Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Old Main Road - Howick - Howick - 3290
Organization Type
GOVERNMENT
Published
15 Oct 2026
OCDS Reference
ocds-9t57fa-174251
TRANSNET pipelines requires the engineering, procurement and construction of a fire system upgrade at the howick pump station. The scope covers fire ring main booster connections, fire water tank refill connections, fire service suction, foam concentrate tank and bund pourer installations, foam monitors, fire hydrants and associated piping and supports. The contractor is responsible for detailed design of several connections and must comply with the referenced project specifications and SANS 1700.
Closing date: 20 November 2026 at 16:00 (submission method not stated in the provided document).
Scope: Engineering, procurement and construction of the fire system upgrade at Howick Pump Station, including booster connections, tank refill, suction, foam tank, bund pourers, monitors and hydrants.
Design responsibility: The contractor must design and submit for acceptance the puddle flange, fire water tank refill connection, fire service suction connection, fire hydrant connection and lifting lugs.
Material requirements: Drop tubes must be stainless steel Schedule 10S, Class 150; only stainless steel and GRP permitted for foam tank internals; use insulation (e.g. Teflon pads) where incompatible metals contact.
U-bolt compliance: Hot-dipped galvanised carbon steel for carbon/galvanised pipelines, 316 stainless steel for stainless pipelines; 2 mm gap for guides, flush for anchors; 3 to 5 thread lengths through nuts; comply with SANS 1700.
Installation details: Bund pourer brackets must be mounted before piping and must not straddle bund wall joints; use M12 bolts, M16 galvanised chemical anchors, 0.5° fall, non-shrink grout min 35 mm, UV resistant rubber.
Referenced specifications: Bidders must comply with project specifications PL 898, PL 900, PL 904, PL 909, PL 910, PL 911 and PL 912.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 20 November 2026 - 16:00
Venue
Old Main Road, Howick, KZN (approximate GPS co-ordinates 29°28'37.19"S, 30°11'41.05"E)
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Proposal
Old Main Road - Howick - Howick - 3290
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Annexure B.7 Structural Engineering Documents.PDF (unknown)15 Oct
2026
Tender Published
Tender was published
20 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure B.4 Fire Engineering Documents.pdf
The tender requires the contractor to provide demolition and removal services for the existing fire protection system at the Howick depot, including equipment dismantling, piping and structural demolition, site levelling and preparation for the upgraded fire protection system. The work must be performed in accordance with environmental regulations, obtain a water disposal permit, and maintain fire protection system functionality during installation.
Annexure B.7 Structural Engineering Documents.PDF
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including structural steel walkways, platforms, cat ladders and stairways, for Transnet Pipelines facilities in KwaZulu-Natal.
Annexure A.6 Fire Engineering Typical Detail Drawings.pdf
Engineering, procurement and construction of a fire system upgrade at the Howick pump station, including fire ring main booster connections, fire water tank refill connections, fire service suction connections, foam concentrate tanks, bund pourers, foam monitors, fire hydrants and associated piping, valves and supports. The work is for Transnet Pipelines and includes detailed design by the contractor.
Annexure A.11 Instrumentation Engineering.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including fire pumps, control and responder panels, mimic panel, instrumentation, electrical and cable works, for Transnet SOC Ltd in KwaZulu-Natal.
Annexure A.1 Civil and Structural Typical Drawings.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including demolition of existing piping, concrete capping, new pipe supports, foundations, plinths, bund wall extensions, layerworks, stormwater drainage, cable draw boxes and a dry stack retaining wall. The works are for Transnet Pipelines at the Howick Pump Station in KwaZulu-Natal.
Annexure A.10 Electrical Engineering.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including lightning protection, earthing, electrical reticulation, lighting and small power installations for Transnet SOC Ltd in KwaZulu-Natal.
TPL Howick Tender Documents Consolidated 15-10-2026.pdf
Engineering, procurement and construction of a fire system upgrade at the Howick Pump Station in KwaZulu-Natal, for Transnet Pipelines. The works include design, supply, installation, testing and commissioning of the fire system, with a compulsory site clarification meeting and strict pre-qualification criteria.
Annexure A.5 Fire Engineering P&IDs.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including fire water reservoirs, pump house with duty, standby and jockey fire pumps, foam proportioning and storage, diesel-driven progressive cavity pumps, and zone piping/ring main, for Transnet Pipelines at Howick, KwaZulu-Natal.
Annexure A.4.1 Site Plans and As built Site Layout.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including new fire water and foam premix piping, hydrants, oscillating monitors, and a containerised pump house with temporary fire water supply, for Transnet Pipelines in KwaZulu-Natal.
Annexure A.3 Structural Engineering Drawings.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade, including a water tank foundation, pump house foundations, and a foam concentrate tank shed, for Transnet Pipelines.
Annexure B.3 Health, Safety and Environment.pdf
Engineering, procurement and construction of the Howick Pump Station fire protection system upgrade for Transnet Pipelines in KwaZulu-Natal under project number HO1436.
Annexure B.8 Civil Engineering Documents.pdf
Analysis completed but response format was invalid
Annexure B.5 Electrical Engineering Documents.pdf
Engineering, procurement and construction of the fire system upgrade at the Howick Pump Station, executed to Transnet Pipelines' specifications for three-phase electric actuators (PL 619) and low voltage switchgear and distribution boards (PL 631). The works cover multi-turn electric actuators for valve control and LV distribution panels and motor control centres rated up to 660 V.
Annexure A.2 Civil Engineering Drawings.pdf
Engineering, procurement and construction of the Howick Pump Station fire system upgrade for Transnet Pipelines, including a new containerised pump house, water tank raft foundation, structural steel canopy shed, Loffelstein walls, G-block paved road, storm water pipe and headwall, and associated civil, mechanical and electrical works.
Annexure B.2 Document Management and Planning.pdf
Transnet Pipelines requires engineering, procurement and construction services for the upgrade of the fire system at the Howick Pump Station in KwaZulu-Natal. The project falls under Transnet SOC Ltd and is scheduled to close on 20 November 2026.
Annexure B.1.1 Surveys and Investigations.pdf
Engineering, procurement and construction of a new fire water system upgrade at the Transnet Pipelines Howick Depot in KwaZulu-Natal, including a pumphouse, water storage tanks, valve banks, and an elevated pipe network. The geotechnical report confirms the site is underlain by residual clay and silt soils from the Volksrust Formation, with fill material present across much of the site, and provides founding and earthworks recommendations.
Annexure B.6 Instrumentation Engineering Documents.pdf
Engineering, procurement and construction of the fire system upgrade at the Howick Pump Station, including the fire control panel cause-and-effect matrix, for Transnet Pipelines. The work involves foam EPV isolation valves, manifold monitors, spill basin bund pourers, pump-sets, and fire alarm indication, with both auto and test modes.
Annexure A.9 Fire Engineering Three-Dimensional Views.pdf
Transnet SOC Ltd requires engineering, procurement and construction of the Howick Pump Station fire system upgrade in KwaZulu-Natal. The scope includes a containerised fire protection solution, fire water tank, foam premix system, piping, hydrants, monitors, spill basin, and tie-ins to existing pump house, water supply and fire ring main.
Annexure A.8 Fire Engineering General Arrangements.pdf
Engineering, procurement and construction of the fire system upgrade at the Howick Pump Station for Transnet SOC Ltd (Transnet Pipelines) in KwaZulu-Natal. The works cover a new fire water tank, a foam premix system, a fire ring main with hydrants and oscillating monitors, tie-ins to the existing water supply line and pump house, and manifold and spill basin modifications.
Annexure A.7 Fire Engineering Section Views.pdf
Engineering, procurement and construction of the fire system upgrade at the Howick Pump Station in KwaZulu-Natal, for Transnet SOC Ltd (Transnet Pipelines). The works cover a fire water tank and fire ring main, foam concentrate storage and foam generating equipment, foam premix distribution to zone piping, manifold monitors, bund pourers, hydrants and fire hose boxes, together with tie-ins to the existing water supply and pump house.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The specification sets minimum requirements for the design, manufacture, erection and supply of walkways, platforms and stairways for Transnet Pipelines facilities. It applies to all TPL facilities and covers design, construction and installation of walkways, platforms, cat ladders and stairways intended to provide safe access and safe working at places normally used for operations, maintenance, and inspections.
Evaluation Criteria
Source: Annexure B.7 Structural Engineering Documents.PDF (unknown)Compliance with SANS 2001-CS1:2017, SANS 1921-3:2018, SANS 10162 Part 1, SANS 10160, SANS 1921-3:2004. Steel grade S355JR. Hot dipped galvanizing to SABS ISO 1461. Design calculations and certification by registered engineer for walkways between tanks. Bolts to SANS 1700:5 with certificate. Grating to be Rectagrid RS40 30 x 4.5 by Mentis or similar. No attachment to existing structures except buildings and walkways between tanks.
Technical Specifications
Source: Annexure B.7 Structural Engineering Documents.PDF (unknown)Design requirements:
Steel sections:
Cat ladders:
Fabrication and erection:
Quality Management
Source: Annexure B.7 Structural Engineering Documents.PDF (unknown)Hot dipped galvanizing: Steelwork galvanised after manufacturing before delivery, per SABS ISO 1461. Coating thickness 85 microns or as specified. Surfaces cleaned, slag removed before galvanising. Shot blasting per SABS 064 or pickling. Zinc coating even, continuous, free of defects. Bolts, nuts, screws hot dip galvanised to SABS ISO 1461. Repair of damaged coatings: plant repairs for black spots >5mm2 individual or >25mm2 collective per m2, abrasive blasting and zinc metal spray applied 25% thicker, overlap 20-25 mm. Site repairs with zinc metal spray or zinc rich paint with at least 90% zinc in dry film, conforming to SABS 926.
Description
Source: Annexure A.5 Fire Engineering P&IDs.pdfThe tender covers the engineering, procurement and construction (EPC) of the Howick Pump Station fire system upgrade. The provided drawings are Process & Instrumentation Diagrams (P&IDs) for the fire water reservoir, pump house, zone piping and ring main, and legend for the HW FIRE project at Transnet Pipelines Howick. The drawings detail the fire water system components including dual boosters, twin valves, back-flow preventers, foam tanks, diesel tanks, fire pumps, and associated piping and instrumentation.
Evaluation Criteria
Source: Annexure A.5 Fire Engineering P&IDs.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS tax clearance (or tax pin).
Returnable forms (complete and sign all):
Bidders must meet B-BBEE level requirements as per the PPPFA 80/20 or 90/10 system.
Bidders must comply with local production and content requirements as declared in SBD 6.2.
Bidders must demonstrate engineering, procurement and construction (EPC) capability for a fire system upgrade, including fire water storage, pumping, foam proportioning and diesel-driven pumps.
Technical Specifications
Source: Annexure A.5 Fire Engineering P&IDs.pdf (unknown)The project is the engineering, procurement and construction (EPC) of the Howick Pump Station fire system upgrade at Transnet Pipelines Howick.
The tender includes Process & Instrumentation Diagrams (P&IDs) covering:
Key system components and installation requirements:
Methodology
Source: Annexure A.5 Fire Engineering P&IDs.pdf (unknown)Installation requirements from the drawing notes:
Compliance Requirements
Source: Annexure A.5 Fire Engineering P&IDs.pdf (unknown)B-BBEE Minimum Level: 50 (as per PPPFA 80/20 or 90/10 system).
CSD registration required.
Valid SARS tax clearance (or tax pin) required.
Local production and content requirements apply as declared in SBD 6.2.
Description
Source: Annexure A.1 Civil and Structural Typical Drawings.pdfThe drawings cover typical construction details for the Howick pump station fire system upgrade, including piping demolition and capping, pipe supports, plinths, base plates, holding-down bolts, joints and sealant, layerworks, paving, stormwater drainage, manholes, cable draw boxes and a dry-stack retaining wall.
Contact Information
Source: Annexure A.1 Civil and Structural Typical Drawings.pdf (unknown)Telephone: 065 1534750
Evaluation Criteria
Source: Annexure A.1 Civil and Structural Typical Drawings.pdf (unknown)The contractor must produce final design drawings and take ownership of construction details, signing off as per the project scope of works and specification documents.
Technical Specifications
Source: Annexure A.1 Civil and Structural Typical Drawings.pdf (unknown)Scope of work (from typical construction detail drawings, series 11364-A1047 to A1194):
Methodology
Source: Annexure A.1 Civil and Structural Typical Drawings.pdf (unknown)The contractor must produce the final design and take ownership of the detail drawings for construction, signing off as per the project scope of works and specification documents. The typical details and dimensions on the drawings are minimum requirements only.
Compliance Requirements
Source: Annexure A.1 Civil and Structural Typical Drawings.pdf (unknown)Compaction and material standards:
Description
Source: Annexure A.10 Electrical Engineering.pdfEngineering, procurement and construction of the Howick pump station fire system upgrade, including fire protection and lighting works, fire reticulation, external and internal lighting, instrumentation, and associated electrical reticulation.
Contact Information
Source: Annexure A.10 Electrical Engineering.pdf (unknown)Engineering designer (drawing contact):
Submission address: not stated in the source document.
Submission Guidelines
Source: Annexure A.10 Electrical Engineering.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method and address: not stated in the source document.
Closing time: 16:00 on 20 November 2026.
Evaluation Criteria
Source: Annexure A.10 Electrical Engineering.pdf (unknown)Evaluation is subject to the Preferential Procurement Policy Framework Act (PPPFA). The specific 80/20 or 90/10 split and any minimum qualifying score are not stated in the source document.
Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin).
Bidders must be registered electrical contractors and provide proof of registration.
B-BBEE minimum level: 3.
Technical Specifications
Source: Annexure A.10 Electrical Engineering.pdf (unknown)Scope: fire protection and lighting works at the Howick pump station, comprising fire reticulation, external and internal lighting, instrumentation, and associated electrical reticulation.
Electrical schematic covers:
Cable routing and containment:
Earthing installation:
Lightning protection:
Lighting and small power:
Quality Management
Source: Annexure A.10 Electrical Engineering.pdf (unknown)Contractor to issue a Certificate of Compliance (COC) and proof of compliance prior to commissioning.
Compliance required with SANS 10142-1, SANS 10142-2, SANS 10313, latest editions of applicable SANS standards, and relevant Municipal By-Laws.
All installations subject to inspection, testing and acceptance by the Engineer.
Only approved, 'equivalent' or 'similar' materials bearing the applicable SABS mark or approved brand name may be quoted and installed.
All items to be quoted at the best quality available.
Contractor responsible for verifying all cable routes, services, levels, dimensions, lengths and quantities against drawings and specifications; any discrepancies to be reported to the Employer's Engineer before work proceeds.
Final quantities subject to measurement on site.
Compliance Requirements
Source: Annexure A.10 Electrical Engineering.pdf (unknown)CSD registration: mandatory.
Tax clearance: valid SARS TCS or tax pin required.
Electrical contractor registration: proof of registration as an electrical contractor required.
B-BBEE: minimum level 3 required; relevant SBD 6.1 and SBD 6.2 forms to be completed.
Local content: compliance with SBD 6.2 required.
Standards compliance: SANS 10142-1, SANS 10142-2, SANS 10313, latest editions of applicable SANS standards, and relevant Municipal By-Laws.
Certificate of Compliance (COC) to be issued prior to commissioning.
Health & Safety
Source: Annexure A.10 Electrical Engineering.pdfContractor to comply with the Occupational Health and Safety Act and its regulations, all relevant Transnet Pipeline Safety requirements, and all applicable Municipal requirements.
Contractor to take all necessary measures to identify and protect existing buried services, electrical cables and manholes before any excavation.
Contractor remains responsible for such services and for any damage caused during installation.
Section
Source: Annexure A.10 Electrical Engineering.pdfEvaluation subject to PPPFA. Specific scoring split and minimum qualifying score not stated in the source document.
Bidders must be registered on CSD, hold valid tax clearance, be registered electrical contractors, and meet B-BBEE minimum level 3.
Description
Source: Annexure A.4.1 Site Plans and As built Site Layout.pdfSite survey date: 2025/07.
Site plan of new fire protection system for Transnet Pipelines Howick.
Zones: Zone One area 471 m², Zone 2 area 204 m².
Existing buildings to be demolished.
Underground product pipelines, fire water pipes, foam premix pipes, DWP incoming/outgoing product lines, water meter supply.
New fire protection system includes oscillating monitors, hydrants, foam premix pressure sustaining valve, temporary fire water supply to existing pump house with water tank, containerised solution, bund pourers, isolation valve.
Technical Specifications
Source: Annexure A.4.1 Site Plans and As built Site Layout.pdf (unknown)Site survey date: 2025/07.
Site plan of new fire protection system for Transnet Pipelines Howick.
Zones: Zone One area 471 m², Zone 2 area 204 m².
Existing buildings to be demolished.
Underground product pipelines, fire water pipes, foam premix pipes, DWP incoming/outgoing product lines, water meter supply.
New fire protection system includes oscillating monitors, hydrants, foam premix pressure sustaining valve, temporary fire water supply to existing pump house with water tank, containerised solution, bund pourers, isolation valve.
Description
Source: Annexure A.11 Instrumentation Engineering.pdfThe drawings detail the fire control panel, mimic panel, and electrical schematic for the Howick Pump Station fire system upgrade. They show panel layouts, alarm and control functions, and the interconnection of fire pumps, diesel tanks, water tanks, and foam system components.
Technical Specifications
Source: Annexure A.11 Instrumentation Engineering.pdf (unknown)The document comprises engineering drawings for the Howick Pump Station fire system upgrade, covering:
Compliance Requirements
Source: Annexure A.11 Instrumentation Engineering.pdf (unknown)Compliance with the Occupational Health and Safety Act and SANS 10142-1/10142-2 is required for the electrical installation works.
Health & Safety
Source: Annexure A.11 Instrumentation Engineering.pdfContractor must comply with the Occupational Health and Safety Act and SANS 10142-1/10142-2. All work must be performed safely, with immediate reporting of any safety concerns. The contractor must ensure excavations and cable routes are safe and comply with relevant regulations.
Description
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdfThe procurement is for the engineering, procurement and construction (EPC) of the Howick Pump Station Fire System Upgrade, located at the Transnet Pipelines Howick Pump Station on Old Main Road, Howick, KwaZulu-Natal. The works involve upgrading the fire system at an operational pump station, requiring careful management of site constraints and operational interfaces.
Important Dates
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Compulsory clarification meeting and site visit: 23 October 2026 at 10:00, at Transnet Pipelines Howick Pump Station, Old Main Road, Howick, KwaZulu-Natal (approx. GPS 29°28'37.19"S, 30°11'41.05"E). Duration about 4 hours. Attendance is compulsory; failure to attend results in disqualification.
Closing date: 20 November 2026 at 16:00 (SAST).
Tender validity: 12 weeks from closing date.
Contact Information
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Employer's Agent / Procurement contact:
Submission portal: https://transnetetenders.azurewebsites.net
Transnet eSupplier portal: https://esupplierportal.transnet.net/portal/
Fraud and corruption reporting: Tip-offs Anonymous 0800 003 056 or [email protected]
Submission Guidelines
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Submission method: electronic only, via the Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net).
Evaluation Criteria
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Evaluation is staged; stages may run in parallel.
Technical Specifications
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Scope: Engineering, Procurement and Construction (EPC) of the Howick Pump Station Fire System Upgrade.
Financial Requirements
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Pricing: electronic pricing only, completed in the eSupplier portal. No paper pricing schedules accepted.
Compliance Requirements
Source: TPL Howick Tender Documents Consolidated 15-10-2026.pdf (RFP)Mandatory compliance:
Description
Source: Annexure A.3 Structural Engineering Drawings.pdfThe drawings show typical foundation layouts and sections for a water tank and pump house at Transnet Pipelines Howick, including concrete layouts, ring beams, engineered layer works, and structural steel details.
Contact Information
Source: Annexure A.3 Structural Engineering Drawings.pdf (unknown)Phone: 045200 1045
Technical Specifications
Source: Annexure A.3 Structural Engineering Drawings.pdf (unknown)The drawings cover typical foundation layouts and sections for a water tank and pump house at Transnet Pipelines Howick, including concrete layouts, ring beams, engineered layer works, and structural steel details.
Description
Source: Annexure B.4 Fire Engineering Documents.pdf (unknown)Scope description
Technical Specifications
Source: Annexure B.4 Fire Engineering Documents.pdf (unknown)Scope
Firefighting scenario calculations (doc 11364-A1021 Rev C)
Spill containment capacity (doc 11364-A1146 Rev A)
Demolition scope of work (doc 11364-A1147 Rev B)
Referenced standards
Environmental
Source: Annexure B.4 Fire Engineering Documents.pdf (unknown)Environmental requirements
Description
Source: Annexure B.3 Health, Safety and Environment.pdf (unknown)Health and Safety Specification for the Howick Pump Station Fire Protection System Upgrade Project.
Document Number: HO1436-SP-0002
Project Number: HO1436
Owner: Transnet Pipelines
Client: Transnet Pipelines
Release Date: 21 November 2025
Health & Safety
Source: Annexure B.3 Health, Safety and Environment.pdf (unknown)Contractor Management Procedure TRN-IMS-GRP-PROC-014 Version 3.0.
Effective Date: 01 June 2025
Review Date: 31 May 2030
Integrated Management System for contractor safety management.
Document sign-off date: 14 May 2025
Group Safety: Sipho Mlaudzi
Section
Source: Annexure B.3 Health, Safety and Environment.pdf (unknown)Author: Thulani Manana
Project Sponsor: Russel Bradbrooke
Senior Project Manager: Sechaba Kunene
Approved by: Sechaba Kunene
Description
Source: Annexure B.2 Document Management and Planning.pdf (unknown)Objectives and scope of the Fixed Asset procedure
Objectives
Scope
Contact Information
Source: Annexure B.2 Document Management and Planning.pdf (unknown)Consultant
Technical Specifications
Source: Annexure B.2 Document Management and Planning.pdf (unknown)Document management and planning (Annexure B.2)
Methodology
Source: Annexure B.2 Document Management and Planning.pdf (unknown)Fixed asset accounting procedure
Control objective
Asset recognition (IAS 16)
Cost components
Components and subsequent expenditure
Servitudes and foreign exchange
Borrowing costs
Decommissioning
Depreciation, useful life and residual value
Intangible assets
Capital spares and rotables
Retirements and transfers
Quality Management
Source: Annexure B.2 Document Management and Planning.pdf (unknown)Physical security and verification of fixed assets
Objective
Pre-verification
General procedures
Completion
Tagging
Description
Source: Annexure B.1.1 Surveys and Investigations.pdf (unknown)The project involves the engineering, procurement and construction of a fire system upgrade at the Transnet Pipelines Howick Depot in KwaZulu-Natal. The new fire water infrastructure comprises a pumphouse, new water tanks, new valve banks, and an elevated pipe network. The geotechnical investigation was undertaken to ascertain ground conditions and recommend a suitable founding regime. The site is a National Keypoint with strict access control, roughly trapezoidal, about 2.4 ha, with a gentle fall to the south east. The earmarked area for the new fire pump room and water storage tank is at the eastern extremity near the main entrance. The site is underlain by sedimentary rocks of the Volksrust Formation, Ecca Group, Karoo Supergroup, with residual clay and silt rich soils. The report includes fieldwork methods, soil profiles, dynamic cone penetrometer tests, geotechnical assessment, earthworks, re-use potential, founding recommendations, and stormwater drainage.
Contact Information
Source: Annexure B.1.1 Surveys and Investigations.pdf (unknown)Enquiries
Geotechnical report contact
Technical Specifications
Source: Annexure B.1.1 Surveys and Investigations.pdf (unknown)Scope
Site characteristics
Geotechnical investigation
Hazardous area classification
Compliance Requirements
Source: Annexure B.1.1 Surveys and Investigations.pdf (unknown)Hazardous area compliance
Health & Safety
Source: Annexure B.1.1 Surveys and Investigations.pdf (unknown)The hazardous area classification report covers infrastructure used on the Transnet Pipelines (TPL) including pig receivers, pig launchers, mainline pump sets, booster pump sets, sumps, strainers, storage tanks, provers, LP delivery manifolds, HP routing manifolds, density huts, oily and storm water separators/spill basins, motorised block valve chambers, road loading and offloading gantries, test facilities, and additives dosing gantry. The classification complies with SANS 10108 Edition 5: 2005 and uses IP Part 15 as the basis. The report details flammable materials handled (petrol, diesel, jet fuel, additives) and their explosive properties, zoning tables for each equipment type, and general requirements including signage, explosion-protected equipment, and conditions that must be met to validate classifications.
Environmental
Source: Annexure B.1.1 Surveys and Investigations.pdf (unknown)The geotechnical report includes commentary on stormwater drainage, groundwater characteristics, and the presence of oily water and storm water separators/spill basins within the existing depot infrastructure. The hazardous area classification report addresses oily water and storm water separators and spill basins, which are relevant to environmental management.
Description
Source: Annexure A.7 Fire Engineering Section Views.pdf (unknown)The document is a set of fire engineering section views for the Howick Pump Station fire system upgrade. It shows:
Technical Specifications
Source: Annexure A.7 Fire Engineering Section Views.pdf (unknown)The document is a set of fire engineering section views for the Howick Pump Station fire system upgrade. It shows:
Description
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)The specification establishes standards and codes of practice for the design, supply and installation of electric actuators on Transnet Pipelines sites. It defines minimum requirements for three-phase electric actuators with flameproof double-sealed watertight enclosures (IP 68).
Evaluation Criteria
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Compliance must be stated paragraph by paragraph against the specification; a broad statement of compliance is not acceptable, and failure to comply may preclude the tenderer from consideration.
Minor deviations that do not materially depart from the specification are considered only at the discretion of the Chief Executive, Transnet Pipelines.
Actuators must hold a flameproof certificate issued by an approved inspection authority confirming construction to the listed standards and suitability for Zone 1 locations.
Equipment described in Appendix 1 (Technical Data Sheet) must be supplied by the successful tenderer with no changes or substitutions without Transnet Pipelines' written consent; the tenderer is responsible for the accuracy of the information submitted.
Discrepancies between this specification and other contract documents must be raised with Transnet Pipelines in writing before work commences; where a conflict exists, the other contract documents prevail.
Technical Specifications
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Three-phase electric actuators (PL 619):
Low voltage switchgear and distribution boards (PL 631):
Experience & Qualifications
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)All work must be carried out by qualified staff under proper supervision by experienced and competent officers. If special tools are required for installation and maintenance, one set per site must be supplied by the manufacturer.
Quality Management
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Actuators must be supplied with a flameproof certificate from an approved inspection authority, confirming construction to the listed standards and suitability for Zone 1 locations. Each actuator must be performance tested, with individual test certificates supplied free of charge, recording current at maximum torque, torque at maximum torque, flash test voltage, and output speed or operating time. A commissioning kit (installation manual, wiring diagram, cover seals) and commissioning tools must be supplied.
LV switchgear assemblies must comply with SANS 10142-1, SANS 60439-1, SANS 1973-1 and/or SANS 1973-3. Type tests must be conducted at a Third Party Test House accredited under ISO 17025, with valid type test reports not older than 5 years. A valid scope of testing certificate must be submitted. The manufacturer must have an Engineering Design System (EDS) as per SANS 1973-1 Annex B.
Compliance Requirements
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Compliance with the specification must be stated paragraph by paragraph; a broad statement of compliance is not acceptable.
Flameproof certificate required for actuators, issued by an approved inspection authority, confirming construction to listed standards and suitability for Zone 1 locations.
Compliance with SANS 10142-1 (wiring of premises) and other listed standards is mandatory.
For LV switchgear, type tests must be conducted at a Third Party Test House accredited under ISO 17025, with valid type test reports not older than 5 years; a valid scope of testing certificate must be submitted.
Manufacturer must have an Engineering Design System (EDS) as per SANS 1973-1 Annex B.
All components must be certified safe by a valid Regulatory Certificate of Compliance (RCC) per SANS 10142-1 Table 4.2 or SABS Mark.
Compliance with Transnet Pipelines specifications PL727 (cable, racking, trenching & earthing) and PL711 (equipment cabinets) requires separate statements of compliance.
Health & Safety
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Compliance with the OHS Act and SANS 60079 (explosive atmospheres) is required. Actuators must be suitable for hazardous area applications as per the data sheet. The specification references SANS 10086-1 (installations in explosive atmospheres) and SANS 10108 (classification of hazardous locations).
Environmental
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Actuator display must be resistant to environmental conditions, UV radiation, and abrasive materials. The LCD glass must be UV resistant.
Contractual Terms
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)The document includes revision history for the LV switchgear specification, noting changes such as fault level ratings, panel labelling, and cable termination assemblies. General arrangement drawings must include terminal block locations, earthing connections, mass of transportable sections, holding down bolt details, and foundation loads.
Section
Source: Annexure B.5 Electrical Engineering Documents.pdf (unknown)Compliance with SABS ISO 9000 (quality management systems) and SANS 1700 (ISO metric bolts, screws and nuts) is referenced.
Description
Source: Annexure A.8 Fire Engineering General Arrangements.pdf (unknown)The drawings cover the general arrangement of the pump house, water tanks, manifold and spill basin at Transnet Pipelines Howick. They show the layout of fire water systems, foam premix piping, fire ring main, fire water tank refill, fire service booster connection, suction connection, oscillating monitors, hydrants, fire hose boxes, bund pourers, spill basins and associated equipment. Key dimensions: foam generating equipment diameter 5.46 m, height 6.28 m, volume 147 m³; spill basin zone 2 area 204 m²; zone one area 471 m².
Technical Specifications
Source: Annexure A.8 Fire Engineering General Arrangements.pdf (unknown)The tender covers the engineering, procurement and construction of the fire system upgrade at the Howick pump station, Transnet Pipelines, KwaZulu-Natal.
Scope includes:
Key dimensions:
Description
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)The document comprises two Transnet Pipelines civil technical specifications: Earthworks Specification (PL 889) and Bedding and Padding Specification (PL 890). PL 889 defines general earthworks requirements for TPL facilities, pipeline servitudes, and access roads, covering site preparation, excavation, material, compaction, finishing, and specific earthworks for manifold areas, block valve chambers, buried pipelines, pavements, and single-storey masonry buildings. PL 890 covers bedding and padding materials placed around and over pipelines in trenches, including material quality, grading, testing, and crossing conditions.
Technical Specifications
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Earthworks specification (PL 889) applies to all Transnet Pipelines facilities, pipeline servitudes, and service/access roads to block valve chambers. Scope includes site preparation, excavation, grading, backfilling, compaction, and material testing.
Site preparation:
Excavation:
Material:
Compaction:
Finishing:
Specific earthworks:
Bedding and padding specification (PL 890):
Methodology
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Execution requirements:
Experience & Qualifications
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Competent person (civil engineering): registered under Engineering Profession Act as Professional Engineer, Technologist, or Technician; tertiary qualification in civil engineering; recognised experience in rational assessments/designs.
Competent person (geotechnical): registered as Professional Engineer/Technologist/Technician, or Professional Natural Scientist (BSc Hons in engineering geology) or Certificated Natural Scientist (NQF 7 or higher); suitable experience in geotechnical investigations or foundation design.
Quality Management
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Material testing requirements:
Compliance Requirements
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Competent person (civil engineering) must be registered under Engineering Profession Act as Professional Engineer, Technologist, or Technician, with tertiary qualification in civil engineering and relevant experience.
Competent person (geotechnical) must be registered as Professional Engineer/Technologist/Technician, or Professional Natural Scientist (BSc Hons in engineering geology) or Certificated Natural Scientist (NQF 7 or higher), with suitable experience in geotechnical investigations or foundation design.
Material certificates required for granular materials (G1–G10).
Deviations from specification require approval by Principal Civil Engineer.
Health & Safety
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Excavation safety:
Environmental
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Dispose surplus/unsuitable material per Transnet Environmental Standards for Construction and local municipality by-laws. Conserve suitable topsoil for future use.
Contractual Terms
Source: Annexure B.8 Civil Engineering Documents.pdf (unknown)Any deviation from this specification must be approved by the Principal Civil Engineer.
Description
Source: Annexure B.6 Instrumentation Engineering Documents.pdf (unknown)The document is an instrumentation engineering annexure for the Howick Pump Station fire system upgrade. It includes fire control panel cause and effect matrices and the PL 723 Automation Standard (Rev 3) which defines Transnet Pipelines' requirements for automation of its pipeline network. The standard covers control and operating philosophy, device typicals, and general control philosophy for device groups. It applies to control systems installed post-2008, with prior versions covering pre-2008 installations.
Technical Specifications
Source: Annexure B.6 Instrumentation Engineering Documents.pdf (unknown)The document is an instrumentation engineering annexure (Annexure B.6) for the Howick Pump Station fire system upgrade. It contains:
Health & Safety
Source: Annexure B.6 Instrumentation Engineering Documents.pdf (unknown)The document references hazardous area safety regulations for purging and pressurisation of control rooms, and safety regulations for purge air control on mainline motors. Tank overfill protection is provided in accordance with the Buncefield Standards Task Group report (24 July 2007) and API 2350 recommendations.
Description
Source: Annexure A.9 Fire Engineering Three-Dimensional Views.pdf (unknown)The drawings show the proposed fire protection system upgrade at the Howick pump station, including 3D and plan views of the pump house, fire department interface connections, temporary connections, rear and front access, manifold monitors, spill basin, and northern view of the new system. They illustrate underground product pipelines, fire water pipes, foam premix pipes, hydrants, fire hose boxes, oscillating monitors, bund pourers, and related infrastructure.
Technical Specifications
Source: Annexure A.9 Fire Engineering Three-Dimensional Views.pdf (unknown)The drawings depict the proposed fire protection system upgrade at the Howick pump station, including:
Description
Source: Annexure A.2 Civil Engineering Drawings.pdf (unknown)The drawing is a site layout plan for the Howick Pump Station fire system upgrade, showing the partial plan of the pump house and water tanks. It includes new water tank raft foundation, Loffelstein walls with handrail and Armco barrier, structural steel canopy shed, storm water pipe and headwall, containerised pump house, G-block paved road, and a ramp at max 1:10 gradient. Drawing details: project name Transnet Pipelines Howick, drawing number 11364-A1189, scale 1:200, revision A, dated 17/02/26, for client review.
Technical Specifications
Source: Annexure A.2 Civil Engineering Drawings.pdf (unknown)The drawing shows a partial site layout of the pump house and water tanks for the Howick Pump Station fire system upgrade. Key elements include:
Description
Source: Annexure A.6 Fire Engineering Typical Detail Drawings.pdf (unknown)The drawings provide typical fire engineering details for the Howick Pump Station fire system upgrade. They cover fire ring main booster connections, fire water tank refill connections, fire service suction, foam concentrate tank details, bund pourers, foam monitors, U-bolt details, and fire hydrant connections. The contractor is responsible for detailed design of certain connections and must comply with referenced project specifications.
Evaluation Criteria
Source: Annexure A.6 Fire Engineering Typical Detail Drawings.pdf (unknown)No eligibility or evaluation criteria are stated in the provided document. Bidders must follow the referenced project specifications (PL 898, PL 900, PL 904, PL 909, PL 910, PL 911, PL 912) and comply with SANS 1700 for U-bolts.
Technical Specifications
Source: Annexure A.6 Fire Engineering Typical Detail Drawings.pdf (unknown)The drawings cover fire protection system components for the Howick Pump Station upgrade. Key items include:
All dimensions in millimetres unless noted. Refer to isometric drawings for continuation details; exact arrangements to be determined by contractor during detailed design.
Methodology
Source: Annexure A.6 Fire Engineering Typical Detail Drawings.pdf (unknown)Fire ring main booster connection: drill and tap end cap to suit 100NB/150NB plug; supply and install plug using hemp and stag on the thread. Provide 2 x ⌀65 instantaneous booster connection with integral check valve. Contractor to design the connection to suit the piping change and maintain the standard height; refer to the isometric for continuation details; exact arrangement to be determined by the contractor during detailed design.
Fire water tank refill connection: contractor to design the refill connection to suit the piping change and maintain the standard height; refer to the isometric for continuation details; to be determined by the contractor during detailed design.
Fire service suction: drill and tap end cap to suit 150NB plug; supply and install plug using hemp and stag. Puddle flange detail to be designed by the contractor and submitted for acceptance; the puddle flange is to be centred in the concrete footing. All buried steel pipe to be wrapped to 150 mm above NGL. Concrete footing as per the engineer's design, minimum 1200 mm. Refer to the isometric for continuation details; contractor to determine during detailed design. Alternative arrangement: fire service suction connection to suit the piping change and maintain the standard height.
Foam concentrate tank: position of nozzles shown for indication purposes only — the contractor is to determine exact nozzle positions and projections. Drop tube support to stop pipes from swaying, made from GRP/stainless steel and mounted to the side of the tank, drilled to allow the use of a U-bolt. Drop tubes to be stainless steel, Schedule 10S, Class 150 pipe, matched to the nozzle size. Stainless steel 304 6 mm plate supports, drilled on site to suit the U-bolt. Arrangement is dependent on pipe size; the pipe contractor is to specify to match the tank flange, preferably mounted directly on the concrete plinth. Where incompatible metals are in contact, suitable insulation materials shall be used (e.g. Teflon pads, top hat washers). Only the use of stainless steel and GRP is permitted. Contractor to design suitable lifting lugs.
Bund pourers to bund wall: the pourer brackets shall be mounted and the pourer installed before the piping to the pourer is completed; the piping shall be adjusted as required to suit the installed position. The pourer bracket shall not straddle any joints in bund walls; should an indicated location require this, the employer shall be advised and will advise how to resolve the matter. Support brackets with M12 bolts, M16 galvanised chemical anchors, 0.5° fall, non-shrink grout of minimum 35 mm thickness, UV resistant rubber. There shall be no sharp edges; all rolled plate shall have a continuous radius and shall mate fully with the mating plate.
Foam monitor: the direction of the monitor valve may vary from that indicated in order to suit requirements — the employer shall be invited to inspect orientations. Dimensions may vary depending on the specification of monitor and oscillating flange used. The connection shall be adjusted to facilitate the required heights. Contractor to supply all carbon steel flange (and reducer if required) to match the flange specification of the monitor. Provide 1500 mm clearance to handle the connection. All dimensions are in millimetres; refer to the isometric for continuation details. Some monitors shall not be supplied from below ground; preferred supply is above ground. Hydrants to be positioned on the same side.
U-bolt detail: for carbon steel and galvanised pipelines, hot-dipped galvanised carbon steel U-bolts, nuts and washers shall be used; for stainless steel pipelines, 316 stainless steel U-bolts, nuts and washers shall be used. Dimensions A, B and C are to be determined by the contractor and shall allow enough thread for a 2 mm gap between the pipe outside diameter and the internal radius of the U-bolt. U-bolts used as guides to have a 2 mm gap between pipe OD and internal radius of U-bolt; U-bolts used as anchors to be flush with the pipe OD. A minimum of three and a maximum of five thread lengths shall project through the nuts at all times. PTFE pad to be secured to the top of the support on both sides of the U-bolt with countersunk bolts with nuts and washers to suit, per drawing 11364-F-STD-TD-119 and the project specification. Support bracket per drawing 11364-F-STD-TD-107. Galvanised carbon steel equipment per PL 904.
Fire hydrant single connection: contractor to design the piping change; the fire hydrant is to maintain the standard height; refer to the isometric for continuation details; contractor to determine during detailed design.
Quality Management
Source: Annexure A.6 Fire Engineering Typical Detail Drawings.pdf (unknown)Material and standard compliance for the fire protection works:
Compliance Requirements
Source: Annexure A.6 Fire Engineering Typical Detail Drawings.pdf (unknown)No specific compliance requirements are stated in the provided document. Bidders must comply with the referenced project specifications (PL 898, PL 900, PL 904, PL 909, PL 910, PL 911, PL 912) and SANS 1700 for U-bolts.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
17 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-2239[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
Median Estimate
R 744 980
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.