Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Holdings SOC Ltd, Duvha Power Station - WITBANK - WITBANK - 1035
Organization Type
GOVERNMENT
Published
15 Sept 2026
OCDS Reference
ocds-9t57fa-170439
Procurement of safety valve repair and testing services, including the provision of a safety valve calibration rig, under an open invitation to tender. Bidders must hold a valid iso 3834-2 certificate covering material groups 1, 5, 6, and 8, and demonstrate a five-year track record with at least one project per calendar year. The most consequential consideration is that only electronically submitted tenders uploaded to the ESKOM e-tendering site by the closing time will be accepted, with NO hard copies or compressed files allowed.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 15 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/320368455245451?p=B5xCiChLzJvaj85ZEk
Categories
Request for Bid(Open-Tender)
Eskom Holdings SOC Ltd, Duvha Power Station - WITBANK - WITBANK - 1035
AI Document Analysis Stages
Description
15 Sept
2026
Tender Published
Tender was published
15 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdf
No summary available
Eskom's (SHEQ) Policy poster (32-727) 27 March 2024 - REV 8 (004).pdf
etendering-user-verification-1.mp4
How-to-register-on-etendering-1.mp4
382-17~2.PDF
Eskom requires the refurbishment of HP and LP heaters, DA/DST vessels, feed water, auxiliary steam range, soot blower, FRF, BFPT, MOT and stator water safety valves at Duvha Power Station during planned outages. The contractor must provide manpower and consumables, with work performed according to the Works Information document 382-170469. The tender is evaluated through mandatory and qualitative technical criteria, with a minimum technical threshold of 70%.
How-to-locate-the-etendering-site-1.mp4
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
etendering-create-submission-1.mp4
Annex-c_Local content Declaration-Summary Schedule.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
EMPLOY~1.PDF
Refurbishment of high-pressure and low-pressure heater, deaerator, feed water, soot blower, auxiliary steam range, FRF, BFPT, MOT and stator water safety valves during planned outages at Eskom power stations in Mpumalanga. The work is governed by Eskom's occupational health and safety procedures, including the right of employees to refuse unsafe work.
SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdf
Analysis completed but response format was invalid
E-Tenderers’ E-Tendering Training Acknowledgement Form.pdf
Refurbishment of safety valves on HP and LP heaters, deaerator, feed water system, soot blowers, auxiliary steam range, FRF, BFPT, MOT, and stator water systems during planned outages at Eskom power stations in Mpumalanga.
Annexure B .pdf
Eskom requires the refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages, with the supply and delivery of economizer elements and bends (two sizes of boiler tubing) as stock items for four years on an as-when-required basis. The contract includes strict compliance with Eskom's Occupational Health and Safety (OHS) requirements and the management of all sub-contractors and suppliers.
Low Risk OHS Specification.pdf
Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Duvha Power Station, Mpumalanga. The contractor will collect, strip, identify damage, refurbish, record clearances, assemble, test, and deliver the pumps back to the station.
NEC ECC3 C1 C4 Safety valve Contract 202609.pdf
Refurbishment of safety valves—HP and LP heaters, DA/DST, feed water, soot blower, auxiliary steam range, FRF, BFPT, MOT and stator water—at Duvha Power Station Units 1, 2, 4, 5 and 6 during planned outages, under an NEC3 Engineering and Construction Contract (Option A, priced contract with activity schedule).
Eskom life-saving rules-Extended review date.pdf
Refurbishment of high-pressure and low-pressure heaters, deaerator, feed water, soot blower, auxiliary steam range, FRF, BFPT, MOT and stator water safety valves during planned outages at Eskom power stations in Mpumalanga. The work is governed by Eskom's Life-Saving Rules, which impose strict safety obligations on all contractors and their employees.
32-726 -rev3-Exp March 2025.pdf
Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Eskom power stations in Mpumalanga. The contract is managed under Eskom's Contract and Contractor OHS Management standard, which sets minimum OHS compliance requirements for suppliers from tender through contract completion.
Occupational Health and safety Act Section 37(2) Agreement Form (Rev 6).pdf
Refurbishment of safety valves across HP and LP heaters, deaerator, feed water system, soot blowers, auxiliary steam range, FRF, BFPT, MOT, and stator water systems during planned outages at Eskom power stations in Mpumalanga.
32-95 -Expires March 2027.pdf
Refurbishment of high-pressure and low-pressure heaters, deaerator, feed water, soot blower, auxiliary steam range, FRF, BFPT, MOT and stator water safety valves during planned outages at Eskom power stations in Mpumalanga.
SAS0012 Project Specific Risk.pdf
Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Eskom's Duvha power station in Mpumalanga. The project-specific risk assessment identifies driving-related hazards on site, with risk ratings and control measures to be applied.
Gx Division Contractor Criminal check.final (005).pdf
Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Eskom power stations in Mpumalanga. The tender closes on 15 October 2026 at 10:00.
382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdf
Eskom Duvha Power Station requires a contractor to refurbish safety and pressure relief valves on HP and LP heaters, DA/DST vessels, feed water, soot blower, auxiliary steam range, FRF, BFPT, MOT and stator water systems during planned outages. The contractor must supply manpower, consumables, spares, welding, machining, NDT and transport, and return refurbished valves to their exact original positions.
Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf
Refurbishment of safety valves across Eskom power station systems, including HP and LP heaters, deaerator, feed water, soot blowers, auxiliary steam range, FRF, BFPT, MOT and stator water systems, during planned outages in Mpumalanga. The contract requires strict compliance with Eskom's OHS legal and other requirements, including contractor management and induction.
Invitation to Tender (ITT) (Safety Valves).pdf
Refurbishment of safety valves (HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water) during planned outages at Eskom's power stations in Mpumalanga. A detailed scope, technical qualification, and evaluation process applies under the NEC3 Engineering and Construction Contract.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 515 868
Range
Based on 6 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This specification sets out the safety, health and environmental obligations for contractors working at Duvha Power Station. It supplements the Occupational Health and Safety Act, 1993 and the contract conditions. It applies to all departments and contractors at the station within the scope of the OHS Management System. The specification is effective from date of authorisation. Normative references include ISO 45001:2018 and the OHS Act; informative references include the Compensation for Occupational Injuries and Diseases Act, National Environmental Management Air Quality Act, ENVP0005 Waste Management Procedure, and 32-726 SHE Requirements for the Eskom Commercial Process.
Submission Guidelines
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdf (unknown)Tender evaluation includes:
Technical Specifications
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdf (unknown)Scope: Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Duvha Power Station.
Key safety requirements:
Quality Management
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdfQuality and inspection requirements:
Compliance Requirements
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdf (unknown)B-BBEE Minimum Level: 6
Registration and good standing with the Compensation Fund or a licensed compensation insurer is required before commencing work on site.
Appointment letter as Main contractor required.
Compliance with the Occupational Health and Safety Act, 1993 and Construction Regulations.
ISO 45001:2018 (Occupational Health and Safety Management System) referenced as normative.
Notification to the provincial director of construction work required if work exceeds 180 days, involves more than 1800 person days, or contract value ≥ R13 million or CIDB grading level 6.
Health & Safety
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdfLife Saving Rules: Five non-negotiable rules apply to all Eskom employees and contractors. Violation of these rules, which describe extreme behaviours with high probability of causing disabilities or fatalities, is treated with zero tolerance and has consequences.
Environmental
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdfEnvironmental requirements:
Section
Source: SAS0012_Rev10_SAFETY HEALTH ENVIRONMENTAL SPECIFICATION FOR CONTRACTORS Signed.pdfAs part of tender evaluation, the client will check that the Main contractor is registered and in good standing with the Compensation Fund or a licensed compensation insurer, that provision has been made for health and safety costs, and that the contractor has the necessary competencies and resources. A technical evaluation will assess tools, equipment, vehicles and manpower.
Description
Source: 32-726 -rev3-Exp March 2025.pdfEskom requires suppliers to comply with its Contract and Contractor OHS Management standard (32-726) from project initiation through to post-contract review. The standard sets minimum OHS criteria for managing supplier compliance and conformity, applicable across Eskom Holdings SOC Ltd, its divisions, subsidiaries and entities where Eskom has controlling interest. Key phases covered: project initiation and briefing, concept and feasibility, design development, tender enquiry and evaluation, supplier registration, site mobilisation, contract execution and monitoring, contract completion and post-contract review. Work may be stopped, suspended or terminated for OHS non-compliance.
Important Dates
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)Closing date: 15 October 2026 at 10:00 (from tender record).
No briefing session or site visit dates are stated in the document. Bidders may be expected to conduct a site visit of the area where work will be executed before tendering, under Eskom supervision.
Contact Information
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)No named contacts or submission address are stated in the document.
Submission Guidelines
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Submission method: as per the tender enquiry. Bidders must submit the required OHS returnables with the tender enquiry.
Disqualification risks:
Evaluation Criteria
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)Evaluation stages:
Preference point system: not stated in the document.
Technical Specifications
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)Scope: Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages.
Location: Eskom power station in Mpumalanga (specific site not stated).
Key requirements:
Experience & Qualifications
Source: 32-726 -rev3-Exp March 2025.pdfA competent person is defined as one with required training, knowledge and experience, and where applicable, qualifications registered under the National Qualifications Framework Act. The supplier must be conversant with OHS legal obligations related to the works tendered for. No specific years of experience or key personnel qualifications are stated.
Quality Management
Source: 32-726 -rev3-Exp March 2025.pdfQuality management is integrated with OHS. Eskom conducts risk-based inspections, audits and blitz inspections to monitor OHS compliance. Contractors performing construction work are audited per legal requirements; non-construction audits frequency determined by risk. Non-conformances are recorded and submitted to Procurement. Supplier performance is evaluated post-contract using OHS KPIs (Annexure D as guideline). Material handling and storage manuals/procedures must be provided to Eskom.
Financial Requirements
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: 32-726 -rev3-Exp March 2025.pdf (unknown)Mandatory compliance:
Required forms and templates (as applicable to scope):
B-BBEE, CIDB, CSD, tax clearance: not stated in the document.
Health & Safety
Source: 32-726 -rev3-Exp March 2025.pdfHealth and safety requirements are central. Key obligations:
Environmental
Source: 32-726 -rev3-Exp March 2025.pdfEnvironmental issues affecting the site/project must be identified, assessed, controlled and monitored for compliance by environmental professionals. Environmental aspects are considered in risk-based decisions on OHS document submission timeframes.
Contractual Terms
Source: 32-726 -rev3-Exp March 2025.pdfContract terms include:
Section
Source: 32-726 -rev3-Exp March 2025.pdfOHS as a contractual requirement is evaluated only for shortlisted suppliers that have passed mandatory and functionality thresholds. The OHS functionality threshold is 70%. Initial tender evaluation includes desktop and, where applicable, onsite assessments. Outstanding documents may be requested once, to be submitted within seven working days. After re-evaluation, remaining gaps are addressed with the preferred supplier at the negotiation meeting. OHS documents are evaluated a maximum of two times during tender evaluation. For construction work, compliance with Construction Regulations 2014 is required. Contract award is subject to OHS file approval before work commences.
Submission Guidelines
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit within the prescribed period will render the tenderer non-responsive and disqualified from the procurement process.
Health & Safety
Source: SAS0012 Project Specific Risk.pdfThe document is a Project Specific Risks form (SAS0012-1) for the Duvha Generation Division. It lists site driving hazards and their potential consequences, including cell phone use while driving, reckless driving, driving unroadworthy vehicles, disregarding safety rules, exposure to wildlife, and night driving. It includes a consequence criteria table and a risk matrix with likelihood and consequence ratings.
Description
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfThe department requires the refurbishment of safety valves and pressure relief valves at Duvha Power Station, covering units 1, 2, 4, 5 and 6. Valves include HP Heaters, LP Heaters, DA/DST Vessels, Feed Water, Auxiliary Steam Range, Soot Blower, FRF, BFPT and MOT Safety Valves. Work is performed during planned outages on Turbine and Boiler Auxiliary areas. The Contractor provides manpower, consumables, and all equipment and engineering services to complete full refurbishment, including welding and machining.
Submission Guidelines
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdf (unknown)Evaluation stages:
Qualitative returnables (Q1–Q4):
Minimum qualifying score: 70% on qualitative returnables.
Technical Specifications
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdf (unknown)Scope of work:
Standard works on every valve:
Seat re-stelliting (where required):
Rigging and transport:
NDT requirements:
Welding requirements:
Non-conformances:
Methodology
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfMethod statements required (Q1):
Works methodology:
Experience & Qualifications
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfKey personnel qualifications (Q3):
Welding personnel:
Track record (M4):
Quality Management
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfQuality management requirements:
Compliance Requirements
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdf (unknown)Mandatory compliance:
B-BBEE: Minimum Level 1 (as stated in the document).
Health & Safety
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfHealth and safety requirements:
Contractual Terms
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfGeneral contract requirements:
Section
Source: 382-170469 Duvha Power Station Safety Valves Works Information_Rev 2.pdfQualitative returnables (Q1–Q4) are scored; minimum 70% required. Q1: three method statements (calibration verification, coil spring stiffness, safe transportation). Q2: at least one WPS example with welding procedures qualified to ISO 15614-7 (carbon steel with stainless steel butter layer overlaid with Stellite 6; overlay for Group 5.2 base material with Stellite 6 with PWHT). Q3: key personnel qualifications as listed. Q4: technical exclusions — if none, signed letter required.
Health & Safety
Source: 32-95 -Expires March 2027.pdfEskom requires all contractors to comply with its Occupational Health and Safety Incident Management Procedure (32-95, Rev 9). This procedure governs how incidents are identified, reported, investigated, and closed out. Contractors must report all incidents to the relevant Eskom stakeholders, participate in investigations, and implement corrective actions. Incidents must be recorded on SAP EH&S. The procedure applies to all Eskom employees, contractors, and affected public.
Submission Guidelines
Source: Annexure B .pdf (unknown)Returnable documents:
Submission method: not stated in this document.
Evaluation Criteria
Source: Annexure B .pdf (unknown)No evaluation criteria are stated in this document. The only stated requirement is the signed Acknowledgement Form (Annexure B) confirming understanding of OHS requirements.
Technical Specifications
Source: Annexure B .pdf (unknown)Supply and delivery of Economizer Elements & Bends, two sizes of Boiler Tubing, for stock items, for a period of four years, on an as-and-when-required basis.
Compliance Requirements
Source: Annexure B .pdf (unknown)OHS compliance:
Contractor/supplier management:
Health & Safety
Source: Annexure B .pdfComply with Eskom OHS legal and other requirements, including the listed standards and procedures. After contract award, align company processes with Eskom's OHS requirements. Penalties apply for non-conformance. All employees must undergo Eskom induction. The main contractor/supplier must manage contractors/suppliers to ensure OHS compliance, monitor through audits, and deal with non-conformances directly. Eskom may request testimonials/references.
Description
Source: Low Risk OHS Specification.pdfThe project involves supply and delivery of Economizer Elements & Bends and Boiler Tubing for stock items on an as-when-required basis, and refurbishment of a damaged pump. Work is performed off site at Duvha Power Station.
Important Dates
Source: Low Risk OHS Specification.pdf (unknown)No specific dates are stated in the document.
Contact Information
Source: Low Risk OHS Specification.pdf (unknown)Eskom Contract's Manager: George Klopper
Eskom OHS Manager: S. Matsebe
Eskom OHS Officer: Ephraim Ngoato
Project Address: Duvha Power Station
Submission Guidelines
Source: Low Risk OHS Specification.pdf (unknown)Returnable documents: The bidder must submit a completed and signed OHS plan, including the Section 37(2) agreement, risk assessments, method statements, and the contractor's organogram. All documents must be submitted with the bid. The bidder must retain a copy of the scope of work.
Evaluation Criteria
Source: Low Risk OHS Specification.pdf (unknown)Evaluation prior to start of work: The OHS department will issue the Section 37(2) agreement to the project manager/end user for signing by Eskom and the contractor. The contractor's OHS plan must be approved before work commences. Compliance with all OHS requirements is mandatory for contract award.
Technical Specifications
Source: Low Risk OHS Specification.pdf (unknown)Scope of work: Refurbishment of a damaged pump, including:
Project: Supply and delivery of Economizer Elements & Bends, two sizes of Boiler Tubing for stock items on an as-when-required basis.
Work is performed off site; site supervisor and health and safety officer not required for this scope.
Experience & Qualifications
Source: Low Risk OHS Specification.pdfAppointed contractors must have appropriate qualifications and certificates. Employees must be under competent supervision.
Quality Management
Source: Low Risk OHS Specification.pdfQuality management: The contractor must maintain satisfactory standards, document inspection results, and keep records for viewing. Tools and equipment must be regularly inspected. Non-conformance procedures must be implemented.
Compliance Requirements
Source: Low Risk OHS Specification.pdf (unknown)COID: The main contractor and all appointed contractors must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (LoG) for the contract duration.
Section 37(2) agreement: Must be signed between Eskom and the main contractor, and between the main contractor and all appointed contractors. Original retained by contractor, copy in OHS file.
OHS Act: Contractor must comply with the Occupational Health and Safety Act and all applicable legislation, including the Constitution, NEMA, National Water Act, National Road Traffic Act, and COID Act.
Child labour: Prohibited.
SHEQ policy: Must be compiled, signed by CE or Section 16(2) appointee, displayed, and filed in OHS file.
Statutory appointments: Competent persons must be appointed per OHS Act criteria.
Eskom Life-Saving Rules: Compliance mandatory, including zero tolerance for substance abuse (0% alcohol/drugs).
Organogram: Must be provided on company letterhead, signed by 16(1) or 16(2), and kept up to date.
Risk assessments: Baseline and daily pre-task risk assessments required.
OHS file: Must be maintained and available for audit.
PPE: Risk-based PPE must be issued and worn.
Medical surveillance: Programme required for contract duration.
Incident reporting: All incidents reported and investigated within 48 hours.
Health & Safety
Source: Low Risk OHS Specification.pdfHealth and safety requirements include: compliance with OHS Act, Section 37(2) agreement, prohibition of child labour, SHEQ policy, COID registration, statutory appointments, Eskom Life-Saving Rules (including zero tolerance for substance abuse), organograms, risk assessments, safe work procedures/method statements, toolbox talks, OHS training and induction, vehicle management, housekeeping, signage, tools and equipment inspection, auditing, smoking and cellular phone policies, medical surveillance, PPE, incident investigation, emergency management, OHS files, hours of work, environmental requirements, contractor performance monitoring, and contract sign-off.
Environmental
Source: Low Risk OHS Specification.pdfEnvironmental management: Duvha Power Station is ISO 14001 compliant. The contractor must comply with environmental legislation and implement an Environmental Management Plan (EMP) including impact summary, mitigation measures, monitoring programme, and environmental awareness training. Non-compliance with Duvha environmental requirements or NEMA may result in penalties.
Contractual Terms
Source: Low Risk OHS Specification.pdf (unknown)Eskom reserves the right to terminate the contract for non-compliance with OHS requirements. Contract sign-off procedures are specified in the OHS specification.
Section
Source: Low Risk OHS Specification.pdfEvaluation prior to start of work: OHS department issues Section 37(2) agreement for signing. Contractor's OHS plan must be approved before work commences.
Description
Source: Gx Division Contractor Criminal check.final (005).pdfEskom Holdings SOC Ltd is a State-Owned Company subject to regulatory compliance as applicable to Government. Generation Business Units are of strategic importance and most facilities are designated as National Key Points in terms of the National Key Point Act. The State Security Agency (SSA) advised Eskom to comply with the Minimum Information Security Standard (MISS) and implement a screening process to identify individuals who might pose a risk to operations. The screening process aims to protect the workforce, assets, and information. Security screening of contractors must take place before a contractor is allowed on site. The extent of access to sensitive information or critical plant areas is determined by the Scope of Work. The purpose of this document is to describe the criminal background check / screening requirements prior to contractor employees being granted access to National Key Points, and to map a standardized framework within Generation involving the requirement to be stipulated in procurement / tender processes and relevant documentation required prior to contract awarding. Relevant legislation includes the Minimum Information Security Standards (MISS), 1996, National Key Point Act, National Strategic Intelligence Act, and Protection of Critical Infrastructure Protection Act.
Important Dates
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Closing date: 15 October 2026 at 10:00
Briefing session: 1 March 2024 (venue not specified, not stated as compulsory)
Contact Information
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Contact: Rhulani Mathebula
Role: Group Executive: Generation Division (Acting)
Telephone: 011 800 5228
Email: Not specified
Address: Not specified
Submission Guidelines
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Returnable documents:
Submission method: Not specified in the document.
Disqualification risks:
Evaluation Criteria
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Evaluation is based on mandatory security screening:
Technical Specifications
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Scope: Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages.
Security screening requirements:
Compliance Requirements
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Mandatory security clearance:
Exemptions:
Termination clause:
Health & Safety
Source: Gx Division Contractor Criminal check.final (005).pdfThe document emphasises the need to ensure optimal safety and security of people and assets, but no specific health and safety requirements are stated.
Special Conditions
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Security screening requirements for contractors accessing power stations: Contractors must provide clear criminal record certificates not older than 30 days from a reputable screening company. Subcontractors are subject to the same provisions. Contractors previously found guilty of offences under the National Road Traffic Act or who have paid admission of guilt fines are exempted. The security screening clause is to be inserted in tender documents, and a termination clause applies if contractors fail to comply with screening requirements.
Requirements
Source: Gx Division Contractor Criminal check.final (005).pdf (unknown)Mandatory security clearance requirements: Contractor employees must undergo criminal clearance verification with the SAPS Criminal Record Centre (CRC) or an accredited supplier linked to the SAPS AFIS system, and provide proof to the security delegated team before site access. Proof of verification must be submitted to Security for verification before access is granted; only individuals with clear criminal records will be considered. Employees must submit the SAPS Clearance Certificate along with a copy of their Identity Document or Passport to the site Security Manager. The Security Manager verifies authenticity with SAPS and cross-references against HR and site databases to check for past disruptive labour actions or dismissal from Eskom. A risk analysis is completed; any risk rating above level III is deemed unsuitable. The process is repeated every 12 months for low-risk employees (Risk Rating 5, 4) and every 6 months for medium to high-risk employees (Risk Rating 3).
Description
Source: Eskom life-saving rules-Extended review date.pdfEskom is committed to preventing all work-related injuries and maintaining a safe and healthy work environment in compliance with industry standards and legislative requirements. The Life-Saving Rules are safety rules that enforce zero tolerance for serious at-risk behaviours that have a high probability of causing disabilities or fatalities. These rules apply to all Eskom employees, agents, consultants, and contractors at all Eskom sites. Visitors must also respect and adhere to these rules and may be instructed to leave the premises if they refuse.
Evaluation Criteria
Source: Eskom life-saving rules-Extended review date.pdf (unknown)Contractors must comply with Eskom's Life-Saving Rules and associated disciplinary procedures. Violation of any Life-Saving Rule by a contractor employee results in immediate removal from site and disciplinary action. Contractor managers or supervisors who allow violations may have the contractor's activities suspended. Contractors must ensure all employees sign the Life-Saving Rule Acknowledgement Form (document 240-63942960).
Technical Specifications
Source: Eskom life-saving rules-Extended review date.pdf (unknown)Eskom's Life-Saving Rules apply to all Eskom employees, agents, consultants, and contractors at all Eskom sites. Visitors must also adhere to these rules and may be instructed to leave the premises if they refuse.
Five Life-Saving Rules:
Contractual Terms
Source: Eskom life-saving rules-Extended review date.pdf (unknown)Violation of a Life-Saving Rule is treated as serious misconduct and results in a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure. Eskom takes a zero-tolerance stance. If a contractor manager or supervisor allows a violation, Eskom may suspend the contractor's activities while determining an appropriate sanction. The contractor must immediately remove the violating employee from site and initiate a disciplinary process within five working days, and must furnish Eskom with a copy of the sanction after the process.
Evaluation Criteria
Source: Occupational Health and safety Act Section 37(2) Agreement Form (Rev 6).pdf (unknown)Bidders must sign the Section 37(2) Agreement, acknowledging that they are employers with duties under the Occupational Health and Safety Act, 1993 (Act 85 of 1993), and agree to comply with the SHE specifications provided for the project.
Compliance Requirements
Source: Occupational Health and safety Act Section 37(2) Agreement Form (Rev 6).pdf (unknown)Section 37(2) Agreement: The contractor/supplier must sign this agreement, acknowledging that it is an employer in its own right with duties under the Occupational Health and Safety Act, 1993 (Act 85 of 1993), and undertakes to ensure all work performed and machinery/plant used complies with the Act. The contractor has been provided with SHE specifications for the project/service and will comply with them. The SHE specifications constitute arrangements and procedures between the contractor and Eskom to ensure compliance with section 37(2) of the Act.
Health & Safety
Source: Occupational Health and safety Act Section 37(2) Agreement Form (Rev 6).pdfThe contractor/supplier must sign the Section 37(2) Agreement, acknowledging that it is an employer in its own right with duties under the Occupational Health and Safety Act, 1993 (Act 85 of 1993), and undertakes to ensure all work performed and machinery/plant used complies with the Act. The contractor has been provided with SHE specifications for the project/service and will comply with them. The SHE specifications constitute arrangements and procedures between the contractor and Eskom to ensure compliance with section 37(2) of the Act.
Description
Source: Invitation to Tender (ITT) (Safety Valves).pdfEskom Holdings SOC Ltd invites tenders for the refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Duvha Power Station. Tender number E3517GXMPDUV.
Important Dates
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Closing date: 15 October 2026 at 10:00
Clarification meeting (non-compulsory): 29 September 2026 at 10:00, via Microsoft Teams
Clarification queries deadline: 10 working days before the tender closing date.
Contact Information
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Eskom Representative (for all queries):
Procurement Manager:
Fraud and corruption reporting:
Submission Guidelines
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Submission method: electronic only, via the Eskom E-Tendering site (Eskom Tender Bulletin).
Returnable forms (all must be completed, signed where required, and submitted by closing time unless noted):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Evaluation is in two stages: technical (functionality) and then price and specific goals.
Stage 1 – Technical evaluation (mandatory and qualitative):
Mandatory criteria (pass/fail):
Qualitative criteria (weighted):
Minimum qualifying score: 70% (if no bidder reaches 70%, Eskom may consider bidders scoring 65–69%).
Stage 2 – Price and specific goals:
Technical Specifications
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Scope: Refurbishment of HP, LP Heater, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Duvha Power Station.
Key technical requirements:
Key personnel requirements:
Methodology
Source: Invitation to Tender (ITT) (Safety Valves).pdfThree method statements required: (a) calibration verification test, (b) confirming coil spring stiffness, (c) safe transportation of safety valves.
These are evaluated under Q1 (35% weighting).
Experience & Qualifications
Source: Invitation to Tender (ITT) (Safety Valves).pdfTrack record: 5-year history of safety valve maintenance, with at least one project per calendar year (years need not be consecutive, but no earlier than 2018).
Evidence must be formal, approved contracts; client contacts will be verified.
At least 60% of listed clients must confirm satisfactory work.
Key personnel:
Quality Management
Source: Invitation to Tender (ITT) (Safety Valves).pdfISO 3834-2 certificate required, covering material groups 1, 5, 6, 8; all pages must be submitted.
Welding procedures must be qualified to ISO 15614-7 as a minimum, including PQR & WPS for carbon steel with stainless steel butter layer overlaid with Stellite 6, and overlay PQR & WPS for Group 5.2 base material with PWHT; mechanical test results must be included.
Workshop must have pressure testing facilities for water and air tests.
Eskom reserves the right to verify certificates with authorities.
Pricing Schedule
Source: Invitation to Tender (ITT) (Safety Valves).pdfPricing schedule/BOQ must be submitted in PDF format.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on Net Present Value basis.
Unconditional discounts considered for evaluation; conditional discounts applied at payment.
Cataloguing line item may be required if cataloguing is a requirement.
Financial Requirements
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Pricing schedule/BOQ must be submitted in PDF format.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, and compared on a Net Present Value basis.
Unconditional discounts are considered for evaluation; conditional discounts are applied at payment.
Payment terms (Eskom standard):
Security: If a performance bond or demand guarantee is required, the tenderer must select at least two financial institutions from Eskom's approved list.
Cataloguing: If required, the pricing schedule must include a line item for cataloguing; Eskom will pay for it.
Compliance Requirements
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Mandatory eligibility:
Tax compliance:
B-bbee:
Employment Equity:
Other:
B-BBEE Requirements
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Preference points claimed under PPPFA 80/20 or 90/10 system.
B-BBEE status level points: Level 1 = 20/10, Level 2 = 18/9, Level 3 = 14/6, Level 4 = 12/5, Level 5 = 8/4, Level 6 = 6/3, Level 7 = 4/2, Level 8 = 2/1, Non-compliant = 0.
Proof of B-BBEE status (certificate or sworn affidavit) required to claim points.
Health & Safety
Source: Invitation to Tender (ITT) (Safety Valves).pdfCOIDA: Original certificate of good standing or proof of application issued by the Compensation Fund is required.
SHEQ requirements are part of the contractual requirements to be met prior to award.
Contractual Terms
Source: Invitation to Tender (ITT) (Safety Valves).pdfContract will be the NEC3 Engineering and Construction Contract (ECC).
Mandatory contractual requirements: proof of CSD registration, SHEQ requirements, financial viability (financial statements), CIDB grading, payment terms, and Supplier Development Localisation and Industrialisation.
These are assessed after evaluation and ranking; failure to meet them may render the tenderer non-responsive.
Eskom payment terms: 30 days for contracts below R50 million, 60 days for contracts above R50 million (incl. VAT).
Subcontracting with subsidiaries is discouraged and must be declared.
Alternative tenders are allowed based on different completion date, payment method, technical methods, or NEC options.
The successful tenderer may be required to provide cataloguing information and label materials per Eskom specifications.
Requirements
Source: Invitation to Tender (ITT) (Safety Valves).pdf (TENDER)Eligibility: no restriction to do business with Eskom or State-Owned Companies; not on international sanctions lists; no conflict of interest; not restricted by National Treasury or on Tender Defaulters list; must not submit more than one tender; JV/consortium must have joint and several liability; must not subcontract 100% of scope.
Basic compliance: meet eligibility, submit complete tender, submit mandatory returnables, CSD number, CIDB ME2 or higher grading.
Mandatory returnables at closing (disqualifiable): Annexures A, B, C, D, E, F, G1-G4, H, J.
Non-disqualifiable: Annexure I (SBD 6.1), E-tendering Help Manual acknowledgement.
Required prior to award: Tax Clearance Certificate, Tax Evaluation Questionnaire, Employment Equity compliance, CIDB proof, NEC contract, Pricing Schedule, Financial statements.
Section
Source: Invitation to Tender (ITT) (Safety Valves).pdfTwo-stage technical evaluation: mandatory (pass/fail) and qualitative (weighted).
Mandatory: M1 company profile, M2 ISO 3834-2 certificate, M3 workshop/pressure testing facilities, M4 5-year track record.
Qualitative: Q1 method statements (35%), Q2 WPS examples (20%), Q3 key personnel (35%), Q4 technical exclusions (10%).
Minimum threshold: 70% (Eskom may consider 65–69% if no bidder meets 70%).
Prices scored out of 80/90 points; specific goals scored out of 20/10 points.
Ranking by 80/20 or 90/10 system; highest total wins.
Description
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfEskom requires all vehicles used for its business, including those of contractors and subcontractors transporting Eskom employees, to comply with this vehicle safety specification. The specification applies throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and any entity in which Eskom has a controlling interest. It incorporates Eskom's specifications, the National Road Traffic Act, and the Construction Regulations under the OHS Act. Only newly purchased vehicles and new contracts must comply; existing vehicles follow a phased replacement plan.
Technical Specifications
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdf (unknown)Eskom requires all vehicles used for its business, including those of contractors and subcontractors transporting Eskom employees, to comply with this vehicle safety specification.
Standard minimum specifications for all vehicles:
Eskom fleet sedans/LDVs must additionally meet:
Light delivery vehicles (LDVs) under 3 500 kg:
Heavy commercial vehicles (GVM 3 500 kg and above):
Minibuses (up to 16 passengers):
Midi-buses and buses (16+ passengers):
Trailers and caravans:
Yellow plant:
Construction vehicles/equipment:
Specialised vehicles (golf carts, quad bikes, self-balancing scooters):
Modifications to vehicles:
Methodology
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfExisting vehicles in the business follow a phased replacement plan by the Fleet Services Department. Scheme and non-Eskom vehicles must comply when replacing the specific vehicle. The specification is effective from the date of authorisation.
Quality Management
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfCompliance with this specification is audited at least annually by the operating/business unit as part of internal OHS and fleet audit/review processes.
Compliance Requirements
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdf (unknown)Vehicles must comply with the National Road Traffic Act, the Occupational Health and Safety Act (including Construction Regulations), the Mine Health and Safety Act, and the National Environmental Management Act, as applicable.
Compliance with this specification is audited at least annually by the operating/business unit as part of internal OHS and fleet audits.
Only newly purchased vehicles and new contracts must comply; existing vehicles follow a phased replacement plan.
Health & Safety
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfVehicle safety specifications are detailed in the technical specifications section. Key requirements include:
Contractual Terms
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdf (unknown)The delegated employer under section 16(2) of the OHS Act, together with appointed responsible managers, is responsible for ensuring compliance with this specification in their area of responsibility.
Description
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfRefurbishment of HP, LP Heaters, DA/DST, Feed Water, Soot Blower, Auxiliary Steam Range, FRF, BFPT, MOT and Stator Water Safety Valves during planned outages at Duvha Power Station, Units 1, 2, 4, 5 and 6.
Important Dates
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Closing date: 15 October 2026 at 10:00 (from tender record).
Starting date: 01 February 2027 or as soon as possible thereafter.
Completion date for the whole of the works: 31 January 2032.
Access dates: per the current outage schedule for Units 1, 2, 4, 5 and 6.
Defects date: 52 weeks after Completion of the whole of the works.
Defect correction period: 1 day after notification.
First programme submission: within 5 working days of the Contract Date.
Revised programme intervals: every 3 working days.
Assessment interval: 25th of each successive month.
Payment period: 4 weeks.
No compulsory briefing or site visit is stated.
Contact Information
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Employer representative:
Project Manager:
Supervisor:
Adjudicator panel contact:
Invoice submission address:
Finance department, Account Payable (APS), 3rd Floor Admin building, Duvha Power Station.
Submission Guidelines
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Returnable documents:
Submission method and address: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Evaluation criteria are not stated in the document. The contract is a priced contract with an activity schedule (Option A). The tenderer must have a CIDB grading of 3ME or higher. B-BBEE status is required for preference points; changes must be notified within 7 days. The bid must be valid for the period stated in the Tender Data (not specified in the document).
Technical Specifications
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Scope: Refurbishment of safety valves during planned outages at Duvha Power Station, Units 1, 2, 4, 5 and 6. The work includes removal, strip and assessment, refurbishment/repairs and pressure testing (including sandblasting and painting), and reinstallation of the following valves:
Each valve requires the four activities listed above, priced per unit.
Methodology
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Pricing methodology (Option A): The Contractor prepares an activity schedule by breaking down the Works Information into well-defined activities, prices each as a lump sum, and links each activity to the programme. The activity schedule is a pricing document only, not Works Information. No adjustment to lump sum prices for quantity variations except through compensation events. The Contractor must include everything necessary and incidental to Providing the Works in the prices.
Experience & Qualifications
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfKey personnel: The Contractor must provide details of key persons, including name, job, responsibilities, qualifications and experience, in the Contract Data Part 2 (C1.2b). CVs are to be appended to the Tender Schedule. Specific experience requirements are not stated in the document.
Quality Management
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfQuality management requirements are not detailed in the document. The contract includes a defects date 52 weeks after Completion and a defect correction period of 1 day. The Contractor is liable for defects due to design, manufacture and fabrication outside the Site, as per the limitation of liability clauses.
Pricing Schedule
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfPricing is a priced contract with activity schedule (Option A). The Price List (activity schedule) includes items for valve removal, strip & assessment, refurbishment/repairs & pressure test (including sandblasting & painting), and valve installation for each valve type, with quantities per unit. The rates and prices entered for each item include all work and other things necessary to complete the item. The total of the Prices is exclusive of VAT; VAT at 15% is added. The offered total inclusive of VAT is for budgeting purposes only.
Financial Requirements
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)Pricing: Priced contract with activity schedule (Option A). Lump sum prices per activity; no part payment for incomplete activities. No adjustment for quantity variations except through compensation events.
Payment terms:
Retention: 5% per sectional completion.
Delay damages: R5,000 per day per section, up to 10% of contract value.
Limitation of liability:
Insurance:
Price adjustment for inflation (Option X1): base date October 2026; proportions: 60% labour (SEIFSA Table C3), 10% transport (SEIFSA Table L2B), 15% machinery (Statistics SA PPI), 15% non-adjustable.
Compliance Requirements
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdf (unknown)CIDB: Grade 3ME or higher (mechanical engineering).
B-bbee:
Permit to Work:
Tax:
CSD: Registration on Central Supplier Database is implied for Eskom contracts.
Ethics: No corrupt practices; termination for illegal or corrupt practices.
Confidentiality: No disclosure of contract information without consent; images of works require prior written consent.
Joint ventures: Jointly and severally liable; notify key person within two weeks; no substantial alteration without consent.
Cession/assignment: No assignment without written consent of Employer.
Health & Safety
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfHealth and safety:
Permit to Work:
Environmental
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfEnvironmental compliance: The Contractor must comply with all applicable environmental laws and regulations, and ensure that subcontractors, employees and others under the Contractor's direction and control also comply. The Employer provides Environmental Liability insurance per Insurance Table B.
Contractual Terms
Source: NEC ECC3 C1 C4 Safety valve Contract 202609.pdfContract form: NEC3 Engineering and Construction Contract (ECC3), April 2013, with main Option A (priced contract with activity schedule), dispute resolution Option W1, and secondary Options X1 (price adjustment for inflation), X2 (change in law), X5 (sectional completion), X7 (delay damages), X18 (limitation of liability), and Z (additional conditions Z1 to Z12 always apply).
Key dates:
Payment:
Delay damages: R5,000 per day per section, up to 10% of contract value.
Retention: 5% per sectional completion.
Limitation of liability:
Additional conditions (Z1 to Z12):
Submission Guidelines
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)No evaluation criteria are stated in the provided document. The only requirement is the signed OHS acknowledgement form.
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf (unknown)OHS compliance obligations:
Contractual Terms
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdfContractor management obligations:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Eskom Holdings SOC Ltd, Duvha Power Station - WITBANK - WITBANK - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
25
Last checked
27 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog