Tender Type
Request for Quotation
Delivery Location
SAAO Sutherland, Old Fraserberg Road - Sutherland - Sutherland - 6920
Organization Type
GOVERNMENT
Published
15 Sept 2026
OCDS Reference
ocds-9t57fa-170475
Bidders must attend the compulsory site visit on Friday, 18 September 2026, and RSVP to [email protected] by 14:00 on that day, indicating whether they will attend and whether shuttle and accommodation services are required.
Bidders must be registered on the Central Supplier Database (CSD) at https://secure.csd.gov.za/ — no award will be made to a provider who is not registered.
Prices must be firm (not subject to exchange rate variations) and valid for at least 60 days from the closing date, inclusive of VAT.
Bidders must submit detailed pricing aligned with the Bill of Quantities, a project programme and timeline, methodology and technical approach, company experience and references, and evidence of qualified personnel.
The 80/20 preference point system applies: a maximum of 80 points for price and 20 points for specific goals as per SBD 6.1; bidders must indicate how they claim points for each specific goal.
All transport costs, including abnormal load requirements, are for the service provider's account, and the service provider bears full responsibility for offloading and installation.
Bidders must confirm no interests with the NRF or its business units and declare any interests in the relevant Standard Bidding Document; the bid will be disqualified if the disclosure is found not to be true and complete.
Date & Time
Friday, 02 October 2026 - 16:00
Venue
SAAO Sutherland, Old Fraserberg Road, Sutherland, 6920
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
SAAO Sutherland, Old Fraserberg Road - Sutherland - Sutherland - 6920
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Revised RFQ117281.zip15 Sept
2026
Tender Published
Tender was published
02 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Revised RFQ117281.zip
No summary available
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 881 787
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The scope includes the design, supply, delivery, installation and commissioning of container slabs at the SAAO Sutherland site. The work must comply with the provided specifications, including the suggested ground plan and pricing list (List01a.pdf). The service provider must produce fully compliant, certified designs for construction; SAAO provides only conceptual specifications and accepts no liability for final design. All personnel must obtain safety induction before working on NRF sites, and construction vehicles must use only tar roads to the site. Working hours are limited to before 17:00.
Important Dates
Source: Revised RFQ117281.zip (RFQ){"closingDate":"15 September 2026","closingTime":"16:00 pm","briefingSession":"{"date":"23 September 2026","time":"08:00 am","venue":"e: 23 September 2026","is_compulsory":true}"}
Contact Information
Source: Revised RFQ117281.zip (RFQ){"name":"SCM Contact person","email":"[email protected]","phone":"021 201 1629","department":"y. The NRF provides these services in all fields","address":"l enquiries may be directed to"}
Submission Guidelines
Source: Revised RFQ117281.zip (RFQ)Returnable Documents: Signed SBD 1 form M, (pricing schedule), Signed and completed SBD 4 form M (=> R 2 000), Signed and completed SBD 6.1 form M (=> R 2 000), CIDB requirement GB 1 or higher M, Submit a valid proof of Compensation for Occupational Injuries and M, Disease Act (COIDA), issued by the Depart of Labour, appointment letters for designing, supplying, deliv
Evaluation Criteria
Source: Revised RFQ117281.zip (RFQ)No eligibility criteria specified
Technical Specifications
Source: Revised RFQ117281.zip (RFQ)a) Location
SAAO Sutherland, Northern-Cape, approximately 370 km from Cape Town, Western-Cape.
b) Project Objective
To provide a fully functional, compliant, and installed container structure supported on
engineered concrete columns and concrete slabs, ready for operational use as per:
i) Annexure 1, Scope and Specification of Works, Filename, SAAO SOW
Container Slabs_a1.pdf.
ii) Annexure 2, Pricing Schedule, Filename, SAAO Container Slabs Pricing
List01a.pdf.
Occupational health and safety when working on nrf sites
All personnel performing work on NRF site/s as part of this contract are responsible to obtain
safety induction. Over and above the obligations provided by the Occupational Health and
Safety Act (OHS Act No and its Regulations, known as ‘the Act’), the contracted
party meets with all relevant health and safety instructions as given to them by site safety
personnel, where relevant. Personal protection equipment including closed safety shoes, hard
hats, height safety equipment, and high visibility vests are worn at all times while on the work
site. All personnel are to obey the relevant instructions, including signage, related to restricted
access and speed limits on all sites.
The contracted party, once signing the contract (SBD 7), is responsible for itself, its employees,
and those people affected by its operations in terms of the Act the regulations promulgated in
terms thereof. The contracted party performs all work and uses equipment on site complying
with the provisions of the Act.
To this end, the contracted party shall make available to the NRF on the valid Letter of Good
Standing in terms of the COID Act and ensures its validity does not expire while executing this
bid, where applicable. The contracted party furnishes its registration number with the office of
the Compensation Commissioner. The contracted party enters into a Section 37.2 agreement
in terms of Occupational Health and Safety Act (OHS Act No and its Regulations)
that the NRF drafts.
The contracted party maintains a health and safety plan complying with the requirements of
The Act at the work site during the period that contracted work takes place on the site. The
NRF manages the contracted party in his capacity for the execution of this contract to meet
the provisions of the said Act and the regulations promulgated in terms thereof.
5 | P a g e
The contracted party accepts liability for any contraventions to the Act. Each member of the
contracted party’s team (including sub-contracted personnel), submit a signed indemnity form
prior to entering the work site and kept in the contracted party’s health and safety file.
Performance/service level conditions
The NRF measures the contracted bidder’s performance against these in the execution of the
contract. The contracted bidder recognises that its failure to meet the performance levels has
material adverse impact on the operations of NRF and that the damage from the contracted
bidder’s failure to meet any performance level is not susceptible to precise determination. The
NRF excuses the contracted bidder from failing to comply with the performance levels to the
extent that non-performance or delayed performance is solely and directly attributable to an
act or omission of the NRF or its staff or circumstances of force majeure as referred to in this
Agreement.
If the contracted bidder fails to meet any performance level:
a) The contracted bidder shall investigate and report on the root causes of the
performance level failure;
b) Promptly correct the failure and begin meeting the set performance levels;
c) Advise the NRF as and to the extent requested by the NRF of the status of remedial
efforts being undertaken with respect to such performance level failure; and
d) Take appropriate preventive measures to prevent the recurrence of the performance
level failure.
The bidder may be required to provide a schedule of their management system that details
their supervisory structure, frequency of management meetings, service-delivery validation
meetings with NRF project team, the procedure where service delivery is found to be below
agreed standards, the performance escalation procedure, as well as the scheduling of the
activities to be deliver for specified services.
Ethical requirements
a) The bidder must confirm that there are no interests with the NRF and its business units, has
clean business practises, and has determined its bid independently from others as reflected
on its submitted SBD 1, SBD 4, SBD 8, and SBD 9 forms. Any interest with the NRF or NRF
official must be declared in the relevant Standard Bidding Document. Failure to provide / or
comply with any of the above particulars may render the bid invalid and also
misrepresentation of facts.
6 | P a g e
Use of reasonable skill and care
a) It will be expected of the bidder to apply reasonable skills and due diligence in the execution
of the duties stipulated in this document.
b) Although the bidder’s documents may be scrutinised by the NRF, this shall in no way
relieve the assigned engineer of their professional responsibility for the proper and prompt
execution of their duties. The NRF shall also be entitled to have any document or
calculations verified by others. In the event of mal performance, default or negligence, the
NRF shall have the right to claim compensation or damages and set-off such against any
amount payable.
c) During assessment of any existing facilities, which may have a direct bearing on the
Project, the bidder shall determine deficiencies with such facilities in terms of the
Occupational Health and Safety Act, 1993 (act ), the SANS 10400, etc. and
recommend measures to rectify those during the project execution phase.
d) The NRF’s representative shall be notified by the bidder and their personnel of any
transgression of inter alia the Occupational Health and Safety Act, 1993 (Act )
and environmental legislation during the service provides operation pertaining to the
contract regardless of who may be involved.
Contract management
The bidder must be issued with a written purchase order authorising the deliverables of this
contract before any service can be rendered. The purchase order stipulates work description,
delivery date, place, time and costs of the service required.
Contract management:
a) The NRF’s provides the bidder with the requirements for each meeting and the bidder
must provide a response within three working days after receiving the request.
b) The bidder is responsible to manage his/her account with the NRF which will include
the timely receipt of invoices by NRF for payment within the agreed time. NRF, where
correct procedures are followed, will make prompt payments.
c) The NRF applies penalties to the bidder where the bidder consistently delivers service
levels below the agreed minimum service level.
Termination of contract due to non-performance
a) In the event of the non-performance as per the agreed contract, SAAO will appoint an
alternative at the cost of the appointed third party. The defaulting third party is obliged
to settle the damages/additional costs that SAAO has incurred as result of the non-
performance of the appointed bidder.
Occupational Health and Safety when working on NRF sites:
7 | P a g e
a) All personnel performing work on SAAO site as part of this contract are responsible to
obtain safety induction.
b) Over and above the obligations provided by the Occupational Health and Safety Act
(OHS Act No and its Regulations, known as ‘the Act’), the appointed bidder
must meet all relevant health and safety instructions as given to them by site safety
personnel, where relevant.
c) The appointed bidder, once signing the contract (SBD 7), is responsible for itself, its
employees, and those people affected by its operations in terms of the Act the
regulations promulgated in terms thereof.
d) SAAO manages the appointed bidder in his capacity for the execution of this contract
to meet the provisions of the said Act and the regulations promulgated in terms thereof.
The appointed bidder accepts liability for any contraventions to the Act.
Original bid documents for contract signing
a) The sets of original bid documents in hard copy format (paper document) serves as the
original master set for the legal contract document between the contracting parties. The
master set remains at the NRF and has precedence over any other copies in the case
of any discrepancies within the other sets of documents. The master set has the
originals or certified copies of any certificates stipulated in this document.
Managing service levels
a) Upon appointment, both parties agree on the final set of performance levels for each
deliverable service levels including measurable key performance indicators with
minimum thresholds in writing which form part of this contract document.
b) Where both parties agree to variation of these, both parties sign the revision which
must be appended to this contract document.
c) The appointed bidder and the SAAO contract manager measure delivered performance
against these performance levels. Where either party has identified poor performance
under this contract, both parties will meet and investigate the matter to determine the
root cause, the correction plan, and the execution planning thereof.
d) Both parties will monitor the corrective actions and assess the applicability of penalties
to the incurred poor performance and then apply them.
8 | P a g e
Statement of performance levels for services/goods
Performance being measurement penalty and level applicable
Measured methodology from
Accuracy and Appropriate NRF Rectification according to the Electrical
Completeness of representatives will Design Report at contractor’s own cost.
Specifications and verify the completeness
Quality of of the project.
Documentation.
Testing and sign-off of Appropriate NRF Where the Acceptance Report deviates
installation of container representatives will from the design specifications,
and electrical works. verify the Acceptance rectification of work to be done at the
Report and Certificate of contractors’ own cost. Where the CoC
Compliance (CoC). is delayed by more than 2 weeks from
the approved Project Plan, penalty is
5% of the original invoice value for
each additional week of delay. Unless
a reasonable justification for the delay
is provided.
9 | P a g e
The RFQ will be evaluated in the following three phases:
Administrative compliance / submission of all returnable documents and Phase 1:
completion of all returnable schedules
Phase 2 Specification evaluation and eligibility
80/20 preferential point system in terms of PPPR22
Phase 3: - Specific goals: relevant in accordance with the B-BBEE
Codes of Good Practice and the PPPFA that are contracting
with persons, or categories of persons, historically
disadvantaged by unfair discrimination on the basis of race,
gender, or disability.
Phase 1 – Administrative Compliance
All returnable documents marked mandatory (‘M’), must be completed or submitted by
service providers in order to proceed to be evaluated further in Phase 2.
Returnable Document/ Schedule Mandatory (M) / Optional (O)
Signed SBD 1 form M
Signed and completed SBD 3.1 form M
(pricing schedule)
Signed and completed SBD 4 form M (=> R 2 000)
Signed and completed SBD 6.1 form M (=> R 2 000)
Valid BBBEE certificate, or sworn O (preference points will not be allocated if not
affidavit detailing annual turnover, in submitted)
the case of EMEs and QSEs
CIDB requirement GB 1 or higher M
10 | P a g e
Submit a valid proof of Compensation for Occupational Injuries and M
Disease Act (COIDA), issued by the Depart of Labour
Submit your company’s signed Occupational Safety, Health, and M
Environmental (SHE) policy.
Bidders must provide a current company profile confirming at least M
three (3) years’ experience in designing, supplying, delivering,
installing, and commissioning of shipping containers, concrete
columns and concrete slabs or civil projects or similar works.
Provide three (3) reference letters or Purchase orders or M
appointment letters for designing, supplying, delivering, installing,
and commissioning of shipping containers, concrete columns and
concrete slabs or civil projects or similar works. This must be on the
clients’ company letterhead. SAAO may contact these references for
clarification on any aspect of the reference given.
Bidders must submit the certifications and CVs of supervisory staff M
who will be involved in the project.
Insurance cover of at least R 2 million for public liability, product M
liability, and/or professional indemnity
11 | P a g e
(Sbd 3.1)
Note: only firm prices will be accepted. Non-firm prices (including
Prices subject to rates of exchange variations) will not be
Considered in cases where different delivery points influence the
Pricing, a separate pricing schedule must be submitted for each
Delivery point
If your prices are variable (subject to change), please specify the
Variables that will affect the price.
Offer to be valid for 60 days from the closing date of bid.
Please see attached Pricing List, Filename SAAO Container Slabs Pricing List01a.pdf.
The following conditions will apply to this request for quotations:
Price(s) quoted must be valid for at least (60) days from date of your offer.
Price(s) quoted must be inclusive of VAT, if applicable.
The bidder is required to submit:
a) Proof of B-BBEE Status Level of contributor, to claim points as per SBD 6.1
b) An EME is required to submit a sworn affidavit confirming their annual total revenue of
R10 million or less and level of black ownership to claim points as per SBD 6.1
c) A QSE is required to submit a sworn affidavit confirming their annual total revenue of
between R10 million and R50 million and level of black ownership or a B-BBEE level
verification certificate to claim points. As per SBD 6.1
register https://secure.csd.gov.za/.
SBD documentation as per section 3 of this document for Quotations duly completed.
lowest bid being higher than R 2000. (VAT inclusive).
acceptable quotation.
12 | P a g e
accept a part of it. SAAO does not bind itself to accepting the lowest quotation.
Contract (GCC) and, if applicable, any other special conditions of contract.
have been delivered. (No Pre- Payment allowed).
conditions, set terms and conditions must be mutually agreed upon. Otherwise,
the National Treasury General Conditions of Contract (GCC) will govern.
Sbd 4 - bidder’s disclosure
Any person (natural or juristic) may make an offer or offers in terms of this invitation
to bid. In line with the principles of transparency, accountability, impartiality, and
ethics as enshrined in the Constitution of the Republic of South Africa and further
expressed in various pieces of legislation, it is required for the bidder to make this
declaration in respect of the details required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List
of Restricted Suppliers, that person will automatically be disqualified from the bid
process.
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners
or any person having a controlling interest1 in the enterprise,
employed by the state?
Yes/no
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable,
state employee numbers of sole proprietor/ directors / trustees / shareholders /
members/ partners or any person having a controlling interest in the enterprise, in
table below.
Full Name Identity Number Name of State
institution
1 the power, by one person or a group of persons holding the majority of
the equity of an enterprise, alternatively, the person/s having the
deciding vote or power to influence or to direct the course and
decisions of the enterprise.
13 | P a g e
2.2
Do you, or any person connected with the bidder, have a relationship with
any person who is employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners
or any person having a controlling interest in the enterprise have any interest in any
other related enterprise whether or not they are bidding for this contract?
Yes/no
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
2.1 Location
SAAO SUTHERLAND, Northern-Cape, approximately 370 km from Cape Town, Western-Cape.
2.2 Project Objective
To provide a fully functional, compliant, and installed container structure supported on engineered
concrete columns and concrete slabs, ready for operational use.
The Service Provider shall provide a complete turnkey solution, including all labour, materials, plant,
transport, supervision, and associated services required.
3.1 Design & Engineering
Prepare all structural, civil, and electrical designs
Winning Bidder to submit detailed construction drawings for approval prior to construction
Ensure designs are certified by a registered professional (Engineer/Architect)
3.2 Container Supply & Installation
Supply a compliant 6m (20ft) ISO shipping container as per picture below
Transport, offload, position, and secure container to foundations
Picture 1: 6m/20Ft Shipping Container
3.3 Concrete Columns
container
Service provider to determine appropriate height above ground level
Install anchoring system for container stability
3.4 Concrete Slabs
locations.
3.5 Electrical Installation
Install internal lighting, sockets, and distribution board
Ensure full compliance with SANS 10142-1
Issue Certificate of Compliance (CoC)
3.6 Testing & Commissioning
Conduct concrete slump and cube tests
Test electrical systems
Commission and hand over complete installation
4.1 Container Requirements
Size: 6m x 2.5m
Condition: New or high-quality used (no structural defects)
Finish: Anti-corrosive primer and white paint
Roof: Waterproofed and sealed
Insulation:
o Floor must be 22mm Shutterply/Plywood with Industrial Polyurethan non-slip
coating
o Walls and Ceiling must be 50mm white ISO Board with 12mm Oriented Strand Board
(OSB) covering. Recess areas of container must be filled with thermal insulation
panels. All gaps and joints must be properly sealed with industrial material.
4.2 Doors
Double doors: lockable, 180° opening
Single access door: lockable aluminium/stainless steel, weatherproof with cabin hooks
4.3 Electrical
LED lighting (minimum two double channel vapour proof fittings)
220V 16 Amps double socket
IP65 weatherproof external lockable distribution board with DIN-RAIL protection devices
(Main Breakers, Circuit Breakers, Earth Leakage, etc.). All components must be surface
mounted.
4.4 Concrete Columns
Quantity: 6
Size: 600mm x 600mm
Reinforced and constructed to SABS standards
Anchor posts at each container corner
Picture 2:
Concrete Column
With Anchor Post
Picture 3: Shipping Container on Concrete Columns
4.5 Concrete Foundations
3000 x 2000 x 200 mm pads (1 units) – in front of shipping container double door
2000 x 1000 x 150 mm pads (1 units) – in front of existing equipment room
750 x 600 x 200 mm pads (1 unit) – in front of single door of shipping container
All three (3) concrete foundations must have steel welded mesh
Strength: 25 MPa concrete
Testing: Slump and cube strength verification required
The Service Provider shall:
Visit and familiarise themselves with site conditions
Provide own power supply for construction activities
Provide temporary facilities (toilets, storage, etc.)
Ensure site security during construction
Remove all rubble and dispose at approved municipal sites
Minimise disruption, dust, and debris
Provide proper protection and erect any temporary tarpaulins and demarcation that may be
necessary during the progress of construction.
working after 17:00.
All work shall comply with:
Applicable SANS 10400 regulations
SANS 10142-1 (Electrical installations)
Relevant ISO standards
Issuing of certification of all Compliance of Electrical and Civil Works
Local authority regulations
The Service Provider shall:
Comply with the Occupational Health and Safety Act
Appoint a Construction Manager
Appoint Safety Officers and Supervisors as required
Maintain a site-specific Health & Safety Plan
Provide all required PPE and safety controls
The Service Provider must provide:
Approved construction drawings
As-built drawings
Test results (concrete and electrical)
Certificates of compliance
Warranty documentation (minimum 12 months)
All transport costs are for the Service Provider’s account
Include abnormal load requirements if applicable
Full responsibility for offloading and installation
10.1 Warranty
Minimum 12-month warranty on workmanship and materials.
10.2 Liability
The Service Provider is responsible for any damage to existing infrastructure.
Bidders must submit:
Detailed pricing aligned with Bill Of Quantities
Project programme and timeline
Methodology and technical approach
Company experience and references
Qualified personnel with at least five years of relevant experience in construction and
installation projects
Certifications and accreditations
Health & Safety plan
Quality control plan
CIDB Grading of 1 or higher.
Submit your company’s signed Occupational Safety, Health, and Environmental (SHE) policy
Submit a valid proof of Compensation for Occupational Injuries and Disease Act (COIDA),
issued by the Depart of Labour
professional indemnity
The Service Provider is responsible for verifying all site dimensions
All work must be completed to the satisfaction of the SAAO
No additional claims due to lack of site inspection will be accepted
The SAAO reserves the right to amend drawings during the contract
SAAO provides conceptual specifications only and accepts no liability for final design.
The appointed Service Provider must produce fully compliant, certified designs for construction.
End of RFQ
Compliance Requirements
Source: Revised RFQ117281.zip (RFQ)Insufficient searchable text - AI extraction recommended
tax compliance status system pin code from the South African Revenue Service (SARS)
appointment letters for designing, supplying, delivering, installing,
Signed SBD 1 form M
(pricing schedule)
Signed and completed SBD 4 form M (=> R 2 000)
Signed and completed SBD 6.1 form M (=> R 2 000)
CIDB requirement GB 1 or higher M
Submit a valid proof of Compensation for Occupational Injuries and M
Disease Act (COIDA), issued by the Depart of Labour
on its submitted SBD 1, SBD 4, SBD 8, and SBD 9 forms. Any interest with the NRF or NRF
NRF shall have the right to claim compensation or damages and set-off such against any
Bidders must submit the certifications and CVs of supervisory staff M
Pricing, a separate pricing schedule must be submitted for each
If your prices are variable (subject to change), please specify the
Please see attached Pricing List, Filename SAAO Container Slabs Pricing List01a.pdf.
a) Proof of B-BBEE Status Level of contributor, to claim points as per SBD 6.1
R10 million or less and level of black ownership to claim points as per SBD 6.1
verification certificate to claim points. As per SBD 6.1
register https://secure.csd.gov.za/.
B-BBEE Details: SYSTEM: 80/20
Delivery information
LOCATION: SAAO, Old Fraserburg Road, Sutherland Northern Cape,
6920
LEAD TIME (from purchase ASAP upon issuance of the official purchase order
order date)
Enquiries relating to bidding procedures Technical enquiries may be directed to:
may be directed to:
Louis Hannie
Contact person: SCM Contact person:
E- Mail address: [email protected] E- Mail address:
Telephone No: 021 201 1629 Telephone No: 021 447 0025
1 | P a g e
Supplier information
Name of Bidder Name:
Street Address:
Telephone Number
Code Number
Cell Phone Number
Code Number
Facsimile Number
Code Number
E-Mail Address
VAT Registration Number
Tax Tax
Central Supplier
Complianc Compliance OR MAAA
Database No.
e Status System PIN
B-BBEE Status B-BBEE Status Tick Applicable Box. Tick Applicable Box.
Level Verification Level Sworn ❑ Yes ❑No ❑ Yes ❑No Certificate Affidavit
[A B-BBEE status level verification certificate/sworn affidavit (for EMEs & QSEs) must be
submitted in order to qualify for preference points for B-BBEE – also refer to the SBD 6.1]
Are you the accredited Are you a foreign- ❑ Yes ❑No representative in South based supplier for ❑ Yes ❑No
[If yes Africa for the the [If yes, answer the
enclose goods/services/works goods/services/wor questionnaire below]
proof] offered? ks offered?
Is the entity a resident of the Republic of South Africa (RSA)? ❑ Yes ❑No
Does the entity have a branch in the RSA? ❑ Yes ❑No
Does the entity have a permanent establishment in the RSA? ❑ Yes ❑No
Does the entity have any source of income in the RSA? ❑ Yes ❑No
Is the entity liable in the RSA for any form of taxation? ❑ Yes ❑No
If the answer is “No” to all of the above, then it is not a requirement to register for a tax
compl
Section
Source: Revised RFQ117281.zipThe 80/20 preference point system applies. Points are awarded for price (80 points) and specific goals (20 points) as per the preference point table in the tender. Bidders must indicate how they claim points for each preference point system. The contract will be awarded to the bidder with the highest total points, subject to compliance with all mandatory requirements. Non-firm prices will not be considered.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
SAAO Sutherland, Old Fraserberg Road - Sutherland - Sutherland - 6920
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
15 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.