Tender Type
Request for Bid(Open-Tender)
Delivery Location
Maxwell drive - Sunninghill - Sandton - 2157
Organization Type
GOVERNMENT
Published
20 Aug 2026
OCDS Reference
ocds-9t57fa-166298
Design, supply, installation, integration, testing, and commissioning of a comprehensive security upgrade including CCTV, access control, intrusion detection, electric fence, pa, alarm, psim, and standby power systems at the simmerpan complex in germiston. The contract also covers ongoing maintenance services and decommissioning of existing security infrastructure. Bidders must comply with multiple ESKOM ntcsa technical standards and provide accreditation and experience evidence as per standard 240-170000723.
Closing date: 30 September 2026 at 10:00 (submission method not specified).
Location: Simmerpan Complex, Germiston.
Scope: Design and build security upgrade for perimeter, access control, and cameras, including decommissioning of existing equipment.
Compliance: Must comply with Eskom NTCSA standards: 240-91190304, 240-102220945, 240-170000691, 240-170000098, 240-86738968, 240-78980848, Annexure D of 240-185000336, 240-118870219, 240-170000096, 240-171000171, and section 3.11 of 240-170000723.
Accreditation and experience: Must comply with sections 3.1.1 and 3.1.2 of Eskom standard 240-170000723.
Contract type: NEC3 ECC Option A (priced contract) with Activity Schedule pricing including preliminary and general, health and safety, environmental works, and security upgrades.
Pricing: Separate pricing for maintenance services (hourly rates, monthly/yearly fees, per-person training, per-km transport, materials at cost plus percentage mark-up). SHEQ breakdown must be provided with the tender.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 30 September 2026 - 10:00
Venue
MS Teams
Request for Bid(Open-Tender)
Maxwell drive - Sunninghill - Sandton - 2157
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: SAIDSA Accreditation, ISO 18788 (Security Operations Management)
AI Document Analysis Stages
Description
Source: Environmental requirements.zip20 Aug
2026
Tender Published
Tender was published
13 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
BOQ.zip
Eskom NTCSA is procuring a security upgrade at the Simmerpan Complex in Germiston, including perimeter security, access control, and CCTV cameras. The contract covers both a design-and-build upgrade and subsequent maintenance services, priced under NEC3 ECC Option A.
SDL&I.zip
Security upgrade for perimeter, access control, and cameras including maintenance at the Simmerpan Complex under Eskom. The project duration is 24 months. Mandatory local content and subcontracting obligations apply, along with skills development targets.
Environmental requirements.zip
Eskom is procuring a security upgrade for the Simmerpan complex, covering perimeter, access control, and cameras. The provided documents are Eskom's standard environmental requirements and SHEQ policy that contractors must comply with, but the full tender specification, evaluation criteria, and returnable forms are not included in the extracted text.
Commercial.zip
A security upgrade for the Simmerpan Complex, covering perimeter, access control, and cameras. The contract is split into a 24-month construction phase and a 60-month maintenance and support phase, awarded to a single supplier. The procuring entity is the National Transmission Company South Africa SOC Ltd (NTCSA), a division of Eskom.
Safety requirements.zip
Eskom is procuring a security upgrade for the Simmerpan complex, covering perimeter security, access control, and cameras. The project is located in the Northern Cape and is issued by Eskom (National Transmission Company South Africa SOC Ltd). The closing date is 30 September 2026 at 10:00. The provided documents focus on post-award occupational health and safety (OHS) compliance requirements, including a detailed SHE file checklist and Eskom's OHS incident management procedure.
NEC.zip
Eskom (NTCSA) is procuring a comprehensive security upgrade for the Simmerpan Complex, a national key point. The project covers replacement and integration of perimeter fencing, access control, CCTV, alarm, PA, and intrusion detection systems, including a new video wall and PSIM interfaces, under a 24-month NEC3 Option A lump-sum contract.
Quality requirements.zip
This document is Eskom's generic Supplier Quality Management specification (QM 58, revision 4) that forms part of the tender pack for the Simmerpan complex security upgrade. It sets out mandatory quality management system requirements for all bidders, including ISO 9001 compliance, submission of a Contract Quality Plan and Quality Control Plan, and adherence to four categories of quality documentation. The specification does not contain the scope of work, pricing, or evaluation criteria for the security upgrade itself.
Technical.zip
Eskom requires a security upgrade of the perimeter, access control and camera systems at its Simmerpan Complex in Gauteng. The works cover the manufacture and supply of two-way and four-way energiser kiosks, an electric fence controller and a guard house kiosk, together with an Integrated Access Control System that integrates with the existing Eskom IACS backbone. Bids close on 13 November 2026 at 10:00.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 559 562
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom requires all Transmission suppliers to comply with its Environmental Requirements standard (240-180100134). This standard sets minimum criteria for environmental conformity, including an EMS (preferably ISO 14001). The standard applies throughout the contract lifecycle: design, tender, registration, site mobilisation, execution, and post-contract review.
Important Dates
Source: Environmental requirements.zip (unknown)Closing: 30 September 2026 at 10:00.
Contact Information
Source: Environmental requirements.zip (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"Practitioner and Contract or Project managers (contract custodians). It also"}
Evaluation Criteria
Source: Environmental requirements.zip (unknown)Bidders must be registered on Eskom's Transmission vendor database and meet the minimum environmental requirements determined by the tender scope. Environmental risk level (high, medium, low) determines evaluation approach: high-risk contracts use an 'all or nothing' scoring for environmental criteria. Outstanding environmental requirements not met during evaluation may be addressed within 7 days; failure to do so retains the original score but does not automatically disqualify.
Technical Specifications
Source: Environmental requirements.zip (unknown)Eskom is committed to creating and sustaining a Zero Harm culture and standard of safety, health,
the environment, and quality (SHEQ). Zero Harm means ensuring that the Eskom operational
activities do not inflict harm on Eskom’s assets, its employees, contractors, and members of the
public affected by its operations, and the environment in terms of compliance obligations. All
procurement has some level of impact on the environment that needs to be minimised to ensure
sustainable procurement practices. Most environmental impacts occur before goods, works or
services are procured, for example, resource extraction, design development, manufacturing,
transportation and storage, etc. Environment is an integral part of Eskom sustainable procurement
strategy.
This standard sets the minimum criteria for assessing supplier environmental conformity, based on
standards, procedures, policies, and compliance obligations with which Transmission suppliers need
to comply. It specifies a pre-determined set of environmental criteria to evaluate and monitor
potential and contracted Transmission suppliers. The objective is to ensure a common
understanding and consistent implementation of environmental requirements for procurement of
assets, goods, and services.
2.1 Scope
The standard outlines the key responsibilities of Procurement Practitioner, Contractor/Supplier,
Clients, Environmental Practitioner and Contract or Project managers (contract custodians). It also
provides the minimum environmental requirements to be addressed during:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
a) Design phase.
b) Tender enquiry, evaluation, and contract award.
c) Supplier registration on the Transmission vendor data base.
d) Site access /site mobilization.
e) Monitoring of performance during the contract execution period.
f) Contract completion, close out, and post-contract review and
g) Instances and criteria where works or services under a contract can be stopped, suspended or
termination of contracts.
2.1.1 Purpose
The purpose of this standard is to ensure that Suppliers, Contractors, and Sub-Contractors
contracted to Transmission have established an Environmental Management System for goods,
works, or services they provide.
2.1.2 Applicability
This document shall apply throughout Transmission including Suppliers, Service providers,
Contractors, and Sub-Contractors.
2.1.3 Effective date
This standard shall be effective from the date of the signature.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure.
[2] 32-196 Eskom Disciplinary Code Standard.
[3] Project Specific Environmental Management Programmes/Environmental Management Plan.
[4] Project Specific Permits and Licenses (Construction stage).
[5] 240-43921804 Environmental Tender Evaluation Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
[6] 240-151560800 Environmental Evaluation-Commencement of work.
[7] 240-180100148 Pre-construction Access Agreement Form.
[8] 240-110600836 Contractor Environmental Requirements Proforma.
2.2.2 Informative
[9] National Environmental Management Act No
[10] ISO 14001: Environmental Management Systems
[11] National Environmental Management: Waste Act (Act )
[12] Environmental Impact Assessment Regulation (2014)
[13] National Water Act (Act )
[14] National Environmental Management: Air Quality Act (Act )
[15] National Environmental Management: Biodiversity Act (Act )
[16] National Environmental Management: Protected Areas Act (Act )
[17] National Heritage Resources Act (Act )
[18] National Veld and Forest Fire Act (Act )
[19] 240-82410629 Environmental Management Strategy
[20] 240-81146134 Implementing SHEQ as Objective Criteria Position Paper
2.3 Definitions
Definition Explanation
Environmental Any change to the environment, whether adverse or beneficial, wholly, or
Impact partially resulting from an organisation’s environmental aspects.
Environmental Authorisation obtained from a competent authority responsible for
Authorisation authorising listed activities in terms of the National Environmental
Management Act No .
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Environmental It is a programme/plan of action for achieving organisational objectives
Management relating to the mitigation of environmental impacts of its activities, products,
Programme and services.
Environmental A programme for achieving organisational objectives and targets relating to
Management Plan mitigation of the environmental impacts of an organisation’s activities,
products, and services.
Project Means an activity or a group of activities that has a defined start and end
date, a defined scope, and as defined sum of money allocated to complete
the activities.
Project Life Cycle The project life cycle is a step-by-step framework of best practices used to
manage a project from its beginning to its end. It provides Project Managers
a structured way to create, execute, and finish a project.
Environmental file Means a permanent record containing information about the Environmental
management system during construction and all information relating to the
post-construction phase after the handover to the client, so that the client
can maintain the works in a healthy and safe way.
Method Statement Means a written document detailing the key environmental activities to
reduce the hazards identified in any risk assessment. In the case of internal
work, it includes procedures, safe work procedures, and work standards.
Environmental The measurable results of an organization's management of its
Performance environmental aspects.
Organisation A company, corporation, firm, enterprise, authority or institution, or part or
combination thereof, whether incorporated or not, public or private, that has
its own functions and administration.
Note: For organisations with more than one operating unit, a single
operating unit may be defined
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Environmental authorisation obtained from a competent authority responsible for
Authorisation authorising listed activities in terms of the National Environmental
Management Act, 1998 (Act No.) Environmental Impact
Assessment Regulations (2014).
Contractor/Supplier Organisation or person that provides a product or service.
Organisation Example: Producers, distributor, retailer or vendor of a product, or provider
of a service or information.
Note 1: A supplier can be internal or external to the organisation.
Note 2: In a contractual situation, a supplier is sometimes called
“contractor”.
Document Controlled disclosure to external parties (either enforced by law or
Controlled discretionary).
Disclosure
Environmental Is a system which integrates policy, procedures, and processes for training
Management of personnel, monitoring, summarizing, and reporting of specialized
System environmental performance information to internal and external
stakeholders of an organisation.
2.4 Abbreviations
Abbreviation Explanation
EA Environmental Authorisation
ECO Environmental Control Officer
EMPr Environmental Management Programme
EMP Environmental Management Plan
EMS Environmental Management System
ISO International Organisation for Standardization
SDS Safety Data Sheet
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Abbreviation Explanation
TDP Transmission Projects Delivery
SHE Safety Health and Environmental
SHEQ Safety Health Environment and Quality
P&SCM Procurement and Supply Chain Management
SHERQS Safety Health Environment Risk Quality & Security
2.5 Roles and Responsibilities
Procurement Practitioner shall:
Environmental Practitioners for the preparation of the relevant environmental requirements
for the enquiry.
the appropriate environmental practitioners prior to the release of tender documents.
input into the relevant meetings or forums, processes, and reports that lead to the awarding
of the contract (e.g., supplier evaluation, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations and evaluation report compilations,
contract award, briefing meetings).
Environmental Practitioner to ensure that all applicable rules and requirements are
referenced in this form for Tenderers to acknowledge and comply with and ensure that its
completed and included in their tender.
Business Unit Manager shall be responsible for:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
The Environmental Practitioner shall:
lead to the awarding of the contract.
requirements together with members of the cross functional team for each tender/enquiry
and shall ensure that these requirements are handed over to commercial representative
for inclusion in the tender/enquiry.
work and environmental risk assessment conducted for the contract.
are submitted with the tender returnables.
execution and post-contract review and assessment and must also ensure that all reports
are provided to contracts management.
interventions taken and provide the report to the contract custodian and submit to
contracts management.
technical evaluation criteria for the contract.
The Contract Custodian (Contract Executor) shall:
Ensure that the Supplier adheres to the relevant contract environmental requirements.
Ensure that project-specific environmental specifications together with specific
environmental aspects and other relevant procedures and documents are developed in
conjunction with the Environmental Practitioner and provided with the tender package.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
environmental obligations during contract execution, environmental intervention or
standoff, post contract review, supplier reconsideration are adequately addressed,
recorded, and submitted to contracts management for record and future references.
impractical to comply with and suggested recommendations shall be submitted in writing
to contract management where it is impractical to implement and /or comply with
environmental requirements as set out in this standard.
results of such assessment are recorded, documented, and kept.
of the Bills of Quantities in the contract.
Supplier /Service Provider:
documentation for evaluation.
Practitioners during the tender clarification meeting to fully comply with the requirements
of this standard. Such support, guidance and advise shall be levelled in writing with the
Eskom Representative whose details are in the tender document. Direct communication
between tenderers and Environmental Practitioners shall not be allowed. .
Transmission environmental requirements always when contracted with Transmission
Business Units.
related to the works, services or goods tendered for.
site requirements, and it is the responsibility of the Supplier to ensure that these
requirements are met before work can commence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
2.6 Process for Monitoring
Compliance to this standard will be monitored during tender evaluations, periodic inspections and
audits on the works, goods or services rendered. The procedure / process shall include documenting
information to monitor performance, applicable operational controls (method statements) and
conformity with the Transmission EMPr/EMP and/or the EA.
environmental management procedures, and/or any inspection authority acting on
supplier’s behalf, to make available all information at its disposal certificates for review
by Transmission or its appointed inspection agency.
shall be made available to Transmission business units. These shall not be limited to:
o A procedure for Monitoring, Measurement, Analysis and Evaluation of
Eskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa’s primary electricity
supplier and is wholly owned by the South African Government. Eskom’s key role is to assist in
lowering the cost of doing business in South Africa, enabling economic growth and security of supply
through providing electricity in an efficient and sustainable manner, including its generation,
transmission and distribution, while ensuring that this is done within acceptable benchmark
standards.
Eskom generates and distributes approximately 95% of the electricity used in South Africa and
approximately 40% of the electricity used on the rest of the African continent. Approximately 90% of
Eskom’s production is coming from coal.
Eskom aims to comply with the legislation, policies, conditions and requirements of key government
stakeholders, including spheres of government.
Eskom is currently moving away from operating as a vertically integrated company that supplies
electricity to South Africa and the Southern African Development Community (SADC) region. As the
main provider of generation, transmission and distribution capacity in South Africa, Eskom supplies
electricity to industrial, mining, commercial, agricultural and residential customers, as well as to
redistributors.
In doing so, Eskom’s mission is to provide sustainable electricity solutions to grow the economy and
improve the quality of life of the people in South Africa and in the region.
Eskom is committed to safety, health, the environment and quality principles to ensure that no
operating condition or urgency of service justifies exposing anyone to negative risks arising out of
Eskom’s business, causing an incident with health, safety, environmental and quality consequences.
This Safety, Health, Environment & Quality (SHEQ) Policy governs principles and rules to fulfil
Eskom’s commitment to people, the environment and quality.
Eskom’s operations are underpinned by the organisation’s vision, mission and values.
Vision
Sustainable power for a better future
Mission
To provide sustainable electricity solutions to grow the economy and improve the quality of life of the people in
South Africa and in the region
Eskom will strive to ensure that zero harm befalls its employees, contractors, the
Zero harm
public and the natural environment
Integrity Honesty of purpose, conduct and discipline in actions, and respect for people
Innovation Value-adding creativity and results oriented. Lead through excellence and innovation
Sinobuntu Caring
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
A commitment to meet and strive to exceed the needs of the receivers of products
Customer satisfaction
and services
Excellence Acknowledged by all for exceptional standards, performance and professionals
The SHEQ Policy and its implementation aims to ensure commitment to the Eskom vision, values
and the sustainability principles. Zero Harm means ensuring that the Eskom operational activities
do not inflict harm on Eskom’s assets, its employees, contractors and members of the public affected
by its operations, and the environment in terms of compliance obligations. Zero Harm is a value,
which the organisation will strive towards by operating within its compliance obligations/legal and
other requirements, continual improvement against set intended outcomes and reduction of its
environmental footprint by avoiding incidents and minimising environmental degradation. The SHEQ
Policy also aims to achieve Zero Defects.
The implementation of this policy will be in line with the abovementioned values, which underpin the
way Eskom operates.
2.1 Policy statement
Eskom will integrate and/or incorporate safety, health, environment and quality requirements through
the plan-do-check-act (PDCA) quality cycle in its activities so that decisions made ensure the
consideration of economic development, environmental duty of care, and social equity to continually
improve performance and achieve stakeholder requirements.
Eskom’s commitment to safety, health, environment, and quality management is achieved through:
14001, and ISO 45001/OHSAS 18001 requirements;
subscribes and sets to meet the intent of this policy;
health, as well as the provision of safe and healthy workplaces and activities;
stakeholders;
measuring performance against these to ensure continual improvement;
assessment, fitness for duty assessments, emergency preparedness responses, response to
emerging outbreaks, pandemic or epidemic disasters and medical surveillances) for the
opportunity for improvement within the SHEQ management systems;
conducting safety, health, environment and quality training and creating employee awareness;
engaging interested parties and stakeholders by promoting open communication and
engagement that is safety, health, environment and quality purpose-driven;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
safety, health, environment and quality requirements;
management;
committees;
degradation, pursuing a low-carbon future, and prioritising energy and water efficiency and
conservation within and outside Eskom including transitioning to a cleaner energy mix;
requirements;
mitigation and adaptation, and protection of biodiversity, ecosystems and the prevention of
pollution and degradation
ensuring continual improvement in SHEQ systems to enhance Eskom’s business performance;
consultation and participation of workers and worker representatives on OH&S management
systems.
2.2 Policy principles or rules
Eskom’s principles and rules that underpin the way in which it approaches safety, health,
environment and quality are as follows:
preventable.
SHEQ performance is achieved through a Zero Harm culture.
Management is accountable for setting safety, health, environment and quality policy and every
employee is expected to ensure implementation and compliance within the scope of their duties.
Conducting business with respect and care for people, the environment and assets.
Eskom strives to ensure that Zero Harm befalls its employees, contractors, the public and the
environment:
o Zero fatalities
o Zero injuries, ill-health
o Zero environmental incidents
o Zero tolerance
o Zero defects
contractors and visitors:
o Open, isolate, test, earth, bond, and/or insulate before touch
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
o Hook up at heights
o Buckle up
o Be sober
o Permit to work
out of Eskom’s business, causing an incident with health, safety, environmental and quality
consequences.
and quality intended outcomes and criteria in line with Eskom values, and promote efficiency.
3.1 Scope
This policy document sets out Eskom’s approach to safety, health, environment and quality across
the Eskom Group.
3.1.1 Purpose
The purpose of this policy is to set the commitment for safety, health, environment and quality
management within Eskom and to ensure uniformity across the organisation.
3.1.2 Applicability
This policy shall apply throughout Eskom Holdings SOC Ltd divisions, subsidiaries, and entities in
which Eskom has a controlling interest or influence.
3.1.3 Effective date
Implementation of this policy shall be monitored after one month from the date of authorisation and
communication.
3.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
3.2.1 Normative
[1] ISO 9001 Quality Management Systems - Requirements
[2] Constitution of the Republic of South Africa Act, No.
[3] National Environmental Management Act, No.
[4] Occupational Health and Safety Act, No.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
[5] Compensation for Occupational Injuries and Diseases Act, No.
[6] Mines Health and Safety Act, No.
[7] 240-62196227 Life-saving Rules standard
[8] 32-716 Internal OHS Communications Standard
[9] 240-62582234 OHS Roles and Responsibilities and Statutory Appointments
[10] ISO 14001 Environmental Management Systems – Requirements with guidance for use
[11] OHSAS 18001: Occupational Health and Safety Management Systems – Requirements
[12] ISO 45001 Occupational Health and Safety Management System Standard — Requirements
with guidance for use
3.2.2 Informative
[1] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[2] Health and Safety Agreement between Eskom and Organised Labour
[3] 240-77569976 Eskom Climate Change Policy
[4] ISO 9004 Managing for the Sustained Success of an Organisation – A Quality Management
Tshegofatso Nnene B
Compliance Requirements
Source: Environmental requirements.zip (unknown)Bidders must have a documented, implemented and maintained Environmental Management System (EMS), preferably aligned with ISO 14001:2015. Environmental documentation must be submitted for evaluation. The Environmental Acknowledgement Form (Appendix E) must be completed and included in the tender.
Section
Source: Environmental requirements.zipEnvironmental compliance is monitored throughout the contract. Non-conformances may lead to work stoppage or supplier status reconsideration. Suppliers must submit environmental documentation (e.g., completed Environmental Requirements Pro-Forma, method statements, EMS records) within 7 days after contract award. Environmental practitioners conduct inspections and audits to ensure compliance with legal and Transmission requirements.
Description
Source: SDL&I.zipThe scope covers security upgrade at Simmerpan complex including perimeter, access control, and cameras, with maintenance for 24 months. Mandatory local content thresholds apply: steel 100%, cables 90%. SBD 6.2 and Annex C are mandatory for contract award.
Contact Information
Source: SDL&I.zip (TENDER)Buyer: Refiloe Mabula. SDL&I Advisor: Martin Sabelo. No email, phone, or address provided.
Submission Guidelines
Source: SDL&I.zip (TENDER)Returnable documents include: valid B-BBEE certificate (SANAS-accredited or sworn affidavit), SBD 6.2 (Declaration for Local Production and Content), Annex C (Local Content Declaration-Summary Schedule), proof of subcontract agreement, CSD report of subcontractor, and subcontractor B-BBEE certificate. No submission address or method provided in this document.
Evaluation Criteria
Source: SDL&I.zip (TENDER)Evaluation includes objective criteria as a condition for award. Bidders must meet mandatory local content thresholds (steel 100%, cables 90%), mandatory subcontracting of 30% to qualifying EME/QSE, and CIDB subcontracting requirement (minimum level 2 SQ for construction portion). Non-compliance may result in award to the second-ranked tenderer. No price/functionality split or preference point system stated.
Technical Specifications
Source: SDL&I.zip (TENDER)Scope: Security upgrade for perimeter, access control, and cameras at Simmerpan complex, including maintenance. Contract duration: 24 months. Local content thresholds: steel 100%, cables 90%. Skills development targets: 1 foreman trainee, 6 technicians.
Compliance Requirements
Source: SDL&I.zip (TENDER)Mandatory requirements:
Important Dates
Source: Safety requirements.zip (unknown)Closing date: 30 September 2026 at 10:00.
Contact Information
Source: Safety requirements.zip (unknown){"name":null,"email":null,"phone":null,"department":"standard","address":"n presented"}
Evaluation Criteria
Source: Safety requirements.zip (unknown)No eligibility criteria specified
Technical Specifications
Source: Safety requirements.zip (unknown)Security upgrade at Simmerpan complex covering perimeter security, access control, and camera systems.
Compliance Requirements
Source: Safety requirements.zip (unknown)Bidders must acknowledge and comply with Eskom's OHS legal and other requirements by signing Annexure B. The contractor must comply with Eskom Contract and Contractor OHS Management (32-726), the provided OHS specification, the Occupational Health and Safety Act, the Compensation for Occupational Injuries and Diseases Act, Eskom SHEQ Policy (32-727), and OHS Incident Management Procedure (32-95). After award, the contractor must align its processes to Eskom's OHS policies, procedures, and standards. Non-conformance attracts penalties. The main contractor is responsible for managing subcontractors' OHS compliance.
Submission Guidelines
Source: NEC.zip (unknown)Submit the signed Form of Offer and Acceptance (including Schedule of Deviations if any).
Provide the Activity Schedule in Excel format (pricing document).
Include a concept design report with the tender.
Complete and submit SBD 6.2 Declaration and Annexure C, D, and E (mandatory for contract award).
Submit a valid B-BBEE certificate or sworn affidavit.
All documents must be received before the closing date and time.
Disqualification: any incomplete or unsigned returnable forms, late submission, or collusion as per SBD 9.
Evaluation Criteria
Source: NEC.zip (unknown)Preference points are awarded based on B-BBEE level (specific split not stated).
SBD 6.2 Declaration and Annexure C, D, E are mandatory for contract award.
A valid B-BBEE certificate or sworn affidavit is a condition for award.
Bidders must submit a B-BBEE Improvement Plan within 30 days of contract award (level 4 or lower must achieve higher levels during contract).
CIDB grading is not applicable.
SDL&I objectives (local content, supplier development) are not scored but become contractual commitments.
Tender programme evaluation includes committed resources.
Concept design report is evaluated as part of the tender.
Technical Specifications
Source: NEC.zip (unknown)Scope: Security upgrade of perimeter fence, access control, and CCTV system at Simmerpan Complex.
Duration: 24 months.
CCTV: Install advanced IP cameras with PTZ, thermal, video motion detection; replace NVRs, monitors, switches; integrate to PSIM at zero control.
Perimeter fence: Refurbish electric fence, install intrusion pre-detection system, PA system.
Alarm system: All buildings to have alarm system per specification 240-86738968.
Access control: Upgrade boom gates, spikes, turnstiles, biometric readers; install emergency buttons; provide workstation for visitor management.
Zero Control Building: Remove old video wall, install new video wall, NVRs, servers, UPS with 8-hour standby.
System integration: All systems integrated per 240-170000096; cause-and-effect matrix must be achieved.
PSIM interfaces: Supply, install, configure and commission interfaces to existing PSIM at zero control.
Trenching: Approximately 3 km additional trenching for power and communication cables.
Design: Contractor to submit concept design with tender and detailed design after award.
Contractor must provide a cherry picker or alternative for installation.
Personnel require police clearance (National Key Point).
Competent Person with professional registration required for design sign-off.
Compliance with SANS 10137, SANS 10085 (scaffolding).
As-built drawings, operating manuals, and training required.
Quality assurance: comply with 240-105658000 Supplier Quality Management Specification.
Health and safety: comply with SHE specification (Annexure), provide PPE, risk assessments, induction.
Environmental: have an Environmental Management System and comply with environmental management plan.
Programming: submit programme in Primavera or Microsoft Project within 2 weeks of start date.
Financial Requirements
Source: NEC.zip (unknown)Contract type: NEC3 Option A – lump sum priced via Activity Schedule.
Pricing format: Excel spreadsheet (Activity Schedule) provided with tender.
After award, contractor must provide securities, bonds, guarantees, and proof of insurance within two weeks of receiving signed agreement.
Invoicing: PDF invoices to [email protected], including contract number, VAT details, and order number.
Payment: based on completed activities (no part payment for incomplete activities). 50% retention released upon submission of as-built drawings.
No specific financial capacity threshold stated.
Compliance Requirements
Source: NEC.zip (unknown)B-BBEE: Valid certificate or sworn affidavit required for award. Level 1-8 accepted; improvement plan required for levels 4-8.
SBD 6.2 Declaration and Annexure C, D, E mandatory.
Police clearance for all site personnel.
Professional registration for design sign-off.
CIDB: not applicable.
Contractor must have an Environmental Management System.
Quality management: comply with Supplier Quality Management Specification (240-105658000).
Important Dates
Source: Quality requirements.zip (unknown){"closingDate":"01 July 2026"}
Evaluation Criteria
Source: Quality requirements.zip (unknown)Bidders must complete and sign Form A (Enquiry/Contract/Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). They must submit a valid ISO 9001 certificate or, for Category 2–4, objective evidence of a developed QMS (e.g., quality manual, policy, objectives, internal audit procedure). The specific category (1–4) applicable to this tender is not stated in the provided document; bidders must refer to the tender's List of Tender Returnables (240-12248652) to determine the required category and returnable documents. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are mentioned in this specification.
Technical Specifications
Source: Quality requirements.zip (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Procurement and Supply
Chain Management
Revision: 4
Total Pages: 30
Next Review Date: May 2030
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by and Authorized by
Functional
Responsibility
Sipho A Sambo Bathusi Montwedi Gerhard Van Der Walt
Middle Manager Senior Manager General Manager
(Acting) (Acting)
Procurement and
Supplier Quality Procurement and Supply Chain
Management Supply Chain Management
ManagementProcurement and Corporate Services
Supply Chain Corporate Services
Management
Corporate Services
Date: 2026/05/26 Date: Date: 01 July 2026
EDC TN Formatted 15.10.2021/TR Formatted 22.10.2025
Template ID: 32-4 (Rev 13) Document template (for procedures, manuals, standards, instructions, etc.)
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Content
. Introduction .................................................................................................................................................. 3
2.1 Scope ................................................................................................................................................. 3
2.1.1 Purpose .................................................................................................................................. 3
2.1.2 Applicability ............................................................................................................................ 3
2.1.3 Effective date ......................................................................................................................... 3
2.2 Normative/Informative References ..................................................................................................... 3
2.2.1 Normative ............................................................................................................................... 3
2.2.2 Informative ............................................................................................................................. 4
2.3 Definitions ........................................................................................................................................... 4
2.4 Abbreviations ...................................................................................................................................... 6
2.5 Roles and Responsibilities ................................................................................................................. 6
2.6 Process for Monitoring ....................................................................................................................... 7
2.7 Related/Supporting Documents ......................................................................................................... 7
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................................... 8
3.2 Quality Plan ........................................................................................................................................ 9
3.3 Contract Quality Plan ......................................................................................................................... 9
3.4 Quality Control Plan ......................................................................................................................... 11
4.1 Main Supplier and Sub-supplier Categories .................................................................................... 15
4.2 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................................... 18
5.1. Contract Execution ............................................................................................................... 19
5.2. Supplier Quality Performance Monitoring Phase ................................................................. 20
5.3. Supplier Quality Audit .......................................................................................................... 21
6.1. Rights of Access ............................................................................................................... 21
6.2. Eskom Rights to Information ............................................................................................................ 22
6.3. Preservation ..................................................................................................................................... 23
6.4. Quality Audits Related Conditions .................................................................................................... 27
6.5. Management of Nonconformities and Nonconforming Outputs Identified by Eskom ...................... 27
6.6. Special Processes ............................................................................................................................ 28
Acceptance ................................................................................................................................................ 29
Revisions ................................................................................................................................................... 29
Development Team ................................................................................................................................... 30
Acknowledgements ................................................................................................................................... 30
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the evaluation, selection,
supplier/ vendor registration, assessment, performance monitoring, and auditing of suppliers.
Eskom’s position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The focus is to ensure suppliers establish and continually
improve their QMS and enhance service delivery, and customer satisfaction by implementing and
conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements for various externally provided products, services and processes and
continual adherence throughout the duration of a contract.
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnable
[12] 240-168873697 Supplier Quality Management: Tender Evaluation Scorecard
[13] 240-125473040 Supplier Quality Management: Guideline for QM 58 Selection Criteria
[14] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[15] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components.
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
NOTE: An Inspection and Test Plan (ITP) is a structured document that outlines the
necessary inspections and tests to ensure that a product or process meets specified quality
requirements and standards.
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use. This may include
welding processes or non-destructive techniques
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CFT Cross Functional Team
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT / NDE Non-Destructive Testing / Non-Destructive Examination
PMI Positive Material Identification
QCP Quality Control Plan
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
WPS Welding Procedure Specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
The assigned Eskom Quality representative/ professional when part of a Cross Functional Team
(CFT) appointed to transact on externally provided products, services and processes shall select
applicable requirements for existing and potential Eskom suppliers using, 240-125473040 Supplier
Quality Management – Guideline for QM 58 Selection Criteria and Form A (Tender and Contract
Quality Requirements for Supplier Quality Management: Specification 240-105658000/ QM 58 and
Quality Requirements for ISO 9001 Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnables as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule to review performance and effectiveness of this specification.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
2.7.1 Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
[5] 240-144723833 Quality Requirements Exemption Certificate
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001, and may include a quality manual, quality plans, work procedures, work
instructions, method statements, workflow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnables, as per the categories
of quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier’s
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Where a new product/ service introduced in Eskom, the requirements for such shall be in line
with available industry recommended practises (RP) or applicable codes (for example for
BESS, the RP UL 9540 or IEEE 1790) in the absence of SANS equivalent
3.1.6 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.7 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
3.1.8 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.9 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables, as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained
contract/project quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract/project quality plan (CQP) and/ or quality control plan (QCP)/ inspection
and test plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract/ Project Quality Plan should address the quality assurance elements related to
the scope of work and/ or technical specification for the specified duration.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans and the
sub-contracted scope of work. In addition to the elements specified in ISO 10005, the supplier’s
and/ or sub-suppliers’ CQPs shall include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture.
3.3.6 The personnel carrying out special processes (for example, NDE, welding, coating, heat
treatment, etc.) where the results cannot be fully verified by subsequent inspection and test
shall be suitably qualified and, where applicable, registered with statutory bodies as legally
required, that is, as radiographic workers to conduct radiography. The requirements for the
qualification shall be specified, and personnel records shall be maintained in accordance with
the Project Quality Personnel Qualification Specification and, where applicable, legal
requirements.
3.3.7 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s training and development policies
or in line with applicable regulatory and statutory bodies requirements.
3.3.8 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training and development policies. All the training certificates shall meet the
applicable regulatory or statutory requirements in terms of having the unit standard /National
Qualification Framework (NQF) completed and the accreditation number of the service
providers.
3.3.9 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.10 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.11 The CQP information shall include, but not limited to:
methods to be utilised to ensure quality.
generated.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Cqp.
project.
3.3.12 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.13 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.3.14 Competence and Qualification of Personnel managing quality shall be in line with applicable
qualification, certificates as deemed by the respectable company criteria.
3.3.15 Where personnel involved in the management of quality shall be noted to be lacking relevant
competences, Eskom shall request the removal of such personnel from the contract site
operations in respect to all activities and process that leads to conformity of product /services.
3.4 Quality Control Plan
The supplier shall develop, implement and maintain processes and procedures that efficiently and
effectively allows monitoring and verification of the scope of work activities, to outline specific
procedures; standards; and responsibilities for maintaining product or service quality.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services. The
intervention points and the inspection and tests methods to be applied are to be indicated
as per ISO 10005, Guidelines for Quality Plans.
3.4.2 QCP/ ITP shall be reviewed and accepted by an Eskom employer representative, its
inspection authority or agency, and they shall allow for the insertion of Eskom specific
requirements, including hold and witness points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
QCP/ ITP and be based on the sub-contracted scope of work.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
with reference to the relevant criticality risk rating
international standard, with the relevant clause number for each operation
agency
intervention in the plan
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
will take place, including facility location(s)
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
inspectors
applicable), and Eskom prior to commencement of work
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
inspected
distribution, and report retention requirements
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
equipment and sub-systems (if applicable)
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
The selected quality assessment criteria and Form A of this specification will be compiled and
completed by the assigned Eskom Quality representative/ professional who using the guideline 240125473040, shall select the suitable supplier quality requirements to be met.
Form A (Section A & Section E) of this specification must also be completed and signed by the
supplier responding to an Eskom invitation to tender, in order to acknowledge, accept and further
commit to comply with the Eskom Supplier Quality requirements as per this specification and ISO
9001 Standard or any additional quality requirements specific to the scope of work.
4.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
The following are the minimum returnable documentation for Categories 1 to 4:
4.1.1 Category 1: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
Automobile; ICT) of a QMS (the latest applicable revision). The QMS should drive the
supplier’s business management processes to ensure that all of Eskom’s requirements are
fully met on a consistent basis.
audit reports. The audit reports must include, if applicable, nonconformities identified, and
the resulting remedial actions (correction and/ or corrective action reports).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals,
procedures.
described in the tender documents. The plan must address the minimum requirements as
per ISO 10005.
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
Processes, Products and Services.
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.1.2 Category 2: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
QMS that complies with ISO 9001 or any applicable standard of quality management system
(the latest applicable revision). The following documents (approved/ signed copies) shall be
submitted:
o Quality Management System manual or a documented information that have defines
and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information)
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The audit reports must include, if applicable, nonconformity identified, and the resulting
remedial actions (correction and/ or corrective action reports).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
described in the tender documents. The plan must address the minimum requirements as
per ISO 10005.
quality control plan (QCP) on similar or previous work done.
Processes, Products and Services.
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals,
procedures.
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.1.3 Category 3: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
9001 (or the latest applicable revision). The following documented information (approved/
signed copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information)
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
described in the tender documents. The plan must address the minimum requirements as
per ISO 10005.
quality control plan (QCP).
Processes, Products and Services.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals,
procedures.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.1.4 Category 4: Quality Requirements
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
scope of work.
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
strategic direction). (documented information)
Processes, Products and Services.
authorities, specific to the project/ scope of work/ technical requirements. Examples of
relevant documented information are; organization charts, job descriptions, work instructions,
duty statements, manuals, procedures.
Note 1: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
Note 2: any additional requirements specific to the scope of work can be included under Section E
(List of Tender Returnable documents (240-12248652)) and subsequently listed from E2 onwards.
4.2 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Critical plant includes the following:
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted during the requirements setting phase of the
transaction.
5.1. Contract Execution
The supplier shall submit the following documents within 30 days (depending on the contract
duration) or as per stated timeline after the contract date, prior to the commencement of work, for
acceptance by Eskom:
Method statement before contract award. This shall be reviewed and signed off by Eskom
appointed employer agent within 30 days or as per stated timeline after contract award.
(Inspection and Test Plan) ITP(s) for review and acceptance by Eskom prior to the
commencement of any work, inclusive of subcontracted work, within 30 days or as per
stated timeline after contract award.
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
considered when compiling CQPs and QCPs.
minimum of 7 working days prior to the activity being executed.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
meetings shall be convened by Eskom with the supplier.
manager or his/her representative for the contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
5.2. Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom assigned employer agent at predetermined
intervals during the execution of a contract using agreed key performance indicators. The monitored
key performance areas include the following:
Subsequent key performance indicators associated with these areas will include the following:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
5.3. Supplier Quality Audit
5.3.1. Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification
such as contract document.
5.3.2. Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, verification of compliance reviews, surveillance,
inspections, or other interim or final assessments of scope of work deliverables provided by
the supplier or sub-suppliers.
5.3.3. Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
5.3.4. Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, verification of compliance reviews, surveillance,
inspections, or other interim or final assessments of scope of work deliverables provided by
the supplier or sub-suppliers.
5.3.5. Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with established documented
information for managing audits.
5.3.6. The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
5.3.7. The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
6.1. Rights of Access
Eskom:
6.1.1. shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
6.1.2. reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
6.1.3. reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
The supplier:
6.1.4. shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
6.1.5. shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
6.1.6. shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
6.1.7. shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
6.1.8. shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
6.1.9. shall ensure that the above requirements flow down to sub-suppliers.
6.2. Eskom Rights to Information
6.2.1. To expect that the works will be conducted in accordance with the contract between the
parties.
6.2.2. To have access to the supplier’s information as determined by applicable legislation.
6.2.3. Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages. Eskom
will coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
6.2.4. To obtain access to any audit reports of audits performed by the supplier reflected in the audit
programme.
6.2.5. To conduct independent quality audits during all phases of the contract, and the supplier shall
provide all resources to support these activities.
6.2.6. Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
6.2.7. To participate in, and/or lead, investigations related to incidents involving its products.
6.2.8. To require from suppliers to be responsible for the cost of re-inspections.
6.2.9. To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.2.10. Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
6.2.11. Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location.
6.2.12. Shall carry out assessments and audits on all new suppliers and sub-suppliers.
6.2.13. Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
6.2.14. Reserves the right to select intervention points within all developed supplier QCPs/ ITPs for
Eskom oversight of selected functions and to perform surveillance or audits of the work.
6.2.15. Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
6.2.16. Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
6.3. Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
6.3.1. Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
6.3.2. Development and implementation of preservation programme training appropriate to work
need.
6.3.3. Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not limited
to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
6.3.4. Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
6.3.5. Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
6.3.6. Review and tracking of compliance with sub-supplier provided preservation requirements and
recommendations.
6.3.7. Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.3.8. Preservation work plan development and plan execution performance evaluation of all parties
engaged for provision of material transportation, handling, or storage services.
6.3.9. Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
6.3.10. Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
6.3.11. The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
6.3.12. Where the project responsibility for equipment and materials management has been formally
delegated, the supplier’s preservation programme shall ensure clear and unambiguous
communication of pre-operation preservation of goods quality requirements to sub-suppliers.
6.3.13. The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
6.3.14. Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
6.3.15. Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
6.3.16. Supplier engineering shall ensure that preservation requirements for scope of work systems,
system components, equipment, materials, and other procured goods are clearly and
unambiguously documented and that preservation requirements are efficiently and effectively
communicated to project procurement, logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements. This shall take the form of a preservation programme applicable
to all systems, system components, equipment, materials, customer-supplied materials, and
other goods procured or managed under the scope of work.
6.3.17. The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions.
coverings, fasteners, lines, and other components for internal and external weather
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
proofing;
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
cyclical motion in transit, for example, wave-generated movement during sea
transport;
bracing, padding, framing, chocking, etc.;
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
by hard and soft barriers, as required, to maintain a protective perimeter;
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
6.3.18. detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain preservation
status.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.3.19. The supplier’s preservation management programme scope shall encompass management
of preservation requirements, from initial transfer of ownership or management responsibility
to project scope of responsibility, through any period of temporary or longer-term storage and
through any period of transit, including transit for final delivery at point of active use or
installation.
6.3.20. The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
6.3.21. The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components, mechanical
and rotating equipment, piping and fittings, instrumentation, flange faces, gaskets, coatings,
insulation, and other materials. Special precautions include, but are not limited to, supplier-
specified maintenance procedures related to engines, electric motors, pumps, compressors,
etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
6.3.22. The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
6.3.23. Where sub-supplier expertise is utilised in determination of the preservation protocol, supplier
procurement processes shall ensure clear and unambiguous documentation of sub-supplier
input into preservation management programme requirements.
6.3.24. Supplier procurement shall ensure that preservation requirements for scope of work systems,
system components, equipment, materials, and other procured goods are clearly and
unambiguously documented and that preservation requirements are efficiently and effectively
communicated to project logistics, construction management, quality, security, and other
project functional areas, as required, for efficient and effective implementation of preservation
requirements.
6.3.25. The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
6.3.26. The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation management
programme execution.
6.3.27. The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
6.3.28. The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.4. Quality Audits Related Conditions
6.4.1. The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
6.4.2. The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
6.4.3. Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s audit
schedule.
6.4.4. Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
6.4.5. Eskom reserves the right to conduct independent quality audits, scheduled and unscheduled,
during all phases of the contract. The supplier shall provide all resources to support these
activities.
6.4.6. Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
6.4.7. The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
6.4.8. The assessments and audits shall be carried out on all new suppliers and their sub-suppliers.
6.4.9. Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
6.4.10. Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
6.5. Management of Nonconformities and Nonconforming Outputs Identified by Eskom
6.5.1. Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
6.5.2. A formal response shall be prepared in respect of the defined criteria and submitted to Eskom
for its review, evaluation, and acceptance, within a maximum of 14 calendar days from the
date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
6.5.3. Eskom may, at its discretion, request a response sooner and, in any case, before the supplier
proceeding with any pending/further intervention or corrective action, as may be required by
Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.5.4. Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
6.5.5. The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
6.5.6. Nonconforming outputs identified by Eskom shall be documented via a NC Report and issued
to the suppliers via the contract communication protocol. The suppliers shall investigate the
matter and respond in writing to Eskom of disposition within the stated contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
6.5.7. Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
6.5.8. Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
6.5.9. Repeated Nonconformities, if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
6.6. Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
6.6.1. The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
6.6.2. This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
6.6.3. All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
Where applicable, a relevant Management System for the special process shall be certified or
approved by an accredited body and proof of certification shall be submitted to Eskom for review.
An example for this will be the Welding Management System based on ISO 3834.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
6.6.4. The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
6.6.5. This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
6.6.6. All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
6.6.7. Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
6.6.8. Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
6.6.9. The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
6.6.10. The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Portia Mngomezulu Group Executive: Corporate Services
Mpho Dire Chief Procurement Officer (Acting): Corporate Services
Bathusi Montwedi Senior Manager (Acting): Procurement and Supply Chain Management
Sanjiv Kalicharran Senior Manager (Acting): Risk and Sustainability - Quality Management
Rolland Ngugama Middle Manager: Risk and Sustainability - Quality Assurance
Pamela Dondashe Middle Manager: Risk and Sustainability - Quality Assurance
Date Rev. Compiler Remarks
Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
October 2025 4 SA Sambo
processes and systems. Including updates on
numbering of the document.
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 4
Page:
Date Rev. Compiler Remarks
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
upgrade for perimeter fence, access control and CCTV cameras
Signature
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 4.1.-105658000) -
Category 2 (refer to clause 4.1.-105658000) -
Category 3 (refer to clause 4.1.-105658000) X-
Category 4 (refer to clause 4.1.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 4.-105658000) -
Post-contract award
3(ESKOM) Contract Execution (refer to clause 5.-105658000) X
B
Supplier Quality Performance Monitoring Phase (refer to clause 5.-105658000) X CLAUSE
Supplier Quality Audit (refer to clause 5.-105658000) XSECTION STANDARD CONDITIONS
Eskom Rights of Access (refer to clause 6.-105658000) X
Eskom Rights to Information (refer to clause 6.-105658000) X
Preservation (refer to clause 6.-105658000) X
Quality Audits Related Conditions (refer to clause 6.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 6.-
Special Processes (refer to clause 6.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Applicable applicable
CLAUSE 4 Context of the Organisation X PRINCIPLE 1 Customer focus X
CLAUSE 5 Leadership X PRINCIPLE 2 Leadership X
CLAUSE 6 Planning X PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support X PRINCIPLE 4 Process approach X
CLAUSE 8 Operation X PRINCIPLE 5 Improvement X
CLAUSE 9 Evidence based decision
Performance evaluations X PRINCIPLE 6 XSECTION making
CLAUSE 10 Improvement X PRINCIPLE 7 Relationship management X
D name designation date signature
Eskom’s quality
REPRESENTATIVE Prudence Maimane Officer Quality 2026/08/20SECTION (ESKOM)
Name designation date signature
E
Tenderer’s
Quality
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Limited, Reg No
2002/015527/06.
of 1
Compliance Requirements
Source: Quality requirements.zip (unknown)Bidders must have a quality management system (QMS) conforming to ISO 9001. They must complete and sign Form A (Enquiry/Contract/Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). The specific quality category (1–4) applicable to this tender is not stated; bidders must refer to the tender's List of Tender Returnables (240-12248652) to determine required documentation. Depending on the category, bidders may need to submit a valid ISO 9001 certificate, quality manual, internal audit reports, contract quality plan, and other QMS documentation.
Description
Source: Commercial.zipSecurity upgrade for perimeter, access control and cameras at Simmerpan Complex. The project includes installation and commissioning of an integrated security system (24 months) and maintenance and support (60 months). Systems covered: alarm, CCTV, access control, public address, intrusion detection, perimeter detection, and system integration with existing PSIM.
Important Dates
Source: Commercial.zip (TENDER)Closing date and time: 30 September 2026 at 10:00 (SAST).
Non-compulsory clarification meeting (virtual): 1 September 2026 at 10:00 (SAST) via Microsoft Teams. Meeting ID: 394 539 291 546 687, Passcode: x2RS6iH6. Confirm attendance with NTCSA Representative.
Non-compulsory site visit: 2 September 2026 at 10:00 (SAST) at Simmerpan Complex next to Zero Control Building, 102 Refinery Road, Elandsfontein, Germiston, Johannesburg (GPS -26.188, 28.153). Request attendance by 27 August 2026 via email to [email protected].
Clarification queries deadline: 10 working days before closing (approximately 16 September 2026).
Tender validity period: 120 days (16 weeks) from closing.
Contact Information
Source: Commercial.zip (TENDER)NTCSA Representative (primary contact): Refiloe Mabula, Tel: +27 11 800 5003, Email: [email protected].
1st Tier Escalation: Takalani Nemavhulani, Tel: +27 11 800 3198, Email: [email protected].
2nd Tier Escalation: Frans Pooe, Tel: +27 11 800 5842, Email: [email protected].
Procurement complaints: [email protected].
Submission portal: https://tenderbulletin.ntcsa.co.za/.
All queries must be directed to the NTCSA Representative in writing.
Submission Guidelines
Source: Commercial.zip (TENDER)Submit electronically via the NTCSA Tender Bulletin site at https://tenderbulletin.ntcsa.co.za/ (Eskom E-tendering page).
Upload documents under folders: Technical, Commercial, Financial, Other.
Format: PDF for all documents; price list in both PDF and Excel.
File size limit: 50 MB per file, 900 MB total submission. No zip files.
No hard copy accepted.
Late submissions are disqualified.
If resubmitting, only the latest version is considered.
Returnable forms (all must be completed and signed where required):
Disqualification risks:
Evaluation Criteria
Source: Commercial.zip (TENDER)Evaluation follows a three-stage technical process and then price and specific goals scoring.
Stage 1 – Mandatory Requirements:
Stage 2 – Functionality (Desktop Evaluation):
Stage 3 – Practical Evaluation (Demonstration):
Price and Specific Goals:
Objective Criteria:
Eligibility:
Technical Specifications
Source: Commercial.zip (TENDER)Scope: Security upgrade for perimeter, access control and cameras at Simmerpan Complex.
The project comprises two contracts awarded to a single supplier:
Systems to be supplied and integrated:
Tenderers must complete Technical Schedules A/B for each system and demonstrate compliance with Eskom standards.
A practical demonstration of the proposed solution is required during evaluation.
Financial Requirements
Source: Commercial.zip (TENDER)Pricing format: inclusive of VAT, corrected for arithmetic errors, excluding contingencies. Prices evaluated on Net Present Value based on tendered programme.
Unconditional discounts considered; conditional discounts applied at payment.
Payment terms:
Performance security: names of two financial institutions to be submitted with tender.
Contract Price Adjustment (CPA):
Cataloguing may be required after award; pricing schedule must include a line item for cataloguing if applicable.
Foreign currency payments: subject to NTCSA approval and specific payment methods (CFC account or Rand at spot rate).
Compliance Requirements
Source: Commercial.zip (TENDER)CSD registration: mandatory prior to contract award (not required at submission).
Tax compliance: provide SARS e-filing PIN or valid tax compliance certificate. Foreign suppliers without SA footprint must complete SBD 1 and provide tax compliance.
B-BBEE: claim level via SBD 6.1; submit B-BBEE certificate or sworn affidavit. Subcontractor B-BBEE certificate required if subcontracting.
CIDB: not required for main contractor, but construction subcontractor must have minimum CIDB grading level 2 SQ. Proof may be submitted within 21 working days if agreed.
PSIRA registration: mandatory – submit valid certificate.
Employment Equity Act: if designated employer, submit proof of compliance and EE report.
Returnable forms (see submissionGuidelines for full list).
Joint Venture: must provide JV agreement with joint and several liability, and power of attorney.
Authority to sign: board resolution or equivalent.
Integrity Declaration (Annexure D): disclose any conflicts of interest.
Local content: may apply per objective criteria.
Subcontracting: if applicable, submit subcontract agreement, CSD report, and B-BBEE certificate of subcontractor.
Section
Source: Commercial.zipTechnical evaluation is conducted in three stages:
Price and specific goals (B-BBEE) are scored separately under the 80/20 or 90/10 PPPFA system.
Objective criteria include SDL&I requirements (subcontracting 30% to designated groups, skills development targets) and may influence award.
Certain returnable documents (e.g., SBD 6.1, Specific Goals forms) are for evaluation only; if missing, score zero but not disqualified.
Description
Source: BOQ.zipSecurity upgrade for perimeter, access control, and cameras at Simmerpan Complex, Germiston. The project includes design, build, supply, installation, commissioning, and ongoing maintenance of security systems. The scope covers CCTV, video wall, access control, intrusion detection, PA, alarm, electric fence, PSIM, IT infrastructure, standby power, system integration, testing, training, and as-built documentation. Also includes decommissioning and removal of existing equipment. Maintenance services are priced separately with hourly rates for various roles and materials at cost plus markup.
Evaluation Criteria
Source: BOQ.zip (unknown)The document does not specify any mandatory eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or local content percentages. Bidders are likely required to complete standard National Treasury forms (SBD 1, SBD 4, SBD 6.1, etc.) and provide proof of compliance with the referenced Eskom standards, but these are not listed in the extracted text. The tenderer must comply with Section 3.1.1 of 240-170000723 for accreditation and Section 3.1.2 for experience.
Technical Specifications
Source: BOQ.zip (unknown)Scope: Security upgrade for perimeter, access control, and cameras at Simmerpan Complex, Germiston.
Contract type: Design and build, with maintenance services.
Work includes:
Maintenance services (priced separately):
Compliance with Eskom NTCSA standards: 240-91190304 (CCTV & Video wall), 240-102220945 (Access control), 240-170000691 (Intrusion detection), 240-170000098 (PA), 240-86738968 (Alarm), 240-78980848 (Electric fence), Annexure D of 240-185000336 (PSIM), 240-118870219 (Standby power), 240-170000096 (Integration), 240-171000171 & section 3.5 of 240-170000723 (Testing and commissioning), section 3.11 of 240-170000723 (Project management).
Financial Requirements
Source: BOQ.zip (unknown)Pricing format: Bill of Quantities / Activity Schedule.
Contract: NEC3 Engineering and Construction Contract (ECC) Option A (priced contract).
Pricing includes:
No bonds, guarantees, or insurance requirements stated in the document.
Compliance Requirements
Source: BOQ.zip (unknown)Accreditation: Must comply with section 3.1.1 of Eskom standard 240-170000723.
Experience and expertise: Must comply with section 3.1.2 of 240-170000723.
SHEQ requirements: Must provide breakdown during tender.
No specific CSD, tax clearance, B-BBEE level, CIDB grading, or local content percentages mentioned in the document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 54 of 1972
Relevant to food safety, catering, canteens, food handling and nutrition-programme procurement.
Relevant because this tender appears to involve cleaning, hygiene, pest control, sanitation, or facilities services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve guarding, access control, CCTV, surveillance, or private security services. Relevant because this tender appears to involve cleaning, hygiene, pest control, sanitation, or facilities services.
Act 56 of 2001
Relevant where security providers, guards, access control or private security services are required.
Relevant because this tender appears to involve guarding, access control, CCTV, surveillance, or private security services.
Address
Maxwell drive - Sunninghill - Sandton - 2157
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
20 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Functional (Including Cleaning and Security Services). Unlock full pricing strategies, bid frequency, and historical win rates.