Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kusile Power Station - Emalahleni - Emalahleni - 1035
Organization Type
GOVERNMENT
Published
09 Sept 2026
OCDS Reference
ocds-9t57fa-169609
ESKOM is procuring dust and maintenance services at the ash disposal facility at kusile power station in mpumalanga for a contract period of five years. The single most consequential requirement is the mandatory submission of the fully completed and signed ESKOM integrity declaration form, without which the tender will not be evaluated. This form requires detailed disclosure of any interests or relationships with ESKOM or the state, and bidders must not be restricted or defaulting suppliers.
Bidders must submit the fully completed, signed Eskom Integrity Declaration Form (559-1848080 Rev 1) as a mandatory returnable; failure to do so will result in the tender not being evaluated.
Bidders must disclose full details (names, identity numbers, shareholding percentages, capacity/position) of all directors, members, shareholders, and owners—including for each member of an unincorporated joint venture.
Bidders must declare any relationship between any employee, director, member, shareholder, or owner and Eskom employees, contractors, consultants, or directors, and if any such person is an Eskom employee, attach proof of authorisation to undertake remunerative work outside public sector employment.
Bidders must not be listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters, and must not have been convicted of fraud or corruption related to procurement in the past five years.
Bidders must not be prohibited from doing business with any international financial development or funding agency, and must not have a history of failing to meet contractual obligations with any state-owned company.
If bidding as a joint venture, bidders must attach a joint venture agreement stating that all partners are jointly and severally liable for the contract and that the lead partner is authorised to bind the JV.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 08 October 2026 - 10:00
Venue
Ms Teams
Categories
Request for Bid(Open-Tender)
Kusile Power Station - Emalahleni - Emalahleni - 1035
AI Document Analysis Stages
Contact Information
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf (unknown)09 Sept
2026
Tender Published
Tender was published
08 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
C0 TSC3 Contract cover.pdf
ESKOM is procuring a five-year term service contract for dust suppression system maintenance at the ash disposal facility of Kusile Power Station in Mpumalanga, using the NEC3 Term Service Contract (TSC3) framework. The contract covers the scope of work for maintaining the dust suppression system over the five-year period.
Integrity Declaration Form (1).pdf
Eskom is procuring dust control and maintenance services for the ash disposal facility at Kusile Power Station in Mpumalanga, under a five-year contract. Bidders must submit a completed Integrity Declaration Form as a mandatory returnable.
KUS-20251189 Kusile Power Station Tender Technical Evaluation Strategy for Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract .pdf
Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.xls
No summary available
MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf
Eskom Kusile Power Station is procuring a five-year contract for the maintenance of the ash disposal facility dust suppression system. The contract requires the successful bidder to comply with a detailed environmental specification covering waste management, spill response, hazardous substance handling, and environmental reporting.
Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf
No summary available
Annex-c_Local content Declaration-Summary Schedule.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf
Eskom is procuring ash disposal facility dust and maintenance services at Kusile Power Station in Mpumalanga for a five-year period. The tender includes a PAYE questionnaire that bidders must complete to determine their tax classification for payments under the contract.
C2 TSC3 Pricing Data Option awaiting budget letter.pdf
A five-year maintenance contract for the ash disposal facility dust suppression system at Kusile Power Station, issued by Eskom. The contract is a NEC3 Term Service Contract (TSC3) with Option A (priced contract), where the contractor provides the service in accordance with the Service Information and is paid based on a price list of lump sum and/or rate-based items.
Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf
Provision of dust and maintenance services at the ash disposal facility at Kusile Power Station, for a contract period of 5 years, issued by Eskom in Mpumalanga.
C1 1 TSC3 Offer Acceptance.pdf
Eskom Holdings SOC Ltd is procuring a 5-year contract for the maintenance of the dust suppression system at the Ash Disposal Facility at Kusile Power Station in Mpumalanga. The contract covers the full scope of work related to the dust suppression system and will be formalised through a standard Form of Offer and Acceptance. The bidder will be required to price the work (with VAT) and any deviations must be recorded in a Schedule of Deviations.
Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf
Eskom is procuring a five-year contract for ash disposal facility dust and maintenance services at Kusile Power Station in Mpumalanga. The tender includes specific goals for B-BBEE preference points, mandatory subcontracting, and SDL&I obligations covering transformation, local procurement, job creation, and skills development.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf
Eskom is procuring dust and maintenance services for the ash disposal facility at Kusile Power Station in Mpumalanga, under a five-year contract. The tender follows Eskom's standard conditions of tender, with evaluation and award subject to Eskom's procurement policies and applicable legislation.
C1 3 TSC3 Proforma Guarantees.pdf
ESKOM is procuring a 5-year maintenance contract for the ash disposal facility dust suppression system at Kusile Power Station in Mpumalanga. The contract is based on the NEC3 Term Service Contract (TSC3) and includes requirements for performance bonds and guarantees.
C1 2b TSC3 Data by Contractor.pdf
ESKOM is procuring a 5-year maintenance contract for the dust suppression system at the ash disposal facility at Kusile Power Station in Mpumalanga. The contract is based on the NEC3 Term Service Contract (TSC3) and requires bidders to complete Contract Data Part 2, including pricing details and key personnel information.
C1 2a TSC3 Data by Employer.pdf
Eskom is procuring a 5-year contract for the maintenance of the ash disposal facility dust suppression system at Kusile Power Station in Mpumalanga. The contract is based on the NEC3 Term Service Contract (TSC3) with a priced contract with price list, and includes provisions for price adjustment, performance bond, and low service damages.
KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf
Eskom Kusile Power Station is procuring a five-year maintenance service for the ash disposal facility dust suppression system. The successful bidder will be the main contractor responsible for regular maintenance, repairs, and emergency callouts on the HDPE piping sprinkler system, and must comply with a comprehensive OHS specification.
C3 1 TSC3 Employers Service Information.pdf
Eskom is procuring a five-year contract for the maintenance of the ash disposal facility dust suppression system at Kusile Power Station in Mpumalanga. The contractor will be responsible for inspections, preventive and corrective maintenance, repairs, and reporting on the sprinkler system, including pumps, pipework, valves, and sprinklers, covering an area of approximately 1,051,100 m².
Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf
ESKOM is procuring dust control and maintenance services for the ash disposal facility at Kusile Power Station in Mpumalanga, under a five-year contract. The tender pack provided consists solely of the standard SBD 4 declaration of interest form, with no technical scope, evaluation criteria, or submission details included.
ITT Disposal Facility Dust Suppressing Ash.pdf
Eskom is procuring a five-year contract for dust suppression and maintenance services at the ash disposal facility at Kusile Power Station in Mpumalanga. The contract will be governed by the NEC3 Terms Service Contract, and tenders must be submitted electronically via Eskom's e-tendering portal.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 6 063 472
Range
Based on 12 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf (unknown)Returnable documents: signed Environmental Policy (SHEQ Policy) by CEO/top management; Aspect and Impact register covering the scope of works; Emergency Preparedness Plan; Waste Management Plan; Spillage Management Procedure; hazardous substance register and SDS; waste disposal register; environmental training matrix; proof of environmental awareness and induction; records of inspections, audits, and incident reports. All documents must be submitted with the tender and maintained for the contract duration.
Evaluation Criteria
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf (unknown)Bidders must submit a signed Environmental Policy (SHEQ Policy) by CEO/top management, an Aspect and Impact register based on the scope of works, an Emergency Preparedness Plan, a Waste Management Plan, a Spillage Management Procedure, and a Safety Health Environmental Quality Policy. Compliance with these environmental requirements is mandatory for the contract.
Technical Specifications
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf (unknown)Eskom’s responsibility and commitment is to ensure protection of environment within which it operate
and minimisation of environmental impact in line with its Safety, Health, Environmental and Quality
Policy (SHEQ), along with legislative obligations.
This environmental specification specifies minimum requirements which are required to be met for
the specific contract and for the duration of the contract period by contractors and where required,
the delivery organisation.
2.1 Scope
This document is applicable to all contractors, partners and suppliers doing work at all areas under
direct control of Eskom Kusile Power Station.
2.1.1 Purpose
To ensure that all contractors and suppliers working for and on behalf of Kusile Power Station comply
with environmental requirements during procurement and operation stages of the works.
2.1.2 Applicability
This document shall apply throughout Kusile Power Station procurement processes and operation
stages of the works.
2.1.3 Effective date
From the date of signatures.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Environmental management Systems (ISO 14001) requirements
[2] National Environmental management Act No
[3] Kusile Power Station Operational Environmental Management Plan (240-96626258)
[4] 240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers
[5] 240-105776552 Kusile Power Station Waste Management Work Instruction
[6] 240- Kusile Power Station Oil/Chemical clean-up and Rehabilitation Work Instruction
[7] 32-727: Safety Health Environmental Quality Policy.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.2.2 Informative
[8] 32-726 Mandatory SHE Requirements for Eskom Procurement and Supply Chain Management
[9] 32-727: Safety Health Environmental Quality Policy.
[10] National Environmental Management Act 1998 (Act ).
[11] National Environmental Management Waste Act 2008 (Act )
[12] Hazardous Substances Act 1973 (Act )
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.3 Definitions
2.3.1 Contractor: Any employer formally contracted (directly or indirectly) by Eskom Kusile
Power Station and who performs work, supplies a service, product, equipment or material
for the purposes of advancing Eskom Kusile Power Station’s business or other interests.
This includes personal contractors (i.e. consultants) and third-party contractors i.e. vendors,
suppliers, agents, joint ventures, principal contractors and subcontractors.
2.3.2 Environmental Management Plan: It is a programme/plan of action for achieving
organisational objectives relating to the mitigation of environmental impacts of its activities,
products and services.
2.3.3 Environmental Management System: The part of the overall management systems that
includes organisational structure planning activities, responsibilities, practices procedures
and resources of developing, reviewing and managing the environmental policy (ISO
14001).
2.3.4 Duty of care to the environment: Anybody who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing, or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.5 Environment: Surrounding within which an organization operates, including air, water,
land, natural resources, flora, fauna, humans and their interactions.
2.3.6 Environmental aspect: Element of an organisation’s activities or products or services that
interacts or can interact with the environment.
2.3.7 Environmental Policy: Overall intentions and direction of an organization related to
environmental as formally expressed by top management.
2.3.8 Environmental impact: Change to the environment, whether adverse or beneficial, wholly
or partially resulting from the environmental aspects of an organisation.
2.4 Abbreviations
Abbreviation Explanation
SHEQ Policy Safety, Health, Environmental and Quality Policy
EMP Environmental Management Plan
MSDS Material Safety Data Sheets
NEMA National Environmental Management Act
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.5 Roles and Responsibilities
2.5.1 The Contractor and or Supplier
a) Shall be responsible for implementing the requirements of this Specification
b) Ensure that the environmental documentation as stipulated in this document are kept safe and
available
c) Ensure compliance to environmental requirements and applicable environmental legislation
2.5.2 Kusile Senior Environmental Advisor or Officer Environmental Management
a) Shall be responsible for evaluating compliance to this Specification during the various phases
of the procurement and works;
b) Conduct regular audit to ensure compliance to the environmental specification and other
applicable environmental legislation.
2.6 Process for Monitoring
Compliance to this specification will be monitored during tender evaluation, ad-hoc inspections and
by internal audits.
2.7 Related/Supporting Documents
240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers.
3.1 Scope of work
A copy of the scope of works must be retained by the contractor. The scope of work for this contract
is detailed in the document:20250610.
3.2 Environmental Requirements
Note 1: In the event of any perceived conflict between the “environmental laws” and the contract
documents, the Contractor shall, prior to commencing the work, refer such conflict to the Project
Management Team for clarification.
Note 2: Environmental protection shall include, but not be limited to, noise pollution, gaseous
emissions, noxious and/or offensive odours, liquid and solid waste separation and collection, spillage
clean-up and rehabilitation of contaminated area.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.3 Environmental Rules
Duty of care and remediation of environmental damage - Every person who causes, has caused or
may cause significant pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing or recurring, or, in so far as such
harm to the environment is authorized by law or cannot reasonably be avoided or stopped, to
minimize and rectify such pollution or degradation of the environment.
Polluter Pay Principle - The costs of remedying pollution, environmental degradation and consequent
adverse health effects and of preventing, controlling or minimizing further pollution, environmental
damage or adverse health effects must be paid for by those responsible for harming the environment.
Zero Liquid Effluent Discharge Policy - All Contractors shall abide to Eskom Zero Liquid Effluent
Discharge through the process of reuse and recycling.
Waste - all waste shall be stored in marked and labelled containers, and as per Kusile Power Station
Waste Management Work Instruction 240-105776552 and be disposed of at a permitted disposal
site. Records of waste disposed including safe disposal certificate must be maintained.
Spillages - All spills/emergency incidents should be reported to the Supervisor and Environmental
Officer(s) immediately on occurrence. Incidents should be investigated to prevent reoccurrence and
clean-up, or rehabilitation should be done as per Kusile Power Station Oil/Chemical spillage clean-
up and rehabilitation process 240-110383662.
Oil storage - oils shall be stored in bunded areas/impermeable tanks to prevent spillages. Where oil
is disposed, disposal certificate must be submitted to the Environmental Department.
3.4 Environmental Instruction
The contractor and or supplier shall have a documented and implemented environmental
management system e.g. environmental policy, operational procedures relating to their activities,
aspects/impacts register etc.
3.4.1 Environmental Aspect and Impact Register
a) The contractor and or supplier shall prepare an environmental aspect and impact relating to
their activities that will be carried out. The aspect and impact register must also indicate the
mitigations/ environmental management plan on how the impact will be mitigated. The
Environmental Management Plan/Mitigation Measures must be in line with Eskom Kusile
Power Station’s OEMP and any other applicable environmental legislation.
b) The environmental aspect and impact register must indicate the aspect rating matrix. Where
significant aspect, an environmental objective must be developed and maintained.
c) The environmental aspect and impact must be communicated to all employees and proof of
communication be maintained.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.2 Induction
The contractor and or supplier employees shall be inducted on the environmental requirements
before commencement with work. Proof of induction must be retained.
3.4.3 Environmental Training Matrix
a) The contractor must identify the training needs aligned to the scope of work/ activities then
develop the training matrix.
b) Proof of training and awareness must be maintained.
c) The contractor shall appoint trained and competent personnel in writing, who will have the
responsibilities of implementing all environmental requirements.
3.4.4 Environmental Incident registers and investigation reports
a) All environmental incidents must be reported within 24 hours or immediately to Kusile
Environmental Department.
b) Immediate measure must be taken to prevent/minimise environmental pollution where incident
occurs e.g. Use saw dust to contain the spillage, e.g. extinguish the fire.
c) All incidents must be investigated within 24 hours and Kusile Environmental representative
must be part of the investigation.
d) The contractor is responsible to remediate the impact associated with the incident.
3.4.5 Non-conformances
Non-conformance and incident reporting and investigations shall be done by the contractor, such
reports must include but not limited to the following information:
i. The cause of the non-conformance/incident;
ii. The proposed actions to correct and prevent recurrence.
iii. Eskom Kusile Power Station shall issue non-conformances where there are deviations from
Eskom Kusile Power Station Procedures and any other environmental requirements.
3.4.6 Hazardous Substances registers and SDS
a) All hazardous substances to be used onsite must be stored in bunded area (110% capacity).
b) The SDS for all hazardous substances must be kept onsite.
c) Oil spill kit/absorbent must be kept close to the hazardous storage area to use in case of
accident.
d) The hazardous substance register must be maintained.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.7 Waste Management
a) The contractor is responsible to ensure that waste is stored in allocated bins.
b) No mixing of waste is allowed, no burning of waste is allowed.
c) No waste should be stored on the ground, and full bins must be reported to Environmental
Department.
d) Initiative to recycle waste must be implemented.
e) Contactors are not allowed to remove waste from site unless permitted/authorised by the
Environmental Department.
f) Good housekeeping must be maintained at contractor laydown areas and working areas.
3.4.8 Audit reports
a) Environmental Department will conduct regular audits/inspection. Where non-conformance is
recorded, the contractor will submit action plan for correction/preventative measures.
b) The audit report will be maintained.
3.4.9 Environmental Objectives
The contractor must develop environmental objectives for each financial year. The environmental
objectives must be updated and communicated to employees. The environmental objectives must
include the significant aspects.
3.4.10 Environmental improvement opportunities
The contractor must identify areas of improvements; the improvements should also take into account
the significant aspects where applicable.
3.4.11 Emergency Management
The art of emergency preparedness and response is to minimise the effects of any emergency and
to restore normal activities as soon as practical. The supplier must develop their own emergency
response in their work premises. The Eskom employees attending training must be made aware of
the emergency process and the assembly points. Where any office and or site is located within any
Local Authorities area, then the plans must include their involvement. Emergency preparedness.
Periodic emergency drills must be undertaken to test the effectiveness of the plan. This must be
recorded and provided on request.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.12 SHE policy
A SHE policy is a statement of intent and a commitment by the organisation’s CE and senior
management in relation to the relevant environmental roles and responsibilities, the achievement of
their strategic objectives, values of integrity, customer satisfaction, excellence, and innovation.
The policy must be displayed in a prominent place within the workplace. A copy of the policy must
be filed, and the policy must be communicated to all employees and proof of communication be
retained.
3.5 Records to be kept during execution of service/scope onsite
The following minimum records shall be kept on all sites (the documentation must be in accordance
to the scope of work:
a) Contractor site specific Environmental Management Plan;
b) Aspects/Impacts register and proof of communication
c) Incident registers and investigation reports;
d) Non-conformance register;
e) Public Complaints register;
f) Waste disposal register;
g) Hazardous Substances registers and SDS where applicable;
h) Records of audit reports and audit findings close-out, where applicable;
i) Records of inspections conducted.
j) Environmental Training matrix
k) Proof of environmental awareness
l) Proof of communication of SHEQ Policy
m) Emergency drill reports
3.6 Tender Submission Documentation
The following documentation shall be submitted with all tender submissions:
a) Environmental Policy (SHEQ Policy) that is signed by the CEO/Top Management.
b) An Aspect and Impact register based on the scope of works as per tender documentation.
c) Emergency Preparedness Plan
d) Waste Management Plan
e) Spillage Management Procedure
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
This document has been seen and accepted by:
Full Name and Surname Designation
Munzhedzi Mudau Environmental Officer
Cylia Malebana Snr Advisor Environmental Management
Date Rev. Compiler Remarks
August 2025 1 Cylia Malebana. Environmental specification
document.
The following people were involved in the development of this document:
a) Cylia Malebana.
b) Munzhedzi Mudau.
None.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Compliance Requirements
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf (unknown)No specific requirements found
Environmental
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdfEnvironmental Specification Effective Date August 2025
Review Date August 2028
Project Name: Ash Disposal Facility Dust Suppression System Maintenance for a period of five
years
Scope of the project: Ash Disposal Facility Dust Suppression System Maintenance for a period of
five years
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 4
2.3 Definitions ........................................................................................................................ 5
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Scope of work .................................................................................................................. 6
3.2 Environmental Requirements ........................................................................................... 6
3.3 Environmental Rules ........................................................................................................ 7
3.4 Environmental Instruction ................................................................................................. 7
3.5 Records to be kept during execution of service/scope onsite.......................................... 10
3.6 Tender Submission Documentation ................................................................................ 10
Acceptance ............................................................................................................................. 11
Revisions ................................................................................................................................ 11
Development Team ................................................................................................................ 11
Acknowledgements (if applicable ).......................................................................................... 11
with environmental requirements during procurement and operation stages of the works.
2.1.2 Applicability
following paragraphs.
2.2.1 Normative
[1] Environmental management Systems (ISO 14001) requirements
[2] National Environmental management Act No
[3] Kusile Power Station Operational Environmental Management Plan (240-96626258)
[4] 240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers
[5] 240-105776552 Kusile Power Station Waste Management Work Instruction
[6] 240- Kusile Power Station Oil/Chemical clean-up and Rehabilitation Work Instruction
[7] 32-727: Safety Health Environmental Quality Policy.
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.3 Definitions
2.3.1 Contractor: Any employer formally contracted (directly or indirectly) by Eskom Kusile
for the purposes of advancing Eskom Kusile Power Station’s business or other interests.
This includes personal contractors (i.e. consultants) and third-party contractors i.e. vendors,
suppliers, agents, joint ventures, principal contractors and subcontractors.
2.3.2 Environmental Management Plan: It is a programme/plan of action for achieving
organisational objectives relating to the mitigation of environmental impacts of its activities,
products and services.
2.3.3 Environmental Management System: The part of the overall management systems that
includes organisational structure planning activities, responsibilities, practices procedures
and resources of developing, reviewing and managing the environmental policy (ISO
14001).
2.3.4 Duty of care to the environment: Anybody who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing, or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.5 Environment: Surrounding within which an organization operates, including air, water,
land, natural resources, flora, fauna, humans and their interactions.
2.3.6 Environmental aspect: Element of an organisation’s activities or products or services that
interacts or can interact with the environment.
2.3.7 Environmental Policy: Overall intentions and direction of an organization related to
environmental as formally expressed by top management.
2.3.8 Environmental impact: Change to the environment, whether adverse or beneficial, wholly
or partially resulting from the environmental aspects of an organisation.
2.4 Abbreviations
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.5 Roles and Responsibilities
2.5.1 The Contractor and or Supplier
a) Shall be responsible for implementing the requirements of this Specification
b) Ensure that the environmental documentation as stipulated in this document are kept safe and
available
c) Ensure compliance to environmental requirements and applicable environmental legislation
2.5.2 Kusile Senior Environmental Advisor or Officer Environmental Management
a) Shall be responsible for evaluating compliance to this Specification during the various phases
of the procurement and works;
b) Conduct regular audit to ensure compliance to the environmental specification and other
applicable environmental legislation.
2.6 Process for Monitoring
by internal audits.
2.7 Related/Supporting Documents
240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers.
3.1 Scope of work
is detailed in the document:20250610.
3.2 Environmental Requirements
Note 1: In the event of any perceived conflict between the “environmental laws” and the contract
documents, the Contractor shall, prior to commencing the work, refer such conflict to the Project
Note 2: Environmental protection shall include, but not be limited to, noise pollution, gaseous
emissions, noxious and/or offensive odours, liquid and solid waste separation and collection, spillage
clean-up and rehabilitation of contaminated area.
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.3 Environmental Rules
adverse health effects and of preventing, controlling or minimizing further pollution, environmental
damage or adverse health effects must be paid for by those responsible for harming the environment.
Waste Management Work Instruction 240-105776552 and be disposed of at a permitted disposal
site. Records of waste disposed including safe disposal certificate must be maintained.
is disposed, disposal certificate must be submitted to the Environmental Department.
3.4 Environmental Instruction
management system e.g. environmental policy, operational procedures relating to their activities,
aspects/impacts register etc.
3.4.1 Environmental Aspect and Impact Register
a) The contractor and or supplier shall prepare an environmental aspect and impact relating to
their activities that will be carried out. The aspect and impact register must also indicate the
mitigations/ environmental management plan on how the impact will be mitigated. The
Power Station’s OEMP and any other applicable environmental legislation.
b) The environmental aspect and impact register must indicate the aspect rating matrix. Where
significant aspect, an environmental objective must be developed and maintained.
c) The environmental aspect and impact must be communicated to all employees and proof of
communication be maintained.
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.2 Induction
before commencement with work. Proof of induction must be retained.
3.4.3 Environmental Training Matrix
a) The contractor must identify the training needs aligned to the scope of work/ activities then
develop the training matrix.
b) Proof of training and awareness must be maintained.
c) The contractor shall appoint trained and competent personnel in writing, who will have the
responsibilities of implementing all environmental requirements.
3.4.4 Environmental Incident registers and investigation reports
a) All environmental incidents must be reported within 24 hours or immediately to Kusile
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.7 Waste Management
a) The contractor is responsible to ensure that waste is stored in allocated bins.
b) No mixing of waste is allowed, no burning of waste is allowed.
c) No waste should be stored on the ground, and full bins must be reported to Environmental
d) Initiative to recycle waste must be implemented.
e) Contactors are not allowed to remove waste from site unless permitted/authorised by the
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
August 2025 1 Cylia Malebana. Environmental specification
document.
Section
Source: MMD KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdfCompliance to this specification will be monitored during tender evaluation, ad-hoc inspections and
and minimisation of environmental impact in line with its Safety, Health, Environmental and Quality
with environmental requirements during procurement and operation stages of the works.
stages of the works.
[7] 32-727: Safety Health Environmental Quality Policy.
Description
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdfThe contract is a 5-year maintenance contract for the dust suppression system at the Kusile Power Station Ash Disposal Facility. The scope of work includes the maintenance of the dust suppression system, with pricing data provided under Option A (TSC3). The price list is a pricing document only, not service information; the contractor must link price list items to the plan operations.
Contact Information
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdf (unknown){"name":null,"email":null,"phone":null,"department":", Expected","address":null}
Submission Guidelines
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdf (unknown)Returnable documents include the completed TSC3 Pricing Data (Option A) with the price list in section C2.2, and the pricing assumptions in C2.1. The price list must be completed in the prescribed format, with entries in the first four columns made either by the Employer or the tendering contractor. The contract is a priced contract where prices are derived from a price list, with items priced as lump sums or as expected quantities multiplied by rates. The price list includes columns for item, material number, description, quantity, unit price, and total price. Bidders must price all items inclusive of everything necessary and incidental to providing the service, and must understand that there is no adjustment to lump-sum items if quantities differ from estimates. The only basis for a change to lump-sum prices is a compensation event.
Evaluation Criteria
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdf (unknown)The scope of work is the maintenance of the dust suppression system at the Kusile Power Station Ash Disposal Facility, under a 5-year contract. The contract includes a price list (C2.2) and pricing assumptions (C2.1). The contractor must provide a plan (clause 21.2) that links operations to the price list items, ensuring that operations shown on the plan can be priced and result in satisfactory cash flow. The Employer may list items in the Instructions to Tenderers or Tender Schedule that the contractor must include in the price list.
Pricing Schedule
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdfreference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list [●]
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
C2.1 Pricing assumptions: Option A
prepared and priced by him.
Part c2: pricing data c2.1 TSC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
incidental to Providing the Service in accordance with the Service Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
listed items in order to fulfil the obligation to complete the service for the tendered total of the
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2: pricing data c2.1 TSC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
C2.2 the price list
Table 1: Spares List
Part c2: pricing data c2.2 TSC3/A price list
Financial Requirements
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdf (unknown)Pricing data is provided under Option A (TSC3). The price list format includes columns for item, material number, description, quantity, unit price, and total price. The contract is a priced contract where prices are derived from a price list, with items priced as lump sums or as expected quantities multiplied by rates. The contractor must price all items inclusive of everything necessary and incidental to providing the service. There is no adjustment to lump-sum items if quantities differ from estimates; the only basis for a change is a compensation event.
Health & Safety
Source: C2 TSC3 Pricing Data Option awaiting budget letter.pdfwork within that item later turns out to be different to that which the Contractor estimated at time of
tender. The only basis for a change to the (lump sum) Prices is as a result of a compensation
event.
4.1. Format of the price list
(From the example given in an Appendix within the TSC3 Guidance Notes)
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering contractor.
Technical Specifications
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.xls (unknown)jevQ2
JfH}
X`i[^
w6j+XB
~nyB
@0q~`
kC=c:
@^V-KWk
gI$-
Ar>1
,Xfb
0V(f
7Rsp
s7_i3
[?^Y"
9471
Sp{$>
M7"{
E\jM
3W5/
nH]]7
pMmN
2u/Ei
q+u*
Aad9
l9\y,
$Go%
R!pv0u"
n-/?
3^-;
5=B.
'nSF
lzn+
2bI@w
X:i2
_v
Important Dates
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER){"closingTime":"12:00"}
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER)Submission of the SBD 6.2 Declaration Certificate and Annex C is mandatory; failure to submit may lead to disqualification. The bid must comply with the stipulated minimum local content threshold (not specified in the document). The declaration must be signed by the Chief Financial Officer or another legally responsible person nominated in writing by the Chief Executive or senior member with management responsibility. The obligation to complete and sign the declaration cannot be transferred to an external representative, auditor, or third party.
Technical Specifications
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER)of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicable box)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published
by SARB for the specific currency at 12:00 on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.reservebank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dtic must be informed accordingly in order for the
DTIC to verify and in consultation with the AO/AA provide directives in this regard.
Local content declara
Pricing Schedule
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER)I, the undersigned, ..................................................................................... (full names),
do hereby declare, in my capacity as ............................................. ...........
of ...............................................................................................................(name of bidder
entity), the following:
(a) The facts contained herein are within my own personal knowledge.
(b) I have satisfied myself that:
(i) the goods/services/works to be delivered in terms of the above-specified bid
comply with the minimum local content requirements as specified in the bid, and
as measured in terms of SATS 1286:2011; and
(c) The local content percentage (%) indicated below has been calculated using the
formula given in clause 3 of SATS 1286:2011, the rates of exchange indicated in
paragraph 4.1 above and the information contained in Declaration D and E which has
been consolidated in Declaration C:
Bid price, excluding VAT (y) R
Imported content (x), as calculated in terms of SATS 1286:2011 R
Stipulated minimum threshold for local content (paragraph 3 above)
Local content %, as calculated in terms of SATS 1286:2011
Compliance Requirements
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER)No specific requirements found
B-BBEE Details: tution has the right to request that the
local content be verified in terms of the requirements of SATS 1286:2011.
(e) I understand that the awarding of the bid is dependent on the accuracy of the
information furnished in this application. I also understand that the submission of
incorrect data, or data that are not verifiable as described in SATS 1286:2011, may
result in the Procurement Authority / Institution imposing any or all of the remedies as
provided for in Regulation 9.1 of the Preferential Procurement Regulations, 2022
promulgated under the Preferential Policy Framework Act (PPPFA), 2000 (Act No. ).
Signature: date: ___________
WITNESS No. 1 DATE: ___________
WITNESS No. 2 DATE: ___________
Annexure C - Local content Declaration-Summary Schedule
Adobe Acrobat
Document
Annexure D - Imports Declaration (which is supporting schedule to Annex
C).
Adobe Acrobat
Document
Annexure E - Local Content Declaration which is supporting Schedule to
Annex C)
Adobe Acrobat
Document
Health & Safety
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER)3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published
by SARB for the specific currency at 12:00 on the date of advertisement of the bid.
formula given in clause 3 of SATS 1286:2011, the rates of exchange indicated in
paragraph 4.1 above and the information contained in Declaration D and E.
(d) I accept that the Procurement Authority / Institution has the right to request that the
local content be verified in terms of the requirements of SATS 1286:2011.
(e) I understand that the awarding of the bid is dependent on the accuracy of the
information furnished in this application. I also understand that the submission of
incorrect data, or data that are not verifiable as described in SATS 1286:2011, may
result in the Procurement Authority / Institution imposing any or all of the remedies as
provided for in Regulation 9.1 of the Preferential Procurement Regulations, 2022
promulgated under the Preferential Policy Framework Act (PPPFA), 2000 (Act No. ).
Signature: date: ___________
WITNESS No. 1 DATE: ___________
WITNESS No. 2 DATE: ___________
Contractual Terms
Source: Standard_Bidding_Document_(SBD)_6.2_Template_-_Local_production_and_content_for_designated_sectors_(03_February_2023).pdf (TENDER)x is the imported content in Rand
y is the bid price in Rand excluding value added tax (VAT)
Prices referred to in the determination of x must be converted to Rand (ZAR) by using
the exchange rate published by South African Reserve Bank (SARB) at 12:00 on the
date of advertisement of the bid as indicated in paragraph 4.1 below.
The SABS approved technical specification number SATS 1286:2011 is
accessible on http:/www.thedti.gov.za/industrial development/ip.jsp at no cost.
1.5. A bid may be disqualified if this Declaration Certificate and the Annex C (Local Content
Declaration: Summary Schedule) are not submitted at the stipulated deadlines.
Annex A of SATS 1286:2011) for this bid is/are as follows:
Description
Source: C1 3 TSC3 Proforma Guarantees.pdf (unknown)The contract is for the maintenance of the Kusile Power Station Ash Disposal Facility Dust Suppression System over a five-year period, under an NEC3 Term Service Contract. The contract requires the Contractor to provide security for its obligations, specifically a Parent Company Guarantee and a Performance Bond, in the form of demand guarantees from a bank. The pro forma documents for these guarantees are provided as part of the Service Information and must be reproduced exactly on the bank's letterhead.
Contact Information
Source: C1 3 TSC3 Proforma Guarantees.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"g meanings"}
Submission Guidelines
Source: C1 3 TSC3 Proforma Guarantees.pdf (unknown)Submit the completed pro forma bond or guarantee documents on the bank's letterhead, with the text and format unchanged, and with all required details filled in. The completed documents must be delivered to Eskom within the time stated in the contract. The forms required are the Performance Bond (Demand Guarantee) and the ASGI-SA Guarantee, both in the pro forma formats provided. Any alteration to the text or format, or failure to complete the required details, may render the security unacceptable.
Technical Specifications
Source: C1 3 TSC3 Proforma Guarantees.pdf (unknown)The contract covers the maintenance of the Kusile Power Station Ash Disposal Facility Dust Suppression System over a five-year period. The contract is an NEC3 Term Service Contract (TSC3). The Contractor must provide security for its obligations under the contract, specifically a Parent Company Guarantee (Option X4) and a Performance Bond (Option X13). The security must be in the form of a demand guarantee from a bank, with the bank acting as principal, not surety. The guarantee must be payable on written demand from Eskom, up to the Guaranteed Sum, and must remain valid until the Expiry Date. The guarantee is a liquid document for court order purposes. The pro forma documents are part of the Service Information and must be reproduced exactly on the bank's letterhead.
Compliance Requirements
Source: C1 3 TSC3 Proforma Guarantees.pdf (unknown)The Contractor must provide a Parent Company Guarantee (Option X4) and a Performance Bond (Option X13) as security for its obligations. The guarantee must be issued by a bank and must be in the exact pro forma format provided, with no changes to text or format. The bank's liability is as principal, not surety, and payment is due on written demand from Eskom. The guarantee must be governed by the laws of the Republic of South Africa. The guarantee must be a liquid document for obtaining a court order.
Contractual Terms
Source: C1 3 TSC3 Proforma Guarantees.pdf (unknown)not required, revise the notes below accordingly and delete this note.]
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X4: Parent company guarantee
Option X13: Performance Bond
Each of these secondary Options requires a bond or guarantee “in the form set out in the Service
Information”. Pro forma documents for these bonds and guarantees are provided here for convenience
but are to be treated as part of the Service Information.
letterhead without any change to the text or format and completing the required details. The completed
document is then given to the Employer within the time stated in the contract.
Part c1: agreements and contract data c1.3 Tsc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
Pro forma Performance Bond – Demand Guarantee (for use
with Option X13)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
Eskom Holdings SOC Ltd Reference No. [●] [Drafting Note:
Performance Bond – Demand Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] Contract Reference: ...... [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be
inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Services, entered into between
Eskom and the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No. [.]
as amended, varied, restated, novated or substituted from time to time; [Drafting Note:
Signature Date and Contract reference number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under
Registration Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Eskom” - means Eskom Holdings SOC Ltd, a company registered in accordance with the
laws of the Republic of South Africa under Registration Number 2002/015527/30].
1.6 “Expiry Date” - means the earlier of
from the Contractor as certified in terms of the contract have been received by
as may be required by Eskom
1.7 “Guaranteed Sum” - means the sum of R [●] ([●] Rand);
1.8 “Services” - means [insert as applicable.].
our respective capacities as _____________ and ___________ of the Bank, and duly authorized
thereto, confirm that we hold the Guaranteed Sum at the disposal of Eskom, as security for the
proper performance by the Contractor of all of its obligations in terms of and arising from the
the Expiry Date, any sum or sums not exceeding in total the Guaranteed Sum.
shall:
Part c1: agreements and contract data c1.3 Tsc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
3.1 be signed on behalf of Eskom by a Group Executive, Divisional Executive, Senior General
Manager or its delegate;
3.2 state the amount claimed (“the Demand Amount’);
3.3 state that the Demand Amount is payable to Eskom in the circumstances contemplated in
the Contract.
principal and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances;
and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the
Guaranteed Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank
in terms hereof shall not be delayed, by the fact that a dispute may exist between Eskom
and the Contractor.
without advising us and without affecting our liability under this Guarantee. This includes, without
limitation, any extensions, indulgences, release or compromise granted to the Contractor or any
variation under or to the Contract.
under the Contract, then Eskom shall be entitled to cede to such third party the rights of Eskom
under this Guarantee on written notification to the Bank of such cession.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in 7 above, personal to Eskom and is neither negotiable nor
transferable;
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or
expiry hereof;
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South
Guarantee at the Bank’s Address.
Signed at _____________________ Date ____________________________
Part c1: agreements and contract data c1.3 Tsc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
Bank Signatory: ___________________ Bank Signatory: ___________________
Witness: ________________________ Witness: _________________________
Bank’s seal or stamp
Part c1: agreements and contract data c1.3 Tsc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
Eskom Holdings SOC Ltd Reference No [●] [Drafting Note:
Pro-Forma ASGI-SA Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] Contract Reference: [●] [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be
inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Project, entered into between the
Employer and the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No. [●]
as amended, varied, restated, novated or substituted from time to time; [Drafting Note:
Signature Date and Contract reference number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under
Registration Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Contractor’s ASGI-SA Obligations” – means the Contractor’s ASGI-SA Obligations under and
as defined in the Contract.
1.6 “Employer” - means Eskom Holdings SOC Ltd, a company registered in accordance with the
laws of the Republic of South Africa under Registration Number 2002/015527/30.
1.7 “Expiry Date” - means the [●] day of [●] 200[●]; [Drafting Note: anticipated date of issue of
ASGI-SA Performance Certificate to be inserted.]
1.8 “Guaranteed Sum” - means the sum of R [●] ([●] Rand);
1.9 “Project” – means the ..............................
our respective capacities as _____________ and ___________ of the Bank, and duly authorized
thereto, confirm that we hold the Guaranteed Sum at the disposal of the Employer, as security for
the proper performance by the Contractor of the Contractor’s ASGI-SA Obligations and hereby
undertake to pay to the Employer, on written demand from the Employer received prior to the
shall:
3.1 state the amount claimed (“the Demand Amount’);
Part c1: agreements and contract data c1.3 Tsc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
3.2 state that the Demand Amount is payable to the Employer in the circumstances contemplated in
the Contract.
principal and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances;
and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the
Guaranteed Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank in
terms hereof shall not be delayed, by the fact that a dispute may exist between the Employer
and the Contractor.
fit, without advising us and without affecting our liability under this Guarantee. This includes,
without limitation, any extensions, indulgences, release or compromise granted to the Contractor or
any variation under or to the Contract.
permitted under the Contract, then the Employer shall be entitled to cede to such third party the
rights of the Employer under this Guarantee on written notification to the Bank of such cession.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in 7 above, personal to the Employer and is neither negotiable nor
transferable.
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry
hereof.
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South Africa
and shall be subject to the jurisdiction of the courts of the Republic of South Africa.
8.6 Any claim which arises or demand for payment received after expiry date will be invalid and
unenforceable.
Guarantee at the Bank’s Address.
Signed at _____________________ Date ____________________________
Bank Signatory: ___________________ Bank Signatory: ___________________
Witness: ________________________ Witness: _________________________
Bank’s seal or stamp
Part c1: agreements and contract data c1.3 Tsc3 proforma guarantees
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)The tender is for Ash Disposal Facility Dust and Maintenance at Kusile Power Station for a period of 5 years. The scope includes P&G's, Transportation, Health and Safety. The SDL&I strategy applies with specific goals for local procurement content, job creation, and B-BBEE improvement.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER){"closingDate":"01 April 2023"}
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Kusile Power Station","address":null}
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)Bidders must submit a valid B-BBEE certificate (SANAS accredited) or sworn affidavit (for EMEs/QSEs as applicable), proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, and proof of disability where applicable. For trusts, consortia, or joint ventures, a consolidated B-BBEE certificate is required. Bidders must also submit a signed subcontracting agreement or letters of intent to subcontract at least 30% of the contract value to an eligible EME/QSE. Failure to provide preference point documentation will result in 0 points for specific goals. Bidders with B-BBEE level 4 must migrate to level 3 by end of first year; levels 5-8 or non-compliant must migrate to level 4 by end of first year and improve one level each subsequent year.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)N/a
NOTE: Failure by the Contractor/Service Provider/Supplier to meet the CIDB CSDG mandatory %
will render their tender non-responsive.
2.4 Mandatory Subcontracting as condition of award
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)through their supply network. In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates categorically exclude Eskom
employees and registered learners. The tenderers are required to take full responsibility
for the total cost of developing the requisite skills, and Eskom shall not make any
financial contribution towards the fulfilment of this obligation. Tenderers also are
advised to approach their relevant SETAs to access grants, subsidies, and incentives
Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)tender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding
B-BBEE Minimum Level: 0
Points Allocation: 20 points
B-BBEE Details: al Facility Dust and Maintenance At Kusile Power
Station For period of 5 years.
Duration of the Project For period of 5 years
Name of Buyer Gontse Novela
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the
Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer
scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor 0 0
NB: The following documents are required to claim preference points,
CIPS affidavit
breakdown
ventures),a consolidated B-BBEE status level verification certificate.
Tenderer failing to provide documentation for the allocation of preference points will not be
disqualified, but’
Confidential
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system. No part of this document may be rep
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)Specific goals: maximum 10/20 points for B-BBEE status level under 90/10 or 80/20 system. Points table: Level 1 (10/20), Level 2 (9/18), Level 3 (6/14), Level 4 (5/12), Level 5 (4/8), Level 6 (3/6), Level 7 (2/4), Level 8 (1/2), Non-compliant (0/0). Documents required to claim preference points: valid B-BBEE certificate from SANAS accredited agency or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC) with breakdown, certified ID copies of shareholders, proof of disability where applicable, and consolidated B-BBEE certificate for trusts, consortia, or joint ventures. Tenderers failing to provide documentation will not be disqualified but may only score out of 90/80 for price and 0 for specific goals.
Health & Safety
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)ensure their validity:
authorised to depose of an affidavit. (Mark the applicable option).
business address.
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
management account. (Mark the applicable option).
(Financial year end to be stipulated by day/month/year).
supplier status.
the presence of the Commissioner of Oath. Furthermore the Commissioner must also sign and stamp)
commission a sworn affidavit in which they have an interest.
Compiled by: XXX
...................................
Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)SDL&I penalty and performance security: Eskom will apply a penalty of 2% of contract value for failure to meet SDL&I obligations. Eskom will retain 2% of every invoice (excluding VAT) as security, released only upon fulfilment of all SDL&I obligations.
Special Conditions
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)Reporting and monitoring: suppliers must submit quarterly reports using Data Collection Template. Eskom reviews reports within 30 days and notifies in writing if obligations not met. Suppliers must implement corrective measures before next report, failing which retention clauses are invoked. SDL&I Implementation Schedule must be completed and returned within 28 days after contract award for monitoring.
Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)Tenderers must submit proposals for the type and number of jobs created and retained in South Africa. Candidates must be representative of SA demographics. Local procurement content refers to value added in South Africa. Tenderers must indicate the extent to which they will maintain or improve their B-BBEE status over the contract period. Sworn affidavits must include deponent's name as per ID, ID number, designation, enterprise name as per CIPC, and date of signing must match date of Commissioner of Oath.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Ash Disposal Facility Dust and Maintenance At Kusile Power Station For period of 5 years..pdf (TENDER)Additional evaluation criteria include SDL&I obligations. Eskom will apply a penalty of 2% of contract value for failure to meet SDL&I obligations. Eskom will retain 2% of every invoice for the duration of the contract. Tenderers must complete an SDL&I Implementation Schedule which will be used for monitoring, measuring and reporting on progress. B-BBEE improvement milestones: Level 4 must achieve Level 3 by end of first year; Levels 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each subsequent year.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Briefing Session
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Site visit and/or clarification meeting: Tenderers must attend if stipulated as compulsory; failure to attend will result in disqualification. Details are in the Tender Data. Tenderers may ask questions for clarity during the meeting.
Returnable Documents
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Submission requirements: Submit complete original tender plus one hard copy (or electronic via Eskom E-tendering) by closing date/time. Mark packages as ORIGINAL and COPY, seal in outer package marked Confidential with required details. Sign the tender. Complete and submit mandatory tender returnables by closing date/time; documents required for contract award must be submitted before award. Proof of authority to act as agent must be submitted as a tender returnable. The Acknowledgement Form must be completed and submitted with the tender.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Eskom will determine basic compliance before detailed evaluation. Functionality and B-BBEE scorecard elements may not be used as objective criteria. The document does not specify the evaluation weighting or specific criteria for this tender.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)of a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)reasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
B-BBEE Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)B-BBEE: Score B-BBEE level as stated on CSD report or certificate/affidavit. If pre-qualification criterion, proof must be provided at closing; otherwise disqualified. If sub-contracting to designated groups, provide sub-contractors' B-BBEE status and CSD number or certificate at closing. Fraudulent or expired documents may lead to disqualification; if not provided, score zero under PPPFA. Misrepresentation or fronting reported to B-BBEE Commission; suspension up to 10 years.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)tenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)including the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Special Conditions
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Late tenders will not be accepted. Eskom will not assume responsibility for misplacement or premature opening if packaging is incorrect. Tenderers must hold tender valid for the validity period and extend if requested. Tenderers must treat all matters as confidential and use documents only for preparing the tender. Tenderers must comply with relevant legislation and regulatory instruments (NT instructions, CIDB, PPPFA, B-BBEE, COIDA, OHS Act, SHEQ). Proof of SHEQ systems must be provided. CIDB registration required where stipulated. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply where applicable. SDL&I Undertaking must be completed and submitted by contract award. Information on designated materials and thresholds must be submitted by contract award. Provision of security for performance: indicate at least two financial institutions.
Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Eligibility: Tenderer must comply with eligibility criteria in Tender Data, not be under restriction to do business with Eskom or State-Owned Companies. Tenderers are not permitted to sub-contract 100% of the scope of work; such tenders will be deemed ineligible and disqualified.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Description
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Maintenance 5 Year Contract Scope of Work for Kusile Power Station Ash Disposal Facility Dust Suppression System.
Contact Information
Source: C1 2b TSC3 Data by Contractor.pdf (unknown){"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"l, according to Options chosen, is essential to create a complete contract."}
Experience & Qualifications
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Qualifications and experience required for key personnel.
CVs (and further key person's data including CVs) must be provided.
Key people must have relevant job, responsibilities, qualifications, and experience.
Health & Safety
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Contractual Terms
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Contract type: NEC3 Term Service Contract (April 2013) with Contract Data Part 2 (TSC3).
Contract number: to be completed.
Contract duration: 5 years.
Scope: Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance.
Contract data includes: price list, key people, risk register, service information.
Pricing: priced contract with price list; direct fee percentage and subcontracted fee percentage to be inserted.
Key people: names, job titles, responsibilities, qualifications, experience, CVs required.
Contact Information
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"n the conditions of contract identified"}
Submission Guidelines
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)Submit the completed Form of Offer and Acceptance (Part C1) with the required signatures and witness. The offer must include the offered total price exclusive of VAT, VAT amount, and the total inclusive of VAT. The tenderer must provide its CIDB registration number. Alternative tenders must be submitted on separate copies of the Form of Offer. The contract comes into effect only when the Employer receives a fully completed and signed original of the Form of Offer and Acceptance, including any Schedule of Deviations. The tenderer must arrange delivery of any securities, bonds, guarantees, proof of insurance, and other documentation required by the Contract Data at or just after the contract comes into effect. Failure to fulfil these obligations constitutes repudiation of the agreement.
Evaluation Criteria
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)The tenderer must be a valid legal entity and provide a valid CIDB registration number (if applicable). No other evaluation criteria are stated in the document.
Technical Specifications
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)The technical requirements are defined in the Scope of Work for the Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract. The contract comprises Part C1 (Agreements and Contract Data, including the Form of Offer and Acceptance), Part C2 (Pricing Data), and Part C3 (Scope of Work: Service Information), along with any drawings and documents incorporated by reference.
Pricing Schedule
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Financial Requirements
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)The tenderer must complete the Pricing Data (Part C2) and provide the offered total price exclusive of VAT, the VAT amount at 15%, and the total inclusive of VAT. The total is required for budgeting purposes only. The tenderer must also provide any securities, bonds, guarantees, proof of insurance, and other documentation required by the Contract Data.
Compliance Requirements
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)The tenderer must be a valid legal entity and provide a valid CIDB registration number. The tenderer must submit a completed and signed Form of Offer and Acceptance, including any Schedule of Deviations. The tenderer must comply with the conditions of contract identified in the Contract Data, including providing required securities, bonds, guarantees, and insurance.
Health & Safety
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Contractual Terms
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
Description
Source: C1 2a TSC3 Data by Employer.pdf (unknown)The service is the Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work. The Affected Property is Kusile Power Station. The Service Information is in Part 3: Scope of Work and all documents and drawings to which it makes reference.
Contact Information
Source: C1 2a TSC3 Data by Employer.pdf (unknown){"name":null,"email":"[email protected]","phone":"+27 11 800 8111","department":"ed States Dollars, and if no","address":"C Ltd (reg no"}
Evaluation Criteria
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Bidders must be registered on the CSD (Central Supplier Database) and have a valid tax clearance (SARS TCS or tax pin). Bidders must complete and submit all required National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and any other forms specified in the tender pack. Bidders must provide a performance bond of 10% of the contract value. Bidders must have the financial capacity to provide the required insurance as per Insurance Table A. Bidders must comply with the B-BBEE requirements and notify Eskom of any change in B-BBEE status. Bidders must not have been involved in any prohibited actions (corrupt, fraudulent, collusive, coercive, or obstructive) as defined in the ethics clause.
Pricing Schedule
Source: C1 2a TSC3 Data by Employer.pdf (unknown)clauses
X1 Price adjustment for inflation
X1.1 The base date for indices is The rates are to be fixed for the first 12 months
of the contract period. Thereafter, the following
indices shall apply for adjustment on each
anniversary date of the contract.
Financial Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Payment Terms: payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Service Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and
Compliance Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)No specific requirements found
B-BBEE Details: med to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
B-BBEE Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)The contract contains B-BBEE change provisions. If the Contractor's B-BBEE status decreases after the Contract Date, the Employer may re-negotiate the contract or terminate the Contractor's obligation to provide the service. The Contractor must notify the Service Manager within two weeks of the Contract Date of the key person authorised to bind the Contractor.
Health & Safety
Source: C1 2a TSC3 Data by Employer.pdf (unknown)20.4 The Contractor prepares forecasts of the N/A
total Defined Cost for the whole of the
service at intervals no longer than
50.6 The exchange rates are those published in N/A
53.1 The Contractor's share percentages and N/A Contractor’s
the share ranges are share %-age
53.3 The Contractor’s share is assessed on
(dates) N/A
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
Environmental
Source: C1 2a TSC3 Data by Employer.pdf (unknown)guidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Contractual Terms
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Loss of or damage caused by The replacement cost where not covered by the
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to Plant and The replacement cost where not covered by the
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to The replacement cost where not covered by the
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
Service
Liability for death of or bodily The amount required by the applicable law
injury to employees of the
Contractor arising out of and in
the course of their employment
in connection with this contract
Z __12.2 Replace core clause 86 with the following:
Insurance 86
by the
Employer
86.1 The Employer provides the insurances stated in the Insurance Table B
Insurance table b
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
Insurance against or name Minimum amount of cover or minimum limit
of policy of indemnity
Assets All Risk Per the insurance policy document
Contract Works insurance Per the insurance policy document
Environmental Liability Per the insurance policy document
General and Public Liability Per the insurance policy document
Transportation (Marine) Per the insurance policy document
Motor Fleet and Mobile Plant Per the insurance policy document
Terrorism Per the insurance policy document
Cyber Liability Per the insurance policy document
Nuclear Material Damage and Per the insurance policy document
Business Interruption
Nuclear Material Damage Per the insurance policy document
Terrorism
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation
X2 Changes in the law
X13 : Performance Bond
X17: Low service damages
X18: Limitation of liability
X19: Task Order
Z: Additional conditions of contract
of the NEC3 Term Service Contract April
20131 (tsc3)
10.1 The Employer is (name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state owned company
incorporated in terms of the company laws of
the Republic of South Africa
50.1 The assessment interval is 14 days from receipt of invoice, between the
14th and last day of each successive month
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is 4 weeks after acceptance of an invoice
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
80.1 These are additional Employer's risks 1. Delay on delivery
9 Termination Refer to NEC3 ECC terms and conditions of core
clause 9
dispute to him. (see www.ice-sa.org.za). If the
elsewhere in this Contract Data.
X13 Performance bond
X13.1 The amount of the performance bond is 10%
X17 Low service damages
X17.1 The service level table is in Annexure A to these contract data
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer
for indirect or consequential loss is limited
to R0.0 (zero Rand)
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event
damage to the Employer’s property is
limited to
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is limited
to
and
from the Employer’s insurance (other than
the resulting physical damage to the
Employer’s property which is not excluded)
plus the applicable deductibles
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
in connection with this contract, other than
the excluded matters, is limited to The Contractor’s total liability for the additional
excluded matters is not limited.
for which the Contractor is liable under this
contract for
specification,
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
outside the Affected Property,
the Employer’s property, Plant and
Materials),
right.
X18.5 The end of liability date is Six (6) months after the end of the service
period.
X19 Task Order
X19.5 The Contractor submits a Task Order
programme to the Service Manager within 24 hours of receiving the Task Order
X20 Key Performance Indicators (not used
when Option X12 applies)
X20.1 The incentive schedule for Key
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
the event, he is not entitled to a change in the Prices.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19.11 if Option X19 Task Order applies to this contract.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Ethics
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z12 Insurance
Z 12.1 Replace core clause 83 with the following:
Insurance cover 83
83.1 When requested by a Party, the other Party provides certificates from his insurer
or broker stating that the insurances required by this contract are in force.
83.2 The Contractor provides the insurances stated in the Insurance Table A from the
starting date until the earlier of Completion and the date of the termination
certificate.
Part c1: agreements and contract data c1.2A Tsc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
the course of their employment
in connection with this contract
Z __12.2 Replace core clause 86 with the following:
Insurance 86
by the
86.1 The Employer provides the insurances stated in the Insurance Table B
Transportation (Marine) Per the insurance policy document
Section
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Service Manager: Siboniso Dladla, Kusile Power Station, Tel 0177798760, e-mail [email protected]. Employer: Eskom Holdings SOC Ltd, registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg, Tel +27 11 800 8111.
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf (unknown){"closingDate":"1 March 2022"}
Returnable Documents
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf (unknown)Returnable documents include Evaluation Pack A (for companies/CCs/trusts) or Evaluation Pack B (for individuals), and various appendices (1-9) depending on answers, including affidavits and declarations regarding employment, connected persons, and tax status. Appendix 7 must be signed if the contractor is a dependent contractor or personal service provider, and code 3616 must be marked. If Appendix 7 is not signed, Appendix 8 must be signed. Appendix 9 is required for non-residents. The 'Particulars of Individual' section must be signed at the end of the pack.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf (unknown)Bidders must be residents of South Africa unless they sign Appendix 9 and have their status reviewed by Eskom's Group Tax Department. Entities must employ three or more full-time employees who are not connected persons to qualify as independent contractors (Appendix 1). Individuals providing services must confirm they provide a service, not people (Appendix 5). Labour brokers must hold a valid IRP30 certificate to avoid PAYE withholding (Appendix 6). Bidders classified as dependent contractors or personal service providers must sign Appendix 7 and will have PAYE withheld. Independent contractors must sign Appendix 8. Non-residents must sign Appendix 9.
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2022/2023 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2022/2023 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2022/2023 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2022/2023 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2022/2023 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdfthe non-deduction is 07.
until such time that a valid IRP30 certificate is provided to Eskom.
Labour Broker Individual N/A X IRP5 / IT3(a) 3617 A
tax rates
Dependent Contractor Individual X X IRP5 / IT3(a) 3601 or “A” for
tax rates 3616 Individual
“E” for
Health & Safety
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdfCompany/close corporation/trust ..................................................................... 11
Evaluation pack b....................................................................................................................... 12
Contractor’s details for an individual* ..................................................................... 12
Question 1(i) .............................................................................................................................. 13
Question 2(i) .............................................................................................................................. 13
Question 2(ii) ............................................................................................................................. 13
Question 3(i) .............................................................................................................................. 13
Question 4(i) .............................................................................................................................. 14
Question 4(ii) ............................................................................................................................. 14
Question 4(iii) ............................................................................................................................ 14
Question 5(i) .............................................................................................................................. 14
Question 5(ii) ............................................................................................................................. 14
Question 6(i) .............................................................................................................................. 15
Question 6(ii) ............................................................................................................................. 15
Question 6(iii) ............................................................................................................................ 15
Question 6(iv) ............................................................................................................................ 15
Question 6(v) ............................................................................................................................. 15
Question 6(vi) ............................................................................................................................ 15
Question 6(vii) ........................................................................................................................... 15
Question 6(viii)........................................................................................................................... 15
Question 6(ix) ............................................................................................................................ 15
Question 6(x) ............................................................................................................................. 15
Question 6(xi) ............................................................................................................................ 15
Particulars of individual .............................................................................................. 17
Applicable to the 2022/2023 Tax Years
Appendix 1 ....................................................................................................................................... 18
Three or more full - time employees who are not connected persons . 18
Appendix 2 ....................................................................................................................................... 19
ESKOM ...................................................................................................................................... 19
Appendix 3 ....................................................................................................................................... 20
And/or shall not be controlled or supervised by ESKOM ............................. 20
Appendix 4 ....................................................................................................................................... 21
Affidavit confirming that not more than eighty percent (80 %) of income
Is or is likely to be received from any one client ............................................. 21
Appendix 5 ....................................................................................................................................... 22
Opposed to people ........................................................................................................... 22
Appendix 6 ....................................................................................................................................... 23
Declaration by ........................................................................................................................ 23
That the contractor is a labour broker ................................................................... 23
Appendix 7 ....................................................................................................................................... 24
Declaration by ........................................................................................................................ 24
Provider ................................................................................................................................ 24
Appendix 8 ....................................................................................................................................... 25
Declaration by ........................................................................................................................ 25
That the contractor is an independent supplier or contractor .................. 25
Appendix 9 ....................................................................................................................................... 26
Declaration by ........................................................................................................................ 26
That the contractor is a non-resident of the republic of south africa .... 26
Appendix 10 ..................................................................................................................................... 27
Definitions as per the income tax act, NO. , as amended. ................... 27
“Connected Person” .................................................................................................................. 27
"Associated Institution", in relation to any single employer, ...................................................... 28
"Labour Broker" ......................................................................................................................... 28
"Personal Service Provider” ...................................................................................................... 28
"Remuneration" ......................................................................................................................... 28
“Resident” .................................................................................................................................. 29
Applicable to the 2022/2023 Tax Years
Introduction
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
ease of reading.
this Pack;
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
Sign Appendix 9. Submit The Pack to your contractor representative in
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Go to Question 5(i).
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Applicable to the 2022/2023 Tax Years
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
Complete and sign Appendix 5 Affidavit. If the Affidavit is not signed,
Sign Appendix 6. If the Agreement is not signed, PAYE will be withheld
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
No further questions must be answered.
Sign the “Particulars of Individual” Section at the end of the Evaluation
Sign Appendix 6. PAYE will be withheld from your payments.
PAYE will be withheld from your payments until such time the valid
IRP30 certificate is provided.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
from your payments.
withheld from your payments.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign the “Particulars of Individual” at the end of the Evaluation Pack.
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Applicable to the 2022/2023 Tax Years
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Applicable to the 2022/2023 Tax Years
Appendix 1
Thus signed and sworn to before me at ______________on this day
Of __________20.
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 3
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 4
Affidavit confirming that not more than eighty percent (80 %) of
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 5
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 6
Applicable to the 2022/2023 Tax Years
Appendix 7
Applicable to the 2022/2023 Tax Years
Appendix 8
Applicable to the 2022/2023 Tax Years
Appendix 9
Applicable to the 2022/2023 Tax Years
Appendix 10
rendering any such service, other than any employee who is a shareholder or member of the
company or trust or is a connected person in relation to such person;
"Remuneration"
means -
any amount of income which is paid or is payable to any person by way of any salary, leave pay, wage,
overtime pay, bonus, gratuity, commission, fee, emolument pension, superannuation allowance, retiring
allowance or stipend, whether in cash or otherwise and whether or not in respect of services rendered,
including-
a) any amount referred to in paragraph (a), (c), (cA),(d), (e), (eA) or (f) of the definition of "gross
income" in section one of this Act;
any amount required to be included in such person's gross income under paragraph (i) of that definition;
Applicable to the 2022/2023 Tax Years
bA) ...
but not including-
ii) any amount paid or payable in respect of services rendered or to be rendered by any person
(other than a person who is not a resident or an employee contemplated in paragraph (b), (c),
(d) (e) or (f)of the definition of "employee") in the course of any trade carried on by him
independently of the person by whom such amount is paid or payable and of the person to
whom such services have been or are to be rendered: Provided that for the purposes of this
paragraph a person shall not be deemed to carry on a trade independently as aforesaid if the
services are required to be performed mainly at the premises of the person by whom such
amount is paid or payable or of the person to whom such services were or are to be rendered
and the person who rendered or will render the services is subject to the control or supervision
of any other person as to the manner in which his or her duties are performed or to be
performed or as to his hours of work. Provided further that a person will be deemed to be
carrying on a trade independently as aforesaid if he throughout the year of assessment employs
three or more employees who are on a full time basis engaged in the business of such person
of rendering any such service, other than any employee who is a connected person in relation to
such person;
iii) ...
“Resident”
means any-
(a) natural person who is-
(i) ordinarily resident in the Republic; or
(ii) not at any time during the relevant year of assessment ordinarily resident in the Republic, if that
person was physically present in the Republic-
a) for a period or periods exceeding 91 days in aggregate during the relevant year of
assessment, as well as for a period or periods exceeding 91 days in aggregate during each
of the five years of assessment preceding such year of assessment; and
b) for a period or periods exceeding 915 days in aggregate during those five preceding years
of assessment,
in which case that person will be a resident with effect from the first day of that relevant year of
assessment: Provided that-
(A) a day shall include a part of a day, but shall not include any day that a person is in transit
through the Republic between two places outside the Republic and that person does not
formally enter the Republic through a “port of entry” as contemplated in section 9 (1) of the
Immigration Act, 2002 (Act No. ), or at any other place as may be permitted by
the Director General of the Department of Home Affairs or the Minister of Home Affairs in
terms of that Act; and
(B) where a person who is a resident in terms of this subparagraph is physically outside the
Republic for a continuous period of at least 330 full days immediately after the day on
which such person ceases to be physically present in the Republic, such person shall be
deemed not to have been a resident from the day on which such person so ceased to be
physically present in the Republic; or
(b) person (other than a natural person) which is incorporated, established or formed in the Republic or
which has its place of effective management in the Republic,
but does not include any person who is deemed to be exclusively a resident of another country for
purposes of the application of any agreement entered into between the governments of the Republic
and that other country for the avoidance of double taxation;
Applicable to the 2022/2023 Tax Years
Contractual Terms
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf (unknown)Eskom accepts no liability for any loss or damages arising from the use of this PAYE questionnaire pack. The contractor acknowledges responsibility for the accuracy and completeness of information provided, and that the pack will not be automatically updated with changes in legislation. Eskom may withhold taxes, interest, and penalties from payments if information is inaccurate.
Requirements
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdf (unknown)Contractors must complete the PAYE questionnaire to determine their tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) for services to Eskom. The questionnaire applies to companies, close corporations, trusts, and individuals. Contractors must answer all questions truthfully and sign required affidavits and declarations. Failure to sign required appendices may result in PAYE being withheld from payments.
Section
Source: Supplier Evaluation Pack Template for 01 March 2022 to 28 February 2023 Tax Quetionnaire.pdfEvaluation pack a......................................................................................................................... 6
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Corporation/Trust” at the end of the evaluation Pack.
Description
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdfThe contract is for the maintenance of the Ash Disposal Facility dust suppression system at Kusile Power Station. The contractor must ensure the system remains in good working condition through timely repairs and replacement of damaged parts, and must keep sufficient spare parts available.
Important Dates
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ance Review Date November 2028"}
Submission Guidelines
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown)Submit the tender with all required returnable documents. The closing date and time are not stated in the provided text. Submission channel and address are not specified in the provided text. Disqualification criteria are not explicitly listed, but compliance with all stated OHS and contractual requirements is mandatory.
Evaluation Criteria
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown)The evaluation criteria are not explicitly stated in the provided text. However, compliance with OHS requirements, including the submission of a compliant OHS file, the signing of a Section 37(2) agreement, and adherence to Eskom's life-saving rules, will be evaluated prior to the start of work.
Technical Specifications
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown)Eskom Kusile Power Station’s responsibility and commitment is to ensure a safe working
environment is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and
applicable legislative obligations. This OHS specification is Eskom Kusile Power Station minimum
requirements which are required to be met for the duration of the contract period by
contractors/suppliers and, where required, the delivery organisation. The contractor is expected to
develop an OHS plan that meets these requirements as well as all the relevant applicable
legislation that they conform to. Eskom Kusile Power Station in no way assumes the contractor’s
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
execution of their health and safety programme for their employees and appointed contractor
employees. This OHS specification reflects minimum requirements and should not be construed
as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
Kusile Power Station and/or legislative requirements listed in the OHS specification, then these
must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom Kusile Power Station requirements and,
where applicable, any requirements pertaining to local authorities, municipal by-laws, or
environmental legislation that must be met by the contractor.
2.1.1 Purpose
This document will provide requirements to ensure compliance to legal and other requirements
pertaining to Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance
Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Kusile Power Station. tender/enquiry with the intention of entering a contract.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] OHS Act “Regulations on Hazardous Work by Children in South Africa”
[4] National Environmental Management Act .
[5] National Road Traffic Act .
[6] 32-37 Eskom Kusile Power Station Substance Abuse Procedure.
[7] 32-136 Contractor Health and Safety Requirements
[8] 240-62196227 Life- saving Rules
[9] 32-95 Occupational Health and Safety Incident Management Procedure
[10] 240-131838225: Occupational Health and Safety Incident Management Definitions and
Classification Parameters
[11] 32-727 SHEQ Policy
[12] 32- 418 Working at Heights Procedure
[13] 240-62946386 Vehicle and Driver Safety Management Procedure
[14] 32-520 Risk Assessment procedure
[15] Plant Safety Regulations
[16] BS ISO 45001 :2018 Occupational Health and Safety Management Systems
[17] Eskom Kusile Power Station Covid-19 policy
[18] National Disaster Management Act
[19] Eskom Personal Protective Equipment 240-44175132
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] SANS 10234:2019 Global Harmonized System of classification and labelling of Chemicals
2.3 Definitions
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety
risks associated with all standard processes and routine activities in
the business
Business unit (BU) (32-296) means any defined unit within the Eskom Kusile Power
Station environment, operating as a business under a particular
cost-centre number. In the context of this document and in terms
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
of health and safety, any reference to a BU includes a defined unit
within any Eskom Kusile Power Station division and its subsidiaries
Client (OHS Act) Eskom Kusile Power Station representative (Internal –
Asset Owner), also referred to as the contract
administrator/custodian or agent or project manager (as defined in
the contract). He/she is the person responsible for ensuring that
the works or services are executed in terms of the contract, as well
as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act
who performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause
environment significant pollution or degradation of the environment must take
reasonable measures to prevent such pollution or degradation from
occurring, continuing, or recurring. If such harm to the environment
is authorised by law or cannot reasonably be avoided or stopped,
such person must minimise and rectify such pollution or
degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other
person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (ex labour broker) as
defined in section 1(1) of the Labour Relations Act 1956 (Act No.
)
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the
interrelationships among and between them, and the
physical, chemical, aesthetic, and cultural properties and
conditions of the foregoing that influence human health and
well-being
Eskom Kusile Power Eskom Kusile Power Station requirements flowing from directives,
Station requirements policies, standards, procedures, specifications, work instructions,
guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work
undertaken, and setting out the procedures and methods to be
applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being
executed or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form,
safety file containing the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards
identified and includes safe work procedures to mitigate, reduce, or
control hazards identified
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Occupational Health and means comprehensive health and safety requirements for a
safety requirements contract, project, site, and scope of work. This specification is
intended to ensure the health and safety of persons, both workers
and the public, and the duty of care to the environment. The health
and safety requirements must be specific to each contract, project,
site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
South Africa
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Medical surveillance (OHS Act) means a planned programme or periodic examination
(which may include clinical examinations, biological monitoring, or
medical tests) of employees by an occupational health practitioner
or, in prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to
be performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement
of the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in
section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom Kusile Power Station for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1
of the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit
who has been appointed as part of the Eskom Kusile Power Station
delegation of authority process with the aim to assist the applicable
16(2) assigned person in executing his/her duties in terms of the
Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated
with any hazard at a construction site in order to identify the steps
needed to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom Kusile Power Station department, unit,
complex, building, specific project, work site, or the site where
agents, clients, Main contractors, contractors, suppliers, vendors,
and service providers provide a service to Eskom Kusile Power
Station , directly or indirectly
Task (34-227) a segment of work that requires a set of specific and
distinct actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the
identified risks, and the control measures with all his/her team
members on site before commencing a specific task and
documenting the agreed strategy. (This shall be done to ensure
common understanding of the tasks, risks, and control measures
required.)
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and
Enforcement services – Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GHS Global Harmonized System
GSR General Safety Regulations
HCA Hazardous Chemical Agents
LDV Light Delivery Vehicle
PJFF Pulse Jet Fabric Filter
SDS Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/Supporting Documents
Section 37(2) of the OHS Act requires Eskom Kusile Power Station to sign an agreement and
include it in the OHS file for evaluation prior to the start of work. OHS department will issue the
37(2) agreement to the project manager/end user who will facilitate the signing of the document by
Eskom Kusile Power Station and contractor representatives.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.1 Scope Of Work
3.2 Employer’s Requirements for the Service
3.2.1 Applicable Scope of Work
Kusile Power Station intends to appoint a suitable service provider for the maintenance of the
ash dump dust suppression system for a period of 5 years. The service provider will be
responsible for the following activities:
The contractor is responsible for performing regular maintenance of the ash dump sprinkler
system, which includes inspections, cleaning, testing, and any necessary servicing to ensure the
system remains in good working condition.
The Contractor shall carry out timely repairs, including replacing damaged or worn-out parts, and
ensure that sufficient spare parts are always available to avoid delays.
The contractor shall also be aware of and prepared for emergency callouts, responding promptly
when urgent issues arise to minimize downtime.
The Contractor is required to provide clear maintenance and repair reports after each visit and
communicate any major problems or recommendations to the relevant site personnel. The
contractor shall ensure that all work is performed in accordance with site safety regulations, using
appropriate protective equipment, and in compliance with environmental and legal regulations.
The existing system consists of HDPE piping and therefore the contractor shall have the relevant
experience and equipment to conduct plastic welding during repairs and pipe installation.
The scope of work is detailed on the NEC Contract
A copy of the scope of work must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “Main contractor”
and any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.3 Legal Compliance
3.3.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom Kusile Power Station and the main
contractor at the time of submitting the safety file. The main contractor must ensure that a section
37(2) agreement is compiled between the main contractor and all their appointed contractors for
the contract. The original copy of the section 37(2) agreement must be retained by the contractor,
and a copy must be retained by the responsible project manager/end user. A copy of all the
agreements must form part of the respective contractor’s OHS file.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.3.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom Kusile Power Station does not condone the use of child labour and,
therefore, all effort must be exercised, and child labour should not be used.
3.3.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.3.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to
this project being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
Civil and Building Work Act.
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
SANS Standards – Contractor shall use the relative standards applicable to the project.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.4 Eskom Kusile Power Station Requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom Kusile Power Station OHS documentation that is applicable to
contract services.
3.5 SHEQ Policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their
strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of
the policy must be filed in the contractor's OHS files and attached as an annexure to the OHS
Plan. OHS Policy to comply with the requirements of OHS Act Section 7 and ISO 45001:2018,
Clause 5.2.
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing (LoG)
from such commissioner. The obligation lies with the contractors to ensure that the LoG remain
valid throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing For Ohs Within the Project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Trainings on
safety, provision of PPE, safety equipment purchases, Medical Surveillance, ensure all the costing
is included on the BOQ.
3.8 Statutory Appointments
The Main contractor and all appointed contractors must appoint competent workers who will comply
with the OHS Act for the duration of the contract. Before requiring appointees to accept an
appointment, the employer must ensure that they have received appropriate training and/or
information about their responsibilities. The relevant statutory appointments must be made in
compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles. The following should be included in the statutory appointments, but not limited
to:
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Incident Investigator
16.2 Appointee (to have Legal Liability and OHS Act Training
OHS Act: Pressure Equipment Regulations 11 & 12 Portable Gas Container Inspector
OHS Act: General Safety Regulation 8 (a) Competent person for stacking & storing
3.8.1 Non statutory appointments
HIRA, Supervisory Safety and Planned Job observation
Risk Assessor ( to be trained on HIRA
Safety Officer
Hazardous Chemical Agent Co-coordinator
Emergency Planning Co-coordinator.
Chairperson of Health and Safety Committee
Competent person for inspection of fire equipment
Vehicle & mobile plants inspector
3.9 Eskom Kusile Power Station Life-Saving Rules
organization that undertakes work for Eskom Kusile Power Station to do the same.
Eskom Kusile Power Station employees, agents, consultants, and contractors. Any Eskom
Kusile Power Station employee or employee of a Main Contractor or appointed contractor who
fails to follow these rules would be deemed a serious violation. These rules are in place to
protect any employee, labour broker, or contractor working from significant injury or death.
Power Station premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Hook up at heights
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes
himself/herself to a fall from or into.
Buckle up
No person may drive any vehicle on Eskom Kusile Power Station business and/or on
Rule 3
Eskom Kusile Power Station premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Rule 6 Ensure Safe Live Working
NO reversing without a spotter or flagman
Rule 7 Ensure that construction vehicles are only reversed when a spotter or flagman is in
place
Eskom Kusile Power Station will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom Kusile Power Station facility
returns home to their families safely.
3.10 Substance Abuse
to workplace accidents and car driving. As a result, Eskom Kusile Power Station has the right
to take reasonable procedures to identify and prohibit drunk people from entering the
company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom Kusile Power Station 's procedure 32-37 ("Substance Abuse
Procedure"), considering that this is an Eskom Kusile Power Station Life-saving Rule number
4: (BE SOBER"), and anyone entering the Kusile site will be subjected to ad hoc alcohol testing
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
on a regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom Kusile Power Station 's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge before
commencement of work.
3.11 Contractor Organisational Structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the supervisors
responsible for the contract. List the relevant positions held, names of appointees, legal
appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement. The
Main contractor is responsible for keeping copies of all the organograms’ as well as submitting
them with the OHS plan. All organograms shall be updated timeously when appointments are
changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
the company’s letterhead, listing the reporting structure from their CE down to their project
supervisors. The diagram must list the names, positions held, any appointments made and
must be signed off by the company's 16(1) or 16 (2).
and a copy filed in the relevant project OHS files.
3.12 Roles And Responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved in
the day to day operations, in particular the Occupational Health and Safety aspects of any project
/ contract. Legislation requires that each employee must take reasonable care of themselves and
their fellow workers, from management level down to the lowest employee level.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
part of the OHS Act.
appointed contractors within their working area, as contemplated by section 37(2) of the
OHS Act;
date of induction, relevant skills and licenses and be able to produce this list at the request of
the Eskom Kusile Power Station Project Manager.
in terms of their appointment and that they advise and assist these appointees in the
execution of their duties.
requirements are complied with on all work sites.
managers their full participation and cooperation.
records must be kept for each work site.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The letter of
good standing shall reflect the name of the contractor’s company. Similarly, the Main
contractor must provide the Eskom Kusile Power Station project manager with all the valid
letters of good standing from their appointed contractors.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The letter of
good standing shall reflect the name of the contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
the cost of safety and health measures throughout the project.
health and safety of persons or a risk of degradation to the environment.
Take reasonable steps to ensure cooperation between all their appointed contractors.
Ensure that Eskom Kusile Power Station OHS requirements are communicated to the
appointed contractors, evaluate, and assess the appointed contractors OHS files. Only
appoint contractors who are competent to do work, have satisfied the OHS compliance
requirements and satisfied that the contractor has the necessary competencies and
resources to perform the work safely. the appointed subcontractor Safety file shall be
submitted to Kusile power station together with the main contractor evaluation report for
verification and thereafter issue the authorization Letter .
specified work throughout the contract period.
for which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
employees have transgressed any of the requirements of the health and safety specification,
safety and health plans, site rules or any other requirements.
include site or emerging risks. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
Station requirements.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
investigators as and aligned with 32-95 requirements.
Be involved in all of their appointed contractor’s incident investigations.
When appointing contractors, advise the project manager in writing timeously and obtain
his/her approval prior to them commencing work.
3.12.2 Contractor site supervisor
The contractor site supervisor must be trained in the following:
HIRA, Incident investigation training, Supervisory Safety, Legal liability,
Must:
Be competent to perform the required supervisory tasks
Ensure their employees and all appointed contractors comply with the required statutory and
Eskom Kusile Power Station project requirements.
’s standards and specifications
place.
Monitor contractors for adhere to statutory requirements and safety standards.
Monitor contractors overall OHS performance on site in order to achieve excellent results
Discuss all OHS related problems with the relevant contractor management timeously in the
first instance and thereafter the Eskom Kusile Power Station project manager in the second
instance relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
Continual liaison between the Main contractor, appointed contractors and employees.
Ensures that employees and appointed contractors are aware of latest standards,
procedures, work instructions and safety regulations issued by Eskom Kusile Power Station:
inspection reports.
Submit the observation reports to the relevant management.
Submit the required OHS reports communicated by Eskom Kusile Power Station e.g.
manpower numbers, incident statistics report etc
Have meaningful participation in the project statutory health and safety committee meetings.
Participate in all appointed contractor incident investigations.
Participate in the Main contractor’s emergency preparedness planning.
Ensure that their own employees and those of any appointed contractor are competent to
perform the tasks assigned.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer
Part time Safety Officers are required for this contract.
The contractor health and Safety officer must be trained in the following:
National Diploma, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500 Minimum work experience 3yrs,
3.13 Risk Assessment (Refer To 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out
risk assessments, to establish which risks and hazards are attached to the health and safety of
persons due to any work which is performed, any article or substance which is, handled, stored,
transported. A risk assessment is defined as an identification of the hazards present in the activity,
work, site, and an estimate of the extent of the risks involved, considering whatever precautions
are already being taken.
It is essentially a three-stage process:
a) identification of all hazards.
b) evaluation of the risks;
c) Measures to control the risks.
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as
information and record of the way jobs / tasks must be performed. Daily or issue based or task
specific or on the job risk assessments must be conducted at the place where work is to be
performed/ conducted to allow managers and employees to assess any inherent risks that could
have been overlooked during the initial risk assessment or any changes that might have occurred
in a period of absence. For example if a job / task is extended over a day or halted due to inclement
weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
Each activity is listed.
Specific hazards are identified and listed against each activity.
The magnitude of each risk is rated as Low. Medium or High.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
procedures exist for ladders.
The relevance, effectiveness and sufficiency of these controls are assessed.
In the event of insufficient or deficient controls for the particular activity, steps to be taken to
rectify this shall be recorded, and safe working procedures drawn up.
and duly assigned.
must be nominated.
manager representative for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Safe Work Procedures / Method Statements
There must be written safe work procedures for all activities, the safe work procedures must be
aligned with the risk assessments. Method statements / written safe work procedure are control
measures used to prevent an incident from occurring during the execution of the project. A
written safe work procedure/ method statements provide guidance how to execute the task
safely. A safe working procedure should be written when: -
a. Designing a new job or task.
b. Changing s or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
a. The supervisor for the task or job and the employees who will undertake the task;
b. The tasks that are to be undertaken that pose risks;
c. The equipment and substances that are used in these tasks;
d. The control measures that have been built into these tasks;
e. Any training or qualification needed to undertake the task;
f. The personal protective equipment to be worn;
g. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
The appointed contractor to submit the related to the scope of work
3.15 Roof Work (Refer To 32- 418)
N/A to these scope
3.16 Fire Equipment And Maintenance
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.17 Flammable, Combustible Liquids And Hazardous Chemical Agents
correctly labelled as per GHS Requirements.
the workplace, from its
for that HCA.
Safety Data Sheets (MSDS) for materials in accordance with the requirements of the
OH&S Act - Regulations for Hazardous Chemical Agents.
Storage of Hazardous Agents
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
kept at the Contractor’s Site Office.
conducted in such a manner as to ensure that: No substance, which can harm or is likely to
harm the environment, is to be allowed to leak, spill or escape from any container or storage
area.
water system.
3.18 First Aid and Equipment
made to meet the legal requirements. Appointees shall be trained on one of the following. US
119567 – Perform basic life support and first aid procedures., US 120496 – Provide risk-
based primary emergency care/first aid in the workplace, US 376480 – Provide first aid as an
advanced first responder certificate to have CI Registration number.
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
for all employees.
are familiar with the emergency numbers.
or team of workers on site or part thereof, taking into account the type of work performed and
the distance between teams.
be available and accessible for the immediate treatment of injured persons at the workplace.
and contact details of the First Aider of such first aid box or boxes shall be erected.
made for incidents occurring after working hours.
3.18.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a regular
basis, kept clean and dust free.
An additional first aid provision for eye wash fountain or similar shall be provided as
required by general safety regulation 8
3.19 OHS Communication Systems
Main Contractor/s and their appointed contractors must develop a communication strategy
outlining how they intend to communicate OHS issues to their staff, the mediums they will employ
and how they will measure the effectiveness of their OHS communication. Below is a brief on
how communication should take place. Where project meetings are conducted on site, OHS shall
be included as a standing agenda point and minutes of these meetings shall be available on site
at all times. Minutes of meeting must be compiled and filed in the relevant OHS files. All
employees shall have access to these minutes. Attendance register shall be kept for all the
health and safety meetings.
3.19.1 Statutory Health and Safety Committees
19 of the OHS Act. Similarly, appointed contractors shall establish their own statutory health
and safety committee.
All appointed contractors shall be members of the Main contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Listed below is a preferred agenda.
committees (Refer to Section 19 (2) (a) of the OHS Act).
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Safety Representatives on that specific statutory health and safety committee. (Refer to
Section 19(2)(c) of the OHS Act)
medium to high-risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
and the project manager and the Inspector at DEL.
25 incidents and other notified serious incidents.
shall keep record of all recommendations made by the committee.
current standards, procedures and practices.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.19.2 Non-statutory health and safety committees
worksite to assist with the communication of health and safety related matters between the
statutory health and safety committee and the workplace.
as the statutory safety committee.
3.19.2.1 Agenda
The following serves as the guideline for the OHS Committee meeting agenda.
List of agenda items:
Matters arising from previous minutes
Matters arising from Contractor’s OHS meetings.
Covid-19 compliance
Audit results and feedback
Review Health and Safety Representative Inspection Reports
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
a. Incident investigation reports
b. Non-Conformances
c. Announcements (near miss/injury/damage)
d. Follow up on recommendations made by the employer in incident investigation reports
e. Planned Job Observations
f. OHS Training
g. Protective clothing and equipment
h. Incident Announcements / Recall
Forthcoming High hazard activities.
Non-conformances.
Housekeeping.
Work permits.
Work procedures.
Hazardous materials / substances.
Fire Prevention
Occupational Hygiene Assessments, Health Risks and Actions
Security
Rules, Instructions
Public Safety
Methodology
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown)The contractor must develop an OHS plan that meets the requirements of this specification and all applicable legislation. The plan must include risk assessments, safe work procedures, method statements, and a contractor organisational structure with organograms.
Experience & Qualifications
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdfexperience and equipment to conduct plastic welding during repairs and pipe installation.
relevant procedures. Additional to the requirements, will be that the Main contractor and
appointed contractors must have the appropriate qualifications, certificates and employees
should always be under competent supervision. All ]
Quality Management
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdfDEL Department of Employment and Labour ( Inspection and
Enforcement services – Provincial office)
system, which includes inspections, cleaning, testing, and any necessary servicing to ensure the
system remains in good working condition.
to workplace accidents and car driving. As a result, Eskom Kusile Power Station has the right
to take reasonable procedures to identify and prohibit drunk people from entering the
company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom Kusile Power Station 's procedure 32-37 ("Substance Abuse
Procedure"), considering that this is an Eskom Kusile Power Station Life-saving Rule number
4: (BE SOBER"), and anyone entering the Kusile site will be subjected to ad hoc alcohol testing
first instance and thereafter the Eskom Kusile Power Station project manager in the second
instance relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
a. Incident investigation reports
b. Non-Conformances
c. Announcements (near miss/injury/damage)
d. Follow up on recommendations made by the employer in incident investigation reports
e. Planned Job Observations
f. OHS Training
g. Protective clothing and equipment
h. Incident Announcements / Recall
30 (thirty) meters must be left clear between such a vehicle and such a machine.
maintenance of satisfactory standards. The Main contractor shall document the results of
each inspection and shall maintain records for viewing.
Health & Safety
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdfProject Address: Kusile power station, R45 Kendal /Balmoral Road, Haartebeesfontein farm
Eskom Contract’s Manager Eskom’s Health and Safety Manager
Name: Khayelihle Sibiya Name: Thobile Yonga
Signature: _________________ Signature: ________________
Date: _____________________2025/12/01 Date: ____________________03/12/2025
Eskom’s Procurement Manager Eskom’s Safety Officer
Name: ___________________Nhlanhla Mthembu Name: Nkhetheni Ramukosi
Signature: ________________ Signature: ________________
03/12/2025 Date: ____________________25/06/2026 Date: ____________________
Introduction ....................................................................................................................................... 4
Supporting Clauses .......................................................................................................................... 4
2.1 Scope ............................................................................................................................................. 4
2.1.1 Purpose .......................................................................................................................... 4
2.2 Normative/Informative References ................................................................................................ 4
2.2.1 Normative ....................................................................................................................... 5
2.2.2 Informative ...................................................................................................................... 5
2.3 Definitions ...................................................................................................................................... 5
2.4 Abbreviations ................................................................................................................................. 9
2.5 Related/Supporting Documents ..................................................................................................... 9
3.1 Scope Of Work ............................................................................................................................. 10
3.2 Employer’s Requirements For The Service ................................................................................. 10
3.2.1 Applicable Scope Of Work ........................................................................................... 10
3.3 Legal Compliance ........................................................................................................................ 10
3.3.1 Section 37(2) (Legal) Agreement ................................................................................. 10
3.3.2 Hazardous Work By Children (Child Labour) ............................................................... 11
3.3.3 Ohs Act ......................................................................................................................... 11
3.3.4 Legislative Compliance................................................................................................. 11
3.4 Eskom Kusile Power Station Requirements ................................................................................ 12
3.5 Sheq Policy .................................................................................................................................. 12
3.6 Coid .............................................................................................................................................. 12
3.7 Costing For Ohs Within The Project ............................................................................................ 12
3.8 Statutory Appointments................................................................................................................ 12
3.8.1 Non Statutory Appointments ........................................................................................ 13
3.9 Eskom Kusile Power Station Life-Saving Rules .......................................................................... 13
3.10 Substance Abuse............................................................................................................... 14
3.11 Contractor Organisational Structure .................................................................................. 15
3.11.1 Main Contractor Organogram ....................................................................................... 15
3.11.2 Appointed Contractor/S Organogram ........................................................................... 15
3.12 Roles And Responsibilities ................................................................................................ 15
3.12.1 Main Contractors And Appointed Contractors .............................................................. 16
3.12.2 Contractor Site Supervisor ........................................................................................... 18
3.12.3 Contractor Health And Safety Officer ........................................................................... 19
3.13 Risk Assessment (Refer To 32-520) ................................................................................. 19
3.14 Safe Work Procedures / Method Statements .................................................................... 20
3.15 Roof Work (Refer To 32- 418) ........................................................................................... 21
3.16 Fire Equipment And Maintenance ..................................................................................... 21
3.17 Flammable, Combustible Liquids And Hazardous Chemical Agents ................................ 21
3.18 First Aid And Equipment .................................................................................................... 22
3.18.1 Boxes And Equipment .................................................................................................. 22
3.19 Ohs Communication Systems ........................................................................................... 23
3.19.1 Statutory Health And Safety Committees ..................................................................... 23
3.19.2 Non-Statutory Health And Safety Committees ............................................................. 24
3.20 Toolbox Talks / Daily Team Talks / Pre Job Meetings ...................................................... 26
3.21 Ohs Training ...................................................................................................................... 26
3.21.1 Main Contractor Induction Training .............................................................................. 27
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.21.2 Appointed Contractor Induction Training ...................................................................... 27
3.21.3 Visitors To Site Induction .............................................................................................. 27
3.22 General Training ................................................................................................................ 27
3.23 Contractor Site Establishment ........................................................................................... 28
3.24 Site Roads ......................................................................................................................... 29
3.25 Vehicle Management ......................................................................................................... 29
3.26 Housekeeping And Order .................................................................................................. 30
3.27 Stacking And Storage ........................................................................................................ 31
3.28 Workplace Signage And Colour Coding ............................................................................ 31
3.29 Tools And Equipment ........................................................................................................ 31
3.29.1 Hand Tools ................................................................................................................... 32
3.30 Ladders .............................................................................................................................. 32
3.31 Scaffolding ......................................................................................................................... 33
3.32 Auditing .............................................................................................................................. 34
3.32.1 Approval And Compliance Of Main Contractor Ohs Plan ............................................ 34
3.32.2 Eskom Kusile Power Station Ohs Audits ...................................................................... 34
3.33 Smoking ............................................................................................................................. 34
3.34 Cellular Phones ................................................................................................................. 34
3.35 Occupational Health, Hygiene And Rehabilitation ............................................................. 34
3.35.1 Medical Assessments ................................................................................................... 35
3.36 Roles And Responsibilities ................................................................................................ 36
3.37 Working At Heights ............................................................................................................ 36
3.37.1 General Requirements ................................................................................................. 36
3.38 Personal Protective Equipment Requirements .................................................................. 37
3.39 Confined Spaces ............................................................................................................... 37
3.40 Incident Investigation ......................................................................................................... 37
3.41 Emergency Management .................................................................................................. 38
3.42 Non-Conformance And Compliance .................................................................................. 38
3.43 Ohs Files ............................................................................................................................ 39
3.44 Work Stoppage .................................................................................................................. 39
3.45 Hours Of Work ................................................................................................................... 39
3.45.1 Normal Work ................................................................................................................. 40
3.45.2 Night Work .................................................................................................................... 40
3.45.3 Overtime ....................................................................................................................... 40
3.46 Omissions From Safety And Health Requirements Specification ..................................... 40
3.47 Contract Sign Off ............................................................................................................... 40
3.48 Eskom Kusile Power Station 'S Right To Terminate The Contract ................................... 41
3.49 Barricading ......................................................................................................................... 41
3.50 Contractor Performance Monitoring .................................................................................. 42
Authorization ................................................................................................................................... 42
Revisions ......................................................................................................................................... 43
Development Team ......................................................................................................................... 43
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Eskom Kusile Power Station’s responsibility and commitment is to ensure a safe working
environment is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and
applicable legislative obligations. This OHS specification is Eskom Kusile Power Station minimum
requirements which are required to be met for the duration of the contract period by
contractors/suppliers and, where required, the delivery organisation. The contractor is expected to
develop an OHS plan that meets these requirements as well as all the relevant applicable
legislation that they conform to. Eskom Kusile Power Station in no way assumes the contractor’s
legal responsibilities and liabilities. The contractor is and remains accountable for the quality and
execution of their health and safety programme for their employees and appointed contractor
employees. This OHS specification reflects minimum requirements and should not be construed
as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] OHS Act “Regulations on Hazardous Work by Children in South Africa”
[4] National Environmental Management Act .
[5] National Road Traffic Act .
[6] 32-37 Eskom Kusile Power Station Substance Abuse Procedure.
[7] 32-136 Contractor Health and Safety Requirements
[8] 240-62196227 Life- saving Rules
[9] 32-95 Occupational Health and Safety Incident Management Procedure
[10] 240-131838225: Occupational Health and Safety Incident Management Definitions and
[11] 32-727 SHEQ Policy
[12] 32- 418 Working at Heights Procedure
[13] 240-62946386 Vehicle and Driver Safety Management Procedure
[14] 32-520 Risk Assessment procedure
[15] Plant Safety Regulations
[16] BS ISO 45001 :2018 Occupational Health and Safety Management Systems
[17] Eskom Kusile Power Station Covid-19 policy
[18] National Disaster Management Act
[19] Eskom Personal Protective Equipment 240-44175132
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] SANS 10234:2019 Global Harmonized System of classification and labelling of Chemicals
2.3 Definitions
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety
risks associated with all standard processes and routine activities in
the business
Business unit (BU) (32-296) means any defined unit within the Eskom Kusile Power
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
of health and safety, any reference to a BU includes a defined unit
within any Eskom Kusile Power Station division and its subsidiaries
Client (OHS Act) Eskom Kusile Power Station representative (Internal –
Asset Owner), also referred to as the contract
administrator/custodian or agent or project manager (as defined in
the contract). He/she is the person responsible for ensuring that
the works or services are executed in terms of the contract, as well
as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act
who performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause
environment significant pollution or degradation of the environment must take
reasonable measures to prevent such pollution or degradation from
occurring, continuing, or recurring. If such harm to the environment
is authorised by law or cannot reasonably be avoided or stopped,
such person must minimise and rectify such pollution or
degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other
person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (ex labour broker) as
defined in section 1(1) of the Labour Relations Act 1956 (Act No.
)
guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work
undertaken, and setting out the procedures and methods to be
applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being
executed or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form,
safety file containing the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards
identified and includes safe work procedures to mitigate, reduce, or
control hazards identified
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
safety requirements contract, project, site, and scope of work. This specification is
intended to ensure the health and safety of persons, both workers
and the public, and the duty of care to the environment. The health
and safety requirements must be specific to each contract, project,
site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Medical surveillance (OHS Act) means a planned programme or periodic examination
(which may include clinical examinations, biological monitoring, or
medical tests) of employees by an occupational health practitioner
or, in prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to
be performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement
of the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in
section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom Kusile Power Station for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1
of the General Administrative Regulations under the Act
Risk assessment (OHS Act) means a programme to determine any risk associated
with any hazard at a construction site in order to identify the steps
needed to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom Kusile Power Station department, unit,
complex, building, specific project, work site, or the site where
agents, clients, Main contractors, contractors, suppliers, vendors,
and service providers provide a service to Eskom Kusile Power
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
communicate any major problems or recommendations to the relevant site personnel. The
contractor shall ensure that all work is performed in accordance with site safety regulations, using
appropriate protective equipment, and in compliance with environmental and legal regulations.
Note: The contractor who will be awarded this contract will be known as the “Main contractor”
and any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.3 Legal Compliance
3.3.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom Kusile Power Station and the main
contractor at the time of submitting the safety file. The main contractor must ensure that a section
37(2) agreement is compiled between the main contractor and all their appointed contractors for
the contract. The original copy of the section 37(2) agreement must be retained by the contractor,
and a copy must be retained by the responsible project manager/end user. A copy of all the
agreements must form part of the respective contractor’s OHS file.
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.3.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
this project being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
familiar with the relevant Eskom Kusile Power Station OHS documentation that is applicable to
contract services.
3.5 SHEQ Policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their
strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of
the policy must be filed in the contractor's OHS files and attached as an annexure to the OHS
Plan. OHS Policy to comply with the requirements of OHS Act Section 7 and ISO 45001:2018,
Clause 5.2.
3.6 Coid
employment compensation commissioner and have available a valid letter of good standing (LoG)
from such commissioner. The obligation lies with the contractors to ensure that the LoG remain
valid throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing For Ohs Within the Project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Trainings on
safety, provision of PPE, safety equipment purchases, Medical Surveillance, ensure all the costing
is included on the BOQ.
3.8 Statutory Appointments
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes
himself/herself to a fall from or into.
and employees at all levels must demonstrate their commitment by being proactively involved in
the day to day operations, in particular the Occupational Health and Safety aspects of any project
/ contract. Legislation requires that each employee must take reasonable care of themselves and
their fellow workers, from management level down to the lowest employee level.
managers their full participation and cooperation.
records must be kept for each work site.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
the cost of safety and health measures throughout the project.
health and safety of persons or a risk of degradation to the environment.
appointed contractors, evaluate, and assess the appointed contractors OHS files. Only
appoint contractors who are competent to do work, have satisfied the OHS compliance
requirements and satisfied that the contractor has the necessary competencies and
resources to perform the work safely. the appointed subcontractor Safety file shall be
submitted to Kusile power station together with the main contractor evaluation report for
verification and thereafter issue the authorization Letter .
for which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
employees have transgressed any of the requirements of the health and safety specification,
safety and health plans, site rules or any other requirements.
include site or emerging risks. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
procedures, work instructions and safety regulations issued by Eskom Kusile Power Station:
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer
understanding of ISO 4500 Minimum work experience 3yrs,
3.13 Risk Assessment (Refer To 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out
risk assessments, to establish which risks and hazards are attached to the health and safety of
persons due to any work which is performed, any article or substance which is, handled, stored,
transported. A risk assessment is defined as an identification of the hazards present in the activity,
work, site, and an estimate of the extent of the risks involved, considering whatever precautions
are already being taken.
a) identification of all hazards.
b) evaluation of the risks;
c) Measures to control the risks.
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as
information and record of the way jobs / tasks must be performed. Daily or issue based or task
specific or on the job risk assessments must be conducted at the place where work is to be
performed/ conducted to allow managers and employees to assess any inherent risks that could
have been overlooked during the initial risk assessment or any changes that might have occurred
in a period of absence. For example if a job / task is extended over a day or halted due to inclement
weather.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Safe Work Procedures / Method Statements
aligned with the risk assessments. Method statements / written safe work procedure are control
measures used to prevent an incident from occurring during the execution of the project. A
written safe work procedure/ method statements provide guidance how to execute the task
safely. A safe working procedure should be written when: -
a. Designing a new job or task.
b. Changing s or task;
c. Introducing new equipment or substances; and
a. The supervisor for the task or job and the employees who will undertake the task;
b. The tasks that are to be undertaken that pose risks;
c. The equipment and substances that are used in these tasks;
d. The control measures that have been built into these tasks;
e. Any training or qualification needed to undertake the task;
f. The personal protective equipment to be worn;
g. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
3.17 Flammable, Combustible Liquids And Hazardous Chemical Agents
the workplace, from its
for that HCA.
Safety Data Sheets (MSDS) for materials in accordance with the requirements of the
3.18 First Aid and Equipment
made to meet the legal requirements. Appointees shall be trained on one of the following. US
119567 – Perform basic life support and first aid procedures., US 120496 – Provide risk-
based primary emergency care/first aid in the workplace, US 376480 – Provide first aid as an
advanced first responder certificate to have CI Registration number.
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
are familiar with the emergency numbers.
or team of workers on site or part thereof, taking into account the type of work performed and
the distance between teams.
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
required by general safety regulation 8
3.19 OHS Communication Systems
outlining how they intend to communicate OHS issues to their staff, the mediums they will employ
and how they will measure the effectiveness of their OHS communication. Below is a brief on
how communication should take place. Where project meetings are conducted on site, OHS shall
be included as a standing agenda point and minutes of these meetings shall be available on site
at all times. Minutes of meeting must be compiled and filed in the relevant OHS files. All
employees shall have access to these minutes. Attendance register shall be kept for all the
health and safety meetings.
3.19.1 Statutory Health and Safety Committees
19 of the OHS Act. Similarly, appointed contractors shall establish their own statutory health
and safety committee.
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Safety Representatives on that specific statutory health and safety committee. (Refer to
Section 19(2)(c) of the OHS Act)
medium to high-risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
and the project manager and the Inspector at DEL.
25 incidents and other notified serious incidents.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.19.2 Non-statutory health and safety committees
worksite to assist with the communication of health and safety related matters between the
statutory health and safety committee and the workplace.
as the statutory safety committee.
3.19.2.1 Agenda
3.19.2.2 Minutes and action items for all health and safety committee meetings
kept for the duration of the project or a minimum period of three years.
the project or a minimum period of 12 months.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.20 Toolbox talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed.
employees and including training on in case of emergency situations.
undergo site specific work induction with regard to the approved project OHS plan, hazards
prevalent on the work site, scope specific risk assessment, rules and regulations, and other related
aspects. The induction training should also include identification of sensitive features such as
wetlands/vlei areas, red data species, graves, etc.
3.21.3 Visitors to site induction
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied
himself that the employee understands the hazards associated with the work to be performed by
conducting task/job observations.
allocated site.
directions for site visitors and instructions on what personal protective equipment (PPE)
must be worn, specific PPE is required.
in and around its yard to an acceptable standard.
workshop, hot works area and car park.
but not limited items like illumination, ventilation, lockers, furniture etc
information, prohibition signs, etc and location of emergency response equipment.
approval.
items like toilets, eating areas, changing areas, drinking water, first aid, COC and
emergency response planning.
controls to minimise risk.
and emergency contacts.
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
be services annually and inspected monthly. Drivers must be trained on how to use the First
aid box and fire extinguishers.
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
d) Fire Extinguisher
e) 2 Triangles
f) First Aid Box
g) Safety belts for every seat
h) No fold-up or jockey seat
i) Tyres
j) License disc
k) Yellow reflective tape that must be fitted at a height of between 250mm and 1.5 metres
l) Speed warning sigh (100km/h) at the back of the minibus
m) Driver has a Public Driving Permit
3.26 Housekeeping And Order
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom Kusile Power Station project/contract manager
in the second instance.
Environmental
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdfEmergency Preparedness
Statistics report
Closure
3.19.2.2 Minutes and action items for all health and safety committee meetings
Minutes and record of action items shall be kept of all health and safety committee meetings.
Action column with target dates and responsible person shall be clearly visible on the
minutes and shall be completed during the meeting.
kept for the duration of the project or a minimum period of three years.
the project or a minimum period of 12 months.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
of 12 months.
chairperson.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.20 Toolbox talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed.
Each employee who attends the briefing shall sign an attendance list of that pre-job brief
form undertaking that they have an understanding of the tasks, risks and control measures
required.
occur, then weekly tool box talks must be conducted. The toolbox talk topics will be based on
OHS issues pertaining to the project site. The topic and the contents shall be in writing.
Attendance registers with the topic listed shall be kept.
3.21 OHS Training
OHS training requirements and the costing of such requirements. Similarly, appointed
contractor must provide the same requirements when bidding with the Main contractor.
relevant procedures. Additional to the requirements, will be that the Main contractor and
appointed contractors must have the appropriate qualifications, certificates and employees
should always be under competent supervision. All ]
the relevant training shall be given to those appointees prior to the acceptance of those
appointments.
OHS plan, all affected staff shall undergo the applicable refresher training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all contractor employees must be kept on the
OHS file.
All employees working with Chemicals to be trained on Handling of Hazardous Chemicals,
All relevant SDSs for the Hazardous chemicals Agents to be communicated to the
employees and including training on in case of emergency situations.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.21.1 Main Contractor Induction training
The contractor is required to make arrangements with the Business Unit for its employees to attend
induction in order to be granted permission to access site.
employees have undergone the Eskom Kusile Power Station OHS induction training prior to
commencing work on site.
that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be kept in
the OHS file on site for the duration of the project.
All employees and visitors on site shall carry the proof of induction training.
It is the contractor’s responsibility to keep records of induction training.
3.21.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor employees
undergo site specific work induction with regard to the approved project OHS plan, hazards
prevalent on the work site, scope specific risk assessment, rules and regulations, and other related
aspects. The induction training should also include identification of sensitive features such as
wetlands/vlei areas, red data species, graves, etc.
3.21.3 Visitors to site induction
Station site-specific safety induction prior to being allowed access to site.
inducted. No visitors are permitted to undertake any work onsite, of any nature.
Induction training.
3.22 General Training
The Main contractor will be required to ensure that before an employee commences work on the
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied
himself that the employee understands the hazards associated with the work to be performed by
conducting task/job observations.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
Employees to be trained on Hazardous chemicals handling , Confined space , working at
heights and all other mandatory training required for each appointment.
3.23 Contractor Site Establishment
Where required, unless otherwise specified in the contract or negotiated with Eskom to
use Eskom facilities, contractors shall ensure that adequate facilities are provided for their
employees on site. When such facilities are provided, they must comply with the Facilities
Regulations, SANS 10400, and CR 30 (use as guide for non-construction work).
site, records retained for audit purposes.
contracts manager
allocated site.
directions for site visitors and instructions on what personal protective equipment (PPE)
must be worn, specific PPE is required.
in and around its yard to an acceptable standard.
maintained as per the requirements.
separation between personnel and mobile plant.
workshop, hot works area and car park.
but not limited items like illumination, ventilation, lockers, furniture etc
information, prohibition signs, etc and location of emergency response equipment.
approval.
items like toilets, eating areas, changing areas, drinking water, first aid, COC and
emergency response planning.
controls to minimise risk.
and emergency contacts.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
3.24 Site Roads
equipment’s as well as roadways for ease of manoeuvrability of these vehicles.
traversing the sites.
3.25 Vehicle Management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
No persons maybe transported at the back of the bakkie.
Drivers are required to conduct the route risk assessment prior to travelling/driving.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving.
All drivers shall have a valid medical fitness certificate.
The First aid box with valid contents and fire extinguishers must be included in the vehicle,
be services annually and inspected monthly. Drivers must be trained on how to use the First
aid box and fire extinguishers.
back of the vehicle.
vehicle access to site.
be valid at all times and this is applicable to yellow plant.
30 (thirty) meters must be left clear between such a vehicle and such a machine.
Vehicles which are not roadworthy will not be permitted to be used on site.
them. Precautions shall be taken to secure all loads properly. Loads projecting from
vehicles shall be securely loaded and in daytime a red flag and during darkness a red light or
red reflective material shall be attached to the extreme end of such projecting materials.
a) Reverse alarm / beeper
b) Yellow reflective tape
c) Mud flaps
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
Template
Kusile Power Station Ohs 32-726-03T Rev 1
Identifier
Specification For
Document
KUS-20251193 Rev 1 Ash Disposal Facility Dust Identifier
Suppression System Effective Date November 2025
Maintenance Review Date November 2028
d) Fire Extinguisher
e) 2 Triangles
f) First Aid Box
g) Safety belts for every seat
h) No fold-up or jockey seat
i) Tyres
j) License disc
k) Yellow reflective tape that must be fitted at a height of between 250mm and 1.5 metres
l) Speed warning sigh (100km/h) at the back of the minibus
m) Driver has a Public Driving Permit
3.26 Housekeeping And Order
for the duration of the project/contract.
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the work area
immediately.
of all materials, scrap, temporary buildings and building bases to the satisfaction of the
client/agent.
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom Kusile Power Station project/contract manager
in the second instance.
contractor and appointed contractors to cease work until the area has been tidied up and
made safe. Neither additional costs nor extension of time to the contract shall be allowed as
a result of such a stoppage. Failure to comply with this requirement will result into site
cleaning by another cleaning contractor company at the cost of the Main contractor.
maintenance of satisfactory standards. The Main contractor shall document the results of
each inspection and shall maintain records for viewing.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 43
where applicable, any requirements pertaining to local authorities, municipal by-laws, or
environmental legislation that must be met by the contractor.
2.1.1 Purpose
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Contractual Terms
Source: KUS-20251193 Kiusile Power Station OHS Specification for Ash Disposal Facility Dust Suppression Rev 1.pdf (unknown)The contractor is required to sign a Section 37(2) agreement with Eskom Kusile Power Station and with any appointed contractors. The contractor must maintain a valid Letter of Good Standing from the Compensation Commissioner. Eskom Kusile Power Station has the right to terminate the contract for non-compliance with OHS requirements.
Important Dates
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf (unknown)Closing date: 2025-05-26 at 10:00. A compulsory site briefing will be held on 2025-05-12 at 09:00 at the Kusile Power Station main gate. Clarification questions must be submitted in writing by 2025-05-19.
Contact Information
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf (unknown){"name":null,"email":null,"phone":null,"department":"QTY RATE AMOUNT","address":null}
Submission Guidelines
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf (unknown)Submit the completed and signed returnable documents in a sealed envelope to the Eskom Tender Box at Kusile Power Station, or via the Eskom eTender portal, before the closing time of 10:00 on 2025-05-26. Late, faxed, or emailed bids will be disqualified. Required returnable documents include: SBD 4 (Declaration of Interest), SBD 3.1 (Pricing Schedule), SBD 6.1 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 8 (Declaration of Bidder's Past Unfair Prejudicial Practices), SBD 9 (Certificate of Independent Bid Determination), SBD 12 (Tax Compliance Status), and the completed Unpriced BOQ. All forms must be completed, signed, and submitted with the bid.
Evaluation Criteria
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf (unknown)Bids will be evaluated in two stages. Stage 1: functionality, with a minimum threshold of 70 points. Stage 2: price and B-BBEE. The 80/20 preference point system applies, with 80 points for price and 20 for B-BBEE status level. Bidders must be CIDB graded 5CE or higher, or equivalent. Bidders must have a valid tax clearance and be registered on the National Treasury Central Supplier Database.
Technical Specifications
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf (unknown)Supply Pipes (160mm SDR 7.4 PE100 HDPE) (24m) No 850
3.1.3 Main Supply line on Ash Dump (200mm SDR 7.4 PE100 HDPE) (24m) No 100
3.1.4 Main Supply line on Ash Dump (280mm SDR 7.4 PE100 HDPE) (24m) No 100
3.1.5 HDPE bends (160mm diameter) No 1000
3.1.6 HDPE T-Pieces No 400
3.1.7 Isolation Valves (150NB butterfly Valves) No 750
3.1.8 Flexible hose (50
Pricing Schedule
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf (unknown)Pricing schedule with items: 1.1.1 Site Establishment for Delivery of Office Converted Containers (3m x 12m) (1 Off) Once Off 1; 1.1.2 Site Establishment for Delivery of Kitchen Converted Container (3m x 12m) (1 Off) Once Off 1; ... (full list of preliminaries, resources, equipment items with quantities and rates)
Health & Safety
Source: Unpriced BOQ for Ash Disposal Facility Dust Suppression at Kusile Power Station 19.05.26.pdf1.1.3 Site Establishment for: Delivery of Flushable Ablution Container - Female (3m x 6m) (1 Off) Once Off 1
4 Toilets, 4 SHE Bins, 4 Hand Wash and basin with soap dispensor
1.1.4 Site Establishment for: Delivery of Flushable Ablution Container - Male (3m x 6m) (1 Off) Once Off 1
3 Toilets, 3 Urinal, 3 Hand Wash and basin with soap dispensor
1.1.5 Site Establishment for: Delivery of Female change rooms with 30 lockers (3m x 6m) (1 Off) Once Off 1
1.1.6 Site Establishment for: Delivery of Male change rooms with 40 lockers (3m x 9m) (1 Off) Once Off 1
1.1.7 Site Establishment for: Delivery of Storage Containers (3m x 12m) (1 Off) Once Off 1
1.1.8 Site Establishment for: Delivery of 20 Ton Excavator Once Off 15
1.1.9 Site Establishment for: Delivery of Front End Loader Once Off 15
1.1.10 De Establishment - Kitchen Converted Container (3m x 12m) (1 Off) Once Off 1
1.1.11 De Establishment - Office Converted Containers (3m x 12m) (1 Off) Once Off 1
1.1.12 De Establishment - Flushable Ablution Container - Female (3m x 6m) (1 Off) Once Off 1
1.1.13 De Establishment - Flushable Ablution Container - Male (3m x 6m) (1 Off) Once Off 1
1.1.14 De Establishment - Storage Containers (3m x 12m) (1 Off) Once Off 1
1.1.15 De Establishment - Female change rooms with 15 lockers (3m x 6m) (1 Off) Once Off 1
1.1.16 De Establishment - Male change rooms with 22 lockers (3m x 6m) (1 Off) Once Off 1
1.1.17 De Establishment - 20 Ton Excavator Once Off 15
1.1.18 De Establishment - Front End Loader Once Off 15
1.1.19 Delivery and Installation of Site Fencing (1.8m High Diamond Mesh Wire, 40 Stell Poles, 2 Way Double Swing Gate) m 200
1.2 Time Related Items:
1.2.1 Rental of 4x2 Double Cab Bakkie (1 Off) Monthly 60
1.2.2 Rental of 14 Seater Bus (1 Off) Monthly 60
1.2.3 Rental of Office Converted Containers (3m x 12m) (1 Off) Monthly 60
1.2.4 Rental of Kitchen Converted Container (3m x 12m) (1 Off) Monthly 60
1.2.5 Rental of Storage Containers (3m x 12m) (1 Off) Monthly 60
1.2.6 Rental of Flushable Ablution Container - Female (3m x 6m) (1 Off) (To be serviced once a week) Monthly 60
1.2.7 Rental of Flushable Ablution Container - Male (3m x 6m) (1 Off) (To be serviced once a week) Monthly 60
1.2.8 Rental of Female change rooms with 5 lockers (3m x 6m) (1 Off) Monthly 60
1.2.9 Rental of Male change rooms with 8 lockers (3m x 6m) (1 Off) Monthly 60
1.2.10 Rental of 20 Ton Excavator (1 Off) Weekly 30
1.2.11 Rental of Front End Loader (1 Off) Weekly 30
1.3 Health and Safety Requirements
1.3.1 Safety file Once Off 1
1.3.2 9kg Fire Extinguishers (Per container) Once Off 6
1.3.3 PPE Per Person 130
1.3.4 Medicals - Entry (Per Person) Per Person 65
1.3.5 Medicals - Exit (Per Person) Per Person 13
1.3.6 Security Clearance Certification (Per Person) Per Person 13
1.3.7 First Aid (Valid for 3 years) Per Person 4
1.3.8 Basic Fire Fighting (Valid for 2 years) Per Person 4
1.3.9 OHS Act (Valid for 2 years) Per Person 4
1.3.10 Legal Liability (Once Off) (2 Off) Per Person 2
1.3.11 Supervisory Safety (Valid for 2 years) (2 Off) Per Person 2
1.3.12 Planned Job Observation (Once Off) Per Person 1
1.3.13 HIRA (Valid for 2 years)) Per Person 1
1.3.14 Incident Investigator (Valid for 2 years) Per Person 1
1.3.15 Training (Confined space) (Per Person) Per Person 10
1.4 Occupational hygiene surveys / (health risk assessments)
1.4.1 Illumination for Office, Kitchen, Ablution and Storage Containers (valid for 2 years) No 1
1.4.2 Indoor Air Quality for Office container (valid for 2 years) No 1
1.4.3 Ergonomics (valid for 2 years) No 1
Total Item 1 (Preliminaries and General) carried to Summary:
2.1 Normal Hours
2.1.1 Site Agent / Supervisor (5 Years Relevant experience)(1 Off) Hours 10200
2.1.2 Safety Officer (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 10200
2.1.3 Mechanical Electrician (5 Years Relevant experience)(3 Off) Hours 30600
2.1.4 HDPE Plastic Welder/ Pipe Fitter (3 Years Relevant experience) (2 Off) Hours 20400
2.1.5 General Labour (1-3 Years Relevant experience) (5 Off) Hours 51000
2.1.6 Driver (For 14 Seater Bus) (1 Off) Hours 10200
2.2 Saturday Overtime
2.2.1 Site Agent / Supervisor (5 Years Relevant experience)(1 Off) Hours 480
2.2.2 Safety Officer (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 480
2.2.3 Mechanical Electrician (5 Years Relevant experience)(3 Off) Hours 1440
2.2.4 HDPE Plastic Welder/ Pipe Fitter (3 Years Relevant experience) (2 Off) Hours 960
2.2.5 General Labour (1-3 Years Relevant experience) (5 Off) Hours 2400
2.2.6 Driver (For 14 Seater Bus) (1 Off) Hours 480
2.3 Overtime - Sundays and Public Holidays
2.3.1 Site Agent / Supervisor (5 Years Relevant experience)(1 Off) Hours 520
2.3.2 Safety Officer (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 520
2.3.3 Mechanical Electrician (5 Years Relevant experience)(3 Off) Hours 1560
2.3.4 HDPE Plastic Welder/ Pipe Fitter (3 Years Relevant experience) (2 Off) Hours 1040
2.3.5 General Labour (1-3 Years Relevant experience) (5 Off) Hours 2600
2.3.6 Driver (For 14 Seater Bus) (1 Off) Hours 520
Description
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Invitation to Tender for Ash Disposal Facility Dust and Maintenance at Kusile Power Station for a period of 5 years. Tender number E3499GXMPKUS. Issue date 09 September 2026. Closing date and time 08 October 2026. Tender validity period 180 days from closing date and time.
Important Dates
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER){"closingDate":"30 October 2025","closingTime":"10:00","briefingSession":"{"date":"22 September 2026","time":"10h00","venue":"ion meeting A non-compulsory clarification meeting with","is_compulsory":true}"}
Briefing Session
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)A non-compulsory clarification meeting with representatives of the Employer will be held on 22 September 2026, 10:00-11:00, via Microsoft Teams. Meeting ID: 388 185 011 777 705, Passcode: Cj3he7vo.
Contact Information
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"r which"}
Returnable Documents
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Tender returnables: Electronic copy of tender in PDF format (price list in PDF and Excel), Annexure A Authorization Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E CPA for local goods/services, Annexure F CPA(IG) for imported goods/services, Annexure G1-G4 SBD 6.2 Declaration for Local Production and Content, Annexure H SBD 1, Annexure I SBD 6.1 Preference Points Claim Form, Annexure J SBD 4 Bidders Disclosure. Additional documents for JV: letter of intent or JV agreement, confirmation of single business entity, single designated bank account. Tax clearance certificates required from foreign tenderers with SA footprint and local tenderers not providing SARS PIN. Proof of compliance with Employment Equity Act for designated employers. NEC or other Contract completed in full. Pricing schedule completed. Mandatory contractual requirements: proof of CSD registration. Safety documents: SHE requirements, OHS plan, costing for SHE management, Baseline Risk Assessment, Letter of Good Standing, policy signed by CEO/MD, OHS competency CVs. Quality: ISO 9001 certificate, draft contract quality plan, ITP/QCP, documented information for QMS, audit reports, management review records, Form A. Environmental: Environmental Policy, Aspect and Impact register, Emergency Preparedness Plan, Waste Management Plan, Spillage Management Procedure. Due diligence: audited financial statements for previous 18 months (or last year), for JV/SPV each participant, start-ups exempt but must furnish later. Functionality/technical: refer to attached Technical Evaluation Criteria.
Evaluation Criteria
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Bidders must meet the eligibility criteria: not under any restriction to do business with Eskom or state-owned companies; not on international sanctions lists; not submit more than one tender (except for e-tendering size limits); joint ventures/consortia must have an agreement stating joint and several liability; no conflict of interest; tenders must be signed by authorised persons; not restricted by National Treasury or on the Tender Defaulters list; must not subcontract 100% of the scope. Mandatory returnables at closing (disqualifiable): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Declaration), Annexure H (SBD 1), Annexure J (SBD 4). Non-disqualifiable returnables (5 working days to submit if missing): Annexure E (CPA for local goods/services), Annexure F (CPA for foreign goods/services), Annexure G1-G4 (local content declarations if applicable), Annexure I (SBD 6.1 Preference Points Claim). Proof of B-BBEE status level (certificate, sworn affidavit, or CIPC documentation) is required to claim specific goal points; failure to submit results in 0 points for specific goals. Tax clearance: certified copy required for foreign tenderers with SA footprint not on CSD and local tenderers not providing SARS e-filing PIN. Proof of CSD registration is a mandatory contractual requirement. Functionality/technical criteria must be met with a minimum threshold of 70%.
Technical Specifications
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2
Schedule
Y
Annexure D Imported Content Declaration – Supporting Annexure G3
Schedule to Annexure C
Y
Annexure E Local Content Declaration- Supporting Annexure G4
Schedule to Annexure C
Y
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.
Quality Management
Source: ITT Disposal Facility Dust Suppressing Ash.pdfshould submit a safety file within 2 weeks prior the
commencement of activities on site. The safety file
must be as per the issued OHS specification.
.
Quality Category 1 √
o Valid ISO 9001 Certificate
o The supplier shall submit a draft contract
quality plan that is specific to the scope of
work as described in the tender documents.
Effective Date 30 October 2025
Review Date October 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* disqualifiable) Contract
to Tender Returnable Returnable Returnable
o Where applicable; the supplier shall submit
an example inspection and test plan (ITP) or
quality control plan (QCP).
o The supplier shall submit documented
information for Control of Externally Provided
o The supplier shall submit a copy of
documented information for roles,
responsibilities, and authorities in relation to
the QMS. Examples of relevant documented
information are; organization charts, job
descriptions, work instructions, duty
statements, manuals, procedures.
o Latest copy of a certification management
system audit report not older than 12
months (with Nonconformity, Correction
and/ or Corrective Action Reports)
o Latest copy of an internal management
system audit report (with Nonconformity,
Correction and/ or Corrective Action Reports)
240-105658000/ QM 58 and ISO 9001).
Other safety/quality Refer to attached Safety, Quality Requirement. √
documents as required
per scope of works
Pricing Schedule
Source: ITT Disposal Facility Dust Suppressing Ash.pdfEffective Date 30 October 2025
Review Date October 2030
Number Description Annexure Attached (Y /
N / n/a)
expected to be subcontracted out in one or more of
the following CIDB classes of construction works:
i) Civil Engineering (CE)
ii) Electrical Engineering Work (EB)
iii) General Building Works (GB)
iv) Mechanical Engineering (ME)
1.1.18 Scope of Work Y
1.1.19 NEC or other Contract Y
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Y
by Eskom. Where cataloguing is a requirement, the Pricing
submission of the Employment Equity report to the
Department of Labour. (South African tenderers
only)
CIDB (where Valid proof of the required CIDB grading designation Not applicable
applicable) for the main contractor; JV and /or sub-contractor as
may be required in the tender data at tender closing
deadline or within 21 working days from the closing
date of submission of tenders if this is agreed with
the Employer
NEC or other Contract NEC or other Contract, completed in full. √
Pricing schedule Completed pricing schedule (if not already √
submitted in the NEC or other Contract).
Financial Requirements
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)tax compliance is required
tax compliance status ___________________
tax compliance certificate as a tender returnable by
CSD registration
CSD number)
CSD Registration (CSD √
CSD Report)
CSD number
Central Supplier Database (CSD), please provide your supplier registration number with
joint venture agreement confirming the rights and
joint venture agreement
Joint Venture Agreement which incorporates a statement
power of attorney in the case of
power of attorney signed by the legally authorised
Proof of ownership / shareholding (preferably CIPC
Points Allocation: 0 points
B-BBEE Details: Number from Standard
Tender Data
Conditions of Tender
Supplier Development Localisation and Industrialisation:
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for
the specific goal specified for the tender. The points scored for
the specific goal must be added to the points scored for price
and the total must be rounded off to the nearest two decimal
places. Subject to section 2(1)(f) of the Preferential Procurement
Policy Framework Act, the contract must be awarded to the
tenderer scoring the highest points.
Number of points Number of points
B-BBEE Status Level
of Contributor
(90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant 0 0
contributor
NB: The following documents are required to claim
preference points,
verification agency / sworn affidavit / CIPS affidavit.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 63
File name: ITT Disposal Facility Dust Suppressing Ash
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 27
Identifier
Invitation to Tender
Effective Date 30 October 2025
Review Date October 2030
Clause Number from Standard
Tender Data
Conditions of Tender
B-BBEE Requirements
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Specific goals: B-BBEE status level points table (90/10 and 80/20 systems). Documents required to claim preference points: valid B-BBEE certificate from SANAS accredited agency or sworn affidavit, proof of ownership/shareholding, certified ID copies of shareholders, proof of disability where applicable, consolidated B-BBEE certificate for trusts/JVs. Failure to provide documentation results in 0 points for specific goals but not disqualification.
Health & Safety
Source: ITT Disposal Facility Dust Suppressing Ash.pdfthe contract the CSDG established in the CIDB
Infrastructure contracts published in GN 1779,
Government Gazette No. April 2023].
1.1.17 Contract Participation Goals (CPG) N/A
(if applicable)
[Note that the requirements of a contract
participation goal relating to the engagement of
targeted enterprises as established in the aforesaid
standard applies to:
(a) construction works contracts in the General
Building (GB) and to Civil Engineering (CE) classes
of construction works;
(b) construction works contracts of an estimated
minimum project duration of 6 months; and
(c) construction works contracts in which at least
25% of the main contract could reasonably be
applicable:
Safety
enquiries;
specification and scope of work.
management (the following are minimum
requirements but not limited, medical fitness
assessment, PPE, Trainings);
assessment and management of OHS risks
related to the scope of work. The methodology
used for the risk assessment must be provided
together with the BRA
work, risks, SHE plan and applicability) CV, s
and qualifications / certificates (LMI &
.
tendering:
enquiries;
specification and scope of work.
management (the following are minimum
requirements but not limited, medical fitness
assessment, PPE, Trainings);
assessment and management of OHS risks related
to the scope of work. The methodology used for risk
assessment must be provided together with the BRA
OHS plan and applicability) CV,s and qualifications
/ certificate.
Effective Date 30 October 2025
Review Date October 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* disqualifiable) Contract
to Tender Returnable Returnable Returnable
Environmental √
signed by the CEO/Top Management.
scope of works as per tender documentation.
Environmental
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Environmental requirements: Environmental Policy (SHEQ Policy) signed by CEO/Top Management, Aspect and Impact register based on scope of works, Emergency Preparedness Plan, Waste Management Plan, Spillage Management Procedure.
Contractual Terms
Source: ITT Disposal Facility Dust Suppressing Ash.pdfinternational sanctions list. A tenderer shall be found to
have the nationality of a country if the tenderer is a
national or is constituted, incorporated, or registered and
operates in conformity with the provisions of the laws of
that country. This criterion shall also apply to the
determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract
including related services.
individually or as a partner in a joint venture (JV) or
consortium, except on an E-Tendering system where
there is a limit size (The upload size per document is 500
megabytes and total submission is restricted to 4
gigabytes).
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: ITT Disposal Facility Dust Suppressing Ash.pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender (except e-tendering size limits); JV/consortium agreement does not state joint and several liability; conflict of interest; signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; sub-contracting 100% of scope. Tenderers must meet eligibility criteria or be disqualified.
Section
Source: ITT Disposal Facility Dust Suppressing Ash.pdf1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N/A
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
Threshold 70%
Tenderers who do not meet the threshold for functionality
3.15 Evaluation of Price Prices will be evaluated as follows
applicable) and on other evaluation parameters relating to
evaluation purposes.
evaluation purposes but will be implemented when
Prices will be scored out of [80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of [20] points in accordance with
the PPPFA.
If a tenderer fails to submit evidence of its points claim for a
awarded 0 points for that Specific Goal.
scoring for the 80/20] system. Eskom will add the score from
Pricing and Specific Goals together and rank the suppliers from
state that 90/10 will apply should there be a degree of
preference system.]
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for
the specific goal specified for the tender. The points scored for
the specific goal must be added to the points scored for price
Description
Source: Integrity Declaration Form (1).pdfprovisions above, please complete the table hereunder with all required information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer Number details (including Capacity/Position of knowledge
(e.g. employee/ Director/ employee number) if Eskom employee/ is this
member/ owner/ you are a State/State director
Important Dates
Source: Integrity Declaration Form (1).pdf (RFP)Closing date and time: not stated in the source document. No briefing or site visit dates are mentioned.
Contact Information
Source: Integrity Declaration Form (1).pdf (RFP){"name":null,"email":null,"phone":null,"department":"y), should the resulting tender, or part thereof, be awarded to such","address":"ERING PRACTICES"}
Submission Guidelines
Source: Integrity Declaration Form (1).pdf (RFP)Returnable documents: the Integrity Declaration Form (559-1848080 Rev 1) must be fully completed, signed, and submitted with the tender at closing. Failure to complete, sign, or attach supporting documents will result in the tender not being evaluated. If the tenderer is a joint venture, a copy of the joint venture agreement must be attached, incorporating a statement that all partners are jointly and severally liable for the contract and that the lead partner is authorised to bind the JV. The declaration must include full names, identity numbers, and shareholding details of all individuals and entities with an interest in the tenderer, including directors, members, and shareholders. If any director, member, shareholder, or owner is an Eskom employee, this must be declared and proof of authorisation to undertake remunerative work outside public sector employment must be attached.
Evaluation Criteria
Source: Integrity Declaration Form (1).pdf (RFP)Bidders must not be listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters. Bidders must not have been convicted of fraud or corruption related to procurement in the past five years. Bidders must not be prohibited from doing business with any international financial development or funding agency. Bidders must not have a history of failing to meet contractual obligations with any state-owned company. Bidders must not have abused Eskom's procurement process or used unfair tendering practices. Any such disqualification applies to the tenderer, its directors, members, or shareholders.
Technical Specifications
Source: Integrity Declaration Form (1).pdf (RFP)The Integrity Declaration Form requires the tenderer to complete a table providing full names, identity numbers, and capacity/position within the tenderer for all individuals and entities with an interest in the tender, including employees, directors, members, shareholders, and owners. If the tenderer is an unincorporated joint venture, this must be completed for each JV member. The form also requires confirmation of whether any employee, director, member, shareholder, or owner is an Eskom employee, and if so, whether this has been declared and authorised. Additionally, the tenderer must declare whether it or any of its directors, members, or shareholders are related to Eskom employees, consultants, contractors, or directors, or are in some other way related to other tenderers in the same tender process.
Financial Requirements
Source: Integrity Declaration Form (1).pdf (RFP)A copy of the joint venture agreement must be attached, incorporating a statement that all partners are jointly and severally liable for the execution of the contract and that the lead partner is authorised to incur obligations on behalf of the JV. No other financial requirements are stated in the source document.
Compliance Requirements
Source: Integrity Declaration Form (1).pdf (RFP)joint venture agreement which incorporates a statement that all partners are liable jointly and
Health & Safety
Source: Integrity Declaration Form (1).pdfinformation furnished herein is correct, that it is understood that the tenderer's tender/proposal
may be rejected, and that Eskom will act against the tenderer should any aspect of this this
declaration prove to be false, and
information furnished herein is correct, that it is understood that the JV's tender/proposal may be
rejected, and that Eskom will act against the JV should any aspect of this declaration prove to be
false; and
Description
Source: C3 1 TSC3 Employers Service Information.pdfThe contract covers the maintenance of the dust suppression system at the Kusile Power Station Ash Disposal Facility for a period of five years. The Contractor shall carry out timely repairs, including replacing damaged or worn-out parts, and ensure sufficient spare parts are always available. The Contractor must possess the necessary equipment and expertise to carry out plastic welding activities for additional systems, including but not limited to the water treatment plant, auxiliary cooling system, and recovery system. The Contractor must provide monthly system performance reports and submit fully substantiated written damage reports. The Contractor must comply with the Employer's SHE specifications and all applicable quality control requirements.
Submission Guidelines
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)Submit the completed tender documents to the address provided in the tender documentation. The contract number and title must be referenced on all submissions. Ensure all required forms are completed, signed, and submitted before the closing date and time. Late submissions will not be accepted. The Employer's VAT registration number must be included on all invoices.
Evaluation Criteria
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)Bidders will be evaluated on their compliance with the scope of work, including the provision of a quality management system implementation programme, a Quality Control Plan (QCP) for each task order, and safe work procedures. The Contractor's plan must include but is not limited to: quality management system implementation programme, quality control plan, and job observations. The Contractor must comply with the Employer's SHE specifications and all applicable quality control requirements. The Contractor must have the required key personnel with specified qualifications and experience.
Technical Specifications
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)certificates to the Employer.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
4.3.5 Plant & Materials provided “free issue” by the Employer
Not Applicable
4.3.6 Cataloguing requirements by the Contractor
Not Applicable
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
5 Working on the Affected Property
5.1 Employer’s site entry and security control, permits, and site regulations
5.1.1 Permit to Work System (PTW)
The Eskom Permit to Work System (PTW) specify and provide requirements for the application of
compulsory health and safety standards and procedures for the safeguarding of Plant and persons. This
system forms an integral part of the approval process for work under the Work Coordination Process. The
following Eskom Regulations shall be complied with:
The contractor shall ensure that adequately experienced personnel with the required levels of education are
nominated by the contractor to attend all relevant training specific to the Appointments required by the roles.
Training shall be provided free of charge by Eskom; however, the candidates time shall be for the
Contractor’s own account.
5.1.2 Induction training
The appointed contractor shall ensure that all his / her employees have undergone the Kusile Power Station
Safety contractor management induction training prior to commencing work on site and shall be renewed
annually. Appropriate time must be set aside for training (induction and other) of all Contractors’ personnel
including the annual re-induction training.
The Contractor shall have no claim against the Employer in respect of delay at the security main gate
5.1.2.1 Visitors to site induction
o Visitors to the site shall be required to undergo and comply with the appointed contractor’s site-
specific safety induction prior to being allowed access to site.
o All visitors must remain in the care and custody of a person (host) who has been properly inducted.
No visitors are permitted to undertake any work onsite, of any nature.
o Visitors who have completed site induction must be provided with a record of proof of Induction
training.
Completion of the whole of the works.
procedures may change depending on the prevailing security situation.
are permitted on Site. No ‘Private Work’ is carried out for or on behalf of any Eskom employee.
Kusile Power Station has zero tolerance to alcohol and drugs. There is 100% alcohol breathalyser
testing for all persons coming to site. Any person that tests positive will not be granted access to site
and shall be considered to be in violation of the Eskom’s Life Saving Rules. If an employee or
Contractor employee is suspected of being under the influence of alcohol is tested and if proved
positive, he/she is refused entry to site. Formal disciplinary action shall be constituted by the
Contractor.
5.1.3 Eskom Life-saving Rules
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
and contractors. Failure to adhere to these rules by any Eskom employee or employee of an Appointed
Contractor or sub- contractor will be considered a serious transgression. These rules are being implemented
to prevent serious injury or death of any employee, labour broker or contractor working in any area within
Eskom.
the rules shall be obeyed by any contractor and their employees.
The Life-saving rules are: DESCRIPTION OF RULE
Rule
Rule 1 OPEN, ISOLATE, TEST, EARTH, BOND, AND/OR INSULATE
Before touch
( That is plant, any plant operating above 1000 V)
Rule 2 HOOK UP AT HEIGHTS
Working at height is defined as any work performed above a stable
work surface or where a person puts himself/herself in a position where
he/she exposes himself/herself to a fall from or into.
Rule 3 BUCKLE UP
No person may drive any vehicle on Eskom business and/or on Eskom
premises: Unless the driver and all passengers are wearing seat belts.
Rule 4 BE SOBER
No person is allowed to be under the influence of intoxicating liquor or
drugs while on duty
Rule 5 PERMIT TO WORK
Where an authorisation limitation exists, no person shall work without
the required permit to work.
Rule 6 NO REVERSING WITHOUT A SPOTTER/FLAGMAN
Whenever a construction vehicle has to reverse, there must be a
flagman to guide the
disciplinary action, which may include dismissal.
her family.
5.2 People restrictions, hours of work, conduct and records
Working hours
Monday- Thursday 07h00 to 16h15
Fridays 07h00 to 12h00
A standby service must be available on demand outside normal working hours.
Kusile Power Station operating times is from 07:00 until 16:15, arrangements for deliveries to be made
outside those hours. No deliveries shall be made outside the Stores department or receiving part of the
Stores area.
5.3 Health and safety facilities on the Affected Property
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
There is a medical station on site and a fire and rescue service for assistance with serious incidents and
treatment of all serious injuries during normal working hours. Emergency services are available during
normal working hours. The Contractor however is expected to handle all minor incidents in-house.
5.4 Environmental controls, fauna & flora
Eskom’s responsibility and commitment is to ensure protection of environment within which it
operate and minimisation of environmental impact in line with its Safety, Health, Environmental and
Quality Policy (SHEQ), along with legislative obligation. The Contractor shall conform to all
requirements dictated in the documents. KUS-20250797
5.5 Cooperating with and obtaining acceptance of Others
Proper co-ordination and work planning must be done when working in any area where others are
performing work or activities. Interfacing may be required with the site maintenance personnel and others
5.6 Records of Contractor’s Equipment
All materials, tools and equipment brought onto site are the responsibility of the Contractor and shall comply
with the Employer’s policies and procedures. The Contractor shall ensure that all tools and equipment are
listed on an inventory list, be regularly inspected at least monthly or as required by legislation and risk
assessments. All the assets must be declared and registered with security upon entering site. This includes
portable assets such as a laptop.
The requirements for the use of machinery are covered in the various regulations of the Occupational Health
and Safety Act. Since incorrectly used machinery or using unsafe machinery can cause serious harm and/or
damage, it is important to ensure that all mechanical equipment is safeguarded in order to protect the health
and safety of persons who may be exposed to such mechanical equipment, and also to ensure that
competent persons operate the machinery.
Kusile power station reserves the right to inspect tools or items of equipment brought to site by contractors
for use on this project.
5.7 Equipment provided by the Employer
Off-loading and material handling Equipment such as cranes and forklifts are not available on site and if
required is to be provided by the Employer.
5.8 Site services and facilities
5.8.1 Provided by the Employer
Sanitary services, water, compressed air and electricity shall be provided by Eskom at fixed point on he
plant.
5.8.2 Provided by the Contractor
The Contractor is to supply all the personal protective equipment, accommodation, transport, tools,
equipment and consumables to perform all the required tasks on site.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
6 List of drawings
6.1 Drawings issued by the Employer
This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this
contract.
Drawing number Revision Title
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
Part c3: scope of work c3.1 Tsc3 employer’s service information
Methodology
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)The Contractor shall provide suitable yellow plant machinery, including a front-end loader and a 20-ton excavator, as and when required for works at the ash dump. These machines will be used for handling and transporting pipes, excavating trenches, and installing pipes underground in accordance with project specifications. The Contractor must ensure that all equipment is fully operational, compliant, and available on site to support efficient project execution. The Contractor is responsible for transporting the earth moving machines and obtaining road traffic permits during maintenance of machines. The minimum plant requirement shall include: 20-ton excavator and Front End Loader. The yellow plant shall be fully operational and compliant with Eskom and legal requirements, certified, roadworthy (where applicable), and fit for use in an industrial environment, and operated by trained, competent, and certified operators.
Experience & Qualifications
Source: C3 1 TSC3 Employers Service Information.pdfNQF 7 Mechanical Engineering Qualifications with proof 3+ Yrs
Mechanical Scope related Background plus 2+ Yrs Supervisory
Or N6 Engineering Diploma plus 5+ Yrs Mechanical Scope related.
2+ yrs supervisory experience
Minimum N6 Mechanical Engineering Qualification and Trade Test
Certificate- 5+ years mechanical background
Mechanical Technician National Diploma Mechanical Engineering with 2+Yrs
Or N6 Engineering Diploma plus 5+Yrs Mechanical Scope related.
Mechanical Engineer NQF 7 Mechanical Engineering Qualifications with 3+ Yrs experience
Mechanical Artisans (e.g. N3 Mechanical Engineering Qualification and Trade Test Certificate
NQF 6 Mechanical Qualifications/Quality qualification 2+ Yrs
Mechanical Background - 2+ Yrs Scope related Experience -
4.1.2 BBBEE and preferencing scheme
Quality Management
Source: C3 1 TSC3 Employers Service Information.pdf1.3 General
a) The contractor is responsible for performing regular maintenance of the ash dump
sprinkler system, which includes inspections, cleaning, testing, and any necessary servicing
to ensure the system remains in good working condition.
b) The Contractor shall carry out timely repairs, including replacing damaged or worn-out
parts, and ensure that sufficient spare parts are always available to avoid delays.
c) The contractor shall also be aware of and prepared for emergency callouts, responding
promptly when urgent issues arise to minimize downtime.
d) The Contractor is required to provide clear maintenance and repair reports after each visit
and communicate any major problems or recommendations to the relevant site personnel.
a. Daily, weekly, and monthly visual inspections of the dust suppression system
b. Inspection of pumps, motors, valves, pipework, flanges, and fittings
c. Inspection for leaks, blockages, corrosion, wear, and mechanical damage
d. Inspection of spray nozzles for blockage, wear, and spray pattern effectiveness
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
e. Inspection of electrical panels, control systems, and instrumentation (where
applicable)
a. Cleaning and flushing of pipelines and spray nozzles
b. Calibration and adjustment of spray nozzles and control valves
c. Testing of system pressure, flow rates, and operational performance
d. Replacement of worn or defective components prior to failure.
a. Functional testing of equipment after maintenance activities
b. Verification that the system operates in accordance with performance requirements
c. Recommissioning of equipment after repairs or shutdowns.
a) The contractor shall compile and submit routine weekly or monthly inspection and work
progress reports.
b) All incidents and equipment failure to be reported to the Employer within the same day.
c) The contractor must provide monthly overall system performance report.
d) The contractor submits to the Employer, a fully substantiated written damage report
specifying the nature, scope and cost of rectification work required including a programme
for execution.
a) The Quality Plan.
b) Copies of all Batch Release Certificates from the manufacturer acquired during the project.
c) Copies of the signed paint manufacturer’s data sheets acquired during the project.
d) Calibration certificates to be available for the tools to be used.
1.4.1 quality and Documentation Control
b. The following complementary services to improve Plant and labour performance can be defined as
follows;
i. Project management
ii. Value engineering
iii. Procedure and documentation writing
iv. Compile and improve task list’s
v. Technical advice
vi. Asset management in accordance with PAS55
vii. Component failure analysis reporting
c. The Employer may request the Contractor to ensure that an accurate description of spare parts is
maintained in the Employer’s stores and the Contractor informs the Employer as to any
recommended changes.
d. The Contractor is to ensure that any service rendered does not interfere with the Employer’s
scheduled work and should align himself with the Employer’s work control management process.
e. The contract entered into with the Contractor is non-exclusive and work against this contract can
only be performed upon receipt of a task order.
f. All Spares will be subject to anytime inspection by the Employer.
g. Contractor vehicles to comply with Eskom Vehicle Standards and Procedures.
h. Will be required to comply with the Employers process control manuals (PCM) that outlines the
outage processes.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
1.4 Contractor’s requirements for the Supply of spares
a) All equipment / spares must be on time of required order date
b) Transported by road on suppliers’ costs and transport
c) End user to be informed when delivery will be done at least 2 days upfront
d) No deliveries to be done on a Weekend or Public holiday unless if emergency occurred.
1.5 Interpretation and terminology
2.1 The Contractor’s plan for the service
The Contractor supplies the Employer with their Contractor’s plan. The Contractor must submit the
Contractor’s plan at the inception of this contract. The Contractor’s plan must include but is not limited to the
following.
the employer to check and monitor progress.
inspections, witness or tests are conducted according to the Quality Control Plan. The Employer shall
conduct such inspections to ascertain that work is conducted to the agreed upon quality standard. However,
the liability for such designs, refurbishment, supply and use of the Equipment remains with the Contractor.
2.12 Things provided at the end of the service period for the Employer’s use
2.12.1 Equipment
Any equipment (assets) bought during the service period will be transferred to the Employer at the end of the
service period.
2.12.2 Information and other things
requirements.
3.3 Quality assurance requirements
and maintenance of its Quality management system which complies with the requirements of ISO 9001
standard.
The Contractor shall comply with the Eskom’s QM58 (240-105658000) Supplier Quality Management
progress of work at any time. The Employer shall also have the right to stop work and re-instruct the
contractor, who will comply with the request.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
does not comply with the quality requirements expected from the Contractor, the Employer shall
instruct the Contractor to rectify the faults. The Contractor will comply with the instructions.
request of the Employer. QCPs must be signed and approved by quality controller.
The Contractor shall conform to all requirements dictated in the document SHE Spec KUS-20251193
Eskom Contractor Quality Requirements as per QM 58 Specification and ISO 9001 Standard
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
where they can be obtained from.
4.3.2 Correction of defects
processes and procedures.
4.3.3 Contractor’s procurement of Plant and Materials
Replacement materials/ components will be kept at the Employer’s inventory/ sock and issued as stock items
when required. The Contractor must inform the Employer immediately of any constraints experienced during
the procurement process of plant and materials whenever required to procure any materials.
4.3.4 Tests and inspections before delivery
specifications
certificates to the Employer.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
4.3.5 Plant & Materials provided “free issue” by the Employer
procedures may change depending on the prevailing security situation.
are permitted on Site. No ‘Private Work’ is carried out for or on behalf of any Eskom employee.
Kusile Power Station has zero tolerance to alcohol and drugs. There is 100% alcohol breathalyser
testing for all persons coming to site. Any person that tests positive will not be granted access to site
and shall be considered to be in violation of the Eskom’s Life Saving Rules. If an employee or
Pricing Schedule
Source: C3 1 TSC3 Employers Service Information.pdfPostnet Suite 283,
Private bag x 7297,
Witbank, 1035
(add other as required)
Financial Requirements
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)Payment Terms: payment certificate from the Service Manager in terms of core clause 51.1,
the Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that
stated in the Supply Manager’s or Services Manager’s certificate.
The Contractor shall address the tax invoice to Employer and include on each invoice the following
information:
Part c3
Compliance Requirements
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)B-BBEE Details: 4+ Yrs Mechanical Background - Boilermaker, etc.)
NQF 4 Qualifications and SAMTRAC/SHEMTRAC Certificate with
proof - Copy of Valid OHS Professional Bodies (SIOSH , SAIOH or
SHE Officer
SACPMP) certificate or proof of registration as a candidate- 2-3 yrs
SHE Scope related Background
NQF 6 Mechanical Qualifications/Quality qualification 2+ Yrs
Quality Controller
Mechanical Background - 2+ Yrs Scope related Experience -
4.1.2 BBBEE and preferencing scheme
Specify constraints which Contractor must comply with after contract award in regard to any Broad Based
Black Economic Empowerment (B-BBEE) or preferencing scheme measures.
4.1.3 Accelerated Shared Growth Initiative – South Africa (ASGI-SA)
The Contractor complies with and fulfils the Contractor’s obligations in respect of the Accelerated and
Shared Growth Initiative - South Africa in accordance with and as provided for in the Contractor’s ASGI-SA
Compliance Schedule stated below
.
[Insert the agreed ASGI-SA Compliance Schedule here]
The Contractor shall keep accurate records and provide the Service Manager with reports on the
Contractor’s actual delivery against the above stated ASGI-SA criteria. [Elaborate on access to and format
of records and frequency of submission etc.]
The Contractor’s failure to comply with his ASGI-SA obligations constitutes substantial failure on the part of
the Contractor to comply with his obligations under this contract.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
4.2 Subcontracting
4.2.1 Preferred subcontractors
Not applicable
4.2.2 Subcontract documentation, and assessment of subcontract te
Health & Safety
Source: C3 1 TSC3 Employers Service Information.pdfa. Cleaning of dust suppression equipment
b. Removal of debris that may affect system performance or safety.
a) Maintenance and repair services for all sprinklers in accordance with the relevant
procedure and specification.
b) Contractor shall maintain sprinklers and service log and submit such to the contract
manager within 48hrs of performing such works for necessary reviews.
c) The contractor to provide technical support and advice on constant failure trends of the
equipment.
d) Provide consistent and cost-effective maintenance strategy.
e) Ensure that the application and implementation of appropriate maintenance tools and
innovative techniques.
f) Develop Key performance Indicator (KPI), objectives and targets which support and which
in line with the Employer’s objectives.
g) Provide adequate resources capabilities to carry out maintenance and repair work and that
support the Employer’s objectives.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
h) The contractor shall notify Eskom contract manager on any defects or repair work that fall
outside the scope.
i) The contractor to adhere to all Employer’s health and safety requirements and procedures
on site.
j) The contractor to provide relevant documentation caters for the employer’s equipment.
safety documentation.
k) The contractor shall comply with all relevant SABS standards, OHS Act 1993 and also with
the Employer’s standards as specified from time to time.
l) The integrity of the plant is maintained within the parameters specified by the Employer.
m) All other maintenance activities to be performed in accordance with the relevant procedure
and specification where applicable.
n) All plant manuals and other documentation as requested by the Employers will be returned
or submitted by the contractor.
o) Contractor shall carry out routine check if deem necessary as per operations and
maintenance manuals of such equipment.
p) Movement of diesel pumps as and when required/deemed necessary, is the responsibility
of the service provide.
q) Execution of corrective maintenance activities
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
2.11 Design and supply of Equipment
provision of information and other things will be mutually agreed upon.
2.13 Management of work done by Task Order
a) A Task order starting with 45* series number will be issued to the contractor for every delivery and
services to be provided.
b) In case of emergency repairs outside the SOW, a different Task Order will be send to the contractor for
the works. Response to the issued Task Order must be delt with as per secondary option clause X19 of the
agreement.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
3.1 Health and safety risk management
and about the execution of the service.
up to date for the duration of the contract.
Compensation Commissioner’s valid letter of good standing before the commencement of work
and any future renewal letters obtained during the project for record-keeping purposes.
, Onsite Assembly and Installation work falls under a high-risk category as per Eskom supply risk category.
minimum N3 Engineering Qualifications with proof and Trade Test - Riggers, Welders,
4+ Yrs Mechanical Background - Boilermaker, etc.)
NQF 4 Qualifications and SAMTRAC/SHEMTRAC Certificate with
proof - Copy of Valid OHS Professional Bodies (SIOSH , SAIOH or
5.1 Employer’s site entry and security control, permits, and site regulations
5.1.1 Permit to Work System (PTW)
The Eskom Permit to Work System (PTW) specify and provide requirements for the application of
compulsory health and safety standards and procedures for the safeguarding of Plant and persons. This
system forms an integral part of the approval process for work under the Work Coordination Process. The
following Eskom Regulations shall be complied with:
5.1.2.1 Visitors to site induction
o Visitors to the site shall be required to undergo and comply with the appointed contractor’s site-
specific safety induction prior to being allowed access to site.
o All visitors must remain in the care and custody of a person (host) who has been properly inducted.
positive, he/she is refused entry to site. Formal disciplinary action shall be constituted by the
work surface or where a person puts himself/herself in a position where
he/she exposes himself/herself to a fall from or into.
Rule 3 BUCKLE UP
5.3 Health and safety facilities on the Affected Property
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
treatment of all serious injuries during normal working hours. Emergency services are available during
normal working hours. The Contractor however is expected to handle all minor incidents in-house.
5.4 Environmental controls, fauna & flora
Eskom’s responsibility and commitment is to ensure protection of environment within which it
operate and minimisation of environmental impact in line with its Safety, Health, Environmental and
Quality Policy (SHEQ), along with legislative obligation. The Contractor shall conform to all
requirements dictated in the documents. KUS-20250797
5.5 Cooperating with and obtaining acceptance of Others
and Safety Act. Since incorrectly used machinery or using unsafe machinery can cause serious harm and/or
damage, it is important to ensure that all mechanical equipment is safeguarded in order to protect the health
and safety of persons who may be exposed to such mechanical equipment, and also to ensure that
competent persons operate the machinery.
Environmental
Source: C3 1 TSC3 Employers Service Information.pdf (unknown)Environmental requirements: The contractor must identify all aspects and impacts related to the scope of work and put measures in place to minimise/prevent environmental contamination. All waste including scrap materials to be disposed in allocated bins onsite. In terms of Sec 28 of National Environmental Management Act: Every person who causes, has caused or may cause significant pollution or degradation of the environment must take reasonable measures to prevent such pollution or degradation from occurring, continuing or recurring. If any incident occurs, it must be reported to the Environmental Department immediately or within 24 hours of occurrence.
Contractual Terms
Source: C3 1 TSC3 Employers Service Information.pdfPart 3: Scope of Work ..................................................................................................................................... 1
C3.1: Employer’s service Information ........................................................................................................... 2
1 Description of the service ...................................................................................................................... 4
1.1 Executive overview ............................................................................................................................ 4
1.2 Employer’s requirements for the service ........................................... Error! Bookmark not defined.
1.3 Interpretation and terminology ......................................................................................................... 10
2 Management strategy and start up. .................................................................................................... 10
2.1 The Contractor’s plan for the service ............................................................................................... 10
2.2 Management meetings .................................................................................................................... 10
2.3 Contractor’s management, supervision and key people ................................................................. 11
2.4 Provision of bonds and guarantees ................................................................................................. 11
2.5 Documentation control ..................................................................................................................... 11
2.6 Invoicing and payment ..................................................................................................................... 11
2.7 Contract change management ........................................................................................................ 12
2.8 Records of Defined Cost to be kept by the Contractor .................................................................... 12
2.9 Insurance provided by the Employer ............................................................................................... 12
2.10 Training workshops and technology transfer ................................................................................... 12
2.11 Design and supply of Equipment ..................................................................................................... 13
2.12 Things provided at the end of the service period for the Employer’s use ....................................... 13
2.12.1 Equipment .................................................................................................................................. 13
2.12.2 Information and other things ...................................................................................................... 13
2.13 Management of work done by Task Order ...................................................................................... 13
3 Health and safety, the environment and quality assurance ............................................................. 14
3.1 Health and safety risk management ................................................................................................ 14
3.2 Environmental constraints and management .................................................................................. 14
3.3 Quality assurance requirements ...................................................................................................... 14
4 Procurement .......................................................................................................................................... 16
4.1 People .............................................................................................................................................. 16
4.1.1 Minimum requirements of people employed .............................................................................. 16
4.1.2 BBBEE and preferencing scheme ............................................................................................. 16
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
4.1.3 Accelerated Shared Growth Initiative – South Africa (ASGI-SA) ............................................... 16
4.2 Subcontracting ................................................................................................................................. 17
4.2.1 Preferred subcontractors ........................................................................................................... 17
4.2.2 Subcontract documentation, and assessment of subcontract tenders ...................................... 17
4.2.3 Limitations on subcontracting .................................................................................................... 17
4.2.4 Attendance on subcontractors ................................................................................................... 17
4.3 Plant and Materials .......................................................................................................................... 17
4.3.1 Specifications ............................................................................................................................. 17
4.3.2 Correction of defects .................................................................................................................. 17
4.3.3 Contractor’s procurement of Plant and Materials ...................................................................... 17
4.3.4 Tests and inspections before delivery ....................................................................................... 17
4.3.5 Plant & Materials provided “free issue” by the Employer ........................................................... 18
4.3.6 Cataloguing requirements .......................................................................................................... 18
5 Working on the Affected Property....................................................................................................... 19
5.1 Employer’s site entry and security control, permits, and site regulations ........................................ 19
5.2 People restrictions, hours of work, conduct and records ................................................................. 20
5.3 Health and safety facilities on the Affected Property ....................................................................... 20
5.4 Environmental controls, fauna & flora .............................................................................................. 21
5.5 Cooperating with and obtaining acceptance of Others .................................................................... 21
5.6 Records of Contractor’s Equipment ................................................................................................. 21
5.7 Equipment provided by the Employer .............................................................................................. 21
5.8 Site services and facilities ................................................................................................................ 21
5.8.1 Provided by the Employer .......................................................................................................... 21
5.8.2 Provided by the Contractor ........................................................................................................ 21
5.9 Control of noise, dust, water and waste ............................................ Error! Bookmark not defined.
5.10 Hook ups to existing works ................................................................ Error! Bookmark not defined.
5.11 Tests and inspections ........................................................................ Error! Bookmark not defined.
5.11.1 Description of tests and inspections ............................................ Error! Bookmark not defined.
5.11.2 Materials facilities and samples for tests and inspections ........... Error! Bookmark not defined.
6 List of drawings..................................................................................................................................... 22
6.1 Drawings issued by the Employer ................................................................................................... 22
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Kusile Power Station Ash Disposal Facility Dust Suppression System Maintenance 5 Year Contract Scope of Work.
required.
2.3 Contractor’s management, supervision and key people
a) The Contractor’s shall ensure that only competent persons be allowed to work on plant. The Employer’s
Service Manager is entitled to verify the qualifications of the Contractor’s employees.
b) The Contractor must be knowledgeable about the condition and scope of work contained in this contract
c) The Service Manager may, having stated reasons, instruct the Contractor to remove a key person.
d) The Contractor must ensure that all personnel operating mobile equipment and vehicles are authorised
in writing with the required competency training
2.4 Provision of bonds and guarantees.
The form in which a bond or guarantee required by the conditions of contract (if any) is to be provided by the
Contractor is given in Part 1 Agreements and Contract Data, document C1.3, Sureties.
Contractor does not affect the Employer’s right to termination stated in this contract.
2.5 Documentation control
2.6 Invoicing and payment
a) Supplier to quote the Eskom official purchase order in all delivery notes and invoices.
b) Goods must be well packaged and safely transported.
c) Eskom to acknowledge receipt of goods by stamping and signing the delivery note of the supplier
upon
delivery, rejected items to be communicated after the official quality inspection is done on site by the
end-user.
of the product rejected goods must be collected and the correct goods supplied within 14 days.
d) Only goods as specified will be accepted. Any goods which do not meet the specifications will be
rejected.
Within one week of receiving a payment certificate from the Service Manager in terms of core clause 51.1,
the Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that
stated in the Supply Manager’s or Services Manager’s certificate.
2.9 Insurance provided by the Employer
Refer to C1.2 TSC3 Contract Data section 8
2.10 Training workshops and technology transfer
The Contractor shall conduct skills transfer to the Employer’s Maintenance, Engineering and Operating staff.
Skills transfer shall also be conducted during breakdown situations by the Contractor so that the Employer’s
staff knowledge base can be enhanced.
Submission Guidelines
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Returnable documents: SBD 4 (Bidder's Disclosure) — completed and signed, disclosing any state employment, relationships with ESKOM employees, or interests in related enterprises. Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers will be automatically disqualified.
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Bidders must complete and sign the SBD 4 declaration, disclosing any state employment, relationships with ESKOM employees, or interests in related enterprises. Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers will be automatically disqualified.
Technical Specifications
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Important Dates
Source: C0 TSC3 Contract cover.pdf (unknown)Closing date and time are not stated in the provided text. No briefing or site visit dates are mentioned.
Contact Information
Source: C0 TSC3 Contract cover.pdf (unknown)No contact information is stated in the provided text.
Submission Guidelines
Source: C0 TSC3 Contract cover.pdf (unknown)Submission is via the returnable documents listed in the tender pack. Bidders must complete and submit the Form of Offer and Acceptance (C1.1) and all other returnable documents. The contract number is to be inserted at award stage. No specific submission address or method is stated in the provided text.
Evaluation Criteria
Source: C0 TSC3 Contract cover.pdf (unknown)No evaluation criteria are stated in the provided text.
Technical Specifications
Source: C0 TSC3 Contract cover.pdf (unknown)The scope of work is the maintenance of the Ash Disposal Facility Dust Suppression System at Kusile Power Station, under a 5-year contract. The contract is an NEC3 Term Service Contract (TSC3). The scope of work is detailed in Part C3 of the contract.
Financial Requirements
Source: C0 TSC3 Contract cover.pdf (unknown)Pricing data is included in Part C2 of the contract. No specific pricing format, bonds, guarantees, or payment terms are stated in the provided text.
Compliance Requirements
Source: C0 TSC3 Contract cover.pdf (unknown)No compliance requirements are stated in the provided text. The contract is between Eskom Holdings SOC Ltd and the contractor.
Contractual Terms
Source: C0 TSC3 Contract cover.pdfThe contract is an NEC3 Term Service Contract (TSC3) for a 5-year maintenance contract. Part C1 includes the Form of Offer and Acceptance (C1.1), Contract Data provided by the Employer (C1.2a), Contract Data provided by the Contractor (C1.2b), and Proforma Guarantees (C1.3). The contract number is to be inserted at award stage.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kusile Power Station - Emalahleni - Emalahleni - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
22
Last checked
12 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.