Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
National Health Laboratory Service (NHLS)Location
Gauteng
Closing Date
09 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 MODDERFONTEIN ROAD - SANDRINGHAM - GAUTENG -
Organization Type
GOVERNMENT
Published
13 Aug 2026
OCDS Reference
ocds-9t57fa-165451
The national health laboratory service requires the upgrade of the emergency power distribution system for savp production block 14, including supply and installation of electrical infrastructure, a 200kva UPS, and a five-year service and maintenance plan. The estimated contract period is 9 months, followed by a 12-month guarantee period and a 4-year maintenance plan, with the installation to comply with SANS 0142 and certificates of compliance issued by an accredited person.
Bidders must price a Bill of Quantities with five bills: Preliminary and General, Cable Reticulation for UPS Installation, Building Installation (Electrical), UPS (Electrical), and a 4-Year Maintenance Plan.
The installation must comply with SANS 0142 specifications and be inspected, tested and handed over in the presence of the Engineer, with results certified on Certificates of Compliance by an accredited person.
Bidders must provide a Health and Safety Plan in accordance with the OHS Act Construction Regulations, appoint an H&S representative, and manage the plan for the contract duration.
Bidders must allow R500,000.00 for contingencies (unseen services during construction) and R400,000.00 for additional materials during the maintenance period, with a 10% contingency included.
Bidders must provide security for the full contract period and price for staff to wear distinctive overalls, bibs, hard hats and name tags at all times on site.
Bidders must provide as-built drawings and three sets of Operations and Maintenance manuals, and arrange a meeting with the Electrical Engineer to discuss mark-up drawings.
The contract period is estimated at 9 months, followed by a 12-month guarantee/maintenance period and a 4-year maintenance plan, with free maintenance during the guarantee period for all defects excluding wear and tear and normal maintenance.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 09 September 2026 - 11:00
Venue
NATIONAL HEALTH LABORATORY SERVICE; 1 MODDERFONTEIN ROAD
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
1 MODDERFONTEIN ROAD - SANDRINGHAM - GAUTENG -
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: NHLS drawings.zip. You don’t need to refresh — this page will pick up the updated review automatically.
13 Aug
2026
Tender Published
Tender was published
09 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFB005_25_26_Bid Document.pdf
Upgrade of the emergency power distribution system for SAVP Production Block 14, including service and maintenance for five years, for the National Health Laboratory Service (NHLS) in Sandringham, Johannesburg.
NHLS SAVP- Electrical BOQ.pdf
The National Health Laboratory Service is procuring the upgrade of the emergency power distribution system for the SAVP Production Block 14, including the supply and installation of a 200kVA UPS, associated cabling, distribution boards, and a five-year service and maintenance plan. The works are detailed in a bill of quantities covering preliminary and general items, cable reticulation, building electrical installation, UPS installation, and a four-year maintenance plan (following a 12-month defect liability period).
NHLS drawings.zip
Upgrade of the emergency power distribution system for the SAVP Production Block 14, including service and maintenance for five years, for the National Health Laboratory Service in Gauteng.
NHLS SAVP- Electrical BOQ.xls
Upgrade of the emergency power distribution system for the SAVP Production Block 14 at the National Health Laboratory Service, including supply, installation, testing, commissioning, and a five-year service and maintenance period. The works cover replacement of distribution boards, cabling, isolators, socket outlets, a 200kVA UPS system, and associated electrical reticulation, with a 12-month defect liability period followed by a four-year maintenance plan.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure NHLS tenders with AI-Powered Matching, health-sector intelligence, compliance analysis, and application support for laboratory and diagnostics contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 920 000
Range
Based on SITA benchmarks. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: RFB005_25_26_Bid Document.pdf (TENDER)Closing: 09 September 2026 at 11:00 (tender box).
Public opening: 09 September 2026 at 11:30, Main Conference Boardroom, NHLS, 1 Modderfontein Road, Sandringham (only bidders' names read out).
Compulsory briefing: 21 August 2026 at 11:00, Reception, NHLS, 1 Modderfontein Road, Sandringham. Grace period of 15 minutes only.
Clarification questions: by e-mail to [email protected] on or before 28 August 2026.
Tender documents available for download from NHLS website from 14 August 2026.
Bid validity: 180 days from closing date.
Briefing Session
Source: RFB005_25_26_Bid Document.pdf (TENDER)Compulsory briefing: 21 August 2026 at 11:00, Reception, NHLS, 1 Modderfontein Road, Sandringham. Grace period of 15 minutes only. Questions must be e-mailed to [email protected] on or before 28 August 2026.
Contact Information
Source: RFB005_25_26_Bid Document.pdf (TENDER)Bidding and technical enquiries: Lesedi Manganye, 011 386 6165, [email protected].
Submission address: NHLS Procurement Tender Office, Main Reception, 1 Modderfontein Road, Sandringham, Johannesburg, 2001.
Submission Guidelines
Source: RFB005_25_26_Bid Document.pdf (TENDER)Submission method: sealed envelope deposited in the tender box at the Main Reception Entrance, NHLS, 1 Modderfontein Road, Sandringham, Johannesburg, 2001, by 11:00 on 09 September 2026. Late bids are not accepted.
Two-envelope procedure: Envelope 1 (marked "TECHNICAL PROPOSAL") must contain Volume 1 (Tendering Procedures, Returnable Documents, Contract Data, Forms of Securities, Pricing Instructions), Volume 2A (Scope of Work, Site Information) and Volume 2B (Generic Specifications). Envelope 2 (marked "FINANCIAL PROPOSAL") must contain the Form of Offer and Acceptance and the Bill of Quantities. No pricing in Envelope 1; failure to follow this format may invalidate the bid.
Each tender must be submitted as an original plus a soft copy on a USB; missing USB disqualifies the bid.
Returnable forms (all must be completed and signed):
Missing or incomplete administrative documents (SBDs, authority to sign) may be corrected within 3 days of notification; documents affecting functionality, price or specific goals cannot be corrected.
Disqualification risks: late submission, wrong envelope format, unauthenticated alterations, corrections made with correction fluid/tape, failure to sign the Form of Offer, or failure to submit the USB copy.
Returnable Documents
Source: RFB005_25_26_Bid Document.pdf (TENDER)Returnable documents include: tender cover (name, contact person, telephone, CSD registration, CIDB registration, COIDA registration, SARS PIN); mandatory documents (CIDB grading 4EB or higher, briefing attendance, signed Form of Offer); administrative documents (Certificate of Authority to Sign, Acknowledgement of Tender Conditions, SBD 1, SBD 4, SBD 6.1, Annexure A and B, JV agreement if applicable, OHS Declaration); technical functionality documentation; specific goals evidence; scope of work; pricing schedule with bill of quantities; terms and conditions. Missing administrative documents may be corrected within 3 days of notification.
Evaluation Criteria
Source: RFB005_25_26_Bid Document.pdf (TENDER)Evaluation in three stages:
Specific goals (20 points total): 51% black-owned (4), 51% black women-owned (4), 51% black disabled-owned (2), 51% black youth-owned (4), 51% black-owned in rural/underdeveloped/townships (2), EME/QSE (4). Points require valid B-BBEE certificate or sworn affidavit; failure to submit proof results in zero points for that goal but not disqualification.
Price points formula: Ps = 80(1 - (Pt - Pmin)/Pmin).
Award to highest total points; tie-breakers: highest specific-goal points, then highest functionality (if applicable), then drawing of lots.
Technical Specifications
Source: RFB005_25_26_Bid Document.pdf (TENDER)Scope: upgrade of the emergency power distribution system for SAVP Production Block 14, including service and maintenance for five (5) years.
Key personnel requirements (each with minimum 5 years' post-qualification experience, certified copies not older than 3 months):
Company experience: at least 3 signed reference letters for similar work, each with minimum value R5,000,000, not older than 5 years, accompanied by appointment/Purchase Order and completion certificates, detailing project type, period, scope, outcome and value. Reference letters must follow the attached template (company letterhead, contactable person, project details, recommendation).
Other technical requirements: valid registration as an electrical contractor with the Department of Labour (in company name); COIDA letter of good standing; POPIA consent from each key person; signed commitment letter for public liability covering the tender amount for the project duration.
Experience & Qualifications
Source: RFB005_25_26_Bid Document.pdfBidder must provide at least 3 signed reference letters with a minimum value of R5,000,000 not older than 5 years, accompanied by Purchase Order/appointment letters and completion certificates, detailing type of project, period, scope of work, outcome of performance, and value. Reference letters must be on company letterhead with contact details and recommendation comments.
Quality Management
Source: RFB005_25_26_Bid Document.pdfThe tenderer must provide access during working hours to its premises for inspections on request. The bid validity period is 180 days, extended to the next working day if it expires on a weekend or public holiday.
Pricing Schedule
Source: RFB005_25_26_Bid Document.pdfPricing instructions: a price or rate must be entered against each item in the Bill of Quantities; unpriced items are considered covered by other prices. Alterations must be authenticated; unauthenticated alterations may lead to disqualification. Corrections must not use correction fluid or tape. Arithmetic errors will be checked and corrected per the specified sequence.
Financial Requirements
Source: RFB005_25_26_Bid Document.pdf (TENDER)Pricing: Bill of Quantities must be completed with a price or rate against every item; unpriced items are deemed covered by other prices. Alterations must be authenticated; unauthenticated alterations to rates or totals may disqualify. No correction fluid or tape.
Arithmetic errors: NHLS will check the highest-scoring bid and correct errors per a set sequence (amount in words governs over figures; line-item totals govern over rates; etc.). Bidders may accept or reject corrections in writing; rejection may lead to disqualification.
Insurance: submission of a tender is acknowledgement that the bidder will provide the insurance cover required under the contract. A signed public liability commitment letter must accompany the bid.
No bond or guarantee percentage is stated in the document.
Compliance Requirements
Source: RFB005_25_26_Bid Document.pdf (TENDER)CSD registration: proof required (MAAA number).
Tax compliance: valid SARS TCS PIN or CSD report reflecting active tax compliance; each JV/consortium member must submit separately.
CIDB: contractor grading 4EB or higher in Electrical Engineering Works – Building class; active status required at evaluation. JV members must each be CIDB registered; lead partner must have the required grading or one level below with recognition status; combined grading must meet the requirement.
B-BBEE: valid B-BBEE certificate (SANAS accredited) or sworn affidavit (for EME/QSE) to claim specific-goal points; certificate expiry must be after closing date.
Department of Labour: valid registration as an electrical contractor in the company's name.
COIDA: letter of good standing from an authorised issuing entity.
No bids from persons in the service of the state, or companies/CCs with directors/members in state service.
Bidders must not be listed on the Register of Tender Defaulters (Prevention and Combating of Corrupt Activities Act).
Health & Safety
Source: RFB005_25_26_Bid Document.pdfThe appointed bidder must submit a Safety file, Project Plan and Cash Flow projection within 14 days of site handover. An Occupational Health and Safety Declaration form is a returnable document. A Safety Officer with specified qualifications (National Diploma in Safety Management, Environmental Health, Environmental Science, Environmental Management, SAMTRAC, SHEOMTRAC, SHEMTRAC, MESHTRAC, NEBOSH or equivalent NQF 5 or higher) is a mandatory key personnel requirement.
Contractual Terms
Source: RFB005_25_26_Bid Document.pdfThe tender is subject to the General Conditions of Contract (GCC) and any Special Conditions of Contract. The Employer reserves the right to appoint in whole or in part, to more than one tenderer, to the highest points scoring bidder, or not to consider any bid with justifiable reasons. A valid and binding contract is concluded once NHLS awards and signs the contract agreement forms.
Requirements
Source: RFB005_25_26_Bid Document.pdf (TENDER)Mandatory requirements: CIDB grading 4EB or higher; attendance at compulsory briefing; proof of CSD registration/MAAA number; agreement to Special Conditions of Contract; key personnel with specified qualifications and experience; valid Department of Labour electrical contractor registration; COIDA letter of good standing; POPIA consent from key personnel; signed public liability commitment letter; at least 3 reference letters of R5,000,000 or more not older than 5 years.
Section
Source: RFB005_25_26_Bid Document.pdfEvaluation stages: Stage 1 Mandatory, Stage 2 Administrative, Stage 3 Specific Goals and Pricing. 80/20 preference point system: 80 points price, 20 points specific goals. Specific goals: 51% black-owned (4), 51% black women-owned (4), 51% black disabled-owned (2), 51% black youth-owned (4), 51% black-owned in rural/underdeveloped/townships (2), EME/QSE (4). Adjudication: highest total points; tie-breakers: highest specific-goal points, then functionality, then drawing of lots.
Description
Source: NHLS SAVP- Electrical BOQ.pdfThe works comprise the refurbishment of the NHLS SAVP Building electrical installation, including the upgrade of the emergency power distribution system for Production Block 14, with a 5-year service and maintenance period. The contract period is estimated at 9 months. The scope is defined by a Bill of Quantities with five bills covering preliminary and general items, cable reticulation for the UPS, building electrical installation, UPS installation, and a 4-year maintenance plan.
Contact Information
Source: NHLS SAVP- Electrical BOQ.pdf (unknown){"name":null,"email":null,"phone":null,"department":"QTY MATERIAL LABOUR TOTAL","address":"drawings. The Electrical contractor as"}
Submission Guidelines
Source: NHLS SAVP- Electrical BOQ.pdf (unknown)Returnable documents: the completed Bill of Quantities (all five bills), priced and totalled, with the total transferred to the tender offer. All documents must be signed and submitted before the closing time. No other returnable forms are named in the available text.
Evaluation Criteria
Source: NHLS SAVP- Electrical BOQ.pdf (unknown)The document does not state the evaluation method, preference point system, or any minimum qualifying scores. Bidders must price the Bill of Quantities, which includes a 10% contingency and 15% VAT. No functionality or quality scoring criteria are provided.
Technical Specifications
Source: NHLS SAVP- Electrical BOQ.pdf (unknown)Scope: upgrade of the emergency power distribution system for the NHLS SAVP Production Block 14, including supply, installation, testing and commissioning of electrical works, plus service and maintenance for five years.
Works are priced against a Bill of Quantities with five bills:
Compliance: the complete installation must comply with SANS 0142 specifications and the quality specifications. Bidders must study the specification and drawings before pricing the bill.
Provisions: R500,000.00 for unseen services during construction (health and safety compliance of existing services and UPS installation requirements); R400,000.00 for additional materials during the maintenance period.
Contract period: estimated 9 months for the construction works.
Quality Management
Source: NHLS SAVP- Electrical BOQ.pdfThe complete installation must comply with SANS 0142 specifications and the quality specifications. Bidders must study the specification and drawings before pricing the bill.
Distribution boards: supply and installation of new recessed distribution boards to replace existing ones, including tracing of existing circuits as indicated on single-line diagrams.
Testing and commissioning: inspections, testing and handover of the complete installation in the presence of the Engineer, with results certified on Certificates of Compliance by an accredited person, and mark-up drawings.
As-built drawings and O&M manuals: provide a complete set of as-built drawings and three sets of O&M manuals, with all changes made on the latest revised drawings. The contractor must arrange a meeting with the Electrical Engineer to discuss mark-up drawings.
Certificates of Compliance: on completion of each distribution board installation, issue a Certificate of Compliance for each installation as required by regulations.
Pricing Schedule
Source: NHLS SAVP- Electrical BOQ.pdfPricing is against a Bill of Quantities with five bills: Bill 1 (Preliminary and General), Bill 2 (Cable Reticulation for UPS Installation), Bill 3 (Building Installation: Electrical Installation), Bill 4 (UPS: Electrical Installation), and Bill 5 (4-Year Maintenance Plan). Rates must be entered for material and labour per item. The summary page requires sub-totals, a 10% contingency, 15% VAT, and the total to be transferred to the tender offer.
Provisions: R500,000.00 for unseen services during construction; R400,000.00 for additional materials during the 4-year maintenance period.
Financial Requirements
Source: NHLS SAVP- Electrical BOQ.pdf (unknown)Pricing format: Bill of Quantities with separate bills for preliminary and general, cable reticulation, building electrical installation, UPS installation, and the 4-year maintenance plan. Rates must be entered for material and labour per item.
Contingencies: 10% added to the sub-total.
VAT: 15% added to the sub-total.
Security: the bidder must price for security for the full contract period (Bill 1, item 2.1).
Guarantee and maintenance: free maintenance for a 12-month guarantee period covering defects in equipment, material and workmanship (excluding wear and tear, normal maintenance, and lamp replacement).
Provisions: R500,000.00 for unseen services during construction; R400,000.00 for additional materials during the 4-year maintenance period.
Compliance Requirements
Source: NHLS SAVP- Electrical BOQ.pdf (unknown)Health and Safety: bidders must provide a Health and Safety Plan in accordance with the OHS Act Construction Regulations, attend H&S meetings, report on compliance, appoint an H&S representative, and manage the plan for the duration of the contract.
Certificates of Compliance: on completion of each distribution board installation, a Certificate of Compliance must be issued as required by regulations.
Standards: the complete installation must comply with SANS 0142 specifications and the quality specifications.
No CSD, tax clearance, B-BBEE, CIDB, or CIPC requirements are stated in the available text.
Health & Safety
Source: NHLS SAVP- Electrical BOQ.pdfHealth and Safety Plan: bidders must provide a plan in accordance with the OHS Act Construction Regulations, attend H&S meetings as required, report on compliance, appoint an H&S representative, and manage the plan for the duration of the contract.
Staff clothing: all staff on site must wear distinctive overalls/work clothes, bibs and hard hats at all times, with name tags provided to all employees.
Provision: R500,000.00 is allowed for unseen services that might be discovered during construction for health and safety compliance of existing services and UPS installation requirements.
Contractual Terms
Source: NHLS SAVP- Electrical BOQ.pdfGuarantee period: 12 months of free maintenance for all defects in equipment, material and workmanship, excluding wear and tear, normal maintenance, and replacement of lamps.
Maintenance period: after the 12-month defect liability period, the contractor must provide 4 years (48 months) of maintenance covering regular scanning of distribution boards, servicing of the UPS and other electrical components. An allowance of R400,000.00 is provided for additional materials during this period.
Description
Source: NHLS SAVP- Electrical BOQ.xlsThe tender is for the upgrade of the emergency power distribution system for SAVP Production Block 14, including service and maintenance for a period of five years. The work includes electrical installation, UPS installation, and a 4-year maintenance plan after a 12-month defect liability period.
Evaluation Criteria
Source: NHLS SAVP- Electrical BOQ.xls (unknown)The installation must comply with SANS 0142 specifications and the quality specifications. Bidders must study the specification and drawings before pricing the bill. The complete installation must be inspected, tested and handed over in the presence of the Engineer, with results certified on Certificates of Compliance by an accredited person. The contract period is estimated at 9 months, followed by a 12-month guarantee/maintenance period and a 4-year maintenance plan.
Technical Specifications
Source: NHLS SAVP- Electrical BOQ.xls (unknown)Scope includes the upgrade of the emergency power distribution system for SAVP Production Block 14, with service and maintenance for five years. The work covers: supply and installation of PVC insulated armoured copper cables, bare copper earth conductors, cable markers, warning tapes, glands and shrouds, PVC sleeves, trenching and excavations (600mm wide, 800mm deep, including bedding and backfilling, with rates for soft rock and hard rock), distribution boards (replacement of existing recessed boards, tracing of existing circuits, replacement of circuit breakers, identification of cables and conductors, inspection, testing and issuing Certificates of Compliance), provision of conductors (wiring for lighting circuits with 2.5mm² conductors and 2.5mm² earth conductors; socket outlet circuits with 4mm² conductors and 2.5mm² earth conductors), socket outlets (5A single un-switched, 16A one lever one way, 16A two lever one way, 16A one lever two way, daylight switch/photocell, isolators, 230V 16A dedicated round 2-pin + shaped earth pin switched socket outlets, 230V 16A standard round 3-pin switched socket outlets, 230V 16A combination switched socket outlets, 230V 16A 3-pin ZA plug switched socket outlets), tracing and testing of existing switched socket outlets, uninterruptible power supply (UPS) system of 200kVA, 400V, 3-phase, >0.99 pf, n+1 type with individual 15-30 mins battery back up, new floor standing UPS distribution board, cable reticulation for UPS installation, medium duty cable tray (200mm x 50mm and 300mm x 50mm, suspended from structure in roof, fixings not to exceed 2m), contactors, timers and breakers (60A 3pole contactors, 30A timer switch, 20A SP 5kA circuit breaker, 60A TP 5kA circuit breaker, 60A 2P earth leakage), new circuit breaker in existing main low voltage panel in substation (300A, 25kA, 3pole), and a contingency allowance of R500,000.00 for unseen services discovered during construction. The bidder must price for staff to wear distinctive overalls/work clothes, bibs and hard hats at all times on site, with name tags for all employees. A Health and Safety Plan must be provided in accordance with the OHS Act Construction Regulations, with attendance of H&S meetings, reporting on compliance, appointment of an H&S representative, and management of the H&S Plan for the contract duration. Cleaning and restoration of the site during construction and after completion is required. As-built drawings must be provided, with three sets of O&M manuals, and a meeting with the Electrical Engineer to discuss mark-up drawings. All devices, device addresses, isolator positions and cable configuration must be indicated in the drawings. The installation must comply with SANS 0142 specifications. Certificates of Compliance must be issued for each installation provided.
Financial Requirements
Source: NHLS SAVP- Electrical BOQ.xls (unknown)The pricing schedule is a Bill of Quantities with separate bills: BILL NO1 (Preliminary and General), BILL NO2 (Cable Reticulation for UPS Installation), BILL NO3 (Building Installation: Electrical Installation), BILL NO4 (UPS: Electrical Installation), and BILL NO5 (4 Year Maintenance Plan: Electrical Installation). The bidder must price for a fixed portion, items variable with contract period, and items variable with contract price. Security is required for the full contract period. A contingency of 10% is included. An allowance of R500,000.00 is required for unseen services during construction. An allowance of R400,000.00 is required for additional materials during the maintenance period. VAT (15%) must be added. The total is to be transferred to the tender offer.
Compliance Requirements
Source: NHLS SAVP- Electrical BOQ.xls (unknown)The installation must comply with SANS 0142 specifications. A Health and Safety Plan must be provided in accordance with the OHS Act Construction Regulations. Certificates of Compliance must be issued by an accredited person. No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the document.
Evaluation Criteria
Source: NHLS drawings.zip (unknown)No eligibility criteria specified
Compliance Requirements
Source: NHLS drawings.zip (unknown)Insufficient searchable text - AI extraction recommended
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
1 MODDERFONTEIN ROAD - SANDRINGHAM - GAUTENG -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
13 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.