Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Mpumalanga
Closing Date
07 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Corner Jellico and Water Meyer Street - Witbank, Eskom Park - North Eastern Region - 1035
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167426
ESKOM ntcsa requires a specialised rock engineering assessment of undermined land along the arnot kendal 400 kv t227 line. The single most consequential requirement is the mandatory submission of the ntcsa supplier declaration of interest form, signed under oath, disclosing any conflicts of interest with ntcsa employees or directors.
Bidders must complete, sign under oath, and submit the NTCSA Supplier Declaration of Interest form (equivalent to SBD 4) as a mandatory returnable.
Bidders must disclose whether any director, shareholder, member, partner, line manager, or fellow employee is employed by NTCSA or serves as an NTCSA director.
Bidders must disclose any close family or associate relationship with an NTCSA employee or director participating in the procurement process.
Bidders must disclose any business courtesies given to or received from NTCSA employees or directors in the last 12 months.
If providing consulting services, bidders must disclose details of any other services currently rendered to NTCSA business units, subsidiaries, primary energy suppliers, strategic commodity suppliers, or key industrial customers.
A false declaration entitles NTCSA to act against the supplier and the signatory personally.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 07 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Corner Jellico and Water Meyer Street - Witbank, Eskom Park - North Eastern Region - 1035
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 240-126469599_Method Statement template final 18 Oct2021.docx, 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx. You don’t need to refresh — this page will pick up the updated review automatically.
28 Aug
2026
Tender Published
Tender was published
07 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC PSC-KENDAL 400kV T227.pdf
Eskom Holdings SOC Ltd, through the National Transmission Company South Africa (NTCSA), is procuring a specialised rock engineering assessment of undermined land at the Arnot Kendal 400kV T227 structure near the Vulcan Substation in Emalahleni. The investigation will assess risks from historical subsurface coal combustion and burning sinkholes, with the aim of determining the feasibility of replacing the current structure with two new structures placed off undermined ground. The contract is a NEC3 Professional Services Contract (PSC3) Option A (priced contract with activity schedule) for a period of 6 months.
SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf
Procurement of specialised rock engineering assessment services for undermined land at the Arnot Kendal 400 kV T227 line, for the National Transmission Company South Africa (NTCSA). The contract runs for two months with no stated budget.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom National Transmission Company of South Africa is procuring a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The work involves a quality-controlled engineering assessment, with inspection and testing activities subject to Eskom's intervention points.
240-68099512 Form A_Cat 4_ Rev 9.pdf
Eskom National Transmission Company of South Africa is procuring a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The tender requires the successful bidder to comply with Eskom's quality requirements and the ISO 9001 standard, with a closing date of 7 October 2026.
Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf
Eskom National Transmission Company of South Africa is procuring a specialised rock engineering assessment of undermined land for the Arnot-Kendal 400 kV Line T227. The tender requires a contractor to assess ground subsidence and sinkhole risks caused by undermining, with evaluation based on technical approach, key personnel qualifications, and relevant experience.
L&S OHS BASELINE RISK ASSESSMENT 2026_.xlsx
Eskom Transmission is procuring a specialised rock engineering assessment of undermined land at the Arnot and Kendal 400 kV substations. The tender is issued by Eskom's North East Grid business unit and requires a contractor to assess ground stability risks associated with undermined land at these sites.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom National Transmission Company of South Africa is procuring a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The contract requires the supplier to comply with Eskom's Supplier Quality Management specification (240-105658000), which mandates a quality management system aligned to ISO 9001 and the submission of quality documentation as part of the tender.
NTCSA Supplier Declaration of Interest.docx
Specialised rock engineering assessment of undermined land at the Arnot and Kendal 400 kV sites, procured by Eskom National Transmission Company of South Africa. The tender requires a qualified geotechnical or rock engineering service provider to assess undermined land conditions and deliver a formal assessment report.
NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf
This is a non-disclosure agreement (NDA) between the National Transmission Company South Africa SOC Ltd (NTCSA) and a prospective vendor for the provision of a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 project. The agreement governs the handling of confidential information disclosed during the tender process.
07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf
NTCSA North East Grid is procuring a specialised rock engineering assessment of undermined land for the Arnot–Kendal 400 kV T227 line. The successful contractor must comply with the SHE specification, develop a SHE plan, and manage all health, safety, and environmental obligations for the duration of the contract.
Scope of work.pdf
Specialised rock engineering assessment of undermined land at the Arnot Kendal 400kV T227 tower, to determine the feasibility of two proposed replacement structure positions, confirm foundation systems, and recommend ground rehabilitation. The work is for the National Transmission Company South Africa (NTCSA) and includes intrusive and non-intrusive ground investigation, desktop studies, and a technical report.
240-126469599_Method Statement template final 18 Oct2021.docx
Specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line, commissioned by Eskom National Transmission Company of South Africa. The work requires a method statement covering scope, objectives, customer focus, competencies, infrastructure, leadership, risk management, process improvement, data analysis, and stakeholder/supplier management.
eTendering_Supplier's User_Guide_v4.4.pdf
Eskom is procuring a specialised rock engineering assessment of undermined land for the Arnot and Kendal 400 kV T227 power line. The tender is issued through Eskom's eTendering system, and bidders must register and submit their documents electronically.
240-77471499 Annexure B -To be completed.pdf
Specialised rock engineering assessment of undermined land at the Arnot and Kendal 400 kV sites, commissioned by Eskom Transmission Division. The work involves geotechnical evaluation of undermined ground to support transmission infrastructure safety and integrity.
NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf
Eskom National Transmission Company of South Africa is procuring a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The tender is classified as high risk for occupational health and safety (OHS), requiring bidders to submit a comprehensive OHS tender returnable pack for evaluation.
1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf
Provision of a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 transmission line, for the National Transmission Company South Africa (NTCSA). The successful bidder will assess ground subsidence and sinkhole risks caused by undermining and coal combustion affecting the powerline.
Environmental Tender Evaluation and Scoring Card_ Arnot Kendal 400kv Rock Engineering assessment.docx
Eskom National Transmission Company of South Africa is procuring specialised rock engineering assessment services for undermined land along the Arnot Kendal 400 kV T227 transmission line. The tender requires bidders to submit a signed SHE acknowledgement (Annexure B) and an Environmental Management Plan tailored to the risk category of the work.
BOQ.pdf
The document is a bill of quantities for rock engineering services related to the assessment of undermined land at the Arnot and Kendal 400 kV sites, including rotary core drilling, surveys, desktop studies, fieldwork supervision, reporting, and disbursements.
240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom is procuring specialised rock engineering assessment services for undermined land at the Arnot and Kendal 400kV sites, under a tender managed by the National Transmission division. The tender requires bidders to complete quality management documentation and returnable forms as part of their submission.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 337 548
Range
Based on 4 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)This document is Eskom's Supplier Quality Management Specification (240-105658000, Rev 3), which applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers. It sets minimum quality requirements for supplier selection, evaluation, vendor registration, management, monitoring, assessment and auditing. Suppliers must develop, implement, maintain and continually improve a quality management system (QMS) conforming to ISO 9001. The specification forms part of all Eskom RFIs, RFQs, RFPs and contracts for products and services.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"closingDate":"17 October 2021"}
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and Quality Requirements for ISO 9001 Standard). Bidders must have a quality management system conforming to ISO 9001 (latest revision) or an applicable QMS standard, unless excluded by the tender category. For Category 1, bidders must submit a valid ISO 9001 certificate from an accredited certification body. Bidders must submit quality documentation as per the selected quality category (1-4) and the List of Tender Returnables (240-12248652). Bidders must submit a Contract Quality Plan (CQP) specific to the scope of work, addressing ISO 10005 requirements. Bidders must submit a Quality Control Plan (QCP) or Inspection and Test Plan (ITP) for Eskom review and acceptance. Bidders must allow Eskom free and uninhibited access to facilities and records. Bidders must manage sub-supplier quality programmes and ensure sub-suppliers comply with the same quality requirements. Bidders must submit documented information for control of externally provided processes, products and services, and for roles, responsibilities and authorities. Bidders must submit documented information retained (records) of management review meetings, internal and external audit reports, quality policy, quality objectives, and a quality method statement (as applicable per category).
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers must prepare quality plans and method statements. Method statements must clearly describe the equipment and locations where each activity will take place, identify quality verification activities and stages, and reference relevant procedures, standards, instructions, and specifications. Preservation work plans must be developed and executed, including evaluation of storage sites, oversight of material quality preservation, and a records management process compliant with Eskom information management requirements.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality audits and quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures. Personnel performing special processes (e.g., NDT, welding, coating, heat treatment) must be suitably qualified and, where applicable, registered with statutory bodies. Training certificates must meet SETA requirements.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers and sub-suppliers must have a formal QMS conforming to ISO 9001, unless excluded by the quality category. Unless excluded, a valid ISO 9001 certificate from an accredited body is required. Suppliers must inform Eskom of any proposed changes to the QMS or staff affecting quality. The main supplier must manage sub-supplier quality through performance programmes including audits, surveillance, CQP/QCP reviews, nonconformity management, inspection and test plans, and risk management. Where specified, all products and services must have documented contract quality plans (CQPs) and quality control plans (QCPs)/inspection and test plans (ITPs). CQPs must comply with ISO 10005 and be submitted before kick-off or pre-fabrication meetings. QCPs/ITPs must cover all stages from contract review through commissioning, and must be accepted by Eskom. Hold and witness points are mandatory. Sub-supplier QCPs/ITPs must also comply. Quality kick-off and coordination meetings with Eskom are required. Supplier inspection personnel must be competent and qualified. Eskom reserves the right to appoint resident quality inspectors and to perform surveillance or audits. Signed ITPs/QCPs become addendums to the main contract.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) and IAEA Safety Standard GS-R-3.1. No additional tender-specific health and safety requirements are stated beyond these references.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Standard conditions include Eskom's rights of access to supplier premises and information. Suppliers must implement a preservation management programme covering temporary, long-term and in-transit preservation of equipment and materials, including protection against atmospheric conditions, coatings, electrical grounding, and structural integrity. Nonconformities identified by Eskom must be addressed immediately; repeated nonconformities within 6 months may be escalated to management review committees. Special processes (e.g., welding, NDT) require suitably qualified operators with records available to Eskom.
Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom classifies supplier quality requirements into four categories (1, 2, 3, 4). Only one category applies per procurement. Category 1 requires a valid ISO 9001 certificate, latest audit reports, draft contract quality plan, example ITP/QCP, documented information for control of externally provided processes, roles/responsibilities, and management review records. Category 2 requires objective evidence of a developed, implemented and maintained QMS complying with ISO 9001, including QMS manual, quality policy, objectives, control of documented information, internal audit procedure, control of nonconforming outputs, corrective action procedure, latest internal audit reports, draft CQP, example ITP/QCP, and management review records. Category 3 requires objective evidence of a developed QMS (same as Category 2 but without management review records). Category 4 requires a quality method statement based on ISO 9001, signed quality policy, quality objectives, and documented information for control of externally provided processes and roles/responsibilities specific to the project.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification defines quality criteria for supplier selection and evaluation. Suppliers must complete and sign Form A (Tender and Contract Quality Requirements) to acknowledge and accept Eskom's quality requirements. Quality requirements are categorised into four levels (Category 1 to 4), each requiring progressively less documentation. The applicable category is indicated in Form A and the List of Tender Returnables (240-12248652).
Description
Source: L&S OHS BASELINE RISK ASSESSMENT 2026_.xlsx (unknown)Cell B3: Occupational Health and Safety Baseline risk assessment template
Evaluation Criteria
Source: L&S OHS BASELINE RISK ASSESSMENT 2026_.xlsx (unknown)No eligibility criteria are stated in the document. The document is a risk assessment template and does not specify CSD registration, tax clearance, B-BBEE requirements, CIDB grading, or any other pre-qualification conditions.
Technical Specifications
Source: L&S OHS BASELINE RISK ASSESSMENT 2026_.xlsx (unknown)Cell B3: Occupational Health and Safety Baseline risk assessment template
Compliance Requirements
Source: L&S OHS BASELINE RISK ASSESSMENT 2026_.xlsx (unknown)No specific requirements found
Important Dates
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)Closing date: 2026-10-07 at 10:00 (as per tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the provided document.
Submission Guidelines
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)Returnable documents: a completed Method Statement template (as per the attached template) must be submitted. The method statement must cover the scope of work, objectives, customer focus, competency/training, PPE, tools/equipment, leadership, risk management, improvement actions, data analysis, and relationship management. No other returnable forms are specified in the provided document.
Evaluation Criteria
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)No eligibility criteria or evaluation scoring split are specified in the provided document.
Technical Specifications
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)The tender is for a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The method statement must outline the scope of work as detailed in the Works Information of the NEC document or RFQ, list 2-3 SMART objectives, identify customer needs, required skills/competencies and training, PPE, tools/equipment (including testing/measurements), risks and mitigation actions, improvement actions, data to be collected and analysed, and stakeholder/relationship management including any outsourcing and supplier selection/monitoring.
Compliance Requirements
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Submission Guidelines
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Returnable document: NTCSA Supplier Declaration of Interest form (equivalent to SBD 4). The form must be completed, signed under oath, and submitted with the bid. It requires disclosure of: any director, shareholder, member, partner, line manager or fellow employee employed by NTCSA or serving as an NTCSA director; any close family or associate relationship with an NTCSA employee or director participating in the procurement process; any business courtesies given to or received from NTCSA employees or directors in the last 12 months; and, for consultants, details of other services currently rendered to NTCSA business units, subsidiaries, primary energy suppliers, strategic commodity suppliers, or key industrial customers. A false declaration entitles NTCSA to act against the supplier and the signatory personally.
Evaluation Criteria
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Bidders must complete and submit the Supplier Declaration of Interest form (SBD 4 equivalent), declaring any conflicts of interest, relationships with Eskom employees or directors, and any business courtesies received or given in the last 12 months. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the document.
Technical Specifications
Source: NTCSA Supplier Declaration of Interest.docx (unknown)I, the undersigned [insert full name of signatory]…………………………………………, in my capacity as [insert capacity, i.e., member, director, partner, etc.] …………………………………………... of the supplier [insert registered full legal name of the supplying entity AND their company registration number] ………………....................................................., certify under oath that, to the best of my knowledge, the information furnished herein is true and correct. I accept that NTCSA reserves its right to act against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Compliance Requirements
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Mandatory returnable: NTCSA Supplier Declaration of Interest form (SBD 4 equivalent). The form must be completed, signed under oath, and submitted with the bid. It requires disclosure of conflicts of interest, relationships with NTCSA employees or directors, business courtesies exchanged in the last 12 months, and (for consultants) other current services to NTCSA entities and related parties. No other compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, CIPC, professional registrations, local content) are stated in this document.
Description
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)eTendering system is a web based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
https://tenderbulletin.eskom.co.za or https://tenderbulletin.ntcsa.co.za - this is used by
members of the public, to view and access Eskom published tenders. eTendering hyperlink
will be found on this site. Members of the public may follow prompt instructions once they
have clicked on the eTendering link (https://eTendering.eskom.co.za). This link will allow
them to upload the required tender documentation.
https://eTendering.eskom.co.za - this is used by members of the public, to view information
about published tenders and submit their tender documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality of submitting tender documents via an ebox or online application called
eTendering instead of a physical submission.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser.
Type Eskom Tender Bulletin or Eskom Tender Bulletin (ntcsa.co.za) or Eskom E-Tendering
Click on the eTendering icon “ ”
eTendering system login page will be displayed:
Fig 1
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Registration Form Steps to follow
Plus prefix e.g +27
captcha picture to validate that you
are not a robot.
click on register button.
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button.
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address
and password.
Fig1.1
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP page will be displayed.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
button.
Landing page once OTP is verified.
Select the preferred “Ref No”
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
be submitted.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
mentioned disclaimers.
To submit tender documents, click on “Add file” button.
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
Continue to submit all the required documents under the correct category, i.e.: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 4GB.
will pop-up.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not, all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button.
submitted documents on email, Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender
#MPKUS10086PS closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-
08-23 15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power
Station Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd
EMAIL LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups, Fig2. Click on “Update” button to update registration details.
Fig1.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name.
Fig1.
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig1.
Fig2.
Fig3.
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
OTP successfully goes through and lands on the below screen, password is successfully
reset.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2025 Eskom of 19
Important Dates
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)No closing date, briefing, or site visit dates are stated in the document.
Contact Information
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)The document advises users experiencing problems with the Tender Bulletin, eTendering or OpenText systems to contact the buyer responsible for the published tender, but provides no name, email, phone number or address.
Submission Guidelines
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Submission is electronic only via the Eskom eTendering system. Bidders must register on the portal first. To submit, upload files to https://eTendering.eskom.co.za. Documents must be uploaded by category (technical, commercial, finance). Each file may not exceed 500 MB, and total size of all uploaded files must not exceed 4 GB. A CSD number is required to access the eTendering system. Do not mail documents unless instructed.
Evaluation Criteria
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Not stated in the document. The supplied document is the Eskom eTendering user manual and contains no evaluation details.
Technical Specifications
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Not specified in the supplied document. The document is a general eTendering user guide, not the tender-specific specifications. The document describes the submission process only.
Methodology
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)To submit tender documents via the eTendering system: 1. Open web browser and navigate to Eskom Tender Bulletin or eTendering website. 2. Click on the eTendering icon and log in. 3. Complete registration, verify email, and log in with verified email and password. 4. Enter the OTP sent to cell phone and email, then verify. 5. Select the preferred tender reference number. 6. Click 'Create New Submission' to submit required documents. 7. Add files by giving a name, selecting file type (Technical, Commercial, Finance, etc.), choosing the file, and clicking 'Upload'. 8. Verify all required documents are uploaded, then click 'Finalize Submission'. 9. Confirm finalization by clicking 'Finalise and Close Submission'. 10. After submission, an email with the submission ID and all submitted documents is sent to the submitter. Save this email for future reference.
Financial Requirements
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Not specified in the supplied document.
Compliance Requirements
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Bidders must have a Central Supplier Database (CSD) number to gain access to eTendering system and submit a tender. Registration on the eTendering system is required. An OTP (one time pin) will be sent to the registered cell phone number and email address.
Special Conditions
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)A channel of communication has been created for users experiencing problems with the system. Users encountering difficulties with Tender Bulletin, eTendering, or OpenText systems should contact the buyer responsible for the published tender.
Section
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)For system problems, contact the buyer responsible for the published tender.
Description
Source: Scope of work.pdf (unknown)The National Transmission Company South Africa (NTCSA) requires a specialised rock engineering investigation at Arnot Kendal 400kV T227, located next to the Eskom Vulcan Substation, eMalahleni. The area has been subject to historical undermining, with surface expressions noted as burning sinkholes, the nearest at 14 meters from the tower. The Employer intends to replace the impacted structure with two new structures placed off the undermined ground. The Contractor must assess the area, determine risk of failure, confirm sub-surface conditions at proposed positions, recommend alternative positions if needed, confirm foundation system applicability, recommend specialised foundations if required, and propose ground rehabilitation methods.
Important Dates
Source: Scope of work.pdf (unknown)Closing date: 24 February 2026 (as per document revision history; the tender record lists closing date as 2026-10-07T10:00:00.000Z).
Submission Guidelines
Source: Scope of work.pdf (unknown)Returnable documents: The Contractor will receive the following upon contract award: L09482 Thermal & Colour Ortho-Imagery Data Metadata Report, PDF/DGN Maps of Undermining (Excelsior Cavities), Conceptual Foundation Drawing, and Tower Drawings.
Submission format: All documentation must be submitted in digital (word-friendly PDF, shape files/CAD) and hardcopy formats (2 copies).
Disqualification risks: Any deviation from the works as outlined requires written consent from the Employer.
Evaluation Criteria
Source: Scope of work.pdf (unknown)The Contractor must be a professionally registered Rock Engineer with SANIRE/SAIMM and Chamber of Mines Rock Mechanics/Engineering accreditations.
Compliance with the Occupational Health and Safety Act, Construction Regulations, and NTCSA safety requirements is required.
All works in close proximity to live lines must be conducted under the supervision of an Authorised Person.
The Contractor must obtain all necessary approvals and authorisations, including environmental permits for work near an active stream.
Normative references include ISO 9001 (2015) Quality Management System and ISO 14001 (2015) Environmental Management System.
Technical Specifications
Source: Scope of work.pdf (unknown)Location: Arnot Kendal 400kV T227, next to Eskom Vulcan Substation, eMalahleni.
Existing structure: Tower type 517A (suspension), construction year 2014, conductor 2 x Dino, attachment height 33m, glass cap and pin insulators, earthwire 2 x 9/2.65 steelwire, no fibre, coordinates 25°49'34.60"S 29°6'33.88"E.
Proposed replacement: Two new structures, type 517F, with coordinates: New tower 1 at 25°49'36.38"S 29°6'27.63"E (height 1521m), New tower 2 at 25°49'35.68"S 29°6'40.54"E (height 1514m).
Scope: Specialised rock engineering investigation of undermined land, including literature review, intrusive and non-intrusive testing, risk of failure assessment, sub-surface geological confirmation, foundation system verification, and ground rehabilitation proposals.
Ground truthing: Desktop empirical analysis of historical, current and future mining works; intrusive and non-intrusive testing at proposed structure positions; geological drilling (minimum 12 x 60m boreholes); Rock Mass Classification (RMR) estimates; laboratory testing at Contractor's discretion.
Structure relocation: Any revised positions must have a stable footprint of ≥20m from the base of the tower foundation.
Foundation: Proposed Type 4 conventional foundation system; specialised foundations may be recommended and must be fully detailed and accepted by the Employer.
Deliverables: Comprehensive technical report including geotechnical risks, failure types and warning signs, time guidance for failures, and risk level recommendations.
Safety: Safe Work Procedure (SWP) required prior to site works, reviewed and accepted by the Employer.
Methodology
Source: Scope of work.pdf (unknown)The Contractor must conduct a site walkover, produce a Safe Work Procedure (SWP) prior to site works, and perform ground truthing including desktop empirical analysis of historical and future mining works, intrusive and non-intrusive testing, geological drilling (minimum 12 x 60m boreholes), Rock Mass Classification (RMR) estimates, and laboratory testing at the Contractor's discretion. The Contractor must confirm feasibility of proposed structure positions, recommend revised positions if needed (stable footprint ≥20m from tower foundation), assess areas for construction plant, and determine if safe routine maintenance can be performed. All recommendations must be detailed for constructable implementation including material specifications, quantities, placement methodologies, and Quality Management items.
Experience & Qualifications
Source: Scope of work.pdf (unknown)The Contractor must be a professionally registered Rock Engineer working in surface and underground coal mining industry with SANIRE, SAIMM, and Chamber of Mines Rock Mechanics/Engineering accreditations.
Quality Management
Source: Scope of work.pdf (unknown)Compliance with ISO 9001 (2015) Quality Management System is required. All recommendations must include Quality Management items such as material testing frequencies and strength testing yields.
Financial Requirements
Source: Scope of work.pdf (unknown)Bill of Material (very high level, subject to re-measure):
Compliance Requirements
Source: Scope of work.pdf (unknown)Professional registration: The Contractor must be a professionally registered Rock Engineer with SANIRE, SAIMM, and Chamber of Mines Rock Mechanics/Engineering accreditations.
Safety compliance: Must comply with the Occupational Health and Safety Act, Construction Regulations, and NTCSA safety requirements.
Environmental compliance: Must comply with NEMA and ISO 14001; environmental permits required due to proximity to an active stream.
Quality management: Must comply with ISO 9001 (2015).
Authorisations: Must obtain all necessary approvals and acceptances, including environmental authorisations (EA) and Water Use Licences (WULA) for any construction.
Health & Safety
Source: Scope of work.pdf (unknown)Safety, Health and Environment requirements: PPE as marked, risk assessments with prevention/mitigation measures, emergency procedures, qualification/training requirements, safety regulations for groundwork under power lines, detailed safe work procedures per Construction Regulations, and environmental personnel to advise on permits due to proximity to an active stream. PPE required: Dust coat, Overalls, Safety shoes, Safety glasses, Dust mask, Ear protection, Safety harness, Gloves.
Environmental
Source: Scope of work.pdf (unknown)Environmental personnel from NTCSA to advise on all necessary permits as work is in proximity to an active stream. Compliance with National Environmental Management Act (NEMA) and ISO 14001.
Contractual Terms
Source: Scope of work.pdf (unknown)Contractor responsibilities include providing adequate resources, sourcing and reviewing historical undermining information, managing cost and schedule, ensuring scope is carried out in full, managing sub-contracted works, providing regular feedback, ensuring site work is undertaken by a professionally registered Rock Engineer, complying with safety requirements and OHS Act, obtaining necessary approvals, applying discretion in subsidence areas, informing the Employer of ground condition changes, notifying of impedances, working under Authorised Person supervision near live lines, maintaining clearances, earthing equipment, and ensuring no fieldwork triggers ground instability.
Special Conditions
Source: Scope of work.pdf (unknown)The Contractor will receive the following documents upon contract award: L09482 Thermal & Colour Ortho-Imagery Data Metadata Report, PDF/DGN Maps of Undermining (Excelsior Cavities), Conceptual Foundation Drawing, and Tower Drawings.
Project risks to consider: substation area high security risk, surface expressions (sinkholes) burning and smoking, ground hot spots from underground coal combustion, potential space constraints for heavy duty equipment, detailed inspection of impacted towers, and general EA/WULA for any construction.
Section
Source: Scope of work.pdf (unknown)The Contractor must be a professionally registered Rock Engineer with SANIRE/SAIMM and Chamber of Mines Rock Mechanics/Engineering accreditations. Compliance with ISO 9001 (2015) Quality Management System is required.
Contact Information
Source: BOQ.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Amount","address":null}
Evaluation Criteria
Source: BOQ.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: BOQ.pdf (unknown)The work comprises a specialised rock engineering assessment of undermined land along the Arnot Kendal 400 kV T227 line. The scope includes:
Methodology
Source: BOQ.pdf (unknown)The methodology includes rotary core drilling, LiDAR/topographical/satellite surveys, initial mobilisation to collect historical data, desk top study (geoscience, chamber of mines, environmental, water), fieldwork, supervision, and reporting with recommendations on foundation depth, type, and backfill material. Disbursements cover accommodation, transport, food, safety file, medicals, printing, and laboratory testing (UCS, point load, triaxial, tensile).
Financial Requirements
Source: BOQ.pdf (unknown)Pricing is to be submitted as lump-sum amounts for each activity line item in the Bill of Quantities. The total amount is the sum of all items.
Environmental
Source: BOQ.pdf (unknown)The desk top study must include environmental and water aspects. The assessment must consider geoscience and chamber of mines data, and incorporate environmental and water information.
Description
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)The tender is for a specialised rock engineering assessment of undermined land along the Arnot - Kendal 400 kV Line T227. The contractor must assess ground subsidence and coal combustion risks caused by undermining for Eskom/NTCSA Transmission powerlines.
Submission Guidelines
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Submit all engineering documentation in a separate, standalone file clearly marked 'Engineering Tender Returnables: Arnot - Kendal 400 kV Line T227 Specialised Rock Engineering Assessment of Undermined Land'. The file must contain only engineering-related information, not SHEQ. Required returnables include: 1. Technical Proposal, 2. CV & qualifications of key personnel, 3. Relevant experience, 4. List of Verifiable References. File all documents properly in separate, clearly marked sections. Not providing supporting documentation results in a zero score for that question. Eskom NTCSA reserves the right to conduct scheduled or unscheduled visits to offices, factories and construction sites.
Evaluation Criteria
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Engineering evaluation minimum pass score is 70%. Evaluation is purely on documentation provided. Mandatory criteria (pass/fail): Contractor must display relevant experience in assessment and risk mitigation of ground subsidence and coal combustion caused by undermining for Eskom/NTCSA Transmission powerlines, with experience in surface and underground mining of coal/ore and assessment of surface subsidence or sinkholes. Contractor must be a member of SANIRE (South African National Institute for Rock Engineering); preferable: member of SAIMM or Chamber of Mines Certificate in Rock Mechanics/Engineering. A 'NO' response to any mandatory criterion results in immediate disqualification. Scoring split: Technical Proposal 30%, Relevant Experience 35%, Qualifications 35%. Technical Proposal scoring: no proposal (0), reiterates scope (2), indicates compliance and methodology with some fieldwork details (4), comprehensive methodology (5). Relevant Experience scoring: projects >15 years old (0), 1+ project within 10-15 years (2), within >7-<10 years (4), within ≤7 years (5). Qualifications scoring: SANIRE with <5 years experience (0), 5-10 years (2), >10 years (4), >10 years plus preferable qualification (5).
Technical Specifications
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Scope: Specialised rock engineering assessment of undermined land for Arnot - Kendal 400 kV Line T227. Eskom NTCSA will provide Thermal & Colour Ortho-Imagery Data, PDF/DGN Maps (Undermining), Conceptual Foundation Drawing, Tower Drawings and Line Profile details. The contractor must assess and report on ground subsidence and coal combustion risks caused by undermining for Eskom/NTCSA Transmission powerlines.
Methodology
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Technical proposal must detail the methodology of approach, compliance with relevant standards and guidelines, proposed additional studies (if required), role of key personnel, and approach to fieldworks and investigations. A comprehensive methodology that fully details how the scope will be met scores highest.
Experience & Qualifications
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Contractor must display relevant experience in assessment and risk mitigation of ground subsidence or sinkholes caused by undermining for Eskom/NTCSA Transmission powerlines. At least one successfully completed project in the last 10 to 15 years is required for minimum scoring. CVs must indicate experience in surface and underground mining of coal/ore and assessment of surface subsidence or sinkholes. Traceable references must include project name, brief description, and valid contact details. Required qualification: Member of SANIRE. Preferable: Member of SAIMM or Chamber of Mines Certificate in Rock Mechanics/Engineering. If the registered professional changes, the replacement must have an equivalent profile.
Compliance Requirements
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Mandatory: Member of SANIRE (South African National Institute for Rock Engineering). Preferable: Member of SAIMM (South African Institute of Mining and Metallurgy) or Chamber of Mines Certificate in Rock Mechanics/Engineering (including Surface and Underground Mining). If the registered professional changes, the replacement must have an equivalent profile as outlined.
Environmental
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)The assessment must address ground subsidence and sinkholes caused by undermining, and coal combustion risks. The contractor must have experience in surface and underground mining of coal/ore and assessment of surface subsidence or sinkholes for Eskom/NTCSA Transmission powerlines.
Section
Source: Engineering Tender Evaluation Returnables_Arnot Kendal T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Engineering evaluation minimum pass score is 70%. Mandatory criteria: experience in assessment and risk mitigation of ground subsidence and coal combustion caused by undermining for Eskom/NTCSA Transmission powerlines, and membership of SANIRE. A 'NO' to any mandatory criterion results in immediate disqualification. Scoring: Technical Proposal 30%, Relevant Experience 35%, Qualifications 35%. Evaluation is purely on documentation provided; Eskom NTCSA reserves the right to conduct scheduled or unscheduled visits.
Contact Information
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"scope of work. The methodology"}
Submission Guidelines
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)Returnable documents required for OHS evaluation (high-risk tender):
7.1 Health and Safety officer competency training certificate (SACPCMP/NEDSAM/SAMTRAC).
7.2 Incident Management/Investigation Training.
7.3 First Aider level 2.
7.4 Hazard Identification & Risk Assessment (HIRA).
7.5 Firefighting.
7.6 Supervisor.
7.7 Legal Liability (OHSA) Training for company CEO/MD.
Failure to submit any required returnable may result in disqualification.
Evaluation Criteria
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)OHS tender evaluation for high-risk tenders uses a pass/fail assessment of the following returnables:
Recommendation outcome: Recommended or Not Recommended based on completeness and compliance.
Technical Specifications
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)Scope: Specialised rock engineering assessment of undermined land for Arnot Kendal 400 kV T227 (Eskom National Transmission Company of South Africa).
OHS requirements specific to the scope:
Experience & Qualifications
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)OHS competency qualifications and certificates required (considering scope of work, risks, OHS plan, and applicability):
Financial Requirements
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)Detailed costing for Health and Safety management must be submitted, broken down (not provided as a lump sum). The costing must be based on the overall scope of work/service to be performed, using the scope of work and risk assessment as a guideline.
Compliance Requirements
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)Mandatory OHS compliance documents:
B-BBEE Minimum Level: 2 (from currentAnalysis).
CSD registration, tax clearance, and CIDB grading are not stated in the provided document.
Health & Safety
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)OHS evaluation requirements for high-risk tenders including: Baseline OHS Risk Assessment methodology, Health and Safety Plan aligned with specifications, OHS policy compliance with OHS Act Section 7, and mandatory competency certificates for Health and Safety officer (SACPCMP/NEDSAM/SAMTRAC), Incident Management/Investigation, First Aid level 2, HIRA, Firefighting, Supervisor, and Legal Liability training for CEO/MD.
Description
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Contact Information
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Eskom's Quality Representative: Sithelwa Mdlalo, Snr Adv Quality Assurance, dated 02.06.2026.
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Returnable documents: Form A (Tender & Contract Quality Requirements) must be completed, signed, and submitted with the bid. The form acknowledges and accepts Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The tenderer must indicate the applicable category (Category 4 selected) and whether a site assessment is applicable.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The tender falls under Category 4 quality requirements (refer to clause 3.5 of 240-105658000). Post-contract award quality requirements include Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, and Special Processes (refer to clauses 3.7 and 3.8).
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)The tender is for the provision of Arnot Kendal 400kV T227 specialised rock engineering assessment of undermined land. The quality requirements are specified under Eskom specification 240-105658000 and ISO 9001. The applicable quality category is Category 4 (refer to clause 3.5 of 240-105658000). The tenderer must indicate whether a site assessment is applicable. Post-contract award quality requirements include Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, and Special Processes (refer to clauses 3.7 and 3.8).
Methodology
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)CLAUSE 5 Leadership - PRINCIPLE 2 Leadership X
CLAUSE 6 Planning - PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support - PRINCIPLE 4 Process approach X
CLAUSE 8 Operation - PRINCIPLE 5 Improvement X
CLAUSE 9 - Evidence based decision
Performance Evaluations PRINCIPLE 6 XSECTION making
CLAUSE 10 - Improvement PRINCIPLE 7 Relationship Management X
Quality Management
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Authorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
ESKOM’S QUALITY Sithelwa Mdlalo Snr Adv Quality Assurance 02.06.2026
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Compliance Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The applicable quality category is Category 4 (refer to clause 3.5 of 240-105658000).
Section
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Ard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations PRINCIPLE 6 XSECTION making
ESKOM’S QUALITY Sithelwa Mdlalo Snr Adv Quality Assurance 02.06.2026
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Description
Source: 240-77471499 Annexure B -To be completed.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Submission Guidelines
Source: 240-77471499 Annexure B -To be completed.pdf (unknown)Returnable documents: Annexure B (Acknowledgement Form for Eskom OHS Legal and Other Requirements), completed and signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses.
Evaluation Criteria
Source: 240-77471499 Annexure B -To be completed.pdf (unknown)Bidders must complete and sign Annexure B (Acknowledgement Form for OHS Legal and Other Requirements), confirming that they understand and will comply with Eskom's OHS requirements. After contract award, the bidder must align their processes to Eskom’s OHS requirements and ensure all contractors/suppliers understand and comply with them.
Technical Specifications
Source: 240-77471499 Annexure B -To be completed.pdf (unknown)Scope includes the appointment of contractors and suppliers. The main contractor must demonstrate the process and selection criteria applied when appointing contractors and suppliers, provide prior notification to Eskom before appointments, ensure adequate resources and competencies, monitor contractor/supplier OHS performance through audits and assessments, and manage all non-conformances through performance and penalty processes. Eskom may verify references and past work of a similar nature.
Compliance Requirements
Source: 240-77471499 Annexure B -To be completed.pdf (unknown)Bidders must complete and sign Annexure B (Acknowledgement Form for OHS legal and other requirements), confirming understanding of Eskom's contractor Health and Safety requirements. This includes Eskom contractor Health and Safety requirements standard 32-136, the OHS specification provided, the Occupational Health and Safety Act, and the Compensation for Occupational Diseases and Illnesses Act. After contract award, bidders must align their processes to Eskom's OHS requirements. Penalties apply for OHS non-conformance. Bidders must also demonstrate the process and selection criteria applied when appointing contractors/suppliers, notify Eskom prior to appointing contractors/suppliers, ensure contractors/suppliers have adequate resources and competencies, and are accountable for managing their contractors/suppliers’ OHS compliance. The main supplier must provide grounds for terminating contractors' work and is subject to performance and penalty processes for non-compliance across all tiers. Eskom may verify this and request testimonials/references from previous clients.
Health & Safety
Source: 240-77471499 Annexure B -To be completed.pdf (unknown)requirements Effective Date May 2021
Annexure B: Acknowledgement Form for Eskom OHS legal and other
requirements
NOTE: the supplier/contractor/tenderer has to ensure that he/she understands the OHS
requirements listed hereunder.
a service to Eskom but not limited to the following:
a. Eskom contractor Health and Safety requirements standards 32-136
b. OHS specification/requirements provided
c. Occupational Health and Safety Act
d. Compensation for Occupational Diseases and Illnesses Act
Note: Please note that after contract award, it is your responsibility to fully align the company’s processes
to Eskom’s OHS requirements (policies, procedures, standards etc).
its contractor and/or supplier) pertaining to Eskom and/or Statutory OHS requirement/s.
Description
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)The tender is for the provision of a specialised rock engineering assessment of undermined land at Arnot Kendal 400 kV T227. The document provided is the List of Tender Returnables (Category 4) focusing on quality requirements.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Eskom representative: Sithelwa Mdlalo (named on the returnables list). No contact details (email/phone) are provided in the document.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Returnable documents for this tender are listed in the List of Tender Returnables (Category 4, Rev 7). Bidders must submit all required quality-related documents as per the specification. The document does not state the submission channel, format, or address.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)The tender is evaluated on quality requirements (Category 4). Bidders must score points on the following sections:
Total possible score is 7 points. There is no stated minimum qualifying threshold or preference point system in this document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)The tender is for a specialised rock engineering assessment of undermined land at Arnot Kendal 400 kV T227. The document focuses on quality deliverables rather than technical scope details. Bidders must provide:
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Form A must be completed and signed. A quality method statement based on the scope is required, using the referenced Method Statement Template. The quality policy and objectives must be approved by top management.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Bidders must provide documented evidence of a Quality Management System (QMS) that complies with ISO 9001, even if not certified. This includes:
No CSD, tax, B-BBEE, or CIDB requirements are stated in this document.
Section
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Evaluation is based on quality deliverables. Section A (QMS ISO 9001) scores up to 3 points, Section B (Evidence of QMS in operation) scores up to 2 points, and Section E (User-defined additional requirements) scores up to 2 points. Total possible score is 7 points.
Description
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The National Transmission Company South Africa (NTCSA) requires a specialised rock engineering investigation at Arnot Kendal 400kV T227, located next to Eskom Vulcan Substation, Emalahleni. The area has historical undermining (suspected pre-1970s) with burning sinkholes; the nearest feature is 14 metres from the structure. The Employer intends to remove the impacted structure and replace it with two structures placed off the undermined ground.
Important Dates
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)Closing date: 2026-10-07 at 10:00. No briefing or site visit dates are stated.
Contact Information
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)Employer: Eskom Holdings SOC Ltd, registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Employer's Agent address: Eskom Park, 2nd Floor, Cnr Watermeyer & Jellicoe Street, Emalahleni 1035. No phone or email contacts are stated.
Submission Guidelines
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)Submit the completed Form of Offer and Acceptance (C1.1) with the Schedule of Deviations (if any) and all returnable documents. The offer must be signed by a duly authorised representative. The offered total of Prices must be stated exclusive and inclusive of VAT. The tenderer must provide securities, bonds, guarantees, proof of insurance and other documentation within two weeks of receiving the completed agreement. Failure to fulfil these obligations constitutes repudiation.
Evaluation Criteria
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)No evaluation criteria are stated in the document.
Technical Specifications
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The services comprise a specialised rock engineering assessment of undermined land at Arnot Kendal 400kV T227, located next to Eskom Vulcan Substation, Emalahleni. The area has historical undermining (suspected pre-1970s) with burning sinkholes; the nearest feature is 14 metres from the structure. The assessment must: determine the area and extent of undermining via literature review, intrusive and non-intrusive testing; determine the risk of failure of the structure; confirm sub-surface geological conditions at two proposed structure positions and recommend alternatives if not feasible; confirm whether the current recommended foundation system can be applied and recommend specialised foundation designs if not; and propose ground rehabilitation methods. The contract period is 6 months.
Methodology
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The assessment must include literature review, intrusive and non-intrusive testing to determine the area and extent of undermining. Key activities include: safety file approval, site walkover, safe working procedure (SWP) approval, ground truthing, drilling activities and any required laboratory or in-situ testing, and the contractor's detailed report approval. The Consultant must submit a first programme within 1 week of the Contract Date, and revised programmes at intervals no longer than 1 week. The Consultant must manage all works on site and supervise all site work by a professionally registered Rock Engineer.
Experience & Qualifications
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The Consultant must be a professionally registered rock engineer with SANIRE, SAIMM, and Chamber of Mines Rock Mechanics/Engineering accreditations. Key personnel details (name, job, responsibilities, qualifications, experience) and CVs must be appended to the Tender Schedule.
Quality Management
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The Consultant must provide a quality policy statement and quality plan within 1 week of the Contract Date. The defects date is 52 weeks after Completion of the whole of the services.
Pricing Schedule
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)Pricing is a lump sum (Option A) with an activity schedule as per the attached BOQ. Only completed activities without defects are assessed for payment. Expenses are assessed separately unless included in activity prices. Staff rates are used for compensation events. The tendered total of Prices must be stated exclusive and inclusive of VAT. Delay damages are R5,000 per day per activity, capped at 10% of total contract cost. Payment period is 4 weeks.
Financial Requirements
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)Pricing is a lump sum (Option A) with an activity schedule. The activity schedule is as per the attached BOQ. Only completed activities without defects are assessed for payment. Expenses are assessed separately unless included in activity prices. Staff rates are used for compensation events. Delay damages are R5,000 per day per activity, capped at 10% of total contract cost. The Consultant's total liability is limited to the total of the Prices; liability for indirect or consequential loss is R0.00. Payment period is 4 weeks. Interest on late payment is at the prime rate of Standard Bank.
Compliance Requirements
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The Consultant must be a professionally registered rock engineer (SANIRE, SAIMM, Chamber of Mines accreditations). The contract includes additional conditions Z1 to Z14 covering cession, delegation, assignment, joint ventures, B-BBEE status change notification, confidentiality, waiver, tax invoices, compensation events, Employer's limitation of liability, termination for business rescue, delay damages, ethics, insurance, nuclear liability, and asbestos management.
Health & Safety
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The Consultant must comply with the Employer's safety requirements, Mine safety requirements (where applicable), and the Occupational Health and Safety Act. Work near live lines must be supervised by an Authorised Person (provided by the Employer). Equipment must maintain required height and width clearances. Asbestos management: the Employer ensures ambient air conforms to prescribed standards; OEL for asbestos is 0.2 fibres/ml (4-hour TWA) and short-term limit 0.6 fibres/ml (10-minute TWA). Consultant's personnel may stop work and leave contaminated areas until declared safe. Asbestos removal/disposal is done by a registered asbestos contractor at the Employer's expense.
Environmental
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The scope includes assessing undermined land and proposing ground rehabilitation methods. The contract includes asbestos management provisions to protect the environment and personnel. No other specific environmental requirements are stated.
Contractual Terms
Source: NEC PSC-KENDAL 400kV T227.pdf (unknown)The contract is an NEC3 Professional Services Contract (PSC3) with main Option A (priced contract with activity schedule). Dispute resolution is via Option W1 (adjudication by ICE-SA, arbitration by Association of Arbitrators). Secondary options include X7 (delay damages), X9 (transfer of rights), X10 (Employer's Agent), X18 (limitation of liability), and additional conditions Z1 to Z14. The law of the contract is South African law; language is English. Period for reply is 5 days; retention period is 10 years. The Consultant's total liability is limited to the total of the Prices; indirect/consequential loss liability is R0.00. End of liability date is 5 years after Completion. Delay damages are R5,000 per day per activity, capped at 10% of total contract cost. Additional conditions cover cession, delegation, assignment, joint ventures, B-BBEE status change, confidentiality, waiver, tax invoices, compensation events, Employer's limitation of liability, termination for business rescue, delay damages limits, ethics, insurance, nuclear liability, and asbestos management.
Description
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)National Transmission Company South Africa SOC Ltd (NTCSA) invites tenders for the provision of Arnot Kendal 400 kV T227 specialised rock engineering assessment of undermined land. Tender number E3433NTCSANEG, issue date 28 August 2026, closing date 07 October 2026 at 10:00am SAST. Tender validity period is 120 days from closing date.
Important Dates
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Closing date: 07 October 2026 at 10:00am SAST. Issue date: 28 August 2026. Tender validity period: 120 days from closing date. Site briefing: Not Applicable.
Contact Information
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)NTCSA Representative: Tshifhiwa Modau, Tel: 011 629 5553, E-mail: [email protected]. Procurement Manager: Vukosi Maluleke. Queries to be directed to the NTCSA Representative. Escalation process: Procurement Manager, then Middle Manager or Senior Manager Procurement, with Group Executives/CEO as last resort.
Submission Guidelines
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Submit electronically via the NTCSA E-tendering site by the closing date and time. No hard copies, zip files, or compressed files. Upload documents under folders Technical, Commercial, Financial, and other. All documents in PDF, price list in PDF and Excel. Upload size per document 500 MB, total submission 4 GB. If resubmitting, only the latest version is accepted. Submission status must be marked complete. Check the NTCSA tender bulletin regularly for addendums and clarifications. Clarification queries must be submitted 10 working days before the tender deadline. Alternative tenders not allowed. No public opening of tenders; prices not read out. Site visit/clarification meeting: Not Applicable. Reverse e-auction: Not Applicable. Provision of Security for Performance: Not Applicable. Cataloguing: successful tenderer may be required to provide cataloguing information after award, materials labelled per NTCSA specifications, pricing schedule must include cataloguing line item. Returnable forms include Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer's Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements for Local Goods/Services (Annexure E), SBD 1 (Annexure H), SBD 6.1 (Annexure I), SBD 4 (Annexure J), Tax Clearance Certificate (if applicable), Tax Evaluation questionnaire, proof of CSD registration, COIDA certificate (South African tenderers), CIDB grading CE level 3 or higher, Supplier Non-Disclosure Agreement, SD&L Undertaking, and audited financial statements.
Returnable Documents
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Returnable documents required at tender closing (disqualifiable): Authorisation Form (Annexure A), Acknowledgement form (Annexure B), Tenderer's particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements for Local Goods/Services (Annexure E), SBD 1 Invitation to Bid (Annexure H), SBD 6.1 Preference Points Claim Form (Annexure I), SBD 4 – Bidders Disclosure (Annexure J), E-tendering Help Manual acknowledgement form, Supplier Non-Disclosure Agreement, SD&L Undertaking. Returnables required at closing (non-disqualifiable): Basic Compliance (electronic copy of tender in PDF, price list in PDF and Excel), Tax Clearance Certificates, Tax Evaluation questionnaire, Compliance with Employment Equity Act, CIDB proof of grading (CE level 3 or higher, within 21 working days), Pricing Schedule/BOQ (must be filled in full). Returnables required at closing for evaluation: Specific Goals proof, Functionality/Technical requirements. Additional documents for JV: letter of intent, written confirmation of single business entity, details of single designated bank account. Mandatory contractual requirements: proof of valid CSD registration. Additional contractual requirements: COIDA certificate, quality documents, environmental documents, audited financial statements for previous 18 months (or last year), for JV/SPV each participant's statements, start-ups exempt but must furnish first year statements when available.
Evaluation Criteria
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Functionality threshold is 70%. Scoring: 1) Technical proposal (30%) – scored 0-5 based on detail and methodology; 2) Relevant experience (35%) – scored based on recency of completed projects (0 for >15 years ago, 2 for 10-15 years, 4 for >7 to <10 years, 5 for ≤7 years); 3) Technical qualifications (35%) – scored based on SANIRE membership and years of experience (0 for <5 years, 2 for 5-10 years, 4 for >10 years, 5 for >10 years plus preferable qualification). Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered, conditional discounts not considered for evaluation. Prices scored out of 80 or 90 points. Specific goals scored out of 20 or 10 points per PPPFA. Ranking: 80/20 system, add price and specific goals scores. B-BBEE points table: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, Non-compliant=0. Objective criteria applicable: Designated Sectors (SBD 6.2 and Annex C mandatory if applicable), CIDB Skills Development (CSDG %).
Technical Specifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Scope: Provision of Arnot Kendal 400 kV T227 specialised rock engineering assessment of undermined land. Mandatory evaluation criteria: Contractor must display relevant experience in assessment and risk mitigation of ground subsidence and coal combustion caused by undermining for Eskom/NTCSA Transmission powerlines, with CV indicating experience in Surface and Underground Mining of Coal/Ore and experience in assessment of surface subsidence or sinkholes as result of undermining for Eskom/NTCSA Transmission Powerlines, plus traceable references. Contractor must have required valid technical qualifications: Member of SANIRE; preferable: Member of good standing with SAIMM, Chamber of Mines Certificate in Rock Mechanics/Engineering. Quality documents as required per scope of works. Environmental documents as required per scope of works.
Methodology
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Technical proposal must indicate scope to be undertaken, compliance with relevant standards and guidelines, methodology of approach, proposed additional studies (if required). It must describe role of key personnel and include details on approach of fieldworks and investigations. It must detail fully how scope will be met and provide comprehensive methodology of approach.
Experience & Qualifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Mandatory evaluation criteria require contractor to display relevant experience in assessment and risk mitigation of ground subsidence and coal combustion caused by undermining for Eskom/NTCSA Transmission powerlines, with CV indicating experience in Surface and Underground Mining of Coal/Ore and experience in assessment of surface subsidence or sinkholes as result of undermining for Eskom/NTCSA Transmission Powerlines, plus traceable references. Contractor must have required valid technical qualifications: Member of SANIRE; preferable: Member of good standing with SAIMM, Chamber of Mines Certificate in Rock Mechanics/Engineering. Functionality criteria also assess relevant experience with projects completed within specified timeframes (10-15 years, >7-10 years, ≤7 years) and technical qualifications with years of experience.
Quality Management
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Quality documents as required per scope of works, refer to contractual requirements. Required documents include Supplier Quality Management Specification, Quality Control Plan or Inspection Test Plan (QCP or ITP), and Method Statement template.
Financial Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Pricing Schedule/BOQ must be filled in full; failure to complete BOQ in full will be regarded as non-responsive. Price list must be submitted in PDF and a copy in Excel format. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered, conditional discounts not considered for evaluation but implemented at payment. Prices scored out of 80 or 90 points. Payment terms: For contracts valued below R50,000,000 including VAT, NTCSA pays within 30 days of receipt of undisputed invoices. For contracts valued above R50,000,000 including VAT, NTCSA pays within 60 days of receipt of undisputed invoices.
Compliance Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)CSD registration: Proof of valid and current CSD registration (CSD number/CSD Report) required for all tenderers of local origin and foreign tenderers with local footprint. Tax: Certified copy of tax clearance certificate required from foreign tenderers with a footprint in South Africa but not registered on CSD, and from local tenderers that have not provided their SARS e-filing PIN number. Foreign suppliers with no footprint in South Africa must complete SBD1 but no proof of tax compliance required. Tax Evaluation questionnaire required for services type contracts. B-BBEE: Valid B-BBEE certificate or sworn affidavit required to claim preference points. CIDB: Contractor grading of CE level 3 or higher required. COIDA: Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or licensed compensation insurer (South African tenderers only). Financial: Audited financial statements for previous 18 months (or last year) required; for JV/SPV each participant's statements; start-ups exempt but must furnish first year statements when available. Other: Supplier Non-Disclosure Agreement, SD&L Undertaking, and any additional documents as per scope.
B-BBEE Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Preference points: To claim specific goals/preference points, tenderer must submit valid B-BBEE certificate issued by a B-BBEE verification professional / sworn affidavit / CIPC affidavit, proof of ownership/shareholding (preferably CIPC documentation) inclusive of shareholding breakdown, certified ID copies of shareholders, proof of disability (where applicable). Failure to submit documentation results in 0 points for specific goals but no disqualification. Tenderer may not be awarded points if subcontracting more than 25% of contract value to a non-qualifying person unless the subcontractor is an EME.
Health & Safety
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)COIDA - Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) is required as an additional contractual requirement. SHE-Specification and OHS baseline risk assessment are referenced.
Environmental
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Environmental documents as required per scope of works, refer to contractual requirements. Environmental tender evaluation and scoring card assesses experience in assessment and risk mitigation of ground subsidence and coal combustion caused by undermining for Eskom/NTCSA Transmission powerlines.
Contractual Terms
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Contract conditions: NEC3 Professional Service Contract. Payment terms: For contracts below R50,000,000 including VAT, payment within 30 days of undisputed invoices; above R50,000,000, within 60 days. NTCSA reserves the right to negotiate with preferred bidders if tendered prices not market-related. Main contractors discouraged from subcontracting with subsidiaries; if doing so, must declare. Tender Data takes precedence over Standard Conditions of Tender. Tender validity period is 120 days from closing date. Mandatory contractual requirements must be met prior to contract award; failure may result in non-responsiveness.
Special Conditions
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Tenders must be submitted electronically via NTCSA E-tendering site by closing date and time. No hard copies accepted. No zip/compressed files. Documents uploaded under folders Technical, Commercial, Financial, and other. All documents in PDF format, price list in PDF and Excel. Upload size per document 500 MB, total submission 4 GB. If resubmitting, latest version only accepted. Submission status must be indicated as complete. Contractors must regularly check NTCSA tender bulletin for addendums and clarifications. Clarification queries must be submitted 10 working days before tender deadline. Alternative tenders not allowed. No public opening of tenders; prices not read out. Site visit/clarification meeting: Not Applicable. Reverse e-auction: Not Applicable. Provision of Security for Performance: Not Applicable. Cataloguing: successful tenderer may be required to provide cataloguing information after award, materials labelled per NTCSA specifications, pricing schedule must include cataloguing line item.
Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template_ Arnot Kendal.pdf (RFQ)Eligibility criteria: Tenderers must not be under restriction to do business with NTCSA or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender individually or as JV partner; JV/consortium agreement does not state joint and several liability; conflict of interest; tenders signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; sub-contracting 100% of Scope of Work; flagged suppliers (implicated in serious misconduct by Zondo Report, SIU, or other credible sources, or on PRECCA restricted list). Mandatory evaluation criteria: Contractor must display relevant experience in assessment and risk mitigation of ground subsidence and coal combustion caused by undermining for Eskom/NTCSA Transmission powerlines (CV indicating experience in Surface and Underground Mining of Coal/Ore, and experience in assessment of surface subsidence or sinkholes as result of undermining for Eskom/NTCSA Transmission Powerlines; traceable references). Contractor must have required valid technical qualifications: Member of SANIRE (South African National Institute for Rock Engineering); preferable: Member of good standing with SAIMM, Chamber of Mines Certificate in Rock Mechanics/Engineering. A response of 'NO' to any mandatory criterion results in immediate disqualification.
Description
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The project is the provision of a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line.
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The receiving party must be a company with the capacity to enter into the agreement. No specific eligibility criteria are stated in the document.
Technical Specifications
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)provision of Arnot Kendal 400 kV T227 specialised rock
Project
Contractual Terms
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The NDA also covers exclusions from confidentiality (e.g., information already known, publicly available, independently developed, or legally required to be disclosed), requires written consent for any other use or disclosure, and includes standard clauses on amendments, enforcement, representations, entire agreement, notices, severability, assignment, and publicity.
Description
Source: Environmental Tender Evaluation and Scoring Card_ Arnot Kendal 400kv Rock Engineering assessment.docx (unknown)The tender is for the provision of specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The document provided is an environmental tender evaluation and scoring card, focusing on the environmental management requirements of the tender. The scope includes the preparation and submission of an Environmental Management Plan tailored to the risk category (low, medium, high) of the work.
Submission Guidelines
Source: Environmental Tender Evaluation and Scoring Card_ Arnot Kendal 400kv Rock Engineering assessment.docx (unknown)Returnable documents: signed Annexure B (acknowledgement of Eskom's SHE rules and requirements) must be attached to the tender submission. The Environmental Management Plan for the scope of work must be submitted. The environmental (or SHE/SHEQ) policy signed by the Company Owner/CEO/MD must be submitted. For high-risk work, detailed costing for environmental management (broken down, not lump sum) must be provided. For medium and high risk, identification of environmental aspects and impacts with methodology must be provided. For high risk, CVs and qualifications/certificates of environmental personnel (e.g., Environmental Officer, Environmental Control Officer, Incident investigator) must be submitted. ISO 14001 certificate is required where applicable. All documents must be submitted with the tender; failure to submit or satisfy minimum requirements results in a score of 0.
Evaluation Criteria
Source: Environmental Tender Evaluation and Scoring Card_ Arnot Kendal 400kv Rock Engineering assessment.docx (unknown)Evaluation uses a scoring system: 0 = document not submitted or does not satisfy minimum requirements; 1 = document submitted and satisfies minimum requirements. Submission of signed Annexure B is a prerequisite. The evaluation covers: Environmental Management Plan addressing waste management, environmental induction, incident management, emergency planning, environmental management structure, method statements, compliance approach, competency, training, appointments, communication and awareness. For high risk only: detailed costing for environmental management. For medium and high risk: identification of environmental aspects and impacts. For all: environmental policy signed by Company Owner/CEO/MD. For high risk: environmental competency CVs and qualifications. ISO 14001 certificate is required where applicable. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level) are stated in the provided document.
Technical Specifications
Source: Environmental Tender Evaluation and Scoring Card_ Arnot Kendal 400kv Rock Engineering assessment.docx (unknown)The scope is the specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The tender requires an Environmental Management Plan for the scope of work, with content varying by risk category (low, medium, high). Low risk requires waste management and environmental induction. Medium risk adds environmental incident management and emergency planning. High risk adds environmental management structure, method statements for significant environmental impacts, compliance approach, environmental competency, training, appointments, communication and awareness. The tenderer must identify environmental aspects and impacts (medium and high risk) and provide detailed costing for environmental management (high risk).
Compliance Requirements
Source: Environmental Tender Evaluation and Scoring Card_ Arnot Kendal 400kv Rock Engineering assessment.docx (unknown)Signed Annexure B (acknowledgement of Eskom's SHE rules and requirements) is a prerequisite. Environmental (or SHE/SHEQ) policy signed by Company Owner/CEO/MD is required. ISO 14001 Environmental Management Standard certificate is required where applicable. For high risk, environmental competency CVs and qualifications/certificates are required. No other compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level) are stated in the provided document.
Contact Information
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Buyer: Tshifhiwa Modau. Department: Transmission. No email, phone, or submission address stated.
Submission Guidelines
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Returnable documents: valid B-BBEE certificate issued by a SANAS accredited verification agency, or a sworn affidavit / CIPC affidavit (depending on annual revenue). SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are mandatory if applicable. Bidders must be registered on the CSD. All required forms must be completed and submitted with the tender.
Evaluation Criteria
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Preference points are allocated under the PPPFA based on B-BBEE status. Objective criteria are a condition for contract award; failure to meet them may lead to the second-ranked tenderer being recommended. SDL&I objectives do not form part of scoring but become contractual obligations. No minimum qualifying score or 80/20 or 90/10 split is stated in the document.
Technical Specifications
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Scope: specialised rock engineering assessment of undermined land at Arnot Kendal 400 kV T227. Duration: 2 months. Budget: R0 excluding VAT (indicative only).
Methodology
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Skills development obligations: for every R3 million invoiced, the supplier must offer a university or university of technology bursary valued at R50,000. Skills development targets exclude NTCSA employees and registered learners. The supplier bears full cost of skills development; NTCSA makes no financial contribution. Suppliers may approach SETAs for grants and SARS for tax rebates.
Pricing Schedule
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)The price schedule must separate local and imported components. Local procurement content is total spending minus the imported component. The NTCSA target for local procurement content is 100%.
Financial Requirements
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Local procurement content target is 100%. Tenderers must separate local and imported components in the price schedule. SDL&I penalty: 2.5% of invoice amount for failure to meet SDL&I obligations. NTCSA retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations, released only after compliance reports are approved. For every R3 million invoiced, the supplier must offer a university or university of technology bursary valued at R50,000.
Compliance Requirements
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)CSD registration required. Valid B-BBEE certificate or sworn affidavit (depending on annual revenue) is a condition for contract award. B-BBEE improvement plan must be submitted within 30 days of contract signing. B-BBEE status level 4 must migrate to level 3 by end of first year; levels 5-8 or non-compliant must migrate to level 4 by end of first year and improve one level each subsequent year. SBD 6.2 and Annex C (local content declaration) mandatory if applicable. No CIDB compulsory training, mandatory subcontracting, or NIPP requirements stated.
Requirements
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Objective criteria: must align with PPPFA clause 2(1)(f). Valid B-BBEE certificate or sworn affidavit required to claim preference points. No CIDB compulsory training, mandatory subcontracting, or NIPP requirements. SDL&I objectives: transformation (B-BBEE improvement plan), local procurement content (100% target), jobs creation and retention, skills development. SDL&I penalties and security: 2.5% invoice penalty and 2.5% retention. Quarterly SDL&I reporting required. SDL&I Implementation Schedule must be returned 28 days after contract award. Sworn affidavits must meet validity requirements (deponent details, ownership percentages, revenue, financial year end, status level, empowering supplier status, signatures).
Section
Source: SDLI Strategy - The provision of Arnot Kendal 400 KV T227 specialised rock engineering assessment of undermined land..pdf (TENDER)Preference points allocated under PPPFA based on B-BBEE status. Objective criteria are a condition for award; failure may lead to second-ranked tenderer being recommended. SDL&I objectives do not form part of scoring but become contractual obligations.
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Returnable documents: the Quality Control Plan or Inspection Test Plan (QCP or ITP) must be completed and submitted. The QCP must include scope of work, item/plant/material descriptions, and be approved by the contractor/supplier, subcontractor (where applicable), Eskom, and any Approved Inspection Authority (AIA) or Notification Body (NOBO) as applicable. The QCP must define intervention points (hold, witness, document review, surveillance, verification) and inspection/test methods with acceptance criteria.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No explicit evaluation criteria are stated in the document. Bidders must comply with the Quality Control Plan approval process and may need to engage with an Approved Inspection Authority (AIA) or Notification Body (NOBO) as applicable.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The tender is for a specialised rock engineering assessment of undermined land for the Arnot Kendal 400 kV T227 line. The scope of work is to be detailed in the Quality Control Plan (QCP), which must specify the item/plant/material descriptions, inspection and test methods (e.g., visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy), and acceptance criteria (e.g., functionality, performance measures, regulatory compliance, chemical test).
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Bidders must comply with the Quality Control Plan approval process. Where applicable, an Approved Inspection Authority (AIA) or Notification Body (NOBO) must be engaged. No other compliance requirements are stated.
Description
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Project: Arnot Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.
Location: NTCSA Division - Northeast Grid.
Scope: Specialised rock engineering assessment of undermined land for the 400kV T227 line.
Key NTCSA personnel:
Document: SHE Specification 240-73416879 Rev 2, effective April 2023, review April 2026.
Applicable to any contracting organisation tendering for this contract.
Provides standardised approach to SHE specifications for NTCSA contracts, standards, and NEC3 contracts.
Lists legislative, NTCSA NEG, local authority, municipal by-law, and environmental legislation requirements.
Normative references include: Basic Conditions of Employment Act, OHS Act and Regulations, NEMA, National Road Traffic Act, Eskom Substance Abuse Procedure (32-37), Contractor Health and Safety Requirements (32-136), Life-saving Rules (240-62196227), Incident Management Procedure (32-95), SHEQ Policy (32-727), Working at Heights Procedure (32-418), Vehicle and Driver Safety Management Procedure (240-62946386), Risk Assessment Procedure (32-520), ORHVS, Disaster Management Act.
Informative references include: Tobacco Products Control Act, SANS 1186 Symbolic Safety Signs, Constitution, DMN 34-110 Operating Vehicle Mounted Crane, DMN 34-1981 Excavations.
Defines key terms: appointed contractor, baseline risk assessment, business unit, client, competent person, contractor, construction work, consultant, controlled disclosure, duty of care to environment, employee, employer, environment, environmental management plan, NTCSA requirements, fall protection plan, hazard, hazard identification, health and safety file, health and safety plan, health and safety specification, health and safety requirements, lifesaving rules, medical certificate of fitness, medical surveillance, method statement, organisation, pre-job meetings, principal contractor, provincial director, responsible manager, risk assessment, site, service provider, subsidiary, supplier, task, toolbox talks, the Act (OHS Act), visitor.
Abbreviations defined for 33 terms including AIA, BU, CE, CNC, CR, COID Act, DMR, DOEL, EAP, EP, ERfW, GAR, GSR, HCS, LDV, LoG, SDS, NEMA, NEG, OHS Act, SACPCMP, SABS, SANS, NTCSA.
Important Dates
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ed work","is_compulsory":false}"}
Contact Information
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)NTCSA NEG Contract's Manager: Granny Mavuso
NTCSA NEG Safety Risk Manager: Thandi Magagula
NTCSA NEG Project Manager: Sizwe Sithole
NTCSA NEG Safety Officer: Kedibone Masoko
Evaluation Criteria
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)The contractor must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing. The contractor must notify the provincial director of the Department of Employment and Labour if construction work falls within Regulation 4 of the Construction Regulations. The contractor must appoint a safety officer registered with SACPCMP. The contractor must comply with all applicable legislation and NTCSA SHE requirements. The contractor must provide a consolidated health and safety file on completion. The contractor must ensure all employees have the required medical fitness certificates, including for work at heights. The contractor must have a substance abuse programme and ensure no alcohol or intoxicating substances on site. The contractor must keep records of all employees and appointed contractors' employees.
Technical Specifications
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Scope: Specialised rock engineering assessment of undermined land for the Arnot Kendal 400kV T227 project within the NTCSA Northeast Grid division.
Contractor must develop a SHE plan meeting NTCSA NEG minimum requirements and all applicable legislation.
SHE plan must address: legal compliance (OHS Act, Construction Regulations, NEMA, COID Act, Basic Conditions of Employment Act, National Road Traffic Act), risk assessments (baseline and daily pre-task), safe work procedures/method statements, statutory appointments (fall protection plan compiler, scaffolding supervisor, construction vehicle/mobile plant operator, stacking and storage supervisor), SHE policy, COID letter of good standing, costing for SHE within the project, life-saving rules compliance, substance abuse programme, contractor organisational structure with organograms, construction site management, fire equipment, flammable liquids handling, first aid, SHE communication systems (statutory and non-statutory committees, toolbox talks), SHE training (induction, site-specific, visitor, general), site establishment (roads, vehicle safety), housekeeping, signage, tools and equipment, ladders, scaffolding, auditing (SHE plan approval, NTCSA audits, contractor audits), smoking and cellular phone restrictions, occupational health (medicals, surveillance, fitness for work at heights), working at heights and fall protection plan per NEG procedure 240-180000262, PPE requirements, incident investigation, emergency management, non-conformance and compliance, SHE file compilation and handover, work stoppage authority, hours of work (normal, night, overtime), contract sign-off.
Contractor remains accountable for health and safety programme; NTCSA does not assume contractor's legal responsibilities.
SHE specification is minimum requirements, not all-encompassing; organisational SHE requirements must also be listed in SHE plans.
Quality Management
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Quality management requirements embedded in SHE specification:
Financial Requirements
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Contractor must make detailed provision for the cost of safety and health measures throughout the project in the tender submission.
Compliance Requirements
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Mandatory compliance requirements:
Health & Safety
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Comprehensive health and safety requirements for the Arnot Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land contract:
Legal Compliance: OHS Act and Regulations, Construction Regulations, NEMA, COID Act, Basic Conditions of Employment Act, National Road Traffic Act, Disaster Management Act. Section 37(2) agreement required. Child labour prohibited per Constitution and BCEA.
Statutory Appointments (Construction Regulations):
COID Compliance: Valid Letter of Good Standing from Compensation Commissioner before work commencement and renewals during project for principal and appointed contractors.
Notification: Principal contractor must notify Provincial Director of Department of Employment and Labour in writing for construction work under Regulation 4 of Construction Regulations.
Safety Officer: Full-time or part-time safety officer or construction safety officer registered with SACPCMP appointed in writing.
Risk Assessment: Baseline and daily pre-task risk assessments by competent person appointed in writing; include public safety; documented before each new task.
Safe Work Procedures/Method Statements: Developed from risk assessments to mitigate, reduce, or control hazards.
Construction Sites: Management per NTCSA requirements.
Fire Equipment: Provision and maintenance per requirements.
Flammable/Combustible Liquids: Handling and storage controls; refuelling procedures at construction site.
First Aid: Boxes and equipment per requirements.
SHE Communication Systems:
Housekeeping and Order: Stacking controls.
Workplace Signage and Colour Coding: Per SANS 1186 and requirements.
Tools and Equipment: Hand tools, ladders, scaffolding per OHS Act requirements.
Auditing: SHE plan approval, NTCSA audits, contractor monthly audits.
Smoking and Cellular Phones: Restrictions per site rules.
Occupational Health, Hygiene and Rehabilitation:
Working at Heights: Fall protection plan per NEG procedure 240-180000262; general requirements per OHS Act and Eskom procedure 32-418.
PPE: Risk-based issue as last resort; regular inspection; training in use, care, maintenance.
Incident Investigation: Timeous reporting and investigation by competent investigators; principal contractor involvement in appointed contractor investigations.
Emergency Management: Emergency preparedness per requirements.
Non-Conformance and Compliance: Management processes.
SHE File: Compilation for each work site; consolidated handover on completion (principal contractor to NTCSA with drawings, designs, materials lists, appointed contractor list, agreements, work completed; appointed contractors to principal contractor).
Work Stoppage: Authority to stop work not in accordance with health and safety plan or posing threat to health, safety, or environment.
Hours of Work: Normal work, night work, overtime provisions.
Substance Abuse: Programme aligned with OHS Act and Eskom procedure 32-37; breathalyser and drug testing on entry/while on site; no alcohol or intoxicating substances on site.
Life-saving Rules: Mandatory compliance for all NTCSA employees, agents, consultants, contractors, visitors; disciplinary action for transgressions; client may suspend contractor activities. Rules cover electrical work, working at height, seatbelts, substance influence, permits to work, live work principles.
Contractor Organisational Structure: Principal contractor and appointed contractor organograms required.
Environmental Management: Duty of care to environment; adherence to Environmental Management Plan where in place; minimal damage during work.
Disciplinary Processes: For transgressions of SHE requirements; no victimisation for reporting safety concerns.
Visitor and Public Protection: Precautions against risks from construction site.
Land Owner Rights: Respect for land owners/lessors and preservation of registered activities.
Contract Sign-Off: Required on completion.
Environmental
Source: 07072026 SHE -Specification_Arnot -Kendal 400kV T227 Specialised Rock Engineering Assessment of Undermined Land.pdf (unknown)Environmental requirements:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
29 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
A meticulously organised tender submission can be the difference between a winning bid and one that hits the rejection pile. Learn how to package, structure, and present your tender response for maximum evaluator impact on South African government contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.