Nelson Mandela Drive - Lephalale - Lephalale - 0557
Organization Type
GOVERNMENT
Published
22 Jul 2026
OCDS Reference
ocds-9t57fa-163200
Summary
ESKOM invites tenders for the fire protection system for diesel generators at units 2-6 of matimba power station in limpopo. This is a professional services contract requiring design, installation, and commissioning expertise. The tender is open and must be submitted electronically via eskom's e-tendering portal.
Key Requirements
Submit electronically via Eskom E-tendering by 17 August 2026 at 10h00.
Attend the compulsory clarification meeting on 30 July 2026 at Matimba Power Station.
Contractor must be CIDB registered as level 4SF or higher.
All discipline engineers (Mechanical, Civil, C&I) must be professionally registered with ECSA.
Nelson Mandela Drive - Lephalale - Lephalale - 0557
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Review in progress · 0 of 9 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentMatimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdfReview complete
Description
Important Dates
22 Jul
2026
PUBLICATION
Tender Published
Tender was published
17 Aug
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253302 Quality Control Plan Inspection and Test Plan QCP ITP.docx
Tender for fire protection system installation/maintenance for diesel generators at Matimba Power Station Units 2-6, issued by ESKOM in Limpopo. The document is a Quality Control Plan (QCP) template outlining inspection and testing protocols.
Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf
This is a technical evaluation strategy document for the Matimba Power Station Diesel Generator Fire Protection tender. It outlines how ESKOM will technically evaluate bids for designing, installing, and commissioning an automatic fixed fire detection and protection system for diesel generators (Units 2-6) at Matimba Power Station in Limpopo. The document defines mandatory and qualitative scoring criteria, the evaluation team, and the process.
Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf
Eskom seeks a contractor to design, supply, install, and commission an automatic fixed fire detection and protection system for five diesel generators (Units 2-6) and their associated day tanks at Matimba Power Station in Limpopo. The scope includes full system integration, civil works, compliance with strict standards, and comprehensive documentation and training.
This is an environmental evaluation document for a low-risk fire protection project at Matimba Power Station. The tender requires contractors to demonstrate environmental compliance through a scored assessment with a minimum threshold of 90%. The evaluation focuses on three key documents: an Environmental Policy, an Aspects and Impacts Register, and a Method Statement.
240-109253698 Template for a Typical Contract Quality Plan.docx
This is a tender document template for the Matimba Power Station Diesel Generator Fire Protection project, issued by ESKOM. It outlines the required structure and content for a Contract Quality Plan (CQP) that suppliers must submit. The document serves as a guideline for suppliers to demonstrate their quality management approach, covering planning, execution, monitoring, and documentation for the scope of work.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx
Eskom tender for fire protection system installation/upgrade for diesel generators at Matimba Power Station Units 2-6. The evaluation heavily emphasizes quality management systems, requiring documented ISO 9001 compliance, operational QMS evidence, and detailed project-specific quality plans.
NEC ECC3 Unit 2-6 Diesel Generator Fire Protection Project.docx
ESKOM seeks a contractor to design, supply, install, test, and commission automatic fixed fire protection and detection systems for diesel generators (Units 2-6) at Matimba Power Station, Limpopo. The contract uses the NEC3 Engineering & Construction Contract (Option A: Priced contract with activity schedule) with a 6-month completion timeframe and a closing date of August 17, 2026.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf
Eskom tender for fire protection system installation/upgrade for diesel generators at Matimba Power Station Units 2-6 in Limpopo. 6-month project with strong emphasis on B-BBEE compliance, local content, and supplier development obligations.
Eskom invites tenders for the fire protection system for diesel generators at Units 2-6 of Matimba Power Station in Limpopo. The tender involves design, installation, and commissioning, with strict technical, safety, and local content requirements. Submission is electronic via Eskom's e-tendering portal.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf
Project: Automatic fixed fire protection and detection system for diesel generators Units 2-6 at Matimba Power Station.
Background: Diesel generators provide backup power; 7 units on site located outside the turbine hall.
Purpose: Define scope for a fully functional automatic fixed fire protection and detection system.
Scope summary: Design review, supply, installation, procurement, delivery, storage, installation to NFPA/SANS/Eskom standards, all associated works, painting, bunding, fire barrier, integration, scaffolding, alarm connections, KKS labelling, commissioning.
Evaluation Criteria
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf (unknown)
While explicit pre-qualification criteria are not listed, the contractor must demonstrate the capability to: Comply with all referenced normative standards (Eskom, NFPA, SANS, ASME). Execute multi-disciplinary works (mechanical, civil, C&I). Manage a project adhering to ISO 9001, ISO 14001, and the Occupational Health and Safety Act. Provide Factory Mutual (FM) approved valves and components. Deliver a system with a 35-year design life and 100% reliability. Fulfill all training and documentation deliverables.
Technical Specifications
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf (unknown)
Project: Design, supply, and installation of automatic fixed fire protection and detection for Unit 2-6 diesel generators and associated day tanks at Matimba Power Station.
Location: Diesel generators are on the 0m level outside the Southern side of the turbine building.
Scope includes:
Design review, procurement, supply, fabrication, delivery, and on-site storage of materials.
Installation compliant with NFPA 850, 13, 15 and SANS 10287, 1128-2, and Eskom standards 240-54937450, 240-54937448, 240-54937439.
All structural, civil, builders work, plumbing, drainage, mechanical, electrical, control, and instrumentation works.
Painting of all plant and material in red.
Building brick bunds and drainage to NFPA/SANS standards.
Constructing a fire barrier between units 2 and 3 diesel generators.
Integrating new systems with existing fire protection.
Supply, erection, and dismantling of scaffolding.
Connecting pressure/flow switches to existing fire detection for alarms in control rooms and EOD.
Manufacturing and installing KKS numbers on standard components.
Commissioning and testing of the installed system.
Mechanical design: Deluge system with medium velocity sprayers, 68°C conventional sprinklers, design density 10.2 l/min/m², minimum flow 59.16 L/min, minimum nozzle pressure 140kPa.
System must be 100% available, reliable, and have a 35-year lifespan.
Civil works: Foundation slabs of 25MPa concrete designed to SANS 1200G.
C&I works: Cables rated 2-hour fire resistant (PH120).
Testing and commissioning: Full functional testing, system integrity, pressure, and continuity tests per Eskom and SANS/NFPA standards.
Deliverables: As-built drawings, operating manuals, maintenance documentation, piping and instrumentation diagrams, general arrangement drawings, detail drawings, system description, control philosophy, technical specifications, design calculations, equipment lists, bill of materials.
Training: Provide training for 4 operators, 4 maintenance personnel, and 1 engineering staff on supplied equipment.
Methodology
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf (unknown)
Contractor reviews design and installs automatic fixed fire protection system referencing SANS standards, NFPA 850, 13, 15, ASIB Rules, ASME B31.1, and Eskom manual N.PMZ 45-392.
Specific design: Deluge system, medium velocity sprayers, 68°C sprinklers, purpose-designed spacing, connected to existing fire ring main.
System must be linked to existing fire detection via pressure/flow switch, be 100% available, reliable, with a 35-year lifespan.
Install as separate system with valve station (isolation valve, Deluge valve, pressure gauges, switches, alarm gong).
Sprinkler design: Minimum density 10.2 mm/min over 186m², confirm temperature rating via ambient measurement.
Pipework: Withstand 1200kPa, support intervals ≤2.5m for ≤50mm NB, ≤4.5m for larger, per SANS 10287.
Valves: FM approved, isolation valves with rising spindles, water from new 80mm deluge control valves.
Civil works: Foundation slabs 25MPa concrete per SANS 1200G, bunding, drainage.
C&I works: Install 2-hour fire resistant (PH120) cables from pressure switch to nearest fire detection panel, relay alarms to EOD.
Testing and commissioning: Verify installation, functional test all devices, conduct integrity/pressure/continuity tests per Eskom/SANS/NFPA.
Deliverables: As-built drawings, operating manuals, P&IDs, arrangement drawings, detail drawings, system description, control philosophy, specs, calculations, equipment lists, bill of materials.
Training: Provide specific training for 4 operators, 4 maintenance staff, 1 engineer on actual supplied equipment.
Quality Management
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf
Contractor must submit all Quality Control Plans (QCPs) for employer review and approval before work starts.
Must provide welding procedures, welder qualifications, non-destructive testing reports, coating inspection reports, material certificates, and hydrostatic test certificates.
Must submit updated as-built drawings in hard copy and electronic format.
References ISO 9001 as an informative standard.
Pricing Schedule
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf
Contractor must provide a complete bill of materials as part of the as-built documentation.
No detailed pricing schedule, rates, or payment schedules are specified.
Financial Requirements
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf (unknown)
The contractor must provide a complete bill of materials as part of the as-built documentation.
No pricing format, bonds, guarantees, or payment terms are specified in the provided text.
Compliance Requirements
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf (unknown)
The fire protection system must comply with National Fire Protection Association (NFPA) standards 850, 13, 15.
Must comply with South African National Standards (SANS) 10287, 1128-2.
Must comply with Eskom standards: 240-54937450 (fire protection and life safety design), 240-54937448 (fire detection and life safety design), 240-54937439 (fire protection/detection assessment).
References ISO 9001 (Quality Management Systems) and ISO 14001 (Environmental Management Systems) as informative.
References the Occupational Health and Safety Act, 1993.
No specific B-BBEE, CIDB, CIPC, tax, or CSD requirements are mentioned.
Health & Safety
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf
References the Occupational Health and Safety Act, 1993 as an informative standard.
The scope includes safety-related works like building bunds, fire barriers, and compliant fire protection systems.
Environmental
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf (unknown)
References ISO 14001 (Environmental Management Systems) as an informative standard.
Section
Source: Matimba Power Station - Unit 2-6 Diesel Generator Fixed Fire Protection Technical Specification (003).pdf
Only quality requirements are referenced; no detailed evaluation criteria, scoring, or stages are provided.
DocumentNEC ECC3 Unit 2-6 Diesel Generator Fire Protection Project.docxReview complete
Description
Source: NEC ECC3 Unit 2-6 Diesel Generator Fire Protection Project.docx
The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Evaluation Criteria
Source: NEC ECC3 Unit 2-6 Diesel Generator Fire Protection Project.docx (unknown)
Contractor must have relevant experience in C&I systems and fire protection installations. Key personnel must be qualified; designs must be signed off by an ECSA-registered Professional Engineer. Must provide proof of ISO 9001:2015 registration. Must comply with Broad-Based Black Economic Empowerment (B-BBEE) requirements. Must have a valid CIDB registration (if applicable). All site personnel must have South African citizenship or valid work permits.
Technical Specifications
Source: NEC ECC3 Unit 2-6 Diesel Generator Fire Protection Project.docx (unknown)
The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Compliance Requirements
Source: NEC ECC3 Unit 2-6 Diesel Generator Fire Protection Project.docx (unknown)
No specific requirements found
Document240-109253302 Quality Control Plan Inspection and Test Plan QCP ITP.docxReview complete
Submission Guidelines
Source: 240-109253302 Quality Control Plan Inspection and Test Plan QCP ITP.docx (unknown)
Returnable Documents: The document does not specify submission details, but a Quality Control Plan (QCP) and Inspection and Test Plan (ITP) are implied as required deliverables. Prepare a detailed QCP/ITP as per the template structure.
Evaluation Criteria
Source: 240-109253302 Quality Control Plan Inspection and Test Plan QCP ITP.docx (unknown)
Likely requires proven experience in fire protection systems, preferably in power stations or heavy industry. Must demonstrate capability to implement rigorous quality control, including working with Approved Inspection Authorities (AIA) or Third-Party Inspectors (TPI). Financial and technical capability to meet ESKOM's standards is implied.
Technical Specifications
Source: 240-109253302 Quality Control Plan Inspection and Test Plan QCP ITP.docx (unknown)
Scope: Fire protection for Diesel Generators at Matimba Power Station Units 2-6.
Quality Control Plan (QCP) and Inspection and Test Plan (ITP) required.
Key elements:
Intervention points: Hold Points, Witness Points, Document Review, Surveillance, Verification.
Inspection and test methods include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, EDDY.
Acceptance criteria cover functionality, performance, regulatory compliance, chemical tests.
Roles: Contractor/Supplier, Subcontractor, Eskom, Approved Inspection Authority (AIA), Notification Body (NOBO), Third Party Inspection (TPI).
Categories: Statutory (S) and Non-statutory (N) inspections.
Records must be maintained for all activities.
DocumentTender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdfReview complete
Description
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf
Project Description:
Diesel generators at Matimba Power Station provide backup power during blackouts and are on standby 24/7.
There are 7 diesel generators on site (one per unit plus one for the station).
Generators also power station and unit auxiliaries during black start operations.
Project Scope:
Review approved design, install, produce as-built drawings, and commission automatic fixed fire detection and protection system for Units 2-6 diesel generators.
New system will integrate with existing station fire system supplied by water from fire pumps.
Contact Information
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf (unknown)
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf (unknown)
Mandatory: 1) Registered with CIDB as level 4SF or above. 2) All Mechanical, Civil, and C&I engineers must be professionally registered with ECSA. Failure to meet these results in immediate disqualification.
Technical Specifications
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf (unknown)
Project Scope:
Review approved design, install, produce as-built drawings, and commission automatic fixed fire detection and protection system for Units 2-6 diesel generators at Matimba Power Station.
New fire system will tie into existing station fire system, which is supplied with water from fire pumps in the Outside Plant Services building.
Background:
Diesel generators provide backup power during blackouts and support black start operations for station and unit auxiliaries.
Matimba Power Station has 7 diesel generators (one per unit plus one for the station).
Referenced Documents:
Normative: Eskom procurement and supply chain management (32-1034), Tender Technical Evaluation Procedure (240-48929482), Tender Technical Evaluation Results Form Template (240-53716712), Tender Technical Evaluation Scoring Form Template (240-53716726).
Informative: Technical Specification for the Matimba Power Station Unit 2-6 Diesel Generator Fixed Fire Protection Project.
Methodology
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf
Method Statement Requirements:
Mechanical: Contractor must submit a method statement detailing execution of works.
Control and Instrumentation: Method statement must detail execution of FDS scope, including instrument selection, loop cable selection, cable routing, interface points to FDS, and HMI modification for new fire detection elements.
Experience & Qualifications
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf
Experience and Qualification Requirements:
Contractor Experience in Fire Protection: Provide summary of similar projects including title, scope, dates, signed completion certificates, and client contacts.
Personnel: Submit CV of Professional Registered Mechanical Technologist/Engineer with track record in fire protection projects.
Key Resource: Submit CV of Professionally Registered Electronics/Electrical Engineer/Technologist/Technician with experience on similar projects.
Civil Contractor Experience: Provide testimonial/completion certificates for at least 3 relevant concrete and masonry construction projects.
Civil Engineer/Technologist: Submit CV of ECSA-registered professional with minimum 5 years relevant experience in design and construction supervision.
Compliance Requirements
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf (unknown)
Mandatory Compliance:
Contractor must be registered with the Construction Industry Development Board (CIDB) as level 4SF or above.
All Mechanical, Civil, and Control & Instrumentation engineers/technologists must be professionally registered with ECSA.
Referenced Standards:
Eskom procurement and supply chain management (32-1034).
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf (unknown)
General Requirements:
Apply most recent editions of referenced Eskom documents.
Definitions and abbreviations as per document.
Roles and responsibilities as per Tender Technical Evaluation Procedure (240-48929482).
Section
Source: Tender Technical Evaluation Strategy - Unit 2 - 6 Diesel Generator Fire Protection System 20260622.pdf
This document defines the Mandatory Evaluation Criteria, Qualitative Evaluation Criteria, and Technical Evaluation Team (TET) responsibilities for tender technical evaluation.
Primary eligibility is contingent on achieving a minimum score of 90% on the environmental evaluation. Submissions missing any of the three required documents, or documents not fully aligned with the specific scope of work, will likely result in a score below the threshold and disqualification.
The tender involves an environmental evaluation for a low-risk activity.
The scope requires the submission of:
A signed environmental policy statement committing to environmental compliance and duty of care.
An Aspects and Impacts Register related to the scope of work.
A Method Statement demonstrating an adequate understanding of the project and how the scope will be executed.
Document240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docxReview complete
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)
Returnable Documents: The tender requires submission of specific quality deliverables for evaluation. Prepare and include the following as part of your submission:
Quality Management System documentation compliant with ISO 9001 (Sections A and B).
A draft Contract Quality Plan specific to the scope.
A provisional Quality Control Plan or Inspection and Test Plan.
Completed and signed Form A.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)
Primary eligibility is determined by the ability to meet the scored quality requirements in Sections A-E. Key criteria include: possession of a documented QMS aligned with ISO 9001:2015 clauses (7.5, 8.7, 10.2, etc.), demonstrated operational QMS with defined roles and supplier management, and capability to produce project-specific quality plans (CQP & QCP) as per ISO 10005. Formal ISO 9001 certification is not explicitly required, but full compliance with its standards is mandatory for evaluation.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)
The scope involves the Diesel Generator Fire Protection system for Units 2-6 at Matimba Power Station. The tender focuses heavily on quality management and control deliverables:
You must provide objective evidence of a Quality Management System compliant with ISO 9001:2015, even if not certified.
You must submit a draft Contract Quality Plan (CQP) that ensures design consistency and proper resource allocation across the project.
You must submit a provisional Quality Control Plan (QCP) or Inspection and Test Plan (ITP) demonstrating how installation practices will be managed to meet design and employer requirements.
The work involves overseeing subcontractors and ensuring world-class engineering practices.
Document240-109253698 Template for a Typical Contract Quality Plan.docxReview complete
Description
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx
This is a template for a Contract Quality Plan. Its purpose is to assist the supplier in identifying and planning how to meet the client's (Eskom's) quality management expectations and requirements for the contract.
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)
While explicit eligibility criteria (e.g., turnover, experience) are not stated in this template document, suppliers must demonstrate a robust Quality Management System compliant with ISO 10005 principles. They must show capability to manage sub-suppliers, adhere to relevant standards (SANS, ISO), and provide all required documentation. Eligibility will likely depend on the completeness and adequacy of the submitted CQP, as well as meeting ESKOM's general procurement requirements.
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)
The tender requires a Contract Quality Plan. The plan must: - Assist the supplier in identifying and planning to meet Eskom's quality expectations. - Reference guidelines such as SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2. - Include detailed sections covering definitions, scope of work, communication channels, organizational structure, interfacing documents, lists of suppliers and sub-suppliers, monitoring procedures, and control of records. - Specify documented information to be submitted to Eskom, including technical records, inspection reports, and certificates. - Outline processes for concession and non-conformance management, data book management, and post-delivery activities.
Compliance Requirements
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)
No specific compliance requirements (e.g., CSD, tax, B-BBEE) are stated in the document.
Deadline: 17 August 2026 at 10h00. Late submissions will not be accepted.
Upload documents in PDF format (max 500 MB per document, total submission restricted to 4 GB).
Price list must be submitted in both PDF and Excel format.
Do not upload zip/compressed files.
Ensure submission status is indicated as complete.
Mandatory returnables (disqualifiable if missing at closing):
Annexure A: Authorization Form
Annexure B: Acknowledgement Form
Annexure C: Tenderer’s Particulars
Annexure D: Integrity Declaration Form
Annexure H: SBD 1 Invitation to Bid
Annexure J: SBD 4 – Bidders Disclosure
E-tendering Help Manual acknowledgement form (if applicable)
Non-disqualifiable returnables: if incomplete, you will have 5 working days to rectify after a request.
Failure to upload required documents will render the tender non-responsive.
Evaluation Criteria
Source: ITT U2-6 Diesel Generator.pdf (RFP)
Tenderer (or JV partners) must be registered with CIDB as 4SF or higher. Tenderer or principals must not be restricted from doing business with Eskom or the state. Tenderer must not be from a sanctioned country, have a conflict of interest, be on tender defaulter lists, or subcontract 100% of the work. Tenderer must submit a single tender and JV/consortium agreements must state joint and several liability.
Technical Specifications
Source: ITT U2-6 Diesel Generator.pdf (RFP)
Scope: Matimba Power Station - Unit 2-6 Diesel Generator Fire Protection.
Mandatory technical criteria:
Contractor must be registered with CIDB as level 4SF or above (provide proof).
All discipline engineers (Mechanical, Civil, C&I) must be professionally registered with ECSA (provide valid certification).
Draft Contract Quality Plan and Quality Control Plan required.
Environmental requirements:
Environmental policy committing to compliance.
Aspects and Impacts register for scope of work.
Method statement demonstrating execution of scope.
Minimum weighted final score threshold of 90%.
Methodology
Source: ITT U2-6 Diesel Generator.pdf
Method statement required detailing how works will be executed.
For Control and Instrumentation: Method statement should include instrument selection, loop cable selection, cable routing, interface points to FDS, HMI modification for new fire detection final elements.
Experience & Qualifications
Source: ITT U2-6 Diesel Generator.pdf
Mandatory technical criteria:
CIDB registration level 4SF or above.
Professional ECSA registration for all discipline engineers.
Qualitative evaluation:
Contractor experience in fire protection projects (replacement/design/installation/commissioning). Provide project titles, dates, completion certificates, client contacts.
Key Mechanical Technologist/Engineer with fire protection track record (CV with qualifications and experience).
Key Electronics/Electrical Engineer/Technologist/Technician with SAQCC Designer experience (CV with qualifications and experience).
Civil construction experience in reinforced concrete and masonry works (testimonial/completion certificates for at least 3 projects with company name, description, verifiable reference).
CV of ECSA-registered Engineer/Technologist certifying civil/structural works (including certified experience, education, design/construction supervision experience, references).
Quality Management
Source: ITT U2-6 Diesel Generator.pdf
Quality Management System requirements (ISO 9001):
QMS manual or document defining QMS scope.
Quality policy approved by top management.
Quality objectives approved by top management.
Documented information for document/record control (Clause 7.5).
Control of nonconforming outputs (Clause 8.7).
Nonconformity and corrective action (Clause 10.2).
Evidence of QMS operation:
Organization chart and responsibility matrix including quality management role (Clause 5.3).
Control of externally provided processes, products, services with evaluation, selection, monitoring, re-evaluation criteria (Clause 8.4).
Draft Contract Quality Plan (CQP) required: comprehensive strategy for design consistency across units.
Draft Quality Control Plan (QCP) or Inspection and Test Plan (ITP) required: ensures world-class engineering practice and compliance with designs.
Pricing Schedule
Source: ITT U2-6 Diesel Generator.pdf
Pricing Schedule/BOQ: Submit as attached PDF and Excel copy.
Upload size per document: 500 MB, total submission restricted to 4 GB.
Cataloguing may be required post-award; include line item in Pricing Schedule if applicable.
Financial Requirements
Source: ITT U2-6 Diesel Generator.pdf (RFP)
Payment terms:
For contracts below R50 million (including VAT): payment within 30 days of undisputed invoice receipt.
For contracts above R50 million (including VAT): payment within 60 days of undisputed invoice receipt.
Pricing Schedule/BOQ: Submit as attached PDF and Excel copy.
Cataloguing may be required post-award; include line item in Pricing Schedule if applicable.
Alternative tenders are not allowed.
Compliance Requirements
Source: ITT U2-6 Diesel Generator.pdf (RFP)
Mandatory contractual requirements:
CSD registration.
Additional requirements may include SHEQ, financial viability (financial statements/analysis compulsory for CIDB-related transactions from R30,000 excluding VAT).
Eligibility criteria:
Tenderer must not be restricted from doing business with Eskom or State-Owned Companies.
Ineligibility includes: nationality on international sanctions list; submitting more than one tender (except on E-Tendering with size limits); JV/consortium without joint and several liability; conflict of interest; non-authorized signatures; restrictions by National Treasury, Tender Defaulters list, or Eskom; subcontracting 100% of scope.
B-BBEE: Proof of B-BBEE status level required (certificate, sworn affidavit, or other prescribed proof).
Local content: Designated materials have minimum thresholds (Pipes 100%, Valves 70%, Cables 90%). SBD 6.2 and supporting annexures are mandatory returnables.
CIDB requirements applicable:
Estimated requirement: CIDB contractor grading of 4SF or higher.
Joint ventures eligible if all members registered, lead partner meets grading, and combined grading meets requirement.
Contract Skills Development Goals (CSDG) applicable for Engineering and Construction Works contracts.
Tax compliance: Tax clearance certificate required for foreign tenderers with South African footprint and local tenderers without CSD/SARS PIN verification. Foreign suppliers with no footprint complete SBD1 only.
B-BBEE Requirements
Source: ITT U2-6 Diesel Generator.pdf (RFP)
Local production and content thresholds apply for designated materials: Pipes 100%, Valves 70%, Cables 90%.
SBD 6.2 and supporting annexures are mandatory returnables.
Health & Safety
Source: ITT U2-6 Diesel Generator.pdf
SHEQ requirements:
Signed acknowledgement of Eskom's OHS legal requirements form.
Health and Safety Plan addressing project OHS risks aligned with specifications.
Detailed costing for OHS (broken down, not lump sum) based on scope and risk assessment.
Baseline OHS Risk Assessment (BRA) with methodology provided.
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by CEO complying with OHS Act Section 7.
OHS competency CVs and qualifications/certificates as required by scope.
Environmental
Source: ITT U2-6 Diesel Generator.pdf
Environmental requirements:
Environmental policy signed committing to compliance and duty of care (weight 10).
Aspects and Impacts register identifying, assessing, and controlling impacts per scope (weight 70).
Method statement demonstrating execution of scope (weight 20).
Additional requirements may include SHEQ and financial viability (financial statements/analysis compulsory for CIDB-related transactions from R30,000 excluding VAT).
Contractual requirements are assessed after evaluation and ranking; proof must be submitted prior to contract award.
Failure to meet requirements by deadlines may result in being deemed non-responsive and ineligible for award.
Payment terms: 30 days for contracts below R50 million (including VAT); 60 days for contracts above R50 million (including VAT).
DocumentSupplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdfReview complete
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
Closing date: 01 April 2023.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
Sworn affidavits for B-BBEE must meet validity requirements regarding deponent, enterprise, ownership, revenue, status, and commissioner of oath.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
All tenderers eligible but B-BBEE status determines preference points. Non-compliant B-BBEE contributors score zero on specific goals. Must provide required B-BBEE documentation. Failure to meet designated sector local content thresholds may lead to next tenderer being awarded. CIDB skills development not applicable for this tender.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
Scope: Unit 2-6 Diesel Generator Fire Protection.
Project duration: 06 Months.
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf
Skills development may involve SETA-accredited training providers.
Tenderers bear full cost for developing skills; Eskom provides no financial contribution.
Tenderers can approach SETAs for grants, subsidies, incentives, and SARS for tax rebates.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
Pricing must separate local and imported components as per the Price Schedule.
Local procurement content is total spending minus imported component.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Diesel Generator Fire Protection 1.pdf (unknown)
B-BBEE documentation required: valid certificate from SANAS accredited agency, sworn affidavit, or CIPS affidavit.
Additional documents: proof of ownership/shareholding (CIPC preferred), certified ID copies of shareholders, proof of disability if applicable, consolidated B-BBEE certificate for trusts/consortia/JVs.
Electrical signatures not accepted.
Designated sectors with local content thresholds:
Steel Products (Pipes): 100%
Valve Products and Actuators (Valves): 70%
Electrical and Telecom Cables (Cables): 90%.
Submit SBD 6.2 Declaration Form and Annex C if applicable.
CIDB compulsory training: not applicable.
Failure to meet CIDB CSDG mandatory percentage renders tender non-responsive.
B-BBEE improvement/retention plan required within 30 days of contract signing.
B-BBEE migration requirements:
Level 4 at award: achieve Level 3 by end of first year, then improve yearly.
Levels 5-8 or non-compliant at award: achieve Level 4 by end of first year, then improve at least one level yearly from second year.
B-BBEE certificate/sworn affidavit is a condition for award:
Nelson Mandela Drive - Lephalale - Lephalale - 0557
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
9
Last checked
22 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.