Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1 Maxwell Dr - Sunninghill - Sandton -
Organization Type
GOVERNMENT
Published
26 Oct 2026
OCDS Reference
ocds-9t57fa-175560
ESKOM requires the procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the duvha solar pv construction site area. The broader scope includes design, engineering, procurement, construction, commissioning, performance testing, training, and two years of operation and maintenance of a 17.00 Mw solar pv plant at duvha power station. Bidders must meet stringent OHS requirements, including a signed OHS policy, coida letter of good standing, a baseline risk assessment, and specified OHS competencies, as these are pass/fail criteria.
OHS Returnables: Submit all listed OHS tender returnables, including Annexure B (signed acknowledgment of Eskom's OHS requirements), an OHS plan, a Baseline OHS Risk Assessment (BRA), a valid Letter of Good Standing (COIDA or equivalent), and an OHS policy signed by the CEO (OHS Act Section 7).
OHS Costing: Provide detailed, itemised costing for health and safety management (not a lump sum), based on the overall scope and risk assessment.
OHS Competency: Provide CVs and certificates for 16.1 and 16.2 legal liability, supervisor course or HIRA, incident investigator, CHSA, SHE Rep, and First Aider. The safety officer must be registered with SACPCMP and have at least 3 years of experience.
Pass/Fail Evaluation: OHS submissions are assessed on a pass/fail basis; incomplete submissions will result in a 'Not Recommended' outcome.
Scope of Work: The tender covers the supply and installation of a temporary perimeter fence and site establishment, but the full scope includes turnkey delivery of a 17.00 MW solar PV plant, including design, engineering, procurement, construction, commissioning, performance testing, training, and two years of O&M.
Compliance: Ensure all OHS documents are signed and submitted as required; missing or unsigned documents may lead to disqualification.
Date & Time
Thursday, 26 November 2026 - 10:00
Venue
https://teams.microsoft.com/meet/3999511667753778?p=x9 4Mxo1xTBdcyIh1bz
Request for Proposal
1 Maxwell Dr - Sunninghill - Sandton -
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Description
26 Oct
2026
Tender Published
Tender was published
26 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253698 CQP Template 2021.docx
Procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site, for Eskom. Bidders must submit a Contract Quality Plan setting out how quality will be managed across the contract, aligned to SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2.
Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdf
Eskom requires the procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area at Duvha Power Station in Mpumalanga. The scope covers site clearance, temporary fencing, a site office and storage container, and related works within a 100m x 100m establishment area.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area. Bidders must comply with Eskom's Supplier Quality Management specification (QM 58), which mandates a certified ISO 9001 quality management system and the submission of quality documentation according to the category selected for the tender.
Supplier Quality Management_Returnables Latest catagory 3.xlsx
Procurement, supply, and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site. The issuing body requires bidders to complete a quality management evaluation scorecard, selecting a category and submitting relevant quality documentation.
NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf
Procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site at Duvha Power Station, near Emalahleni in Mpumalanga. The contract is an NEC3 Engineering and Construction Short Contract (ECSC3) administered by Eskom, with the works covering barricading and site establishment for the solar PV construction area.
Tender Technical Evaluation Strategy for barricading (002).pdf
Eskom requires the procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area. The technical evaluation strategy sets out the criteria used to appoint a contractor to execute site establishment, barricading and vegetation clearing at Duvha Power Station.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site in Gauteng, on behalf of Eskom.
Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf
Eskom is procuring the supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area. The contract will be governed by the NEC Engineering and Construction Contract, and bidders must have a CIDB contractor grading of 2CE or higher. Tenders must be submitted electronically via the Eskom e-Tendering system by 26 November 2026 at 10:00 SAST.
NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docx
Procurement, supply and installation of a temporary perimeter fence and associated site establishment activities at the Duvha Solar PV construction site, near Duvha Power Station in Mpumalanga. The contract is let under the NEC3 Engineering and Construction Short Contract (April 2013) and includes standard Eskom conditions for B-BBEE, confidentiality, health and safety, and termination for prohibited actions.
Site Clearance_BOQ.xlsx
Supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site. The scope covers preliminary and general items, site clearance, earthworks, fencing, site facilities and environmental measures, priced on a bill of quantities.
Environmental Requirements for Duvha Solar PV construction Site establishment area.pdf
Procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area, including barricading. The work is subject to the project's Environmental Authorisation, EMPr and General Authorisation, with a full set of environmental management deliverables required from the contractor.
240-68099512 Form A Rev 10 (001).docx
Eskom requires the procurement, supply and installation of temporary perimeter fencing and associated site establishment activities for the Duvha Solar PV construction site area. The work is barricading and site establishment for the construction site in Gauteng, and is subject to Eskom's supplier quality requirements under specification 240-105658000 and ISO 9001.
To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdf
Eskom requires the procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area. The work is classified as high risk, and bidders must submit a set of OHS returnable documents with their bid.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Supplier Quality Management Specification (240-105658000, Rev 4, dated 01 July 2026). Applies to all Eskom procurement including RFIs, RFQs and RFPs. Sets minimum quality requirements for suppliers and sub-suppliers, covering QMS, quality plans, QCP/ITP, evaluation, monitoring and auditing.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Closing date: 26 November 2026 at 08:00
Document revision effective date: 01 July 2026
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Department: Procurement and Supply Chain Management
No specific contact name, email, telephone or submission address is stated in the document.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Returnables per the List of Tender Returnables (240-12248652) for the applicable quality category (1, 2, 3 or 4):
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Quality criteria are selected by Eskom's quality representative per the Guideline for QM 58 Selection Criteria (240-125473040).
Evaluation uses the Tender Evaluation Scorecard (240-168873697) and CIDB Best Practice Guideline A4 for evaluating quality in tenders.
The applicable quality category (1, 2, 3 or 4) is indicated in Form A; suppliers must prepare returnables for that category.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)The specification defines minimum quality requirements for all Eskom suppliers and sub-suppliers.
Applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of RFIs, RFQs and RFPs.
Suppliers and sub-suppliers must develop, implement, maintain and continually improve a QMS conforming to ISO 9001 (latest revision).
The QMS must include appropriate documented information (e.g. quality manual, quality plans, procedures, work instructions, method statements).
A valid ISO 9001 certificate from an accredited body is required unless the applicable category excludes it; this applies to suppliers and manufacturing third parties.
The main supplier must manage sub-supplier quality, including verification of QMS, audits, assessment of CQPs, QCP reviews, NC and defect management, ITPs, risk management and documentation.
Sub-suppliers whose scope includes design, manufacturing, testing, installation, commissioning, or project management must also comply with ISO 9001.
Eskom may assess sub-supplier facilities and expects free access for inspectors.
No specific technical parameters for the perimeter fence works are given in this document.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation programme: supplier must develop and implement a documented programme for pre-operation preservation of all physical assets, including bulk materials, consumables, equipment systems and components.
The programme must address temporary, long-term and in-transit preservation, including protection from atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres and other environmental factors.
Compliance monitoring must start from engineering instruction and continue until equipment or materials are incorporated into an operating or operational system.
The programme must anticipate transfer of preservation responsibility between functional areas (e.g. procurement to logistics, logistics to fabrication).
Supplier engineering must communicate preservation requirements to procurement, logistics, construction management, quality, security and other functions.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfQuality management system: suppliers and sub-suppliers must maintain a formal QMS conforming to ISO 9001 (latest revision).
Quality plans: contract/project quality plans and quality control plans (QCP/ITP) are required where specified, covering all production and service provision activities.
Contract Quality Plan (CQP): must be based on ISO 10005 and include management of records, access for inspection, final documentation submission, special processes (welding, NDE), personnel qualification, and monitoring and measurement procedures.
CQP must be submitted before kick-off or pre-fabrication meeting, and before start of manufacturing.
Quality Control Plan (QCP/ITP): must include contract number, order number, work area, sequence of operations, acceptance criteria, intervention points (hold, witness), and sign-off provisions.
QCP/ITP must be reviewed and accepted by Eskom or its inspection agency; changes require agreement before work.
Quality kick-off meeting at contract start; coordination meetings with Eskom at least 14 days' notice.
Eskom may appoint resident quality inspectors and expects workspace at no cost.
Mandatory pre-inspection meetings convened by Eskom or its agency.
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo pricing schedule or payment information is provided in this document.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No financial requirements (bid security, guarantees, retention, payment terms, turnover) are stated in this document.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)ISO 9001 certification from an accredited body is required unless the applicable category excludes it.
QMS must comply with ISO 9001 (latest revision); applicable standard may be considered.
Form A (240-68099512) must be completed and signed.
Compliance with Safety, Health, Environment and Quality (SHEQ) Policy 32-727 is referenced.
B-BBEE and other standard tender compliance requirements are not detailed in this document.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe supplier must implement a preservation management programme covering all goods from transfer of ownership or management responsibility through storage, transit and final installation.
Preservation requirements must be documented in purchase orders and work authorisations, and communicated to all project functional areas.
The programme must include special precautions for valves, electrical motors, mechanical equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation and similar materials.
Sub-supplier responsibility for preservation must be clearly defined.
Eskom must have free and unrestricted access to all preservation records.
Once signed, ITPs and QCPs become addendums to the contract and may be reviewed by Eskom at its discretion.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfQuality requirements are selected using the Guideline for QM 58 Selection Criteria (240-125473040) and Form A. Quality returnables are evaluated per the applicable category (1, 2, 3 or 4) using the List of Tender Returnables (240-12248652).
Description
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdfDesign, engineering, procurement, construction, construction management, start-up, commissioning, performance testing, operator and maintenance training, and two years of operation and maintenance of a 17.00 MW Solar PV Plant at Duvha Power Station.
Submission Guidelines
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdf (unknown)Returnable forms and documents — all must be completed, signed and submitted with the proposal:
Submission: Not specified.
Evaluation Criteria
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdf (unknown)OHS tender returnables are assessed on a pass/fail basis. The tenderer must provide:
A recommendation of 'Recommended' or 'Not Recommended' is given based on the completeness of OHS submissions.
Technical Specifications
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdf (unknown)Scope of work: Provision for the design, engineering, procurement, construction, construction management, start-up, commissioning, performance testing, operator and maintenance training, and two years of operation and maintenance of a 17.00 MW Solar Photovoltaic (PV) Plant at Duvha Power Station.
Also includes the turnkey procurement and delivery of studies, designs, engineering, licensing and permitting, manufacturing, factory testing, deliveries to site (including customs duties and importation), project management, project cost control, supervision, documentation, labour, execution, and erection.
Quality Management
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdfOHS plan must address project-specific risks and align with the health and safety specification. Baseline OHS Risk Assessment (BRA) must cover legal and other requirements. Valid Letter of Good Standing (COIDA or equivalent) is required.
Compliance Requirements
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdf (unknown)Mandatory OHS compliance:
Health & Safety
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdfBaseline OHS Risk Assessment (BRA) must identify, assess, and manage safety and health risks related to the scope. Costing for OHS must be broken down, not lump sum, based on overall scope. Required competencies: SACPCMP registration with 3 years experience, 16.1 and 16.2 legal liability, supervisor/HIRA, incident investigator, CHSA, SHE Rep, and First Aider.
Contractual Terms
Source: To install solar PV Technology Safety Requirements 240-77471969 Annexure C2 - HiGh Risk (004) (002).pdfOHS plan and competency requirements include: 16.1 and 16.2 legal liability certificate, supervisor course or HIRA, incident investigator certificate, Construction Health and Safety Agent (CHSA) course, and SACPCMP registration with 3 years experience.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No evaluation criteria are stated in the available document.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The available document is a blank Quality Control Plan (QCP) / Inspection and Test Plan (ITP) template. It sets out fields for recording contract details, scope of work, and approval signatories, and defines intervention points (Hold, Witness, Document Review, Surveillance, Verification) and inspection/test categories (statutory vs non-statutory). No tender-specific technical requirements, quantities, or locations are described.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No compliance requirements are stated in the available document.
Description
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docxThe procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area.
Submission Guidelines
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docx (unknown)Submission is through the NEC3 Form of Offer and Acceptance. The signed Offer, Acceptance, and any Schedule of Deviations must be submitted. The tenderer must provide its CIDB registration number. The Offer is valid until acceptance by the Employer, within the validity period stated in the Tender Data.
Evaluation Criteria
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docx (unknown)The tender is evaluated under the NEC3 Engineering and Construction Short Contract. The Employer will consider compliance with the contract data, including B-BBEE levels. The bidder must maintain the B-BBEE level at which it is awarded; if lost, it has 90 days to comply. The Employer may terminate if the Contractor engages in coercive, collusive, corrupt, fraudulent, or obstructive actions.
Technical Specifications
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docx (unknown)The works involve the temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area. The site is Duvha Power Station, approximately 15 km east of Emalahleni in the Nkangala District, Mpumalanga. The Contractor must establish offices and storage facilities. A programme must be submitted within 2 weeks of contract signing, with weekly updates. The Contractor must strictly use Eskom's standard forms.
Financial Requirements
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docx (unknown)Pricing must be in the NEC3 Price List, with prices excluding VAT. Retention: 5% of each payment certificate. Delay damages: 0.5% of the contract amount per day. Interest rate on late payment: 0.5% per week. The assessment day is the 25th of each month (or the first working day after if a public holiday). The offered total of the Prices exclusive of VAT is to be stated.
Compliance Requirements
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.docx (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance status. Maintain the B-BBEE level awarded; if lost, 90 days to comply. Provide CIDB registration number (grade not specified). Comply with NEC3 contract conditions, including insurance certificates. The contract includes a prohibition on any prohibited action (coercive, collusive, corrupt, fraudulent or obstructive), with termination as a remedy.
Technical Specifications
Source: Site Clearance_BOQ.xlsx (unknown)Scope: Supply, install and establish a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site.
Bill of Quantities includes:
Financial Requirements
Source: Site Clearance_BOQ.xlsx (unknown)Pricing must be provided in a Bill of Quantities format with rates and amounts for each listed item. No lump-sum prices accepted for items with defined quantities.
Description
Source: 240-109253698 CQP Template 2021.docxThe procurement involves the supply, installation and associated site establishment of a temporary perimeter fence for the Duvha Solar PV construction site area.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The supplier must prepare a Contract Quality Plan that identifies and plans how to meet the client's and contract expectations for quality management. The plan must follow the guidelines of SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2.
The plan must address at minimum:
Description
Source: 240-68099512 Form A Rev 10 (001).docxThe tender is for the procurement, supply and installation of a temporary perimeter fence and associated site establishment activities for the Duvha Solar PV construction site area. The tenderer must complete and sign the Form A Supplier Quality Requirements acknowledgement, accepting Eskom specification 240-105658000 and ISO 9001, as a condition of the bid.
Submission Guidelines
Source: 240-68099512 Form A Rev 10 (001).docx (unknown)Returnable documents:
Submission method: Not specified in the source document.
Submission address: Not specified.
Closing time: Not specified.
Disqualification risks:
Evaluation Criteria
Source: 240-68099512 Form A Rev 10 (001).docx (unknown)Bidders must complete and sign the Supplier Quality Requirements acknowledgement form (Form A) agreeing to Eskom specification 240-105658000 and ISO 9001.
Quality requirements are assessed under Category 3 of clause 4.1.3 of specification 240-105658000; only one category may be selected (Category 3 is selected).
Post-contract award quality requirements apply:
Standard conditions apply (clause 6):
No scoring split or minimum qualifying score is stated in the provided document.
Compliance Requirements
Source: 240-68099512 Form A Rev 10 (001).docx (unknown)Supplier Quality: Bidders must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard, by completing and signing Form A.
Quality category: Category 3 (clause 4.1.3 of 240-105658000) applies.
No CIDB, B-BBEE, CSD, tax or other compliance requirements are stated in the provided source document.
Contact Information
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf (unknown)Contact: Ms Nonkululeko Ganare
Role: Employer's representative
Email: [email protected]
Telephone: 013 699 7348
Address: Eskom Holdings Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Site: Duvha Power Station, approximately 15 km East of Emalahleni, Nkangala District, Mpumalanga
Submission Guidelines
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf (unknown)Returnable documents include the completed Form of Offer and Acceptance (C1.1) with the offered price, VAT, and CIDB registration number, and the Schedule of Deviations if any. The Contract Data provided by the Contractor must be completed. Documents such as securities, bonds, guarantees, and proof of insurance must be delivered to the Employer's agent within one week of receiving the signed contract. Failure to provide these as required constitutes repudiation. The bid must be submitted before the closing time; late submissions are disqualified.
Evaluation Criteria
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf (unknown)Bidders must be registered with the CIDB in a relevant construction class. The grade is not stated. The bid is evaluated on the basis of the offer and acceptance, with no explicit scoring split. The contract will be awarded to the tenderer whose offer is accepted. B-BBEE level contributed at award must be maintained; a decrease may lead to renegotiation or termination.
Technical Specifications
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf (unknown)Works: Duvha Solar PV Construction Site Establishment Area Barricading
Scope: Supply, installation of temporary perimeter fence and associated site establishment activities.
Site: Duvha Power Station, approximately 15 km East of Emalahleni, Nkangala District, Mpumalanga.
The contract includes: site establishment, offices and storage facilities for the contractor.
The contractor must submit a programme (Microsoft Project or similar) within 2 weeks after contract signing, with weekly updates.
Meetings: weekly contract progress, daily toolbox talks, as-needed risk register, compensation events, and early warnings.
The contractor must use Eskom's standard forms for payments, early warnings, and compensation events.
Quality Management
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdfNo specific quality management requirements stated.
Pricing Schedule
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdfPrice List: per item with description, unit, quantity, rate, and price. All prices excluding VAT. Total of prices excluding VAT to be stated. Overheads and profit percentages on defined cost for people and other defined cost to be stated in Contractor's Contract Data. Price List is in Part 2 of the contract.
Financial Requirements
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf (unknown)Payment: assessed monthly on the 25th, or first working day after if a public holiday.
Retention: 5% of each payment certificate.
Delay damages: 0.5% of contract amount per day.
Interest on late payment: 0.5% per week.
Pricing: Prices shown excluding VAT, with VAT at 15% added. Overheads and profit percentages on defined cost for people and other defined cost to be stated in the Contractor's Contract Data.
Price list: per item with unit, quantity, rate, and price; total of prices excluding VAT.
Employer's liability for indirect or consequential loss: R0.00.
Insurance: Contractor provides insurances per Insurance Table A; Employer provides per Insurance Table B. Proof of insurance to be provided on request.
Compliance Requirements
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdf (unknown)CIDB registration required (grade not stated).
B-BBEE: maintain level at award; notify Employer within 7 days of any change in status, and submit updated verification certificate within 30 days. Decrease in level may result in renegotiation or termination.
Tax: submit tax invoice with Employer's VAT number 4740101508; comply with VAT Act.
No cession, delegation, or assignment without written consent.
Comply with Construction Regulations 2014 under OHSA. Employer may appoint contractor as Principal Contractor.
Comply with environmental laws.
Asbestos: comply with Asbestos Regulations; OEL 0.2 fibres/ml (4-hour TWA), short-term 0.6 fibres/ml (10-min TWA). If asbestos unexpectedly encountered, stop work, leave area, and await safe declaration.
Ethics: no coercive, collusive, corrupt, fraudulent, or obstructive actions; termination for such actions.
Health & Safety
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdfComply with Construction Regulations 2014 under OHSA. Employer may appoint contractor as Principal Contractor.
Comply with all health and safety laws and site-specific rules.
Asbestos: comply with Asbestos Regulations. OEL 0.2 fibres/ml (4-hour TWA), short-term 0.6 fibres/ml (10-min TWA). If asbestos encountered, stop work, leave area, and await safe declaration. Asbestos removal/disposal by registered contractor at employer's expense.
Environmental
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdfComply with all applicable environmental laws and regulations. General specifications include environmental requirements, but no further details provided.
Contractual Terms
Source: NEC 3 ECSC - Duvha Solar PV Construction Site Establishment Area Barricating.pdfContract: NEC3 Engineering and Construction Short Contract (April 2013) with additional conditions Z1 to Z14.
No cession, delegation, or assignment without written consent.
Confidentiality: contractor must not disclose information without consent; images of works require prior written consent.
Termination: possible if business rescue order granted, or for prohibited actions (ethics).
Insurance: contractor provides insurances per Insurance Table A; employer provides per Insurance Table B.
Dispute resolution: adjudicator from ICE-SA panel; if not agreed, appointed by AFSA; arbitration under Association of Arbitrators (Southern Africa) rules, held in Johannesburg.
Employer's liability for indirect/consequential loss limited to R0.00.
Delay damages: 0.5% per day; may terminate if delay damages reach limits.
Defects date: 24 weeks after completion; defect correction period 2 weeks.
Period for reply: 14 working days.
Description
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdfEskom requires the procurement, supply and installation of a temporary perimeter fence for the Duvha Solar PV construction site establishment area (100m x 100m). Works include site establishment, vegetation clearance, temporary fencing, container transport, dust control, and waste disposal.
Contact Information
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdf (unknown)Compiled by:
Authorised by:
Evaluation Criteria
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdf (unknown)Bidders must provide an ISO 9001:2015 certificate or equivalent evidence of a developed and fully implemented Quality Management System with the tender submission. The submitted QCP must be approved by Eskom before commencement. No specific evaluation scoring, minimum score, or preference point system is stated in this scope document.
Technical Specifications
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdf (unknown)Site establishment and barricading works at Duvha Power Station (Emalahleni, Mpumalanga) for a 100m x 100m site establishment area within the 35.2ha environmental authorised solar PV land.
Works include:
Quality Management
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdfContractor's ISO 9001:2015 certificate or equivalent evidence of a compliant QMS must be submitted with tender documents. Must comply with Employer's Quality Management Specification QM-58 (240-105658000); QCPs must follow Form A requirements. All Quality Control documentation must be submitted at least one month before project start. QCPs must include hold and witness points, 3rd party interventions, and quality/test specifications. Successful contractor to hand over quality documentation within 30 days of order placement. QCP must include covering page, TOC, unique number, revision, page numbers, approval signatures (Contractor Supervisor, Quality Controller, Eskom System Engineer/QC), inspection reports, high-level work description, intervention points, and final acceptance signatures.
Compliance Requirements
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdf (unknown)Quality:
Health and Safety:
Environmental:
Documentation to be provided:
Health & Safety
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdfSafety file must be pre-approved by Duvha Safety Department. All contractor employees must complete Duvha Safety Induction Course before work. Contractor supervisor must conduct risk assessment and pre-job brief with all employees, with copies to client. Work requires a Permit to Work (domestic installations exempt) and pre-arrangement with the contract manager. Full PPE must be worn at all times. Compliance with all Eskom safety rules is mandatory. Risk assessment must be conducted prior to activities.
Environmental
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdfDuvha Power Station Solar PV project is located in Emalahleni Local Municipality (Nkangala District, Mpumalanga), ~15km from Witbank. The site has trees, uneven surfaces, and rocks; the environmental authorised land is 35.2ha. Environmental requirements: submit current Environmental Policy aligned with ISO 14001:2015, dust management plan, detailed method statement for alien invasive species removal including waste handling, MSDS for chemicals, impacts and aspects register. Contractor must employ an environmental officer with alien invasive species experience and adhere to Waste Management Procedure ENVP0005.
Section
Source: Duvha Solar PV Construction Site Establishment Area Barricading Scope of work rev 1.pdfISO 9001:2015 certificate or equivalent QMS evidence must be supplied with tender. No other criteria stated.
Description
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsxThe tender covers the procurement, supply and installation of a temporary perimeter fence for the Duvha Solar PV construction site, including site establishment activities. The work is at a solar PV construction site in Gauteng. Bidders must complete the Supplier Quality Management returnable template and select the applicable category based on the type of work.
Contact Information
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsx (unknown)No contacts or submission address were provided in the document.
Submission Guidelines
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsx (unknown)Bidders must complete the Supplier Quality Management returnable template:
Evaluation Criteria
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsx (unknown)Quality evaluation is structured in five weighted sections:
Technical Specifications
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsx (unknown)The procurement, supply and installation of a temporary perimeter fence for the Duvha Solar PV construction site area.
Financial Requirements
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsx (unknown)No financial requirements, bid security, bonds, or payment terms were stated in the document.
Compliance Requirements
Source: Supplier Quality Management_Returnables Latest catagory 3.xlsx (unknown)Supplier Quality Management compliance:
Description
Source: Environmental Requirements for Duvha Solar PV construction Site establishment area.pdfThe contractor is to be aware of and comply with the Environmental Authorisation, EMPr and General Authorisation for the project during site establishment and barricading activities.
Evaluation Criteria
Source: Environmental Requirements for Duvha Solar PV construction Site establishment area.pdf (unknown)Environmental officer: the contractor must appoint an environmental officer with experience in alien invasive species eradication and submit their qualifications.
Environmental policy: must be current, aligned to ISO 14001:2015 principles and signed by the company's top management.
Compliance Requirements
Source: Environmental Requirements for Duvha Solar PV construction Site establishment area.pdf (unknown)The contractor must comply with the Environmental Authorisation, EMPr and General Authorisation for the project.
The contractor must adhere to Duvha Power Station Waste Management Procedure ENVP0005 and Hydrocarbons Procedure ENVP0030.
Excavation work requires a permit.
Health & Safety
Source: Environmental Requirements for Duvha Solar PV construction Site establishment area.pdfComply with Duvha Power Station Waste Management Procedure ENVP0005 and Hydrocarbons Procedure ENVP0030.
Submit a dust management plan specifying control measures, suppression frequency and equipment numbers.
Obtain a permit for any excavation works.
Stockpile uncontaminated topsoil at a designated area, protect it from contamination, wind and erosion.
Compile and submit an Emergency Response Plan before project commencement, covering accidents, harsh weather, disasters, wildlife interactions, spillages and fires in line with legislation.
Provide basic environmental awareness training for all employees as part of safety training/induction.
Environmental
Source: Environmental Requirements for Duvha Solar PV construction Site establishment area.pdfComply with the Environmental Authorisation, EMPr and General Authorisation for the project.
Submit a current Environmental Policy aligned to ISO 14001:2015 and signed by top management.
Submit a detailed method statement for alien invasive species removal, including chemical use and waste handling.
Submit Material Safety Data Sheets for all proposed chemicals with the method statement.
Submit an impacts and aspects register in line with the scope.
Provide a waste management plan.
Appoint an environmental officer with experience in alien invasive species eradication and submit their qualifications.
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdfThe tender is for the procurement, supply and installation of temporary perimeter fencing and site establishment activities for the Duvha Solar PV construction site. The scope includes the use of the NEC contract form and submission of a pricing schedule. The tenderer must provide the required annexures and forms as listed in the tender returnables.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Closing date: 26 November 2026 at 10:00 SAST.
Clarification meeting (non-compulsory): 30 October 2026 at 10:00 SAST, on Microsoft Teams. Bidders must confirm attendance with the Eskom Representative.
Tender validity period: 90 days from closing date.
Clarification queries deadline: 5 working days before the tender closing deadline.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Eskom Representative: Martin Nndwammbi
Fraud and corruption reporting:
Submission portal: https://etendering.eskom.co.za
No physical submission address provided.
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Submission method: Electronic only via the Eskom e-Tendering system. Link: https://etendering.eskom.co.za. No hard copies accepted.
Returnable forms (mandatory at closing unless noted):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Evaluation order and minimums:
Price evaluation details:
Contractual requirements (assessed after evaluation, not scoring criteria):
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Scope: Supply and installation of temporary perimeter fencing and associated site establishment activities for the Duvha Solar PV construction site.
Quality requirements are specified in the tender quality pack.
The tender requires compliance with the scope of work, NEC, and the pricing schedule/BOQ.
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdfThe pricing schedule (BOQ) must be submitted in PDF and a copy in Excel format. The pricing schedule may be part of the NEC or separate. Cataloguing line item must be included if required; Eskom will pay for cataloguing. The tender is evaluated under the 80/20 system: price scored out of 80, specific goals out of 20.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Pricing schedule (BOQ) must be submitted in PDF and a copy in Excel.
Payment terms (standard Eskom commitments)
No performance security or bid bond specified for this tender (marked N/A).
Cataloguing: Eskom will pay for cataloguing; the price schedule must include a cataloguing line item if required.
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdf (RFP)Mandatory contractual requirements (proof required prior to award):
Eligibility criteria (disqualifying):
CIDB requirements (applicable, since this is construction work):
B-BBEE: Preference points are claimed via SBD 6.1 under the 80/20 system. The specific goals for this tender are not detailed but are scored out of 20.
Tax compliance:
Safety:
Quality: Comply with the tender quality pack.
Environmental: Comply with applicable labour, health, safety and environmental regulations, including waste disposal rules.
Financial due diligence (for award):
Employment Equity: Designated employers must provide proof of compliance, including the EE report submitted to the Department of Labour.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdfSafety compliance includes submission of COIDA certificate (or proof of application) for South African tenderers, and completion of Annexure C 2 (OHS Tender Evaluation Template). Contractual SHEQ requirements may apply. The CPG (Contract Participation Goals) is not applicable for this tender; but if it were, the standard CIDB indirect targeting requirements (minimum project duration of 6 months and at least 25% subcontracting in CE/EB/GB/ME classes) would apply. Here CPG is marked N/A.
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdfThe bidder must comply with applicable labour laws, health, safety and environmental regulations and standards, and follow regulations concerning disposal of any waste generated during installation. Quality requirements are as per the tender quality pack.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdfThe contract will be the NEC form. Tenderers must be eligible (not on sanctions lists, not restricted, no conflict of interest, not subcontracting 100% of scope). No performance security is required (marked N/A). Payments: within 30 days for contracts below R50m, within 60 days for contracts above R50m (incl. VAT).
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Duvha Solar PV E3522GXMPDUVR.pdfFunctionality criteria have a 70% threshold; refer to the Technical Evaluation Criteria (the specific criteria are not included in the provided text). Price is scored out of 80, and Specific Goals out of 20 under the 80/20 system. Contractual requirements (e.g., CSD registration) are not part of the scoring but must be met before award. OHS and quality templates must be submitted for evaluation.
Description
Source: Tender Technical Evaluation Strategy for barricading (002).pdfEskom requires a contractor for temporary site establishment, barricading, and vegetation clearing for the Duvha Solar PV project at Duvha Power Station. This is a technical evaluation strategy document; scope of work is 'Duvha Solar PV Construction Site Establishment Area Barricading Scope of work'.
Contact Information
Source: Tender Technical Evaluation Strategy for barricading (002).pdf (unknown)Contact: Vusi Chirwa
Role: Duvha System Engineer: Civil Structures
Contact: Thilivhali Muthakhi
Role: Duvha System Engineer: Civil Water Retaining Structures
Contact: Ayanda Nzo
Role: Mechanical Engineering Senior Engineer – Station Support
Evaluation Criteria
Source: Tender Technical Evaluation Strategy for barricading (002).pdf (unknown)Technical evaluation threshold: 70% weighted score overall to qualify.
Criteria weightings:
Scoring bands per criterion (5 to 0):
No mandatory technical criteria listed. SHEQ is objective and not part of the technical score.
Technical Specifications
Source: Tender Technical Evaluation Strategy for barricading (002).pdf (unknown)Scope: temporary site establishment for the Duvha Solar PV project, including site establishment, barricading, and vegetation clearing.
Activities to be covered:
Location: Duvha Power Station.
Methodology
Source: Tender Technical Evaluation Strategy for barricading (002).pdfMethod statement must be safe for environment and people. Must cover all key points, demonstrating understanding of scope, including labour and plant. Must include site establishment, vegetation clearance, temporary perimeter barricading, and waste management. Unacceptable if it does not cover entire scope.
Experience & Qualifications
Source: Tender Technical Evaluation Strategy for barricading (002).pdfCompany Experience (30%): Must have completed at least 3 similar projects involving earthworks, site clearance, and fencing. Submit completion certificates or letters signed by client showing client name, project description, start/end dates, location, and reference contact. If certificates lack details, attach supporting documents (contract/PO).
Project Supervisor (sub-weighting 50% within Project Key Skills): Minimum diploma in project management, construction management, or civil engineering; at least 3 years construction experience, with at least 1 year in supervisory/management role. Score based on years: 5 pts if >3 years, 4 if 2, 2 if 1, 0 if <1 or no CV.
Technical Personnel (sub-weighting 50% within Project Key Skills): Minimum national diploma in civil engineering, at least 3 years civil engineering experience. Score based on years: 5 if >3, 4 if 2, 2 if 1, 0 if <1 or incomplete.
Compliance Requirements
Source: Tender Technical Evaluation Strategy for barricading (002).pdf (unknown)Unacceptable technical risks:
Section
Source: Tender Technical Evaluation Strategy for barricading (002).pdfTechnical weighted score of 70% or more to qualify for further evaluation. Weighting: Technical 100%, SHEQ objective (not scored). Criteria: Company Experience (30%), Construction Method Statement (30%), Project Key Skills (40%). Scoring per sub-criterion on 5-point scale.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
1 Maxwell Dr - Sunninghill - Sandton -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
27 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
March 2026 brings a fresh wave of infrastructure and service tenders to Gauteng, but the days of the lone-ranger contractor are fading fast. National Treasury’s new “shared-capacity” rules, quietly slipped into the 2025/26 PFMA circular, mean that bids above R50 million in the General sector must demonstrate local SME participation through a consortium or joint venture (JV). If you’re a small plumber, electrician, painter, or general repair firm in Pretoria or Johannesburg, this is your moment to piggy-back onto the big-ticket work—provided you understand the regulatory hoops first.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 4 021 722
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.