills Development
Must align with Eskom’s core/scarcity skills (e.g., Diploma Technicians).
Excludes Eskom employees; tenderers fund all costs.
Technical Specifications
Source: SDL&I Requirements.pdf (TENDER)
Scope of work: Belt splicing, belt repairs, belt inspections, and pulley lagging at Grootvlei Power Station on an 'as and when required' basis.
Duration: 60 months (5 years).
Compliance Requirements
Source: SDL&I Requirements.pdf (TENDER)
B-BBEE documentation is required to claim preference points:
Valid B-BBEE certificate from a SANAS accredited verification agency, or a sworn affidavit/CIPS affidavit.
Proof of ownership/shareholding (preferably CIPC documentation) including shareholding breakdown.
Certified ID copies of shareholders.
Proof of disability where applicable.
For trusts, consortia, or joint ventures: a consolidated B-BBEE status level verification certificate.
Failure to provide B-BBEE documentation does not disqualify but means you score points for price only and zero for specific goals.
Objective criteria are conditions for contract award; not meeting them may lead to the second-ranked tenderer being recommended.
Designated sectors: This commodity is not a designated sector; local content thresholds are not applicable.
CIDB skills development: No CIDB compulsory training is applicable; failure to meet CIDB CSDG mandatory percentage renders a tender non-responsive.
National Industrial Participation Programme (NIPP): Applicable only if the contract has an imported/foreign content equal to or exceeding USD 5 million. If applicable, the winning bidder must negotiate and sign an NIPP obligation agreement with the dtic before contract signing.
Mandatory subcontracting: For contracts above R10 million, subcontracting a minimum of 10% of contract value to designated groups (EME or QSE 51% owned by black people in rural/underdeveloped areas or townships) is a condition for award.
Subcontracting returnables required: Subcontracting agreement with subcontractor's company registration documents (CK and B-BBEE certificate/sworn affidavit) OR copies of subcontracting contracts/letters of intent.
SDL&I objectives (Transformation, Local Procurement Content, Jobs, Skills Development) form part of contractual obligations but do not affect scoring.
A valid B-BBEE certificate or sworn affidavit is a condition for contract award:
Annual total revenue ≤ R10 million: Exempted Micro Enterprise can submit sworn affidavit.
Annual total revenue ≤ R50 million: Qualifying Small Enterprise must comply with QSE scorecard unless ≥51% black-owned, then sworn affidavit required.
Annual total revenue > R50 million: Valid B-BBEE certificate required.
B-BBEE improvement or retention plan must be submitted within 30 days of signing the contract.
Local procurement content target: 100%.
Jobs and skills development proposals must be submitted as per tables in the document.
SDL&I penalty: 2.5% of contract value for failure to meet SDL&I obligations.
Performance security: 2.5% of every invoice (excluding VAT) retained until SDL&I obligations are fulfilled.
Quarterly SDL&I compliance reports required.
SDL&I Implementation Schedule must be completed and returned within 28 days after contract award.
DocumentScope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdfReview complete
Contact Information
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
No specific contact details provided. The document only lists roles: System Engineer, Eskom Quality Inspector, Contractor, Employer Supervisor at Grootvlei Power Station.
Submission Guidelines
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
Returnable Documents:
Quality Control Plan (QCP) must be submitted and approved prior to any work.
Material Safety Data Sheets (MSDS) for all materials used.
Equipment Calibration Certificates for all tools and presses.
Method Statement detailing the execution approach.
All documentation must be kept readily available and submitted as required.
Returnable Documents
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
Documentation submission and recording
Quality Control Plan (QCP)
Material Safety Data Sheets (MSDS)
Equipment Calibration Certificates
Method Statement
Evaluation Criteria
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
General
Must be a registered legal entity capable of entering into a contract with Eskom.
Proven experience in conveyor belt splicing, repairs, and pulley lagging for power stations or similar industrial environments.
Demonstrated ability to comply with SANS and Eskom technical standards.
Technical
Certified splicers and supervisors with training in textile ply and steel cord belt splicing.
Access to NDT equipment and certified personnel for steel cord belt inspections.
Ownership of required tools/equipment (e.g., presses, calibration tools) as listed in Appendices C, D, E.
Safety
Compliance with Eskom’s Life-Saving Rules and occupational health/safety regulations.
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
Scope: Splicing of all conveyor belts and lagging of conveyor pulleys for the coal handling plant at Eskom Grootvlei Power Station.
Two belt types: steel cord and textile/ply reinforced conveyor belts.
Work includes repairs, replacements, inspections, and emergency breakdown services on an 'as and when required' basis.
Contractor must comply with specific splicing and lagging standards: SANS 485, SANS 484-1, SANS 484-2, SANS 1669-2, and internal Eskom standards.
Pre-work requirements: Contractor must submit splice design drawings, tool/material lists, and Quality Control Plan for approval.
Site preparation: Requires permit to work, risk assessment, humidity control, and coordination with Employer for belt tension removal.
Equipment: Contractor provides all splicing presses, tools, and consumables. Presses must meet specific dimensional and performance specifications.
Inspections: Contractor must conduct fault-finding surveys and provide detailed reports on belt condition, including Non-Destructive Testing for steel cord belts.
Emergency response: 24/7 standby service with a requirement to be on site within 210 minutes of a call-out.
Material storage: Materials must be stored at 16-18°C, with expiry dates and batch numbers recorded.
Methodology
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
Pre-Work:
Employer provides full belt specifications to Contractor.
Contractor must provide splice design drawings for approval before arriving on site.
Contractor submits list of tools, materials, and equipment for approval.
Quality Control Plan must be submitted and approved.
Site Preparation:
Determine splicing workstation position with engineer/supervisor.
Verify belt details from Employer records.
Obtain permit to work.
Conduct risk assessment.
Employer removes belt tension; Contractor clamps belt.
Monitor humidity; erect tent cover and use heaters if humidity exceeds 70%.
Execution:
Contractor provides all splicing equipment, presses, tools, and consumables.
Equipment must be inspected and calibrated; certificates must be available.
After repairs, conduct root cause analysis and provide corrective action recommendations.
Submit completed QCP and job report after each job.
Conduct on-site fault-finding surveys and submit report within one week.
Inspections:
For steel cord belts: Use Non-Destructive Testing (Eddy Current/Magnetic Flux Leakage). Provide detailed report on cord condition, splices, and recommendations.
For fabric belts: Visual inspection. Report must include splice details, damage assessment with pictures, and recommendations.
Emergency Works:
24/7 standby service for breakdowns.
Must be on site within 210 minutes of call-out.
Maintain readily available team.
Equipment & Materials:
Press specifications: Capable of required pressure/temperature, platens at least 100mm wider than belt, regular checks for flatness and temperature distribution.
Material storage: Store at 16-18°C, record batch numbers, adhere to expiry dates, comply with SANS 1366 and SANS 1173.
Quality Management
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf
Contractor must comply with specific quality standards: Textile Ply Belt Splicing Quality Control Standard (240-55864585), Splicing and Repairs of Steel Cord and Textile/Plied Reinforced Conveyor Belting (240-120532564), and relevant SANS standards.
Roles: System Engineer reviews/authorizes QCPs and provides quality assurance. Eskom Quality Inspector ensures quality requirements and processes are followed.
Contractor must submit a Quality Control Plan (QCP) for each job, approved before work starts.
QCP must include details like number of steps, step lengths, cord cleaning length, cord arrangement, and bias for steel cord.
Equipment must be inspected and calibrated regularly; calibration certificates must be available.
Contractor must conduct root cause analysis after failures and provide corrective action recommendations.
Inspection reports for both steel cord and fabric belts must include splice details, damage assessment with pictures, and recommendations.
Compliance Requirements
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
No specific compliance requirements like CSD, tax, B-BBEE, CIDB, or CIPC are stated in the document.
The Contractor must comply with Eskom Life-Saving Rules and safety requirements.
Contractor must obey laws pertaining to the National Key Points Act (no photography without written permission).
Contractor must have suitable workshop premises with required tools/equipment, subject to Eskom inspection with 24-hour notice.
Health & Safety
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf
Contractor must comply with all Eskom Life-Saving Rules and referenced safety requirements.
A permit to work is mandatory before any work starts; no work without a permit.
Contractor must conduct a risk assessment prior to starting work and inform Employer of any hazards.
National Key Points Act applies: No photography inside Employer premises without prior written permission.
Contractor must maintain confidentiality and not divulge privileged information.
Contractual Terms
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf
Workmanship and materials guarantee: Minimum 3 years for all work following splice completion.
Steel cord belting: Additional 1-year guarantee against visual evidence of oxidation/corrosion.
Repairs carry the same guarantee as the parent belt.
Requirements
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf (unknown)
General Requirements:
Applicable to Grootvlei Power Station and all stakeholders in the commercial process.
Roles defined: System Engineer, Eskom Quality Inspector, Contractor, Employer Supervisor.
Contractor must have suitable workshop premises with tools/equipment, subject to Eskom inspection with 24-hour notice.
Confidentiality: Must not divulge confidential information.
National Key Points Act: No photography on site without written permission.
Documentation: Must submit QCP, MSDS, calibration certificates, method statement.
Standards: Must apply latest editions of referenced standards (SANS and Eskom internal standards).
Definitions provided for Employer, Contractor, Service Manager, Splicer Supervisor, Splicer.
Abbreviations include MSDS, NDT, QCP, SANS, SOW.
Section
Source: Scope of work - belt splicing Rev 2 @ 2025-08-05 (1).pdf
The document does not provide evaluation criteria. It only mentions the role of the Eskom Quality Inspector in ensuring technical quality requirements and quality management processes are followed.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
N3 South, Between Heidelberg and Villiers. - Grootvlei - Grootvlei - 2420
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
22 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.