Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom E-tendering - Eskom E-tendering - Eskom E-tendering - 2271
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169539
Date & Time
Monday, 05 October 2026 - 10:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
MS TEAMS
Categories
Request for Bid(Open-Tender)
Eskom E-tendering - Eskom E-tendering - Eskom E-tendering - 2271
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)08 Sept
2026
Tender Published
Tender was published
05 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Authority to submit a tender Nov 2012.pdf
ESKOM is procuring the upgrade of the HMI simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender requires bidders to complete and submit the Authority to Submit a Tender schedule, indicating their business status and providing the relevant authorisation certificate.
SBD 1.pdf
Analysis completed but response format was invalid
Standard Bidding Document (SDB) 4_Annexure A.pdf
Supplier Risks identified Rev 1 Oct 2009.pdf
Supplier Integrity Pack.pdf
NDA Vendors.pdf
Annexure B Safety Requirements.pdf
Annexure C.pdf
Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf
No summary available
TAX EVALUATION.pdf
SWORN AFFIDAVIT – B-BBEE EXEMPTED MICRO ENTERPRISE - GENERAL.pdf
SWORN AFFIDAVIT – B-BBEE QUALIFYING SMALL ENTERPRISE - GENERAL.pdf
No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf
The tender is for the upgrade of an HMI simulator at Matla Power Station, with a contract period of two years, issued by Eskom in Mpumalanga. The document provided is the SBD 6.2 declaration form for local production and content, which bidders must complete and submit as part of their bid.
Authorisation Form - final.pdf
Eskom is procuring the upgrade of the HMI (Human-Machine Interface) simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender requires bidders to complete an authorisation form appropriate to their legal entity type and to provide certified supporting documents.
Eskom - Standard Conditions of Tender.pdf
Eskom Standard Condition.pdf
559-164900433 Tender Technical Evaluation Strategy for Simulator Upgrade Project.docx.pdf
Annexure D.pdf
SBD 1 - Invitation to Bid..pdf
C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf
Upgrade of the HMI simulator at Matla Power Station, awarded under an NEC3 Engineering and Construction Contract for a two-year period. The contract is a priced contract with an activity schedule (Option A) and includes extensive additional conditions (Z clauses).
Eskom Supplier Integrity Pact.pdf
Environmental Contractors Assessment Form.pdf
Upgrade of the HMI simulator at Matla Power Station, for a two-year contract period. The environmental assessment form indicates contractors must comply with Eskom's Environmental Management System requirements.
559-164900433 Tender Technical Evaluation Strategy for Simulator Upgrade Project.docx.pdf
Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf
Eskom seeks a contractor to upgrade the HMI simulator at Matla Power Station in Mpumalanga over a two-year period. The procurement is managed through Eskom’s tender process, with the closing date set for 5 October 2026 at 10:00 UTC.
SBD 6.2.pdf
Upgrade of the HMI simulator at Matla Power Station, with a contract period of two years, issued by Eskom in Mpumalanga. The tender is subject to local production and content requirements under the Preferential Procurement Regulations, 2017.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Eskom is procuring the upgrade of the HMI (Human-Machine Interface) simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender requires bidders to acknowledge completion of e-Tendering self-training via a mandatory returnable form.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Eskom is procuring an upgrade of the HMI simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender requires bidders to comply with Eskom's Supplier Integrity Pact, including signing an Integrity Declaration Form and disclosing any conflicts of interest.
No 5 ANNEXURE A Integrity Declaration Form (1).pdf
Upgrade of the HMI simulator at Matla Power Station, with services to be delivered over a two-year period. The tender is issued by Eskom and is open to natural and legal persons, including those related to Eskom employees, subject to integrity declarations.
Scope of work (003).pdf
Upgrade of the HMI (Human-Machine Interface) simulator at Matla Power Station, with services required over a two-year period.
Conditions to tender.pdf
Eskom is procuring the upgrade of the HMI simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender follows Eskom's standard conditions of tender and requires bidders to comply with all stated obligations, including registration and submission requirements.
Authorisation Form - Final.f.pdf
Eskom is procuring the upgrade of the HMI simulator at Matla Power Station in Mpumalanga, for a contract period of two years. The tender requires bidders to complete and submit an authorisation form appropriate to their organisation type, along with supporting certified documents.
Annexure E.pdf
Scope of work (003).pdf
Upgrade of the HMI simulator at Matla Power Station, with services required for a period of two years. The tender is issued by Eskom and is open to bidders in Mpumalanga.
Code of Ethics.pdf
Eskom is procuring the upgrade of the HMI (Human-Machine Interface) simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender is issued by Eskom Holdings Limited and requires bidders to comply with Eskom's Code of Ethics and related standards.
Contractors Assessment Form.pdf
ESKOM is procuring the upgrade of an HMI simulator at Matla Power Station in Mpumalanga, for a two-year period. The tender includes an environmental management assessment form for contractors, covering waste, hazardous substances, and compliance with Matla's environmental procedures.
SBD 6.1 - Preference Points Claims Form..pdf
Upgrade of the HMI simulator at Matla Power Station, with the contract running for two years. The bid is evaluated under the 80/20 preference point system, with 80 points for price and 20 for B-BBEE status level of contribution.
Eskom - Standard Conditions of Tender - final.pdf
Eskom is procuring an upgrade of the HMI simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender is governed by Eskom's Standard Conditions of Tender, which set out the procedural and compliance requirements for bidders.
Attachment 5_ANNEXURE A Integrity Declaration Form.pdf
Upgrade of the HMI simulator at Matla Power Station, with a contract period of two years, issued by Eskom in Mpumalanga.
Declaration of Fair Bidding Practices.pdf
Eskom is procuring an upgrade of the HMI simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender requires bidders to submit a bona fide, competitive offer and to complete a Declaration of Fair Tender Schedule T2.2a.
No 11 Designated items Local Content percentages THRESHOLDS.pdf
ESKOM is procuring an upgrade of the HMI (Human-Machine Interface) simulator at Matla Power Station in Mpumalanga, with a contract period of two years. The tender is open to bidders who can deliver the upgrade and associated services over the two-year term.
Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf
Eskom is procuring a two-year contract to upgrade the HMI (Human-Machine Interface) simulator at Matla Power Station in Mpumalanga. The tender pack consists solely of Eskom's PAYE questionnaire for service contractors, which determines the tax classification of the contractor (independent contractor, personal service provider, labour broker, or dependent contractor) for the 2023/2024 tax year.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom is procuring the upgrade of the HMI simulator at Matla Power Station in Mpumalanga, with the contract running for two years. The agreement is governed by Eskom's General Conditions of Purchase, which set out the terms for delivery, payment, warranties, and termination.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom is procuring the upgrade of the HMI simulator at Matla Power Station in Mpumalanga for a two-year period. The tender is managed through Eskom's eTendering system, requiring electronic submission of all bid documents.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 907 418
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"27 January 2025"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period will render the tenderer non-responsive and disqualified from the procurement process.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)No specific requirements found
Important Dates
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Contact Information
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)Bidders must comply with eligibility criteria stated in the Tender Data and must not be under any restriction to do business with Eskom or State-Owned Companies. Tenderers must be registered on the CSD (Central Supplier Database) and have a valid tax clearance (SARS TCS or tax pin). Bidders must meet any pre-qualification criteria, including B-BBEE level, as stipulated in the Invitation to Tender. If CIDB grading is stipulated, bidders must be registered with CIDB at closing date or capable of registration within 21 working days, with proof of registration mandatory at closing. Bidders must not have misrepresented or falsified any information; fraud or fronting will lead to disqualification and reporting to the B-BBEE Commission. Tenders must include mandatory returnables as listed in the Invitation to Tender; failure to submit them by closing time results in disqualification.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)of a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)reasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)tenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)including the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Section
Source: Eskom - Standard Conditions of Tender - final.pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Important Dates
Source: Declaration of Fair Bidding Practices.pdf (unknown){"closingDate":"01 August 2012"}
Evaluation Criteria
Source: Declaration of Fair Bidding Practices.pdf (unknown)Bidders must complete and submit the Declaration of Fair Tender Schedule T2.2a No. 2, confirming that the tender is bona fide and that no collusion or price-fixing has occurred. The signatory must be authorised to act on behalf of the tenderer.
Health & Safety
Source: Declaration of Fair Bidding Practices.pdf (unknown)I, the undersigned [insert full name of signatory] __________________________________________,
duly authorised to complete this tender in my capacity as [insert capacity, i.e., member, director, partner, etc]
__________________________ on behalf of the tenderer [insert full name of the business entity]
certify that, to the best of my knowledge, the information furnished herein is true and correct.
Contact Information
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown){"name":null,"email":null,"phone":null,"department":" 100%","address":"Minimum threshold for local"}
Evaluation Criteria
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown)Bidders must complete and submit the standard SBD forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination). No specific eligibility thresholds (e.g., B-BBEE level, CIDB grading, or local content percentage) are stated for this tender in the provided document.
Technical Specifications
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown)Construction
Steel Value-added Products
Fabricated Structural Steel 100%
Joining/Connecting Components 100%
Frames 100%
Roof and Cladding 100%
Fasteners 100%
Wire Products 100%
Ducting and Structural pipework
Quality Management
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown) Casting or Frame Fabrication 100%
Fabrication and winding of the Rotor Core 100%
Accessories 100%
Assembly and testing of the fully-built unit 100%
Rail Permanent Way 90%
Rails and rail joints 100%
Ballasts 100%
Ballastless 100%
Turnouts/switches and crossings 100%
Railway sleepers 100%
Rail fastening and accessories 100%
Railway maintenance of way plant & equipment 70%
Assembly and testing of fully build unitst 100%
Health & Safety
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown) Plates 100%
Sheets 100%
Galvanised and Colour Coated Coils 100%
Wire Rod and Drawn Wire 100%
Sections 100%
Reinforcing bars 100%
Pumps, Medium Voltage (MV) Motor and Associated 70%
Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown){"closingDate":"31 May 2024"}
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"note specifying the means of transport, weight, number or volume as appropriate and"}
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)The supplier must accept Eskom's General Conditions of Purchase; non-acceptance must be indicated in writing. The supplier must be able to provide goods/works/services that meet Eskom's approval and warranty requirements. No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)supply the goods or
execute the works
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)240-59385009 Rev 3 Eskom General Conditions Identifier
of Purchase Effective Date 31 May 2024
Review Date May 2029
part of the goods by giving written notice to the Supplier specifying the reason for rejection and whether
replacement of goods or re-work is required.
In the case of goods delivered, Eskom may return the rejected goods to the Supplier at the Supplier's risk
and expense. Any money paid to the Supplier in respect of the goods not replaced within the time required,
together with the costs of returning rejected goods to the Supplier and obtaining replacement goods from a
third party, shall be paid by the Supplier to Eskom.
In the case of works/services, the Supplier shall correct non-conformances/defects as indicated by Eskom.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)for price adjustment, which is calculated in accordance with the formula stated in the agreement. The
Health & Safety
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)rate shall be used to convert from this currency to South African Rand (ZAR). Payment to the Supplier in
any currency other than ZAR shall not exceed the amounts stated in the agreement. Eskom’s CPA (IG)
form must be duly completed by the Supplier. Eskom will pay for the item within 30 days after receipt of a
correct Tax invoice. Eskom’s VAT registration number (4740101508) has to appear on the tax invoice,
before any payment will be made, as from 1 June 2004.
compliance with the terms and conditions of the agreement at the point of delivery/site specified in the
agreement on or before the date stated in the agreement. Late deliveries of the goods or late completion
of the works/services may be subject to a penalty as stated in the agreement. No payment shall be made
if the Supplier does not provide the goods/services/works as stated in agreement. Where goods are to be
delivered the Supplier shall:-
clearly mark the outside of each consignment or package with the Supplier's name and full details of
the destination in accordance with the order and include a packing note stating the contents thereof;
send an advice note specifying the means of transport, weight, number or volume as appropriate and
the point and date of dispatch, to Eskom at the address for delivery of the items;
send a detailed Tax invoice to Eskom after delivery of the goods or after completion of the
works/services;
state the agreement number on all communications in respect of the agreement; and
state in his tender whether delivery cost is included in the price. If not, it will be deemed to be included.
made for containers or packing materials or their return to the Supplier.
inspect and/or test the goods/works/services as well as the workmanship at any stage of the work. Should
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)corrected by a third party at the Supplier’s costs.
and expenses arising from the negligence, infringement of intellectual or legal rights or breach of statutory
duty of the Supplier, his subcontractors, agents or servants or the rights of others, or from the Supplier's
defective design, materials or workmanship.
that the goods/works/services are fit for the purpose for which they are intended and that they will remain
free from defects for a period of one year (unless otherwise stated in the agreement) from acceptance. If
a defect/non-conformance is found with the goods/works/services within this period, the Supplier shall
rectify the defect/non-conformance within an agreed time period, free of cost to Eskom. The Supplier shall
use reasonable skill and care to provide the goods/ works/services as described in the contract.
obligations to any person without the written consent of the other or sub-contracting by the Supplier.
obligations under this agreement to any of its subsidiaries or any of its present divisions or operations
which may be converted into separate legal entities as a result of restructuring.
agreement which is governed by the law of the RSA and the parties hereby submit to the jurisdiction of
the SA courts.
and fail to rectify or remedy the default, and after receiving written notice from the non-defaulting party, the
latter shall be entitled to terminate the agreement.
has accrued or thereafter accrues to Eskom) if the Supplier defaults in due performance of the agreement,
or becomes bankrupt or otherwise is, in the opinion of Eskom, in such financial circumstances as to
prejudice the proper performance of the agreement.
our suppliers.
Description
Source: SBD 1 - Invitation to Bid..pdfThe successful bidder will be required to fill in and sign a written contract form (sbd7).
Bid response documents may be deposited in the bid box
Situated at (street address)
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration number
TCS PIN: OR CSD No:
B-BBEE STATUS LEVEL VERIFICATION Yes B-BBEE STATUS Yes
Certificate level sworn
[TICK APPLICABLE BOX] No AFFIDAVIT No
If yes, who was the certificate
Issued by?
An accounting officer as contemplated in the close corporation
An accounting officer as act (cca)
Contemplated in the close a verification agency accredited by the south african
Corporation act (cca) and name accreditation system (sanas)
The applicable in the tick box a registered auditor
Name:
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/SWORN AFFIDAVIT(FOR EMEs& QSEs) MUST BE SUBMITTED IN
Order to qualify for preference points for b-bbee]
ARE YOU THE ACCREDITED Yes No ARE YOU A FOREIGN Yes No
Representative in south africa based supplier for
For the goods /services /works the goods /services [if yes answer part b:3
Offered? [If yes enclose proof] /works offered? Below ]
Signature of bidder .................................... Date
Capacity under which this bid is
SIGNED (Attach proof of authority to sign
this bid; e.g. resolution of directors, etc.)
Total bid price (all
Total number of items offered inclusive)
Bidding procedure enquiries may be directed to: technical information may be directed to:
Department/ public entity contact person
Contact person telephone number
Telephone number facsimile number
Facsimile number e-mail address
E-mail address
Sbd1
Part b
Terms and conditions for bidding
1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted for
Consideration.
1.2. All bids must be submitted on the official forms provided–(not to be re-typed) or online
1.3. Bidders must register on the central supplier database (csd) to upload mandatory information namely: (
Business registration/ directorship/ membership/identity numbers; tax compliance status; and banking
Information for verification purposes). B-bbee certificate or sworn affidavit for b-bbee must be submitted
To bidding institution.
1.4. Where a bidder is not registered on the csd, mandatory information namely: (business registration/
Directorship/ membership/identity numbers; tax compliance status may not be submitted with the bid
Documentation. B-bbee certificate or sworn affidavit for b-bbee must be submitted to bidding institution.
1.5. This bid is subject to the preferential procurement policy framework act 2000 and the preferential
Procurement regulations, 2017, the general conditions of contract (gcc) and, if applicable, any other
Legislation or special conditions of contract.
2.1 Bidders must ensure compliance with their tax obligations.
2.2 Bidders are required to submit their unique personal identification number (pin) issued by SARS to enable the
Organ of state to view the taxpayer’s profile and tax status.
2.3 Application for tax compliance status (tcs) or pin may also be made via e-filing. In order to use this provision,
Taxpayers will need to register with SARS as e-filers through the website www.SARS.GOV.ZA.
2.4 Bidders may also submit a printed tcs together with the bid.
2.5 In bids where consortia / joint ventures / sub-contractors are involved, each party must submit a separate
Proof of tcs / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a csd number
Must be provided.
3.1. Is the bidder a resident of the republic of south africa (RSA)? yes NO
3.2. Does the bidder have a branch in the RSA? yes NO
3.3. Does the bidder have a permanent establishment in the RSA? yes NO
3.4. Does the bidder have any source of income in the RSA? yes NO
If the answer is “NO” to all of the above, then, IT is not a requirement to obtain a tax compliance status / tax
Compliance system pin code from the south african revenue service (SARS) and if not register as per 2.3 Above.
Nb: failure to provide any of the above particulars may render the bid invalid.
Contact Information
Source: SBD 1 - Invitation to Bid..pdf (TENDER){"name":null,"email":null,"phone":null,"department":"/ PUBLIC ENTITY)","address":"UIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7)."}
Technical Specifications
Source: SBD 1 - Invitation to Bid..pdf (TENDER)The successful bidder will be required to fill in and sign a written contract form (sbd7).
Bid response documents may be deposited in the bid box
Situated at (street address)
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration number
TCS PIN: OR CSD No:
B-BBEE STATUS LEVEL VERIFICATION Yes B-BBEE STATUS Yes
Certificate level sworn
[TICK APPLICABLE BOX] No AFFIDAVIT No
If yes, who was the certificate
Issued by?
An accounting officer as contemplated in the close corporation
An accounting officer as act (cca)
Contemplated in the close a verification agency accredited by the south african
Corporation act (cca) and name accreditation system (sanas)
The applicable in the tick box a registered auditor
Name:
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/SWORN AFFIDAVIT(FOR EMEs& QSEs) MUST BE SUBMITTED IN
Order to qualify for preference points for b-bbee]
ARE YOU THE ACCREDITED Yes No ARE YOU A FOREIGN Yes No
Representative in south africa based supplier for
For the goods /services /works the goods /services [if yes answer part b:3
Offered? [If yes enclose proof] /works offered? Below ]
Signature of bidder .................................... Date
Capacity under which this bid is
SIGNED (Attach proof of authority to sign
this bid; e.g. resolution of directors, etc.)
Total bid price (all
Total number of items offered inclusive)
Bidding procedure enquiries may be directed to: technical information may be directed to:
Department/ public entity contact person
Contact person telephone number
Telephone number facsimile number
Facsimile number e-mail address
E-mail address
Sbd1
Part b
Terms and conditions for bidding
1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted for
Consideration.
1.2. All bids must be submitted on the official forms provided–(not to be re-typed) or online
1.3. Bidders must register on the central supplier database (csd) to upload mandatory information namely: (
Business registration/ directorship/ membership/identity numbers; tax compliance status; and banking
Information for verification purposes). B-bbee certificate or sworn affidavit for b-bbee must be submitted
To bidding institution.
1.4. Where a bidder is not registered on the csd, mandatory information namely: (business registration/
Directorship/ membership/identity numbers; tax compliance status may not be submitted with the bid
Documentation. B-bbee certificate or sworn affidavit for b-bbee must be submitted to bidding institution.
1.5. This bid is subject to the preferential procurement policy framework act 2000 and the preferential
Procurement regulations, 2017, the general conditions of contract (gcc) and, if applicable, any other
Legislation or special conditions of contract.
2.1 Bidders must ensure compliance with their tax obligations.
2.2 Bidders are required to submit their unique personal identification number (pin) issued by SARS to enable the
Organ of state to view the taxpayer’s profile and tax status.
2.3 Application for tax compliance status (tcs) or pin may also be made via e-filing. In order to use this provision,
Taxpayers will need to register with SARS as e-filers through the website www.SARS.GOV.ZA.
2.4 Bidders may also submit a printed tcs together with the bid.
2.5 In bids where consortia / joint ventures / sub-contractors are involved, each party must submit a separate
Proof of tcs / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a csd number
Must be provided.
3.1. Is the bidder a resident of the republic of south africa (RSA)? yes NO
3.2. Does the bidder have a branch in the RSA? yes NO
3.3. Does the bidder have a permanent establishment in the RSA? yes NO
3.4. Does the bidder have any source of income in the RSA? yes NO
If the answer is “NO” to all of the above, then, IT is not a requirement to obtain a tax compliance status / tax
Compliance system pin code from the south african revenue service (SARS) and if not register as per 2.3 Above.
Nb: failure to provide any of the above particulars may render the bid invalid.
Compliance Requirements
Source: SBD 1 - Invitation to Bid..pdf (TENDER)Tax compliance status
Tax compliance status may not be submitted with the bid
Tax compliance requirements
Tax compliance status (tcs) or pin may also be made via e-filing
Tax compliance status / tax
TCS PIN: OR CSD No
Csd number
Central supplier database (csd) to upload mandatory information namely: (
Central supplier database (csd), a csd number
1.3. Bidders must register on the central supplier database (csd) to upload mandatory information namely: (
Business registration/ directorship/ membership/identity numbers; tax compliance status; and banking
1.4. Where a bidder is not registered on the csd, mandatory information namely: (business registration/
Directorship/ membership/identity numbers; tax compliance status may not be submitted with the bid
2.3 Application for tax compliance status (tcs) or pin may also be made via e-filing. In order to use this provision,
1.4. Where a bidder is not registered on the csd, mandatory inform
B-BBEE Details: SBD1
Part a
Invitation to bid
You are hereby invited to bid for requirements of the (name of department/ public entity)
Bid number: closing date: closing time:
Description
The successful bidder will be required to fill in and sign a written contract form (sbd7).
Bid response documents may be deposited in the bid box
Situated at (street address)
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration number
TCS PIN: OR CSD No:
B-BBEE STATUS LEVEL VERIFICATION Yes B-BBEE STATUS Yes
Certificate level sworn
[TICK APPLICABLE BOX] No AFFIDAVIT No
If yes, who was the certificate
Issued by?
An accounting officer as contemplated in the close corporation
An accounting officer as act (cca)
Contemplated in the close a verification agency accredited by the south african
Corporation act (cca) and name accreditation system (sanas)
The applicable in the tick box a registered auditor
Name:
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/SWORN AFFIDAVIT(FOR EMEs& QSEs) MUST BE SUBMITTED IN
Order to qualify for preference points for b-bbee]
ARE YOU THE ACCREDITED Yes No ARE YOU A FOREIGN Yes No
Representative in south africa based supplier for
For the goods /services /works the goods /services [if yes answer part b:3
Offered? [If yes enclose proof] /works offered? Below ]
Signature of bidder .................................... Date
Capacity under which this bid is
SIGNED (Attach proof of authority to sign
this bid; e.g. resolution of directors, etc.)
Total bid price (all
Total number of items offered inclusive)
Bidding procedure enquiries may be directed to: technical information may be directed to:
Department/ public entity contact person
Contact person t
Compliance Requirements
Source: Supplier Integrity Pack.pdf (unknown)Insufficient searchable text - AI extraction recommended
Important Dates
Source: Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf (unknown){"closingDate":"01 November 2012"}
Contact Information
Source: Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"on with the tender offer for Contract"}
Evaluation Criteria
Source: Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf (unknown)Bidders must be authorised to submit the tender and bind the organisation. The authorisation must be evidenced per the applicable certificate in Annexure L. For joint ventures, all partners must be jointly and severally liable, and the lead partner must be authorised to receive instructions, incur liabilities, and handle payments.
Compliance Requirements
Source: Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf (unknown)joint venture agreement which incorporates a statement
power of attorney signed by legally authorised signatories of all
Description
Source: Standard Bidding Document (SDB) 4_Annexure A.pdfSupply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Evaluation Criteria
Source: Standard Bidding Document (SDB) 4_Annexure A.pdf (TENDER)agreements or arrangements with any competitor regarding the quality,
Technical Specifications
Source: Standard Bidding Document (SDB) 4_Annexure A.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Section
Source: Standard Bidding Document (SDB) 4_Annexure A.pdfagreements or arrangements with any competitor regarding the quality,
Description
Source: Supplier Risks identified Rev 1 Oct 2009.pdfClause in Works
Information
Important Dates
Source: Supplier Risks identified Rev 1 Oct 2009.pdf (unknown){"closingDate":"1 Oct 2009"}
Contact Information
Source: Supplier Risks identified Rev 1 Oct 2009.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"es not cover all the risks associated with the work stated in the Works"}
Technical Specifications
Source: Supplier Risks identified Rev 1 Oct 2009.pdf (unknown)Clause in Works
Information
Evaluation Criteria
Source: Scope of work (003).pdf (unknown)No eligibility criteria specified
Contact Information
Source: NDA Vendors.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"orporated under the laws of"}
Evaluation Criteria
Source: NDA Vendors.pdf (unknown)information relating to the design, manufacture at works, testing, quality
Technical Specifications
Source: NDA Vendors.pdf (unknown)provisions of this Agreement
for any purpose whatsoever other than the Project
Contractual Terms
Source: NDA Vendors.pdfagree to abide by the terms of this Agreement to prevent the unauthorised
disclosure of the Confidential Information to third parties. For purposes of this
clause, the Receiving Party’s Representatives shall be deemed to be acting, in
the event of a breach, as the Receiving Party’s duly authorised agents.
3.5 Except as otherwise contemplated in this Agreement, the Parties agree in favour
of one another not to utilise, exploit or in any other manner whatsoever use the
for any purpose whatsoever other than the Project without the prior written
consent of the Disclosing Party.
3.6 Accordingly, the Receiving Party agrees to indemnify, defend and hold the
8.1 is known to, or in the possession of the Receiving Party prior to disclosure
thereof by the Disclosing Party;
8.2 is or becomes publicly known, otherwise than as a result of a breach of this
Agreement by the Receiving Party;
240-63152171 NDA Vendors CONFIDENTIAL TE – Group Technology & Commercial
Effective March 2015
240-63152171
8.3 is developed independently of the Disclosing Party by the Receiving Party in
circumstances that do not amount to a breach of the provisions of this
Agreement;
8.4 is disclosed by the Receiving Party to satisfy an order of a court of competent
jurisdiction or to comply with the provisions of any law or regulation in force from
time to time; provided that in these circumstances, the Receiving Party shall
advise the Disclosing Party to enable the Disclosing Party to take whatever steps
it deems necessary to protect its interests in this regard and provided further that
the Receiving Party will disclose only that portion of the Confidential Information
which it is legally required to disclose and the Receiving Party will use its
reasonable endeavours to protect the confidentiality of such Confidential
Information to the greatest extent possible in the circumstances;
8.5 is disclosed to a third party pursuant to the prior written authorisation and Ltd to
the extent of such approval of the Disclosing Party;
8.6 is received from a third party in circumstances that do not result in a breach of
the provisions of this Agreement.
and shall endure for a period of 3 (three) years after the date of termination of the
relationship between the parties or at a date specified in any subsequent
agreement(s) between the Parties in pursuance of the Project referred to herein.
Agreement and fail to remedy such breach within seven (7) business days from
date of a written notice to do so, then the Disclosing Party shall be entitled to
invoke all remedies available to it in law including, but not Ltd to, the institution of
urgent proceedings as well as any other way of relief appropriate under the
circumstances, in any court of competent jurisdiction, in the event of breach or
threatened breach of the Agreement and/or an action for damages.
14.2 The Disclosing Party warrants that disclosure of the Confidential Information to
the Receiving Party:
14.2.1 will not result in a breach of any other Agreement to which it is a party; and
14.2.2 will not, to the best of its knowledge and belief, infringe the rights of any third
party; and the Disclosing Party hereby indemnifies and holds the Receiving Party
harmless against any liability for third party claims on such a basis.
Technical Specifications
Source: Annexure B Safety Requirements.pdf (unknown)appointment of contractors or suppliers for the
commencement of work
Quality Management
Source: Annexure B Safety Requirements.pdfagainst Eskom.
and/or its sub-contractor and/or supplier) pertaining to Eskom and/or Statutory SHE requirement/s.
Health & Safety
Source: Annexure B Safety Requirements.pdfrequirements that the tenderer has to comply with when submitting the tender returnable:
NOTE: the tenderer has to ensure that he/she understands the SHE requirements listed
hereunder.
but not limited to the following:
a. Eskom contractor Health and Safety requirements standards 32-136
b. SHE specification provided
c. Occupational Health and Safety Act
d. Mine Health and Safety Act (where applicable)
e. Compensation for Occupational Diseases and Illnesses Act
f. National Environmental Management Act
Note: Please note that after contract award, it is your responsibility to fully align the company’s processes
to Eskom’s SHE requirements (policies, procedures, standards etc).
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown){"closingDate":"27 June 2023"}
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies and that","address":null}
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Bidders must be registered on the Eskom Vendor Database. They must complete and submit the Integrity Declaration Form, which includes a Declaration of Fair Tendering Practices(migrations). Bidders must disclose any financial, personal, or private interest with Eskom employees/directors. Failure to comply with the Integrity Pact may result in suspension from the Eskom Vendor Database and inclusion on the National Treasury's List of Restricted Suppliers.
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Section
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
Important Dates
Source: Authorisation Form - Final.f.pdf (unknown){"closingDate":"08 November 2024"}
Contact Information
Source: Authorisation Form - Final.f.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"d to sign all documents in connection with the tender and any contract that may result from it on"}
Evaluation Criteria
Source: Authorisation Form - Final.f.pdf (unknown)Bidders must be one of the following organisation types: company, close corporation, partnership, joint venture, sole proprietor, or trust. The authorised representative must be properly authorised via the relevant resolution or power of attorney, with certified copies attached where required. No other eligibility criteria are stated in the provided document.
Compliance Requirements
Source: Authorisation Form - Final.f.pdf (unknown)Joint Venture Agreement which incorporates a statement
power of attorney in the case of
power of attorney signed by the legally authorised
Contact Information
Source: Authority to submit a tender Nov 2012.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"tion with the tender offer for Contract _ _ _ _ _ _ _ _"}
Evaluation Criteria
Source: Authority to submit a tender Nov 2012.pdf (unknown)Bidders must be one of the following: a company, close corporation, partnership, joint venture, or sole proprietor, and must provide the relevant authorisation certificate as per the Authority to Submit a Tender schedule. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level) are stated in the provided document.
Contact Information
Source: Attachment 5_ANNEXURE A Integrity Declaration Form.pdf (RFP){"name":null,"email":null,"phone":null,"department":"y), should the resulting tender, or part thereof, be","address":"ENDERING PRACTICES"}
Evaluation Criteria
Source: Attachment 5_ANNEXURE A Integrity Declaration Form.pdf (RFP)Bidders must complete and sign Annexure A – Integrity Declaration Form. Bidders must declare any interest or relationship with Eskom employees/directors or other tenderers. Bidders must not be listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters. Bidders must not have been convicted of fraud or corruption related to procurement in the past five years. Bidders must not be prohibited from doing business with any International Financial Development/funding Agency or Lending Institution. For joint ventures, a joint venture agreement must be attached.
Technical Specifications
Source: Attachment 5_ANNEXURE A Integrity Declaration Form.pdf (RFP)provisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
Compliance Requirements
Source: Attachment 5_ANNEXURE A Integrity Declaration Form.pdf (RFP)joint venture agreement which incorporates a statement that all partners are
Health & Safety
Source: Attachment 5_ANNEXURE A Integrity Declaration Form.pdf (RFP)information furnished herein is correct, that it is understood that the tenderer’s
tender/proposal may be rejected, and that Eskom will act against the tenderer should any
aspect of this this declaration prove to be false.
information furnished herein is correct, that it is understood that the JV’s tender/proposal may
be rejected, and that Eskom will act against the JV should any aspect of this this declaration
prove to be false.
Section
Source: Attachment 5_ANNEXURE A Integrity Declaration Form.pdf (RFP)employee/contractor/consultant/director involved in the tender evaluation/tender
director. interest(marital/ evaluation/
Evaluation Criteria
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)Bidders must submit proof of B-BBEE status level of contributor to claim preference points; failure to do so results in zero B-BBEE points. The bidder must complete the SBD 6.1 form, including the declaration and company details. The bidder must not have claimed B-BBEE status fraudulently; doing so may lead to disqualification and other penalties.
Technical Specifications
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)provision of goods or services, through price
quotations, advertised competitive bidding processes or proposals;
(d) “Broad-Based Black Economic Empowerment Act” means the Broad-Based
Black Economic Empowerment Act, 2003 (Act No. );
(e) “EME” means an Exempted Micro Enterprise in terms of a code of good
Compliance Requirements
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)No specific requirements found
B-BBEE Minimum Level: 20
Points Allocation: 2 points
B-BBEE Details: SBD 6.1
Preference points claim form in terms of the preferential
Procurement regulations 2017
This preference form must form part of all bids invited. It contains general information and
serves as a claim form for preference points for Broad-Based Black Economic Empowerment
(B-BBEE) Status Level of Contribution
Nb: before completing this form, bidders must study the general
Conditions, definitions and directives applicable in respect of b-
Bbee, as prescribed in the preferential procurement
Regulations, 2017.
1.1 The following preference point systems are applicable to all bids:
applicable taxes included); and
a) The value of this bid is estimated to exceed R50 000 000 (all applicable taxes
included) and therefore the 80/20 preference point system shall be applicable;
1.2 Points for this bid shall be awarded for:
(a) Price; and
(b) B-BBEE Status Level of Contributor.
1.3 The maximum points for this bid are allocated as follows:
Points
Price 80
B-bbee status level of contributor 20
Total points for Price and B-BBEE must not exceed 100
1.4 Failure on the part of a bidder to submit proof of B-BBEE Status level of contributor
together with the bid, will be interpreted to mean that preference points for B-BBEE
status level of contribution are not claimed.
1.5 The purchaser reserves the right to require of a bidder, either before a bid is
adjudicated or at any time subsequently, to substantiate any claim in regard to
preferences, in any manner required by the purchaser.
(a) “B-BBEE” means broad-based black economic empowerment as defined in section
1 of the Broad-Based Black Economic Empowerment Act;
(b) “B-BBEE status
Section
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER) Pt P min Ps 801
P min
Where
Ps = Points scored for price of bid under consideration
Pt = Price of bid under consideration
Pmin = Price of lowest acceptable bid
4.1 In terms of Regulation 6 (2) and 7 (2) of the Preferential Procurement Regulations,
preference points must be awarded to a bidder for attaining the B-BBEE status level of
contribution in accordance with the table below:
Number of points
B-BBEE Status Level of Contributor
(80/20 system)
1 20
2 18
3 14
4 12
5 8
6 6
7 4
8 2
Non-compliant contributor 0
of 4
5.1 Bidders who claim points in respect of B-BBEE Status Level of Contribution must
complete the following:
Paragraphs 1.4 And 4.1
6.1 B-BBEE Status Level of Contributor: . = .........(maximum of 20 points)
(Points claimed in respect of paragraph 7.1 must be in accordance with the table
reflected in paragraph 4.1 and must be substantiated by relevant proof of B-BBEE
status level of contributor.
7.1 Will any portion of the contract be sub-contracted?
(Tick applicable box)
Yes NO
7.1.1 If yes, indicate:
i) What percentage of the contract will be subcontracted.....................................%
ii) The name of the sub-contractor...................................................................
iii) The B-BBEE status level of the sub-contractor......................................................
iv) Whether the sub-contractor is an EME or QSE
(Tick applicable box)
Yes NO
v) Specify, by ticking the appropriate box, if subcontracting with an enterprise in
terms of Preferential Procurement Regulations,2017:
Designated Group: An EME or QSE which is at last 51% owned EME QSE
by: √ √
Black people
Black people who are youth
Black people who are women
Black people with disabilities
Black people living in rural or underdeveloped areas or townships
Cooperative owned by black people
Black people who are military veterans
Or
Any EME
Any QSE
8.1 Name of company/firm:...........................................................................
8.2 VAT registration number:.........................................................................
8.3 Company registration number:.................................................................
8.4 Type of company/ firm
Partnership/Joint Venture / Consortium
One person business/sole propriety
Close corporation
Company
(Pty) Limited
of 4
[Tick applicable box]
8.5 Describe principal business activities
..................................................................................................................
..................................................................................................................
..................................................................................................................
8.6 Company classification
Manufacturer
Supplier
Professional service provider
Other service providers, e.g. transporter, etc.
[Tick applicable box]
8.7 Total number of years the company/firm has been in business:..............................
8.8 I/we, the undersigned, who is / are duly authorised to do so on behalf of the
company/firm, certify that the points claimed, based on the B-BBE status level of
contributor indicated in paragraphs 1.4 and 6.1 of the foregoing certificate, qualifies
the company/ firm for the preference(s) shown and I / we acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as
indicated in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 6.1, the contractor may be required to furnish documentary
proof to the satisfaction of the purchaser that the claims are correct;
iv) If the B-BBEE status level of contributor has been claimed or obtained on a
fraudulent basis or any of the conditions of contract have not been fulfilled, the
purchaser may, in addition to any other remedy it may have –
(a) disqualify the person from the bidding process;
(b) recover costs, losses or damages it has incurred or suffered as a
result of that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered
as a result of having to make less favourable arrangements due to
such cancellation;
(d) recommend that the bidder or contractor, its shareholders and
directors, or only the shareholders and directors who acted on a
fraudulent basis, be restricted by the National Treasury from
obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other
side) rule has been applied; and
(e) forward the matter for criminal prosecution
Witnesses ..............................................
Signature(s) of bidders(s)
Date: .........................................
of 4
Evaluation Criteria
Source: Authorisation Form - final.pdf (unknown)The bidder must be a legally recognised entity type (company, close corporation, partnership, joint venture, sole proprietor, or trust) and must provide the corresponding certificate and certified supporting documents as described in the Authorisation Form.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bidders must have a valid CSD number to access the eTendering system. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD number to gain access to
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Contact Information
Source: Environmental Contractors Assessment Form.pdf (unknown){"name":null,"email":null,"phone":null,"department":"_______________________________________________________________","address":null}
Evaluation Criteria
Source: Environmental Contractors Assessment Form.pdf (unknown)Completion of the Environmental Contractors Assessment Form (Annexure A) is explicitly required. No other pre-qualification criteria (CSD, tax clearance, B-BBEE, CIDB grading, etc.) are stated in the extracted document.
Technical Specifications
Source: Environmental Contractors Assessment Form.pdf (unknown)Maintenance
Other
If other, please specify:
Task list y n
Quality Management
Source: Environmental Contractors Assessment Form.pdf (unknown)(Record of decision), Example: Water Use License, Waste Permit, etc.
disposal certificate must be supplied to Matla Environmental department
polluter pays principles? Note: Corrective actions will be the liability of the
contractor.
Assessor Signature_______________________________
Error! Unknown document property name.
Health & Safety
Source: Environmental Contractors Assessment Form.pdf (unknown)Example: oil, grease, SAF-Heavy, Hydrochloric acid, cleaning material, pesticides
etc. If yes, list them or attach a 16 point form MSDS.
and specify the type of waste. Example hazardous, domestic etc.
Important Dates
Source: Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf (unknown){"closingDate":"1 March 2024"}
Technical Specifications
Source: Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2024/2025 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2024/2025 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2024/2025 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2024/2025 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2024/2025 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2024/2025 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2024/2025 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2024/2025 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2024/2025 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2024/2025 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2024/2025 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2024/2025 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2024/2025 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2024/2025 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2024/2025 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Pricing Schedule
Source: Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf (unknown)the non-deduction is 07.
until such time that a valid IRP30 certificate is provided to Eskom.
Labour Broker Individual N/A X IRP5 / IT3(a) 3617 A
tax rates
Dependent Contractor Individual X X IRP5 / IT3(a) 3601 or “A” for
tax rates 3616 Individual
“E” for
Health & Safety
Source: Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf (unknown)Company/close corporation/trust ..................................................................... 11
Evaluation pack b....................................................................................................................... 12
Contractor’s details for an individual* ..................................................................... 12
Question 1(i) .............................................................................................................................. 13
Question 2(i) .............................................................................................................................. 13
Question 2(ii) ............................................................................................................................. 13
Question 3(i) .............................................................................................................................. 13
Question 4(i) .............................................................................................................................. 14
Question 4(ii) ............................................................................................................................. 14
Question 4(iii) ............................................................................................................................ 14
Question 5(i) .............................................................................................................................. 14
Question 5(ii) ............................................................................................................................. 14
Question 6(i) .............................................................................................................................. 15
Question 6(ii) ............................................................................................................................. 15
Question 6(iii) ............................................................................................................................ 15
Question 6(iv) ............................................................................................................................ 15
Question 6(v) ............................................................................................................................. 15
Question 6(vi) ............................................................................................................................ 15
Question 6(vii) ........................................................................................................................... 15
Question 6(viii)........................................................................................................................... 15
Question 6(ix) ............................................................................................................................ 15
Question 6(x) ............................................................................................................................. 15
Question 6(xi) ............................................................................................................................ 15
Particulars of individual .............................................................................................. 17
Applicable to the 2024/2025 Tax Years
Appendix 1 ....................................................................................................................................... 18
Three or more full - time employees who are not connected persons . 18
Appendix 2 ....................................................................................................................................... 19
ESKOM ...................................................................................................................................... 19
Appendix 3 ....................................................................................................................................... 20
And/or shall not be controlled or supervised by ESKOM ............................. 20
Appendix 4 ....................................................................................................................................... 21
Affidavit confirming that not more than eighty percent (80 %) of income
Is or is likely to be received from any one client ............................................. 21
Appendix 5 ....................................................................................................................................... 22
Opposed to people ........................................................................................................... 22
Appendix 6 ....................................................................................................................................... 23
Declaration by ........................................................................................................................ 23
That the contractor is a labour broker ................................................................... 23
Appendix 7 ....................................................................................................................................... 24
Declaration by ........................................................................................................................ 24
Provider ................................................................................................................................ 24
Appendix 8 ....................................................................................................................................... 25
Declaration by ........................................................................................................................ 25
That the contractor is an independent supplier or contractor .................. 25
Appendix 9 ....................................................................................................................................... 26
Declaration by ........................................................................................................................ 26
That the contractor is a non-resident of the republic of south africa .... 26
Appendix 10 ..................................................................................................................................... 27
Definitions as per the income tax act, NO. , as amended. ................... 27
“Connected Person” .................................................................................................................. 27
"Associated Institution", in relation to any single employer, ...................................................... 28
"Labour Broker" ......................................................................................................................... 28
"Personal Service Provider” ...................................................................................................... 28
"Remuneration" ......................................................................................................................... 28
“Resident” .................................................................................................................................. 29
Applicable to the 2024/2025 Tax Years
Introduction
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2024/2025 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
ease of reading.
this Pack;
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
Sign Appendix 9. Submit The Pack to your contractor representative in
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2024/2025 Tax Years
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Go to Question 5(i).
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Applicable to the 2024/2025 Tax Years
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2024/2025 Tax Years
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
Complete and sign Appendix 5 Affidavit. If the Affidavit is not signed,
Sign Appendix 6. If the Agreement is not signed, PAYE will be withheld
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
No further questions must be answered.
Sign the “Particulars of Individual” Section at the end of the Evaluation
Sign Appendix 6. PAYE will be withheld from your payments.
PAYE will be withheld from your payments until such time the valid
IRP30 certificate is provided.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
from your payments.
withheld from your payments.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign the “Particulars of Individual” at the end of the Evaluation Pack.
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Applicable to the 2024/2025 Tax Years
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2024/2025 Tax Years
Applicable to the 2024/2025 Tax Years
Appendix 1
Thus signed and sworn to before me at ______________on this day
Of __________20.
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2024/2025 Tax Years
Appendix 3
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2024/2025 Tax Years
Appendix 4
Affidavit confirming that not more than eighty percent (80 %) of
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2024/2025 Tax Years
Appendix 5
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2024/2025 Tax Years
Appendix 6
Applicable to the 2024/2025 Tax Years
Appendix 7
Applicable to the 2024/2025 Tax Years
Appendix 8
Applicable to the 2024/2025 Tax Years
Appendix 9
Applicable to the 2024/2025 Tax Years
Appendix 10
rendering any such service, other than any employee who is a shareholder or member of the
company or trust or is a connected person in relation to such person;
"Remuneration"
means -
any amount of income which is paid or is payable to any person by way of any salary, leave pay, wage,
overtime pay, bonus, gratuity, commission, fee, emolument pension, superannuation allowance, retiring
allowance or stipend, whether in cash or otherwise and whether or not in respect of services rendered,
including-
a) any amount referred to in paragraph (a), (c), (cA),(d), (e), (eA) or (f) of the definition of "gross
income" in section one of this Act;
any amount required to be included in such person's gross income under paragraph (i) of that definition;
Applicable to the 2024/2025 Tax Years
bA) ...
but not including-
ii) any amount paid or payable in respect of services rendered or to be rendered by any person
(other than a person who is not a resident or an employee contemplated in paragraph (b), (c),
(d) (e) or (f)of the definition of "employee") in the course of any trade carried on by him
independently of the person by whom such amount is paid or payable and of the person to
whom such services have been or are to be rendered: Provided that for the purposes of this
paragraph a person shall not be deemed to carry on a trade independently as aforesaid if the
services are required to be performed mainly at the premises of the person by whom such
amount is paid or payable or of the person to whom such services were or are to be rendered
and the person who rendered or will render the services is subject to the control or supervision
of any other person as to the manner in which his or her duties are performed or to be
performed or as to his hours of work. Provided further that a person will be deemed to be
carrying on a trade independently as aforesaid if he throughout the year of assessment employs
three or more employees who are on a full time basis engaged in the business of such person
of rendering any such service, other than any employee who is a connected person in relation to
such person;
iii) ...
“Resident”
means any-
(a) natural person who is-
(i) ordinarily resident in the Republic; or
(ii) not at any time during the relevant year of assessment ordinarily resident in the Republic, if that
person was physically present in the Republic-
a) for a period or periods exceeding 91 days in aggregate during the relevant year of
assessment, as well as for a period or periods exceeding 91 days in aggregate during each
of the five years of assessment preceding such year of assessment; and
b) for a period or periods exceeding 915 days in aggregate during those five preceding years
of assessment,
in which case that person will be a resident with effect from the first day of that relevant year of
assessment: Provided that-
(A) a day shall include a part of a day, but shall not include any day that a person is in transit
through the Republic between two places outside the Republic and that person does not
formally enter the Republic through a “port of entry” as contemplated in section 9 (1) of the
Immigration Act, 2002 (Act No. ), or at any other place as may be permitted by
the Director General of the Department of Home Affairs or the Minister of Home Affairs in
terms of that Act; and
(B) where a person who is a resident in terms of this subparagraph is physically outside the
Republic for a continuous period of at least 330 full days immediately after the day on
which such person ceases to be physically present in the Republic, such person shall be
deemed not to have been a resident from the day on which such person so ceased to be
physically present in the Republic; or
(b) person (other than a natural person) which is incorporated, established or formed in the Republic or
which has its place of effective management in the Republic,
but does not include any person who is deemed to be exclusively a resident of another country for
purposes of the application of any agreement entered into between the governments of the Republic
and that other country for the avoidance of double taxation;
Applicable to the 2024/2025 Tax Years
Section
Source: Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf (unknown)Evaluation pack a......................................................................................................................... 6
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Corporation/Trust” at the end of the evaluation Pack.
Important Dates
Source: Conditions to tender.pdf (TENDER){"briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting at which tenderers may familiarise","is_compulsory":false}"}
Evaluation Criteria
Source: Conditions to tender.pdf (TENDER)Bidders must comply with the criteria in the Tender Data, not be under any restriction to do business with Eskom, be registered with the CIDB in the required category and grade, provide proof of COIDA registration, and have SHEQ systems in place. Failure to meet stipulated gatekeepers or provide compulsory documentation will render the tender non-responsive.
Technical Specifications
Source: Conditions to tender.pdf (TENDER)Supply Chain Policy 32-1033 on the following link:
http://www.eskom.co.za/c/61/eskom-purchasing-policies/”.
After the cancellation of the tender process or the rejection of all tenders Eskom
may abandon the proposed work
Quality Management
Source: Conditions to tender.pdf (TENDER)tenderer to extend it. A tenderer agreeing to the request will not be required or
permitted to modify a tender, except to the extent Eskom may allow for the
effects of inflation over the additional period.
Clarification of tender 31 Provide, on request from the Eskom Representative during the evaluation of
after submission tenders, any other material that has a bearing on the tender, the tenderer’s
commercial position (including notarised joint venture agreements), preferencing
arrangements or samples of materials, considered necessary by Eskom for the
purpose of a full and fair risk assessment, and for the purposes of conducting
inspections, tests or any other analysis. This may include providing a breakdown
of rates or Prices. No change in the total of the Prices or substance of the tender
is sought, offered, or permitted except as required by the Eskom Representative
to confirm the correction of arithmetical errors discovered in the evaluation of
tenders. The total of the Prices stated by the tenderer as corrected by the Eskom
Pricing Schedule
Source: Conditions to tender.pdf (TENDER)Insurance 10 Be informed that the extent (if any) of insurance provided by Eskom may not be
for the full cover required in terms of the relevant category listed in Section 8 of
the conditions of contract. The tenderer is advised to seek qualified advice
regarding insurance.
Pricing the tender 11 Include in the rates, prices, and the tendered total of the Prices (if any) all duties,
taxes (except VAT), and other levies payable by the successful tenderer. Such
duties, taxes and levies are those applicable 14 (fourteen) days prior to the
deadline for tender submission.
12 Show Value-Added Tax (VAT) payable by Eskom separately as an addition to
the tendered total of the Prices.
Compliance Requirements
Source: Conditions to tender.pdf (TENDER)Compliance with CIDB 36 Eskom, as a state owned entity, requires all tenderers to be registered with the Construction Industry Development Board (“the CIDB”). This requirement flows from the Construction Industry Development Board Act, (“the CIDB Act”) and the Construction Industry Development Board Regulations (“the Regulations”), in terms of which a contractor is required to register with the CIDB to partake in public sector procurement for construction works (as defined therein). The required grade and category of registration which is determined with reference to the nature and value of the contract, is detailed in the Tender Data. Eskom requires tenderers to submit proof of registration or proof of application for registration with the CIDB, in the required category of registration, as a tender returnable. In the event that at the deadline for tender submission only proof of application is available, a valid proof of registration must be submitted by the tenderer when it is issued, and in any event prior to contract award. The requirements of the CIDB Act and the Regulations may change from time to time and Eskom will be required to apply the version of the CIDB Act and Regulations applicable at the time of contract award. Tenderers should keep themselves updated on these requirements. Further information on the CIDB and CIDB registration can be found on the CIDB website www.cidb.org.za. Compliance with COIDA, 37 The law requires that tenderers are registered with the Compensation Fund (“the OHS Act & Eskom’s Fund”) in terms of the Compensation for Occupational Injuries and Diseases Act SHEQ Requirements (“COIDA”) or with a licensed compensation insurer. This requirement flows from the Occupational Health and Safety Act (“the OSH Act”), and Regulation 4(1) (g) of the Construction Regulations 2003. Tenderers are required to provide proof to the satisfaction of Eskom that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the time of tendering, failing which, Eskom reserves the right to declare the tender non-responsive during tender evaluation. All costs and 240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial Effective May 2013 of 9 240-62044728 Unique Identifier Eskom Holdings SOC Limited’s Standard Revision Rev. 1 Conditions of Tender Revision Date May 2016 Group Technology & Commercial personnel associated with SHEQ should be reflected in the tender for Eskom’s assessment thereof. Provision of Security for 38 To the extent that the provision of security for performance is a requirement, the Performance tenderer must indicate the names of a minimum of 2 (two) financial institutions that the tenderer is likely to approach in order to obtain the required form of security.
Eskom’s undertakings Eskom and the Eskom Representative, shall: Respond to clarification 1 Respond to a request for clarification received earlier than the closing time for clarification of queries. The response is notified to all tenderers. Issue Addenda 2 If necessary, issue Addenda that may amend, amplify, or add to the tender documents, to each tenderer. If a tenderer applies for an extension to the deadline for tender submission, in order to take Addenda into account in preparing a tender, Eskom may grant such an extension and the Eskom Representative shall notify the extension to all tenderers. Return late tenders 3 Return tenders received after the deadline for tender submission unopened to the tenderer submitting a late tender. Tenders will be deemed late if they are not received at the designated facsimile machine or in the designated tender box at the date and time stipulated as the deadline for tender submission. Tender opening 4 Open the tenders in the presence of the tenderers’ representatives who choose to attend at the time and place stated in the Tender Data. Tenders for which an acceptable notice of withdrawal has been submitted will not be opened. 5 At tender opening, Eskom will announce the names of the tenderers. Prices and lead times for completion will be announced, unless otherwise stated in the Tender Data. Two-envelope system 6 Where stated in the Tender Data that a two-envelope system is to be followed, open only the technical proposals in the presence of tenderer’s representatives and announce the name of each tenderer. 7 Evaluate the quality of the technical proposals and advise tenderers on who remains in contention for the award of the contract. Return unopened financial proposals to tenderers whose technical proposals failed to meet the minimum criteria. 240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial Effective May 2013 of 9 240-62044728 Unique Identifier Eskom Holdings SOC Limited’s Standard Revision Rev. 1 Conditions of Tender Revision Date May 2016 Group Technology & Commercial Non-disclosure 8 Unless required to do so by law, not disclose to tenderers, or to any other person not officially concerned with such processes, information relating to the evaluation and comparison of tenders and recommendations for the award of a contract, until after the award of the contract to the successful tenderer. Grounds for rejection 9 Consider rejecting a tender if there is any effort by a tenderer to influence the processing of tenders or contract award. Disqualification 10 Immediately disqualify a tenderer (and his tender) if it is established that the tenderer offered an inducement to any person with a view to influencing the placing of a contract arising from this Invitation to Tender. Test for responsiveness 11 Determine before detailed evaluation, whether each tender properly received Meets the requirements of these Conditions of Tender, Has been properly signed, and Is responsive to the requirements of the tender documents. 12 Judge a responsive tender as one which conforms to all the terms, conditions, and specifications of the tender documents without material deviation or qualification. A material deviation or qualification is one which, in Eskom's opinion would Detrimentally affect the scope, quality, or performance of the works, services or supply identified in the specification, Change Eskom's or the tenderer's risks and responsibilities under the contract, or Affect the competitive position of other tenderers presenting responsive tenders, if it were to be rectified. 13 A tenderer’s failure to comply with the said conditions of tender or failure to provide any compulsory documentation required for purposes tender evaluation and the determination of competitive ranking will render a tender non-responsive. Gatekeepers 14 A tenderer’s failure to meet stipulated gatekeepers (pre-requisites for evaluation) will also render the tender / offer non-responsive. Copies of Tenders 15 It must further be noted that a tenderer’s failure to provide the necessary copies of the original tender and in the stipulated format, will also disqualify the tenderer from further evaluation. Tenderers will not be permitted to provide the required copies after tender / enquiry closing, and Eskom will not be responsible for the making of copies for the purposes of evaluation, in an effort to avoid the risks of tender tampering. Non-responsive tenders 16 Reject a non-responsive tender, and not allow it to be subsequently made responsive by correction or withdrawal of the non-conforming deviation or reservation. 240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial Effective May 2013 of 9 240-62044728 Unique Identifier Eskom Holdings SOC Limited’s Standard Revision Rev. 1 Conditions of Tender Revision Date May 2016 Group Technology & Commercial Arithmetical errors 17 Check responsive tenders for arithmetical errors, correcting them as follows: Where there is a discrepancy between the amounts in figures and in words, the amount in words shall govern. If a bill of quantities applies and there is a discrepancy between the rate and the line item total, resulting from multiplying the rate by the quantity, the rate as quoted shall govern. Where there is an obviously gross misplacement of the decimal point in the rate, the line item total as quoted shall govern, and the rate will be corrected. Where there is an error in the total of the Prices, either as a result of other corrections required by this checking process or in the tenderer's addition of prices, the total of the Prices, if any, will be corrected. The corrected price will be communicated to the tenderer. The tenderer may withdraw the tender, but may not change the tendered price. 18 Reject a tender if the tenderer does not accept the corrected total of the Prices (if any). Evaluating the tender 19 Evaluate responsive tenders in accordance with the procedure and criteria stated in the Tender Data. Unless required to do so by law, the evaluated tender price will be disclosed only to the relevant Eskom adjudicating authority and will not be disclosed to tenderers or any other person until after the award of the contract to the successful tenderer. Clarification of a tender 20 Obtain from a tenderer clarification of any matter in the tender which may not be clear or could give rise to ambiguity in a contract arising from this tender if the matter were not to be clarified. Acceptance of tender 21 Notify Eskom's acceptance to the successful tenderer before the expiry of the validity period, or agreed additional period. Notice to unsuccessful 22 After the successful tenderer has acknowledged Eskom’s notice of acceptance, tenderers notify other tenderers in accordance with Eskom’s current procedures that their tenders have not been accepted. Prepare contract 23 Revise the contract documents issued by Eskom as part of the tender documents documents to take account of Addenda issued during the tender period, Inclusion of some of the tender returnables, and Other revisions agreed between Eskom and the successful tenderer, before the issue of Eskom’s notice of acceptance (of the tender). The schedule of deviations attached to the Form of Agreement, if any. Sign Form of Agreement 24 Arrange for authorised signatories of both parties to complete and sign the original and one copy of the Form of Agreement. Provide copies of the 25 Provide to the successful tenderer the number of copies stated in the Tender contracts Data of the signed copy of the contracts. 240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial Effective May 2013 of 9
Contractual Terms
Source: Conditions to tender.pdf (TENDER)for non-receipt of communications from or by a tenderer.
Eskom's rights to accept 6 Eskom may accept or reject any variation, deviation, tender, or alternative
or reject any tender tender, and may cancel the tender process and reject all tenders at any time
prior to the formation of a contract. Eskom or the Eskom Representative will not
accept or incur any liability to a tenderer for such cancellation and rejection, but
will give written reasons for the action upon written request to do so. Eskom
reserves the right to accept the whole of any part of any tender.
For further details on Eskom’s procurement processes, please refer to the
Eskom Supply Chain Policy 32-1033 on the following link:
http://www.eskom.co.za/c/61/eskom-purchasing-policies/”.
may abandon the proposed work and services, have it performed in any other
manner, or re-issue a similar invitation to tender at any time. Eskom, its
subsidiaries, shareholders, advisors, directors, employees, representative
including the Eskom Representative shall not be liable for any losses, claims or
damages of whatsoever nature or howsoever arising which may be sustained by
a tenderer or any other person as a result of any amendment, termination or
suspension of the process set out in this Invitation to Tender (and all its
schedules and annexures) or which may be sustained by any tenderer or any
other person arising out of or pursuant to its participation in the tender process
outlined in this Invitation to Tender, or its exclusion from participating in the
tender process at any point.
240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial
Effective May 2013
of 9
240-62044728
Eskom’s right to 7 Eskom reserves the right to enter into mandated negotiations with any one or
negotiate more selected tenderers in accordance with Eskom’s approved procurement
policies and procedures.
Disclaimer regarding 8 While Eskom takes all reasonable measures to ensure that all information
accuracy of tender contained in the tender documents is correct and complete, Eskom does not,
documents
however,make any representations or warranties, express or implied, as to the
accuracy or completeness of such information and Eskom expressly disclaims
any and all liability for such representations, warranties or statements.
restriction to do business with Eskom.
Cost of tendering 2 Accept that Eskom will not compensate the tenderer for any costs incurred in the
preparation and submission of a tender, or the negotiation of any contract,
including the costs of any testing necessary to demonstrate that aspects of the
tender satisfy the evaluation criteria.
Check documents 3 Check the tender documents on receipt, including pages within them, and notify
the Eskom representative of any discrepancy or omissions using the enclosed
fax-back form.
Confidentiality and 4 Treat as confidential all matters arising in connection with the tender. Use and
copyright of documents copy the documents provided by Eskom only for the purpose of preparing and
submitting a tender in response to this Invitation to Tender.
Standardised 5 Obtain, as necessary for submitting a tender, copies of the latest revision of
specifications and other standardised specifications and other publications, which are not attached butpublications
which are incorporated into the tender documents by reference.
Acknowledge receipt 6 Complete the Receipt of Invitation to Tender and submit the tender fax-back
form, which is attached to the Letter of Invitation, and return it within 5 (five) days
of receipt of the Invitation to Tender.
tenderer
Submit bonds, policies 32 If instructed by the Eskom Representative (before the formation of a contract),
etc. submit for Eskom’s acceptance, the bonds, guarantees, policies and certificates
of insurance required to be provided by the successful tenderer in terms of the
conditions of contract.
240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial
Effective May 2013
of 9
240-62044728
if it were to be rectified.
13 A tenderer’s failure to comply with the said conditions of tender or failure to
provide any compulsory documentation required for purposes tender evaluation
and the determination of competitive ranking will render a tender non-responsive.
Gatekeepers 14 A tenderer’s failure to meet stipulated gatekeepers (pre-requisites for evaluation)
will also render the tender / offer non-responsive.
Copies of Tenders 15 It must further be noted that a tenderer’s failure to provide the necessary copies
of the original tender and in the stipulated format, will also disqualify the tenderer
from further evaluation. Tenderers will not be permitted to provide the required
copies after tender / enquiry closing, and Eskom will not be responsible for the
making of copies for the purposes of evaluation, in an effort to avoid the risks of
tender tampering.
Non-responsive tenders 16 Reject a non-responsive tender, and not allow it to be subsequently made
responsive by correction or withdrawal of the non-conforming deviation or
reservation.
240-62044728 Std Conditions Tender PUBLIC TE – Group Technology & Commercial
Effective May 2013
of 9
240-62044728
Section
Source: Conditions to tender.pdf (TENDER)tender satisfy the evaluation criteria.
health, environmental and quality (SHEQ) systems, policies and capabilities are
declare the tender non-responsive during tender evaluation. All costs and
Contact Information
Source: Code of Ethics.pdf (unknown){"name":null,"email":"[email protected]","phone":"+27 11 800 3187","department":null,"address":"nt, just and equal for all."}
Evaluation Criteria
Source: Code of Ethics.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS Tax Clearance (TCS or tax pin). They must also comply with B-BBEE requirements as per the PPPFA. No specific CIDB grading or local content percentages are stated in the provided document.
Technical Specifications
Source: Code of Ethics.pdf (unknown)This Code of Ethics outlines and provides for the ethical standards and behaviour that is required of all
directors and employees of Eskom Holdings Limited.
2 The Way – Living the Eskom values through our Code of Ethics
The Way, Eskom’s Code of Ethics, defines the road we need to take as we walk together into the
future. It reflects our organisation’s commitment to the highest ethical standards and principles in all
Eskom business. Our Code not only describes the acceptable behaviour and attitudes that are
essential in living the Eskom values of Integrity, Excellence, Customer Satisfaction and Innovation, but
it also establishes the foundation for the interaction of Eskom’s Board of Directors and employees with
colleagues, customers, suppliers, shareholders, the environment, the public and other stakeholders.
Our Code of Ethics will show us the way. The Eskom Way. Clear direction will ensure that we walk the
talk.
Eskom commits itself to upholding its values and ethical standards, and demonstrating this
commitment to all its stakeholders. Therefore, Eskom’s directors and employees are required to apply
the Code of Ethics in their day-to-day activities, especially if there are no rules governing decisions.
Adhering to this Code of Ethics is not optional; it is the way we do business at Eskom. This way, we
will be role models for each other. And Eskom, in turn, will be a role model amongst its peers.
Our Code of Ethics should be read together with the Supplementary Code information, Eskom policies
and legislation. Any contravention of the Code and applicable Eskom directives, policies and
standards will result in disciplinary action, which is transparent, just and equal for all.
Should you become aware of any unethical behaviour or non-compliance with this Code, it is your duty
to address it and/or report it. Eskom will protect employees, who have reported suspected violations of
the Code, against any form of victimisation or occupational detriment, and will make every effort to
protect the confidentiality of anyone reporting a breach of the Code.
Together, we will build an ethical Eskom
Integrity
Acting the Eskom Way
In Eskom we demonstrate Integrity:
By being respectful;
compassionate and by being considerate to their rights, dignity and well-being.
intended; and not to gain personally through the abuse of assets and resources.
improve our impact on the environment.
By being honest and trustworthy;
channels to keep our customers, suppliers, shareholder and other stakeholders informed of
matters affecting them.
teamwork and open communication.
By being professional at all times, and loyal to the organisation, our country, and its people;
expected, and giving our best at all times.
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
we report concerns in the workplace, including violations of the law and policies.
workplace which is free of sexual harassment, discrimination and favouritism.
with the safety, health and environmental legislation and Eskom policies.
By being fair and transparent;
acceptance of inappropriate gifts and entertainment.
By being disciplined;
applicable, the codes and professional standards of specific professions.
behavioural deviations, and enforcing disciplinary action when appropriate.
Excellence
Working the Eskom Way
In Eskom we demonstrate Excellence:
By being committed to employee satisfaction;
By being committed to effective, ethical supplier relationships;
cost-effective.
Customer Satisfaction
Caring the Eskom Way
In Eskom we demonstrate Customer Satisfaction by:
external customers.
timely, reliable and quality service.
Innovation
Thinking the Eskom Way
In Eskom we demonstrate Innovation by being committed to continuous improvement;
processes, our impact on the environment, and service delivery, to satisfy our internal and external
customer needs.
individuals.
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
Finding your way
Ethics Office advice line: +27 11 800 3187/3189
E-mail: [email protected]
Fax: 086 663 4120
Ethics website FAQs (Eskom Intranet)
Eskom confidential whistle blowing/hot line: 0800 11 27 22
3 Supporting Clauses
Index of Supporting Clauses
3.1 Scope ......................................................................................................................................... 4
3.2 Normative/Informative References ............................................................................................ 4
3.3 Definitions .................................................................................................................................. 5
3.4 Abbreviations ............................................................................................................................. 6
3.5 Roles and Responsibilities ........................................................................................................ 6
3.6 Process for monitoring ............................................................................................................... 8
3.7 Related/Supporting Documents ................................................................................................. 8
3.1 Scope
3.1.1 Purpose
The Code of Ethics explains what behaviour is acceptable within Eskom, and highlights how the
Eskom values should be lived within the workplace.
3.1.2 Applicability
This Code of Ethics shall apply throughout Eskom Holdings Limited, which includes its Board of
Directors, employees within its Divisions, temporary employees, contract employees and anyone
acting on behalf of Eskom.
3.2 Normative/Informative References
Parties using this Code of Ethics shall apply the most recent edition of the documents listed below
3.2.1 Normative
3.2.1.1 Ethics climate survey report (2005/2006)
3.2.1.2 Disciplinary Code
3.2.2 Informative
3.2.2.1 Supplementary Code information
3.2.2.2 The Constitution of South Africa
3.2.2.3 Basic Conditions of Employment Act
3.2.2.4 Disciplinary Procedure
3.2.2.5 Grievance Procedure
3.2.2.5 Labour Relations Act
3.2.2.6 Employment Equity Act
3.2.2.7 Eskom’s Conditions of Service
3.2.2.8 Eskom’s Conflict of Interest Policy
3.2.2.9 Eskom’s Protected Disclosures Policy
3.2.2.10 The King Report on Corporate Governance
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
3.3 Definitions
3.3.1 Public domain: Published in any public forum without constraints (Either enforced by law, or
discretionary)
3.3.2 Code of Ethics: A Code of Ethics is similar to an agreement on the standards for behaviour,
which should be applied in the workplace. A Code of Ethics highlights the ethical values, such
as respect, honesty, compassion, etc. that explains what behaviour is good and right in the
workplace. It sets the standard of behaviour within the organisation, and guides employees in
making ethical decisions. ‘The Way’, Eskom’s Code of Ethics, is a tool that assists employees
in living the Eskom Values in an ethical way.
3.3.3 Director(s): A director as referred to in this document, means a member of the Eskom
Holdings Board of Directors.
3.3.4 Employees: Also referred to as staff members. These include individuals employed by
Eskom Holdings Limited on a permanent basis, contract labour, temporary employees, part-
time employees, casual employees, occasional employees, learners and others acting for
Eskom. The Code of Ethics and Supplementary Code information also applies to those
employees of subsidiary companies that have adopted Eskom Holdings Ltd’s Code of Ethics,
‘The Way’.
3.3.5 Ethics: Ethics refers to the process of distinguishing between what is right and wrong in my
interaction with others, so that I can do what is right. Doing what is right, is also interpreted as
doing what is good, or ensuring that I do no harm.
3.3.6 Favouritism: Favouritism refers to the practice of showing favour to, or giving preference to
some person or group, to the detriment or expense of another person or group that is entitled
to equal treatment or opportunity. This action normally entails discriminating against another
person or group. Within Eskom, each person should be valued as an individual and as an
important member of the team, and therefore favouritism will not be condoned.
3.3.7 Nepotism: Nepotism is a specific form of favouritism. It entails showing favour or preference
towards relatives based upon that relationship, rather than on an objective evaluation of ability
or suitability. For example, offering employment to a relative, despite the fact that there are
others who are better qualified and willing to perform the job, would be considered a form of
nepotism, which is not allowed in Eskom.
3.3.8 Professionalism: In Eskom, directors and employees demonstrate professionalism by paying
attention to detail, demonstrating expertise in their fields, behaving above reproach, and giving
their best to Eskom at all times.
3.3.9 Relative: A relative in this context is someone who is related through blood, marriage or
adoption.
3.3.10 Respect: Respect is demonstrated when you show consideration for, or appreciate someone
or something. For example, appreciating your colleagues and staff members; or being
considerate towards your customers’ needs and expectations. When you show respect, you
treat others in the same manner in which you want them to treat you. You treat others’ assets
in the same way in which you expect others to treat your personal assets.
3.3.11 Stakeholders: Broadly defined, stakeholders refer to any group, individual, or thing (e.g.
environment) that can affect, or is affected by, the achievement of the organisation’s
objectives. Eskom’s stakeholders include its shareholder, its Board of Directors, its
employees, its customers, its suppliers, the public, the environment and the communities in
which it operates.
3.3.12 Supplementary Code information: This document provides additional information about
Eskom’s Code of Ethics, its core values and the ethical behaviour that is expected from all
directors and employees. The Supplementary code information is published onto the ethics
website (Eskom Intranet), and is regularly updated.
3.3.13 Suppliers: A supplier means any person or entity that does business with Eskom or tenders
to do business with Eskom, such as consultants, contractors, sub-contractors, and providers
of goods and services.
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
3.3.14 Values: Values refer to core beliefs, which define what one believes in and what is important.
Values influence behaviour and motivate decisions. Values do not only apply to individuals
but also to organisations. Eskom’s core values are integrity, excellence, customer satisfaction
and innovation. These values describe what is important to the organisation, what it stands for
and what it believes in.
To constantly act in a respectful, professional manner that promotes trust, loyalty,
transparency, and discipline, and a commitment to honesty and fairness at all times.
To continuously strive to be the best through exceptional performance, employee
satisfaction, and through effective, ethical supplier relationships.
To be passionate and committed to service delivery of the highest standards that exceeds
our internal and external customers’ expectations.
To foster an environment that nurtures innovative people that are committed to continues
improvement through creative, ethical solutions.
3.4 Abbreviations
3.4.1 CE: Chief Executive
3.4.2 MD: Managing Director
3.4.3 EDC: Eskom Documentation Centre
3.4.4 BU : Business Unit
3.5 Roles and Responsibilities
Managerial responsibilities:
In addition to their general rights and responsibilities as employees of Eskom, managers and
supervisors have additional responsibilities resulting from their seniority and the nature of their
managerial/supervisory duties:
a) make a personal commitment to act in accordance with the Code of Ethics, communicate
this commitment to staff members, and lead by example;
b) guide staff members to behave in accordance with the Code of Ethics;
c) identify ethics risks in your business activities, and establish ways to mitigate these risks,
and to address potential contraventions of the Code of Ethics;
d) take appropriate action to correct behavioural deviations, and
e) enforce disciplinary action when appropriate.
temporary employees and contract workers in the department:
a) are in possession of the Code of Ethics brochure, ‘The Way – Living the Eskom Values
through our Code of Ethics’ and/or the Code Quick reference guide ‘How to find the Way’;
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
b) are sensitised to the Code, Supplementary Code information and ethics-related policies,
through staff dialogue sessions facilitated by managers and supervisors. Employees need
to know how to apply the Code of Ethics and ethical standards in their specific work
environments. (Presentation material is available from the ethics website).
temporary or contract workers attend their Division’s induction programme, as well as formal
ethics training workshops.
temporary and contract workers, attend a formal ethics workshop at least every two years.
ethics issues and concerns both formally (e.g. staff meetings) and informally (one-to-one
meetings). It is recommended that ‘ethics’ is a standing agenda item for staff meetings, so as
to encourage ethics dialogue.
a) addressing ethics issues and concerns, and/or
b) reporting unethical behaviour and violations of the law and policies, so that incidences can
be investigated and appropriate action be taken.
report unethical behaviour, and/or violations of the law and policies.
Other role players’ responsibilities:
Ethics brochure (formal one-pager available from the Ethics Office and ethics website) as part
of the sign-on documentation that is given to them on the first day of employment. New
employees must also be registered to attend an induction programme within one month of
joining Eskom.
Eskom’s standards of conduct. Therefore, Procurement and Supply chain departments are
required to ensure that suppliers (as defined in this document) receive the Code of Ethics
brochure (formal one-pager available from the ethics website) as part of the contract
documentation received from Eskom. The Supplementary Code information should be made
available on request (document available from the ethics website).
other organisations on request. These requests must be referred to the Ethics Office.
published onto the Ethics website (Eskom intranet). Managers, supervisors, communication
practitioners, trainers and ethics co-ordinators are required to access this information in order
to ensure ongoing ethics awareness and training within their respective working environments.
supervisors play in instilling an ethical culture through ethics awareness, communication,
training and disciplinary action for non-compliance, the functions mentioned below are
responsible for further entrenching an ethical culture within the organisation.
Corporate Audit by providing an assurance function that the respective Divisions are
complying with legislation, policies and procedures of the organisation, and that the
organisational values and Code of Ethics are lived within the workplace. Corporate Audit also
serves an oversight function by monitoring ethics training and awareness.
Forensic Services by investigating and reporting on ethics matters referred to them by the
Ethics Office, and ensuring that disciplinary action is instituted against employees where
evidence of non-compliance exists. Forensic Services is also accountable for the confidential,
externally managed, toll-free whistle blowing/hot line (0800-11-27-22), the investigation of
incidents reported to them through various channels, and for maintaining accurate statistics on
crime and irregularities within the organisation, and reporting these to EXCO and the Eskom
Board.
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
Employee Relations by ensuring that grievances (Grievance Procedure 32-195) are
effectively addressed, and disciplinary action is taken against employees in terms of Eskom’s
Disciplinary Code (32-196) and Procedure (32-197).
Employee responsibilities:
Eskom is committed to the highest ethical standards and principles in all Eskom business, and
requires the same from Eskom employees (as defined) in fulfilling their Eskom responsibilities.
Compliance with Eskom's Code of Ethics, Supplementary Code information and ethics-related
policies is therefore required of all Eskom Holdings Limited employees, which include contract
labour, temporary employees, part-time employees, casual employees, occasional employees,
learners and others acting for Eskom.
and ethics-related policies, and that you receive proper training on these.
are no rules or policies that address the specific situation.
If you have questions or concerns, ask for advice. (Refer ‘Finding your way)
Request detailed information from managers, supervisors and policy custodians regarding
policies and procedures affecting your work, and ensure that you understand and comply with
these.
grievances. Eskom will protect employees, who have reported suspected illegal activities and
violations of the Code, against any form of victimisation or occupational detriment, and will
make every effort to protect the confidentiality of anyone reporting a breach. (Refer to the
Whistle blowing Policy 32-250)
3.6 Process for monitoring
The Code of Ethics falls under the responsibility of the Ethics Office in the Corporate Governance
Department. The Ethics Office’s role is to manage and review the Code of Ethics, and to assist the
organisation with the effective implementation thereof.
The Divisional Managing Directors are accountable for compliance with the Code of Ethics within their
respective Divisions.
3.7 Related Documents
The Code of Ethics, The Way, must be read together with the Supplementary Code information
document, available from the ethics website.
The Code of Ethics, The Way, supersedes the Business Conduct Policy and Guidelines, ESKPBAAN4
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Document Template Unique Identifier: 32-527
Code of Ethics – The Way
Revision: 0
Page:
4 Authorisation
This document has been seen and accepted by:
Name Designation
The Eskom Board of Directors under the chairmanship of Mr Vali Moosa
PJ Maroga Chief Executive
E Johnson Chief Officer (Networks & Customer Service)
BA Dames Chief Officer (Generation)
B Nqwababa Finance Director
ME Letlape Managing Director (Human Resources Division)
MM Ntsokolo Managing Director (Transmission Division)
JA Dladla Managing Director (Special Project 2010)
Dr SJ Lennon Managing Director (Corporate Services Division)
A Noah Managing Director (Distribution Division)
B Conradie Acting managing Director (Enterprises Division)
K Lakmeerharan Acting Managing Director (System Operations & Planning Division)
T Govender Managing Director (Generation Division)
C Schutte Acting Managing Director (Primary Energy Division)
5 Revisions
Date Rev. Remarks
Two year process 0 The 12 year-old Business Conduct Policy was revised,
(2006-2008) and replaced by a Code of Ethics. The new Code is
centred on the Eskom values, which did not feature in the
Business Conduct Policy.
6 Development team
This Code of Ethics was developed by the Ethics Office, with inputs from the following key role-
players:
Public
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user
to ensure it is in line with the authorised version on the database.
Section
Source: Code of Ethics.pdf (unknown)preference to
3.3.7 Nepotism: Nepotism is a specific form of favouritism. It entails showing favour or preference
towards relatives based upon that relationship, rather than on an objective evaluation of ability
timely, reliable and quality service.
Evaluation Criteria
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Bidders must comply with the Preferential Procurement Regulations, 2017, and the local content requirements of SATS 1286:2011. The bid may be disqualified if the SBD 6.2 Declaration Certificate and Annex C are not submitted. The stipulated minimum threshold for local content is not specified in the provided document. Bidders must not sub-contract in a manner that reduces the local production and content of the overall value of the contract below the stipulated minimum threshold.
Technical Specifications
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicable box)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published by
SARB for the specific currency at 12:00 on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.reservebank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dti must be informed accordingly in order for the dti
to verify and in consultation with the AO/AA provide directives in this regard.
Local content declaratio
Pricing Schedule
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)I, the undersigned, ..................................................................................... (full names),
do hereby declare, in my capacity as ............................................. ...........
of ...............................................................................................................(name of bidder
entity), the following:
(a) The facts contained herein are within my own personal knowledge.
(b) I have satisfied myself that:
(i) the goods/services/works to be delivered in terms of the above-specified bid
comply with the minimum local content requirements as specified in the bid,
and as measured in terms of SATS 1286:2011; and
(c) The local content percentage (%) indicated below has been calculated using the
formula given in clause 3 of SATS 1286:2011, the rates of exchange indicated in
paragraph 4.1 above and the information contained in Declaration D and E which has
been consolidated in Declaration C:
Bid price, excluding VAT (y) R
Imported content (x), as calculated in terms of SATS 1286:2011 R
Stipulated minimum threshold for local content (paragraph 3 above)
Local content %, as calculated in terms of SATS 1286:2011
Compliance Requirements
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)No specific requirements found
B-BBEE Details: ) make provision for the
promotion of local production and content.
1.2. Regulation 8.(2) prescribes that in the case of designated sectors, organs of state must
advertise such tenders with the specific bidding condition that only locally produced or
manufactured goods, with a stipulated minimum threshold for local production and content
will be considered.
1.3. Where necessary, for tenders referred to in paragraph 1.2 above, a two stage bidding
process may be followed, where the first stage involves a minimum threshold for local
production and content and the second stage price and B-BBEE.
1.4. A person awarded a contract in relation to a designated sector, may not sub-contract in
such a manner that the local production and content of the overall value of the contract is
reduced to below the stipulated minimum threshold.
1.5. The local content (LC) expressed as a percentage of the bid price must be calculated in
accordance with the SABS approved technical specification number SATS 1286: 2011 as
follows:
LC = [1 - x / y]
Where
x is the imported content in Rand
y is the bid price in Rand excluding value added tax (VAT)
Prices referred to in the determination of x must be converted to Rand (ZAR) by using
the exchange rate published by South African Reserve Bank (SARB) at 12:00 on the
date of advertisement of the bid as indicated in paragraph 4.1 below.
The SABS approved technical specification number SATS 1286:2011 is accessible
on http:/www.thedti.gov.za/industrial development/ip.jsp at no cost.
1.6. A bid may be disqualified if this Declaration Certificate and the Annex C (Local Content
Declaration: Summary Schedule) are not submitted as part of the bid documentation;
Health & Safety
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published by
SARB for the specific currency at 12:00 on the date of advertisement of the bid.
formula given in clause 3 of SATS 1286:2011, the rates of exchange indicated in
paragraph 4.1 above and the information contained in Declaration D and E.
(d) I accept that the Procurement Authority / Institution has the right to request that the
local content be verified in terms of the requirements of SATS 1286:2011.
(e) I understand that the awarding of the bid is dependent on the accuracy of the
information furnished in this application. I also understand that the submission of
incorrect data, or data that are not verifiable as described in SATS 1286:2011, may
result in the Procurement Authority / Institution imposing any or all of the remedies as
provided for in Regulation 14 of the Preferential Procurement Regulations, 2017
promulgated under the Preferential Policy Framework Act (PPPFA), 2000 (Act No. 5
of 2000).
Signature: date: ___________
WITNESS No. 1 DATE: ___________
WITNESS No. 2 DATE: ___________
Description
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)provisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
Evaluation Criteria
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)Bidders must not be listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters. Bidders (or their directors/members/shareholders) must not have been convicted of fraud or corruption related to procurement in the past five years. Bidders must not be prohibited from doing business with any International Financial Development/funding Agency or Lending Institution. Bidders must declare any interest or relationship with Eskom employees, directors, or other tenderers as required by the integrity declaration.
Pricing Schedule
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)Date:
(A copy of the joint venture agreement which incorporates a statement that all partners are
liable jointly and severally for the execution of the contract and that the lead partner is
authorised to incur liabilities, receive instructions and payments and be responsible for the
entire execution of the contract for and on behalf of any and all the partners is attached to the
invitation to tender/Request for proposal).
Health & Safety
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)information furnished herein is correct, that it is understood that the tenderer’s
tender/proposal may be rejected, and that Eskom will act against the tenderer should any
aspect of this this declaration prove to be false.
information furnished herein is correct, that it is understood that the JV’s tender/proposal may
be rejected, and that Eskom will act against the JV should any aspect of this this declaration
prove to be false.
Section
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)employee/contractor/consultant/director involved in the tender evaluation/tender
director. interest(marital/ evaluation/
Description
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2023/2024 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2023/2024 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2023/2024 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2023/2024 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2023/2024 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2023/2024 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2023/2024 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2023/2024 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2023/2024 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2023/2024 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2023/2024 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2023/2024 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2023/2024 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown){"closingDate":"1 March 2023"}
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)The document does not specify eligibility criteria for the tender itself. It only determines the tax classification of the contractor for PAYE purposes. Bidders must be residents of South Africa or, if non-residents, must sign Appendix 9 and have the pack referred to Eskom's Group Tax Department. The classification (independent contractor, personal service provider, labour broker, or dependent contractor) affects whether PAYE is withheld from payments.
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)the non-deduction is 07.
until such time that a valid IRP30 certificate is provided to Eskom.
Labour Broker Individual N/A X IRP5 / IT3(a) 3617 A
tax rates
Dependent Contractor Individual X X IRP5 / IT3(a) 3601 or “A” for
tax rates 3616 Individual
“E” for
Health & Safety
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)Company/close corporation/trust ..................................................................... 11
Evaluation pack b....................................................................................................................... 12
Contractor’s details for an individual* ..................................................................... 12
Question 1(i) .............................................................................................................................. 13
Question 2(i) .............................................................................................................................. 13
Question 2(ii) ............................................................................................................................. 13
Question 3(i) .............................................................................................................................. 13
Question 4(i) .............................................................................................................................. 14
Question 4(ii) ............................................................................................................................. 14
Question 4(iii) ............................................................................................................................ 14
Question 5(i) .............................................................................................................................. 14
Question 5(ii) ............................................................................................................................. 14
Question 6(i) .............................................................................................................................. 15
Question 6(ii) ............................................................................................................................. 15
Question 6(iii) ............................................................................................................................ 15
Question 6(iv) ............................................................................................................................ 15
Question 6(v) ............................................................................................................................. 15
Question 6(vi) ............................................................................................................................ 15
Question 6(vii) ........................................................................................................................... 15
Question 6(viii)........................................................................................................................... 15
Question 6(ix) ............................................................................................................................ 15
Question 6(x) ............................................................................................................................. 15
Question 6(xi) ............................................................................................................................ 15
Particulars of individual .............................................................................................. 17
Applicable to the 2023/2024 Tax Years
Appendix 1 ....................................................................................................................................... 18
Three or more full - time employees who are not connected persons . 18
Appendix 2 ....................................................................................................................................... 19
ESKOM ...................................................................................................................................... 19
Appendix 3 ....................................................................................................................................... 20
And/or shall not be controlled or supervised by ESKOM ............................. 20
Appendix 4 ....................................................................................................................................... 21
Affidavit confirming that not more than eighty percent (80 %) of income
Is or is likely to be received from any one client ............................................. 21
Appendix 5 ....................................................................................................................................... 22
Opposed to people ........................................................................................................... 22
Appendix 6 ....................................................................................................................................... 23
Declaration by ........................................................................................................................ 23
That the contractor is a labour broker ................................................................... 23
Appendix 7 ....................................................................................................................................... 24
Declaration by ........................................................................................................................ 24
Provider ................................................................................................................................ 24
Appendix 8 ....................................................................................................................................... 25
Declaration by ........................................................................................................................ 25
That the contractor is an independent supplier or contractor .................. 25
Appendix 9 ....................................................................................................................................... 26
Declaration by ........................................................................................................................ 26
That the contractor is a non-resident of the republic of south africa .... 26
Appendix 10 ..................................................................................................................................... 27
Definitions as per the income tax act, NO. , as amended. ................... 27
“Connected Person” .................................................................................................................. 27
"Associated Institution", in relation to any single employer, ...................................................... 28
"Labour Broker" ......................................................................................................................... 28
"Personal Service Provider” ...................................................................................................... 28
"Remuneration" ......................................................................................................................... 28
“Resident” .................................................................................................................................. 29
Applicable to the 2023/2024 Tax Years
Introduction
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2023/2024 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
ease of reading.
this Pack;
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
Sign Appendix 9. Submit The Pack to your contractor representative in
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2023/2024 Tax Years
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Go to Question 5(i).
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Applicable to the 2023/2024 Tax Years
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
Complete and sign Appendix 5 Affidavit. If the Affidavit is not signed,
Sign Appendix 6. If the Agreement is not signed, PAYE will be withheld
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
No further questions must be answered.
Sign the “Particulars of Individual” Section at the end of the Evaluation
Sign Appendix 6. PAYE will be withheld from your payments.
PAYE will be withheld from your payments until such time the valid
IRP30 certificate is provided.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
from your payments.
withheld from your payments.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign the “Particulars of Individual” at the end of the Evaluation Pack.
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Applicable to the 2023/2024 Tax Years
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Applicable to the 2023/2024 Tax Years
Appendix 1
Thus signed and sworn to before me at ______________on this day
Of __________20.
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2023/2024 Tax Years
Appendix 3
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2023/2024 Tax Years
Appendix 4
Affidavit confirming that not more than eighty percent (80 %) of
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2023/2024 Tax Years
Appendix 5
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2023/2024 Tax Years
Appendix 6
Applicable to the 2023/2024 Tax Years
Appendix 7
Applicable to the 2023/2024 Tax Years
Appendix 8
Applicable to the 2023/2024 Tax Years
Appendix 9
Applicable to the 2023/2024 Tax Years
Appendix 10
rendering any such service, other than any employee who is a shareholder or member of the
company or trust or is a connected person in relation to such person;
"Remuneration"
means -
any amount of income which is paid or is payable to any person by way of any salary, leave pay, wage,
overtime pay, bonus, gratuity, commission, fee, emolument pension, superannuation allowance, retiring
allowance or stipend, whether in cash or otherwise and whether or not in respect of services rendered,
including-
a) any amount referred to in paragraph (a), (c), (cA),(d), (e), (eA) or (f) of the definition of "gross
income" in section one of this Act;
any amount required to be included in such person's gross income under paragraph (i) of that definition;
Applicable to the 2023/2024 Tax Years
bA) ...
but not including-
ii) any amount paid or payable in respect of services rendered or to be rendered by any person
(other than a person who is not a resident or an employee contemplated in paragraph (b), (c),
(d) (e) or (f)of the definition of "employee") in the course of any trade carried on by him
independently of the person by whom such amount is paid or payable and of the person to
whom such services have been or are to be rendered: Provided that for the purposes of this
paragraph a person shall not be deemed to carry on a trade independently as aforesaid if the
services are required to be performed mainly at the premises of the person by whom such
amount is paid or payable or of the person to whom such services were or are to be rendered
and the person who rendered or will render the services is subject to the control or supervision
of any other person as to the manner in which his or her duties are performed or to be
performed or as to his hours of work. Provided further that a person will be deemed to be
carrying on a trade independently as aforesaid if he throughout the year of assessment employs
three or more employees who are on a full time basis engaged in the business of such person
of rendering any such service, other than any employee who is a connected person in relation to
such person;
iii) ...
“Resident”
means any-
(a) natural person who is-
(i) ordinarily resident in the Republic; or
(ii) not at any time during the relevant year of assessment ordinarily resident in the Republic, if that
person was physically present in the Republic-
a) for a period or periods exceeding 91 days in aggregate during the relevant year of
assessment, as well as for a period or periods exceeding 91 days in aggregate during each
of the five years of assessment preceding such year of assessment; and
b) for a period or periods exceeding 915 days in aggregate during those five preceding years
of assessment,
in which case that person will be a resident with effect from the first day of that relevant year of
assessment: Provided that-
(A) a day shall include a part of a day, but shall not include any day that a person is in transit
through the Republic between two places outside the Republic and that person does not
formally enter the Republic through a “port of entry” as contemplated in section 9 (1) of the
Immigration Act, 2002 (Act No. ), or at any other place as may be permitted by
the Director General of the Department of Home Affairs or the Minister of Home Affairs in
terms of that Act; and
(B) where a person who is a resident in terms of this subparagraph is physically outside the
Republic for a continuous period of at least 330 full days immediately after the day on
which such person ceases to be physically present in the Republic, such person shall be
deemed not to have been a resident from the day on which such person so ceased to be
physically present in the Republic; or
(b) person (other than a natural person) which is incorporated, established or formed in the Republic or
which has its place of effective management in the Republic,
but does not include any person who is deemed to be exclusively a resident of another country for
purposes of the application of any agreement entered into between the governments of the Republic
and that other country for the avoidance of double taxation;
Applicable to the 2023/2024 Tax Years
Section
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)Evaluation pack a......................................................................................................................... 6
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Corporation/Trust” at the end of the evaluation Pack.
Contact Information
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"n the conditions of contract identified"}
Submission Guidelines
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [●], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer, This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and
Evaluation Criteria
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) (implied by Eskom's requirements). The tenderer must submit a valid tax compliance status (SARS TCS) and B-BBEE status affidavit or certificate. The tenderer must complete SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination). The Contractor must provide its CIDB registration number if applicable. The Contractor must maintain insurance as specified (including employer's assets, contract works, environmental liability, general and public liability, etc.). The Contractor must comply with the Construction Regulations 2014 and be a 'Principal' if appointed. A percentage limit of liability for indirect or consequential loss is R0.00. The Employer can terminate if the Contractor's B-BBEE status decreases after contract date.
Technical Specifications
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)Upgrade HMI simulator at Matla Power Station for a period of two (02) years
NEC3 Engineering & Construction Contract
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________)
for Upgrade HMI simulator at Matla Power Station for a
period of two (02) years
Contents: No of
pages 61
Part C1 Agreements & Contract Data
Part C2 Pricing Data
Part C3 Scope of Work
Experience & Qualifications
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)2 Name:
Job
Responsibilities:
2 Available from Engineering Contract Strategies Tel 011 803 3008, Fax 011 803 3009 or see www.ecs.co.za
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
CV's (and further key persons data including
CVs) are appended to Tender Schedule
entitled .
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Data is
A Priced contract with activity schedule
11.2(20) The activity schedule is in
11.2(30) The tendered total of the Prices is (in figures)
(in words), excluding VAT
B Priced contract with bill of quantities
11.2(21) The bill of quantities is in
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
C Target contract with activity schedule
11.2(20) The activity schedule is in
11.2(30) The tendered total of the Prices is (in figures)
(in words), excluding VAT
D Target contract with bill of quantities
11.2(21) The bill of quantities is in
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
F Management contract
20.2 Work which the Contractor’s will do price (lump sum or
himself is Activity rate)
Note “SCC” means Schedule of Cost Components
Data for Schedules of Cost starting on , and “SSCC” means Shorter
Components Schedule of Cost Components starting on
of ECC3 (April 2013).
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
A Priced contract with activity schedule Data for the Shorter Schedule of Cost
Components
B Priced contract with bill of quantities Data for the Shorter Schedule of Cost
Components
41 in The percentage for people overheads is: %
Sscc
21 in The published list of Equipment is the last
SSCC edition of the list published by
The percentage for adjustment for
Equipment in the published list is Minus %
22 in The rates of other Equipment are: Equipment Size or Rate
SSCC capacity
61 in The hourly rates for Defined Cost of
SSCC design outside the Working Areas are Category of employee Hourly rate
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Please insert another schedule if foreign
resources may also be used
62 in The percentage for design overheads is %
Sscc
63 in The categories of design employees
SSCC whose travelling expenses to and from the
Working Areas are included in Defined
Cost are:
If Option C, D or E is used Data for Schedule of Cost Components
23 in The listed items of Equipment purchased Equipment Time Per (time
SCC for work on this contract, with an on cost related period)
charge, are: charge
24 in The rates of special Equipment are: Equipment Size or Rate
SCC capacity
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
44 in The percentage for Working Areas :
SCC overheads is: %
51 in The hourly rates for Defined Cost of
SCC manufacture or fabrication outside the Category of employee Hourly rate
Working Areas are
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates
Please insert another schedule if foreign
resources may also be used
52 in The percentage for manufacture and
SCC fabrication overheads is %
If Option C, D, or E is used Data for both schedules of cost components
61 in The hourly rates for Defined Cost of
SCC & design outside the Working Areas are Category of employee Hourly rate
Sscc
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Please insert another schedule if foreign
resources may also be used
62 in The percentage for design overheads is %
Scc &
Sscc
63 in The categories of design employees
SCC & whose travelling expenses to and from the
SSCC Working Areas are included as a cost of
design of the works and Equipment done
outside the Working Areas are:
If Option C, D or E is used Data for the Shorter Schedule of Cost
Components
41 in The percentage for people overheads is: %
Sscc
21 in The published list of Equipment is the last
SSCC edition of the list published by
The percentage for adjustment for
Equipment in the published list is %
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
22 in The rates of other Equipment are: Equipment Size or Rate
SSCC capacity
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Part 2: pricing data
ECC3 Option A
Document Title No of
reference pages
C2.1 Pricing assumptions: Option A
C2.2 The activity schedule
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C2.1 Pricing assumptions: Option A
How work is priced and assessed for payment
Clause 11 in NEC3 Engineering and Construction Contract, (ECC3) Option A states:
Identified and 11
defined terms 11.2 (20) The Activity Schedule is the activity schedule unless later changed in
accordance with this contract.
(27) The Price for Work Done to Date is the total of the Prices for
A completed activity is one which is without Defects which would either delay
or be covered by immediately following work.
(30) The Prices are the lump sum prices for each of the activities on the
Activity Schedule unless later changed in accordance with this contract.
This confirms that Option A is a lump sum form of contract where the work is broken down into activities,
each of which is priced by the tendering contractor as a lump sum. Only completed activities are assessed
for payment at each assessment date; no part payment is made if the activity is not completed by the
assessment date.
Function of the Activity Schedule
Clause 54.1 in Option A states: “Information in the Activity Schedule is not Works Information or Site
Information”. This confirms that specifications and descriptions of the work or any constraints on how it is to
be done are not included in the Activity Schedule but in the Works Information. This is further confirmed by
Clause 20.1 which states, “The Contractor Provides the Works in accordance with the Works Information”.
Hence the Contractor does not Provide the Works in accordance with the Activity Schedule. The Activity
Schedule is only a pricing document.
Link to the programme
Clause 31.4 states that “The Contractor provides information which shows how each activity on the Activity
Schedule relates to the operations on each programme which he submits for acceptance”. Ideally the
tendering contractor will develop a high level programme first then resource each activity and thus arrive at
the lump sum price for that activity both of which can be entered into the activity schedule.
Preparing the activity schedule
Generally it is the tendering contractor who prepares the activity schedule by breaking down the work
described within the Works Information into suitable activities which can be well defined, shown on a
programme and priced as a lump sum.
The Employer, in his Instructions to Tenderers or in a Tender Schedule, may have listed some items that
he requires the Contractor to include in his activity schedule and be priced accordingly.
It is assumed that in preparing his activity schedule the Contractor:
and incidental to Providing the Works in accordance with the Works Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
Part c2: pricing data c2.1 ECC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
activities in order to fulfil the obligation to complete the works for the tendered total of the Prices.
quantity, of work within that activity later turns out to be different to that which the Contractor
estimated at time of tender. The only basis for a change to the Prices is as a result of a
compensation event.
An activity schedule could have the following format:
Item Programme Activity description Price
No. Reference
Part c2: pricing data c2.1 ECC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C2.2 the activity schedule
Use this page as a cover page to the Contractor’s activity schedule.
Item No Description Amount
Simulator (hmi) upgrade at matla power station
1 Hardware
2 Software
3 Engineering
4 Installation and Commissioning
5 Shipping
6 Training and Documentation
7 Project Management and Safety
Total excluding VAT r
Part c3: scope of work 1 c3 ecc3 cover page
Qualifications:
Experience:
2 Name:
Qualifications:
2 Available from Engineering Contract Strategies Tel 011 803 3008, Fax 011 803 3009 or see www.ecs.co.za
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Experience:
CV's (and further key persons data including
CVs) are appended to Tender Schedule
entitled .
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Quality Management
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)have been discovered on reasonable
inspection by the Employer or the Supervisor
before the defects date, without requiring any
inspection not ordinarily carried out by the
any inspection over and above the reasonable
inspection, this does not place a greater
responsibility on the Employer or the
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
Pricing Schedule
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)terms of the conditions of contract.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C1.2 ECC3 Contract Data
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
11.2(3) The completion date for the whole of the
works is TBA
11.2(9) The key dates and the conditions to be Condition to be met key date
met are:
1 [●] [●]
2 [●] [●]
3 [●] [●]
30.1 The access dates are: Part of the Site Date
1 [●] [●]
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
2 [●] [●]
3 [●] [●]
31.1 The Contractor is to submit a first
programme for acceptance within Three weeks of the Contract Date.
31.2 The starting date is TBA
32.2 The Contractor submits revised
programmes at intervals no longer than Two weeks.
35.1 The Employer is not willing to take over [No data needed if this statement is included]
the works before the Completion Date.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
60.1(13) The place where weather is to be recorded is:
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Foundation of Southern Africa (AFSA).
Address [●]
Tel No. [●]
Fax No. [●]
e-mail [●]
W1.2(3) The Adjudicator nominating body is: the Chairman of ICE-SA a joint Division of the
elsewhere in this Contract Data.
X3 Multiple currencies
X3.1 The Employer will pay for these items or Maximum
activities in the currencies stated Items & activities Other payment in
currency other
currency
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
[●] [●] [●]
[●] [●] [●]
[●] [●] [●]
[●] [●] [●]
X3.1 The exchange rates are those published in [●] on [●] (date)
are Z1 to Z15 always apply.
Z1 Cession delegation and assignment
Z1.1 The Contractor does not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer.
Z1.2 Notwithstanding the above, the Employer may on written notice to the Contractor cede and
delegate its rights and obligations under this contract to any of its subsidiaries or any of its
present divisions or operations which may be converted into separate legal entities as a result
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
of the restructuring of the Electricity Supply Industry.
Z2 Joint ventures
Z2.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two
or more persons or organisations then these persons or organisations are deemed to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Project
Z12.1 A Committing Party may not take any Prohibited Action during the course of the procurement of
this contract or in execution thereof.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Z12.2 The Employer may terminate the Contractor’s obligation to Provide the Services if a Committing
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Z14.4 The Employer does not waive its rights provided for in section 30 (7) of Act , or any
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
replacement section dealing with the same subject matter.
Z14.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z15 Asbestos
08:00 = 80%
14:00 = 52%
20:00 = 73%
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
above is taken into account in assessing a compensation event.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C1.2 Contract Data
11.2(21) The bill of quantities is in
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
11.2(21) The bill of quantities is in
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
of ECC3 (April 2013).
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
61 in The hourly rates for Defined Cost of
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
23 in The listed items of Equipment purchased Equipment Time Per (time
SCC for work on this contract, with an on cost related period)
charge, are: charge
24 in The rates of special Equipment are: Equipment Size or Rate
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
44 in The percentage for Working Areas :
SCC overheads is: %
51 in The hourly rates for Defined Cost of
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates
61 in The hourly rates for Defined Cost of
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Equipment in the published list is %
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
22 in The rates of other Equipment are: Equipment Size or Rate
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Part 2: pricing data
ECC3 Option A
reference pages
C2.1 Pricing assumptions: Option A
C2.2 The activity schedule
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C2.1 Pricing assumptions: Option A
and incidental to Providing the Works in accordance with the Works Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
Part c2: pricing data c2.1 ECC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
activities in order to fulfil the obligation to complete the works for the tendered total of the Prices.
quantity, of work within that activity later turns out to be different to that which the Contractor
estimated at time of tender. The only basis for a change to the Prices is as a result of a
compensation event.
Part c2: pricing data c2.1 ECC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C2.2 the activity schedule
Use this page as a cover page to the Contractor’s activity schedule.
Financial Requirements
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)Payment Terms: payment certificate from the Project Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Works Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and b
Compliance Requirements
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)C1.1 Form of Offer and Acceptance [●]
C1.1 Form of Offer & Acceptance
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer
B-BBEE Details: med to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Project
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Project Manager
within thirty days of the notification or as otherwise instructed by the Project Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Works.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in con
Health & Safety
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
no rate is quoted for the currency in question
then the rate for United States Dollars, and if
no such rate appears in The Wall Street
rights and does not give rise to an estoppel unless the Parties agree otherwise and confirm
such agreement in writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the works. Without limitation the Contractor:
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Site;
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of works; and
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z15.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail.
and related control measures at the Contractor’s expense. For the purposes of compliance
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
the results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z15.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z15.3 The Employer manages asbestos and ACM according to the Standard.
Z15.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z15.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z15.6 The Contractor continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
statement however other clauses may also use the same data
selected. Click on the form field once and type in the data. Otherwise, complete by hand and in ink.
21 in The published list of Equipment is the last
Equipment in the published list is Minus %
22 in The rates of other Equipment are: Equipment Size or Rate
21 in The published list of Equipment is the last
Environmental
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)guidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the works, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Project Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
dates are extended by the notification periods required by regulations 3 and 21 of the
Asbestos Regulations, 2001.
Z15.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Annexure A: One-in-ten-year-return weather data obtained from SA Weather
Bureau for [weather station]
Contractual Terms
Source: C0 ECC3 Contract HMI Simulator Upgrade Final.fin.pdf (unknown)(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________)
for Upgrade HMI simulator at Matla Power Station for a
period of two (02) years
Contents: No of
pages 61
Part C1 Agreements & Contract Data
Part C2 Pricing Data
Part C3 Scope of Work
Part C4 Site Information
CONTRACT No. [Insert at award stage]
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Part C1: Agreements & Contract Data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [●]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer [●]
C1.2b Contract Data provided by the Contractor [●]
[to be inserted from Returnable Documents at award
stage]
C1.3 Proforma Guarantees [●]
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
C1.1 Form of Offer & Acceptance
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option
A: Priced contract with activity schedule
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation
X2 Changes in the law
X3: Multiple currencies
X7: Delay damages
X15: Limitation of Contractor’s liability for
design to reasonable skill and care
X16: Retention
X17: Low performance damages
X18: Limitation of liability
Z: Additional conditions of contract
of the NEC3 Engineering and Construction
Contract, April 2013 (ECC3)
10.1 The Employer is (Name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state-owned company
incorporated in terms of the company laws of
the Republic of South Africa
50.1 The assessment interval is between the 25day of each successive month.
51.1 The currency of this contract is the South African Rand.
51.2 The period within which payments are
made is [●]8 weeks.
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
Monitor Money Rates Service (or such service
as may replace the Reuters Monitor Money
Rates Service) on the due date for the payment
in question, adjusted mutatis mutandis every 6
months thereafter and as certified, in the event
of any dispute, by any manager employed in
the foreign exchange department of The
dispute to him. (see www.ice-sa.org.za). If the
(select one of the three methods as agreed with successful
tenderer and delete the others and this note)
X7 Delay damages (but not if Option X5 is
also used)
X7.1 Delay damages for Completion of the
whole of the works are R[●] per day up to a limit of R[●]
X15 Limitation of the Contractor’s liability There is no reference to Contract Data in this
for his design to reasonable skill & care Option and terms in italics are identified
elsewhere in this Contract Data.
X16 Retention (not used with Option F)
X16.1 The retention free amount is R
The retention percentage is %
X17 Low-performance damages
X17.1 The amounts for low-performance
damages are: Amount Performance level
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer R0.0 (zero Rand)
for indirect or consequential loss is limited
to:
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event
damage to the Employer’s property is
limited to:
X18.3 The Contractor’s liability for Defects due to The greater of
his design which are not listed on the
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
from the Employer’s assets policy for
correcting the Defect (other than the
resulting physical damage which is not
excluded) plus the applicable deductible as
at contract date.
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
connection with this contract, other than
excluded matters, is limited to: The Contractor’s total liability for the additional
excluded matters is not limited.
for which the Contractor is liable under this
contract for
before the Defects Certificate is issued,
outside the Site,
the works, Plant and Materials),
right.
X18.5 The end of liability date is (i) 7 years after the defects date for latent
(ii) the date on which the liability in question
prescribes in accordance with the Prescription
Act No. (as amended or in terms of
any replacement legislation) for any other
matter.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Project Manager
within thirty days of the notification or as otherwise instructed by the Project Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Works.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Project Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the works or any
portion thereof, in the course of Providing the Works and after Completion, requires the prior
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
written consent of the Project Manager. All rights in and to all such images vests exclusively in
the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of core clause 51.2 is then calculated from the delayed date by when payment is to be made.
Z7.3 The Contractor (if registered in South Africa in terms of the companies Act) is required to
comply with the requirements of the Value Added Tax Act, no (as amended) and to
include the Employer’s VAT number 4740101508 on each invoice he submits for payment.
Z8 Notifying compensation events
Z8.1 Delete from the last sentence in core clause 61.3, “unless the Project Manager should have
notified the event to the Contractor but did not”.
Part c2: pricing data c2 ECC3/A cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Upgrade HMI simulator at Matla Power Station for a period of two (02) years
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 83.1 is provided for in 60.1(14) and the
Employer’s liability under the indemnity is limited.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Addition to secondary Option X7 Delay damages (if applicable in this contract)
Z11.1 If the amount due for the Contractor’s payment of delay damages reaches the limits stated in
this Contract Data for Option X7 or Options X5 and X7 used together, the Employer may
terminate the Contractor’s obligation to Provide the Works using the same procedures and
payment on termination as those applied for reasons R1 to R15 or R18 stated in the
or in any other similar process, of such Prohibited Action before the Employer can terminate the
Contractor’s obligation to Provide the Services for this reason.
Z12.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason, the
amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z12.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited Action.
ensures that the Committing Party co-operates fully with an investigation.
Z13 Insurance
Z 13.1 Replace core clause 84 with the following:
Insurance cover 84
84.1 When requested by a Party, the other Party provides certificates from his
insurer or broker stating that the insurances required by this contract are
in force.
84.2 The Contractor provides the insurances stated in the Insurance Table A.
84.3 The insurances provide cover for events which are at the Contractor’s risk
from the starting date until the earlier of Completion and the date of the
termination certificate.
and Materials covered by the Employer’s insurance
The Employer’s policy deductible, as
Employer’s insurance
property (except the works, Plant and Employer’s property
Materials and Equipment) and liability
covered by the Employer’s insurance (not an employee of the Contractor)
caused by activity in connection with
this contract The Employer’s policy deductible, as
Employer’s insurance
Transportation (Marine) Per the insurance policy document
Z14 Nuclear Liability
Z14.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z14.2 The Employer is solely responsible for and indemnifies the Contractor or any other person
against any and all liabilities which the Contractor or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Contractor or any other person or the
presence of the Contractor or that person or any property of the Contractor or such person at
or in the KNPS or on the KNPS site, without the permission of the Employer or of a person
acting on behalf of the Employer.
Z14.3 Subject to clause Z14.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Contractor or any other person, or the presence of the Contractor or
that person or any property of the Contractor or such person at or in the KNPS or on the
Description
Source: SBD 1.pdf (TENDER)The successful bidder will be required to fill in and sign a written contract form (sbd7).
Bid response documents may be deposited in the bid box
Situated at (street address)
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration number
TCS PIN: OR CSD No:
B-BBEE STATUS LEVEL VERIFICATION Yes B-BBEE STATUS Yes
Certificate level sworn
[TICK APPLICABLE BOX] No AFFIDAVIT No
If yes, who was the certificate
Issued by?
An accounting officer as contemplated in the close corporation
An accounting officer as act (cca)
Contemplated in the close a verification agency accredited by the south african
Corporation act (cca) and name accreditation system (sanas)
The applicable in the tick box a registered auditor
Name:
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/SWORN AFFIDAVIT(FOR EMEs& QSEs) MUST BE SUBMITTED IN
Order to qualify for preference points for b-bbee]
ARE YOU THE ACCREDITED Yes No ARE YOU A FOREIGN Yes No
Representative in south africa based supplier for
For the goods /services /works the goods /services [if yes answer part b:3
Offered? [If yes enclose proof] /works offered? Below ]
Signature of bidder .................................... Date
Capacity under which this bid is
SIGNED (Attach proof of authority to sign
this bid; e.g. resolution of directors, etc.)
Total bid price (all
Total number of items offered inclusive)
Bidding procedure enquiries may be directed to: technical information may be directed to:
Department/ public entity contact person
Contact person telephone number
Telephone number facsimile number
Facsimile number e-mail address
E-mail address
Sbd1
Part b
Terms and conditions for bidding
1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted for
Consideration.
1.2. All bids must be submitted on the official forms provided–(not to be re-typed) or online
1.3. Bidders must register on the central supplier database (csd) to upload mandatory information namely: (
Business registration/ directorship/ membership/identity numbers; tax compliance status; and banking
Information for verification purposes). B-bbee certificate or sworn affidavit for b-bbee must be submitted
To bidding institution.
1.4. Where a bidder is not registered on the csd, mandatory information namely: (business registration/
Directorship/ membership/identity numbers; tax compliance status may not be submitted with the bid
Documentation. B-bbee certificate or sworn affidavit for b-bbee must be submitted to bidding institution.
1.5. This bid is subject to the preferential procurement policy framework act 2000 and the preferential
Procurement regulations, 2017, the general conditions of contract (gcc) and, if applicable, any other
Legislation or special conditions of contract.
2.1 Bidders must ensure compliance with their tax obligations.
2.2 Bidders are required to submit their unique personal identification number (pin) issued by SARS to enable the
Organ of state to view the taxpayer’s profile and tax status.
2.3 Application for tax compliance status (tcs) or pin may also be made via e-filing. In order to use this provision,
Taxpayers will need to register with SARS as e-filers through the website www.SARS.GOV.ZA.
2.4 Bidders may also submit a printed tcs together with the bid.
2.5 In bids where consortia / joint ventures / sub-contractors are involved, each party must submit a separate
Proof of tcs / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a csd number
Must be provided.
3.1. Is the bidder a resident of the republic of south africa (RSA)? yes NO
3.2. Does the bidder have a branch in the RSA? yes NO
3.3. Does the bidder have a permanent establishment in the RSA? yes NO
3.4. Does the bidder have any source of income in the RSA? yes NO
If the answer is “NO” to all of the above, then, IT is not a requirement to obtain a tax compliance status / tax
Compliance system pin code from the south african revenue service (SARS) and if not register as per 2.3 Above.
Nb: failure to provide any of the above particulars may render the bid invalid.
Evaluation Criteria
Source: SBD 1.pdf (TENDER)Unable to extract eligibility criteria
Evaluation Criteria
Source: Contractors Assessment Form.pdf (unknown)No explicit eligibility criteria are stated in the provided document. The assessment form implies contractors must comply with environmental management requirements, but no pre-qualification thresholds are specified.
Quality Management
Source: Contractors Assessment Form.pdf (unknown)(Record of decision), Example: Water Use License, Waste Permit, etc.
certificate must be supplied to Matla
principles? Note: Corrective actions will be the liability of the contractor.
Description
Source: SBD 6.2.pdf (TENDER)of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicablebox)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published by
SARB for the specific currency on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.resbank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dti must be informed accordingly in order for the dti
to verify and in consultation with the AO/AA provide directives in this regard.
Local content declaration
(Refer to a
Evaluation Criteria
Source: SBD 6.2.pdf (TENDER)Bidders must comply with the local production and content requirements as per the Preferential Procurement Regulations, 2017 and SATS 1286:2011. A bid may be disqualified if the SBD 6.2 Declaration Certificate and Annex C are not submitted as part of the bid documentation. Bidders must provide proof of SARB exchange rates if imported content is declared. The stipulated minimum threshold for local content is not specified in the document.
Technical Specifications
Source: SBD 6.2.pdf (TENDER)of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicablebox)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published by
SARB for the specific currency on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.resbank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dti must be informed accordingly in order for the dti
to verify and in consultation with the AO/AA provide directives in this regard.
Local content declaration
(Refer to a
Pricing Schedule
Source: SBD 6.2.pdf (TENDER)5 years. The successful bidder is required to continuously update Declarations C, D
and E with the actual values for the duration of the contract.
I, the undersigned, ..................................................................................... (full names),
do hereby declare, in my capacity as ............................................. ...........
of ...............................................................................................................(name of bidder
entity), the following:
(a) The facts contained herein are within my own personal knowledge.
(b) I have satisfied myself that:
(i) the goods/services/works to be delivered in terms of the above-specified bid
comply with the minimum local content requirements as specified in the bid, and
as measured in terms of SATS 1286:2011; and
(c) The local content percentage (%) indicated below has been calculated using the
formula given in clause 3 of SATS 1286:2011, the rates of exchange indicated in
paragraph 3.1 above and the information contained in Declaration D and E which has
been consolidated in Declaration C:
Bid price, excluding VAT (y) R
Imported content (x), as calculated in terms of SATS 1286:2011 R
Stipulated minimum threshold for local content (paragraph 3 above)
Local content %, as calculated in terms of SATS 1286:2011
Health & Safety
Source: SBD 6.2.pdf (TENDER)3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published by
given in clause 3 of SATS 1286:2011, the rates of exchange indicated in paragraph 3.1
above and the information contained in Declaration D and E.
(d) I accept that the Procurement Authority / Institution has the right to request that the
local content be verified in terms of the requirements of SATS 1286:2011.
(e) I understand that the awarding of the bid is dependent on the accuracy of the
information furnished in this application. I also understand that the submission of
incorrect data, or data that are not verifiable as described in SATS 1286:2011, may
result in the Procurement Authority / Institution imposing any or all of the remedies as
provided for in Regulation 14 of the Preferential Procurement Regulations, 2017
promulgated under the Preferential Policy Framework Act (PPPFA), 2000 (Act No. ).
Signature:_________________________
WITNESS No. 1 DATE: ___________
WITNESS No. 2 DATE: ___________
Contractual Terms
Source: SBD 6.2.pdf (TENDER)x is the imported content in Rand
y is the bid price in Rand excluding value added tax (VAT)
Prices referred to in the determination of x must be converted to Rand (ZAR) by using the
exchange rate published by South African Reserve Bank (SARB) on the date of
advertisement of the bid as indicated in paragraph 3.1 below.
The SABS approved technical specification number SATS 1286:2011 is accessible
on http:/www.thedti.gov.za/industrial development/ip.jsp at no cost.
1.6. A bid may be disqualified if this Declaration Certificate and the Annex C (Local Content
Declaration: Summary Schedule) are not submitted as part of the bid documentation;
A of SATS 1286:2011) for this bid is/are as follows:
Section
Source: SBD 6.2.pdf (TENDER)1.3. Where necessary, for tenders referred to in paragraph 1.2 above, a two stage bidding
process may be followed, where the first stage involves a minimum threshold for local
production and content and the second stage price and B-BBEE.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Eskom E-tendering - Eskom E-tendering - Eskom E-tendering - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
43
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
Guide to sports tenders in South Africa. Covers SRSA-funded facility maintenance, sports equipment supply, surfacing contracts, and tournament management opportunities.
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Computer Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.