Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1 Jones Road - Kempton Park - Ekhuruleni - 1632
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169476
The airports company south africa is procuring a contractor for the replacement of split units at o.R. Tambo international airport over a 24-month period. Bidders must hold a CIDB contractor grading of 6me or higher, and the tender evaluation applies a 80/20 preference point system with a mandatory functionality threshold of 75 points out of 100 before price and preference are considered.
CIDB contractor grading of 6ME or higher is mandatory.
Bids must be submitted by 09 October 2026 at 12:00 midday, into Tender Box A at the specified O.R. Tambo International Airport address.
The tender is evaluated on a 80/20 preference point system (price 80, specific goals 20) with a mandatory functionality threshold of 75 out of 100 points.
Bidders must provide proof of qualifications and experience for key personnel (Project Manager, Air-conditioning and Refrigeration Mechanic, Electrician, Controls and Instrumentation Engineer, Assistant Refrigeration Mechanic) as per the evaluation criteria.
Bidders must submit reference letters for at least 2 (preferably 3) completed similar projects (installation/commissioning of split units, packaged units, or VRVs) with referee letterhead, description, value, contact details, and signature/stamp.
Bidders must submit a project plan in the form of a Gantt chart with completion within 24 months.
Bids must be submitted as one original and one copy, plus an electronic format (USB Flash Drive), in sealed packages marked "ORIGINAL" and "COPY".
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 09 October 2026 - 12:00
Venue
https://teams.microsoft.com/meet/314128907553412?p=iCC8iZE9ZWDlXoiomB
Non - compulsory briefing a non - compulsory clarification meeting with representatives of the employer will take place online on 17 september 2026 at 10:00 AM meeting link: microsoft teams meeting join: https://teams.microsoft.com/meet/314128907553412?p=iCC8iZE9ZWDlXoiomB Meeting ID: 314 128 907 553 412 passcode: vd93cm6q
Categories
Request for Proposal
1 Jones Road - Kempton Park - Ekhuruleni - 1632
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: CIDB Bid document Template - replacement of Split units.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
08 Sept
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf
The Airports Company South Africa is seeking a contractor to replace split air-conditioning units at O.R. Tambo International Airport over a 24-month period, under an NEC3 Engineering and Construction Contract with a priced activity schedule.
CIDB Bid document Template - replacement of Split units.pdf
Airports Company South Africa is procuring a contractor for the replacement of split units at O.R. Tambo International Airport over a 24-month contract period. The tender is open to bidders with a CIDB contractor grading of 6ME or higher, and evaluation will be based on functionality (minimum 75 points) and the 80/20 preference point system.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: CIDB Bid document Template - replacement of Split units.pdf (RFP){"briefingSession":"{"date":null,"time":null,"venue":null,"is_compulsory":false}"}
Contact Information
Source: CIDB Bid document Template - replacement of Split units.pdf (RFP){"name":null,"email":"[email protected]","phone":"+27 21 834 0841","department":"S AT O.R TAMBO INTERNATIONAL AIRPORT","address":"NATIONAL"}
Evaluation Criteria
Source: CIDB Bid document Template - replacement of Split units.pdf (RFP)Evaluation includes: 1) Experience of key personnel (projects completed within 24 months from closing date; projects completed beyond 24 months score 0 points). 2) Site establishment (clearly defined timelines within one calendar month after contract award). 3) Preference points for specific goals (bidders must indicate how they claim points). Reference letters will be verified during evaluation.
Compliance Requirements
Source: CIDB Bid document Template - replacement of Split units.pdf (RFP)No specific requirements found
B-BBEE Minimum Level: 1
B-BBEE Details: 68
Confidential
Confidential
ACSA will score specific goals out of 20 in accordance with the Preferential Procurement Regulations 2022..
If a bidder fails to meet the Specific goals as outlined on the table below and to submit proof, the bidder will
score zero (0) out of 20. ACSA will not disqualify the bidder. See below Specific goals that must be achieved
for this bid:
(Note to tenderers: The tenderer must indicate how they claim points for each preference point system.)
Number of Number of
points Points claimed
Specific Goals (80/20 by bidder
system) (Bidder to
complete)
B-BBEE Status Level 1 5
B-BBEE Status Level 2 4.5
B-BBEE Status Level 3 4
B-BBEE Status Level 4 3
B-BBEE Status Level 5 2
B-BBEE Status Level 6 0.5
B-BBEE Status Level 7 0.3
B-BBEE Status Level 8 0.1
Black youth majority-owned entities 5
Black women majority-owned entities 5
Company majority owned by people with disabilities 5
Non- compliant contributor 0
Bidder to provide proof to support The Preference Points being Claimed.
a)Provide original or certified copy Valid sworn Affidavit OR
b) B-BBEE Certificate from a SANAS accredited rating agency
must be provided
as prescribed by the B-BBEE Act and its relevant/most recent Codes of Good Practice
a) Any other supporting information..
In order to score for preference points, bidder must provide supporting
Information (proof)that is relevant to the specific goals.
Stage 5 - Objective Criteria Evaluation – NOT APPLICABLE
In line with the PPPFA, the tender must be awarded to the bidder who scores the highest points, unless
objective criteria in addition to those contemplated in the specific goals (Preferen
Description
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdfThe works involve the replacement of split units at OR Tambo International Airport. The contract is an NEC3 Engineering & Construction Contract (June 2005) with a priced activity schedule. The method of measurement is the 6th edition of the Standard System of Measuring Building Works. The contract includes secondary options, including Option X13 (Performance Bond) and Option X5 (Delay Damages). Delay damages are 0.05% of the contract value per day, capped at 10% of the contract value. The contract value does not exceed R150 million, the instruction period does not exceed 36 months, and the defects liability period does not exceed 24 months.
Contact Information
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown){"name":null,"email":null,"phone":null,"department":"S AT OR TAMBO","address":". . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ."}
Submission Guidelines
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown)Submit the completed tender documents, including all returnable forms, to the Employer (ACSA) before the closing date and time. The closing date and time are not stated in the available text. Bids must be submitted in the prescribed format; failure to complete and sign all required forms may lead to disqualification. The contract is subject to South African law and the language of the contract is English.
Returnable Documents
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown)Contractor must provide performance bond (10% of contract value excluding VAT) within 10 working days of award, and other securities as per contract data.
Evaluation Criteria
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown)The evaluation criteria are not explicitly stated in the available text. The contract includes secondary options such as Option X13 (Performance Bond) and Option X5 (Delay Damages). The contract includes additional conditions (Z clauses) covering cession, delegation, assignment, and other responsibilities.
Technical Specifications
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown)Construction Contract
Between Airports Company South Africa
(Registration no: 1993/004149/06)
and [Insert at award stage]
(Reg No. ___________ )
for REPLACEMENT OF SPLIT UNITS AT OR TAMBO
International airport for a period of 24
Months
Contents: No of
pages
Part C1 Agreements & Contract Data [1]
Part C2 Pricing Data [42]
Part C3 Scope of Work
Experience & Qualifications
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf2 Air-conditioning and
Refrigeration Mechanic
Name:
Qualifications relevant to this
contract
3 Electrician
Name:
Qualifications relevant to this
contract
4 Controls and Instrumentation
Engineer
Name:
Qualifications relevant to this
contract
5 Assistant Refrigeration
Mechanic
Name:
Contract Data (Contractor) C1.2b
Confidential
Qualifications relevant to this
contract
Contract Data (Contractor) C1.2b
Confidential
C1.3 Forms of Securities
Pro formas for Bonds & Guarantees
For use with the NEC3 Engineering & Construction Contract (June 2005)
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X13: Performance Bond
Each of these secondary Options requires a bond or guarantee “in the form set out in the Works
Information”. Pro forma documents for these bonds and guarantees are provided here for convenience
but are to be treated as part of the Works Information.
Option X16: Retention (not used with Option F)
The Contractor may provide a Retention Money Guarantee in the form stated here. When the Employer
receives and accepts a Retention Money Guarantee exactly in the form stated he will instruct the Project
Manager not to assess any amount be retained in terms of secondary Option X16.
The organisation providing the bond / guarantee does so by copying the pro forma document onto his
letterhead without any change to the text or format and completing the required details. The completed
document is then given to the Employer within the time stated in the contract.
Forms of Sureties C1.3
Confidential
Confidential
Pro forma Performance Bond – Demand Guarantee (for use with
Option X13)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Bond / Guarantee)
[Insert Contractor’s name and registered address] Bank reference No.
Date:
Dear Sirs,
Performance Bond – Demand Guarantee for [insert name of Contractor] required in terms of contract
[insert Contractor’s contract reference number or title]
In this Guarantee the following words and expressions shall have the following meanings: -
1.1 “Bank” means [Insert name of Bank], [●] Branch, Registration No. [●]
1.2 “Bank’s Address” means [Insert physical address of Bank]
1.3 “Contract” means the written agreement relating to providing the works, entered into
between the Employer and the Contractor, on or about the [●] day of
[●] 20[●] (Contract Reference No. [●]) as amended, varied, restated,
novated or substituted from time to time;
1.4 “Contractor” means [●] a company registered in accordance with the laws of [●] under
Registration No [●].
1.5 “Employer” means Airports Company South Africa SOC Limited a company registered in
accordance with the laws of the Republic of South Africa under
Registration Number 1993/004149/30
1.6 “Expiry Date” means the earlier of
the date that the Bank receives a notice from the Employer stating that
all amounts due from the Contractor as certified in terms of the
contract have been received by the Employer and that the Contractor
has fulfilled all his obligations under the Contract, or
the date that the Bank issues a replacement Bond for such lesser or
higher amount as may be required by the Employer.
1.7 “Guaranteed Sum” means 10% of contract value excluding VAT which must be submitted within
10 working days from notification of award
1.8 “works” means Replacement of Split Units at OR Tambo International Airport as
set out in the Section C3, Works Information
At the instance of the Contractor, we the undersigned ______________ and ______________, in our
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto, confirm
that we hold the Guaranteed Sum at the disposal of the Employer as security for the proper performance by
the Contractor of all of its obligations in terms of and arising from the Contract and hereby undertake to pay to
the Employer, on written demand from the Employer received prior to the Expiry Date, any sum or sums not
exceeding in total the Guaranteed Sum.
Forms of Sureties C1.3
Confidential
Confidential
A demand for payment under this guarantee shall be made in writing at the Bank’s address and shall:
be signed on behalf of the Employer by a director of the Employer;
state the amount claimed (“the Demand Amount’);
state that the Demand Amount is payable to the Employer in the circumstances contemplated in the Contract.
Notwithstanding the reference herein to the Contract the liability of the Bank in terms hereof is as principal and
not as surety and the Bank’s obligation/s to make payment:
is and shall be absolute provided demand is made in terms of this bond in all circumstances; and
is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
The Bank’s obligations in terms of this Guarantee:
Sum; and
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the
Contractor.
The Employer shall be entitled to arrange its affairs with the Contractor in any manner which it sees fit, without
advising us and without affecting our liability under this Guarantee. This includes, without limitation, any
extensions, indulgences, release or compromise granted to the Contractor or any variation under or to the
Contract.
Should the Employer cede its rights against the Contractor to a third party where such cession is permitted
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
This Guarantee:
shall expire on the Expiry Date until which time it is irrevocable;
is, save as provided for in Error! Reference source not found. above, personal to the Employer and is neither n
egotiable nor transferable;
shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry hereof;
shall be regarded as a liquid document for the purpose of obtaining a court order; and
shall be governed by and construed in accordance with the law of the Republic of South Africa and shall be
subject to the jurisdiction of the Courts of the Republic of South Africa.
will be invalid and unenforceable if any claim which arises or demand for payment is received after the Expiry
Date.
The Bank chooses domicilium citandi et executandi for all purposes in connection with this Guarantee at the
Bank’s Address.
Signed at on this day of 20__
For and on behalf of the Bank
Bank Signatories(s)
Name(s) (printed)
Forms of Sureties C1.3
Confidential
Confidential
Witness(s)
Bank’s seal or stamp
Forms of Sureties C1.3
Confidential
Confidential
C1.4 Insurance Schedule
Summary of Terms and other Matters Applicable to Employer Provided Insurance
Insurance clauses for capex projects
Section a: definitions
Landside refers to:
Areas of the airport before the security points; and
The restricted area beyond the security points but, within the perimeter of gatehouses,
passenger terminals and cargo buildings.
Airside refers to:
The Apron / maneuvering areas; and
Area within the airside boundary/perimeter fence, excluding the internal areas of the
passenger terminals, perimeter gatehouses and cargo buildings.
Insurance Clauses C1.4
Section b: insurance clauses
Awarded contract value does not exceed r150 million, and the
Instruction period does not exceed 36 months, and the defects
Liability period does not exceed 24 months
Each Party shall be responsible for effecting and maintaining the relevant insurances as specified below
and to the extent relevant to the Contract.
1.1 Notwithstanding anything elsewhere contained in this Contract and without limiting the obligations,
liabilities or responsibilities of the Contractor in anyway whatsoever (including but not limited to any
requirement for the provision by the Contractor of any other insurances) the Employer shall effect and
maintain for the duration of the construction and maintenance periods of the Contract – as appropriate in
the joint names of the Employer, the Contractor and where relevant Sub-Contractors the following
insurances which are subject to the terms, limits, exceptions and conditions of the Policy:
a) Contract Works/Contractors Public Liability/ Removal Of Lateral Support Liability
Section 1 Of The Policy – Contract Works
Contract Works Insurance for the full value of the Works to provide cover against accidental physical loss
of or damage to the Works, Temporary Works and materials intended for incorporation in the Works all
being the subject matter of this Contract including to the extent provided for in the policy whilst in transit or
temporarily stored at any premises en route to or from the Site (other than where this is a continuation of
Marine Transit) within the territorial limits of the policy.
This insurance may specifically exclude any cost necessary to replace or rectify any of the property insured,
which is in a defective condition due to defect in design, plan specification, material or workmanship.
This insurance contains the following limitations and warrantees;
Open Trench Limitation
In respect of loss or damage to open trenches and pipes, conduits or cables laid therein, caused directly or indirectly by
rain, inundation or flood, Insurers liability shall be limited in respect of the aggregate length of open trenches at any one
time to 2,500 meters.
Exposed Layer Works (applicable to works involving paving, roadways, bulk earthworks and runways and
taxiways)
In respect of loss or damage to Exposed Layer Works relating to paving, roadways and runways (including taxiways)
caused directly or indirectly by rain, inundation or flood, Insurers liability shall be limited in respect of the aggregate
length of Exposed Layer Works at any one time to 2,500 meters.
Section II of the Policy – Contractors Public Liability
Public Liability Insurance which provides indemnity against legal liability in the event of accidental death
of or injury to persons and/or loss of or damage to property(other than the Works the subject matter of this
Contract) arising from the execution of the Contract with a limit of indemnity of R100,000,000 in respect of
any one occurrence or series of occurrences consequent on or attributable to one source or original cause.
Section III of the Policy – Removal Of Lateral Support Liability
Insurance Clauses C1.4
Removal Of Lateral Support Liability which provides indemnity against legal liability in the event of
accidental death of or injury to persons and/or loss of or damage to property (other than the Works the
subject matter of this Contract) arising out of or in connection with shock or vibration or the removal or
weakening of or interference with support to property in the vicinity of the Contract Site and arising out of or
in connection with the Insured Contract (but not in respect of tunneling works) and occurring during the
Period of Insurance.
The Limit of Indemnity being limited to R50,000,000 attributable to one source or original cause
b. Contract Works SASRIA – Providing physical loss of or damage to the Works, Temporary Works and
materials intended for incorporation in the Works as covered by the underlying Contract Works policy as
noted in (a) above due to perils as covered in terms of the SASRIA Contract Works wording as issued by
Sasria soc.
The Contract Works SASRIA cover excludes consequential or indirect loss or damage of any kind or
description whatsoever.
The SASRIA Contract Works policy is limited to R500,000,000 (Incl VAT) in the aggregate during the policy
period of insurance.
The Contract Works SASRIA policy wording can be obtained from the SASRIA website
http://www.sasria.co.za/ which notes the covers and policy exclusions.
c) Aviation Liability Insurance which provides indemnity against legal liability in the event of accidental
death of or injury to persons and/or loss of or damage to property (other than the Works the subject matter
of this Contract) arising from the execution of the Contract with a limit of indemnity of R2,000,000,000 in
respect of any one occurrence or series of occurrences consequent on or to one source or original cause.
This insurance is in respect of liability relating to aircrafts.
d) Design & Construct Professional Indemnity Insurance which provides indemnity against legal liability
to pay compensation as a result of any actual or alleged negligent act, error or omission in the performance
of the Professional Duties of the insured and arising from the execution of this project. The limit of indemnity
under this insurance shall be *R25,000,000 in the aggregate during the annual policy period of
insurance that ACSA effect such cover during the policy period from 1 April to 31 March during each
policy period of insurance.
*The limits of indemnity applies to all ACSA contracts as a whole and does not apply specifically to this
contract. The aggregate limit could be exhausted by claims under other ACSA contracts and there is no
guarantee that this insurance cover will provide sufficient cover to this specific contract should the aggregate
limit be exhausted.
The Policy only covers the rectification of the works and excludes all consequential losses.
Professional Duties do not include:
a) Labour and construction work which would normally be the responsibility of the building or engineering
contractor.
b) Supervision of the construction works usually undertaken by a building or engineering contractor.
The Contractor shall comply to all the terms and conditions of the Employer arranged policies and the
Insurance Clauses C1.4
contract
Experience
contract
Experience
contract
Experience
contract
Experience
Contract Data (Contractor) C1.2b
Quality Management
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdfhave been discovered on reasonable
inspection by the Employer or the
requiring any inspection not ordinarily
carried out by the Employer or the
undertake any inspection over and above the
reasonable inspection, this does not place a
greater responsibility on the Employer or the
Pricing Schedule
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdfContents: No of
pages
Part C1 Agreements & Contract Data [1]
Part C2 Pricing Data [42]
Part C3 Scope of Work [46]
Part C4 Site Information [63]
(in words)
(The above amount should be calculated as per the guide provided in the Pricing Data [Subtotal F]. In the event of any conflict
between the amount above and the Pricing Data [Subtotal F], the former shall prevail.)
for the Contractor
Part C1: Agreements and contract data, (which includes this agreement)
Part C2: Pricing data and Price List
Part C3: Works information.
Part C4: Site information
and schedules, drawings and documents or parts thereof where so indicated.
C2.1, Pricing Assumptions.
11 Data for Option W1
W1.1 The Adjudicator is (Name) The person appointed jointly by the parties
from the list of adjudicators contained in the
Compliance Requirements
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown)C1.1 Form of Offer and Acceptance [3]
C1.1 Form of Offer and Acceptance
B-BBEE Minimum Level: Two
B-BBEE Details: Z21.3 A built environment CIDB registered firm contracted (either by Joint Venture, partnership or sub-
contracting) by the tenderer to perform a specified percentage of work stated in the Contract Data
under the guidance of the tenderer and which complies with the following:
Z21.3.1. Does not share equity holding with the tenderer; and
Z21.3.2. Is registered in terms of the Company’s Act, 2008 (Act No. ) or Close Corporation Act,
1984 (Act No. ); and
Z21.3.3. Is registered with the South African Revenue Service; and
Z21.3.4. Is at least an Exempted Micro Enterprise (EME) with a B-BBEE Status of “Level Two Contributor”,
as defined in the Amended Codes of Good Practice for measuring Broad- Based Black Economic
Empowerment (published in Government Gazette No. 36928 on 11 October 2013); or
Z21.3.5. Is at least a Qualifying Small Enterprise (QSE) with a B-BBEE Status of “Level Two Contributor”,
as defined in the Amended Codes of Good Practice for measuring Broad- Based Black Economic
Empowerment (published in Government Gazette No. 36928 on 11 October 2013); and
Z21.3.6. Is 50% or more black owned or 30% or more black women owned; and
Contract Data (Employer) C1.2a
Confidential
Z21.3.7. Has entered into a written relationship agreement of co-operation and assistance with the tenderer
for the duration of the contract.
The service provider shall achieve in the performance of the contract the contract skills
development goal established in the CIDB Standard for developing skills through infrastructure
contracts (August 2013)
The Employer shall have no contractual relationships with Subcontractors. However, if a
Subcontractor is found by the Employer to be incompetent, the Employer may request the Service
Provider either to provide a Subcontrac
B-BBEE Requirements
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdf (unknown)Transformation imperatives: Contractor must subcontract at least 30% of work to Targeted Enterprises (defined as built environment firms with B-BBEE Level 2 or better, 50% black owned or 30% black women owned). Subcontracting to non-compliant enterprises limited to 25% of contract value. Penalties for failing to meet targets: 50% of shortfall value. Annual B-BBEE certificate required.
Health & Safety
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdfschedule
60.6 The method of measurement is The 6th edition of the Standard System of
measuring Building Works published by
waiver of rights and does not give rise to an estoppel unless the Parties agree otherwise
and confirm such agreement in writing.
Contract Data (Employer) C1.2a
to the design, scope, and Works information that is 5% or more
Z19.2 The Project Manager requires the written consent of the Employer if an action will result in the
Completion Date being extended by more than 30 days.
Z20 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as
amended the Contractor agrees to the following:
Contract Data (Employer) C1.2a
Z20.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own
right with duties as prescribed in the Occupational Health and Safety Act No as amended
and agree to ensure that all work being performed, or Equipment, Plant and Materials being used,
are in accordance with the provisions of the said Act, and in particular with regard to the
Z21 Transformation Imperatives
Z21.1 The Service Provider shall enter into a contract (either through partnership, joint venture or sub-
contracting) with (a) Targeted Enterprise(s) to perform a minimum of 30% of work.
Z21.2 A Targeted Enterprise is a registered built environment firm contracted (either by Joint Venture,
partnership or sub-contracting) by the tenderer to perform a specified percentage of work stated in
the Contract Data under the guidance of the tenderer; or
Z21.3 A built environment CIDB registered firm contracted (either by Joint Venture, partnership or sub-
contracting) by the tenderer to perform a specified percentage of work stated in the Contract Data
under the guidance of the tenderer and which complies with the following:
Z21.3.1. Does not share equity holding with the tenderer; and
Z21.3.2. Is registered in terms of the Company’s Act, 2008 (Act No. ) or Close Corporation Act,
1984 (Act No. ); and
Z21.3.3. Is registered with the South African Revenue Service; and
Z21.3.4. Is at least an Exempted Micro Enterprise (EME) with a B-BBEE Status of “Level Two Contributor”,
as defined in the Amended Codes of Good Practice for measuring Broad- Based Black Economic
Empowerment (published in Government Gazette No. 36928 on 11 October 2013); or
Z21.3.5. Is at least a Qualifying Small Enterprise (QSE) with a B-BBEE Status of “Level Two Contributor”,
as defined in the Amended Codes of Good Practice for measuring Broad- Based Black Economic
Empowerment (published in Government Gazette No. 36928 on 11 October 2013); and
Z21.3.6. Is 50% or more black owned or 30% or more black women owned; and
Contract Data (Employer) C1.2a
development goal established in the CIDB Standard for developing skills through infrastructure
contracts (August 2013)
11.2 The working areas are See C3 ‘Works information’
24.1 The Contractor’s Key people are: CV’s to be appended to Resource Proposal (Annex F)
Contractual Terms
Source: APPENDIX 1 - NEC 3 ECC FOR REPLACEMENT OF SPLIT UNITS AT OR TAMBO.pdfPart C1: Agreements & Contract Data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [3]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer [6]
C1.2b Contract Data provided by the Contractor [21]
[to be inserted from Returnable Documents at award
stage]
C1.3 Proforma Guarantees [24]
schedule of deviations (if any), contact the employer’s agent (whose details are given in the contract data)
to arrange the delivery of any bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the contract data. Failure to fulfil any of these
obligations in accordance with those terms shall constitute a repudiation of this agreement.
Unless the Bidder (now Contractor) within five working days of the date of such receipt notifies the
employer in writing of any reason why he cannot accept the contents of this agreement, this agreement
shall constitute a binding contract between the parties.
for the Employer
clauses and the clauses for main Option
A: Priced contract with Activity schedule
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X2: Changes in the law
X5: Sectional Completion
X7: Delay damages
X13: Performance Bond
X16: Retention
X17: Low performance damages
X18: Limitation of liability
Z: Additional conditions of contract
of the NEC3 Engineering and Construction
Contract, April 2013
10.1 The Employer is (Name): Airports Company South Africa SOC Ltd.
(Reg no: 1993/004149/30), a juristic person
incorporated in terms of the company laws
of the Republic of South Africa
80.1 These are additional Employer's risks 1. None
84.1 The Employer provides these Contract Work Insurance, Public Indemnity,
insurances from the Insurance Table Professional Indemnity and SASRIA. The
terms and other matters applicable to these
insurances provided by the Employer (and
to insurances generally) are detailed in the
insurance schedule attached as section
C1.4 to the contract (“the insurance
Schedule)
84.1 The Employer provides these The terms and other matters applicable to
additional insurances these insurances provided by the Employer
(and to insurances generally) are detailed in
the insurance schedule attached as section
C1.4 to the contract (“the insurance
Schedule)
84.2 The minimum limit of indemnity for As stated in C1.4
insurance in respect of loss of or
damage to property (except the works,
Plant, Materials and Equipment) and
liability for bodily injury to or death of a
person (not an employee of the
Contractor) caused by activity in
connection with this contract for any
one event is
84.2 The minimum limit of indemnity for As stated in C1.4
insurance in respect of death of or
bodily injury to employees of the
X5 Sectional Completion Completion of installation, commissioning and
handover of each unit.
X7 Delay damages (but not if Option X5
is also used)
X7.1 Delay damages for Completion of Amount per day is 0.05% of the contract value,
each section of the works are up to the maximum of 10% of the contract value
X7.1 Delay damages for Completion of the Amount per day is 0.05% of the contract value,
whole of the works are up to the maximum of 10% of the contract value
X13 Performance bond
X13.1 The amount of the performance bond 5% of Contract value excluding VAT.
is
X16 Retention (not used with Option F)
X16.1 The retention percentage is 5%
X18 Limitation of liability
X18.1 The Contractor’s liability to the Nil - Neither Party is liable to the other for
loss is limited to: including but not limited to loss of profit,
loss of income or loss of revenue
X18.2 For any one event, the Contractor’s Total of the losses incurred and/or repairs to the
liability to the Employer for loss of or damages caused
damage to the Employer’s property is
limited to:
X18.3 The Contractor’s liability for Defects Total of the losses incurred and/or repairs to the
damages caused due to his design which are not listed
on the Defects Certificate is limited to
X18.4 The Contractor’s total liability to the The Contractor’s total direct liability to the
Contractor’s risks
loss of or damage to property (other than the
works, Plant and Materials),
death of or injury to a person;
damage to third party property; and
infringement of an intellectual property right
X18.5 The end of liability date is (i) 5 years after the defects date for latent
(ii) the date on which the liability in question
prescribes in accordance with the
Prescription Act No. (as amended
or in terms of any replacement legislation)
for any other matter.
rectified by the Contractor at the Contractor’s own costs.
Z4 Extending the defects date:
Add the following as a new clause 46:
Z4.1 If the Employer cannot use the works due to a Defect, which arises after Completion and
before the defects date, the defects date is delayed by a period equal to that during which
the Employer, due to a Defect, is unable to use the works.
Z4.2 If part of the works is replaced due to a Defect arising after Completion and before the
defects date, the defects date for the part of the works which is replaced is delayed by a
period equal to that between Completion and the date by when the part has been replaced.
Z4.3 The Project Manager notifies the Contractor of the change to a defect date when the delay
occurs. The period between Completion and an extended defects date does not exceed
twice the period between Completion and the defects date stated in the Contract Data.
Z5 Termination
Z5.1 Add the following to core clause 91.1, at the second main bullet, fifth sub-bullet point, after
the words “assets or”: “business rescue proceedings are initiated, or steps are taken to initiate
business recue proceedings”.
Z6.1 The Contractor shall not cede, delegate or assign any of its rights or obligations to any
person without the written consent of the Employer, which consent shall not be
unreasonably withheld. This clause shall be binding on the liquidator/business rescue
practitioner /trustee (whether provisional or not) of the Contractor.
Z6.2 The Employer may cede and delegate its rights and obligations under this contract to any
person or entity.
Z7 Joint and several liability
Insert the following new clause as Option X18.6:
Z7.1 The Employer's liability to the Contractor for the Contractor's indirect or consequential loss is
limited to R0.00
Z7.2 Notwithstanding any other clause in this contract, any proceeds received from any insurances
or any proceeds which would have been received from any insurances but for the conduct of
the Contractor shall be excluded from the calculation of the limitations of liability listed in the
contract
Z8 Cession, delegation and assignment
Z8.1 The Contractor shall not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer, which consent shall not be unreasonably withheld.
This clause shall be binding on the liquidator/business rescue practitioner /trustee (whether
provisional or not) of the Contractor
Z8.2 The Employer may cede and delegate its rights and obligations under this contract to any
person or entity
Z9 Joint and several liability
Z9.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two
or more persons, these persons are deemed to be jointly and severally liable to the Employer
for the performance of the Contract.
Z9.2 The Contractor shall, within 1 week of the Contract Date, notify the Project Manager and the
Z10.1.1 not to give any offer, payment, consideration, or benefit of any kind, which constitutes or could be
construed as an illegal or corrupt practice, either directly or indirectly, as an inducement or reward
for the award or in execution of this contract;
Z10.1.2 to comply with all laws, regulations or policies relating to the prevention and combating of bribery,
corruption and money laundering to which it or the Employer is subject, including but not limited to
the Prevention and Combating of Corrupt Activities Act, .
Z10.2 The Contractor’s breach of this clause constitutes grounds for terminating the Contractor’s
obligation to Provide the Works or taking any other action as appropriate against the Contractor
(including civil or criminal action). However, lawful inducements and rewards shall not constitute
grounds for termination.
Z10.3 If the Contractor is found guilty by a competent court, administrative or regulatory body of
participating in illegal or corrupt practices, including but not limited to the making of offers (directly
or indirectly), payments, gifts, gratuity, commission or benefits of any kind, which are in any way
whatsoever in connection with the contract with the Employer, the Employer shall be entitled to
terminate the contract in accordance with the procedures stated in core clause 92.2. the amount
due on termination is A1.
Z11 Confidentiality
Z11.1 All information obtained in terms of this contract or arising from the implementation of this contract
shall be treated as confidential by the Contractor and shall not be used or divulged or published to
any person not being a party to this contract, without the prior written consent of the Project
Contractor at the time of disclosure (evidenced by written records in existence at that time);
Z11.4 The taking of images (whether photographs, video footage or otherwise) of the works or any
portion thereof, in the course of Providing the Works and after Completion, requires the prior
written consent of the Project Manager. All rights in and to all such images vests exclusively in
the Employer
Z11.5 The Contractor ensures that all his Subcontractors abide by the undertakings in this clause.
Z12 Employer’s Step-in rights
Z12.1 If the Contractor defaults by failing to comply with his obligations and fails to remedy such
default within 2 weeks of the notification of the default by the Project Manager, the Employer,
without prejudice to his other rights, powers and remedies under the contract, may remedy the
default either himself or procure a third party (including any subcontractor or supplier of the
Contractor) to do so on his behalf. The reasonable costs of such remedial works shall be borne
by the Contractor
Z12.2 The Contractor co-operates with the Employer and facilitates and permits the use of all required
information, materials and other matter (including but not limited to documents and all other
drawings, CAD materials, data, software, models, plans, designs, programs, diagrams,
evaluations, materials, specifications, schedules, reports, calculations, manuals or other
documents or recorded information (electronic or otherwise) which have been or are at any time
prepared by or on behalf of the Contractor under the contract or otherwise for and/or in
connection with the works) and generally does all things required by the Project Manager to
achieve this end.
Z13 Liens and Encumbrances
Z13.1 The Contractor keeps the Equipment used to Provide the Services free of all liens and other
encumbrances at all times. The Contractor, vis-a-vis the Employer, waives all and any liens
which he may from time to time have, or become entitled to over such Equipment and any part
thereof and procures that his Subcontractors similarly, vis-a-vis the Employer, waive all liens
they may have or become entitled to over such Equipment from time to time
Z14 Intellectual Property
Z14.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design, copyright,
trademark, trade name, trade secret or other intellectual or industrial property right relating to
the Works.
Z14.2 IP rights remain vested in the originator and shall not be used for any reason whatsoever other
than carrying out the works.
Z14.3 The Contractor gives the Employer an irrevocable, transferrable, non-exclusive, royalty free
licence to use and copy all IP related to the works for the purposes of constructing, repairing,
demolishing, operating and maintaining the works
Contract Data (Employer) C1.2a
Z14.4 The written approval of the Contractor is to be obtained before the Contractor's IP made
available to any third party which approval will not be unreasonably withheld or delayed. Prior
to making any Contractor's IP available to any third party the Employer shall obtain a written
confidentiality undertaking from any such third party on terms no less onerous than the terms
the Employer would use to protect its IP
Z14.5 The Contractor shall indemnify and hold the Employer harmless against and from any claim
alleging an infringement of IP rights (“the claim”), which arises out of or in relation to:
Z14.5.1 the Contractor’s design, manufacture, construction or execution of the Works
Z14.5.2 the use of the Contractor’s Equipment, or
Z14.5.3 the proper use of the Works.
Z14.6 The Employer shall, at the request and cost of the Contractor, assist in contesting the claim and
the Contractor may (at its cost) conduct negotiations for the settlement of the claim, and any
litigation or arbitration which may arise from it.
Z16 Dispute resolution:
Z16.1 Appointment of the
a dispute arises, from the Panel
of Adjudicators below. The Name Location Contact details
referring party nominates an (phone & e mail)
Adjudicator, which nomination is Adv. Ghandi Badela Gauten +27 11 282 3700
either accepted or rejected by the g [email protected]
other party. In the instance of a Mr. Errol Tate Pr. Durban +27 11 262 4001
rejection of the nominated Eng. [email protected]
Adjudicator, the referring Party Adv. Saleem Gauten +27 11 535-1800
refers the appointment deadlock Ebrahim g [email protected]
to the Chairman of the .za
Johannesburg Bar Council, who Mr. Sebe Msutwana Gauten +27 11 442 8555
appoints an Adjudicator listed in Pr. Eng. g [email protected]
the Panel of Adjudicators below Mr. Sam Amod Gauten [email protected]
g
The Parties appoint the Adv. Sias Ryneke Gauten 083 653 2281
Adjudicator under the NEC3 SC g [email protected]
Adjudicator’s Contract, April o.za
2013 Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z16.2 Appointment of the Arbitrator
Contract Data (Employer) C1.2a
a dispute arises from the Panel
of Arbitrators below. The Name Location Contact details
referring party nominates an (phone & e mail)
Arbitrator, which nomination is Adv. Ghandi Badela Gauteng +27 11 282 3700
either accepted or rejected by [email protected]
the other party. In the instance of Mr. Errol Tate Pr. Durban +27 11 262 4001
a rejection of the nominated Eng. [email protected]
Arbitrator, the referring Party Adv. Saleem Gauteng +27 11 535-1800
refers the appointment deadlock Ebrahim [email protected].
to the Chairman of the za
Johannesburg Bar Council, who Mr. Sebe Msutwana Gauteng +27 11 442 8555
appoints an Arbitrator listed in Pr. Eng. [email protected]
the Panel of Arbitrators below Mr. Sam Amod Gauteng [email protected]
Adv. Sias Ryneke Gauteng 083 653 2281
o.za
Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z17 Notification of a compensation event
Z17.1 Delete “eight weeks” in clause 61.3 and replace with “four weeks”. Delete the words “unless the
event arises from the Project Manager or the Supervisor giving an instruction, issuing a certificate,
changing an earlier decision or correcting an assumption.
Z18 BBBEE Certificate
Z18.1 The Contractor shall be expected to annually present a compliant BEE Certificate. Failure to do
adhere to these requirements shall be considered a material breach of the conditions of this
For use with the NEC3 Engineering & Construction Contract (June 2005)
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X13: Performance Bond
Each of these secondary Options requires a bond or guarantee “in the form set out in the Works
Information”. Pro forma documents for these bonds and guarantees are provided here for convenience
but are to be treated as part of the Works Information.
Option X16: Retention (not used with Option F)
receives and accepts a Retention Money Guarantee exactly in the form stated he will instruct the Project
Manager not to assess any amount be retained in terms of secondary Option X16.
Pro forma Performance Bond – Demand Guarantee (for use with
Option X13)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Bond / Guarantee)
[Insert Contractor’s name and registered address] Bank reference No.
Date:
Performance Bond – Demand Guarantee for [insert name of Contractor] required in terms of contract
[insert Contractor’s contract reference number or title]
In this Guarantee the following words and expressions shall have the following meanings: -
1.1 “Bank” means [Insert name of Bank], [●] Branch, Registration No. [●]
1.2 “Bank’s Address” means [Insert physical address of Bank]
1.3 “Contract” means the written agreement relating to providing the works, entered into
between the Employer and the Contractor, on or about the [●] day of
[●] 20[●] (Contract Reference No. [●]) as amended, varied, restated,
novated or substituted from time to time;
1.4 “Contractor” means [●] a company registered in accordance with the laws of [●] under
Registration No [●].
1.5 “Employer” means Airports Company South Africa SOC Limited a company registered in
accordance with the laws of the Republic of South Africa under
Registration Number 1993/004149/30
1.6 “Expiry Date” means the earlier of
the date that the Bank receives a notice from the Employer stating that
all amounts due from the Contractor as certified in terms of the
contract have been received by the Employer and that the Contractor
has fulfilled all his obligations under the Contract, or
the date that the Bank issues a replacement Bond for such lesser or
higher amount as may be required by the Employer.
1.7 “Guaranteed Sum” means 10% of contract value excluding VAT which must be submitted within
10 working days from notification of award
1.8 “works” means Replacement of Split Units at OR Tambo International Airport as
set out in the Section C3, Works Information
At the instance of the Contractor, we the undersigned ______________ and ______________, in our
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto, confirm
that we hold the Guaranteed Sum at the disposal of the Employer as security for the proper performance by
the Contractor of all of its obligations in terms of and arising from the Contract and hereby undertake to pay to
the Employer, on written demand from the Employer received prior to the Expiry Date, any sum or sums not
exceeding in total the Guaranteed Sum.
Forms of Sureties C1.3
A demand for payment under this guarantee shall be made in writing at the Bank’s address and shall:
be signed on behalf of the Employer by a director of the Employer;
state the amount claimed (“the Demand Amount’);
state that the Demand Amount is payable to the Employer in the circumstances contemplated in the Contract.
not as surety and the Bank’s obligation/s to make payment:
is and shall be absolute provided demand is made in terms of this bond in all circumstances; and
is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
The Bank’s obligations in terms of this Guarantee:
Sum; and
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the
advising us and without affecting our liability under this Guarantee. This includes, without limitation, any
extensions, indulgences, release or compromise granted to the Contractor or any variation under or to the
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
shall expire on the Expiry Date until which time it is irrevocable;
is, save as provided for in Error! Reference source not found. above, personal to the Employer and is neither n
egotiable nor transferable;
shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry hereof;
shall be regarded as a liquid document for the purpose of obtaining a court order; and
shall be governed by and construed in accordance with the law of the Republic of South Africa and shall be
subject to the jurisdiction of the Courts of the Republic of South Africa.
will be invalid and unenforceable if any claim which arises or demand for payment is received after the Expiry
C1.4 Insurance Schedule
passenger terminals, perimeter gatehouses and cargo buildings.
Insurance Clauses C1.4
Section b: insurance clauses
Awarded contract value does not exceed r150 million, and the
Instruction period does not exceed 36 months, and the defects
Liability period does not exceed 24 months
and to the extent relevant to the Contract.
1.1 Notwithstanding anything elsewhere contained in this Contract and without limiting the obligations,
liabilities or responsibilities of the Contractor in anyway whatsoever (including but not limited to any
requirement for the provision by the Contractor of any other insurances) the Employer shall effect and
maintain for the duration of the construction and maintenance periods of the Contract – as appropriate in
the joint names of the Employer, the Contractor and where relevant Sub-Contractors the following
insurances which are subject to the terms, limits, exceptions and conditions of the Policy:
a) Contract Works/Contractors Public Liability/ Removal Of Lateral Support Liability
Section 1 Of The Policy – Contract Works
which is in a defective condition due to defect in design, plan specification, material or workmanship.
This insurance contains the following limitations and warrantees;
rain, inundation or flood, Insurers liability shall be limited in respect of the aggregate length of open trenches at any one
time to 2,500 meters.
Exposed Layer Works (applicable to works involving paving, roadways, bulk earthworks and runways and
taxiways)
In respect of loss or damage to Exposed Layer Works relating to paving, roadways and runways (including taxiways)
caused directly or indirectly by rain, inundation or flood, Insurers liability shall be limited in respect of the aggregate
length of Exposed Layer Works at any one time to 2,500 meters.
Section II of the Policy – Contractors Public Liability
of or injury to persons and/or loss of or damage to property(other than the Works the subject matter of this
Contract) arising from the execution of the Contract with a limit of indemnity of R100,000,000 in respect of
any one occurrence or series of occurrences consequent on or attributable to one source or original cause.
Section III of the Policy – Removal Of Lateral Support Liability
Insurance Clauses C1.4
description whatsoever.
The SASRIA Contract Works policy is limited to R500,000,000 (Incl VAT) in the aggregate during the policy
period of insurance.
http://www.sasria.co.za/ which notes the covers and policy exclusions.
c) Aviation Liability Insurance which provides indemnity against legal liability in the event of accidental
death of or injury to persons and/or loss of or damage to property (other than the Works the subject matter
of this Contract) arising from the execution of the Contract with a limit of indemnity of R2,000,000,000 in
respect of any one occurrence or series of occurrences consequent on or to one source or original cause.
d) Design & Construct Professional Indemnity Insurance which provides indemnity against legal liability
to pay compensation as a result of any actual or alleged negligent act, error or omission in the performance
of the Professional Duties of the insured and arising from the execution of this project. The limit of indemnity
under this insurance shall be *R25,000,000 in the aggregate during the annual policy period of
insurance that ACSA effect such cover during the policy period from 1 April to 31 March during each
policy period of insurance.
*The limits of indemnity applies to all ACSA contracts as a whole and does not apply specifically to this
contract. The aggregate limit could be exhausted by claims under other ACSA contracts and there is no
guarantee that this insurance cover will provide sufficient cover to this specific contract should the aggregate
limit be exhausted.
a) Labour and construction work which would normally be the responsibility of the building or engineering
contractor.
b) Supervision of the construction works usually undertaken by a building or engineering contractor.
Insurance Clauses C1.4
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
1 Jones Road - Kempton Park - Ekhuruleni - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
13 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 4 463 438
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.