Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
R545 KENDAL/BALMORAL RD, Kusile Power Station - HAARTEBEESFONTEIN FARM - WITBANK - 1035
Organization Type
GOVERNMENT
Published
27 Nov 2026
OCDS Reference
ocds-9t57fa-180169
ESKOM requires a supplier to calibrate and maintain plant performance and testing instruments at kusile power station, including replacement of components and spares, on an as-and-when basis for a five-year period. The bidder must complete and submit a contract quality plan (cqp) template as part of the bid, covering quality management, scope, communication, and post-delivery activities. The most consequential consideration is that the cqp must be fully completed, signed by the designated roles, and address all template sections to be considered responsive.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 18 January 2027 - 11:00
Venue
null
Categories
Request for Quotation
R545 KENDAL/BALMORAL RD, Kusile Power Station - HAARTEBEESFONTEIN FARM - WITBANK - 1035
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx27 Nov
2026
Tender Published
Tender was published
18 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender Bulletin.docx
240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf
Eskom requires calibration and maintenance of plant performance and testing instruments, including replacement of components and spares, at Kusile Power Station in Mpumalanga, on an as-and-when basis for five years. Bidders must provide quality management documentation and plans as specified.
SHE SPEC Cegrits n Instruments.pdf
Eskom Kusile Power Station requires a contractor for the calibration, repair, maintenance, and replacement of plant performance and testing instruments, including Cegrits samplers, on an as-and-when basis for five years. The contract includes condition monitoring and adoption of new instrumentation technology, with the employer able to adjust service frequencies based on plant risk.
NEC TSC3 Contract -Instruments Calibrations .pdf
Eskom requires a contractor to provide calibration and maintenance services for plant performance and testing instruments at Kusile Power Station, including replacement of components and spares, on an as-and-when basis for a five-year period. The contract is a NEC3 Term Service Contract (TSC3) with a priced contract (Option A) and includes various secondary options such as price adjustment, low service damages, and task orders.
Instrument Calibration KUS-20250797 Kusile Power Station Environmental Specification Rev.pdf
Eskom Kusile Power Station requires contractors for the calibration, repair, replacement, and maintenance of plant performance and testing instruments, including the supply of components and spares, on an as-and-when basis for five years. The contract includes adopting new technologies to enhance plant performance and reliability, with strict environmental compliance obligations.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom requires calibration and maintenance of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including replacement of components and spares, on an as-and-when basis for five years. The contract covers a quality control plan with defined intervention points for inspections, testing, and approvals.
Invitation to Tender (ITT) or Request for Proposal (RFP) Instrument Calibration.pdf
Eskom requires a contractor for the calibration and maintenance of plant performance and testing instruments at Kusile Power Station, including the replacement of components and spares, on an as-and-when basis for five years. The contract will be governed by the NEC3 Term Service Contract (TSC3).
Instrument Calibration.xlsx
Eskom requires a five-year contract for the calibration and maintenance of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including the replacement of components and spares on an as-and-when basis. The scope covers flue gas analysers, testing probes, temperature, pressure, flow, and speed measurement instruments, with bi-annual calibrations and ad-hoc maintenance/repairs.
TES - Instruments calibrations registered.pdf
Eskom requires a contractor for the calibration and maintenance of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including the replacement of components and spares, on an as-and-when basis for a period of five years. The tender will be evaluated using a two-step process: mandatory criteria followed by qualitative scoring, with a minimum technical threshold of 70%.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom requires a supplier for the calibration and maintenance of plant performance and testing instruments at Kusile Power Station, including the replacement of components and spares, on an as-and-when basis for a period of five years. The contract will be governed by Eskom's Supplier Quality Management specification, which mandates a quality management system conforming to ISO 9001 and requires the submission of quality documentation as part of the tender.
Annexure A -SBD 4.pdf
Eskom requires calibration and maintenance of plant performance and testing instruments at Kusile Power Station, including replacement of components and spares, on an as-and-when basis for a period of five years.
559-667439824 Generation Quality Control Plan Template 18Nov.docx
Eskom requires calibration and maintenance of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including replacement of components and spares, on an as-and-when basis for five years. The work involves quality control procedures with documented approvals and final acceptance into a data book.
Supplier Development Localisation Industrialisation (SDLI) Strategy Calibrations and Maintenance of Plant Performance and Testing and Spares on as and When Basis.pdf
Eskom requires a contractor to calibrate and maintain plant performance and testing instruments at Kusile Power Station in Mpumalanga, including replacement of components and spares, on an as-and-when basis for five years. The tender applies the 90/10 preference point system with up to 10 points for B-BBEE status, and includes SDL&I obligations covering transformation, local procurement, job creation, and skills development.
SOW Instr Calib.pdf
Eskom requires a contractor for the calibration, maintenance, repair, and replacement of plant performance and testing instruments at Kusile Power Station in Mpumalanga, on an as-and-when basis for five years. The contractor will collect instruments, arrange SANAS-accredited calibration, perform ad hoc repairs, and supply replacements, covering a specified list of analysers, probes, temperature, pressure, flow, and speed measurement devices.
240-68099512 Form A_Cat 3_ Rev 9.docx
Eskom requires the calibration and maintenance of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including the replacement of components and spares, on an as-and-when basis for a period of five years. The contract will be awarded under Eskom's Supplier Quality Requirements, with the successful bidder required to comply with ISO 9001 standards and Eskom's quality management clauses.
Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdf
Eskom requires calibration, repair, and maintenance of plant performance and testing instruments at Kusile Power Station, including replacement of components and spares, on an as-and-when basis for five years. Bidders must provide a quality management system and associated quality documentation.
Instrument Calibration.pdf
Eskom requires a five-year contract for the calibration, maintenance, and repair of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including the replacement of components and spares on an as-and-when basis. The scope covers flue gas analysers, testing probes, temperature, pressure, flow, and speed measurement instruments, with bi-annual calibrations and ad hoc maintenance/repairs.
240-109253698 CQP Template- Rev 3.docx
Eskom requires a supplier for the calibration and maintenance of plant performance and testing instruments at Kusile Power Station in Mpumalanga, including the replacement of components and spares, on an as-and-when basis for a period of five years. The supplier must provide a Contract Quality Plan (CQP) in line with SANS 466:2005 / ISO 10005:2005, covering quality management, sub-supplier control, documentation, and post-delivery activities.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Bidders must complete and sign the Eskom Supplier Quality Requirements form to acknowledge and accept the requirements of specification 240-105658000 and ISO 9001. The tender is classified under Category 3 quality requirements (clause 3.5.4 of the specification). No other evaluation criteria are stated in the provided document.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)No specific compliance requirements are stated in the provided document.
Description
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdfCalibration, repair and maintenance of plant performance and testing instruments at Kusile Power Station, including replacement of components and spares, on an as and when basis over a five-year period.
Submission Guidelines
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdf (TENDER)Returnable documents to be submitted with the bid (Specification 240-105658000, Category 3 quality deliverables):
Submission channel, address, number of copies and packaging are not stated in this document.
Evaluation Criteria
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdf (TENDER)Evaluation is against the quality requirements of Specification 240-105658000. Each listed deliverable carries an indicator of 1 and is scored per section.
No minimum qualifying score, price weighting or preference point system (80/20 or 90/10) is stated in this document.
Technical Specifications
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdf (TENDER)Scope: calibration, repair and maintenance of plant performance and testing instruments at Kusile Power Station, including replacement of components and spares.
Detailed quantities, instrument lists and site locations are not stated in this document.
Quality Management
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdfQuality requirements are set out in Specification 240-105658000, Category 3, and are evaluated as tender returnables.
Compliance Requirements
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdf (TENDER)Quality management system
No CSD registration, tax compliance, B-BBEE, CIDB or professional registration requirements are stated in this document.
Section
Source: Tender Returnables _calibrations, repairs, and maintenance of Plant Performance and Testing Instruments.pdfQuality deliverables are scored per section, each item carrying an indicator of 1:
Total available: 12 points.
Description
Source: 240-109253698 CQP Template- Rev 3.docxThe tenderer must complete the Contract Quality Plan (CQP) template to identify and plan for meeting Eskom's quality management expectations and requirements for the contract. The CQP must cover all sections of the template, including scope of work, communication channels, organogram, interfacing documents, suppliers and sub-suppliers, monitoring, special controls, documented information, records control, non-conformance management, databook management, tools and equipment, customer property, product preservation, identification and traceability, and commissioning and post-delivery activities.
Submission Guidelines
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)The tenderer must complete the Contract Quality Plan template as part of the bid. The CQP must address all sections of the template, including:
The CQP must be signed by the compiled-by and approved-by roles. The scope of work category must be marked with an X for each applicable activity.
Technical Specifications
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)The tenderer must complete the Contract Quality Plan (CQP) template to identify and plan for meeting Eskom's quality management expectations and requirements for the contract. The CQP must cover:
Compliance Requirements
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)The tenderer must complete the Contract Quality Plan template in accordance with the guidelines for quality plans SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2.
Description
Source: SOW Instr Calib.pdfThe scope of work focuses on calibrations, repairs, replacements, maintenance, and adoption of new technologies for plant performance and testing instruments at Kusile Power Station.
The purpose is to enhance key performance indicators such as thermal efficiency, Energy Availability Factor (EAF), and Planned Capability Loss Factor (PCLF) by minimising unplanned downtime and optimising equipment utilisation.
The document is applicable throughout all plants at Kusile Power Station.
The document is effective from the approval date.
Important Dates
Source: SOW Instr Calib.pdf (unknown)Closing date: 18 January 2027 at 09:00.
No briefing or site visit dates are stated in the provided document.
Contact Information
Source: SOW Instr Calib.pdf (unknown)No contact information is provided in the document.
Submission Guidelines
Source: SOW Instr Calib.pdf (unknown)Returnable documents: none specified in the provided document.
Submission method: not specified in the provided document.
Closing time: 18 January 2027 at 09:00 (from tender record).
Evaluation Criteria
Source: SOW Instr Calib.pdf (unknown)Bidders must be able to provide SANAS-accredited calibration services.
Contractor must comply with Eskom's occupational health and safety, environmental, risk, and quality requirements.
Contractor must provide own PPE and valid medical certificates for personnel.
Contractor must have own transport for collection and delivery of instruments.
Contractor must adhere to Eskom's Vehicle and Driver Safety Management Procedure and Cardinal Rules.
No specific B-BBEE level, CIDB grading, or financial thresholds are stated in the provided document.
Technical Specifications
Source: SOW Instr Calib.pdf (unknown)Scope: Calibration, maintenance, repair, and replacement of plant performance and testing instruments at Kusile Power Station, on an as-and-when basis, for a period of five years.
Applicability: All plants at Kusile Power Station.
Contractor duties:
Instruments requiring calibration (Table 1) include:
Instruments requiring maintenance and repairs (Table 2) include the same categories and quantities, on an ad-hoc basis.
Methodology
Source: SOW Instr Calib.pdfMaintenance, repairs, and replacements will be performed based on the condition of instruments as assessed during calibrations or as issues arise.
When instruments are found malfunctioning during calibration, the contractor must promptly alert the Employer to inform of potential risks and allow timely assessment and decision-making.
Effective communication between contractor and Employer is crucial, including timely reporting of instrument conditions, collaborative risk assessment, and agreement on action plans.
Experience & Qualifications
Source: SOW Instr Calib.pdfContractor must be a competent person with knowledge, training, experience, and qualifications specific to the work, as defined in the OHS Act.
Contractor must demonstrate competence and adequacy of resources to perform duties as required by Eskom.
No specific years of experience or key personnel qualifications are stated in the provided document.
Quality Management
Source: SOW Instr Calib.pdfCalibration is fundamental to quality assurance; verifies instruments perform within specified tolerances.
Testing equipment must be calibrated by a SANAS-accredited calibration authority, and certificates must remain valid.
Compliance with ISO 9001 Quality Management System is referenced as a normative standard.
Contractor must comply with Eskom's quality requirements and standards.
Financial Requirements
Source: SOW Instr Calib.pdf (unknown)No financial requirements (bid security, guarantees, retention, payment terms, turnover) are stated in the provided document.
Compliance Requirements
Source: SOW Instr Calib.pdf (unknown)SANAS-accredited calibration services required.
Compliance with Eskom occupational health and safety, environmental, risk, and quality requirements.
Compliance with Eskom mandatory standards and statutory requirements.
Provide own PPE before commencing any activity on site.
Provide valid medical certificates signed by a medical practitioner.
Complete induction prior to commencement of work.
Comply with Eskom Vehicle and Driver Safety Management Procedure.
Adhere to Eskom Cardinal Rules.
No specific B-BBEE level, CIDB grading, or financial thresholds are stated in the provided document.
Health & Safety
Source: SOW Instr Calib.pdfContractor must comply with Eskom occupational health and safety, environmental, risk, and quality requirements, standards, and policies.
Compliance with all Eskom mandatory standards and statutory requirements is required.
Contractor must provide own PPE before commencing any activity on site.
Contractor must provide valid medical certificates signed by a medical practitioner.
Induction must be completed prior to commencement of work.
Contractor must provide own transport and comply with Eskom Vehicle and Driver Safety Management Procedure.
Contractor must adhere to Eskom Cardinal Rules.
Minimum PPE in work area: hard hat with chin strap, gloves, dust mask (where applicable), safety boots, safety glasses (tinted not at night), safety clothing including reflective vest, ear plugs or earmuffs.
Normative references include: 32-520 Occupational Health & Safety Risk Assessment Procedure, 32-95 Environmental, Occupational Health and Safety Incident Management Procedure, 32-245 Waste Management Procedure, 32-418 Working at Height Procedure, Occupational Health and Safety Act, Eskom Lifesaving rules, Plant Safety Regulations – GGR 0992.
Environmental
Source: SOW Instr Calib.pdfEnvironmental protection must include noise, water pollution, gaseous emissions, noxious and/or offensive odours, liquid waste collection, and solid waste separation and collection.
Duty of care: any person causing pollution or degradation must take reasonable measures to prevent, minimise, and rectify it.
Polluter Pays Principle: costs of remedying pollution and adverse health effects are borne by those responsible.
Zero Liquid Effluent Discharge Policy: all contractors must abide by Eskom's policy through reuse and recycling.
Waste: all waste must be stored in marked and labelled containers and disposed of at a permitted disposal site. Hazardous substances must be notified to Protective Services with a Safety Material Data Sheet. Spills/emergency incidents must be reported to the Supervisor and Environmental Officer(s). Fuels or oils must be stored in bounded areas.
Equipment must be in good working condition; no fuel or oil leaks tolerated.
Report all environmental incidents or potential incidents immediately.
Dust: contractor must provide, maintain, and calibrate fall-out dust collectors. At least two dust collectors per active working area. If fall-out exceeds 0.25 g/m²/day, operations causing dust must cease until remedial measures are in place. Records of dust level measurements must be kept for the duration of the contract.
Protection of watercourses, water bodies, and wetlands: must be protected from contamination or degradation. No personal washing or washing of machinery/clothes in natural watercourses or water bodies.
Contractual Terms
Source: SOW Instr Calib.pdfContract period: five years.
Work is on an as-and-when basis.
Contractor must be fully conversant with the document, specifications, and all relevant health and safety procedures and standards before commencing work.
Contractor must demonstrate competence and adequacy of resources to perform duties as required by Eskom.
Any change in scope or responsibilities will be controlled through updating or changing of this document.
Description
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdfEskom requires calibration and maintenance of plant performance and testing instruments at Kusile Power Station, together with replacement of components and spares, on an as-and-when basis over a five-year period.
Important Dates
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Returnables list issued: 13 October 2025
Contact Information
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Eskom representative
Submission Guidelines
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Returnable quality documents — Category 3, Eskom specification 240-105658000. Every item marked with an evaluation indicator of 1 must be submitted.
Section A — Quality management system (ISO 9001)
Section B — Evidence of the QMS in operation
Section C — Contract quality plan
Section D — Quality control plan
Section E — Additional requirements
Evaluation Criteria
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Quality evaluation — Category 3 deliverables, specification 240-105658000. Only deliverables carrying an evaluation indicator of 1 are scored.
Points allocation
Evaluation stages
Technical Specifications
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Scope
Contract framework
Compliance Requirements
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Quality management system
Returnable forms
Referenced Eskom specifications
Section
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdfQuality deliverables are scored out of 12 points, with only items marked with an evaluation indicator of 1 counted.
Points by section
What is assessed
Description
Source: SHE SPEC Cegrits n Instruments.pdfThis document is the SHE specification for the Kusile Power Station calibrations, repairs, and maintenance of plant performance and testing instruments, including cegrits samplers. It sets out the minimum health and safety requirements that the contractor must meet for the duration of the contract. The contractor must develop an OHS plan that meets these requirements and all applicable legislation. The contractor remains accountable for the quality and execution of their health and safety programme.
Important Dates
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)No dates are stated in this document.
Contact Information
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)No contact information is stated in this document.
Submission Guidelines
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)Returnable documents: none specified in the provided document. The document is a SHE specification, not the full tender pack. Submission method, address, and closing time are not stated in this document.
Evaluation Criteria
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)No evaluation criteria are stated in this document. The document is a SHE specification, not the tender evaluation document. Bidders must comply with the OHS Act, hold a valid COID Letter of Good Standing, and sign a Section 37(2) agreement with Eskom and any appointed contractors.
Technical Specifications
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)Scope of work: calibration, repairs, replacements, and maintenance of all plant performance instrumentation and cegrits samplers, including condition monitoring and any new instruments with the latest technology. The work is to be performed at Kusile Power Station. The employer may adjust the frequencies stated in the scope of work depending on plant risk. A copy of the scope of work must be retained by the contractor. The awarded contractor is designated the Main contractor; any contractor appointed by the Main contractor is an Appointed contractor.
Experience & Qualifications
Source: SHE SPEC Cegrits n Instruments.pdfThe contractor site supervisor must be trained in HIRA, incident investigation, supervisory safety, authorised person and PSR, and legal liability. The contractor must have an understanding of ISO 45001 and a minimum of 2 years' work experience. The contractor must provide a breakdown of OHS training requirements and costing. Employees must have appropriate qualifications and certificates and be under competent supervision.
Quality Management
Source: SHE SPEC Cegrits n Instruments.pdfThe contractor must adhere to Eskom Kusile Power Station standards and specifications. The contractor site supervisor must inspect all work to ensure adherence to these standards, conduct follow-up inspections to close out findings, and monitor overall OHS performance. The contractor must comply with BS ISO 45001:2018 Occupational Health and Safety Management Systems.
Financial Requirements
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)OHS costs must be itemised based on the overall scope of the project, including training, PPE, and safety equipment purchases. Covid-19 costs are not for profit-making purposes; Eskom reserves the right to accept or decline the list of PPE in the detailed Covid-19 costs. No other financial requirements are stated.
Compliance Requirements
Source: SHE SPEC Cegrits n Instruments.pdf (unknown)Mandatory compliance:
Health & Safety
Source: SHE SPEC Cegrits n Instruments.pdfThe contractor must develop an OHS plan that meets the minimum requirements of this specification and all applicable legislation. Key requirements include:
Environmental
Source: SHE SPEC Cegrits n Instruments.pdfThe contractor must comply with the National Environmental Management Act and other environmental legislation. The contractor has a duty of care to the environment, including preventing pollution or degradation and minimising and rectifying any harm caused. The contractor must comply with Eskom's Environmental, Occupational Health and Safety Incident Management Procedure (32-95).
Contractual Terms
Source: SHE SPEC Cegrits n Instruments.pdfThe contractor is accountable for the health and safety of their employees and appointed contractors. Eskom does not assume the contractor's legal responsibilities. The contractor must comply with all applicable legislation and Eskom requirements for the duration of the contract. Eskom has the right to terminate the contract for non-compliance with OHS requirements. Work stoppage may be imposed for serious non-compliance.
Description
Source: Instrument Calibration.pdfThe work comprises calibration, maintenance and repair of plant performance and testing instruments at Kusile Power Station, including collection and delivery of instruments, safety file, and medicals for personnel.
Submission Guidelines
Source: Instrument Calibration.pdf (unknown)Returnable documents: the completed pricing schedule (SBD 3.1) with rates and amounts for each item. No other returnable forms are listed in the document.
Submission method: not stated in the document.
Closing time: 09:00 on 18 January 2027.
Evaluation Criteria
Source: Instrument Calibration.pdf (unknown)The document does not specify evaluation criteria, scoring split, or minimum qualifying score. Bidders must price each item in the schedule; the contract is awarded on an as-and-when basis for five years.
Technical Specifications
Source: Instrument Calibration.pdf (unknown)Scope: calibration, maintenance and repair of plant performance and testing instruments at Kusile Power Station, on an as-and-when basis for five years.
Calibration frequency: most instruments calibrated twice per year (bi-annually); a few annually.
Maintenance/repairs: as and when required (ad hoc).
Item 1 – Preliminary and generals (once-off and yearly):
Calibration items (bi-annually unless noted):
Maintenance/repair items (ad hoc, same instrument types and quantities as calibration items, except flow measurements listed separately).
Quality Management
Source: Instrument Calibration.pdfCalibration must be performed twice per year for most instruments, annually for a few. The list of instruments and quantities is provided in the pricing schedule.
Financial Requirements
Source: Instrument Calibration.pdf (unknown)Pricing format: schedule of rates with unit rates and amounts for each item. No bid security, guarantees, retention, or payment terms are stated.
Compliance Requirements
Source: Instrument Calibration.pdf (unknown)No specific compliance requirements stated (e.g., CSD, tax clearance, B-BBEE, CIDB). The document only lists a safety file as a preliminary item.
Health & Safety
Source: Instrument Calibration.pdfA safety file must be provided (once off). Entry and exit medicals are required for the driver and two assistants.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
R545 KENDAL/BALMORAL RD, Kusile Power Station - HAARTEBEESFONTEIN FARM - WITBANK - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
27 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 5 501 600
Range
Based on 11 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.