Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
01 Maxwell Drive - Sunninghill - Sandton - 2109
Organization Type
GOVERNMENT
Published
29 Oct 2026
OCDS Reference
ocds-9t57fa-176325
ESKOM requires a five-year support and maintenance contract covering its data centres, server rooms and portable modular data centres (pmdc), advertised nationally under reference e3770cxmwp. Bids are accepted only through eskom's etendering portal, and a valid csd number is required before the portal can be accessed. The most consequential consideration for bidders is that the bid must be uploaded, named, assigned to the correct category and finalised electronically before the closing time of 27 november 2026 at 08:00 (utc), after which the portal records a submission timestamp and emails a submission ID that must be kept for any later enquiry.
Scope and duration: support and maintenance of data centres, server rooms and portable modular data centres (PMDC) for a period of 5 years, reference E3770CXMWP.
Submission channel: electronic submission only through Eskom's eTendering portal (https://eTendering.eskom.co.za); tenders are advertised on the Tender Bulletin (https://tenderbulletin.eskom.co.za), which links to the portal. Physical delivery to Eskom tender offices is no longer used.
CSD registration: a valid CSD number is mandatory to gain access to the eTendering portal and to submit; registered details, including the CSD number, must be kept current.
Closing: 27 November 2026 at 08:00 (UTC). The portal stamps the date and time only once the submission is finalised, so an unfinalised upload will not register as a bid.
Upload limits and categorisation: each file may not exceed 50 MB and all uploaded files together may not exceed 900 MB; every file must be named and assigned to the correct category (for example technical, commercial or finance).
Finalisation and proof of submission: click Finalise Submission, then Finalise and Close Submission; keep the confirmation email listing the submitted documents, as it carries the submission ID needed for later enquiries.
Enquiries: difficulties with the Tender Bulletin, eTendering or OpenText systems must be raised with the Eskom buyer responsible for the published tender.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 27 November 2026 - 10:00
Venue
https://teams.microsoft.com/meet/3845893786421376?p=2jousI12BLUI6TXy2h
Categories
Request for Proposal
01 Maxwell Drive - Sunninghill - Sandton - 2109
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Description
29 Oct
2026
Tender Published
Tender was published
27 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253698 CQP Template 2021 -Annexure V.docx
Provision of data centers, server rooms and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years, issued by ESKOM on a national basis. The contract requires the supplier to deliver maintenance and support services for data center infrastructure, with a strong emphasis on quality management through a Contract Quality Plan (CQP) aligned with SANS 466:2005 / ISO 10005:2005.
20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdf
Eskom requires the provision of data centres, server rooms and portable modular data centres (PMDC) support and maintenance for a period of five years. The contract includes quality management system requirements and the submission of a draft contract quality plan.
E-tendering Help Manual for supplier - Annexure L.docx
Eskom requires a five-year support and maintenance contract covering its data centres, server rooms and portable modular data centres (PMDC). Bids are submitted electronically through Eskom's eTendering portal rather than at tender offices.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom requires a five-year contract for the support and maintenance of data centres, server rooms, and portable modular data centres (PMDCs) nationwide. The contract will be governed by Eskom's Supplier Quality Management specification, which mandates a quality management system aligned to ISO 9001 and requires bidders to submit quality documentation according to a specified category.
Server rooms maintenance contract_TEC -Annexure X.xlsx
Provision of Data Centers, Server Rooms and Portable Modular Data Centres (PMDC) support and maintenance contract for a period of 5 years. The contract covers preventive maintenance, repairs, and parts supply for server rooms and PMDCs across Eskom's operations in Gauteng. Bidders must demonstrate experience, OEM partnerships, technical staff certifications, and service delivery capability.
Group Technology SHE Tender Requirements Low Risk Proffessional Services Contracts.docx
Eskom requires a five-year support and maintenance contract for data centres, server rooms, and portable modular data centres (PMDCs) in Gauteng. Bidders must comply with comprehensive safety, health, and environmental (SHE) requirements, including an OHS plan, risk assessments, and statutory appointments.
20260409 _DataCentre&Servermntnce support-GIT- Form A_Cat 2 -Annexure W.docx
Eskom is procuring a five-year support and maintenance contract for its data centres, server rooms, and portable modular data centres (PMDCs). The contract covers the provision of these services and requires the successful bidder to comply with Eskom's Supplier Quality Requirements as specified in specification 240-105658000 and the ISO 9001 standard.
Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docx
Eskom requires a five-year contract for the support and maintenance of data centres, server rooms, and portable modular data centres (PMDCs). The tender includes extensive supplementary terms covering data security, ownership, availability, retention, disaster recovery, and service levels. Bidders must respond to detailed questions on security practices, data location (with a preference for South Africa), and must comply with stringent audit and indemnification requirements.
Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf
Eskom requires support and maintenance services for its data centers, server rooms, and portable modular data centres (PMDCs) under a five-year contract. The tender is open nationally, with a closing date of 27 November 2026 at 10:00 SAST.
Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdf
Eskom requires a five-year contract for the support and maintenance of its data centres, server rooms, and portable modular data centres (PMDCs). The service provider will be responsible for incident resolution, maintenance, and reporting, with performance measured against defined key performance indicators (KPIs) and subject to penalties for non-compliance.
Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf
Eskom Holdings SOC Ltd is procuring a five-year support and maintenance contract for data centres, server rooms and portable modular data centres (PMDCs) nationally. The contract will be governed by the NEC Term Services Contract (TSC3) and the Eskom Master Services Agreement, with a 90/10 preferential point scoring system for evaluation.
Occupational Health and Safety Act Section 37(2)Agreement Form - Rev 7 -Annexure S.docx
Provision of support and maintenance for data centres, server rooms and portable modular data centres (PMDC) for Eskom under a five-year contract. The scope is delivered by a contractor that carries employer duties under the Occupational Health and Safety Act No. 85 of 1993.
PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc
Provision of support and maintenance for data centres, server rooms and portable modular data centres (PMDC) to Eskom Holdings SOC Ltd and its subsidiaries, under a contract period of five years, nationally. Bidders must complete Eskom's PAYE questionnaire so that the correct tax classification and withholding treatment can be applied to contract payments.
Annexure B -Annexure Q.docx
Eskom requires a five-year support and maintenance contract for its data centres, server rooms, and portable modular data centres (PMDCs) in Gauteng. The successful bidder must align its processes with Eskom's OHS requirements and manage its subcontractors' compliance. Closure is at 10:00 on 27 November 2026.
E-Tenderers E-Tendering Training Acknowledgement Form -Annexure M.docx
Provision of support and maintenance services for data centers, server rooms, and Portable Modular Data Centres (PMDCs) under a five-year contract. The procurement is issued by Eskom in Gauteng, with a closing date of 27 November 2026 at 10:00.
Data Center Support Costing Schedule v0.3 - Annexure G.xlsx
Eskom requires a five-year contract for the support and maintenance of data centers, server rooms, and portable modular data centres (PMDCs) across multiple sites nationally. The scope includes monthly, quarterly, and six-monthly maintenance of generators, UPS systems, HVAC, fire detection, and other infrastructure, plus ad hoc repairs and server relocations. Bidders must complete a detailed pricing schedule for each site, with prices in ZAR excluding VAT.
SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docx
Eskom requires a 5-year support and maintenance contract for data centers, server rooms, and portable modular data centres (PMDCs). The contract is subject to preferential procurement scoring (90/10 or 80/20) and includes mandatory subcontracting, local procurement, skills development, and B-BBEE improvement obligations.
NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc
Eskom requires a five-year support and maintenance contract for its data centres, server rooms, and portable modular data centres (PMDCs), governed by the NEC3 Professional Services Contract (PSC3). The contract covers scheduled maintenance, ad hoc repairs and installations, and server relocations across all regions.
SOW_Data Center and server rooms national contract - Annexure N.pdf
Eskom requires a five-year support and maintenance contract for data centers, server rooms, and portable modular data centres (PMDCs) across its national sites. The scope covers all components including UPS, generators, HVAC, fire systems, electrical distribution, and monitoring systems, with maintenance at monthly, quarterly, and six-monthly intervals. The contract is divided into four regional clusters, and no single service provider may be awarded more than one cluster.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This specification defines the minimum quality requirements for all existing and potential Eskom suppliers, and the quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment, and auditing of suppliers. Eskom seeks to partner with suppliers who demonstrate commitment to developing, implementing, and maintaining a quality management system conforming to ISO 9001. The specification applies to all Eskom Holdings SOC Ltd divisions, subsidiaries, suppliers, and sub-suppliers, and forms part of all RFI/RFQ/RFP and contracts for procurement of products and services.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 27 November 2026 at 08:00 (from tender record). No other dates are stated in the document.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific contacts are provided in the document. The department is Supply Chain Management.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents: complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). Submit the quality documentation listed in the List of Tender Returnables (240-12248652). The specific category (1, 2, 3, or 4) determines which documents are required. Submit all documents with the bid; failure to include required quality documentation may disqualify the bid.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality assessment criteria are selected by an Eskom Quality representative and specified in Form A. Bidders must acknowledge and accept Eskom Supplier Quality requirements by completing and signing Form A. Depending on the category, bidders must submit a valid ISO 9001 certificate (or applicable QMS certificate) from an accredited certification body, or objective evidence of a developed, implemented, and maintained QMS complying with ISO 9001. Eskom may perform capability and capacity assessments prior to contract award, particularly for high-risk or critical plant items. Sub-suppliers must also meet the same quality management requirements.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification applies to all Eskom Holdings SOC Ltd divisions, subsidiaries, suppliers, and sub-suppliers, and forms part of all RFI/RFQ/RFP and contracts for procurement of products and services. Suppliers must develop, implement, maintain, and continually improve a quality management system (QMS) based on ISO 9001. The QMS must conform to the latest ISO 9001 standard or any applicable standard of QMS. Suppliers must comply with the requirements of this specification throughout the duration of the contract.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality control plans (QCP) and inspection and test plans (ITP) must clearly describe the equipment and location(s) for each activity, identify quality verification activities and stages, and reference the procedures, standards, and method statements to be used. The supplier must develop a preservation programme records management process in compliance with Eskom information management requirements, ensuring generation, maintenance, and ready access by Eskom to all preservation programme records. The supplier must deploy a documented programme for identification of all physical asset pre-operation preservation of quality requirements, covering bulk materials, consumable items, equipment systems, and components.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality audits and related quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures. Personnel performing special processes (e.g., NDE, welding, coating, heat treatment) must be suitably qualified and, where applicable, registered with statutory bodies. Personnel must be certified competent through a certificate of competency in accordance with internal training management procedures or an external certification body (e.g., NDT) through an accredited service provider as per SETA requirements. All personnel who perform activities that affect quality must have their training needs identified and documented, and training certificates must meet SETA requirements.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality management system requirements: The supplier and sub-suppliers must develop, implement, maintain, and improve a formal QMS conforming to the latest ISO 9001 standard or applicable standard. The QMS must include documented information such as a quality manual, quality plans, work procedures, work instructions, method statements, and workflow documentation. Unless excluded by the quality category, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. The supplier must inform Eskom of any proposed changes to the QMS or staff that affect the quality system prior to implementation. The main supplier must develop and implement a performance management programme for sub-suppliers, including verification of QMS, audits, surveillances, assessment of CQPs, review of QCPs, NC and defect management, inspection and test plans, and risk management.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfNo pricing schedule information is provided in the document.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific financial requirements are stated in the document.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)ISO 9001 certification (or applicable QMS certificate) from an accredited certification body is required, unless specifically excluded by the quality category. Bidders must submit a valid copy of ISO 9001 or applicable QMS certificate. Bidders must complete and sign Form A. Bidders must submit quality documentation as per the List of Tender Returnables (240-12248652). Sub-suppliers must also comply with the same quality management requirements. B-BBEE: Minimum Level 1 (from currentAnalysis, but not confirmed in the document).
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfThe specification references the Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) and IAEA Safety Standard GS-R-3.1. No specific health and safety requirements are detailed in the document.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPreservation requirements: The supplier must implement a preservation management programme covering valves, electrical motors, mechanical and rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation, and other materials. Special precautions include periodic shaft rotation, engine turnover, and lubrication. Preservation requirements must be documented in purchase orders and work authorisations. Sub-supplier input into preservation protocols must be documented. Preservation responsibilities must be clearly defined within the project team and at all work locations. Eskom must have free and unrestricted access to all preservation records for inspection and audit.
Compliance Requirements
Source: Occupational Health and Safety Act Section 37(2)Agreement Form - Rev 7 -Annexure S.docx (unknown)Occupational Health and Safety Act obligations
Important Dates
Source: PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc (unknown)Pack validity
Contact Information
Source: PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc (unknown)Group Tax
Submission Guidelines
Source: PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc (unknown)Pack selection
Completion and return
Consequence of non-submission
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc (unknown)Purpose: the pack classifies the contractor for employees' tax as an independent contractor, personal service provider, labour broker or dependent contractor.
Company / CC / trust (Pack A)
Individual (Pack B)
Financial Requirements
Source: PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc (unknown)Tax withholding
Compliance Requirements
Source: PAYE Questionnaire for Service Contracts 2025_2026 -Annexure K.doc (unknown)Applicability
Contractor details required
Affidavits and declarations
Ongoing obligations
Description
Source: SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docxThe tender is for a support and maintenance contract for data centers, server rooms, and portable modular data centres (PMDC) for a period of 5 years. The evaluation includes specific goals (SDL&I) worth up to 10/20 points, added to price points, with the highest total winning.
Submission Guidelines
Source: SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docx (unknown)Returnable documents:
Submission method: Not specified in the document.
Closing time: 08:00 (from tender record).
Evaluation Criteria
Source: SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docx (unknown)Evaluation is based on the 90/10 or 80/20 preference point system. Specific goals (SDL&I) carry a maximum of 10 points (90/10) or 20 points (80/20). Price carries 90 or 80 points. The contract is awarded to the tenderer scoring the highest total points, rounded to two decimal places.
B-BBEE status level points (90/10 system): Level 1: 10, Level 2: 9, Level 3: 6, Level 4: 5, Level 5: 4, Level 6: 3, Level 7: 2, Level 8: 1, Non-compliant: 0.
B-BBEE status level points (80/20 system): Level 1: 20, Level 2: 18, Level 3: 14, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, Non-compliant: 0.
Objective criteria (NIPP and mandatory subcontracting) are not scored but are conditions for contract award. Failure to meet them may lead to the second-ranked tenderer being recommended.
Tenderers who do not provide documentation for preference points will not be disqualified but will score 0 for specific goals and only score out of 90/80 for price.
Technical Specifications
Source: SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docx (unknown)Scope: Provision of support and maintenance for data centers, server rooms, and portable modular data centres (PMDC).
Contract duration: 5 years.
Specific goals (SDL&I) include:
Financial Requirements
Source: SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docx (unknown)Retention: Eskom will retain 2.5% of every invoice amount (excluding VAT) for failure to submit SDL&I performance reports biannually or failure to meet SDL&I obligations. Retained amounts released upon positive compliance results.
Mandatory subcontracting: Where feasible, 30% subcontracting for cumulative task orders/purchase orders above R30 million, to EMEs or QSEs that are at least 51% black owned (including youth, women, disabled, rural/township, military veterans, cooperatives). Subcontracting is a condition for award. A supplier may not subcontract more than 25% of contract value to an entity with a lower B-BBEE status unless it is an EME with capability.
Compliance Requirements
Source: SDL&I Template for Bidders - Data centre_Server rooms_PMDC v0.1 - Annexure P.docx (unknown)CSD registration: Required (Central Supplier Database).
Tax clearance: Valid SARS TCS or tax pin required.
B-BBEE: Valid B-BBEE certificate or sworn affidavit required (original signature; electronic signatures not accepted).
NIPP: If imported content is USD 5 million or more, the winning bidder must sign a NIPP obligation agreement with the dtic before signing the Eskom contract.
B-BBEE improvement plan: Must be submitted within 30 days of contract signing.
Sworn affidavit validity requirements: deponent name and ID number, designation, enterprise name and address, percentage of black ownership, total revenue and basis, financial year end, B-BBEE status level, empowering supplier status, same date for deponent and Commissioner of Oaths signatures, Commissioner must not be an employee or ex officio of the enterprise.
Description
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdfThis is a service-level agreement between Eskom Holdings SOC Limited and the Service Provider for the provision of Data Centre and Server Room facilities maintenance and upkeeping services. The SLA defines the scope, service levels, support, maintenance, and repairs within the Service Provider's mandate. It is effective upon signature by both parties and must be read together with the main contract documents. The SLA will be reviewed as and when required to accommodate changes or improvements identified within Eskom business.
Important Dates
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdf (unknown)Closing time: 07:30am (as per tender record; the SLA document itself does not state a closing date or time).
Evaluation Criteria
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdf (unknown)The document does not specify evaluation criteria such as scoring splits, minimum qualifying scores, or preference point systems. The SLA defines service performance management and penalties for non-achievement of KPIs, but no bid evaluation methodology is provided.
Technical Specifications
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdf (unknown)Scope of services: support, maintenance, and repairs of Data Centre and Server Room facilities, including upkeeping services. The SLA is between Eskom Holdings SOC Limited and the Service Provider, effective upon signature by both parties. The SLA must be read together with the main contract documents. Applicable standards and references include: Eskom Information Security Policy (32-85), Server Room RACI document (240-103185854), Eskom Server Rooms and Data Centres Standard (32-894), and ITIL best practices (informative).
Key Performance Indicators (KPIs) with targets:
Incident management: incidents logged manually or automatically to Eskom Group IT ITSM tool; measured 24x7. High priority incidents require progress feedback every 1 hour until resolved; standby resource after hours; Root Cause Analysis report within 10 business days from resolution. Hardware failing at threshold of 3 incidents per month related to same root cause replaced at no cost to Eskom.
Ad hoc project management: service requests or major changes involving multiple components managed as projects; Service Provider appoints a single point of contact; 100% of projects completed within agreed time frames; deviations not pre-agreed result in penalties at medium weighting.
Request fulfilment: request tickets indicate desired service or product; time measured during working day.
Problem management: problems analysed, workaround planned, change implemented; Root Cause Analysis report with recommended resolution within 10 days.
Change management: all changes affecting solution approved in writing by Eskom before implementation; 100% of change tickets implemented on agreed date/time; 5 working days written notice for service interruption during working day.
Reporting: monthly operational and SLA reports by 5th working day of month; weekly operational reports by Tuesday midday; reports available electronically via email or Eskom portal; data from audits not shared without Eskom written consent.
Service performance management: starts 3 months from service commencement; monthly measurement; Eskom may change service levels with 60 days notice; new KPIs proposed at least 60 days prior; changes not more than twice per calendar year.
Methodology
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdfAd hoc project management: service requests or major changes involving multiple components are managed as ad hoc projects. Service Provider works with Eskom's nominated main point of contact, appoints a project manager as single point of contact, attends kick-off and progress meetings, plans and manages activities, and deploys within mutually agreed time frames. Eskom approves the Project Implementation Plan and provides support and data. Implementation measured against targets in signed project proposal; 100% of projects must be completed within agreed time frames, deviations not pre-agreed result in penalties at medium weighting. Request fulfilment: request tickets indicate desired service or product; time measured during working day. Problem management: problems analysed, workaround planned, change implemented; Root Cause Analysis report with recommended resolution within 10 days. Change management: all changes affecting solution approved in writing by Eskom before implementation; 100% of change tickets implemented on agreed date/time; 5 working days written notice for service interruption during working day.
Quality Management
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdfService Provider responsibilities include delivering services as per scope of work, resolving all facility-related tickets, logging and managing changes, resolving incidents within agreed service levels, providing monthly service/operational/maintenance/SLA reports, and requesting change approval before maintenance/repairs affecting Group Technology services. Eskom responsibilities include reporting faults, informing Service Provider of environment changes, timely approval of billing files, and providing the ITSM tool platform. Monthly Service Review meetings are held between Group Technology and Service Provider, scheduled by Eskom. Service Provider must monitor and measure performance against service levels as per KPI summary, provide trend analysis with six-month view, and identify service-level breaches in reports. If SLA reports are not provided before due date, performance for that month is presumed failed.
Financial Requirements
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdf (unknown)Penalties for SLA breaches: calculated according to KPI weighting; high weighting penalty 5% of service bill; medium weighting 3% of service bill; low weighting no penalty; if multiple KPIs failed, total penalty not more than 10% of service bill. Penalties recoverable as credit note against reporting month's billable schedule.
Compliance Requirements
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in the SLA document. The SLA references Eskom policies and standards that the Service Provider must comply with, including the Eskom Information Security Policy and Server Rooms and Data Centres Standard.
Contractual Terms
Source: Service_Level_Agrement__between_Eskom_&_service_provider -Annexure T.pdfThe SLA is a formal agreement between Eskom and the Service Provider, binding upon signature. It defines service levels, KPIs, and remedies for non-achievement. Eskom may change, add, or delete service levels during the contract term with 60 days written notice; the Service Provider has 60 days to implement and report on new levels. New KPIs may be proposed by Eskom with at least 60 days prior notice, not more than twice per calendar year. The SLA is a dynamic document reviewed periodically. Service performance management starts 3 months from service commencement. If no SLA reports are provided before the due date, performance for that month is presumed failed. Eskom has the right to access Service Provider's service management software where Eskom data is hosted. Data from audits not shared without Eskom's written consent. The agreement constitutes the sole agreement between parties; variations require written confirmation and signature by both parties. Each signatory warrants authority to sign.
Description
Source: SOW_Data Center and server rooms national contract - Annexure N.pdfThe contract covers supply, maintenance and support of Data Center, Server Room and PMDC components for Eskom. Components include cooling, power management, environmental management, access control and monitoring systems. Maintenance routines per OEM requirements, with monthly, quarterly and six-monthly intervals. Also includes inspections, relocations, and supply/install of non-peripheral components on request. Sites are grouped into four clusters; bidders may tender for one or more clusters but can be appointed on only one.
Contact Information
Source: SOW_Data Center and server rooms national contract - Annexure N.pdf (unknown)End user / requestor: Wisani Makamu, Middle Manager – Data Center & Server Rooms Hosting Services (Acting). No email or telephone provided.
Submission Guidelines
Source: SOW_Data Center and server rooms national contract - Annexure N.pdf (unknown)Submission method and address not stated in the document. Returnable forms not listed in the document. Bidders must provide safety files upon award and prior to visiting Eskom sites.
Evaluation Criteria
Source: SOW_Data Center and server rooms national contract - Annexure N.pdf (unknown)No evaluation criteria stated in the document. Bidders must be able to provide safety files upon award and prior to site visits.
Technical Specifications
Source: SOW_Data Center and server rooms national contract - Annexure N.pdf (unknown)Scope of work: supply, maintain and support all Data Center, Server Room and PMDC components, including:
Methodology
Source: SOW_Data Center and server rooms national contract - Annexure N.pdfServer Rooms to be onboarded in a phased and staggered approach as existing contracts end. Sites grouped into clusters; bidders may tender for one or more clusters, but no single provider can be appointed on more than one cluster.
Quality Management
Source: SOW_Data Center and server rooms national contract - Annexure N.pdfMaintenance routines must be executed in accordance with best practice and OEM requirements. Regular maintenance intervals: monthly, quarterly, and six-monthly as specified. Reporting of anything out of the ordinary is required.
Compliance Requirements
Source: SOW_Data Center and server rooms national contract - Annexure N.pdf (unknown)Safety: vendor must provide safety files upon award and prior to visiting Eskom sites. No other compliance requirements stated.
Environmental
Source: SOW_Data Center and server rooms national contract - Annexure N.pdfEnvironmental management systems are part of the components to be maintained. No specific environmental requirements stated.
Description
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdfEskom requires support and maintenance of its data centres, server rooms and portable modular data centres (PMDC) under a 5-year contract. The RFP is an open invitation to tender issued free of charge, and the tender is for the whole of the contract.
Annexures issued with the RFP
Precedence and access
Important Dates
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Closing
Clarification meeting (non-compulsory)
Clarification queries
Tender validity
Contact Information
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Eskom Representative (all queries and clarifications)
Procurement Manager
Fraud and corruption reporting
Submission
Submission Guidelines
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Submission channel
Returnables that must be completed, signed and submitted by the closing time (failure disqualifies)
Returnables that do not disqualify if late or incomplete
Disqualification risks
Evaluation Criteria
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Evaluation stages
Preference point system
Functionality gatekeepers (pass/fail)
Price evaluation basis
Other
Technical Specifications
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Scope
Quality
Cataloguing
Local presence
Pricing Schedule
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdfPricing
Financial Requirements
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Pricing
Payment terms
Security for performance
Financial capacity
Other
Compliance Requirements
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdf (RFP)Mandatory
Eligibility exclusions
Other
Health & Safety
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdfSHE returnables required with the tender
Status
Contractual Terms
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdfContract
Payment
Security
Other
Section
Source: Request for Proposal (RFP)Data Centers Server Rooms and Portable Modular Data Centres.pdfFunctionality gatekeepers (pass/fail)
Functionality scoring
Price and preference points
Price evaluation adjustments
Not applicable
Description
Source: Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docxThis Schedule Q is a supplementary terms document for the RFP. It requires suppliers to respond to items covering agreement, data ownership, availability, storage, retention, security, data location, termination, service offering, disaster recovery, service levels, insurance, indemnification, risk assessment, supporting documentation, data protection, policies, reactive security, compliance, and e-discovery. Responses will be drafted into legally binding commitments.
Submission Guidelines
Source: Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docx (unknown)Returnable documents: complete and sign all mandatory forms, including SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign. Submit the completed Schedule Q with responses to all items, plus supporting documentation as listed (SOC attestations, DRP test results, architecture diagrams, security policies, etc.).
Evaluation Criteria
Source: Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docx (unknown)Bidders must be registered on the CSD and hold a valid tax clearance. Mandatory entry criteria: SOC 1 Type II and SOC 2 Type II attestation reports; if reports are older than six months, a bridge letter is required. Bidders must provide evidence of financial viability; Eskom may terminate if business rescue or liquidation occurs. Specific evaluation split and B-BBEE points are not stated in the extracted text.
Technical Specifications
Source: Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docx (unknown)The tender is for the provision of data centers, server rooms, and portable modular data centres (PMDC) support and maintenance for a 5-year period. The Schedule Q requires detailed responses on service offering, technology stack, availability, disaster recovery, and security. Eskom requires that all data be stored in a physically and logically secure environment, with backups and audit rights. Data must be stored in South Africa; offshoring is not permitted except as a mere conduit. The supplier must provide detailed service levels covering uptime, planned downtime, response times, and remedies including service credits.
Financial Requirements
Source: Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docx (unknown)Supplier must effect insurance at its own cost, including a cyber liability policy covering unauthorized access, data theft, hacker attacks, denial of service, and malicious code, as well as technology errors and omissions liability insurance and a commercial blanket bond. Eskom must be listed as an additional insured party. Supplier must provide quarterly financial condition reports; Eskom may terminate if financial wherewithal is insufficient.
Compliance Requirements
Source: Schedule Q 240-IT002 rev 4 latest_2024 - Annexure Y.docx (unknown)Bidders must be registered on the CSD and hold a valid tax clearance. Mandatory security certifications: SOC 1 Type II and SOC 2 Type II attestation reports (bridge letter if older than six months). Supplier must adhere to Eskom's data security requirements, including ISO 27001/2 or SOC/ISAE reports, annual penetration tests, and SAST/DAST results. Supplier must comply with Eskom's data retention and destruction policies, and provide a signed declaration of data destruction at contract end.
Description
Source: E-tendering Help Manual for supplier - Annexure L.docxEskom's eTendering system is a web-based platform that replaces the physical delivery of tender documents to Eskom tender offices. Suppliers upload their bids electronically rather than submitting them by hand. Registration is required before access is granted, and each login is confirmed with a one-time PIN sent to the supplier's cell phone and email address. The system also handles closed tenders — opportunities that are not published on the Tender Bulletin and are sent by email link to selected suppliers who meet the buyer's criteria.
Contact Information
Source: E-tendering Help Manual for supplier - Annexure L.docx (unknown)Enquiries
Submission Guidelines
Source: E-tendering Help Manual for supplier - Annexure L.docx (unknown)Submission channel
Registration and access
Uploading a bid
System notes
Compliance Requirements
Source: E-tendering Help Manual for supplier - Annexure L.docx (unknown)CSD registration
Description
Source: Server rooms maintenance contract_TEC -Annexure X.xlsxThe tender covers the provision of data centers, server rooms and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years.
Submission Guidelines
Source: Server rooms maintenance contract_TEC -Annexure X.xlsx (unknown)Returnable documents: proof of valid and legible registration with ECSA (Engineering Council of South Africa); a letter confirming the supplier's operational presence within the cluster for which they are submitting a tender; signed reference letters from clients on company letterhead; copy of SLA/KPI and client contact details; OEM partnership proof; spares/logistics plan with supplier SLAs and evidence of recent fulfilments; staff matrix with named resources, roles, certifications (with expiry), and CVs; completed National Treasury standard forms (SBD series) including declarations of interest, preference points, and independent bid determination.
Evaluation Criteria
Source: Server rooms maintenance contract_TEC -Annexure X.xlsx (unknown)Technical evaluation criteria (weighted, total 1.0):
Gatekeepers (mandatory):
Technical Specifications
Source: Server rooms maintenance contract_TEC -Annexure X.xlsx (unknown)Scope: Provision of data centers, server rooms and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years.
Key requirements:
Compliance Requirements
Source: Server rooms maintenance contract_TEC -Annexure X.xlsx (unknown)Proof of registration or accreditation with the respective Regulatory Body or Association (specifically ECSA registration).
National Treasury standard forms (SBD series) must be completed as part of the returnables.
Submission Guidelines
Source: Group Technology SHE Tender Requirements Low Risk Proffessional Services Contracts.docx (unknown)Returnable documents: Annexure B (Eskom requirement 32-726) must be completed and submitted with the tender. The 37-2 Agreement must be signed by the service provider and Eskom project manager at tender award.
Evaluation Criteria
Source: Group Technology SHE Tender Requirements Low Risk Proffessional Services Contracts.docx (unknown)Bidders must hold a valid Letter of Good Standing under the COID Act (or equivalent for international bidders). They must comply with Annexure B (Eskom requirement 32-726). They must provide a SHE policy and OHS documentation. They must make a Section 16(2) appointment and agree to the Section 37(2) agreement.
Technical Specifications
Source: Group Technology SHE Tender Requirements Low Risk Proffessional Services Contracts.docx (unknown)The scope of work is the provision of data centers, server rooms and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years. The tender is for professional services contracts with low risk SHE requirements.
Compliance Requirements
Source: Group Technology SHE Tender Requirements Low Risk Proffessional Services Contracts.docx (unknown)Bidders must provide a Letter of Good Standing under the COID Act (or equivalent for international bidders). They must provide a SHE policy and OHS documentation. They must make a Section 16(2) appointment and agree to the Section 37(2) agreement.
Evaluation Criteria
Source: Annexure B -Annexure Q.docx (unknown)Annexure B (Acknowledgement Form for Eskom OHS legal and other requirements) must be completed and signed by an authorised person (CEO, Director, or Managing Director) and witnessed by two witnesses. This form is part of the bid submission.
Compliance Requirements
Source: Annexure B -Annexure Q.docx (unknown)Bidders must comply with the following OHS documents when working at or rendering services to Eskom:
After contract award, the supplier must align its processes to Eskom's OHS requirements (policies, procedures, standards).
Penalties will be enforced on the main supplier for non-conformance to Eskom or statutory OHS requirements.
All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's induction.
The main contractor/supplier must:
Eskom may request testimonials/references and contact details of clients for similar work.
Description
Source: 20260409 _DataCentre&Servermntnce support-GIT- Form A_Cat 2 -Annexure W.docxThe tender is for the purchasing of data centre and server room support and maintenance services for a period of five years. The bidder must complete and sign Form A (Annexure W) to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Submission Guidelines
Source: 20260409 _DataCentre&Servermntnce support-GIT- Form A_Cat 2 -Annexure W.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 20260409 _DataCentre&Servermntnce support-GIT- Form A_Cat 2 -Annexure W.docx (unknown)Bidders must complete and sign the quality requirements form to confirm acceptance of Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001.
The bidder will be categorised under Category 2 as per clause 3.5.3 of the specification, which applies to the provision of data centre and server room support and maintenance.
No scoring split or minimum qualifying score is stated.
Technical Specifications
Source: 20260409 _DataCentre&Servermntnce support-GIT- Form A_Cat 2 -Annexure W.docx (unknown)Scope: Provision of support and maintenance for data centres, server rooms, and portable modular data centres (PMDC) for a period of five years.
The tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Category 2 applies (as per clause 3.5.3 of the specification) – the specific requirements of this category are not detailed in the available text.
Compliance Requirements
Source: 20260409 _DataCentre&Servermntnce support-GIT- Form A_Cat 2 -Annexure W.docx (unknown)Quality management: The bidder must accept and comply with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 standard.
The bidder must complete and sign the quality requirements form (Form A / Annexure W) to confirm acceptance.
No B-BBEE, CSD, tax, or CIDB requirements are stated in the available text.
Description
Source: E-Tenderers E-Tendering Training Acknowledgement Form -Annexure M.docxThe tender is for the provision of data centers, server rooms, and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years. No further description is provided in the available document.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form -Annexure M.docx (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form -Annexure M.docx (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period will render the tenderer non-responsive and disqualified from the procurement process. No other evaluation criteria are stated in the available document.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form -Annexure M.docx (unknown)The tender is for the provision of data centers, server rooms, and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years. No further technical specifications are provided in the available document.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form -Annexure M.docx (unknown)The bidder must complete and submit the E-Tendering Training Acknowledgement Form (Annexure M) as a mandatory compliance requirement. No other compliance requirements are stated in the available document.
Description
Source: Data Center Support Costing Schedule v0.3 - Annexure G.xlsxThe document is a pricing schedule (Annexure G) for a five-year support and maintenance contract for data centers, server rooms and portable modular data centres (PMDCs) at multiple Eskom sites. The schedule requires bidders to price monthly, quarterly, six-monthly and ad hoc maintenance services, plus server relocations, for each site over five years.
Submission Guidelines
Source: Data Center Support Costing Schedule v0.3 - Annexure G.xlsx (unknown)Returnable documents: none stated beyond the pricing schedule. The pricing schedule (Annexure G) must be completed with all green-highlighted cells filled in. Quoted prices must be in ZAR, excluding VAT and escalations. The currency must be selected from the drop-down list, and the applicable currency, rate of exchange (ROE) and ROE published date must be captured on the 'Currency sheet'. Exchange rate variations may not be claimed for the local mark-up. Contract price adjustment details must be provided in the specified column (Column AI).
Evaluation Criteria
Source: Data Center Support Costing Schedule v0.3 - Annexure G.xlsx (unknown)No evaluation criteria are stated in the available document. Bidders must complete the pricing schedule as the primary submission requirement.
Technical Specifications
Source: Data Center Support Costing Schedule v0.3 - Annexure G.xlsx (unknown)The pricing schedule covers maintenance and support for data centers, server rooms and portable modular data centres (PMDCs) at multiple Eskom sites. For each site, the following service categories are priced:
Sites listed include: Acacia, Ankerlig, Polokwane, Belville 1, Belville 2, Blackenbergvlei, Bloemfontein, Camden Power Station, Drakensberg Comms, Drakensberg Equipment, Durbanville, Duvha Power Station, Duvha ST, EAL, East London, and others.
Financial Requirements
Source: Data Center Support Costing Schedule v0.3 - Annexure G.xlsx (unknown)Prices must be quoted in ZAR, excluding VAT and escalations. The pricing schedule requires unit prices in the nominated currency and in ZAR, with totals per year for each of the five contract years. The contract price adjustment must be detailed in the specified column. Exchange rate variations may not be claimed for the local mark-up.
Description
Source: 240-109253698 CQP Template 2021 -Annexure V.docxThe Contract Quality Plan (CQP) template is used to help the supplier identify and plan for meeting the client's and contract's expectations and requirements for quality management.
Submission Guidelines
Source: 240-109253698 CQP Template 2021 -Annexure V.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-109253698 CQP Template 2021 -Annexure V.docx (unknown)Evaluation will consider the completeness and quality of the Contract Quality Plan (CQP) submitted. The CQP must demonstrate how the supplier will meet the client's quality expectations and requirements. The tenderer must show how quality management processes will be applied, including quality assurance, quality control, and risk management. The CQP must be approved by the owner of the organisation. The tenderer must indicate which scope of work categories apply and list suppliers/sub-suppliers with selection criteria. No specific scoring split or minimum qualifying score is stated.
Technical Specifications
Source: 240-109253698 CQP Template 2021 -Annexure V.docx (unknown)The tenderer must complete a Contract Quality Plan (CQP) template. The CQP must cover:
Compliance Requirements
Source: 240-109253698 CQP Template 2021 -Annexure V.docx (unknown)No specific compliance requirements are stated in the document.
Important Dates
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)Closing date: 27 November 2026 at 08:00 (SAST).
Contact Information
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)Enquiries and clarifications must be directed in writing to the Eskom Representative identified in the enquiry document. No other Eskom official may be approached.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)Submission method: paper only. Submit the complete original tender and one complete hard copy, each as a separate sealed package marked "ORIGINAL" and "COPY". If an electronic copy is requested, package it separately and mark it "ELECTRONIC COPY". Seal all packages together in an outer package marked "Confidential".
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)The tender is for the provision of data centers, server rooms and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years.
Quality Management
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdfQuality management requirements are not detailed in this document. Tenderers must provide proof of safety, health, environmental and quality (SHEQ) systems, policies and capabilities to Eskom's satisfaction by the deadline stipulated in the Enquiry. All SHEQ costs and personnel must be reflected in the tender.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdfPricing schedule:
Financial Requirements
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)Pricing format:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdf (TENDER)Eligibility:
Compliance with legislation:
CIDB:
Contract Skills Development Goals (CSDG):
Contract Participation Goals (CPG):
Health & Safety
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdfHealth and safety:
Contractual Terms
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdfTender validity:
Confidentiality:
Section
Source: Eskom - Standard Conditions of Tender (August 2024) - Annexure Y.pdfAdditional evaluation criteria:
Description
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.docThe contract is for the provision of Data Centers, Server Rooms and Portable Modular Data Centres (PMDC) support and maintenance for a period of 5 years, under an NEC3 Professional Services Contract.
Important Dates
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Closing date: 27 November 2026 at 08:00.
Contract start date: 1 August 2026 or soon thereafter.
Contract duration: 5 years from start date.
First programme for acceptance: within 1 week of the Contract Date.
Revised programmes: at intervals no longer than 2 weeks.
Quality policy statement and quality plan: within 4 weeks of the Contract Start Date.
SDL&I Implementation plan submission: to be confirmed prior to contract award.
SDL&I Key Dates: 60 days after the contract start date.
Defects date: 5 years after Completion of the whole of the services.
End of liability date: 5 years after Completion of the whole of the services/task order.
Contact Information
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Employer's Agent:
Employer (Eskom Holdings SOC Ltd):
No other contacts stated.
Submission Guidelines
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Returnable documents:
Submission method: not stated in the document.
Closing time: 08:00 on 27 November 2026 (per tender record).
Evaluation Criteria
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Evaluation is not detailed in the document. The contract is an NEC3 Professional Services Contract (PSC3) with main Option G (Term Contract) and dispute resolution Option W1.
Secondary options selected:
Bidders must accept these options as part of the contract.
Technical Specifications
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Scope: Data Center, Server Room and Portable Modular Data Centres (PMDC) support and maintenance contract for a period of 5 years.
Services include (from multiple currencies option X3):
No quantities or locations specified in the document.
Financial Requirements
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Pricing: Form of Offer and Acceptance requires the offered total of the Prices exclusive of VAT, VAT @ 15%, and inclusive of VAT.
Performance bond: 10% of the task order per year, reviewed annually (Option X13).
Parent company guarantee: required (Option X4).
Delay damages: 5% of the purchase order (Option X7).
Payment terms:
Limitation of liability:
Price adjustment: 85% adjustable, 15% non-adjustable, using SEIFSA/STATSSA tables.
Compliance Requirements
Source: NEC Professional Services Contract - Data Center, Server Room and PMDC - Annexure R.doc (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance.
B-BBEE requirements:
Insurance requirements (per Z12):
Nuclear liability: Employer indemnifies Consultant against nuclear damage, except for unlawful intent or unauthorised presence at Koeberg Nuclear Power Station.
Asbestos: Employer ensures ambient air conforms to South African asbestos standards; Consultant may stop work if asbestos is identified until area declared safe.
Description
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdfThe tender covers support and maintenance of data centers, server rooms and portable modular data centres (PMDC) for a 5-year period. Deliverables include monthly and quarterly maintenance report templates.
Contact Information
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdf (TENDER)Eskom representative: Lesego Garegae (Mbulelo Mncengani)
Date issued: 09 April 2026
Submission Guidelines
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdf (TENDER)Returnable documents (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdf (TENDER)Evaluation is based on quality requirements (Category 2) with a scoring indicator of 1. The bidder must achieve the required scores in each section:
Minimum qualifying score: not explicitly stated; bidders must meet all applicable requirements to be considered.
Preference points: B-BBEE status level is required for preference points under the PPPFA system (80/20 or 90/10).
Technical Specifications
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdf (TENDER)Scope: Provision of data centers, server rooms and portable modular data centres (PMDC) support and maintenance contract for a period of 5 years.
Deliverables:
Compliance Requirements
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD).
Bidders must have a valid tax clearance (SARS TCS or tax pin).
B-BBEE status level is required for preference points.
Quality management system requirements:
Evidence of QMS in operation (Section B):
Contract Quality Plan (Section C):
Section
Source: 20260409_ DataCentre&ServerRoomsupprt-GIT-Cat 2_ Rev 7 -Annexure U.pdfQuality requirements are evaluated under Category 2 with a scoring indicator of 1. Section A offers two options: Option 1 (ISO 9001 certification) scores 4 points; Option 2 (documented QMS evidence) scores 7 points. Section B (evidence of QMS in operation) scores 4 points. Section C (Contract Quality Plan) scores 1 point. Section E (user-defined requirements) scores 2 points. Bidders must meet all applicable requirements to be considered.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
01 Maxwell Drive - Sunninghill - Sandton - 2109
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
31 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win government telecom contracts including fiber rollout, network infrastructure, mobile services, and broadband projects. ICASA licensing and compliance.
South Africa is bridging the digital divide. Explore the provincial and municipal broadband rollout projects and the technical requirements for bidding.
Avoid disqualification with our technical compliance checklist for IT bids. From OEM authorizations to POPIA and ISO standards.
Master the process of winning government IT tenders in South Africa. Learn about SITA registration, compliance requirements, and strategies for success.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 13 687 875
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Information and communication. Unlock full pricing strategies, bid frequency, and historical win rates.