Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Transnet Pipelines Alrode and Witbank Depot - Gauteng - Alberton - 1449
Organization Type
GOVERNMENT
Published
24 Aug 2026
OCDS Reference
ocds-9t57fa-166727
The TRANSNET national ports authority is procuring the installation of a smallbore steel pipe wastewater system at the alrode and witbank TRANSNET pipelines petroleum products storage and handling facility. Bidders must supply and install fully functional pump systems for discharging wastewater from the spill basin/oil separator to the sewer lines.
The Contractor shall supply all required material and equipment for the installation of the wastewater system.
The Contractor shall be responsible for the full works, including supply, procurement, storage, fabrication, factory testing, delivery, off-loading, excavation, core drilling, welding, installation, site testing, and quality control.
The Contractor shall comply with all applicable laws and regulations, including the Occupational Health and Safety Act and Water Services Act.
The Contractor shall also comply with the Transnet National Ports Authority's requirements and specifications.
A compulsory site briefing will be held at the TPL Alrode Station.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 23 September 2026 - 12:00
Venue
Transnet Pipeline’s Alrode Depot, 35 Garfield Street, Alberton
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
The pre-qualification eligibility criteria's are: T2.2-01 stage one as per eligibility criteria schedule - certificate of attendance at compulsory tender clarification meeting T2.2-02 stage two as per CIDB eligibility criteria schedule – CIDB registration T2.2-03 stage three as per eligibility criteria schedule – technical pre-qualification criteria
Categories
Request for Proposal
Transnet Pipelines Alrode and Witbank Depot - Gauteng - Alberton - 1449
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Binded RFP.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
24 Aug
2026
Tender Published
Tender was published
23 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure H Health and Safety Specification USE.pdf
The Transnet National Ports Authority is procuring the installation of a smallbore steel pipe wastewater system at the Alrode and Witbank Transnet pipelines petroleum products storage and handling facility. The project requires the contractor to prepare, implement, and maintain a project-specific Health and Safety Management Plan.
Binded RFP.pdf
Installation of a smallbore steel pipe spill basin wastewater system to the municipal sewer line at Transnet Pipelines' Alrode and Witbank petroleum products storage and handling facilities, procured by Transnet National Ports Authority under an NEC3 Engineering and Construction Contract.
Binded Annexures.pdf
Installation of a smallbore steel pipe wastewater system at the Alrode and Witbank Transnet Pipelines petroleum products storage and handling facilities, procured by Transnet National Ports Authority. The tender requires the contractor to provide key personnel including construction, mechanical, civil/structural, and electrical supervisors, as well as a health and safety officer, with documented qualifications and relevant project experience.
Technical Specifications.pdf
The Transnet National Ports Authority is procuring the installation of a smallbore steel pipe wastewater system at the Alrode and Witbank Transnet pipelines petroleum products storage and handling facility. The system includes pump sets, piping, valves, fittings, and control equipment. The contractor must supply and install all required materials and equipment, and perform site testing and quality control.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 312 937
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Annexure H Health and Safety Specification USE.pdfThis Health and Safety Specification applies to the Installation of the Smallbore Steel Pipe Spill Basin Wastewater System to Municipal Sewer Line at the Alrode and Witbank Transnet Pipelines Petroleum Products Storage and Handling Facilities. It provides health and safety information for the principal contractor and contractors to consider during planning and execution, and guides the compilation of Health and Safety Management Plans and other health and safety file documents. The specification covers all personnel involved during design and construction, including TPL employees, designers, principal contractor, contractors, visitors and service providers. The principal contractor is responsible for ensuring all their contractors comply fully with legal requirements and this specification.
Important Dates
Source: Annexure H Health and Safety Specification USE.pdf (RFP)Release Date: 11 June 2026. The Health and Safety Management Plan and other health and safety file documents must be submitted electronically and as a hard copy to the SHEQ Specialist or designated personnel for review prior to mobilisation. Work may not commence until the plan is accepted/approved. Provisional approval allows site establishment only; full approval allows execution of work. If provisionally approved, the contractor must resolve issues within 30 days from commencement of work, failing which work related to outstanding actions must stop until resolved.
Contact Information
Source: Annexure H Health and Safety Specification USE.pdf (RFP)SHEQ Specialist (Projects): Luke Otto. SHEQ Manager: Thulani Manana. Project Manager: Vincent Mazuza. All are Transnet Pipelines (TPL) personnel. No email addresses or phone numbers are provided in the document.
Evaluation Criteria
Source: Annexure H Health and Safety Specification USE.pdf (RFP)The contractor must comply with all applicable health and safety legislation and project-specific standards and procedures as amended from time to time. The contractor must set project-specific health and safety objectives and develop improvement action plans to achieve them, with primary considerations being elimination of hazards, minimisation of risks, prevention of incidents, injuries and illnesses, and legal compliance. Objectives must be specific, measurable, documented, communicated to all personnel, reviewed quarterly and whenever significant changes occur. The contractor must carry out detailed project-specific Task-Based Risk Assessments reviewed and approved by the SHEQ Specialist or designated personnel before any work commences. Risk assessments must be facilitated by a competent person appointed in writing per Construction Regulations 9(1), with mandatory participation of site management, supervisory personnel, technical experts and workforce. Safe Work Procedures based on Task-Based Risk Assessments must be compiled and approved before work starts. Monthly internal audits and daily site health and safety inspections are required. Performance assessment and auditing procedures must cover health and safety performance reporting, monthly internal audits, and daily inspections.
Technical Specifications
Source: Annexure H Health and Safety Specification USE.pdf (RFP)Scope: Installation of the smallbore steel pipe spill basin wastewater system to municipal sewer line at the Alrode and Witbank Transnet Pipelines Petroleum Products Storage and Handling Facilities. The specification covers all personnel involved during design and construction, including TPL employees, designers, principal contractor, contractors, visitors and service providers. The principal contractor is responsible for ensuring all their contractors comply with legal requirements and this specification. Key technical requirements include: Health and Safety Management Plan (project-specific, covering mobilisation to commissioning to handover); Hazard Identification and Risk Assessments (baseline, task-based, pre-task, DSTI/continuous, issue-based, specialised studies); Safe Work Procedures; Permit to Work system; Excavation controls (battering, benching, shoring); Cranes and lifting equipment; Fall protection; Electrical safety; Hot work; Machinery and mobile equipment; Traffic management; Barricading and signage; PPE requirements; Fuel/flammable liquid storage; Fire protection; Waste management; Occupational hygiene; Fitness for work; Emergency preparedness and response; Incident reporting and investigation; Temporary works; Structures; Working at night; Facilities; Stacking and storage; Housekeeping; Manual handling and vibration; Tools and equipment; Communication, participation and consultation (toolbox talks, DSTI, safety observations); Documentation and document control; Contractor health and safety file requirements; Notification of construction work; General rules of conduct; Site establishment; Access control; Visitors; Alcohol, drugs and intoxicating substances; Light vehicle and mobile equipment rules; Loading and offloading; Measuring and monitoring; Management of change; Non-conformance and action management; Management review.
Methodology
Source: Annexure H Health and Safety Specification USE.pdf (RFP)The contractor must prepare, implement and maintain a project-specific Health and Safety Management Plan based on this specification and all applicable legislation, covering all activities from mobilisation to commissioning to handover. The plan must include: H&S policy (OHSA Section 7); hazard identification and risk assessment procedures; legal and other requirements register; H&S objectives with action plans; resources/accountabilities/responsibilities with written appointments; competence/training/awareness system; communication/participation/consultation arrangements; documentation and document control; operational control procedures (safe work procedures for critical risks); emergency preparedness and response; management of change; subcontractor H&S assessment process; measuring and monitoring plans; incident reporting and investigation; non-conformance and action management; performance assessment and auditing; management review. Baseline risk assessment conducted by client prior to site establishment. Task-based risk assessments facilitated by competent person appointed per Construction Regulations 9(1) with mandatory participation of site management, supervisors, technical experts and workforce. Safe work procedures compiled from task-based risk assessments and approved before work. Daily Safe Task Instructions (DSTI) completed by entire team daily before work and at shift end. Pre-task hazard assessments for any changes. Issue-based risk assessments for near-misses, new equipment, process changes, new knowledge. Specialised studies (HAZOP, HAZCON) for critical risks by specialist risk person. Risk assessment monitoring and reviews documented with planned review dates.
Experience & Qualifications
Source: Annexure H Health and Safety Specification USE.pdfCompetent Person definition: must have required knowledge, training and experience for the work/task, and where applicable, qualifications specific to that work/task; must be familiar with the OHSA and applicable regulations. Construction Manager: competent person responsible for management of physical construction processes and coordination/administration/management on construction site (per Construction Regulations 8(1)). Construction Supervisor: competent person responsible for supervising construction activities. Health and Safety Officer: minimum 5 years post registration with SACPCMP and total 8 years' experience in assisting with development, implementation and maintenance of health and safety management systems. Isolation Officer: authorised in writing, trained and assessed competent in isolation and lockout of systems/plant/equipment within scope of designation; formalised training by competent trainer with certification issued. Authorised Person (Permit to Work): authorised in writing by nominated project management representative to issue permits; trained and assessed competent in systems/plant/equipment operation within scope. Applicant (Permit to Work): authorised in writing to receive/accept permits; competent by training, experience and knowledge of area/plant. All legal appointments must be in writing with documented proof retained.
Quality Management
Source: Annexure H Health and Safety Specification USE.pdfThe contractor must develop and maintain project-specific documentation for effective health and safety management, with document control processes in place. Operational control procedures (typically in Safe Work Procedures) must manage critical risks including excavation, working at heights, confined spaces, mobile equipment, light vehicles, lifting operations, hazardous chemical agents, and hot work. Emergency preparedness and response procedures are required. A management of change process must ensure health and safety risks are considered before changes are implemented. Principal contractors must assess subcontractors' health and safety requirements and performance before awarding contracts or purchase orders. Measuring and monitoring plans must include employee exposure to hazardous chemical agents (noise, dust, etc.) to determine control effectiveness. Incident reporting, investigation, non-conformance and action management procedures are mandatory. Performance assessment and auditing must cover monthly internal audits, daily site inspections, and performance reporting. Management review processes must assess the effectiveness of health and safety management efforts. Planned Task Observations must be carried out on an ad hoc basis. Monthly auditing of the health and safety management system and workplace activities is required. Corrective actions from incidents, audits and inspections must be tracked and reported.
Financial Requirements
Source: Annexure H Health and Safety Specification USE.pdf (RFP)All costs associated with meeting health and safety responsibilities shall be borne by the contractor. Any cost associated with work stoppage due to non-compliance with a health and safety requirement shall be for the contractor's account. The contractor must ensure proof of public liability insurance as required with the bonds for the contract is in the health and safety file.
Compliance Requirements
Source: Annexure H Health and Safety Specification USE.pdf (RFP)The contractor must comply with the Occupational Health and Safety Act (OHSA) as amended, Construction Regulations (latest version), and all other applicable health and safety legislation and project-specific standards. Mandatory appointments in writing per legal requirements: Construction Manager (Construction Regulations 8(1)), Health and Safety Officers, Supervisors, Health and Safety Representatives, First Aiders, Isolation Officers, Authorised Persons (Permit to Work), Applicants (Permit to Work). A mandatary agreement in terms of OHSA Section 37 must be in place, as well as principal contractor and contractor appointments per Construction Regulations 5(1)(k) and 7(1)(c)(v). Letter of good standing in terms of COIDA must be up to date and in the health and safety file. Proof of public liability insurance as required with the bonds for the contract must be in the health and safety file. The Contractor's Health and Safety Officer must have minimum 5 years post registration with SACPCMP and a total of 8 years' experience in assisting with development, implementation and maintenance of health and safety management systems. Competent persons must have required knowledge, training, experience and qualifications specific to the work/task, and be familiar with the OHSA and applicable regulations. CSD registration, tax compliance, B-BBEE level, and CIDB grading are not mentioned in this document.
Health & Safety
Source: Annexure H Health and Safety Specification USE.pdfComprehensive health and safety specification covering 55 sections including: Purpose, Project Scope, Scope, Definitions, Abbreviations, Health and Safety Management Plan, Health and Safety Policy, Hazard Identification and Risk Assessments (baseline, task-based, pre-task, DSTI/continuous, issue-based, specialised studies, monitoring and reviews, safe work procedures), Legal and Other Requirements, Health and Safety Objectives, Resources/Accountabilities/Responsibilities, Competencies/Training/Awareness, Communication/Participation/Consultation, Documentation and Document Control, Contractor Health and Safety File Requirements, Notification of Construction Work, General Rules of Conduct, Site Establishment, Access Control, Visitors, Alcohol/Drugs/Intoxicating Substances, Light Vehicle, Mobile Equipment, Traffic Management Plan, Loading/Offloading, Signs/Notices, Machinery, Barricading, Excavation, Cranes/Lifting Equipment, Fall Protection, Permit to Work, Electrical Safety, Hot Work, Tools/Equipment, Manual Handling/Vibration, PPE, Fuel/Flammable Liquid Storage/Refuelling, Fire Protection/Prevention, Housekeeping, Waste Management, Stacking/Storage, Facilities, Occupational Hygiene, Fitness for Work, Measuring/Monitoring, Working at Night, Temporary Works, Structures, Emergency Preparedness/Response, Incident Reporting/Investigation, Performance Assessment/Auditing, Management Review, Management of Change, Non-Conformance/Action Management. Key requirements: project-specific H&S Management Plan approved before mobilisation; baseline risk assessment by client; task-based risk assessments by competent person with mandatory team participation; safe work procedures; permit to work system; dedicated H&S professionals appropriate to work scale; written appointments for all legal roles; COIDA letter of good standing; public liability insurance; SACPCMP-registered H&S Officer with 5+ years post-registration and 8+ years experience.
Environmental
Source: Annexure H Health and Safety Specification USE.pdfEnvironmental considerations are integrated into hazard identification: hazard (energy) types include particulates and aerosols (dust, fibres, fumes, spray, mist, smoke), chemical agents (corrosive/irritant, asphyxiate/poison, narcotic/anaesthetic, allergen/sensitiser, carcinogen, teratogen/mutagen), microbiological (virus, bacterium, parasite, fungus), and weather (lightning, heavy wind, flooding, hail storm). Waste management, fuel/flammable liquid storage and refuelling, fire protection and prevention, and housekeeping requirements address environmental protection. The specification requires compliance with all applicable legislation, which includes environmental legislation. No specific environmental impact assessment or environmental management programme requirements are detailed in this document.
Contractual Terms
Source: Annexure H Health and Safety Specification USE.pdfThe contractor must ensure a mandatary agreement in terms of OHSA Section 37 is in place, as well as principal contractor and contractor appointments per Construction Regulations 5(1)(k) and 7(1)(c)(v) respectively, all signed and filed in the health and safety file. A valid letter of good standing in terms of COIDA must be maintained in the health and safety file. Proof of public liability insurance as required with the bonds for the contract must be in the health and safety file. All health and safety appointments must be in writing with documented proof (signed appointment letters) retained. The contractor must not discharge legal responsibilities to employees who are not legally appointed. A project-specific health and safety organisational chart must be documented and maintained. All costs for meeting health and safety responsibilities are borne by the contractor. Costs for work stoppages due to non-compliance are for the contractor's account.
Requirements
Source: Annexure H Health and Safety Specification USE.pdf (RFP)The contractor must comply with all applicable health and safety legislation and project-specific standards and procedures as amended from time to time. A register of all legal and other requirements must be compiled, maintained and updated regularly. Applicable laws and standards must be communicated to all employees and subcontractor personnel. The contractor must adequately allocate resources, responsibility and accountability for effective implementation of the H&S management system. All H&S appointments must be in writing with documented proof retained. A project-specific H&S organisational chart must be documented and maintained. The provision of dedicated H&S professionals must be appropriate for the nature and scale of work. Contractor management must demonstrate visible commitment through risk management approach, immediate action on violations, and active participation in day-to-day prevention activities. All costs for meeting these responsibilities are borne by the contractor.
Section
Source: Annexure H Health and Safety Specification USE.pdfEvaluation of health and safety performance will be based on: compliance with the Health and Safety Management Plan and this specification; monthly internal audits to assess compliance with project health and safety requirements; daily site health and safety inspections; incident reporting, recording, investigation and analysis; non-conformance and corrective action management; health and safety performance reporting; achievement of project-specific health and safety objectives; and annual review of the Health and Safety Management System. The SHEQ Specialist or designated personnel will review and approve the Health and Safety Management Plan and Task-Based Risk Assessments prior to work commencement. Provisional approval allows site establishment only; full approval allows execution of work. Failure to resolve issues within 30 days of provisional approval results in work stoppage on outstanding actions.
Important Dates
Source: Binded RFP.pdf (RFP)Issue Date: 24 August 2026. Compulsory Briefing: Yes. Date: 04 September 2026. Venue: Transnet Pipeline's Alrode Depot, 35 Garfield Street, Alberton. Time: 10:30am (per notice) or 12h00 (per tender data) – the notice states 10:30am for a period of ±2 hours. Closing Date: 23 September 2026. Closing Time: 12:00pm. Tender Validity Period: 180 business days from closing date.
Contact Information
Source: Binded RFP.pdf (RFP)Employer's Agent: Procurement Manager Administrator, Name: Fezeka Mhlongo, Address: 202 Anton Lembede Street, Durban 4001, Tel: 031 816 9888, Email: [email protected]. Tender documents may be downloaded from National Treasury eTender Publication Portal (www.etenders.gov.za) and Transnet website (https://transnetetenders.azurewebsites.net).
Submission Guidelines
Source: Binded RFP.pdf (RFP)Tenders must be submitted electronically via the Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net) before 12:00pm on 23 September 2026. Late tenders will not be accepted. Tenderers must register on the portal, log intent to bid, and upload documents. Upload limit is 30mb per upload; multiple uploads permitted. Tenderers are advised to submit at least a day before closing to avoid technical issues. Telephonic, telegraphic, facsimile or e-mailed tenders are not accepted. Tender offers must be in English. The tender validity period is 180 business days from closing date. Required returnable documents include: T2.2-01 Certificate of Attendance at Compulsory Tender Clarification Meeting, T2.2-02 CIDB Grading Designation, T2.2-03 Technical Pre-qualification Criteria (Construction Manager and Health & Safety Officer registrations), T2.2-04 to T2.2-07 Evaluation Schedules (Key Person Experience, Company Experience, Method Statement, Programme), T2.2-08 Authority to submit tender, T2.2-09 Record of addenda, T2.2-10 Letter of Good Standing, T2.2-11 Schedule of proposed Subcontractor, T2.2-12 CIDB SFU ANNEX G Compulsory Enterprise Questionnaire, T2.2-13 Non-Disclosure Agreement, T2.2-14 Declaration Form, T2.2-15 Breach of Law, T2.2-16 Certificate of Acquaintance with Tender Document, T2.2-17 Provider Integrity Pact, T2.2-18 Supplier Code of Conduct, T2.2-19 Insurance provided by the Contractor, T2.2-20 Transnet Vendor Registration Form, plus C1.1 Form of Offer and Acceptance, C1.2 Contract Data, C1.3 Forms of Securities, C2.1 Pricing Instructions, C2.2 Activity Schedule. Tenderers must also provide a valid TCS PIN, B-BBEE certificate or sworn affidavit (for EMEs/QSEs with 51% black ownership), valid CIDB certificate, proof of CSD registration, and Letter of Good Standing with the Workmen's Compensation Fund.
Evaluation Criteria
Source: Binded RFP.pdf (RFP)Evaluation is staged. Stage 1: Attendance at compulsory clarification meeting. Stage 2: CIDB registration with grading 3 ME or higher (or capability to obtain); joint ventures must have all members CIDB-registered, lead partner not lower than one level below required, combined grading meeting threshold, and provide certified copy of signed JV agreement. Stage 3: Construction Manager registered with SACPCMP as Professional Construction Manager (PrCM); Health & Safety Officer registered with SACPCMP as Construction Health and Safety Officer (CHSO). Stage 4: Functionality minimum score of 60 points. Functionality criteria: T2.2-04 Management & CVs of Key Persons (Construction Manager 10 points, Mechanical Supervisor 10, Civil & Structural Supervisor 5, Electrical Supervisor 5, Health & Safety 5), T2.2-05 Previous Experience (45 points), T2.2-06 Method Statement (10 points), T2.2-07 Programme (10 points). Total functionality 100 points. Only tenders achieving minimum functionality are evaluated further under 80/20 preference points system (price 80, specific goals 20). Specific goals: B-BBEE Status Level 1 or 2 (10 points), Qualifying Black Women Owned 30% (10 points). Non-compliant contributor scores 0. Tenderers must not be listed on Register of Tender Defaulters or Transnet's restricted list, and must complete Compulsory Enterprise Questionnaire. Transnet may conduct due diligence and risk analysis on preferred tenderer.
Technical Specifications
Source: Binded RFP.pdf (RFP)The works involve the installation of a smallbore steel pipe spill basin wastewater system to municipal sewer line at the Alrode and Witbank Transnet Pipelines petroleum products storage and handling facility. The contract is an NEC3 Engineering and Construction Contract. Tenderers must provide a method statement and programme (using Primavera P6 or MS Projects) as part of the returnables. Site visit/walk will take place during the compulsory briefing; tenderers must wear safety shoes, goggles, long sleeve shirts, high visibility vests and hard hats. Breathalyser testing is mandatory for all entering Transnet premises. Firearms are prohibited.
Financial Requirements
Source: Binded RFP.pdf (RFP)No specific financial requirements are stated beyond the provision of a valid TCS PIN (SARS tax compliance), a valid B-BBEE certificate or sworn affidavit, and a Letter of Good Standing with the Workmen's Compensation Fund. The 80/20 preference point system applies, indicating the tender value is likely R50 million or below (inclusive of all taxes). Tenderers may be required to provide audited financial statements for due diligence purposes.
Compliance Requirements
Source: Binded RFP.pdf (RFP)Mandatory requirements: Attendance at compulsory clarification meeting (failure leads to disqualification). CIDB registration with grading 3 ME or higher (or capability to obtain). Construction Manager registered with SACPCMP as PrCM. Health & Safety Officer registered with SACPCMP as CHSO. Valid TCS PIN. Valid B-BBEE certificate or sworn affidavit for EMEs/QSEs with 51% black ownership. Valid CIDB certificate. Proof of CSD registration. Letter of Good Standing with Workmen's Compensation Fund. Tenderers must not be listed on Register of Tender Defaulters or Transnet's restricted list. Must complete Compulsory Enterprise Questionnaire. Must sign Non-Disclosure Agreement and Provider Integrity Pact. Must comply with Supplier Code of Conduct. Tenderers must not have been convicted of a serious breach of law in the preceding 5 years (including Competition Act breaches).
Description
Source: Binded Annexures.pdf (unknown)of the Project
Year of Execution & Contract Duration
Was this on a Process/Petrochemical Yes No
Installation?
References
Contact Person(s) Name
Working Telephone Number
Working e-mail address
Detailed Description of KeyResource Roles and Responsibilities:
Notes:
in similar format.
Contact Information
Source: Binded Annexures.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"s on a Process/Petrochemical Yes No"}
Submission Guidelines
Source: Binded Annexures.pdf (unknown)Returnable documents: the bidder must complete and submit the Annexure A1-A2 and B1-B4 qualification and experience schedules for each key resource (Construction, Mechanical, Civil/Structural, and Electrical Supervisors, and a Health and Safety Officer). Certified copies of certificates must not be older than six months. The bidder must also complete Annexure C (Contractor's relevant projects and value schedule) and a Schedule of Completed Projects for each resource. Failure to meet the registration requirements results in a score of zero.
Evaluation Criteria
Source: Binded Annexures.pdf (unknown)The evaluation is based on the qualification and experience of key personnel. The bidder must submit certified copies of certificates for the required qualifications. Failure to meet the stipulated registration requirements results in a score of zero for that resource. The document does not state a specific points split between price and functionality.
Technical Specifications
Source: Binded Annexures.pdf (unknown)The scope covers the installation of a smallbore steel pipe wastewater system at the Alrode and Witbank Transnet Pipelines petroleum products storage and handling facility. Key personnel required include Construction, Mechanical, Civil/Structural, and Electrical Supervisors, and a Health and Safety Officer. Each key resource must complete a qualifications information schedule (Annexure A) and a project experience form (Annexure B) detailing the company or client, project description, year of execution, contract duration, and whether the work was on a process or petrochemical facility.
Experience & Qualifications
Source: Binded Annexures.pdf (unknown)Annexure A1-A2 and B1-B4 are qualification and experience schedules for key personnel (Construction, Mechanical, Civil/Structural, Electrical Supervisors). They require certified copies of certificates (not older than six months), and failure to meet registration requirements results in a score of zero. Annexure B forms capture project experience, client references, and detailed roles and responsibilities for each key resource.
Financial Requirements
Source: Binded Annexures.pdf (unknown)The bidder must provide a completion certificate or payment certificate as proof that listed projects were completed. The document does not state specific pricing format, bonds, or guarantees.
Compliance Requirements
Source: Binded Annexures.pdf (unknown)Certified copies of certificates for required qualifications must be submitted. Certification by a Commissioner of Oaths must not be older than six months. The bidder must provide completion or payment certificates as evidence of completed projects.
Health & Safety
Source: Binded Annexures.pdf (unknown)A Health and Safety Officer is a required key resource. The officer must complete a qualifications information schedule and a project experience form similar to other key personnel.
Important Dates
Source: Technical Specifications.pdf (RFP){"briefingSession":"{"date":null,"time":null,"venue":"the TPL Alrode Station.","is_compulsory":false}"}
Submission Guidelines
Source: Technical Specifications.pdf (RFP)Bidders must submit their bids to the address specified in the tender document. The submission must include all required documents and information, and must be received by the closing date and time. Late submissions will not be accepted.
Evaluation Criteria
Source: Technical Specifications.pdf (RFP)Bidders will be evaluated based on their compliance with the tender requirements, their technical capabilities, and their pricing. The evaluation criteria include the bidder's experience, qualifications, and past performance, as well as the quality and suitability of their proposed solution.
Technical Specifications
Source: Technical Specifications.pdf (RFP)The technical specification is for the supply of all required material and equipment, and installation of fully functional pump systems for discharging wastewater from the spill basin/oil separator to the sewer lines at Transnet Pipeline’s Alrode and Witbank stations. This shall include, but not limited to, the procurement, storage, fabrication, factory testing, delivery to TPL site, off-loading, excavation, core drilling, welding, installation, site testing and quality control of the complete works.
Methodology
Source: Technical Specifications.pdf (RFP)The systems shall consist of but not limited to pump sets (pump and motor), piping, valves, fittings, supports, meter, control equipment and interface with the existing installations. The Contractor shall determine the interfacing of the new design to the existing installation and structures as shown in the various drawings supplied.
Quality Management
Source: Technical Specifications.pdfThe Contractor shall ensure that all works are carried out in accordance with the Quality Control Plan. The Contractor shall supply all components and materials as per approved design and also make provision for all tools and equipment required to carry out the works.
Pricing Schedule
Source: Technical Specifications.pdfThe Contractor shall provide a detailed pricing schedule for all works, including all components and materials. The pricing schedule shall be based on the approved design and shall include all costs associated with the works.
Financial Requirements
Source: Technical Specifications.pdf (RFP)The Contractor shall be responsible for the full works which include supply, procurement, storage, fabrication, factory testing, delivery to TPL site, off-loading, excavation, core drilling, minor civil works, welding, installation, site testing and quality control. The Contractor shall supply all components and materials as per approved design and also make provision for all tools and equipment required to carry out the works.
Compliance Requirements
Source: Technical Specifications.pdf (RFP)The Contractor shall comply with all applicable laws and regulations, including the Occupational Health and Safety Act, Water Services Act, and other relevant legislation. The Contractor shall also comply with the Transnet National Ports Authority's requirements and specifications, including those related to B-BBEE and CIDB grading.
Health & Safety
Source: Technical Specifications.pdfThe Contractor shall ensure that all works are carried out in accordance with the Occupational Health and Safety Act and regulations. The Contractor shall take all necessary precautions to prevent accidents and injuries.
Environmental
Source: Technical Specifications.pdf (RFP)The Contractor shall ensure that all works are carried out in accordance with the Water Services Act and regulations. The Contractor shall take all necessary precautions to prevent environmental damage.
Contractual Terms
Source: Technical Specifications.pdf (RFP)The Contractor is responsible for familiarising themselves with the following standards to meet TPL's design criteria and ensure the motor-pump set complies with acceptable design standards. The Contractor shall provide a Supplementary CoC for this installation as per SANS 10142-1 with all supporting documentation.
Requirements
Source: Technical Specifications.pdf (RFP)The Contractor shall provide an experienced, qualified, efficient, and effective team of resources and equipment to carry out the works. The Contractor shall supply all components and materials as per approved design and also make provision for all tools and equipment required to carry out the works.
Section
Source: Technical Specifications.pdfThe Site Acceptance Test (SAT) is required for the commissioning of the complete motor starter installation. The Contractor shall provide a Supplementary CoC for this installation as per SANS 10142-1 with all supporting documentation.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
24 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-1273[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.