Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
National Health Laboratory Service (NHLS)Location
Gauteng
Closing Date
30 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 MODDERFONTEIN ROAD - SANDRINGHAM - Johannesburg - 1818
Organization Type
GOVERNMENT
Published
03 Sept 2026
OCDS Reference
ocds-9t57fa-168834
RFB071/24/25 is an open tender by the national health laboratory service (nhls) for the outright purchase of a building management system/environmental monitoring system (ems) for their pharmaceutical manufacturing facility, including service and maintenance of the system for five years. The system must be delivered, installed and supported to meet stringent regulatory requirements, with a mandatory compulsory briefing session before bidding.
System must enable environmental monitoring of critical parameters (particle counts, temperature, humidity, pressure differentials, TOC etc.) for the pharmaceutical facility.
Must comply with cGMP, EU GMP Annex 1 (2023) and 21 CFR Part 11 regulations.
Bids must be submitted on official forms; failure to provide required particulars shall result in disqualification.
Bidders must be registered on the Central Supplier Database (CSD) and submit a valid Tax Clearance Certificate (or CSD with tax pin) - Schedule 2.
A B-BBEE Verification Certificate or sworn affidavit (for EMEs/QSEs) must be submitted to qualify for preference points - Schedule 7.
Mandatory compulsory briefing session to be held at NHLS Main Conference Boardroom, 1 Modderfontein Road, Sandringham (Refer to bid document for specific time). Bidders failing to attend shall be disqualified.
Bids must remain valid for 180 days from closing date.
Evaluation will be according to the 80/20 or 90/10 preferential procurement principle, depending on the bid price, and a minimum qualifying score for functionality (technical) will apply.
An original or certified copy of a valid B-BBEE certificate or sworn affidavit must be submitted to qualify for preferential points.
The bid is subject to the general conditions of contract and failing to complete SBD 1 and other official forms may lead to disqualification.
Late bids will not be accepted; bids must be deposited in the bid box at NHLS Main Reception, 1 Modderfontein Road, Sandringham.
Manufacturers may provide a letter of support for the services to ensure maintenance for 5 years is supported.
Maintenance & Support: The bidder should confirm the ability to provide maintenance and support for a period of at least 5 years.
The EMS solution must be supplied and implemented within 120 days from the date of the order.
Installation will be at NHLS facilities in Braamfontein and Sandringham (Auckland Park).
Contract period is 60 months, starting from the date of signature / implementation.
Completion/servicing/installation must not exceed 120 days.
Available 24/7/365 for system maintenance and support, with a response matrix covering reaction time, site attendance, and restoration.
The system must have an electronic audit trail with complete historical data on all system activity.
Software system must be 21 CFR Part 11 compliant and have audit trail capability.
The electronic system, software or solution must be able to handle and provide data and reports in XML, CSV and PDF format.
Solutions must align to 21 CFR Part 11, EU GMP Annex 11, SAHPRA and Euro-pharmaceutical compliance and guidelines.
A Preventative Maintenance Programme must be included in the total bid price, the programme must cover quarterly, bi-annual and annual maintenance.
The electronic system must support more than 100 concurrent users, able to handle significant data volumes, be network-based across NHLS and have security controls aligned with ISO 27001/31000; system must be user-friendly and not browser-dependent.
Potential bidders must have valid various certifications and must be able to tender project timeframes β e.g., any potential bidder must have at least 50% of its operations within the borders of South Africa.
Bidders must provide an implementation plan indicating how the system shall be delivered, implemented, tested and validated in compliance with all applicable regulatory requirements, and training plan for NHLS staff. The plan will be evaluated as part of the functionality evaluation.
Bids must have sufficient technical capacity, resources, and a full-time project manager with proven experience in projects of this magnitude.
A designated project manager must be appointed for the term of the project.
The bidder must provide details regarding local content and local production as per Department of Trade, Industry and Competition (dtic) local production.
Bidders must complete and submit for evaluation the SBD 6.2. Please verify that the SBD 6.2 document is retained as part of this bid document. Refer to the NHLS SCM policy.
Bidders will be evaluated using a 80/20 PPPFA preferential points system according to the 2022 Preferential Procurement Regulations for 80/20 scoring formula for tenders above R50 million. (The indicated estimated value is used for this purpose only).
Evaluation: An 80/20 preferential point system will be used for the evaluation.
Local production: 100 points, 80 points, 10 points. The 80/20 preferential point system as per the 2022 Preferential Procurement Regulations.
Local content and production: The local production and content as stipulated in the Preferential Procurement Regulations, 2022 and the local production and content will be applicable to this bid. Local production and content will be evaluated in terms of the PPPFA Regulation 4(3), 5(3) and 9(1).
Electronic: The CSD (Central Supplier Database) registration is a mandatory requirement.
Preferential Procurement: The NHLS shall apply the 80/20 preferential point system.
ocrExtractedText_bidDocText1.txt.pdf.txt
Date & Time
Wednesday, 30 September 2026 - 11:00
Venue
1 MODDERFONTYEIN ROAD, SANDRINGHAM, JOHANNESBURG, SAVP LIBRARY
Categories
Request for Bid(Open-Tender)
1 MODDERFONTEIN ROAD - SANDRINGHAM - Johannesburg - 1818
03 Sept
2026
Tender Published
Tender was published
30 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFB071_24_25 Bid Document_Reviewed v01.pdf
The National Health Laboratory Service (NHLS) is procuring the outright purchase of a Building Management System/Environmental Monitoring System (EMS), including service and maintenance for five years, under bid number RFB071/24/25. The tender is open to bidders who can supply, install, and maintain the system across NHLS facilities, with a compulsory briefing session and a strict closing date.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
RΒ 95Β 615
Range
Based on 8 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: SANC Registration, SAPC Registration, ISO 15189 (Medical Laboratory Quality)
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf2.1 Based on the Bids submitted and the outcome of the evaluation process according to the set evaluation
criteria, NHLS intends to select a preferred bidder with the view of concluding a service level agreement
(SLA) with such successful bidder. The Bid shall be evaluated in terms of the Preferential Procurement
Policy Framework Act (PPPFA)
2.2 Queries
2.2.1 Should it be necessary for a bidder to obtain clarity on any matter arising from or referred to in this RFB
document, please refer queries, in writing, and to the contact person email address number listed below
on or before 15 September 2026 Under no circumstances may any other employee within NHLS be
approached for any information. Any such action might result in a disqualification of a response submitted
in competition to the RFB. NHLS reserves the right to place responses to such queries on the website.
Telephone 011 555 0595
South African Vaccine producers are currently investing in an Electronic Building Management
System/Environmental Monitoring System (EMS) to continuously monitor and record critical
environmental parametersβparticle counts, temperature, relative humidity, differential pressure,
andβwithin classified areas of the SAVP pharmaceutical manufacturing facility. The system must
comply with EU GMP Annex 1 (2023), 21 CFR Part 11, EU GMP Part 11, GAMP (Good Automated
Manufacturing Practices) 5, and other applicable regulatory guidelines.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
If a bidder does not comply fully with each of the mandatory requirements, it Shall be regarded as mandatory
non-performance/non-compliance and the bid Shall be disqualified. No βunansweredβ questions will be
allowed. If a response to a question has been indicated as comply but not elaborated upon or substantiated it
shall be regarded as mandatory non- performance/non-compliance and the bid shall be disqualified.
Bidders shall provide full and accurate answers to the mandatory questions posed in this document, and, where
required, explicitly state either βComply/Accept (with a βYesβ)β or βDo not comply/do not accept (with a βNoβ)β
regarding compliance to the requirements. Bidders must substantiate their responses to all mandatory
questions. PLEASE NOTE: If the response does not substantiate any of the points or requirements in the body of
the tender, it will be deemed to not comply, even if the βComplyβ field has been marked. Please note: All
documentation to substantiate the mandatory requirements has to be supplied.
The bidder who fails to comply with the Mandatory Requirements will be disqualified.
No. Description Comply Do Not Comply
a. Risk assessment and needs analysis to cover all essential areas of the
production facility, ensuring compliance with current South African and
NHLS safety requirements.
b. Integration of EMS into existing infrastructure including BMS, LMS and Fire
alarm system.
c. Demonstration of data collection, fidelity and retrieval systems including
audit trails, password security and storage facility
d. Demonstration of alarm systems which should include audible and visual
alarms and alerts which are fed through to HMI sms system, email
notification.
e. Validation and verification plan for QT, FAT etc.
f. Training plan.
Substantiation: The bidder must provide a detailed project plan detailing the above items.
and the facility from 2 pharmaceutical grade facilities.
Substantiation: The bidder must attach two letters on a clientβs letterhead.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
.
No. Description Comply Do Not Comply
a) Clean rooms and controlled environments (Grade A, B, C, D).
b) HVAC systems interfacing (for pressure, temperature, humidity data).
c) Cleanroom particle monitoring systems.
d) Water system total organic carbon and conductivity monitoring.
e) Viable microbial air sampling systems (need to have a separate particle counter).
f) 12 Cold storage, 2 Incubators, and 1 Ultra-low freezers.
g) Data management and reporting functions for QA, Production, and Engineering
departments. (Demonstration by means of brochure).
h) Fire alarm system.
Substantiation: Bidder must submit a commitment letter covering a-h.
references detailing that they completed similar work.
Substantiation: The bidder must attach two letters on a clientβs letterhead.
meets the following specifications:
Environmental Monitoring System (EMS) to fully meet the below specifications:
a) Scope This URS applies to the procurement, installation, qualification, and
operation of an EMS that covers:
Clean rooms and controlled environments (Grade A, B, C, D).
HVAC systems interfacing (for pressure, temperature, humidity data).
Cleanroom particle monitoring systems.
Water system total organic carbon and conductivity monitoring.
Viable microbial air sampling systems (need to have a separate particle
counter).
Engineering departments.
b) System Overview
parameters (pressure, temperature, humidity, Total Organic Carbon,
conductivity, particles etc), generate alerts and alarms (Audible alarm
attached to the equipment, SMS, Email) for any excursions, and store all
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Important Dates
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Closing date: 30 September 2026 at 11:00 AM. Compulsory briefing session: 11 September 2026 at 11:00 AM at SAVP Library, 1 Modderfontein Road, Sandringham, Johannesburg. Late coming will not be accepted. All questions must be emailed to [email protected] on or before 15 September 2026. Public tender opening: 30 September 2026 at 11:30 AM at Main Conference Boardroom, NHLS, 1 Modderfontein Road, Sandringham.
Briefing Session
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Compulsory briefing session will be held on 11 September 2026 at 11:00 AM at SAVP Library, 1 Modderfontein Road, Sandringham, Johannesburg. Late coming will not be accepted. All questions must be sent via email to [email protected] on or before 15 September 2026.
Contact Information
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Bidding procedure enquiries: Phillip Serage, telephone 011 555 0595, email [email protected]. Technical enquiries: Simon Machaba, telephone 082 328 2119, email [email protected]. Queries must be directed only to these contacts; approaching other NHLS employees may lead to disqualification.
Submission Guidelines
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Bids must be submitted in two sealed envelopes inside an outer envelope. The first envelope, marked "BID / Proposal Section", holds all documents except pricing. The second, marked "PRICING Section", holds the pricing schedule, price declaration and supporting pricing documentation. Submit one original, one hard copy and one electronic copy on a USB flash drive in PDF format. The original must be signed in black ink by an authorised representative, and every page initialled. Bids must be deposited in the bid box at NHLS Main Reception, 1 Modderfontein Road, Sandringham, Johannesburg, before 11:00 on 30 September 2026. Bids too large for the box must be handed in at reception during office hours (08:00β16:30) or before 11:00 on closing date. Bids sent by post or courier must reach the office at least 36 hours before closing. Late bids will not be accepted. Telephonic, faxed, emailed or oral bids are not accepted. Bids must be on the official forms; any alteration to wording will lead to disqualification. Returnable forms include SBD 1 (Invitation to Bid), SBD 4 (Bidder's Disclosure), SBD 6.1 (Preference Points Claim), SBD 7 (Contract Form), and proof of authority to sign (e.g. company resolution). Failure to sign mandatory documents or to price according to the costing template will result in disqualification.
Returnable Documents
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Mandatory returnable documents include: proof of attendance at compulsory briefing session and site visit; accepted NHLS Special Conditions of Contract; fully completed and signed Bidder's Disclosure SBD 4. Essential returnable documents include: valid Tax Clearance Certificate or Tax Compliance Status letter with PIN; B-BBEE certificate or sworn affidavit; audited financial statements not older than two years.
Evaluation Criteria
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Evaluation is based on the 80/20 PPPFA principle: price 80 points, specific goals 20 points, total 100 points. The process has four stages: Stage 1 Administrative Compliance verification, Stage 2 Technical Mandatory requirement evaluation, Stage 3 Technical Functionality requirement evaluation, Stage 4 Price/Specific Goals evaluation. Bidders must pass each stage to proceed. The BID/Proposal envelope is opened first; the PRICING envelope is only opened for bidders who meet the minimum predefined functionality threshold. The Cross Functional Evaluation Team (CFET) evaluates technical and functional aspects. Bidders that score the minimum threshold are recommended to the Bid Adjudication Committee (BAC), and the contract is awarded to the bidder with the highest total points (Merit 1).
Technical Specifications
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)The system must be an Electronic Building Management System/Environmental Monitoring System (EMS) for the SAVP pharmaceutical manufacturing facility, to continuously monitor and record critical environmental parameters including particle counts, temperature, relative humidity, differential pressure, total organic carbon, and conductivity. It must comply with EU GMP Annex 1 (2023), 21 CFR Part 11, EU GMP Part 11, GAMP 5, and other applicable regulatory guidelines. The EMS must cover: clean rooms and controlled environments (Grade A, B, C, D); HVAC systems interfacing for pressure, temperature, humidity data; cleanroom particle monitoring systems; water system total organic carbon and conductivity monitoring; viable microbial air sampling systems (with a separate particle counter); 12 cold storage units, 2 incubators, and 1 ultra-low freezer; data management and reporting functions for QA, Production, and Engineering departments; and fire alarm system integration. The system must provide real-time continuous monitoring, generate alerts and alarms (audible, SMS, email) for excursions, and store all data. Mandatory requirements include: a project plan covering risk assessment, integration with existing BMS/LMS/fire alarm, data collection and retrieval with audit trails, alarm systems, validation and verification plan (DQ, FAT, IQ, OQ, PQ), and training plan; two contactable reference letters from pharmaceutical grade facilities; a commitment letter covering the EMS scope; and supply, delivery, installation, qualification, and operation of the EMS. The system must include UPS and power backup for at least 2 hours. At least 12 months' warranty is required. The supplier must provide spares, preventative and corrective maintenance, and standby service after hours, weekends and holidays.
Methodology
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Bidders must provide full and accurate answers to all mandatory questions, explicitly indicating 'Comply/Accept' or 'Do not comply/Do not accept'. Responses must be substantiated; failure to substantiate will be deemed non-compliance and may lead to disqualification. Bidders must promote growth and development of SMMEs and will be assessed on their efforts.
Experience & Qualifications
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf7.1 Identify key personnel, by employer (include subcontractor(s) and provide contact information.
8.1 NHLS reserves the right to disqualify any bidder which does any one or more of the following, and such
disqualification may take place without prior notice to the offending bidder, however the bidder shall be
notified in writing of such disqualification:
8.1.1 bidders who submitted did not sign the mandatory documents;
8.1.2 bidders who submitted information that is fraudulent, factually untrue or inaccurate, for example
memberships that do not exist, B-BBEE credentials, experience, etc.;
8.1.3 bidders who received information not available to other vendors through fraudulent means;
8.1.4 bidders who do not comply with mandatory requirements as stipulated in this RFB; and
8.1.5 bidders who fail to price according to the costing template provided;
9.1 All additions to the proposal documents i.e. annexes, supporting documentation pamphlets, photographs,
technical specifications and other support documentation covering the goods offered etc. shall be neatly
bound as part of the schedule concerned.
9.2 All responses regarding questions posed in the annex attached herewith shall be answered in accordance
with the prescribed RFB Response Format.
9.3 Telephonic, faxed, e-mailed or oral tenders shall not be accepted.
10.1 Bidders who submit Bids in response to this RFB may be required to give an oral presentation, which may
include, but is not limited to, an equipment/service demonstration of their proposal to NHLS. This provides
an opportunity for the vendor to clarify or elaborate on the proposal. This is a fact finding and explanation
session only and does not include negotiation. NHLS shall schedule the time and location of these
presentations. Oral presentations are an option of NHLS and may or may not be conducted and must not
be construed as being successful in or awarded the tender.
11.1 Bidders shall provide full and accurate answers to all (including mandatory) questions posed in this
document and are required to explicitly indicate either "Comply/Accept (with a ο)" or "Do not comply/Do
not accept (with an X)" regarding compliance with the requirements. Where a condition is not applicable,
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
an βN/Aβ option is provided, and bidders must clearly indicate this by marking with an βXβ. Where
necessary, the bidder shall substantiate their response to a specific question.
NOTE: It is mandatory for bidders to complete or answer this part fully (11.2 to 11.34); otherwise, their
bid shall be treated as incomplete and shall be disqualified. Refer to paragraph 8 of this document
(reasons for disqualification).
11.2
Accept Do not Accept This bid is subject to the General Conditions of Contract stipulated in this document.
11.3
The laws of the Republic of South Africa shall govern this RFB, and the Bidders hereby Accept Do not Accept
accept that the courts of the Republic of South Africa shall have the jurisdiction.
11.4
NHLS shall not be liable for any costs incurred by the bidder in the preparation of Accept Do not Accept
response to this RFB. The preparation of response shall be made without obligation
to acquire any of the items included in any bidderβs proposal or to select any proposal,
or to discuss the reasons why such vendorβs or any other proposal was accepted or
rejected.
11.5
NHLS Procurement Services may request written clarification regarding any aspect of Accept Do not Accept
this proposal. The bidders must supply the requested information in writing within the
specified time frames after the request has been made, otherwise the proposal shall
be disqualified.
11.6
Do not N/A
In the case of Consortium, Joint Venture or subcontractors, bidders are required to Accept
Accept
provide copies of signed agreements stipulating the work split and Rand value.
11.7
Do not N/A
In the case of Consortium, Joint Venture or subcontractors, all bidders are required to Accept Accept
provide mandatory documents as stipulated in schedule 1 of the Response format.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.8
NHLS reserves the right to; cancel or reject any proposal and not to award the Accept Do not Accept
proposal to the lowest bidder or award parts of the proposal to different bidders, or
not to award the proposal at all.
11.9
Where applicable, bidders who are distributors, resellers and installers of network Accept N/A Do not Accept
equipment are required to submit back-to-back agreements and service level
agreements with their principals.
11.10
By submitting a proposal in response to this RFB, the bidders accept the evaluation Accept Do not Accept
criteria as it stands.
11.11
Where applicable, NHLS reserves the right to conduct benchmarks on Accept Do not Accept
product/services offered during and after the evaluation.
11.12
NHLS reserves the right to conduct a pre-award survey during the source selection Accept Do not Accept
process to evaluate contractors' capabilities to meet the requirements specified in
the RFB and supporting documents.
11.13
Where the bid calls for commercially available solutions, bidders who offer provide Accept Do not Accept
future based solutions will be disqualified.
11.14
The bidder should not qualify the proposal with own conditions. Accept Do not Accept
Caution: If the bidder does not specifically withdraw its own conditions of proposal
when called upon to do so, the proposal response shall be declared invalid.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.15
Accept Do not Accept
Should the bidder withdraw the proposal before the proposal validity period expires,
NHLS reserves the right to recover any additional expense incurred by NHLS having to
accept any less favourable proposal or the additional expenditure incurred by NHLS in
the preparation of a new RFB and by the subsequent acceptance of any less favourable
proposal.
11.16
Accept Do not Accept
Delivery of and acceptance of correspondence between NHLS and the bidder sent by
prepaid registered post (by air mail if appropriate) in a correctly addressed envelope
to either partyβs postal address or address for service of legal documents shall be
deemed to have been received and accepted after (2) two days from the date of
postage to the South African Post Office Ltd.
11.17
Accept Do not Accept
Should the parties at any time before and/or after the award of the proposal and prior
to, and-or after conclusion of the contract fail to agree on any significant product
price or service price adjustments, change in technical specification, change in
services, etc. NHLS shall be entitled within 14 (fourteen) days of such failure to agree,
to recall the letter of award and cancel the proposal by giving the bidder not less than
90 (ninety) days written notice of such cancellation, in which event all fees on which
the parties failed to agree increases or decreases shall, for the duration of such notice
period, remain fixed on those fee/price applicable prior to the negotiations.
Such cancellation shall mean that NHLS reserves the right to award the same proposal
to next best bidders as it deems fit.
11.18
Do not N/A
In the case of a consortium or JV, each of the authorised enterpriseβs members and/or Accept
Accept
partners of the different enterprises must co-sign this document.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.19
Any amendment or change of any nature made to this RFB shall only be of force and Accept Do not Accept
effect if it is in writing, and an Amendment to the RFB will be issued. Bidders will be
required to utilise the latest Amendment in preparation of their bid response.
11.20
Failure or neglect by either party to (at any time) enforce any of the provisions of this Accept Do not Accept
proposal shall not, in any manner, be construed to be a waiver of any of that partyβs
right in that regard and in terms of this proposal. Such failure or neglect shall not, in
any manner, affect the continued, unaltered validity of this proposal, or prejudice the
right of that party to institute subsequent action.
11.21
Bidders who make use of subcontractors. Accept Do not Accept
The proposal shall however be awarded to the Vendor as a primary contractor who
shall be responsible for the management of the awarded proposal. No separate
contract shall be entered into between NHLS and/or its client and any such
subcontractors. Copies of the signed agreements between the relevant parties must
be attached to the proposal responses.
11.22
All services supplied in accordance with this proposal must be certified to all legal Accept Do not Accept
requirements as per the South African law.
11.23
No interest shall be payable on accounts due to the successful vendor in an event of a Accept Do not Accept
dispute arising on any stipulation in the contract.
11.24
Evaluation of Bids shall be performed by a CFET established by NHLS. Accept Do not Accept
Bids shall be evaluated on the basis of conformance to the required specifications as
outlined in the RFB. Points shall be allocated to each bidder, on the basis that the
maximum number of points that may be scored for price is 80/90, and the maximum
number of preference points that may be claimed for Specific Goals (according to the
PPPFA) is 20/10.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.25
Prior to the award of any tender or contract the NHLS will check the Prohibition status Accept Do not Accept
of recommended suppliers/ service providers on the Treasury website
([email protected]) as well as the Treasury Register for Tender Defaulters
11.26
Accept Do not Accept
The NHLS will act against the bidder or person awarded the contract upon detecting
that the B-BBEE status level of contribution has been claimed or obtained on a
fraudulent basis or any of the contract conditions have not been fulfilled.
11.27
The NHLS may, in addition to any other remedy that it may have against the bidder Accept Do not Accept
or person:
Disqualify the bidder or person from the bidding process;
Recover all costs, losses or damages it has incurred;
or suffered as a result of that personβs conduct;
Cancel the contract and claim any damages which it;
has suffered as a result of having to make less;
favourable arrangements due to such cancellation;
Restrict the bidder or contractor, its shareholders;
and directors, or only the shareholders and directors;
who acted on a fraudulent basis, from obtaining business;
from any organ of state for a period not exceeding 10;
years, after applying the audi alteram partem (hear the other side) rule;
Forward the matter for Blacklisting by Treasury; and
Forward the matter for criminal prosecution
11.28
If the successful bidder disregards contractual specifications, this action may result in Accept Do not Accept
the termination of the contract.
11.29
The biddersβ response to this Tender, or parts of the response, shall be included as a Accept Do not Accept
whole or by reference in the final contract.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.30
NHLS has discretion to extend the validity period should the evaluation of this bid not Accept Do not Accept
be completed within the stipulated validity period.
11.31
Upon receipt of the request to extend the validity period of the bid, the bidder must Accept Do not Accept
respond within the required time frames and in writing on whether or not he agrees
to hold his original bid response valid under the same terms and conditions for a
further period.
11.32
Should the bidder change any wording or phrase in this document, the bid shall be Accept Do not Accept
deemed unresponsive and may lead to the disqualification of the bid response.
11.33
11.34
Accept Do not Accept
No alternative tender offers will be considered.
12.1 Bidders shall provide full and accurate answers to all (including mandatory) questions posed in this
document and are required to explicitly indicate either "Comply/Accept (with a ο)" or "Do not comply/Do
not accept (with an X)" regarding compliance with the requirements. Where necessary, the bidder shall
substantiate their response to a specific question.
12.2 NOTE: It is mandatory for bidders to complete or answer this part fully (12.2.1 to 12.2.8); otherwise, their
bid shall be treated as incomplete and shall be disqualified. Refer to paragraph 8 of this document (reasons
for disqualification).
(NOTE: Failure to address the items in the scope of works WILL lead to disqualification).
No. Description Accept Do Not Accept
12.2.1 The bidder must provide the Qualification documentation for the automated
Building Management System/Environmental Monitoring System (EMS) and its
controls with each milestone of the project:
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
No. Description Accept Do Not Accept
Design Qualification (DQ)
Factory Acceptance Test (FAT)
Installation Qualification (IQ)
Operations Qualification (OQ)
Performance Qualification (PQ)
12.2.2. At least 12 monthsβ warranty documentation.
12.2.3. Bidder must accept drafting and submitting a Risk assessment for the environmental
monitoring system.
Risk assessment should detail the following:
a) Risk assessments should be performed to establish the comprehensive
environmental monitoring programme, i.e. sampling locations, frequency of
monitoring and monitoring methods.
b) These risk assessments should be conducted based on detailed knowledge
of the process inputs and final product, the facility, equipment, the
criticality of specific processes and steps, the operations involved, routine
monitoring data, monitoring data obtained during qualification.
12.2.4. UPS and Power backup for at least 2 hours to ensure data capture during power
failure.
12.2.5. a) Training and Support
Supplier to provide comprehensive training for:
System operation
Administration and configuration
Maintenance and calibration
Data review and reporting
Ongoing technical support and periodic system health checks.
12.2.6. Five yearsβ Service and Maintenance of the Environmental monitoring system
(Ems).
This phase focuses on servicing and maintenance of the installed
environmental monitoring system for a period of five (5) years. The work
includes, but is not limited to:
and outage maintenance work.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
No. Description Accept Do Not Accept
maintained and operable; performs related testing and repair as needed.
remedial)
maintenance (PM), corrective maintenance (CM).
12.2.7. The supplier/installer must comply with the Occupational Health and Safety Act and
relevant regulations.
12.2.8. A valid Electrical Certificate of Compliance (CoC), issued by a registered electrician,
must be provided for all electrical work related to the EMS installation. The CoC must
be submitted as part of the handover documentation. Failure to provide the CoC will
result in non-acceptance of the installation. Failure to provide the CoC will result in
non-acceptance of the installation.
13.1 Evaluation of tenders and selection of contractorsβ/service providers
The NHLS is a Schedule 3A Government Institution subjected to the Public Finance Management Act
(PFMA), the Public Preferential Framework Act (PPPFA) and Treasury Regulations/ Instructions. Bidders
must assist the NHLS to eliminate corruption and fraud by completing and submitting form SBD4.
13.1.1. A public bid opening will be conducted at the bid closing date and time for all bids received in the bid/tender
box. The bidderβs name will be announced to the attendees of the public opening. The same information
will be published on the NHLS website. Financial offers or prices will not be disclosed or read out during
the public opening. The public disclosure of pricing will be only of the awarded bidder at the conclusion of
the procurement process.
13.1.2 Next steps of evaluation is administrative compliance verification and the βtechnicalβ or so called
βfunctionalβ evaluation which is purely based on NHLS specifications (Annexure 2) and Scope of Work. NHLS
end-user department (who requested the bid), Procurement Services, Finance and subject specialists are
part of the Cross Functional Evaluation Team (CFET) meeting which is chaired by Quality Assurance (QA).
All the members of the CFET must complete Declaration of Interest forms and must recuse themselves in
case of any conflict of interest.
13.1.3 The final stage of evaluation is done after the CFET has reached their verdict and is done by NHLS
Procurement Services and separately from the CFET meeting. Points for Specific Goals (commercial
evaluation) is being added in order to get the final order of merit for the bidders being evaluated.
13.1.4 Bidders that score the minimum threshold are recommended and submitted to the NHLS Bid
Adjudication Committee (BAC) for adjudication and the bid MUST be awarded to the bidder who scored
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
the highest points (Merit 1) during the CFET and Commercial evaluation (Specific Goals). All the
members of the CFET must complete Declaration of Interest forms and must recuse themselves in case
of any conflict of interest. Should the BAC decide on a bidder other than Merit 1, this decision must be
motivated as a Deviation from NHLS Policy & procedure and Treasury must be advised accordingly.
13.1.5 The CEO of the NHLS must finally approve the recommendation by the Bid Adjudication Committee
(BAC), in his/her capacity as the Accounting Officer.
13.1.6 Details of the successful bidder to be advertised in the National Treasury e-tender portal.
13.1.7 Suppliers must accept the Terms & Conditions of our contract(s) which will result from the RFB
documentβ. RFB conditions and pricing shall be fixed and firm from RFB closing date to the end of
contract.
13.2 Bid evaluation stages
The bid evaluation process consists of several stages that are applicable according to the nature of the
bid as defined below:
Stage 1: Administrative Compliance verification
Stage 2: Technical Mandatory requirement evaluation
Stage 3: Technical Functionality requirement evaluation
Stage 4: Price / Specific Goals evaluation
NOTE: The bidder must qualify for each stage to be eligible to proceed to the next stage of the
evaluation.
13.3 Administrative compliance requirements
Administrative compliance/responsiveness will be tested based on returnable documents submitted
and signatures on the Bid documents.
At this stage, it must be determined what documents are required to be returned by Bidders.
Returnable documents are categorised as follows:
a) Mandatory Returnable Documents
(NOTE: Failure to provide the below listed documents WILL lead to disqualification).
Comply Do Not Comply
Substantiation: The bidder is to indicate whether they have attended the Compulsory Briefing session and site visit.
conditions of Contract.
Substantiation: The bidder must submit and attach to the bid response the signed and accepted NHLS General contract
terms and conditions.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Substantiation: The bidder must submit and attach to the bid response the accepted NHLS Special Conditions of
Contract.
Substantiation: The bidder must submit and attach to the bid response the signed Bidderβs Disclosure SBD 4.
b) Essential Returnable Documents
(NOTE: Failure to provide the below listed documents MAY lead to disqualification).
Submission of original valid Tax Clearance Certificate or a Tax Compliance Status Comply Do Not Comply
Substantiation: The bidder must submit and attach to the bid response a copy of a valid certificate.
Preferential Procurement Claim form and copy of the B-BBEE Verification Comply Do Not Comply
Certificate(s) issued by an authorised body or person, or a sworn affidavit
prescribed by the B-BBEE Codes of Good Practice.
Substantiation: The bidder must submit and attach to the bid response a valid BBBEE Certificate/Affidavit.
Comply Do Not Comply
Audited financial statements not older than two (2) years.
Substantiation: The bidder must submit and attach to the bid response two years financial statements.
Comply Do Not Comply
Proof of Central Supplier Database (CSD) Registration.
Substantiation: The bidder must submit a CSD Report with the bid response.
Compliant with EU GMP Annex 1 (2023) requirements for environmental monitoring.
Compliant with 21 CFR Part 11 and EU GMP Annex 11 for electronic data integrity.
Substantiation: The bidder must submit a commitment letter that the supplied system will be Compliant with
EU GMP Annex 1 (2023) requirements for environmental monitoring and 21 CFR Part 11 and EU GMP Annex 11
for electronic data integrity.
The bidder/manufacturer must provide a Letter of Good Standing from the Comply Do Not Comply
Department of Employment and Labour (COIDA).
of
Labour (COIDA).
13.4 The evaluation of the Bids shall be based on the 80/20 PPPFA principle and the points for evaluation
criteria are as follows:
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Price points 80
Specific Goals 20
Total 100 points
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
ANNEXURE A: Technical Specification
1 special instructions to vendors
1.1 Should a Bidder have reasons to believe that the Technical Specification is not open and/or is written for
a particular brand or product; the Bidder shall notify Procurement Services within ten (10) days after
publication of the bid.
1.2 Bidders shall provide full and accurate answers to the mandatory questions posed in this document, and,
where required explicitly state either βComply/Not Complyβ regarding compliance with the requirements.
Bidders must substantiate their response to all questions, including full details on how their
proposal/solution will address specific functional requirements. All documents as indicated must be
supplied as part of the submission.
1.3 Bidders are encouraged to promote the growth and development of SMMEβs and will be assessed on their
efforts in this regard during the evaluation of this Tender.
2 acronyms and abbreviations
Term Definition
EBS Oracle e-Business Suite
DR Disaster Recovery
DB Database
NHLS National Health Laboratory Service
PMO Project Management Office
SLA Service Level Agreement
8.1 NHLS reserves the right to disqualify any bidder which does any one or more of the following, and such
disqualification may take place without prior notice to the offending bidder, however the bidder shall be
notified in writing of such disqualification:
8.1.1 bidders who submitted did not sign the mandatory documents;
8.1.2 bidders who submitted information that is fraudulent, factually untrue or inaccurate, for example
memberships that do not exist, B-BBEE credentials, experience, etc.;
8.1.3 bidders who received information not available to other vendors through fraudulent means;
8.1.4 bidders who do not comply with mandatory requirements as stipulated in this RFB; and
8.1.5 bidders who fail to price according to the costing template provided;
Quality Management
Source: RFB071_24_25 Bid Document_Reviewed v01.pdfmaintained and operable; performs related testing and repair as needed.
remedial)
maintenance (PM), corrective maintenance (CM).
12.2.7. The supplier/installer must comply with the Occupational Health and Safety Act and
relevant regulations.
12.2.8. A valid Electrical Certificate of Compliance (CoC), issued by a registered electrician,
must be provided for all electrical work related to the EMS installation. The CoC must
be submitted as part of the handover documentation. Failure to provide the CoC will
result in non-acceptance of the installation. Failure to provide the CoC will result in
non-acceptance of the installation.
13.1 Evaluation of tenders and selection of contractorsβ/service providers
The NHLS is a Schedule 3A Government Institution subjected to the Public Finance Management Act
(PFMA), the Public Preferential Framework Act (PPPFA) and Treasury Regulations/ Instructions. Bidders
must assist the NHLS to eliminate corruption and fraud by completing and submitting form SBD4.
13.1.1. A public bid opening will be conducted at the bid closing date and time for all bids received in the bid/tender
box. The bidderβs name will be announced to the attendees of the public opening. The same information
will be published on the NHLS website. Financial offers or prices will not be disclosed or read out during
the public opening. The public disclosure of pricing will be only of the awarded bidder at the conclusion of
the procurement process.
13.1.2 Next steps of evaluation is administrative compliance verification and the βtechnicalβ or so called
βfunctionalβ evaluation which is purely based on NHLS specifications (Annexure 2) and Scope of Work. NHLS
end-user department (who requested the bid), Procurement Services, Finance and subject specialists are
part of the Cross Functional Evaluation Team (CFET) meeting which is chaired by Quality Assurance (QA).
a) Clean rooms and controlled environments (Grade A, B, C, D).
b) HVAC systems interfacing (for pressure, temperature, humidity data).
c) Cleanroom particle monitoring systems.
d) Water system total organic carbon and conductivity monitoring.
e) Viable microbial air sampling systems (need to have a separate particle counter).
f) 12 Cold storage, 2 Incubators, and 1 Ultra-low freezers.
g) Data management and reporting functions for QA, Production, and Engineering
departments. (Demonstration by means of brochure).
h) Fire alarm system.
Substantiation: Bidder must submit a commitment letter covering a-h.
references detailing that they completed similar work.
Substantiation: The bidder must attach two letters on a clientβs letterhead.
meets the following specifications:
Environmental Monitoring System (EMS) to fully meet the below specifications:
a) Scope This URS applies to the procurement, installation, qualification, and
operation of an EMS that covers:
Clean rooms and controlled environments (Grade A, B, C, D).
HVAC systems interfacing (for pressure, temperature, humidity data).
Cleanroom particle monitoring systems.
Water system total organic carbon and conductivity monitoring.
Viable microbial air sampling systems (need to have a separate particle
counter).
Pricing Schedule
Source: RFB071_24_25 Bid Document_Reviewed v01.pdfbidder and each and every page of the proposal shall contain the initials of same signatories.
5.12.2 The bidders are required to submit their bids/tenders in TWO envelopes:
(a) the first envelope to be clearly marked βBID / Proposal Sectionβ. The first envelope holds all
documents, excluding the price schedule, price declaration and detailed supporting pricing
documentation; and
(b) the second envelope to be clearly marked βPRICING Sectionβ. The second envelope holds the
pricing schedule, price declaration and the detailed supporting pricing documentation.
Financial Requirements
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Pricing must be submitted in a separate envelope marked "PRICING Section" with the RFB number, description and bidder's name. The pricing schedule (Annexure B) must be completed according to the costing template provided; failure to price according to the template leads to disqualification. The bid validity period is 180 days from the closing date. Bidders must provide a solvency statement signed by a qualified independent auditor confirming the company's financial position is sound and that it can mobilise financial resources to deliver the project.
Compliance Requirements
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD) and provide a CSD registration report. A valid Tax Clearance Certificate or Tax Compliance Status PIN from SARS must be submitted; for consortia, joint ventures or subcontractors, each party must submit a separate TCS certificate/PIN/CSD number. B-BBEE status level verification certificate or sworn affidavit (for EMEs and QSEs) must be submitted to qualify for preference points. Bids from persons in the service of the state, or companies with directors who are, will not be considered. Bidders must complete and sign SBD 4 (Bidder's Disclosure) and SBD 6.1 (Preference Points Claim). The successful bidder must sign SBD 7 (Contract Form). Proof of authority to sign (e.g. company resolution) must be submitted. Employees and subcontractors may be required to hold security clearances determined by the State Security Agency (SSA) or NHLS, at the bidder's cost. Bidders must warrant coverage under the Compensation for Occupational Injuries and Diseases Act and may be required to provide proof of good standing with the Compensation Fund.
Health & Safety
Source: RFB071_24_25 Bid Document_Reviewed v01.pdfContract (gcc) and, if applicable, any other special conditions of contract.
The following particulars must be furnished (failure to do so shall result in your bid being
Disqualified)
Sbd1
3.1 National Health Laboratory Services [hereinafter referred to as NHLS] is a public health laboratory service
with laboratories across South Africa. Its activities comprise diagnostic laboratory services, research,
teaching and training, and production of sera for anti-snake venom, reagents and media.
3.2 NHLS was established in 2001 by an Act of Parliament to provide diagnostic pathology laboratory services
to the National and Provincial Health Department.
3.3 βAcceptable Bidβ - means any bid, which, in all respects, complies with the specifications and conditions
of the RFB as set out in this document.
3.4 βB-BBEEβ β means broad bases black economic empowerment as defined in section 1 of the Broad-Based
areas of ownership (shareholding), skills transfer, employment equity and procurement practices
(SMME Development) etc.
5.4.2 NHLS shall apply the principles of the Preferential Procurement Policy Framework Act, (Act No. ) to this proposal.
5.4.3 Bidders shall complete the preference certificate attached to this proposal. In the case of a consortium
and sub-contractors, the preference certificate must be completed for each legal entity.
5.5 National Industrial Participation Programme
5.5.1 The Industrial Participation policy, which was endorsed by Cabinet on 30 April 1997, is applicable to
contracts that have an imported content. The NIP is obligatory and therefore must be complied with.
Bidders are required to sign and submit the Standard Bidding Document (SBD5).
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
5.6 Language
5.6.1 Bids shall be submitted in English.
5.7 Gender
5.7.1 Any word implying any gender shall be interpreted to imply all other genders.
5.8 Headings
5.8.1 Headings are incorporated into this proposal and submitted in response thereto, for ease of reference
only and shall not form part thereof for any purpose of interpretation or for any other purpose.
5.9 Security clearances
5.9.1 Employees and subcontractors of the successful bidder may be required to be in possession of valid
security clearances to the level determined by the State Security Agency (SSA) and/or NHLS
commensurate with the nature of the project activities they are involved in. The cost of obtaining
suitable clearances is for the account of the bidders. The bidders shall supply and maintain a list of
personnel involved on the project indicating their clearance status.
5.9.1 Employees and subcontractors of the successful bidder will be required to sign a non-disclosure
agreement.
5.10 Occupational Injuries and Diseases Act
5.10.1 The Bidder warrants that all its employees (including the employees of any sub-contractor that may be
appointed) are covered in terms of the Compensation for Occupational Injuries and Diseases Act and that the cover shall remain in force for the duration of the adjudication of this bid and/ or
subsequent agreement. NHLS reserves the right to request the Bidder to submit documentary proof of
the Bidderβs registration and βgood standingβ with the Compensation Fund, or similar proof acceptable
to NHLS.
5.11 Formal contract
5.11.1 This RFB, all the appended documentation and the proposal in response thereto read together, form
the basis for a formal contract to be negotiated and finalised between NHLS and/or its clients and the
enterprise(s) to whom NHLS awards the bid in whole or in part.
5.11.2 Any offer and/or acceptance entered verbally between NHLS and any vendor, such offer shall not
constitute a contract and thus not binding on the parties.
5.12 Instructions for submitting a proposal
5.12.1 Bidders are required to submit one (1) original, one (1) hard copy and 1 (one) electronic copy on a USB
Flash drive in Portable Document Format (PDF) of the Bid shall be submitted on the date of closure of
the Bid.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Pricing: Bid Price must be submitted in a separate envelop and marked clearly as follows: RFB number,
RFB description and bidderβs name). One (1) original, one (1) hard copy and 1 (one) electronic copy on
a USB Flash drive in Portable Document Format (PDF) of the Bid shall be submitted on the date of closure
of the Bid.
a) Risk assessments should be performed to establish the comprehensive
environmental monitoring programme, i.e. sampling locations, frequency of
monitoring and monitoring methods.
b) These risk assessments should be conducted based on detailed knowledge
of the process inputs and final product, the facility, equipment, the
criticality of specific processes and steps, the operations involved, routine
monitoring data, monitoring data obtained during qualification.
12.2.4. UPS and Power backup for at least 2 hours to ensure data capture during power
failure.
12.2.5. a) Training and Support
a. Risk assessment and needs analysis to cover all essential areas of the
production facility, ensuring compliance with current South African and
Environmental
Source: RFB071_24_25 Bid Document_Reviewed v01.pdfRFB: Enclosed:
Closing Date: 30 September 2026
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
You are hereby invited to bid for requirements of the (name of department/ public entity)
Bid number: RFB071/24/25 closing date: 30 september 2-026 closing time: 11h00
Outright purchase of building management system/environmental monitoring system (ems)
Description including service and maintenance of the system for a period of five (5) years.
Bid response documents may be deposited in the bid box situated at (street address)
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Is the entity a resident of the republic of south africa (RSA)? yes NO
Does the entity have a branch in the RSA? yes NO
Does the entity have a permanent establishment in the RSA? yes NO
Does the entity have any source of income in the RSA? yes NO
Is the entity liable in the RSA for any form of taxation? Yes NO
If the answer is βNOβ to all of the above, then IT is not a requirement to register for a tax compliance status
System pin code from the south african revenue service (SARS) and if not register as per 2.3 Below.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Members persons in the service of the state.β
Nb: failure to provide / or comply with any of the above particulars may render the bid invalid.
Signature of bidder: ...................................................
Capacity under which this bid is signed: ...................................................
(Proof of authority must be submitted e.g. company resolution)
Date:
...................................................
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Confidential information disclosure notice ................................................................................................................ 6
Introduction .............................................................................................................................................................. 6
Definitions ................................................................................................................................................................. 6
Acronyms and abbreviations ................................................................................................................................... 10
General Rules and Instructions ................................................................................................................................ 11
Response format ..................................................................................................................................................... 15
Key personnel .......................................................................................................................................................... 16
Reasons for Disqualification .................................................................................................................................... 16
Bid Preparation ....................................................................................................................................................... 16
Oral presentations and Briefing Sessions ................................................................................................................. 16
General Conditions of Bid and Conditions of Contract ............................................................................................. 16
Evaluation Criteria and Methodology ...................................................................................................................... 24
ANNEXURE A: Technical Specification ............................................................................................................................... 28
ANNEXURE B: Pricing Schedule .......................................................................................................................................... 33
ANNEXURE C: Bidderβs Disclosure (SBD4) .......................................................................................................................... 36
ANNEXURE D: Preferential Procurement Claim Form (SBD6.1) ......................................................................................... 41
ANNEXURE E: Government Procurement: General Conditions of Contract β July 2011 ...................................................... 53
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
3.5 βB-BBEE status level of contributorβ means the B-BBEE status received by a measured entity based on its
overall performance using the relevant scorecard contained in the Codes of Good Practice on Black
Economic Empowerment, issued in terms of section 9(1) of the Broad-Based Black Economic
3.6 βBidβ - means a written offer in a prescribed or stipulated form in response to an invitation by an organ
of state for the provision of services, works or goods through price quotations, advertised bidding
processes or proposals.
3.7 βBiddersβ - means any enterprise, consortium or person, partnership, company, close corporation, firm
or any other form of enterprise or person, legal or natural, which has been invited by NHLS to submit a
bid in response to this bid invitation.
3.8 βBroad-Based Black Economic Empowerment Actβ β means the Broad-Based Black Economic
Empowerment Act, 2003 (Act No. ).
3.9 βClientβ - means the goods or services requestor.
3.10 βComparative Priceβ - Means the price after the factors of a non-firm price and all unconditional discounts
that can be utilized have been taken into consideration.
3.11 βConsortiumβ - means several entities joining forces as an umbrella entity to gain a strategic collaborative
advantage by combining their expertise, capital, efforts, skills and knowledge for the purpose of executing
this tender.
3.12 βContractor Agentβ - means any person mandated by a Prime Contractor or consortium/joint venture to
do business for and on behalf of, or to represent in a business transaction, the Prime Contractor and
thereby acquire rights for the Prime Contractor or consortium/joint venture against NHLS or an organ of
state and incur obligations binding the Prime Contractor or consortium/joint venture in favour of NHLS or
an organ of state.
3.13 βDisabilityβ - means, in respect of a person, a permanent impairment of a physical, intellectual, or sensory
function, which results in restricted, or lack of, ability to perform an activity in the manner, or within the
range, considered normal for a human being.
3.14 Designated group means β
(a) Black designated groups;
(b) Black people;
(c) Women
(d) People with disabilities; or
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
(e) Small enterprises as defined section 1 of the National Small Enterprise Act, 1996 (Act No. )
3.15 βDesignated sectorβ means β a sector, sub-sector or industry or product designated by the Department
of Trade and Industry.
3.16 βEMEβ means an Exempted Micro Enterprise in terms of a code of good practice on black economic
empowerment issued in terms of section 9 (1) of the Broad-Based Black Economic Empowerment Act;
3.17 βFirm Priceβ - means the price that is only subject to adjustments in accordance with the actual increase
or decrease resulting from the change, imposition or abolition of customs or excise duty and any other
duty, levy or tax which, in terms of a law or regulation is binding on the contractor and demonstrably has
influence on the price of any supplies or the rendering cost of any service, for the execution of a contract.
3.18 βGoodsβ β means any work, equipment, machinery, tools, materials or anything of whatever nature to be
rendered to NHLS or NHLSβs delegate by the Successful Bidder in terms of this bid.
3.19 βHistorically Disadvantaged Individualβ (HDI) - means a South African citizen:
3.19.1 Who, due to the apartheid policy that had been in place, had no franchise in national elections prior
to the introduction of the Constitution of the Republic of South Africa, 1983, (Act No. ) or
the Constitution of the Republic of South Africa, 1993 (Act No. ) (the Interim Constitution);
and/or;
3.19.2 who is a female; and/or;
3.19.3 who has a disability;
provided that a person who obtained South African citizenship on or after the coming to effect of the
3.20 βJoint Ventureβ - (Project) means two or more businesses joining together under a contractual agreement
to conduct a specific business enterprise with both parties sharing profit and losses. The venture is for
one specific project only, rather than for a continuing business relationship as in a strategic alliance. It is
about sharing risk with others and providing one or more missing and needed assets and competencies.
3.21 βManagementβ - in relation to an enterprise or business, means an activity inclusive of control, and
performed on a daily basis, by any person who is a principal executive officer of the company, by whatever
name that person may be designated, and whether or not that person is a director.
3.22 βMilitary veteranβ- has the meaning assigned to it in section 1 of the Military Veterans Act, 2011 (Act No.
).
3.23 βNon-firm Price(s)β - means all price(s) other than βfirmβ price(s).
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
3.24 βOrgan of Stateβ - means a National Department or Provincial Administration as stipulated in Schedules
1 and 2 of the Public Service Act, Act (as amended).
3.25 βPerson(s)β - refers to a natural and/or juristic person(s).
3.26 βPriceβ- includes all applicable taxes less all unconditional discounts.
3.27 βPrime Contractorβ β means any person (natural or juristic) who forwards an acceptable proposal in
response to this RFB with the intention of being the main contractor should the proposal be awarded to
him/her.
3.28 βProof of B-BBEE status level of contributorβ means -
(a) B-BBEE Status level certificate issued by an authorized body or person;
(b) A sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; and
(c) Any other requirement prescribed in terms of the B-BBEE Act.
3.29 βQSEβ - means a qualifying small business enterprise in terms of a code of good practice on black
economic empowerment issued in terms of section 9 (1) of the Broad-Based Black Economic
Empowerment Act;
3.30 βRand Valueβ - means the total estimated value of a contract in South African currency, calculated at the
time of invitations and includes all applicable taxes and excise duties.
3.31 βRural Areaβ means β
(a) A sparsely populated area in which people farm or depend on natural resources, including villages
and small town that are dispersed through the area; or
(b) An area including a large settlement which depends on migratory labour and remittances and
government social grants for survival and may have a traditional land tenure system.
3.32 βSMMEβ β bears the same meaning assigned to this expression in the National Small Business Act, 1996
(Act No. ).
3.33 βStipulated minimum thresholdβ means β the minimum threshold stipulated for local production and
content.
3.34 βSub-contractβ means - the primary contractorβs assigning, leasing, making out work to, or employing,
another person to support such primary contractor in the execution of part of a project in terms of the
contract.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
3.35 βSubcontractorβ - means any person (natural or juristic) who is subcontracted a portion of an existing
contract by a Prime Contractor.
3.36 βSuccessful Bidderβ - means the organization or person with whom the order is placed and who is
contracted to execute the work as detailed in the bid.
3.37 βTownshipβ means β an urban living area that any time from late 19th century until 27 April 1994, was
reserved for black people, including areas developed for historically disadvantage individuals post 27 April
3.38 βYouthβ has the meaning assigned to it in section 1 of the National Youth Development Agency Act, 2008
(Act No. ).
24x7 24 hours a day, 7 days a week
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
evaluated fairly and in an unbiased manner, in respect of those bidders that achieve the
minimum predefined functionality threshold.
The NHLS only opens the BID / Proposal Sectionβ the first envelope β at the evaluation stage and
only opens the PRICING Sectionβ the second envelope β for those bidders who met the
predefined functionality threshold at the BID section evaluation
5.12.3 Bidders shall submit proposal responses in accordance with the prescribed manner of submissions as
specified above.
5.12.4 Bids must be submitted in a prescribed response format herewith reflected as Response Format, and
be sealed in an envelope clearly marked.
5.12.5 Bids that are too large to fit into the tender box must be handed in at the reception desk during office
hours from 08:00- 16:30 or before 11:00 on the closing date.
5.12.6 All Bids in this regard shall only be accepted if they have been placed in the bid box before or on the
closing date, 30 September 2026 and stipulated time, 11h00 am.
5.12.7 Bids received after the time stipulated shall not be considered.
5.12.8 Bid responses sent by post or courier must reach this office at least 36 hours before the closing date to
be deposited into the proposal box. Failure to comply with this requirement shall result in your proposal
being treated as a βlate proposalβ and shall not be entertained. Such proposal shall be returned to the
respective bidders.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
5.12.9 No proposal shall be accepted by NHLS if submitted in any manner other than as prescribed above.
Compliance Status letter (with pin) issued by the South African Revenue Services or a CSD Report
reflecting active Tax Clearance Compliance status must be submitted for each member.
6.2.2.2 Central Supplier Database (CSD) Registration Report
6.2.3 Schedule 3: Executive Summary of proposal
6.2.4 Schedule 4: Technical/Functionality (Annexure A)
6.2.5 Schedule 5: Bid Price (to be submitted in a separate envelop and marked clearly as follows: RFB
number, RFB description and bidderβs name) (Annexure B)
6.2.6 Schedule 6: Bidderβs Disclosure SBD 4 (Annexure C)
6.2.7 Schedule 7: Preferential Procurement Claim form and copy of the B-BBEE Verification Certificate(s) issued
by an authorised body or person, or a sworn affidavit prescribed by the B-BBEE Codes of Good Practice.
(Annexure D)
6.2.8 Schedule 8: Bidder Profile:
6.2.8.1 Credentials of the company/consortium members etc.
6.2.8.2 Structure of the company/ consortium members etc.
6.2.8.3 Partnership agreements/contracts
6.2.9 Schedule 9: General Conditions of Contract (Annexure E)
6.3 Bidder background information materials:
6.3.1 Bidder Operating Organisation β Provide an overview of the operating structure and geographical
locations of the firm at the national, regional, and local levels.
6.3.2 Standards β Include information regarding your firmβs utilization of widely known Industry Standards and
guidelines, as they apply to your firm, your firmβs proposal and proposed hardware assets.
6.3.3 Company Contact(s) β Provide the name, title, street address, city, state, telephone and fax numbers and
e-mail of the primary companyβs contact person, and for any sub-Contractors.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
6.3.4 Corporate Financial Solvency - Provide solvency statement signed by a qualified independent auditor that
the financial position of the company is sound and that the company will be able to mobilise financial
resources to deliver the project.
7.1 Identify key personnel, by employer (include subcontractor(s) and provide contact information.
11.1 Bidders shall provide full and accurate answers to all (including mandatory) questions posed in this
document and are required to explicitly indicate either "Comply/Accept (with a ο)" or "Do not comply/Do
not accept (with an X)" regarding compliance with the requirements. Where a condition is not applicable,
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
an βN/Aβ option is provided, and bidders must clearly indicate this by marking with an βXβ. Where
necessary, the bidder shall substantiate their response to a specific question.
NOTE: It is mandatory for bidders to complete or answer this part fully (11.2 to 11.34); otherwise, their
bid shall be treated as incomplete and shall be disqualified. Refer to paragraph 8 of this document
(reasons for disqualification).
11.2
provide mandatory documents as stipulated in schedule 1 of the Response format.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.8
NHLS reserves the right to; cancel or reject any proposal and not to award the Accept Do not Accept
proposal to the lowest bidder or award parts of the proposal to different bidders, or
not to award the proposal at all.
11.9
Caution: If the bidder does not specifically withdraw its own conditions of proposal
when called upon to do so, the proposal response shall be declared invalid.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.15
partners of the different enterprises must co-sign this document.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.19
outlined in the RFB. Points shall be allocated to each bidder, on the basis that the
maximum number of points that may be scored for price is 80/90, and the maximum
number of preference points that may be claimed for Specific Goals (according to the
PPPFA) is 20/10.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.25
12.2.1 The bidder must provide the Qualification documentation for the automated
Building Management System/Environmental Monitoring System (EMS) and its
controls with each milestone of the project:
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
System operation
Administration and configuration
Maintenance and calibration
Data review and reporting
Ongoing technical support and periodic system health checks.
12.2.6. Five yearsβ Service and Maintenance of the Environmental monitoring system
(Ems).
environmental monitoring system for a period of five (5) years. The work
includes, but is not limited to:
and outage maintenance work.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
case of any conflict of interest.
13.1.3 The final stage of evaluation is done after the CFET has reached their verdict and is done by NHLS
Procurement Services and separately from the CFET meeting. Points for Specific Goals (commercial
evaluation) is being added in order to get the final order of merit for the bidders being evaluated.
13.1.4 Bidders that score the minimum threshold are recommended and submitted to the NHLS Bid
Adjudication Committee (BAC) for adjudication and the bid MUST be awarded to the bidder who scored
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
the highest points (Merit 1) during the CFET and Commercial evaluation (Specific Goals). All the
members of the CFET must complete Declaration of Interest forms and must recuse themselves in case
of any conflict of interest. Should the BAC decide on a bidder other than Merit 1, this decision must be
motivated as a Deviation from NHLS Policy & procedure and Treasury must be advised accordingly.
13.1.5 The CEO of the NHLS must finally approve the recommendation by the Bid Adjudication Committee
(BAC), in his/her capacity as the Accounting Officer.
13.1.6 Details of the successful bidder to be advertised in the National Treasury e-tender portal.
13.1.7 Suppliers must accept the Terms & Conditions of our contract(s) which will result from the RFB
documentβ. RFB conditions and pricing shall be fixed and firm from RFB closing date to the end of
contract.
13.2 Bid evaluation stages
conditions of Contract.
Substantiation: The bidder must submit and attach to the bid response the signed and accepted NHLS General contract
terms and conditions.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Proof of Central Supplier Database (CSD) Registration.
Substantiation: The bidder must submit a CSD Report with the bid response.
Compliant with EU GMP Annex 1 (2023) requirements for environmental monitoring.
Compliant with 21 CFR Part 11 and EU GMP Annex 11 for electronic data integrity.
Substantiation: The bidder must submit a commitment letter that the supplied system will be Compliant with
EU GMP Annex 1 (2023) requirements for environmental monitoring and 21 CFR Part 11 and EU GMP Annex 11
for electronic data integrity.
Department of Employment and Labour (COIDA).
of
Labour (COIDA).
13.4 The evaluation of the Bids shall be based on the 80/20 PPPFA principle and the points for evaluation
criteria are as follows:
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Price points 80
Specific Goals 20
Total 100 points
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
ANNEXURE A: Technical Specification
System/Environmental Monitoring System (EMS) to continuously monitor and record critical
environmental parametersβparticle counts, temperature, relative humidity, differential pressure,
andβwithin classified areas of the SAVP pharmaceutical manufacturing facility. The system must
comply with EU GMP Annex 1 (2023), 21 CFR Part 11, EU GMP Part 11, GAMP (Good Automated
Manufacturing Practices) 5, and other applicable regulatory guidelines.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
b. Integration of EMS into existing infrastructure including BMS, LMS and Fire
alarm system.
c. Demonstration of data collection, fidelity and retrieval systems including
audit trails, password security and storage facility
d. Demonstration of alarm systems which should include audible and visual
alarms and alerts which are fed through to HMI sms system, email
notification.
e. Validation and verification plan for QT, FAT etc.
f. Training plan.
Substantiation: The bidder must provide a detailed project plan detailing the above items.
and the facility from 2 pharmaceutical grade facilities.
Substantiation: The bidder must attach two letters on a clientβs letterhead.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
.
b) System Overview
parameters (pressure, temperature, humidity, Total Organic Carbon,
conductivity, particles etc), generate alerts and alarms (Audible alarm
attached to the equipment, SMS, Email) for any excursions, and store all
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
Contractual Terms
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf1.1 This document may contain confidential information that is the property of the NHLS and the Client.
1.2 No part of the contents may be used, copied, disclosed or conveyed in whole or in part to any party in any
manner whatsoever other than for preparing a proposal in response to this Bid, without prior written
permission from NHLS and the Client.
1.3 All Copyright and Intellectual Property herein vests with NHLS and its Client.
2.1 Based on the Bids submitted and the outcome of the evaluation process according to the set evaluation
criteria, NHLS intends to select a preferred bidder with the view of concluding a service level agreement
(SLA) with such successful bidder. The Bid shall be evaluated in terms of the Preferential Procurement
Policy Framework Act (PPPFA)
2.2 Queries
2.2.1 Should it be necessary for a bidder to obtain clarity on any matter arising from or referred to in this RFB
document, please refer queries, in writing, and to the contact person email address number listed below
on or before 15 September 2026 Under no circumstances may any other employee within NHLS be
approached for any information. Any such action might result in a disqualification of a response submitted
in competition to the RFB. NHLS reserves the right to place responses to such queries on the website.
Telephone 011 555 0595
Queries:
E-mail [email protected]
5.1.1 The information contained in this document is of a confidential nature and must only be used for
purposes of responding to this RFB. This confidentiality clause extends to Bidder partners and/or
implementation agents, whom the Bidder may decide to involve in preparing a response to this RFB.
5.1.2 For purposes of this process, the term βConfidential Informationβ shall include all technical and business
information, including, without limiting the generality of the foregoing, all secret knowledge and
information (including any and all financial, commercial, market, technical, functional and scientific
information, and information relating to a partyβs strategic objectives and planning and its past, present
and future research and development), technical, functional and scientific requirements and
specifications, data concerning business relationships, demonstrations, processes, machinery, know-
how, architectural information, information contained in a partyβs software and associated material and
documentation, plans, designs and drawings and all material of whatever description, whether subject
to or protected by copyright, patent or trademark, registered or un-registered, or otherwise disclosed
or communicated before or after the date of this process.
5.1.3 The receiving party shall not, during the period of validity of this process, or at any time thereafter, use
or disclose, directly or indirectly, the confidential information of NHLS (even if received before the date
of this process) to any person whether in the employment of the receiving party or not, who does not
take part in the performance of this process.
5.1.4 The receiving party shall take all such steps as may be reasonably necessary to prevent NHLSβs
confidential information coming into the possession of unauthorised third parties. In protecting the
receiving partyβs confidential information, NHLS shall use the same degree of care, which does not
amount to less than a reasonable degree of care, to prevent the unauthorised use or disclosure of the
confidential information as the receiving party uses to protect its own confidential information.
5.1.5 Any documentation, software or records relating to confidential information of NHLS, which comes into
the possession of the receiving party during the period of validity of this process or at any time
thereafter or which has so come into its possession before the period of validity of this process:
5.1.5.1 shall be deemed to form part of the confidential information of NHLS;
5.1.5.2 shall be deemed to be the property of NHLS;
5.1.5.3 shall not be copied, reproduced, published or circulated by the receiving party unless and to the extent
that such copying is necessary for the performance of this process and all other processes as
contemplated in; and
5.1.5.4 shall be surrendered to NHLS on demand, and in any event on the termination of the investigations
and negotiations, and the receiving party shall not retain any extracts.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
5.2.1 Bidders or their agents shall not make any news releases concerning this RFB or the awarding of the
same or any resulting agreement(s) without the consent of, and then only in co-ordination with, NHLS
and its Client.
5.3 Precedence of documents
5.3.1 This RFB consists of a number of sections (see list). Where there is a contradiction in terms between the
clauses, phrases, words, stipulations or terms and herein referred to generally as stipulations in this RFB
and the stipulations in any other document attached hereto, or the RFB submitted hereto, the relevant
stipulations in this RFB shall take precedence.
5.3.2 Where this RFB is silent on any matter, the relevant stipulations addressing such matter and which
appear in the PPPFA shall take precedence. Bidders shall refrain from incorporating any additional
stipulations in its proposal submitted in terms hereof other than in the form of a clearly marked
recommendation that NHLS may in its sole discretion elect to import or to ignore. Any such inclusion
shall not be used for any purpose of interpretation unless it has been so imported or acknowledged by
dispute arising on any stipulation in the contract.
11.24
the termination of the contract.
11.29
The biddersβ response to this Tender, or parts of the response, shall be included as a Accept Do not Accept
whole or by reference in the final contract.
Confidential of 65
RFB071/24/25: Outright purchase of Building Management System/Environmental Monitoring System (EMS) including service and
maintenance of the system for a period of five (5) years.
11.30
Design Qualification (DQ)
Factory Acceptance Test (FAT)
Installation Qualification (IQ)
Operations Qualification (OQ)
Performance Qualification (PQ)
12.2.2. At least 12 monthsβ warranty documentation.
12.2.3. Bidder must accept drafting and submitting a Risk assessment for the environmental
monitoring system.
Special Conditions
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Bidders must submit one original, one hard copy, and one electronic copy on USB in PDF. Pricing must be in separate envelope marked clearly. Bids must be in two envelopes: 'BID/Proposal Section' and 'PRICING Section'. Bids too large for tender box must be handed at reception during office hours. Bids sent by post/courier must reach office 36 hours before closing.
Requirements
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf (TENDER)Bidders must comply with tax obligations, submit SARS PIN or CSD number. No bids from persons in service of the state or companies with directors in state service. Bidders must submit bids on official forms without changes. Bids must be delivered by stipulated time to correct address; late bids not accepted.
Section
Source: RFB071_24_25 Bid Document_Reviewed v01.pdf2.1 Based on the Bids submitted and the outcome of the evaluation process according to the set evaluation
Policy Framework Act (PPPFA)
minimum predefined functionality threshold.
The NHLS only opens the BID / Proposal Sectionβ the first envelope β at the evaluation stage and
predefined functionality threshold at the BID section evaluation
13.4 The evaluation of the Bids shall be based on the 80/20 PPPFA principle and the points for evaluation
Price points 80
Specific Goals 20
Total 100 points
efforts in this regard during the evaluation of this Tender.
13.1.2 Next steps of evaluation is administrative compliance verification and the βtechnicalβ or so called
βfunctionalβ evaluation which is purely based on NHLS specifications (Annexure 2) and Scope of Work. NHLS
part of the Cross Functional Evaluation Team (CFET) meeting which is chaired by Quality Assurance (QA).
13.1.3 The final stage of evaluation is done after the CFET has reached their verdict and is done by NHLS
Procurement Services and separately from the CFET meeting. Points for Specific Goals (commercial
evaluation) is being added in order to get the final order of merit for the bidders being evaluated.
13.1.4 Bidders that score the minimum threshold are recommended and submitted to the NHLS Bid
Adjudication Committee (BAC) for adjudication and the bid MUST be awarded to the bidder who scored
the highest points (Merit 1) during the CFET and Commercial evaluation (Specific Goals). All the
13.2 Bid evaluation stages
The bid evaluation process consists of several stages that are applicable according to the nature of the
Stage 1: Administrative Compliance verification
Stage 2: Technical Mandatory requirement evaluation
Stage 3: Technical Functionality requirement evaluation
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 61 of 2003
Relevant to healthcare services, public health facilities and health-sector procurement.
Relevant because this tender appears to involve health services, public health facilities, clinical services, or medical procurement.
Act 85 of 1993
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsx
The National Health Laboratory Service (NHLS) is procuring the outright purchase of a Building Management System/Environmental Monitoring System (EMS), including installation, programming, and five years of service and maintenance. The contract covers the supply of the system, ongoing maintenance, calibration, and training over a five-year period.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
National Health Laboratory Service (NHLS)Contact Person
phillip serage
Phone
064-880-5687
[email protected]
Address
1 MODDERFONTEIN ROAD - SANDRINGHAM - Johannesburg - 1818
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
08 Sept 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Secure NHLS tenders with AI-Powered Matching, health-sector intelligence, compliance analysis, and application support for laboratory and diagnostics contracts.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Description
Source: Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsxThe tender is for the outright purchase of a Building Management System/Environmental Monitoring System (EMS) including service and maintenance for a period of five (5) years. The bid price must be inclusive as per the scope of work.
Submission Guidelines
Source: Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsx (unknown)Bidders must complete the pricing schedule exactly as per the provided template (Annexure B). Failure to price according to the costing template will result in disqualification. All required sections of the pricing schedule must be completed.
Evaluation Criteria
Source: Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsx (unknown)Bidders must complete the pricing schedule as per the provided template; failure to do so will lead to disqualification. No other eligibility criteria are stated in the document.
Technical Specifications
Source: Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsx (unknown)The tender covers the outright purchase of a Building Management System/Environmental Monitoring System (EMS), including installation, programming, service and maintenance for a period of five (5) years. The bid price must be inclusive as per the scope of work. Pricing must be provided for: Section A β Outright purchase of the system (including programming); Section B1 β Service and maintenance (preventative maintenance and service per year); Section B2 β Calibrators (list of all calibrators); Section C β Training and application support (system operation, data review and reporting; administration and configuration) for 6 delegates per year.
Financial Requirements
Source: Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsx (unknown)Prices must be provided in South African Rand (R). Line prices are VAT exclusive; the total price is VAT inclusive. The pricing schedule includes subtotals (VAT excl.), VAT at 15%, and subtotal (VAT incl.) for each section, plus a summary of bid amounts. Bidders must ensure that all listed prices are included in the Total Declared Price.
Compliance Requirements
Source: Copy of Proposed Pricing Schedule_RFB071-25-26 Annexure B Price.xlsx (unknown)No specific requirements found
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve health services, public health facilities, clinical services, or medical procurement.
Data conflicts
None detected
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Medical. Unlock full pricing strategies, bid frequency, and historical win rates.