Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Limpopo
Closing Date
16 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
NTCSA-Northern Grid - Limpopo & Northwest - Limpopo & Northwest -
Organization Type
GOVERNMENT
Published
24 Aug 2026
OCDS Reference
ocds-9t57fa-166701
The tender is for the provision of hazardous assessments, inspections and testing contract for ntcsa northern grid for a period of 36 months on an as and when required basis
Bidders must have the necessary expertise and experience in hazardous assessments, inspections and testing.
Bidders must comply with all relevant laws and regulations.
Bidders must have the necessary equipment and resources to perform the services.
Bidders must have a good track record of delivering similar services.
Bidders must be able to provide references from previous clients.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
https://teams.microsoft.com/meet/396007876975288?p=PVHpcbOiMFYT8CNyCd
Categories
Request for Bid(Open-Tender)
NTCSA-Northern Grid - Limpopo & Northwest - Limpopo & Northwest -
AI Document Analysis Stages
Evaluation Criteria
Source: Annexure K_PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)24 Aug
2026
Tender Published
Tender was published
16 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure K_PAYE Questionnaire for Service Contracts 2026_2027.doc
This document is the PAYE (Pay-As-You-Earn) Questionnaire from Eskom for the period 1 March 2026 to 28 February 2027. It is a due diligence compliance form used to classify contractors for tax purposes. It contains a series of 'tests' (e.g., Income Test, Place of Business Test, Dominant Impression Test) and declarations designed to determine whether the contractor is an independent supplier or an employee/independent contractor whose services are subject to PAYE withholding.
Annexure S _SDL&I undertaking.pdf
Eskom National Transmission Company of South Africa (NTCSA) is procuring hazardous assessments, inspections and testing services for substation battery rooms in the Northern Grid (Limpopo province) on an as-and-when required basis for a period of 36 months.
Annexure K_PAYE Questionnaire for Service Contracts -Excel 2026_2027.xls
No summary available
Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom National Transmission Company of South Africa is procuring hazardous assessments, inspections, and testing services for the Northern Grid for a period of 36 months on an as-and-when-required basis.
NTCSA Supplier Declaration of Interest.docx
Provision of hazardous assessments, inspections and testing services for the NTCSA Northern Grid on an as-and-when-required basis over a 36-month period, issued by Eskom National Transmission Company of South Africa.
Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf
A 36-month, as-and-when-required contract for hazardous assessments, inspections and testing across NTCSA's Northern Grid, issued by Eskom's National Transmission Company of South Africa (NTCSA SOC Ltd). The contract is based on the NEC3 Term Service Contract (TSC3) with a priced price list (Option A), and includes provisions for task orders, low service damages, and extensive Z-clauses covering ethics, insurance, asbestos, and nuclear liability.
Annexure L_E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Provision of hazardous assessments, inspections, and testing services for the NTCSA Northern Grid on an as-and-when-required basis for 36 months. Issued by Eskom National Transmission Company of South Africa, covering the Limpopo province.
Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf
The provision of hazardous assessments, inspections and testing services for battery rooms at 27 substations of the NTCSA Northern Grid, on an as-and-when required basis for 36 months. The contract requires a Master Installation Electrician (MIE) to assess, inspect, test, and issue Certificates of Compliance (CoCs) and hazardous location classification reports for substation battery rooms in accordance with the OHS Act and SANS standards.
Annexure M_E-tendering Help Manual for supplier - 27 January 2025.docx
Eskom National Transmission Company of South Africa seeks a contractor for hazardous assessments, inspections and testing services for the NTCSA Northern Grid on an as-and-when required basis for a period of 36 months.
Annexure P_BOQ for HAZARDOUS ASSESSMENTS, INSPECTIONS AND TESTING CONTRACT FOR NTCSA NORTHERN GRID FOR A PERIOD OF 36 MONTHS ON AN AS AND WHEN REQUIRED BASIS.xlsx
A 36-month, as-and-when required contract for hazardous assessments, inspections, and testing of substation battery rooms (hazardous locations) across four areas of the Northern Grid: Polokwane & Phalaborwa, Lephalale, Rustenburg, and Carletonville. The contractor will compile compliance reports and issue Certificates of Compliance for a total of up to 28 substations (10 + 6 + 6 + 6).
Annexure V_Environmental Managemement Tender Returnable Doc.pdf
A 36-month, as-and-when-required contract for hazardous assessments, inspections, and testing of substation battery rooms and other hazardous locations within the NTCSA Northern Grid (Limpopo). The procuring entity is Eskom National Transmission Company of South Africa.
Annexure R_Non-Disclosure Agreement for Suppliers.docx
The National Transmission Company South Africa (NTCSA) is procuring a contract for hazardous assessments, inspections, and testing services for its Northern Grid, on an as-and-when-required basis for a period of 36 months. The document provided is a non-disclosure agreement (NDA) that bidders must sign before receiving confidential information related to the tender.
Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf
NTCSA (Eskom National Transmission Company) seeks a contractor for hazardous area assessments, inspections, and testing on an as-and-when-required basis at its Northern Grid in Limpopo province. The contract runs for 36 months and covers inspections, testing, and certification of hazardous locations in accordance with SANS 10108 and IEC 60079 standards. Bidders must have a Master Installation Electrician (MIE) registered with the Department of Employment and Labour, hold a valid electrical contractor registration, and demonstrate relevant experience.
Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf
Eskom National Transmission Company of South Africa is procuring hazardous assessments, inspections, and testing services for the Northern Grid on an as-and-when-required basis for a period of 36 months. The contract aims to ensure compliance with relevant regulations and standards for hazardous locations, including substation battery rooms.
Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx
A 36-month, as-and-when-required contract for hazardous assessments, inspections and testing services for NTCSA's Northern Grid, issued by Eskom's National Transmission Company of South Africa.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 587 250
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
No eligibility criteria specified
Technical Specifications
Source: Annexure K_PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Compliance Requirements
Source: Annexure K_PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)No specific requirements found
Submission Guidelines
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Returnable documents: the NTCSA Supplier Declaration of Interest (Rev 1) must be completed, signed under oath, and submitted. Any false information may result in action against the supplier or the signatory.
Evaluation Criteria
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Bidders must submit the Supplier Declaration of Interest (Rev 1) as a returnable. The declaration requires disclosure of any conflicts of interest, including employment of any person holding an interest in the supplier by NTCSA, close family or associate relationships with NTCSA employees or directors involved in the procurement, business courtesies given or received in the last 12 months, and other services rendered to NTCSA or related entities (for consultants).
Technical Specifications
Source: NTCSA Supplier Declaration of Interest.docx (unknown)I, the undersigned [insert full name of signatory]…………………………………………, in my capacity as [insert capacity, i.e., member, director, partner, etc.] …………………………………………... of the supplier [insert registered full legal name of the supplying entity AND their company registration number] ………………....................................................., certify under oath that, to the best of my knowledge, the information furnished herein is true and correct. I accept that NTCSA reserves its right to act against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Compliance Requirements
Source: NTCSA Supplier Declaration of Interest.docx (unknown)No specific compliance requirements beyond the declaration.
Submission Guidelines
Source: Annexure L_E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID 240-9722574 Rev 1), confirming self-training on the e-Tendering system. Must be fully completed, signed, and submitted before the closing time. Failure to submit will disqualify the bidder.
Evaluation Criteria
Source: Annexure L_E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)One mandatory returnable identified: Acknowledgment Form – e-Tendering Training (Template ID: 240-9722574 (Rev 1)), confirming self-training on the e-Tendering system. Must be fully completed, signed, and submitted before the closing time. Failure to submit will disqualify the bidder.
Technical Specifications
Source: Annexure L_E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Business name/JV: _______________________________________________________
Description
Source: Annexure R_Non-Disclosure Agreement for Suppliers.docx (unknown)This document is Annexure R — a Non-Disclosure Agreement (NDA) template that bidders must sign when receiving confidential information from NTCSA in connection with the provision of hazardous assessments, inspections and testing services for the NTCSA Northern Grid. It is an attachment to the tender, not the tender specification itself.
Contact Information
Source: Annexure R_Non-Disclosure Agreement for Suppliers.docx (unknown)NTCSA contact for NDA matters:
Technical Specifications
Source: Annexure R_Non-Disclosure Agreement for Suppliers.docx (unknown)I. National Transmission company south africa SOC LTD a company incorporated under the laws of the Republic of South Africa, having its registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa, with registration number 2021/539129/30 [hereinafter referred to as “the Disclosing Party”.
Description
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Provision of hazardous assessments,
Inspections and testing contract for
Ntcsa northern grid for a period of 3
Years on an as and when required basis.
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work
Important Dates
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Closing date: 2026-09-16 at 10:00 (extracted from tender record).
No briefing, site visit, or clarification deadline is stated in the document.
Base date for price adjustment indices: one month prior to tender closing date.
Compensation event notification limit: 8 weeks from becoming aware of the event.
Contract period: 36 months (service period).
Contact Information
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Employer: NTCSA SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199.
Service Manager: TBA (details to be provided at a later stage).
For NEC3 TSC3 guidance notes: Engineering Contract Strategies, Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za (this is not the tender enquiry contact).
No SCM or technical enquiry contacts were provided in the document.
Submission Guidelines
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Returnable forms required with the bid:
All forms must be completed in full and signed where indicated. The offer is valid until the period stated in the Tender Data.
Disqualification risks:
Evaluation Criteria
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)No evaluation scoring split or preference points system is stated in the document.
The tender form requires the bidder to enter their CIDB registration number, indicating CIDB registration is mandatory.
B-BBEE status will be considered as part of the contract conditions (change in status may lead to termination).
No functionality or minimum qualifying scores were identified.
Technical Specifications
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Service: Hazardous assessments, inspections, and testing for the NTCSA Northern Grid on an as and when required basis for 36 months.
Location: 27 substations (including two new ones) across five Customer Load Networks: Carletonville, Rustenburg, Lephalale, Polokwane, and Phalaborwa.
Scope deliverables:
CoCs and test reports are required to comply with the Electrical Installations Regulations of the OHS Act.
The service includes all matters necessary to meet legislative compliance for battery rooms.
Quality Management
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)in the Northern Grid battery rooms. The services will be provided in various Northern Grid substations (27
substations (including two new ones). The service provider shall provide the hazardous location (Haz Loc)
classification report where such report does not exist. Assess battery room electrical installations, test and
issue certificates of compliance (CoC) for specialised (hazardous locations) and normal electrical installations
after reparations, modifications or new installations. Do inspections and issue valid CoC’s as per SANS
requirements. Assess and analyse any other Haz Loc areas and recommend appropriate classifications on
existing, modified and new plant and equipment as and when required for the duration of the contract period.
1.3 Interpretation and terminology
Pricing Schedule
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work [●]
CONTRACT No. [Insert at award stage]
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed
Period of 36 months.
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 02
C2.2 The price list 02
Part c2: pricing data c2 tsc3 cover
Period of 36 months.
C2.1 Pricing assumptions: Option A
Before preparing the price list, both the Employer and tendering contractors should read the TSC3 Guidance
Notes pages 14 and 15. In an Option A contract, either Party may have entered items into the price list
either as a process of offer and acceptance (tendering) or by negotiation depending on the nature of the
service to be provided. Alternatively the Employer, in his Instructions to Tenderers or in a Tender Schedule,
may have listed some items that he requires the Contractor to include in the price list to be prepared and
priced by him.
Part c2: pricing data c2.1 TSC3/A pricing assumptions
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2: pricing data c2.1 TSC3/A pricing assumptions
Financial Requirements
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Pricing format: NEC3 TSC3 Option A (priced contract with price list).
Payment terms:
Price adjustment for inflation (Option X1):
Low service damages: 10% of the total task order issued.
Limitation of liability:
Compliance Requirements
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)CIDB registration: The Form of Offer and Acceptance requires the tenderer's CIDB registration number.
VAT registration: South African VAT number required on invoices (Employer's VAT number: 4710303126).
B-BBEE: The contractor must notify the Employer within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. A decrease in status may lead to contract renegotiation or termination.
Insurance: The contractor must provide insurance as per Insurance Table A (loss/damage to Employer's property, Plant/Materials, Equipment, public liability, employer's liability). The Employer provides insurance per Table B.
Tax invoice: Within one week of receiving a payment certificate, the contractor must provide a tax invoice in accordance with Employer's procedures.
Independent bid determination: The Form of Offer and Acceptance implies standard certification of independent pricing (offer is binding).
No mention of CSD registration, tax clearance certificate, or specific professional registrations beyond the above.
Health & Safety
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. )
for PROVISION OF HAZARDOUS ASSESSMENTS,
signature of
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Period of 36 months.
11.2(2) The Affected Property is Commercial buildings and substations in
various locations within the Northern Grid
11.2(13) The service is Provision of Hazardous Assessments,
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
accepts that the Employer may appoint him as the “Principal Contractor” (as defined and
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
warrants that the total of the Prices as at the Contract Date includes a sufficient amount for
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
undertakes, in and about the execution of the service, to comply with the Construction
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Has taken account of the guidance given in the TSC3 Guidance Notes relevant to Option A;
Understands the function of the Price List and how work is priced and paid for;
Is aware of the need to link operations shown in his plan to items shown in the Price List;
Has listed and priced items in the price list which are inclusive of everything necessary and incidental
to Providing the Service in accordance with the Service Information, as it was at the time of tender,
as well as correct any Defects not caused by an Employer’s risk;
Has priced work he decides not to show as a separate item within the Prices or rates of other listed
items in order to fulfil the obligation to complete the service for the tendered total of the Prices.
Understands there is no adjustment to items priced as lump sums if the amount, or quantity, of work
within that item later turns out to be different to that which the Contractor estimated at time of tender.
The only basis for a change to the (lump sum) Prices is as a result of a compensation event.
4.1. Format of the price list
(From the example given in an Appendix within the TSC3 Guidance Notes)
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering contractor.
1.1 Executive overview
The National Transmission Company South Africa (NTCSA) Northern Grid has five (5) Customer Load
Networks (CLN), namely Carletonville, Rustenburg, Lephalale, Polokwane and Phalaborwa. The Grid has a
total of 27 substations (including two new ones). Substations consist of battery rooms (Haz Loc) that do not
have any valid Certificates of Compliance (CoC) and accompanying test reports as required by the Electrical
Installations Regulations of the Occupational Health and Safety Act, 1993 (Act No. ) (OHS Act).
certificates, maintenance records, etc. were identified as a serious safety risk that may have serious
consequences to the health and safety of persons working or accessing the battery rooms at Northern Grid
substations. Management took a decision to initiate a project to ensure that all battery rooms at Northern Grid
substations be assessed, tested and issued with all required documentation in accordance with the OHS Act
and applicable South African National Standards (SANS). The project will ensure legislative compliance of
OHS Act Occupational Health and Safety Act (Act No.
)
Part c3: scope of work c3.1 Tsc3 employer’s service information
his plan as required by clause 21.2. For example information about the order and timing or method of carrying
out particular items of work.
List technical reporting and scheduling requirements which are to be incorporated into the Contractor’s plan.
2.2 Management meetings
The conditions of contract (e.g. Clause 16.2) and other sections of the Service Information (e.g. safety risk
management) may require that a meeting shall be held. However the intention of all NEC contracts is that the
a weekly risk register meeting (Clause 16.2). This could be used to discuss safety, compensation events,
subcontracting, overall co-ordination and other matters of a general nature. Separate meetings for specialist
activities such as planning and activities of a technical nature may also be warranted.
Environmental
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Period of 36 months.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
Period of 36 months
4.2.3 Limitations on subcontracting ...................................................................................................... 11
4.2.4 Attendance on subcontractors ..................................................................................................... 11
4.3 Plant and Materials ............................................................................................................................ 11
4.3.1 Specifications .............................................................................................................................. 11
4.3.2 Correction of defects ................................................................................................................... 11
4.3.3 Contractor’s procurement of Plant and Materials ............................................................................... 11
4.3.4 Tests and inspections before delivery ......................................................................................... 11
4.3.5 Plant & Materials provided “free issue” by the Employer ............................................................. 11
4.3.6 Cataloguing requirements............................................................................................................ 11
5 Working on the Affected Property ........................................................................................................ 12
5.1 Employer’s site entry and security control, permits, and site regulations .............................................. 12
5.2 People restrictions, hours of work, conduct and records ................................................................... 12
5.3 Health and safety facilities on the Affected Property ......................................................................... 12
5.4 Environmental controls, fauna & flora ............................................................................................... 12
5.5 Cooperating with and obtaining acceptance of Others ...................................................................... 12
5.6 Records of Contractor’s Equipment............................................................................................................ 12
5.7 Equipment provided by the Employer ............................................................................................... 12
5.8 Site services and facilities ................................................................................................................. 13
5.8.1 Provided by the Employer ........................................................................................................... 13
5.8.2 Provided by the Contractor .......................................................................................................... 13
5.9 Control of noise, dust, water and waste ............................................................................................ 13
5.10 Hook ups to existing works ................................................................................................................ 13
5.11 Tests and inspections ........................................................................................................................ 13
5.11.1 Description of tests and inspections ............................................................................................ 13
5.11.2 Materials facilities and samples for tests and inspections ........................................................... 14
6 List of drawings ...................................................................................................................................... 15
6.1 Drawings issued by the Employer ..................................................................................................... 15
Part c3: scope of work c3.1 Tsc3 employer’s service information
Contractual Terms
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Loss of or damage caused by The replacement cost where not covered by the
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to Plant and The replacement cost where not covered by the
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to The replacement cost where not covered by the
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
Service
Liability for death of or bodily The amount required by the applicable law
injury to employees of the
Contractor arising out of and in
the course of their employment
in connection with this contract
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NO.
The provision of hazardous assessments, inspections and testing contract for northern grid, for a
Period of 36 months.
Z 12.2 Replace core clause 86 with the following:
Insurance 86
by the
Employer
86.1 The Employer provides the insurances stated in the Insurance Table B
Insurance table b
Insurance against or name Minimum amount of cover or minimum li
of policy of indemnity
Assets All Risk Per the insurance policy document
Contract Works insurance Per the insurance policy document
Environmental Liability Per the insurance policy document
General and Public Liability Per the insurance policy document
Transportation (Marine) Per the insurance policy document
Motor Fleet and Mobile Plant Per the insurance policy document
Terrorism Per the insurance policy document
Cyber Liability Per the insurance policy document
Nuclear Material Damage and Per the insurance policy document
Business Interruption
Nuclear Material Damage Per the insurance policy document
Terrorism
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear installation,
as designated by the National Nuclear Regulator of the Republic of South Africa, and is the holder
of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Contractor or any other person against
any and all liabilities which the Contractor or any person may incur arising out of or resulting from
nuclear damage, as defined in Act , save to the extent that any liabilities are incurred
due to the unlawful intent of the Contractor or any other person or the presence of the Contractor
or that person or any property of the Contractor or such person at or in the KNPS or on the KNPS
site, without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to the
unlawful intent of the Contractor or any other person, or the presence of the Contractor or that
person or any property of the Contractor or such person at or in the KNPS or on the KNPS site,
without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.4 The Employer does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z13.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NO.
The provision of hazardous assessments, inspections and testing contract for northern grid, for a
Period of 36 months.
Z14 Asbestos
For the purposes of this Z-clause, the following definitions apply:
AAIA means approved asbestos inspection authority.
ACM means asbestos containing materials.
AL means action level, i.e. a level of 50% of the OEL, i.e. 0.1 regulated asbestos fibres
per ml of air measured over a 4 hour period. The value at which proactive actions is
required in order to control asbestos exposure to prevent exceeding the OEL.
Ambient Air means breathable air in area of work with specific reference to breathing zone, which
is defined to be a virtual area within a radius of approximately 30cm from the nose
inlet.
Compliance means compliance sampling used to assess whether or not the personal exposure of
Monitoring workers to regulated asbestos fibres is in compliance with the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
OEL means occupational exposure limit.
Parallel means measurements performed in parallel, yet separately, to existing measurements
Measurements to verify validity of results.
Safe Levels means airborne asbestos exposure levels conforming to the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
Standard means the Employer’s Asbestos Standard 32-303: Requirements for Safe Processing,
Handling, Storing, Disposal and Phase-out of Asbestos and Asbestos Containing
Material, Equipment and Articles.
SANAS means the South African National Accreditation System.
TWA means the average exposure, within a given workplace, to airborne asbestos fibres,
normalised to the baseline of a 4 hour continuous period, also applicable to short term
exposures, i.e. 10-minute TWA.
Z14.1 The Employer ensures that the Ambient Air in the area where the Contractor will Provide the
Services conforms to the acceptable prescribed South African standard for asbestos, as per the
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NO.
The provision of hazardous assessments, inspections and testing contract for northern grid, for a
Period of 36 months.
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
AAIA approved control measure intervention, for example, per the emergency asbestos work plan,
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER
The provision of hazardous assessments, inspections and testing contract for northern grid, for a
Period of 36 months.
C1.2 Contract Data
Part two - Data provided by the Contractor
Notes to a tendering contractor:
Guidance Notes (TSC3-GN)1 in order to understand the implications of this Data which the tenderer
is required to complete.
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Clause Statement Data
10.1 The Contractor is (Name):
Address
Tel No.
Fax No.
11.2(8) The direct fee percentage is %
The subcontracted fee percentage is %
11.2(14) The following matters will be included in
the Risk Register
11.2(15) The Service Information for the
Contractor’s plan is in:
21.1 The plan identified in the Contract Data is
contained in:
24.1 The key people are:
1 Name:
Job:
Responsibilities:
Period of 36 months.
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [●]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer [●]
C1.2b Contract Data provided by the Contractor [●]
[to be inserted from Returnable Documents at award
stage]
C1.3 Proforma Guarantees [●]
CONTRACT - ii - TSC3 COVER PAGES
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation X2
X17: Low service damages
X18: Limitation of Liability
X19: Task Order
Z: Additional conditions of contract
of the NEC3 Term Service Contract April
20131 (tsc3)
10.1 The Employer is (name): NTCSA SOC Ltd (reg no: 2021/539129/30), a
state owned company incorporated in terms of
the company laws of the Republic of South
50.1 The assessment interval is between the 25th day of each successive month.
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is As per Eskom payment terms linked to vendor
registration
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
Period of 36 months.
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
dispute to him. (see www.ice-sa.org.za). If the
elsewhere in this Contract Data.
X17 Low service damages 10% of the total task order issued.
X17.1 The service level table is in Annexure A in the Service Information
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer The sum of the Task Orders issued in terms of
for indirect or consequential loss is limited this contract.
to
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event as per the ACAR document.
damage to the Employer’s property is
limited to
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is
limited to the total of the Prices at the Contract Date
and the amounts excluded and unrecoverable
from the Employer’s insurance (other than the
resulting physical damage to the Employer’s
property which is not excluded) plus the
applicable deductibles
the total of the Prices other than for the
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
Period of 36 months.
X18.4 The Contractor’s total liability to the additional excluded matters.
in connection with this contract, other than The Contractor’s total liability for the additional
the excluded matters, is limited to excluded matters is not limited.
for which the Contractor is liable under this
contract for
18.5 The end of liability date is 06 months after the end of the service period.
X19 Task Order
X19.5 The Contractor submits a Task Order
programme to the Service Manager within Three (03) days of receiving the Task Order
Period of 36 months.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
the event, he is not entitled to a change in the Prices.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19.11 if Option X19 Task Order applies to this contract.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Ethics
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Period of 36 months.
Z12 Insurance
Z 12.1 Replace core clause 83 with the following:
Insurance cover 83
83.1 When requested by a Party, the other Party provides certificates from his insurer
or broker stating that the insurances required by this contract are in force.
83.2 The Contractor provides the insurances stated in the Insurance Table A from the
starting date until the earlier of Completion and the date of the termination
certificate.
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
Period of 36 months.
Z 12.2 Replace core clause 86 with the following:
Insurance 86
by the
86.1 The Employer provides the insurances stated in the Insurance Table B
Transportation (Marine) Per the insurance policy document
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear installation,
as designated by the National Nuclear Regulator of the Republic of South Africa, and is the holder
of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Contractor or any other person against
any and all liabilities which the Contractor or any person may incur arising out of or resulting from
nuclear damage, as defined in Act , save to the extent that any liabilities are incurred
due to the unlawful intent of the Contractor or any other person or the presence of the Contractor
or that person or any property of the Contractor or such person at or in the KNPS or on the KNPS
site, without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to the
unlawful intent of the Contractor or any other person, or the presence of the Contractor or that
person or any property of the Contractor or such person at or in the KNPS or on the KNPS site,
without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.4 The Employer does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z13.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
Part 3: Scope of Work ....................................................................................................................................... 1
C3.1: Employer’s service Information ....................................................................................................................... 2
1 Description of the service ........................................................................................................................ 4
1.1 Executive overview.............................................................................................................................. 4
1.2 Employer’s requirements for the service ............................................................................................. 4
1.3 Interpretation and terminology ............................................................................................................. 4
2 Management strategy and start up ......................................................................................................... 5
2.1 The Contractor’s plan for the service .................................................................................................. 5
2.2 Management meetings ........................................................................................................................ 5
2.3 Contractor’s management, supervision and key people ............................................................................ 6
2.4 Provision of bonds and guarantees ..................................................................................................... 6
2.5 Documentation control ........................................................................................................................ 6
2.6 Invoicing and payment ........................................................................................................................ 6
2.7 Contract change management ............................................................................................................ 7
2.8 Records of Defined Cost to be kept by the Contractor ........................................................................ 7
2.9 Insurance provided by the Employer ................................................................................................... 7
2.10 Training workshops and technology transfer ....................................................................................... 7
2.11 Design and supply of Equipment ......................................................................................................... 8
2.12 Things provided at the end of the service period for the Employer’s use ................................................ 8
2.12.1 Equipment ..................................................................................................................................... 8
2.12.2 Information and other things .......................................................................................................... 8
2.13 Management of work done by Task Order .......................................................................................... 8
3 Health and safety, the environment and quality assurance ................................................................. 9
3.1 Health and safety risk management .................................................................................................... 9
3.2 Environmental constraints and management ...................................................................................... 9
3.3 Quality assurance requirements .......................................................................................................... 9
4 Procurement ........................................................................................................................................... 10
4.1 People ............................................................................................................................................... 10
4.1.1 Minimum requirements of people employed ................................................................................ 10
4.1.2 BBBEE and preferencing scheme ............................................................................................... 10
4.1.3 Accelerated Shared Growth Initiative – South Africa (ASGI-SA) ................................................. 10
4.2 Subcontracting .................................................................................................................................. 10
4.2.1 Preferred subcontractors ............................................................................................................. 10
4.2.2 Subcontract documentation, and assessment of subcontract tenders ........................................ 10
Part c3: scope of work c3.1 Tsc3 employer’s service information
the meeting. Such minutes or register shall not be used for the purpose of confirming actions or instructions
under the contract as these shall be done separately by the person identified in the conditions of contract to
carry out such actions or instructions.
2.3 Contractor’s management, supervision and key people
State any additional constraining requirements on Contractor’s supervision and key people that are not already
stated in other sections such as for Health and Safety. This section could be used to solicit an organogramme
from the Contractor showing his people and their lines of authority / communication. This would be essential
if the Contractor is a Joint Venture.
2.4 Provision of bonds and guarantees
The form in which a bond or guarantee required by the conditions of contract (if any) is to be provided by the
Contractor is given in Part 1 Agreements and Contract Data, document C1.3, Sureties.
does not affect the Employer’s right to termination stated in this contract.
2.5 Documentation control
Inspection Logs: Keep detailed records of all Inspection and assessment activities, including
dates, actions taken.
Reporting: Provide reports to the client on the status of the Hazardous Locations,
and any recommendations for future actions.
Document management control will be handled as per the Employer’s document and records
management procedure 32-1216 which is obtainable from the Employers Representative All
communication will be in writing.
All NEC standard forms shall be used, e.g. Task orders, Early Warnings, Defect certificates and
Period of 36 months
The contract number and title;
Contractor’s VAT registration number;
The Employer’s VAT registration number 4710303126;
Description of service provided for each item invoiced based on the Price List;
Total amount invoiced excluding VAT, the VAT and the invoiced amount including VAT;
(add other as required)
Add procedures for invoice submission and payment (e. g. electronic payment instructions)
2.7 Contract change management
a) The Service Manager issues a Task order to The Contractor to authorise the execution of the work.
b) In the event where it is identified that there is additional work to be done outside the scope of work
on the Task order, the Contractor will give The Service Manager an early warning with a written
quotation.
c) If agreed, the Service Manager issues a revised Task Order or additional Task Order.
d) The Contractor starts the work on the starting date of the Task Order.
2.8 Records of Defined Cost to be kept by the Contractor
If Option C or E applies first read clause 52.2 and then state whether the Contractor is required to keep any
other records. Include any other constraint which may be required in regard to format and filing of the records,
and whether access for the Service Manager shall be provided in hard copy or electronically.
Could delete if Option A applies unless the Employer requires some form of control over the Contractor’s
record keeping for the purpose of compensation event management.
2.9 Insurance provided by the Employer
First read TSC3 Core Clause 86.1 and then add anything necessary for the management of insurance related
issues such as a cross reference to where procedures for making claims can be found. Also provide contact
details for persons capable of being able to answer any insurance related queries the Contractor may have,
as well as to whom the information required by Marine Insurance (if any) may be addressed.
2.10 Training workshops and technology transfer
User Training: Contractor to provide training materials and support to the Employer personnel doing
maintenance and inspections in the Hazardous location.
Technical Support: Contractor shall offer ongoing technical support to address any operational issues or
questions from the Employer.
Part c3: scope of work c3.1 Tsc3 employer’s service information
Requirements
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)Employer’s requirements include compliance with GMR 2.1 General Machinery Regulation 2(1).
Section
Source: Annexure O_ NEC TSC3_The provision of Hazardous Assessment, Inspections and Tesing contract.pdf (unknown)3 Health and safety, the environment and quality assurance ................................................................. 9
3.3 Quality assurance requirements .......................................................................................................... 9
Contact Information
Source: Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"pplicable South African National Standards (SANS). The project will ensure legislative"}
Evaluation Criteria
Source: Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf (unknown)Bidders must be a Master Installation Electrician (MIE) registered with the Department of Employment and Labour (DEL) under the OHS Act.
Technical Specifications
Source: Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf (unknown)Scope: Hazardous location (substation battery room) assessments, inspections, and testing for NTCSA Northern Grid.
Quality Management
Source: Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf (unknown)Work must comply with ISO 45001:2018 (Occupational Health and Safety Management Systems) and ISO 9001:2015 (Quality Management Systems). The MIE must use calibrated test equipment and provide valid calibration certificates. All test results must be recorded, compared with specifications, and non-compliance reported.
Compliance Requirements
Source: Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf (unknown)CSD registration: Not stated.
Tax clearance: Not stated.
B-BBEE: Not stated.
CIDB grading: Not stated.
CIPC registration: Not stated.
Professional registration: Master Installation Electrician (MIE) registered with the Department of Employment and Labour (DEL).
Local content: Not stated.
Health & Safety
Source: Annexure N_ Scope of Work for Inspection Assessment and testing (HAZLOCS).pdf (unknown)Work involves battery rooms where hydrogen gas may create an explosive atmosphere (4% to 74% hydrogen concentration). Bidders must follow procedures to eliminate ignition sources and ensure adequate ventilation. The contractor must comply with the OHS Act, Electrical Machinery Regulations Section 9, and NTCSA's Safety, Health, Environment and Quality Policy (32-727). A contractor Health and Safety plan must be approved before work starts.
Description
Source: Annexure K_PAYE Questionnaire for Service Contracts -Excel 2026_2027.xls (unknown)This will save your file. Please select the correct folderA@
Technical Specifications
Source: Annexure K_PAYE Questionnaire for Service Contracts -Excel 2026_2027.xls (unknown)This will save your file. Please select the correct folderA@
Contact Information
Source: Annexure S _SDL&I undertaking.pdf (TENDER)Buyer: Thandiwe Gxabuza. Business Unit: NTCSA Northern Grid. No email, phone, or submission address provided in this annexure.
Submission Guidelines
Source: Annexure S _SDL&I undertaking.pdf (TENDER)Returnable documents for preference points: Valid B-BBEE certificate or sworn affidavit (depending on revenue). SBD 6.2 and Annex C are mandatory on contract award. No other submission instructions are provided in this annexure.
Evaluation Criteria
Source: Annexure S _SDL&I undertaking.pdf (TENDER)Preference points are allocated based on B-BBEE status. The specific split (80/20 or 90/10) is not stated in this annexure. No CIDB grading or designated sector thresholds apply. SDL&I objectives do not form part of scoring but become contractual obligations.
Technical Specifications
Source: Annexure S _SDL&I undertaking.pdf (TENDER)Scope: Hazardous assessments, inspections, and testing of substation battery rooms within the NTCSA Northern Grid. Contract duration: 36 months, as and when required.
Financial Requirements
Source: Annexure S _SDL&I undertaking.pdf (TENDER)Pricing must separate local and imported components as per the Price Schedule. NTCSA will retain 2.5% of each invoice (excl VAT) as security for SDL&I obligations. A penalty of 2.5% of the invoice amount applies for failure to meet SDL&I obligations.
Compliance Requirements
Source: Annexure S _SDL&I undertaking.pdf (TENDER)B-BBEE: Valid certificate or sworn affidavit required for preference points. Revenue thresholds: EME ≤R10m, QSE ≤R50m, above R50m need certificate. No CIDB grading or designated sector requirements. B-BBEE improvement plan must be submitted within 30 days of contract award. SBD 6.2 and Annex C are mandatory on contract award.
B-BBEE Requirements
Source: Annexure S _SDL&I undertaking.pdf (TENDER)B-BBEE: Valid certificate or sworn affidavit required. B-BBEE improvement plan required within 30 days of contract award. Mandatory improvement milestones: Level 4 at award must reach Level 3 by end of year 1; Level 5-8 must reach Level 4 by end of year 1 and improve one level each subsequent year. Local procurement content target: 100%. Tenderers must propose jobs to be created/retained and skills development (one SHEQ officer per R2m spend).
Special Conditions
Source: Annexure S _SDL&I undertaking.pdf (TENDER)SDL&I penalty: 2.5% of invoice for non-compliance. Retention: 2.5% of each invoice (excl VAT) held as security until SDL&I obligations fulfilled and compliance report approved. Quarterly reporting required. SDL&I Implementation Schedule must be submitted within 28 days of contract award.
Requirements
Source: Annexure S _SDL&I undertaking.pdf (TENDER)No CIDB compulsory training. No mandatory subcontracting. No National Industrial Participation Programme requirements.
Important Dates
Source: Annexure M_E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Closing: 16 September 2026 at 10:00.
Submission Guidelines
Source: Annexure M_E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission is electronic via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must be registered on the system and have a valid Central Supplier Database (CSD) number. Upload tender documents as separate files categorised as Technical, Commercial, Finance, etc. File size limit: 50 MB per file, 900 MB total. After all documents are uploaded, click 'Finalize Submission' to complete the bid before the closing time. No late submissions accepted.
Evaluation Criteria
Source: Annexure M_E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Bidders must be registered on the Eskom eTendering system and have a valid Central Supplier Database (CSD) number. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Annexure M_E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Compliance Requirements
Source: Annexure M_E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Bidders must be registered on the Eskom eTendering system and possess a valid Central Supplier Database (CSD) number to access the submission portal.
Description
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The National Transmission Company South Africa SOC Ltd invites you to submit a tender for the provision of Hazardous Assessments, Inspections and Testing contract for NTCSA Northern Grid for a period of 36 months on an as and when required basis.
Important Dates
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The closing date for tender submission is 16 September 2026, and the closing time is 10h00. A non-compulsory clarification meeting will be held on 07 September 2026, from 10h00 to 12h00, at the Microsoft Teams meeting platform.
Contact Information
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The NTCSA Representative is Thandiwe Gxabuza, and can be contacted at [email protected]. The 1st Escalation is Procurement Manager Vukosi Maluleke, who can be contacted at [email protected]. The 2nd Escalation is Middle Manager Esther Seshabela, who can be contacted at [email protected].
Submission Guidelines
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)Tenders must submit their bids electronically via the Eskom E-tendering site by the stipulated closing date and time. All documents must be submitted in PDF format, with a maximum upload size of 500 megabytes per document and a total submission size restricted to 4 gigabytes. The price list must also be submitted in PDF format. No zip or condensed files can be uploaded, and no hard copies will be accepted.
Returnable Documents
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The documents listed in this paragraph are either attached to this enquiry or should be submitted by the tenderer. The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Evaluation Criteria
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The evaluation criteria include functionality, price, and specific goals. Functionality will be evaluated based on the tenderer's technical competence, experience, and equipment. Price will be evaluated based on the tenderer's pricing schedule, and specific goals will be evaluated based on the tenderer's B-BBEE status level and compliance with the Employment Equity Act.
Technical Specifications
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The tenderer must provide a proof of a valid registration certificate as a Master Installation Electrician, with a minimum of 3 years' experience. The tenderer must also provide a list of all Ex-rated tools, test instruments, and equipment to be used for the Ex Rated inspection and testing work.
Experience & Qualifications
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The tenderer must provide a detailed CV, and registered with the Department of Employment and Labour, with relevant experience in providing such services.
Quality Management
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The Contractor / Service Provider shall provide objective evidence of documented information but not limited to: Quality Management System Requirements, and quality documents as required per scope of works are listed in annexure U.
Pricing Schedule
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The tenderer must submit a pricing schedule, and the prices will be evaluated based on the tenderer's pricing schedule.
Financial Requirements
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)Payment terms: NTCSA is committed to paying suppliers within 30 days of receipt of undisputed invoices for contracts valued below R50 000 000, and within 60 days for contracts valued above R50 000 000.
Compliance Requirements
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The tenderer must comply with the Employment Equity Act, and provide proof of compliance, including submission of the Employment Equity report to the Department of Labour. The tenderer must also provide a valid B-BBEE certificate, proof of ownership, and certified ID copies of shareholders.
B-BBEE Requirements
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The tenderer must submit a valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPS Certificate, Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding breakdown, Certified ID copies of shareholder(s), Proof of Disability (where applicable)
Health & Safety
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The Contractor / Service Provider shall provide objective evidence of documented information but not limited to: Health and Safety Plan, and costing for Health and Safety management.
Environmental
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The Contractor / Service Provider shall provide objective evidence of documented information but not limited to: Environmental Management System Requirements, Environmental Management Programme, and Waste Management Plan.
Contractual Terms
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The conditions of contract will be NEC3 Professional Services, and the tender shall be for the whole of the contract. NTCSA may extend the validity period for a specified additional period.
Requirements
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)Tenderers (whether a single company or an incorporated or unincorporated joint venture or consortium) must meet the eligibility criteria stated in the Tender Data. The tenderer, or any of its principals, must not be under any restriction to do business with NTCSA or State-Owned Companies.
Section
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.pdf (TENDER)The following criteria will be applicable for this transaction under functionality criteria: Mandatory Requirements (Refer to Annexure W)
Evaluation Criteria
Source: Annexure P_BOQ for HAZARDOUS ASSESSMENTS, INSPECTIONS AND TESTING CONTRACT FOR NTCSA NORTHERN GRID FOR A PERIOD OF 36 MONTHS ON AN AS AND WHEN REQUIRED BASIS.xlsx (unknown)The document does not state pre-qualification criteria such as B-BBEE levels, CIDB grading, or mandatory briefings. The pricing workbook includes a CPA form requiring bidders to propose a price adjustment formula with indices from recognised sources (e.g., SEIFSA, StatsSA). Bidders must complete the tender cover sheet and all price schedule sheets in the provided Excel workbook.
Technical Specifications
Source: Annexure P_BOQ for HAZARDOUS ASSESSMENTS, INSPECTIONS AND TESTING CONTRACT FOR NTCSA NORTHERN GRID FOR A PERIOD OF 36 MONTHS ON AN AS AND WHEN REQUIRED BASIS.xlsx (unknown)Scope: Substation battery room (hazardous locations) assessments, inspections and testing for the Northern Grid (Limpopo and North West provinces).
Locations: Polokwane & Phalaborwa (10 substations), Lephalale (6), Rustenburg (6), Carletonville (6).
Activities per substation: Compile inspection/test reports for proof of compliance (highlighting problem areas, risks, corrective actions); allow provisional sum of R60,000 for testing; issue Certificate of Compliance.
Resources per site (9 hours): 1 Supervisor (Electrician), 1 MEI, 3 EX Technicians, 1 RP.
Deliverables: Dossier pack with completed Certificate of Compliance.
Provisional sums: Testing R60,000 (supplier to specify); Consumables R50,000 (supplier to specify). Profit/markup percentage to be entered.
Financial Requirements
Source: Annexure P_BOQ for HAZARDOUS ASSESSMENTS, INSPECTIONS AND TESTING CONTRACT FOR NTCSA NORTHERN GRID FOR A PERIOD OF 36 MONTHS ON AN AS AND WHEN REQUIRED BASIS.xlsx (unknown)Pricing format: Fixed price for first 12 months; CPA (Contract Price Adjustment) applicable thereafter. Bidders must use the provided Excel workbook (Annexure P) and complete all green-shaded cells. Separate Excel file required for each alternative offer.
Provisional sums: Testing R60,000.00, Consumables R50,000.00 – subject to profit/markup percentage.
Preliminaries to include: office overheads, SHEQ plan (OHS Act compliant), transport (per km), PPE, medicals (entry-interim-exit), living out allowance (incl. cell phone), accommodation.
CPA Formula: Bidders must propose a price adjustment formula with indices from recognised sources (e.g., SEIFSA, StatsSA, LME). Minimum fixed non-adjustable portion 15%. Provide 5 years' historical data for non-standard indices. All calculations are the bidder's responsibility; discrepancies must be reported to the designated buyer.
Compliance Requirements
Source: Annexure P_BOQ for HAZARDOUS ASSESSMENTS, INSPECTIONS AND TESTING CONTRACT FOR NTCSA NORTHERN GRID FOR A PERIOD OF 36 MONTHS ON AN AS AND WHEN REQUIRED BASIS.xlsx (unknown)Compliance with the OHS Act No. 83 of 1993: a SHEQ (Safety, Health, Environment and Quality) plan must be submitted. Certificate of Compliance to be issued for each substation.
Important Dates
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing date: 16 September 2026 at 10:00 SAST. No mandatory briefing or site visit is stated in the available document; such details, if any, are in the Tender Data.
Contact Information
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Submission Guidelines
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Submission method and address are specified in the Tender Data. Bidders must submit the required returnable forms (including SBD 1, SBD 4, SBD 6.1, SBD 9, and the Acknowledgement Form) complete and signed by the closing date and time. Late or incomplete submissions will be disqualified. For e-tendering, submit via the Eskom Tender Bulletin site; for hard copy, submit one original and one copy in sealed packages marked accordingly.
Evaluation Criteria
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The evaluation will follow the PPPFA point system (80/20 or 90/10 as specified in the Tender Data). Price and Specific Goals (including B-BBEE) will be scored. If functionality applies, a minimum threshold must be met to proceed. Bidders who do not submit a valid B-BBEE certificate or affidavit will score zero points for preference. Eskom may apply objective criteria as per section 2(1)(f) of the PPPFA. Eskom will not measure a criterion twice in different evaluation phases.
Technical Specifications
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The contract covers hazardous assessments, inspections, and testing services for the NTCSA Northern Grid, for a period of 36 months, on an as-and-when-required basis.
Financial Requirements
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Prices must be submitted in South African Rand, inclusive of all duties and taxes. Rates are to remain fixed for the contract duration. If security for performance is required, the bidder must name at least two financial institutions from which it would obtain the security. Eskom may conduct a financial analysis to assess risk.
Compliance Requirements
Source: Annexure Q_Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)CSD registration and valid tax compliance PIN are mandatory. B-BBEE certificate or affidavit must be submitted (or CSD report) – if not provided, zero points for preference. If CIDB grading is a qualification criterion (as per Tender Data), proof of registration is required. Proof of SHEQ systems, policies, and capabilities must be provided. The SDL&I Undertaking must be completed by contract award. All mandatory returnable forms (SBD 1, 4, 6.1, 9) must be signed and submitted.
Description
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)This annexure is the Environmental Management Tender Returnable Document for the provision of hazardous assessments, inspections, and testing services for the NTCSA Northern Grid. It is to be completed and submitted by the bidder as part of the tender submission.
Contact Information
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)Buyer: Thandi Gxabuza (name only, no direct contact details provided).
Document owner: Transmission Environmental Management.
Evaluation Criteria
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)Minimum qualifying threshold: Bidders must achieve a weighted average score of at least 80% on the environmental requirements evaluation (Sections A–E) to be considered for further evaluation.
Scoring framework:
Total score = weighted sum of section scores. Bidders with scores below 80% are disqualified.
Technical Specifications
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)Scope: Hazardous assessments, inspections and testing of battery rooms at substations within the NTCSA Northern Grid (Limpopo).
Contract duration: 36 months, on an as-and-when required basis.
Environmental management: Bidders must submit documented evidence of environmental management systems, environmental management programme, waste management plan, aspect and impact register, and additional environmental requirements as per the Environmental Management Returnable Document (Annexure V).
Compliance Requirements
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)Submit the completed Environmental Management Tender Returnable Document (Annexure V) with all sections fully completed.
Provide objective evidence for each item in Sections A–E as specified in the document.
Sign and submit Environmental Requirements Proforma (240-110600836).
Reference standard: Environmental Requirements for Contractors/Suppliers (240-180100134).
Environmental
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)Environmental management deliverables required for evaluation:
Section A – Environmental Management System (EMS): Provide objective evidence of a documented EMS (not necessarily certified) including manual, policy signed by owner/CEO, project objectives, roles and responsibilities, interested parties, communication plan, nonconformity and corrective action, emergency preparedness and response, performance evaluation, internal audit programme, and management review.
Section B – Environmental Management Programme (EMPr) or Method Statements: Submit documentation covering handling of hazardous chemical substances, vegetation management, site establishment, water management (consumption, testing, storm water), access control, landowner liaison, noise control, dust control, rehabilitation, wildlife interaction, resource competence and training, incident reporting (oil spills, fire, biodiversity), complaints/grievance management, compliance obligations, and environmental human resources. For the latter, provide CV of a person with a National Diploma or degree in Environmental Sciences/Management/Nature Conservation or related field, responsible for monitoring environmental planning and activities. For low-risk projects, two weeks' environmental training suffices.
Section C – Waste Management Plan: Submit a plan or method statement identifying waste types, applicable legislation, segregation and minimisation, handling and disposal, and reporting template.
Section D – Aspect and Impact Register: Provide a project-specific register with ratings.
Section E – Additional Requirements: Include an Environmental Bill of Quantity with items for waste management, pollution control, water management, land management (rehabilitation, erosion control, access roads, No Go fencing, vegetation clearing), and human resources for environmental officer. Also complete and sign Environmental Requirements Proforma (240-110600836).
Section
Source: Annexure V_Environmental Managemement Tender Returnable Doc.pdf (unknown)Threshold: Bidders must achieve a weighted average score of 80% or above across Sections A–E to be considered. The scores serve as a numerical basis for comparison.
Description
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdfNTCSA Northern Grid is establishing a contract for hazardous locations (substation battery rooms) assessment, inspection and testing for 36 months on an as-and-when-required basis. This document defines the technical evaluation criteria that will be used to evaluate tenderers.
Important Dates
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf (unknown){"briefingSession":{"date":null,"time":null,"venue":"NTCSA Northern Grid","is_compulsory":false}}
Contact Information
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf (unknown){"name":"NTCSA Northern Grid","email":null,"phone":null,"department":"NTCSA Northern Grid","address":null}
Submission Guidelines
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf (unknown)Bidders must submit their bids to the address specified in the tender document. The submission must include all required returnable forms, which are: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), and SBD 9 (Certificate of Independent Bid Determination). Bids received after the closing time will be disqualified.
Evaluation Criteria
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf (unknown)The technical evaluation consists of mandatory criteria (pass/fail) and qualitative criteria (weighted score card). The minimum weighted final score threshold is 70%. Qualitative criteria: Technical competence (40%), Previous experience of MIE (30%), Tools and test equipment (30%). Acceptable risk: tendering without a site visit. Unacceptable risks: failure to understand scope, failure to meet mandatory criteria, no track record, deviation from criteria.
Technical Specifications
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf (unknown)The scope is the assessment, inspection and testing of hazardous locations (substation battery rooms) for NTCSA Northern Grid. The contract is for 36 months on an as-and-when-required basis. All hazardous locations installations must be verified and certified by a Master Installation Electrician and issued with a Certificate of Compliance (COC) in accordance with SANS 10108 and 60079, and the OHS Act.
Methodology
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdfThe tender evaluation methodology is set out in this document: mandatory pass/fail criteria followed by a weighted qualitative scorecard. The evaluation is performed by the appointed NTCSA Technical Evaluation Team (TET). No changes to the evaluation criteria are permitted once the strategy is approved.
Experience & Qualifications
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdfThe MIE must have at least 3 years' experience and be registered with DEL. For qualitative scoring, the MIE's detailed CV and registration proof are required. Experience is scored based on years and registration status. Additionally, the bidder must submit a track record of past completed projects (assessment, inspection, testing, COC issuing) for Hazardous Location works, with a minimum of 1 project for any score.
Quality Management
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdfWork must comply with SANS 10108, SANS 60079, the OHS Act and the Hazardous Location Scope of Work. Certificates of Compliance must be issued for all hazardous location installations.
Compliance Requirements
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdf (unknown)Bidders must meet mandatory criteria: MIE registration, DEL registration as a Registered Person, and company registration as an Electrical Contractor with DEL. For qualitative evaluation, bidders must provide proof of past projects, MIE CV with experience, and a list of Ex-rated tools with calibration and Ex certifications.
Health & Safety
Source: Annexure W_Technical Evaluation Criteria for Hazardous locations Contract.pdfThe Occupational Health and Safety Act, 1993 is listed as a normative reference. The work involves hazardous locations (substation battery rooms) and must be performed in accordance with OHS requirements for such environments.
Description
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)The provision of hazardous assessments, inspections and testing contract for ntcsa northern grid for a period of 36 months on an as and when required basis
Important Dates
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)The tender validity period is 120 days from the closing date and time. A non-compulsory clarification meeting will be held on 07 September 2026 from 10h00 to 12h00 via Microsoft Teams meeting. The closing date and time for tender submission is 16 September 2026 at 10h00.
Contact Information
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)The NTCSA Representative is Thandiwe Gxabuza, email: [email protected]. The 1st escalation contact is Procurement Manager Vukosi Maluleke, email: [email protected]. The 2nd escalation contact is Middle Manager Esther Seshabela, email: [email protected].
Submission Guidelines
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)Tenders must submit their bids electronically via the Eskom E-tendering site by the stipulated closing date and time. The deadline for tender submission is 16 September 2026 at 10h00. Late tenders will not be accepted. All documents must be submitted in PDF format, with a maximum upload size of 500 megabytes per document and a total submission size restricted to 4 gigabytes. No zip or condensed files can be uploaded, and no hard copy will be accepted. If a tenderer resubmits their tender, the latest version will be accepted and all previous submissions will be null and void.
Evaluation Criteria
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)Bidders must not be restricted from doing business with NTCSA or any state-owned company, nor appear on the National Treasury's Register for Tender Defaulters or List of Restricted Suppliers. Bidders must not have a conflict of interest or submit more than one tender (except for e-tendering file size limits). Joint ventures must submit a JV agreement with joint and several liability. Subcontracting 100% of scope is not allowed. Required returnables at closing (disqualifiable if missing): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Declaration Form – available on www.ntcsa.co.za), Annexure E (CPA Requirements for Local Goods/Services), Annexure H (SBD 1 – Invitation to Bid), Annexure I (SBD 6.1 – Preference Points Claim Form). Tax clearance: local bidders must provide a SARS e-filing PIN or a tax clearance certificate; foreign bidders without a South African footprint complete SBD 1 but need no tax proof. CSD registration is mandatory prior to award. Foreign tenderers with a local footprint must also provide CSD registration. B-BBEE status level must be claimed via SBD 6.1, supported by a certificate or sworn affidavit.
Financial Requirements
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)NTCSA will pay suppliers within 30 days of receipt of undisputed invoices for contracts valued below R50 000 000, and within 60 days for contracts valued above R50 000 000. NTCSA reserves the right to negotiate CPA terms and conditions during negotiations with tenderers. A minimum of 15% of the total agreement value must be fixed when a CPA formula is applied.
Compliance Requirements
Source: Invitation_to_Tender_(ITT)_ eTendering -Hazloc.docx (unknown)CSD registration is mandatory prior to award. Foreign tenderers with a local footprint must also provide CSD registration. B-BBEE status level must be claimed via SBD 6.1, supported by a certificate or sworn affidavit. Tax clearance is required for local bidders, who must provide a SARS e-filing PIN or a tax clearance certificate.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Website
www.eskom.co.za/Pages/Landing.aspx
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
25 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa