Betha/Ogies Road - Kriel - Kriel - 2271
Organization Type
GOVERNMENT
Published
20 Nov 2026
OCDS Reference
ocds-9t57fa-178976
ESKOM requires the supply and delivery of emd spares to kriel power station on an 'as and when required' basis for a three-year period. The spares include air handling units, compressors, electrical meters, toolboxes, resistors, air conditioners, test probes, batteries, and clamp meters, with quantities ranging from 3 to 204 units per item. Bidders must commit to a reasonable lead-time, deliver to kriel power station main stores within specified hours, and comply with strict quality, safety, and environmental requirements. The most consequential consideration is the mandatory 3% csi contribution on total contract expenditure and the risk of default for failing sdl&i obligations.
Contract period: 3 years, 'as and when required' basis; orders placed only when spares are needed.
Closing: 14 December 2026 at 08:00; submission method not stated.
Delivery: to Kriel Power Station Main Stores; notify end-user two days before delivery; hours Monday-Thursday 07:00-14:30, Friday 07:00-10:00.
Quality: QCP must be approved by supplier, Eskom engineer, and QC inspector before deliveries; comply with Eskom Supply Quality Management Specification (240-105658000) and ISO 9001:2015.
Safety: submit safety file for approval before site access; comply with OHSA Section 10 and site SHE requirements; personnel need temporary access permits.
CSI: allocate 3% of total contract expenditure to Community Social Investment initiatives; failure to meet SDL&I obligations may be treated as default.
Invoicing: tax invoice within one week of payment certificate, addressed to [email protected], with specified details including employer VAT number 4740101508.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 14 December 2026 - 10:00
Venue
Microsoft Teams meeting
Categories
Request for Bid(Open-Tender)
Betha/Ogies Road - Kriel - Kriel - 2271
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
20 Nov
2026
Tender Published
Tender was published
14 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annex-c_Local content Declaration-Summary Schedule.pdf
Annex-d_Imports Declaration-Supporting schedule to Annex C - Copy.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
Eskom - Standard Conditions of Tender (August 2024).pdf
Supply and delivery of EMD spares for Kriel Power Station on an "as and when" required basis over a three-year period, for Eskom. The scope covers the spares only; no quantities, item list or station-specific technical specification is set out in the conditions of tender provided.
C3 1 SC3 Purchasers Goods Information.doc
Supply and delivery of EMD spares to Kriel Power Station on an 'as and when required' basis for a period of three years. The contract covers a range of specified spares including air handling units, compressors, electrical meters, toolboxes, resistors, air conditioners, batteries, and test probes, with quantities ranging from 3 to 204 units per item. The supplier is responsible for sourcing, quality assurance, packaging, and delivery to Kriel Power Station Main Stores, with orders placed only as operational needs arise.
E-tendering Help Manual for supplier - 27 January 2025.docx
Supply and delivery of EMD (Electro-Mechanical Drive?) spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, issued by Eskom. Bidders must submit their tender documents electronically via the Eskom eTendering system.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Supply and delivery of EMD (Electro-Mechanical Drive) spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years. The contract is issued by Eskom and is open to bidders nationally.
C2 SC3 Pricing Data.doc
Supply and delivery of EMD (Electrical Maintenance Department) spares for Kriel Power Station, on an 'as and when' required basis for a period of 3 years. The contract is a priced NEC3 Supply Contract where the supplier provides goods and services in accordance with the Goods Information, and payment is based on the Price Schedule.
240-109253698 CQP Template .docx
Supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of 3 years, issued by Eskom. The contract requires a Contract Quality Plan (CQP) to be submitted by the successful bidder, detailing how quality management requirements will be met.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Supply and delivery of Kriel Power Station EMD spares on an as-and-when required basis for a period of 3 years. The contract is subject to Eskom's General Conditions of Purchase, including payment within 30 days of a correct tax invoice, one-year warranty, and delivery penalties for late delivery.
SDL&I Strategy for Supply and Delivery of EMD spares.pdf
Eskom requires the supply and delivery of EMD spares for Kriel Power Station on an as-and-when-required basis for a period of 36 months. The tender is open to the national market, with preference points awarded for B-BBEE status and specific goals.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of three years. The tender is governed by Eskom's Supplier Quality Management specification (QM 58), which mandates that suppliers maintain an ISO 9001-compliant quality management system and comply with category-specific quality requirements.
C1 2b SC3 Data by Supplier.doc
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, issued by Eskom.
Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdf
Supply and delivery of electrical maintenance department (EMD) spares to Kriel Power Station on an as-and-when required basis over a three-year period. The scope covers 14 line items, including air handling units, rotary compressors, midwall split air conditioners, electrical meters, test probes, a lead-acid battery, a resistor bank and fully equipped electrical tool boxes.
C0 SC3 Contract cover pages.doc
Supply and delivery of EMD spares for Kriel Power Station on an "as and when" required basis over a three-year period, contracted under the NEC3 Supply Contract (SC3) with Eskom Holdings SOC Ltd.
240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdf
Supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of 3 years, issued by Eskom. The tender includes quality management system requirements, a draft contract quality plan, and a quality control plan, with evaluation based on the provided returnable documents.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, issued by Eskom Holdings SOC Ltd under tender number E3862GXMPKRI.
240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf
Supply and delivery of Kriel Power Station EMD (Electro-Mechanical) spares on an 'as and when' required basis for a period of three years, issued by Eskom Holdings SOC Ltd. The tender is open nationally, with a closing date of 14 December 2026 at 10:00.
C1 2a SC3 Data by Purchaser (23).doc
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, under an NEC3 Supply Contract with Eskom Holdings SOC Ltd.
Annexure B.pdf
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, issued by Eskom.
Commercial Code of Ethics 32-527 Rev 0.pdf
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, issued by Eskom.
Tender Technical Evaluation Strategy Supply and Delivery of EMD Spares_.pdf
Eskom requires the supply and delivery of EMD (Electrical Maintenance Department) spares for Kriel Power Station on an 'as and when' required basis for a period of three years. The spares support critical plant systems including boiler, turbine, ash and coal conveyors, and water plant, with a technical evaluation threshold of 70%.
C1 1 SC3 Offer Acceptance.doc
Supply and delivery of Kriel Power Station EMD (Electro-Mechanical) spares on an 'as and when' required basis for a period of three years, for Eskom Holdings SOC Ltd. The contract is a standard Eskom procurement using the Form of Offer and Acceptance, with pricing to be determined in accordance with the contract conditions.
240-68099512 (Rev 9) Form A Tender .pdf
Supply and delivery of EMD spares for Kriel Power Station on an as-and-when required basis for a period of three years, issued by Eskom. The tender includes quality requirements aligned with ISO 9001 and Eskom's standard conditions, with a closing date of 14 December 2026 at 10:00.
SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdf
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of three years, issued by Eskom.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Supply and delivery of EMD spares for Kriel Power Station on an 'as and when' required basis for a period of 3 years, issued by Eskom.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This document is Eskom's Supplier Quality Management Specification (240-105658000, Revision 4), which sets out the minimum quality requirements for all existing and potential Eskom suppliers. It defines the quality criteria for evaluation, selection, supplier registration, assessment, performance monitoring and auditing of suppliers. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for procurement of products and services.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Closing date: 14 December 2026 at 08:00
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific contact details provided in the document.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation stages:
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Scope: Supply and delivery of Kriel Power Station EMD Spares on an "as and when" required basis for a period of 3 years.
Quality management system requirements:
Quality plans:
Preservation requirements:
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation work plan development and execution:
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo specific pricing schedule or rates are provided in the document.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific financial requirements stated in the document.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)B-BBEE: Minimum Level 1 (as per currentAnalysis, but not confirmed in the document text).
Quality compliance:
Supplier registration:
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe document references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific OHS requirements are detailed in the provided text.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation management programme requirements:
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfQuality requirements are evaluated per the applicable category (1, 2, 3, or 4) selected for the tender. The evaluation uses the Tender Evaluation Scorecard (240-168873697) and the Guideline for QM 58 Selection Criteria (240-125473040). Bidders must complete and sign Form A to acknowledge and commit to Eskom's quality requirements. Failure to submit required quality documentation may lead to disqualification.
Description
Source: 240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdfSupply and delivery of Kriel Power Station EMD Spares on an "as and when" required basis for a period of 3 years.
Contact Information
Source: 240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdf (TENDER)Eskom representative: Zama Sabela (issued the tender returnables list). No other contacts provided.
Submission Guidelines
Source: 240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdf (TENDER)Returnable documents (all must be completed, signed and submitted with the bid):
Evaluation Criteria
Source: 240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdf (TENDER)Quality deliverables are evaluated as Category 3 (indicator = 1). Bidders must meet the Quality Management System requirements:
Each section must be scored (apply = 1) to pass.
Compliance Requirements
Source: 240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdf (TENDER)Quality Management System compliance is mandatory:
Section
Source: 240-12248652 (Rev 7)_List of Tender Returnables - Supply and delivery of Kriel Power Station EMD Spares .pdfQuality deliverables are evaluated as Category 3 (indicator = 1). Bidders must meet the Quality Management System requirements:
Each section must be scored (apply = 1) to pass.
Submission Guidelines
Source: Annexure B.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Annexure B.pdf (unknown)Bidders must sign and submit the Annexure B Acknowledgement Form. No other evaluation criteria are stated in the provided document.
Compliance Requirements
Source: Annexure B.pdf (unknown)OHS compliance obligations:
Health & Safety
Source: Annexure B.pdfOHS requirements:
Contractual Terms
Source: Annexure B.pdfContractor management obligations:
Description
Source: 240-109253698 CQP Template .docxThe tender is for the supply and delivery of Kriel Power Station EMD Spares on an "as and when" required basis for a period of 3 years. The supplier must prepare and submit a Contract Quality Plan (CQP) that identifies and plans for meeting the client's/contract expectations and requirements for quality management.
Evaluation Criteria
Source: 240-109253698 CQP Template .docx (unknown)No specific evaluation criteria are stated in the provided document. Bidders must be able to comply with the Contract Quality Plan requirements and supply the specified spares.
Technical Specifications
Source: 240-109253698 CQP Template .docx (unknown)The tender is for the supply and delivery of Kriel Power Station EMD Spares on an "as and when" required basis for a period of 3 years.
The supplier must prepare and submit a Contract Quality Plan (CQP) that identifies and plans for meeting the client's/contract expectations and requirements for quality management.
The CQP must be based on the guidelines in SANS 466:2005 / ISO 10005:2005.
The CQP must cover, among others: scope of work, communication channels with Eskom, organogram, interfacing documents, list of suppliers and sub-suppliers, monitoring of suppliers, items to be manufactured/refurbished/purchased, items requiring QCP/ITP, special controls governed by codes of manufacturing/fabrication standards, documented information to be submitted to Eskom, records control and retention, concession and non-conformance management, databook management, management of working tools and equipment, dealing with customer property, product preservation, identification and traceability, and commissioning and post-delivery activities.
Compliance Requirements
Source: 240-109253698 CQP Template .docx (unknown)No specific compliance requirements (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Description
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfThis document is the Eskom Supplier Integrity Pact, which applies to all Eskom Holdings SOC Ltd and its wholly owned subsidiaries, and to all existing and potential suppliers. Its purpose is to prescribe ethical behaviour in all interactions between Eskom and its suppliers. Suppliers must read, complete, sign, and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process. Both Eskom and suppliers commit to refraining from any form of dishonesty, fraud, or corruption, including tendering practices in bad faith, under-pricing, collusion, and bid rigging.
Contact Information
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Ethics reporting (for reporting dishonest or fraudulent behaviour by Eskom employees/directors):
No other contacts are stated in this document.
Submission Guidelines
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Bidders must be registered on the Eskom Vendor Database.
Bidders must not be listed on the List of Restricted Suppliers on the National Database.
Bidders must not have been found guilty of misconduct under the Supplier Discipline Process.
Bidders must comply with all applicable South African laws and regulations, including constitutional principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
No scoring split or minimum qualifying score is stated in this document.
Technical Specifications
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)This document is the Eskom Supplier Integrity Pact, applicable to all Eskom Holdings SOC Ltd and its wholly owned subsidiaries, and to all existing and potential suppliers.
It supplements all other relevant commercial and ethics policies, codes, and procedures.
Suppliers must maintain an impeachable standard of integrity in all business dealings and prevent dishonest, unfair, fraudulent, corrupt, and illegal practices during procurement and contract execution.
Suppliers must be familiar with all publicly available Eskom policies and procedures affecting supply chain processes, including the Standard Conditions of Tender.
Suppliers must not abuse the trust placed in them by Eskom employees or misuse opportunities for personal gain.
Suppliers must adopt policies and practices aligned with Eskom's labour practices, employment equity initiatives, and human relations policies.
Confidential information must not be disclosed without express consent from an authorised Eskom representative.
Suppliers must avoid relationships with Eskom employees or directors that could be perceived as contrary to fairness, equitability, transparency, competitiveness, or cost-effectiveness.
Business courtesies or gifts to Eskom employees or directors must not exceed R1,500 in value and must not be construed as placing an Eskom employee under obligation.
Suppliers must not offer or accept bribes, gifts, fees, commissions, or inducements to or from Eskom employees involved in evaluation, adjudication, or negotiation.
Suppliers must report any dishonest, fraudulent, or inappropriate behaviour by Eskom employees or directors to the Eskom Ethics office or Forensic office.
Pricing Schedule
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfNo pricing schedule or payment terms are stated in this document.
Financial Requirements
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)No pricing, bid security, bonds, guarantees, retention, payment terms, or financial capacity thresholds are stated in this document.
Compliance Requirements
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Registration on the Eskom Vendor Database is required.
Bidders must complete, sign, and submit the Eskom Supplier Integrity Pact and Integrity Declaration Form.
Bidders must complete a Non-Disclosure Agreement (NDA) regarding confidential information.
Bidders must disclose any interest or relationship with Eskom employees or directors.
Bidders must not have any direct or indirect personal or beneficial interest in any contract with Eskom.
Bidders must not have been found guilty of misconduct under the Supplier Discipline Process.
Bidders must not be listed on the List of Restricted Suppliers on the National Database.
No B-BBEE, CIDB, CSD, or tax compliance requirements are stated in this document.
Contractual Terms
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfSuppliers may be subject to a supplier discipline process and sanctions if found guilty of misconduct. Eskom may suspend a supplier from the Eskom Vendor Database and forward the names of offending suppliers and their directors to National Treasury for inclusion on the List of Restricted Suppliers. Eskom employees involved in tender evaluation or negotiation are prohibited from accepting gifts, money, or other benefits from tenderers. The Integrity Pact is governed by South African law and remains valid until replaced.
Section
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfNo additional evaluation criteria are stated beyond the general integrity obligations. Bidders must not engage in unethical or fraudulent dealings with Eskom employees involved in evaluation, adjudication, or negotiation, and must not offer or accept any improper benefits.
Description
Source: C0 SC3 Contract cover pages.docThe contract is for the supply and delivery of EMD spares to Kriel Power Station, on an as-and-when required basis, over a three-year period. The contract form is NEC3 Supply Contract (SC3).
Technical Specifications
Source: C0 SC3 Contract cover pages.doc (unknown)Supply and delivery of EMD spares for Kriel Power Station on an as-and-when required basis for a period of three years. The contract is an NEC3 Supply Contract (SC3).
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud and corruption reporting: [email protected], telephone 0800 11 2722.
Submission Guidelines
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Returnable documents: none specified in the provided document. The document is Eskom's General Conditions of Purchase, not the tender-specific returnable forms.
Submission method: not specified in the provided document.
Closing time: not specified in the provided document.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)The tender is for the supply and delivery of Kriel Power Station EMD spares on an "as and when" required basis for a period of 3 years.
Delivery: goods must be delivered to the point of delivery/site specified in the agreement, on or before the date stated in the agreement.
Packaging: each consignment or package must be clearly marked with the supplier's name and full destination details, and include a packing note stating contents.
Advice note: must be sent to Eskom specifying means of transport, weight, number or volume, and point and date of dispatch.
Delivery cost: the tender must state whether delivery cost is included in the price; if not, it is deemed to be included.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPrices or rates may include an amount for price adjustment, calculated per the formula stated in the agreement.
Payment may be made in any currency, with one exchange rate used to convert to ZAR; non-ZAR payments shall not exceed amounts stated in the agreement.
Eskom's CPA (IG) form must be duly completed by the supplier.
Eskom will pay within 30 days after receipt of a correct tax invoice.
Eskom's VAT registration number (4740101508) must appear on the tax invoice before payment is made.
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Payment: Eskom will pay within 30 days after receipt of a correct tax invoice.
VAT: Eskom's VAT registration number (4740101508) must appear on the tax invoice before payment is made.
Currency: payment may be made in any currency, with one exchange rate used to convert to ZAR; payments in non-ZAR currency shall not exceed amounts stated in the agreement.
Price adjustment: prices or rates may include an amount for price adjustment, calculated per the formula in the agreement.
CPA (IG) form: must be duly completed by the supplier.
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Statutory requirements: the supplier must adhere to all statutory requirements relevant to the agreement, governed by the law of the RSA, and submit to the jurisdiction of SA courts.
No specific B-BBEE, CIDB, CSD, or tax compliance requirements are stated in the provided document.
Description
Source: C1 2b SC3 Data by Supplier.docThe contract data form (Part C2) must be completed in full by the Supplier, according to the options chosen, to create a complete contract. The form captures essential contract details such as supplier identification, pricing, delivery dates, and programme references.
Technical Specifications
Source: C1 2b SC3 Data by Supplier.doc (unknown)The Supplier must complete the Contract Data in full, according to the options chosen, to create a complete contract. Required data includes: supplier name, address, telephone and fax numbers; tendered total of prices (in words and figures); price schedule reference (Part C2, C2.1); matters to be included in the Risk Register; restrictions to access for the Supply Manager and others; delivery dates for goods and services; programme reference; and the percentage for overheads and profit added to the Defined Cost.
Financial Requirements
Source: C1 2b SC3 Data by Supplier.doc (unknown)The tendered total of the prices must be stated in words and figures. The price schedule is in Part C2, C2.1. The percentage for overheads and profit added to the Defined Cost must be specified.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Bidders must comply with the Quality Control Plan (QCP) approval process. The QCP outlines intervention points (Hold, Witness, Document Review, Surveillance, Verification) and inspection/test methods (e.g., visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current). Acceptance criteria include functionality, performance measures, regulatory compliance, and chemical tests. Statutory and non-statutory requirements apply as indicated.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The tender is for the supply and delivery of Kriel Power Station EMD (Electro-Mechanical?) spares on an 'as and when' required basis for a period of 3 years. The scope of work is to be detailed in the Quality Control Plan (QCP) or Inspection Test Plan (ITP). The QCP must include item/plant/material description, activities, intervention points, inspection and test methods, controlling documents, acceptance criteria, and records.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No specific compliance requirements (e.g., CSD registration, B-BBEE level, CIDB grading, tax clearance) are stated in the available document. Bidders must comply with the Quality Control Plan approval process and any applicable statutory or non-statutory requirements as indicated in the QCP.
Contact Information
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Enquiries must be directed in writing to the Eskom Representative identified in the enquiry document. No other Eskom official may be contacted.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Submission method: paper only, unless the Tender Data states otherwise. Facsimile and email submissions are not accepted unless expressly allowed.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)The tender is for the supply and delivery of Kriel Power Station EMD Spares on an "as and when" required basis for a period of 3 years.
Financial Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Pricing format:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Eligibility:
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docxThe document is the Eskom eTendering System Suppliers Help Manual, which explains how suppliers register and upload tender documents electronically. It does not contain the tender specification for the supply and delivery of Kriel Power Station EMD spares.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission is electronic only via the Eskom eTendering system.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)No evaluation criteria are stated in the provided document. The only stated requirement is that bidders must have a CSD number to access the eTendering system.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The document is a user manual for the Eskom eTendering system, not the tender specification. It describes how suppliers upload tender documents electronically. No technical specifications for the supply and delivery of Kriel Power Station EMD spares are included.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)A CSD (Central Supplier Database) number is required to access the eTendering system.
Description
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdfKriel Power Station requires the supply and delivery of EMD spares on an "as and when" required basis for a period of 3 years. The spares are for the Electrical Maintenance Department to support operational efficiency, routine maintenance, and critical projects. Suppliers must demonstrate a proven track record of delivering quality equipment, exceptional customer service, and competitive pricing.
Evaluation Criteria
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdf (unknown)Suppliers must meet the quality management requirements of ISO 9001, QM 58 Supplier Contract Quality Requirements, and Eskom standard 240-55944466.
Technical Specifications
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdf (unknown)Supply and delivery of EMD spares on an "as and when" required basis for a period of 3 years.
Items and quantities:
All equipment must be new and meet the specified standards and quality.
Experience & Qualifications
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdfSuppliers must demonstrate a proven track record of delivering quality equipment, providing exceptional customer service, and offering competitive pricing.
Quality Management
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdfQuality control on incoming product will be done, and all equipment is to be signed off by the appointed QC personnel, Engineer, or End User to ensure the quality of the goods is according to standard.
Compliance with ISO 9001 Quality Management Systems is required.
Financial Requirements
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdf (unknown)All guarantees and warranties that come as part of the sale will be passed on to Eskom, even if Eskom does not buy the items directly from the OEM.
Goods may be returned to the supplier without penalty and at the supplier's risk and expense if they fail to satisfy the requirements and standards within six months after delivery, in terms of Section 56(2) of the Consumer Protection Act.
Compliance Requirements
Source: Scope of work Supply and delivery of Kriel Power Station EMD Spares AS AND WHEN required basis for a period of 3 years_kk.pdf (unknown)Quality management compliance required: ISO 9001, QM 58 Supplier Contract Quality Requirements, and Eskom standard 240-55944466.
Description
Source: C2 SC3 Pricing Data.docSupply and delivery of EMD spares for Kriel Power Station on an "as and when" required basis for a period of 3 years. The spares include air handling units, compressors, electrical meters, toolboxes, resistors, air conditioners, test probes, and batteries.
Technical Specifications
Source: C2 SC3 Pricing Data.doc (unknown)The price schedule lists the following items to be priced by the bidder:
Bidders must ensure they quote against the correct drawing revision number where applicable.
Financial Requirements
Source: C2 SC3 Pricing Data.doc (unknown)Pricing is on a priced contract basis under the NEC3 Supply Contract (SC3).
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfThe tender is for the supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of 3 years. The scope includes providing spares, ensuring quality, delivery within 8 weeks, warranty, preservation, and technical support.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Closing date: 14 December 2026 at 10:00
Clarification meeting (non-compulsory): 02 December 2026 at 10:00, via Microsoft Teams
Clarification queries deadline: 7 working days before tender submission deadline
Tender validity period: 90 days from closing date and time (note: Tender Data states 52 weeks; the earlier statement of 90 days appears in the invitation header, but the Tender Data overrides with 52 weeks)
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Eskom Representative (for all queries):
Procurement Manager (signatory on invitation):
Fraud and corruption reporting:
Submission: via Eskom E-tendering site (no physical address provided)
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Submission method: electronic only, via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable forms (all must be completed, signed where required, and submitted at closing unless noted):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Evaluation stages:
Contractual requirements (not evaluation criteria, assessed after ranking): CSD registration, and possibly SHEQ requirements, financial viability (financial statements), or others. Failure to meet by deadlines may render the bidder non-responsive.
Objective criteria may apply; Eskom may award to a tenderer other than the highest scorer if justified.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Scope: Supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of 3 years.
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfMethodology (weight 40% in qualitative evaluation):
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfExperience requirement (under Technical Compliance, weight 20%):
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfQuality requirements (evaluated under qualitative criteria, weight 20%):
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfPricing schedule/BOQ is attached to the tender. Must be submitted in PDF and Excel format.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Payment terms:
Pricing:
Security for performance:
Financial viability:
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdf (RFP)Mandatory contractual requirements (proof required prior to award):
Additional contractual requirements (if applicable):
Tax compliance:
B-bbee:
Employment Equity:
Safety:
Quality:
Environmental:
Eligibility:
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfSafety requirements (returnables):
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfEnvironmental requirements: documents as required per scope of work. No specific environmental criteria detailed in the extracted text.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfContract conditions: NEC (New Engineering Contract) will apply.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 EMD Spares.pdfAdditional evaluation criteria:
Description
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdfSupply and delivery of EMD spares to Kriel Power Station on an as-and-when-required basis for a period of 36 months.
Contact Information
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdf (unknown)Buyer: Mataboge Mogashoa
Business unit: Kriel Power Station
Evaluation Criteria
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdf (unknown)Specific goals (B-BBEE status level) earn up to 10 points under the 90/10 system or 20 points under the 80/20 system. Points for price and specific goals are added and rounded to two decimals; the contract is awarded to the highest total. Bidders who fail to submit the required B-BBEE documentation are not disqualified but score only on price (out of 90 or 80) and receive 0 for specific goals.
B-BBEE points table:
Technical Specifications
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdf (unknown)Supply and delivery of EMD (electro-mechanical drive?) spares to Kriel Power Station on an as-and-when-required basis for a period of 36 months.
Pricing Schedule
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdfTenderers must separate their proposal into local and imported components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdf (unknown)Local procurement content target: 100%. Tenderers must separate their proposal into local and imported components as per the Price Schedule; local content is total spending minus the imported component.
Compliance Requirements
Source: SDL&I Strategy for Supply and Delivery of EMD spares.pdf (unknown)B-BBEE evidence required to claim preference points:
B-BBEE improvement obligations:
Sworn affidavit validity requirements:
Description
Source: C1 2a SC3 Data by Purchaser (23).docSupply and delivery of EMD spares for Kriel Power Station on an "as and when" required basis for a period of 3 years. The contract is governed by the NEC3 Supply Contract with Eskom's standard conditions.
Important Dates
Source: C1 2a SC3 Data by Purchaser (23).doc (unknown)Contract start date: 01 April 2027
Contract end date: 31 March 2030
Defects date: 52 weeks from date of delivery and acceptance by the Purchaser.
Contact Information
Source: C1 2a SC3 Data by Purchaser (23).doc (unknown)Supply Manager: Michael Meso
Email: [email protected]
Address: Eskom Holdings SOC Limited, Kriel Power Station, Generation, Group, Cluster 3, Ogies/Bethal Road, Kriel
Purchaser: Eskom Holdings SOC Ltd (reg no: 2002/015527/30)
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Telephone: 011 871 3706
Evaluation Criteria
Source: C1 2a SC3 Data by Purchaser (23).doc (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin). B-BBEE status applies; any change in B-BBEE status must be notified to Eskom within 7 days, with an updated verification certificate submitted within 30 days. No specific CIDB grading or local content percentage is stated in the provided document.
Technical Specifications
Source: C1 2a SC3 Data by Purchaser (23).doc (unknown)Goods: EMD spares, supplied on an "as and when" required basis for a period of 3 years.
Delivery: As per agreed delivery schedule lead time per task order, as specified in Part C2/C3 of the NEC contract.
The supplier must submit a first programme within 2 days after order placement, and revised programmes at intervals no longer than 2 working days following the accepted revision.
Financial Requirements
Source: C1 2a SC3 Data by Purchaser (23).doc (unknown)Payment terms: 30 days for contracts with a value less than R50M; 60 days for contracts with a value greater than R50M.
Interest rate: publicly quoted prime rate of Standard Bank of South Africa (365-day year) for amounts due in Rands; LIBOR for other currencies.
Currency: South African Rand.
Assessment interval: 1 week after each delivery acceptance.
Delay damages: 5% per day of the total purchase order value for late delivery of all EMD spares.
Low performance damages: R20,000 for not adhering to the period for reply (within 24 hours) and R20,000 for not adhering to defects period (clauses 43.2 and 42.2).
Supplier's liability for indirect or consequential loss is limited to R0.00 (zero Rand).
Supplier's total liability limited to the total of the Prices.
End of liability date: 1 year after delivery of the spare to the plant.
Insurance: Supplier must provide insurances per Insurance Table A (loss/damage to goods, liability for property damage/bodily injury, etc.) with minimum cover as stated.
Compliance Requirements
Source: C1 2a SC3 Data by Purchaser (23).doc (unknown)Bidders must be registered on the CSD and have a valid tax clearance.
B-BBEE status applies; changes must be notified within 7 days and updated certificate submitted within 30 days.
No specific CIDB grading or local content percentage stated.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). Failure to fully complete and submit this form within the prescribed period will result in disqualification.
Description
Source: Commercial Code of Ethics 32-527 Rev 0.pdfEskom's Code of Ethics defines the ethical standards and behaviour required of all directors, employees, and those acting on behalf of Eskom. It is based on the values of Integrity, Excellence, Customer Satisfaction, and Innovation, and applies to interactions with colleagues, customers, suppliers, shareholders, the environment, and the public. The code is mandatory and non-compliance may result in disciplinary action.
Contact Information
Source: Commercial Code of Ethics 32-527 Rev 0.pdf (unknown)Ethics Office advice line: +27 11 800 3187/3189
Email: [email protected]
Fax: 086 663 4120
Whistle-blowing hotline: 0800 11 27 22
Evaluation Criteria
Source: Commercial Code of Ethics 32-527 Rev 0.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance. Suppliers must accept and adhere to Eskom's Code of Ethics. No other specific eligibility criteria are stated in the document.
Technical Specifications
Source: Commercial Code of Ethics 32-527 Rev 0.pdf (unknown)Eskom requires all directors, employees, and those acting on its behalf to adhere to its Code of Ethics, which outlines expected ethical standards and behaviour. The code covers values of Integrity, Excellence, Customer Satisfaction, and Innovation, and applies to interactions with colleagues, customers, suppliers, and stakeholders. Suppliers are expected to receive the Code of Ethics brochure as part of contract documentation and to comply with its standards.
Compliance Requirements
Source: Commercial Code of Ethics 32-527 Rev 0.pdf (unknown)Bidders must be registered on the CSD and have a valid tax clearance. Suppliers must accept and adhere to Eskom's Code of Ethics. No other specific compliance requirements are stated in the document.
Health & Safety
Source: Commercial Code of Ethics 32-527 Rev 0.pdfEskom requires a safe and healthy environment for all stakeholders, and compliance with safety, health, and environmental legislation and Eskom policies.
Description
Source: C1 1 SC3 Offer Acceptance.docSupply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of three years.
Contact Information
Source: C1 1 SC3 Offer Acceptance.doc (unknown)Purchaser: Eskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199. No other contacts are provided in the document.
Submission Guidelines
Source: C1 1 SC3 Offer Acceptance.doc (unknown)Returnable documents: the Form of Offer and Acceptance (C1.1) must be completed, signed by a duly authorised representative, and submitted. The Schedule of Deviations, if any, must be attached. The offered total prices (exclusive of VAT, VAT at 15%, and inclusive of VAT) must be stated. The tenderer must contact the Purchaser's agent within two weeks of receiving the signed agreement to arrange delivery of any securities, bonds, guarantees, proof of insurance, and other required documentation. Failure to fulfil these obligations constitutes repudiation of the agreement.
Evaluation Criteria
Source: C1 1 SC3 Offer Acceptance.doc (unknown)No specific evaluation criteria (such as scoring split, minimum qualifying score, or preference point system) are stated in the provided document. The tender is subject to the Conditions of Tender and the Conditions of Contract identified in the Contract Data. The Schedule of Deviations is to be completed by the Purchaser prior to contract award.
Technical Specifications
Source: C1 1 SC3 Offer Acceptance.doc (unknown)The procurement is for the supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of three years. The scope of work is detailed in Part C3 (Scope of Work: Goods Information including Supply Requirements).
Financial Requirements
Source: C1 1 SC3 Offer Acceptance.doc (unknown)The offered total of the Prices exclusive of VAT, Value Added Tax at 15%, and the total inclusive of VAT must be stated. The inclusive amount is required for budgeting purposes only; actual amounts due will be assessed per the conditions of contract. The tenderer must provide any securities, bonds, guarantees, and proof of insurance as required by the conditions of contract.
Compliance Requirements
Source: C1 1 SC3 Offer Acceptance.doc (unknown)No specific compliance requirements (such as CSD registration, tax clearance, B-BBEE level, or CIDB grading) are stated in the provided document. The tenderer must comply with the Conditions of Tender and the Conditions of Contract.
Important Dates
Source: 240-68099512 (Rev 9) Form A Tender .pdf (unknown)Closing date: 11 December 2025 (per the quality form signature date; the tender record lists 14 December 2026). No closing time is stated.
Contact Information
Source: 240-68099512 (Rev 9) Form A Tender .pdf (unknown)Eskom quality representative:
No email, telephone, or submission address provided.
Submission Guidelines
Source: 240-68099512 (Rev 9) Form A Tender .pdf (unknown)Returnable documents:
Submission method and address: not stated in the provided document.
Closing time: not stated in the provided document.
Evaluation Criteria
Source: 240-68099512 (Rev 9) Form A Tender .pdf (unknown)The document is a quality requirements form (Form A) and does not specify evaluation criteria, scoring, or preference points. No minimum qualifying score is stated.
Technical Specifications
Source: 240-68099512 (Rev 9) Form A Tender .pdf (unknown)Scope: Supply and delivery of Mill Reject Chamber Brushes on an as-and-when-required basis for a period of five years (per the enquiry description in the form).
Quality requirements:
Quality Management
Source: 240-68099512 (Rev 9) Form A Tender .pdfQuality management requirements:
Compliance Requirements
Source: 240-68099512 (Rev 9) Form A Tender .pdf (unknown)No specific eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document. Bidders must complete and sign the tenderer's quality representative section of Form A.
Description
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdfThe tender is for the supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of 3 years. The scope includes adherence to Eskom's safety, health and environmental requirements.
Submission Guidelines
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdf (unknown)Safety evaluation criteria (as part of bid evaluation):
Technical Specifications
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdf (unknown)Scope: Supply and delivery of Kriel Power Station EMD Spares on an 'as and when' required basis for a period of 3 years.
Safety requirements for the scope of work:
Compliance Requirements
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdf (unknown)Mandatory safety compliance:
Health & Safety
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdfMandatory safety returnables:
Section
Source: SAFETY HEALTH RETURNABLES THAT CONTRACOTORS ,SUPPLIERS AND COMPANIES SHOULD COMPLY TO..pdfSafety evaluation criteria include submission of signed Annexure B, a compliant OHS Plan, a Baseline Risk Assessment with methodology, a valid Letter of Good Standing (COIDA or equivalent), and an OHS policy signed by CEO/MD.
Description
Source: C3 1 SC3 Purchasers Goods Information.docThe procurement establishes a three-year arrangement for the supply and delivery of EMD spares to Kriel Power Station on an 'as and when required' basis. The purpose is to ensure timely availability of genuine, fit-for-purpose, and technically compliant spares for operation, maintenance, repair, and reliability of equipment. The appointed supplier is responsible for sourcing, supply, quality assurance, packaging, and delivery of spares per approved specifications and purchase orders. Orders are placed only when specific spares are required.
Contact Information
Source: C3 1 SC3 Purchasers Goods Information.doc (unknown)No contact details provided in the document.
Submission Guidelines
Source: C3 1 SC3 Purchasers Goods Information.doc (unknown)Returnable documents: none specified in the provided document.
Submission method: not stated in the provided document.
Closing time: 08:00 (from tender record).
Evaluation Criteria
Source: C3 1 SC3 Purchasers Goods Information.doc (unknown)Evaluation criteria not detailed in the provided document. The document focuses on contractual and compliance requirements rather than scoring.
Preference points system: not stated.
Technical Specifications
Source: C3 1 SC3 Purchasers Goods Information.doc (unknown)Supply and delivery of EMD spares to Kriel Power Station on an 'as and when required' basis for 3 years.
Items include air handling units, compressors, electrical meters, toolboxes, resistors, air conditioners, test probes, batteries, and clamp meters.
Quantities range from 3 to 204 units per item.
All goods must be genuine, fit-for-purpose, and technically compliant.
Technical datasheets must be supplied with goods.
Packaging must prevent mechanical damage.
Damaged goods due to supplier fault must be corrected at supplier's cost.
Goods must be designed and manufactured per applicable design standards.
Maintenance manuals must be submitted upon delivery.
Delivery to Kriel Power Station Main Stores.
End-user must be notified two days before delivery.
Delivery hours: Monday-Thursday 07:00-14:30, Friday 07:00-10:00.
Each unit must have a permanent tag plate with manufacturer name, country of origin, year of manufacture, and manufacturer reference.
Supplier must confirm availability of rigging equipment, cranes, or forklift with the Supply Manager before dispatch.
All contractual communications must be in letters or forms attached to emails, not in the email body.
Supplier must comply with Section 10 of the Occupational Health and Safety Act (Act No. 85 of 1993).
Supplier must submit a safety file for approval before access is granted.
Supplier must comply with site environmental management plan and waste management procedures.
Quality Control Plan (QCP) must be approved by supplier, Eskom engineer, and QC inspector before deliveries commence.
Material certificates, mechanical testing certificates, and NDT certificates must accompany QCPs.
Supplier must comply with Eskom's Supply Quality Management Specification (Document No: 240-105658000) and ISO 9001:2015.
Supplier must allocate 3% of total contract expenditure towards CSI initiatives.
Failure to meet SDL&I obligations may be treated as a default under the contract.
Financial Requirements
Source: C3 1 SC3 Purchasers Goods Information.doc (unknown)Invoicing: tax invoice must be submitted within one week of receiving a payment certificate.
Invoice must be addressed to [email protected] and include: contractor name and address, contract number and title, contractor's VAT number, employer's VAT number 4740101508, description of services, total amount excluding VAT, VAT amount, total including VAT, purchase order number, invoice number, GR number, and supplier's banking details.
Bonds and guarantees: not applicable to this contract.
Insurance provided by the purchaser: not applicable.
Compliance Requirements
Source: C3 1 SC3 Purchasers Goods Information.doc (unknown)CSD registration: not stated.
Tax compliance: not stated.
B-BBEE: not stated.
CIDB grading: not applicable (supply contract).
Occupational Health and Safety Act compliance required.
ISO 9001:2015 compliance required.
Eskom Supply Quality Management Specification (240-105658000) compliance required.
Safety file submission required before site access.
Temporary access permits required for all supplier personnel.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Betha/Ogies Road - Kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
26
Last checked
20 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 2 250 212
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog